Loading...
HomeMy WebLinkAbout20050732 Ver 12_Final SW Management Plan Design_20081031? f' t w oq THE JOHN R. McADAMS COMPANY, INC. 01) 31 V12, Ve.r 'T BRIAR CHAPEL - PHASE 4 CHATHAM COUNTY, NORTH CAROLINA FINAL STORMWA TER MANAGEMENT PL4N DESIGN WATER QUALITYPONDS #1- #6 NEW-05042 Research Triangle Park, NC Post Office Box 14005 i Research Triangle Park, North Carolina 27709 October 2008 2905 Meridian Parkway Durham, North Carolina 27713 800-733-5646 919-361-5000 919-361-2269 Fax 67'01rCarmel oad Suite 205 Charlotte, North Carolina 28226 800-733-5646 Jeremy V. Finch, PE Q(? l a3 1 2008 704-527-0800 Stormwater Project Manager 704-527-2003 Fax ;u.; ?j, wUALITY W? r ,yu 4t :i 6TORWATER BRANCH Wilmington, NC 3904 Oleander Drive Suite W10 Wi'*North Carolina 28403 80, 46 910-799-8181 910-799-8171 Fax wwwjohnrmcadams.com Design Services Focused On Client Success BRIAR CHAPEL - PHASE 4 is Final Stormwater Management Facility Design - Water Quality Ponds #1 - 96 General Description Located off of US Highway 15-501, north of Andrews Store Road and south of Mann's Chapel Road in Chatham County, NC is the proposed development known as Briar Chapel. Phase 4 of the proposed development is approximately 140-acres and will consist of the construction of single- family lots, a clubhouse/amenity center, along with the associated utility, parking, and roadway infrastructure. The overall proposed Briar Chapel development is located within the Cape Fear River Basin, and drains to a stream (Pokeberry Creek) classified as Water Supply IV (WS-IV), and Nutrient Sensitive Waters (NSW). As a result of the proposed development exceeding the maximum allowable limit for stream impacts, an individual permit issued by The United States Army Corps of Engineers (USACE) was required (Clean Water Act Section 404 permit). Also, a Clean Water Act Section 401 Water Quality Certification from NCDWQ was attached to the individual permit. Under the 401 Water Quality Certification issued by NCDWQ, the proposed site will be required to comply with the following stormwater management requirements: 1. A final written stormwater management plan for each subwatershed (including signed and notarized Operation and Maintenance agreements) shall be submitted to the 401 Oversight and Express Permitting Unit. The stormwater management plan may be submitted to DWQ in phases for written approval as long as no impact to wetlands or streams occur in that phase until written approval is received from DWQ. • 2. The stormwater plans shall utilize constructed wetlands, bioretention areas, wet ponds followed by forested filter strips and similar best management practices designed to remove nutrients. The stormwater management plan must include plans, specifications, and worksheets for stormwater management facilities that are appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NCDENR Stormwater Best Management Practices Manual. 3. For low density areas of the project with low impervious surface area, engineered stormwater management facilities are not expected. For these areas of lower impervious area, similar best management practices that remove nutrients such as grassed swales and vegetated riparian buffers should be sufficient rather than more intensive engineered stormwater devices such as constructed wetlands. In addition to the above DWQ stormwater requirements, the following stormwater quality and quantity items are required per Section 8.3 ("Stormwater Controls") of the Chatham County Compact Communities Ordinance: 1. Control and treat the first inch of runoff from the project site and from any offsite drainage routed to an on-site control structure. Ensure that the draw down time for this treatment volume is a minimum of forty eight (48) hours and a maximum of one hundred and twenty (120) hours. 2. Maintain the discharge rate for the treatment volume at or below the pre-development discharge rate for the ]-year, 24-hour storm. To satisfy these stormwater requirements, Phase 4 of the Briar Chapel development will be treated • via water quality ponds with preformed scour hole/level spreader outlets that will provide sheet flow of the 1" runoff volume into the existing stream buffers. The existing stream buffers downstream of these facilities will be utilized as forested filter strips. This report contains the final design . calculations for water quality ponds #1 thru #6. These water quality ponds have been designed so that both the water quality and water quantity requirements described above are satisfactorily met. Please refer to the summary of results and discussion of results sections of this report for additional information. Calculation Methodolo y Rainfall data for the Chatham County, NC region is derived from USWB Technical Paper No. 40 and NOAA Hydro-35. This data was used to generate a depth-duration-frequency (DDF) table describing rainfall depth versus time for varying return periods in the Chatham County region. These rainfall depths were then input into the meteorological model within HEC-HMS for peak flow rate calculations. Please reference the rainfall data section within this report for additional information. Using maps contained within the Chatham County Soil Survey, the watershed soils were determined to range from hydrologic soil group (HSG) `B' to HSG `C' soils. Since the method chosen to compute the post-development peak flow rates and runoff volumes is dependent upon the soil type, all hydrologic calculations are based upon the percentage of HSG `B' and HSG `C' soils within each subbasin. Within each subbasin, the proportion of each soil group was determined using soils information. Once the proportion was determined, a composite SCS CN was computed for each cover condition. For example, the post-development condition of the drainage area to WQ Pond #1 consists of approximately 95% HSG `B' soils and 5% HSG `D' soils. Therefore, for the open area cover condition, the composite SCS CN is computed as follows • (assuming good condition) Composite Open SCS CN (0.95*61) + (0.05 *80) - 62 This type of calculation was done for each of the studied subbasins in the post-development condition in an effort to accurately account for the difference in runoff between HSG `B' soils and HSG `C' soils. A composite SCS Curve Number was calculated for the post-development condition using SCS curve numbers and land cover conditions. Land cover conditions for the post- development condition were taken from the proposed development plan. The post-development time of concentration to the water quality ponds were all assumed to be 5 minutes in the post-development condition. All on-site topo was taken from aerial topography information provided to The John R. McAdams Company, Inc. The drainage map for the post-development. condition has been included in this report. HEC-HMS Version 2.2.2, by the U.S. Army Corps of Engineers, was used to generate post- development peak flow rates for the water quality ponds. Final routing calculations for the ponds were also performed within HEC-HMS. Pondpack Version 8.0, by Haestad Methods, was used to generate the stage-discharge rating curves for the proposed water quality ponds. These rating curves were input into HEC-HMS for routing calculations. • The stage-storage rating curve and stage-storage function for the proposed water quality ponds were both generated externally in a spreadsheet and then input into HEC-HMS. Velocity dissipaters are provided at the end of the principal spillway outlets for the water quality ponds to prevent erosion and scour in the downstream area. The dissipaters are constructed using riprap, underlain with a woven geotextile filter fabric. The filter fabric is used to minimize the loss of soil particles beneath the riprap apron. The dissipaters are sized for the 10-year storm event using the NYDOT method. It is a permanent feature of the outlets. Water quality sizing calculations were performed in accordance with the N.C. Stormwater Best Management Practices manual (NCDENR April 1999). The normal pool surface area for the water quality ponds were sized by calculating the average depth and then selecting the appropriate SAIDA ratio from the water quality pond section of the NCDENR manual. A temporary storage pool for the 1" runoff volume is provided in the ponds, to be drawn down in 2 to 5 days using an inverted siphon. For 100-year storm routing calculations, a "worst case condition" was modeled in order to ensure the proposed ponds would safely pass the 100-year storm event. The assumptions used in this scenario are as follows: 1. The starting water surface elevation in the ponds, just prior to the 100-year storm event, is at the top of the principal spillway structures. This scenario could occur as a result of a clogged siphon or a rainfall event that lingers for several days. This could also occur as a result of several rainfall events in a series, before the inverted siphon has an opportunity to draw down the storage pool between NWSE and the riser crest elevation. is 2. A minimum of 0.5-ft of freeboard between the peak elevation during the "worst case" scenario and the top of the dam was achieved for the water quality ponds. The downstream tailwater elevation for the ponds was assumed to be a free outfall condition during the 1-year storm event (a conservative assumption). The 100-year tailwater elevation for the ponds was assumed to be free outfall because the 100-year floodplain elevation downstream of the ponds is below the invert out elevation. Discussion of Results As previously stated, this report contains the final design calculations for the proposed water quality ponds #1 thru #6 located within Phase 4 of the Briar Chapel development. These ponds will function as "dual-purposed facilities" by providing both water quality and water quantity (for the 1- year storm only). Please refer to the Summary of Results tables for additional information. Conclusion If the development on this tract is built as proposed within this report, then the requirements set forth in the Water Quality Certification #3402 (WQC 93402) and Section 8.3 ("Stormwater Controls") of the Chatham County Compact Communities Ordinance will be met with the proposed water quality ponds. However, modifications to the proposed development may require that this analysis be revised. Some modifications that would require this analysis to be revised include: 0 i. The proposed site impervious surface exceeds the amount accounted for in this report. 2. The post-development watershed breaks change significantly from those used to prepare this • report. The above modifications may result in the assumptions within this report becoming invalid. The computations within this report will need to be revisited if any of the above conditions become apparent as development of the proposed site moves forward. • 0 • • BRIAR CHAPEL - PHASE 4 NEW-05042 WATER QUALITY POND #1 SUMMARY OF RESULTS J. FINCH, PE 10/13/2008 Return Period Inflow [cfs] Outflow [cfs] Max. WSE [ft] Freeboard [ft] 1-Year 38.82 0.43 413.43 2.57 10-Year 104.73 66.87 414.18 1.82 25-Year 134.66 110.08 414.41 1.59 100-Year (Siphon Unclogged) 181.48 163.32 414.66 1.34 100-Year (Siphon Clogged) 181.48 165.28 414.67 1.33 Design Draina e Area = 22.20 acres Design Impervious Area = 9.61 acres To of Dam = 416.00 ft Required Surface Area / Drainage Area Ratio = 1.53 Surface Area at NWSE = 19068 sf Required Surface Area at NWSE = 14749 sf Si hon Diameter = 3 _ inches Total Number of Siphons = 1 Armorflex Principal Spillway Weir Length 50 ft Armorflex Principal Spillway Weir Crest Elevation 413.60 ft Foreba Weir Length = 65 ft Forebay Weir Crest Elevation = 415.00 _ ft 0 BRIAR CHAPEL - PHASE 4 SUMMARY OF RESULTS NEW-05042 • • 0 WATER QUALITY POND #2 J. FINCH, PE 10/13/2008 Return Period Inflow [cfs] Outflow [cfs] Max. WSE [ft] Freeboard [ft] 1-Year 58.73 0.45 423.22 3.03 10-Year 136.58 _ 49.95 424.38 1.87 25-Year 167.15 110.39 424.80 1.45 100-Year (Siphon Unclogged) 214.38 192.35 425.14 1.11 100-Year.(Siphon Clogged) 214.38 197.31 425.19 1.06 Design Drainage Area = 28.31 acres Design Impervious Area = 13.83 acres To of Dam = 426.25 ft Required Surface Area / Drainage Area Ratio = 1.77 Surface Area at NWSE = 25110 sf Required Surface Area at NWSE = 21837 sf Siphon Diameter = ^ 3 inches Total Number of Siphons = 1 Riser Length = 6 ft Riser Width = 6 ft? Riser Crest = 423.60 ft Barrel Diameter = 42 inches # of Barrels = I Invert In = 414.00 feet Invert Out = 413.00 feet Length = 68 feet Slope = 0.0147 ft/ft Emergency Spillway Weir Length 30 ft Emergency Spillway Weir Crest Elevation = 424.50 ft BRIAR CHAPEL - PHASE 4 SUMMARY OF RESULTS J. FINCH, PE NEW-05042 10/13/2008 • WATER QUALITY POND #3 Return Period Inflow [cfs] Outflow [cfs] Max. WSE [ft] Freeboard [ft] 1-Year 19.61 0.15 434.90 3.10 10-Year ~ 47.78 9.69 435.84 2.16 25-Year 59.12 24.32 436.13 1.87 100-Year (Siphon Unclogged) 76.70 46.42 436.59 1.41 100-Year (Siphon Clogged) 76.70 47.21 436.82 1.18 Design Drainage Area = 10.53 acres Design Impervious Area = 4.29 acres To of Dam = 438.00 ft Re uired Surface Area / Drainage Area Ratio = 1.62 Surface Area at NWSE = 17411 sf Required Surface Area at NWSE = 7428 sf Siphon Diameter = 2 inches Total Number of Siphons = 1 Riser Length = M 4 ft Riser Width = 4 ft Riser Crest = 435.50 ft Barrel Diameter = 24 inches of Barrels = 1 Invert In = 426.50 feet Invert Out= 426.00 feet _ Length = 73 feet Slope = 0.0068 ft/ ft is • • BRIAR CHAPEL - PHASE 4 NEW-05042 WATER QUALITY POND #4 SUMMARY OF RESULTS J. FINCH, PE 10/27/2008 Return Period Inflow [cfs] Outflow [cfs] Max. WSE [ft] Freeboard [ft] 1-Year 61.61 1.06 421.57 2.43 10-Year 134.39 59.59 422.43 1.57 25-Year s 161.92 101.97 422.81 1.19 100-Year (Siphon Unclogged) 204.35 125.77 423.38 0.62 100-Year (Siphon Clogged) 204.35 125.81 423.44 0.56 Design Drainage Area = 25.64 acres Design Impervious Area = 13.9 acres To of Dam = 424.00 ft Required Surface Area / Drainage Area Ratio = 1.79 Surface Area at NWSE = 36163 sf Required Surface Area at NWSE = 20012 sf Siphon Diameter = 3 inches Total Number of Siphons = 1 Riser Length = 6 It Riser Width = 6 ft Riser Crest = 421.55 It Barrel Diameter = 42 inches. of Barrels = 1 Invert In = 414.30 feet Invert Out = 414.00 feet Length = 54 feet Slope = 0.0056 ft/ft LJ BRIAR CHAPEL - PHASE 4 SUMMARY OF RESULTS J. FINCH, PE NEW-05042 10/23/2008 E • WATER QUALITY POND #5 Return Period Inflow [cfs] Outflow [cfs] Max. WSE [ft] Freeboard [ft] 1-Year 32.10 0.40 437.56 2.44 10-Year 71.52 36.33 438.46 1.54 25-Year 86.61 63.56 438.78 1.22 100-Year (Siphon Unclogged) 109.88 94.67 439.10 0.90 100-Year (Siphon Clogged) 109.88 97.97 439.10 0.90 Design Drainage Area = 14.02 acres Design Impervious Area = 7.47 acres To of Dam = 440.00 ft Required Surface Area / Drainage Area Ratio = 1.93 Surface Area at NWSE = 14468 sf Re wired Surface Area at NWSE = 11758 sf Siphon Diameter = 3 inches Total Number of Siphons = 1 Riser Length = 5 ft Riser Width = 5 ft Riser Crest = 437.75 ft Barrel Diameter = 36 inches # of Barrels = 1 Invert In = 428.35 feet Invert Out = 428.00 feet Length = 64 feet Slope = 0.0055 ft/ft 0 BRIAR CHAPEL - PHASE 4 SUMMARY OF RESULTS J. FINCH, PE NEW-05042 10/23/2008 WATER QUALITY POND #6 • 0 Return Period Inflow [cfs] Outflow [cfs] Max. WSE [ft] Freeboard [ft] 1-Year 30.04 1.11 454.03 1.97 10-Year 59.02 41.23 454.77 1.23 25-Year 69.47 58.73 454.98 1.02 100-Year (Siphon Unclogged) 85.61 75.93 455.17 0.83 100-Year (Siphon Clogged) 85.61 76.02 455.17 0.83 Design Drainage Area = 10.08 acres Design Impervious Area = 6.66 acres To of Dam = 456.00 ft Required Surface Area / Drainage Area Ratio = 2.55 Surface Area at NWSE = 12334 sf Required Surface Area at NWSE = 11186 sf Siphon Diameter = 2 inches Total Number of Siphons = 1 Riser Length = 5 ft Riser Width = 5 ft Riser Crest = 454.00 ft Barrel Diameter = 36 inches # of Barrels = 1 Invert In = 448.25 feet Invert Out = 448.00 feet Length = 48 feet Slope = 0.0052 ft/ft E • RAINFALL DATA 2 SOILS DATA 3 USGS MAP 4 FEMA FLOODPLAIN MAP POST-DEVELOPMENT 5 HYDROLOGIC CALCULATIONS WATER QUALITY POND #1 FINAL 6 DESIGN CALCULATIONS WATER QUALITY POND #2 FINAL 7 DESIGN CALCULATIONS 8 WATER QUALITY POND #3 FINAL DESIGN CALCULATIONS 9 WATER QUALITY POND #4 FINAL DESIGN CALCULATIONS 1 WATER QUALITY POND #5 FINAL 0 DESIGN CALCULATIONS 11 WATER QUALITY POND #6 FINAL DESIGN CALCULATIONS 0 BRIAR CHAPEL MASTER IMPERVIOUS AREA SUMMARY - PHASE 4 Mazimum Im rvious Per Lot Impervious Surface Treated Per Stormwater Management Facili Construction Drawing Lot # Plat Lot # Lot Type Impervious Area [s WQ Pond #1 WQ Pond #2 WQ Pond #3 WQ Pond #4 WQ Pond #5 WQ Pond #6 Bypass 1 198 100' Lot 4,600 4,600 2 197 100' Lot 4,600 4,600 3 196 100' Lot 4,600 4,600 4 195 100' Lot 4,600 4,600 5 194 100' Lot 4,600 4,600 6 193 100' Lot 4,600 4,600 7 192 100' Lot 4,600 4,600 8 191 100' Lot 4,600 4,600 9 190 100' Lot 4 600 4,600 10 189 100' Lot 4 600 4 600 11 188 100' Lot 4,600 4 600 12 86 100' Lot 4,600 4 600 13 85 100' Lot 4,600 4,600 14 84 100' Lot 4,600 4,600 15 83 Custom Lot 4,450 4,450 16 82 Custom Lot 4,200 4,200 17 81 Custom Lot 4,200 4,200 18 80 80' Lot 4,300 4,300 19 79 80' Lot 4,300 4 300 20 78 80' Lot 4,300 4,300 21 77 Custom Lot 4,450 4,450 22 76 Custom Lot 4,450 4 450 23 75 80' Lot 4,300 4,300 24 74 80' Lot 4,300 4,300 25 73 80' Lot 4,300 4,300 26 72 80' Lot 4,300 4,300 27 71 Custom Lot 4,450 4,450 28 70 Custom Lot 4,450 4,450 29 69 Custom Lot 4,450 4,450 30 68 Custom Lot 4,300 4,300 31 15 70' Lot 4,000 4,000 32 14 70' Lot 4,000 4,000 33 13 70' Lot 4,000 4,000 34 12 70' Lot 4,000 4,000 35 18 80' Lot 4,300 4,300 36 17 80' Lot 4,300 4,300 37 16 80' Lot 4 300 4,300 38 92 100' Lot 4,600 4,600 39 91 100' Lot 4,600 4,600 40 90 100' Lot 4,600 4,600 41 89 100' Lot 4 600 4,600 42 88 100' Lot 4,600 4,600 43 87 100' Lot 4,600 4,600 44 208 80' Lot 4,300 4,300 45 207 80' Lot 4,300 4,300 46 206 80' Lot 4,300 4.300 47 205 80' Lot 4,300 4,300 48 204 80' Lot 4,300 4,300 49 203 80' Lot 4,300 4,300 50 202 80' Lot 4,300 4,300 51 201 80' Lot 4,300 4,300 52 200 80' Lot 4,300 4,300 53 199 80' Lot 4,300 4,300 54 214 Custom Lot 4,300 4,300 55 213 90' Lot 4,500 4 500 56 212 90' Lot 4,500 4,500 57 211 90' Lot 4 500 4,500 58 210 90' Lot 4,500 4,500 59 209 90' Lot 4,500 4 500 60 97 80' Lot 4,300 4,300 61 96 80' Lot 4,300 4,300 62 95 80' Lot 41300 4,300 63 94 80' Lot 4,300 4,300 64 93 80' Lot 4,300 4,300 65 19 80' Lot 4,300 4,300 66 309 60' Lot 3,700 3,700 67 310 60' Lot 3,700 3,700 68 311 60' Lot 3,700 3,700 69 312 60' Lot 3,700 3,700 70 313 60' Lot 3,700 3,700 71 314 60' Lot 3,700 3,700 72 315 60' Lot 3,700 3,700 73 5 60' Lot 3 700 3,700 74 6 60' Lot 3,700 3,700 75 7 60' Lot 3,700 3,700 76 9 90' Lot 4,500 4,500 77 10 90' Lot 4,500 4,500 78 11 Info Center 8,000 8,000 79 35 80' Lot 4,300 4,300 80 34 Custom Lot 4 600 4,600 81 33 80' Lot 4,300 4,300 82 32 70' Lot 4,000 4,000 83 31 70' Lot 4,000 4,000 84 30 70' Lot 4,000 4,000 85 29 70' Lot 4,000 4,000 86 28 60' Lot 3,700 3,700 87 27 60' Lot 3 700 3,700 88 26 60' Lot 3,700 3,700 89 25 60' Lot 3,700 3,700 90 41 70' Lot 4,000 4,000 91 40 70' Lot 4,000 4 000 92 39 70' Lot 4,000 4,000 93 38 70' Lot 4 000 4,000 94 37 70' Lot 4,000 4,000 95 36 70' Lot 4,000 4,000 96 20 100' Lot 4,600 4,600 97 98 100' Lot 4,600 2,300 2,300 98 99 100' Lot 4,600 4,600 99 100 100' Lot 4,600 4,600 100 101 100' Lot 4,600 4,600 101 102 60' Lot 3,700 3,700 102 103 60' Lot 3,700 3,700 103 104 60' Lot 3,700 3,700 104 105 60' Lot 3,700 3,700 105 106 60' Lot 31700 3,700 106 107 60' Lot .3 700 3,700 107 108 60' Lot 3,700 3,700 108 24 70' Lot 4,000 2 000 2,000 109 23 70' Lot 4,000 4 000 110 22 70' Lot 4,000 4,000 111 21 70' Lot 41000 4,000 112 317 80' Lot 4,300 4,300 113 318 80' Lot 4,300 4,300 114 319 80' Lot 4,300 4,300 115 320 80' Lot 4,300 4,300 116 321 80' Lot 4,300 4,300 117 322 80' Lot 4 300 4,300 118 323 80' Lot 4,300 4 300 119 324 80' Lot 4,300 4,300 120 325 60' Lot 3,700 3,700 121 326 60' Lot 3,700 3,700 BRIAR CHAPEL MASTER IMPERVIOUS AREA SUMMARY - PHASE 4 Maximum m pervious Per Lot Impervious Surface Treated Per Stormwater Management Fscili Construction Drawing Lot # Plat Lot # Lot Type Impervious Area [sfJ WQ Pond.#1 WQ Pond #2 WQ Pond #3 WQ Pond #4 WQ Pond #5 WQ Pond #6 Bypass 122 327 60' Lot 3,700 3,700 123 328 60' Lot 3,700 3,700 124 329 60' Lot 3,700 3,700 125 330 60' Lot 3,700 3,700 126 109 60' Lot 3,700 3,700 127 110 60' Lot 3,700 3,700 128 111 60' Lot 3,700 3,700 129 112 60' Lot 3,700 3 700 130 113 60' Lot 3,700 1,850 1,850 131 114 60' Lot 3,700 3,700 132 331 60' Lot 3,700 3,700 133 332 60' Lot 3,700 3,700 134 333 60' Lot 3,700 3,700 135 334 60' Lot 3,700 3 700 136 335 60' Lot 3,700 3,700 137 336 60' Lot 3,700 3,700 138 351 70' Lot 4,000 4,000 139 352 70' Lot 4,000 4,000 140 353 70' Lot 4,000 2,000 2,000 141 337 50' Lot 3,400 3,400 142 338 50' Lot 3,400 3,400 143 339 50' Lot 3,400 3,400 144 340 80' Lot 4,300 4,300 145 341 80' Lot 4,300 4,300 146 342 80' Lot 4,300 4,300 147 343 80' Lot 4,300 4,300 148 344 80' Lot 4,300 4,300 149 345 80' Lot 4,300 4,300 150 346 80' Lot 4,300 4,300 151 347 60' Lot 31700 3,700 152 348 60' Lot 3,700 3,700 153 349 60' Lot 3,700 3,700 154 350 60' Lot 3 700 3,700 155 118 60' Lot 3,700 3,700 156 117 60' Lot 3,700 3,700 157 116 60' Lot 3 700 3,700 158 115 60' Lot 3,700 3,700 159 131 60' Lot 3,700 3,700 160 130 60' Lot 3,700 3,700 161 129 60' Lot 3,700 3,700 162 128 60' Lot 3,700 3,700 163 127 60' Lot 3 700 3,700 164 126 80' Lot 4,300 4,300 165 125 80' Lot 4,300 4,300 166 124 80' Lot 4,300 4,300 167 123 60' Lot 3,700 3,700 168 122 60' Lot 3,700 3,700 169 121 60' Lot 31700 3,700 170 120 60' Lot 3,700 3,700 171 119 60' Lot 3,700 3,700 172 215 90' Lot 4,500 4,500 173 216 90' Lot 4 500 4,500 174 217 90' Lot 4,500 41500 175 218 90' Lot 4 500 4 ,5.00 176 219 90' Lot 4 500 4,500 177 220 90' Lot 4,500 4 500 178 154 60' Lot 3,700 3,700 179 153 60' Lot 3,700 3,700 180 152 60' Lot 3,700 3,700 181 151 60' Lot 3,700 3,700 182 150 60' Lot 3 700 3,700 183 149 60' Lot 3,700 1,850 1,850 184 148 60' Lot 3,700 3 700 185 147 60' Lot 3,700 3,700 186 146 60' Lot 3,700 3,700 187 145 60' Lot 3,700 3 700 188 144 60' Lot 3,700 3,700 189 143 60' Lot 3,700 3,700 190 142 60' Lot 3,700 3,700 191 141 50' Lot 3,400 3,400 192 140 50' Lot 3,400 3,400 193 139 50' Lot 3,400 3 400 194 138 50' Lot 3 400 3,400 195 137 50' Lot 3,400 3,400 196 257 50' Lot 3,400 3,400 197 256 50' Lot 3,400 3,400 198 255 50' Lot 3,400 3,400 199 254 50' Lot 3,400 3,400 200 253 50' Lot 31400 3,400 201 252 50' Lot 3,400 3,400 202 251 50' Lot 3,400 3,400 203 250 50' Lot 3,400 3,400 204 249 50' Lot 3,400 3,400 205 248 50' Lot 3,400 3,400 206 247 50' Lot 3 400 3,400 207 246 50' Lot 3,400 3 400 208 160 50' Lot 3,400 3,400 209 159 50' Lot 3,400 3,400 210 158 50' Lot 3,400 3,400 211 157 50' Lot 3,400 3,400 212 156 50' Lot 3,400 3,400 213 155 50' Lot 3 400 3,400 214 221 70' Lot 4,000 4,000 215 222 70' Lot 4,000 4,000 216 223 70' Lot 4,000 4,000 217 224 80' Lot 4,300 4,300 218 225 80' Lot 4,300 4,300 219 226 80' Lot 4 300 4,300 220 227 80' Lot 4,300 4,300 221 228 80' Lot 4,300 4,300 222 229 80' Lot 4,300 4,300 223 230 80' Lot 4,300 4,300 224 231 80' Lot 4,300 4,300 225 232 60' Lot 3,700 3,700 226 233 60' Lot 3 700 3,700 227 234 60' Lot 3 700 0 3,70 228 235 60' Lot 3,700 3,700 229 236 60' Lot 3,700 3,700 230 237 50' Lot 3,400 3,400 231 238 50' Lot 3,400 3,400 232 239 50' Lot 3 400 3,400 233 240 50' Lot 3,400 3,400 234 241 50' Lot 3,400 3,400 235 242 50' Lot 3,400 3 400 236 243 50' Lot 3,400 3,400 237 244 50' Lot 3,400 3,400 238 245 50' Lot 3 400 3,400 239 132 50' Lot 3,400 3,400 240 133 50' Lot 3,400 3,400 241 134 50' Lot 3,400 3,400 242 135 50' Lot 3,400 3,400 BRIAR CHAPEL MASTER IMPERVIOUS AREA SUMMARY - PHASE 4 Construction Drawin Lot # Pl t L t # Maximum Im ervious Per Lot Impervious Surface Treated Per Stormwater Management Facili g a o Lot Type Impervious Area sff WQ Pond #1 WQ Pond #2 WQ Pond #3 WQ Pond #4 WQ Pond #5 WQ Pond #6 Bypass 243 136 50' Lot 3,400 3 400 244 258 50' Lot 3,400 3,400 245 259 50' Lot 3,400 3,400 246 260 50' Lot 3,400 3,400 247 261 50' Lot 3,400 3,400 248 262 60' Lot 3,700 3,700 249 263 60' Lot 3,700 3,700 250 264 60' Lot 3,700 3 700 251 265 60' Lot 3,700 3,700 252 266 50' Lot 3,400 3,400 253 267 50' Lot .3 ,400 3,400 254 268 50' Lot 3,400 3,400 255 269 50' Lot 3,400 3 400 256 46 50' Lot 3,400 3,400 257 45 50' Lot 3,400 3,400 258 44 50' Lot 3,400 3,400 259 43 50' Lot 3,400 3,400 260 42 50' Lot 3,400 3,400 261 66 60' Lot 3,700 3,700 262 65 60' Lot 3,700 3,700 263 64 60' Lot 3,700 3,700 264 63 60' Lot 3,700 3,700 265 62 70' Lot 4,000 4,000 266 61 70' Lot 4,000 4,000 267 60 70' Lot 4,000 4,000 268 58 50' Lot 3,400 3,400 269 57 50' Lot 3,400 3,400 270 56 50' Lot 3,400 3,400 271 55 50' Lot 3,400 3,400 272 54 50' Lot 3,400 3,400 273 53 50' Lot 3,400 3,400 274 52 50' Lot 3,400 3,400 275 51 50' Lot 3,400 3,400 276 50 50' Lot 3,400 1,700 1,700 277 49 50' Lot 3,400 3,400 278 48 50' Lot 3,400 3,400 279 47 50' Lot 3,400 3,400 280 270 60' Lot 3,700 3,700 281 271 60' Lot 3,700 3,700 282 272 60' Lot 3,700 3,700 283 273 60' Lot 3,700 3,700 284 274 60' Lot 3,700 3,700 285 275 60' Lot 3,700 3 700 286 276 60' Lot 3,700 31700 287 277 60' Lot 3,700 3,700 288 167 50' Lot 3,400 3,400 289 166 50' Lot 3,400 3,400 290 165 50' Lot 3,400 3,400 291 164 50' Lot 3 400 3 400 292 163 50' Lot 3,400 3,400 293 162 50' Lot 3,400 3,400 294 161 50' Lot 3,400 3,400 600 Centex 4,000 2,000 2,000 601 Centex 4,000 2,000 2,000 602 Centex 4,000 2,000 2,000 603 Centex 4,000 4,000 604 Centex 4,000 4,000 605 Centex 4,000 4 000 606 Centex 4,000 2,000 2,000 607 Centex 4,000 2,000 2,000 608 Centex 4,000 2,000 2,000 609 Centex 4,000 4,000 610 Centex 4,000 4,000 299 60' Lot 3,700 3,700 300 60' Lot 3,700 3,700 301 60' Lot 3,700 3,700 302 60' Lot 3,700 3,700 303 60' Lot 3,700 3,700 304 - 60' Lot 3,700 3,700 305 187 50' Lot 3,400 3,400 306 186 50' Lot 3,400 3,400 307 185 50' Lot 3,400 3,400 308 184 50' Lot 3,400 3,400 309 183 50' Lot 3 400 3,400 310 182 50' Lot 3 400 3,400 311 181 50' Lot 3,400 3,400 312 4 50' Lot 3,400 1,700 1,700 313 3 50' Lot 3,400 1,700 1,700 314 2 50' Lot 3,400 1,700 1,700 315 1 50' Lot 3,400 1,700 1,700 316 316 50' Lot 3,400 1,700 1,700 317 296 30'-40' Lot 2,400 2,400 318 297 30'-40' Lot 2,400 2,400 319 298 30'-40' Lot 2,400 2,400 320 299 30'-40' Lot 2,400 2,400 321 300 30'-40' Lot 2,400 2,400 322 301 30'-40' Lot 2,400 2,400 324 59 70' Lot 4,000 4,000 325 8 Custom Lot 4,350 4,350 326 295 Townhome Lot 2,400 2,400 327 294 Townhome Lot 2,400 2 400 328 293 Townhome Lot 2,400 2,400 329 292 Townhome Lot 2,400 2,400 330 291 Townhome Lot 2,400 2,400 331 290 Townhome Lot 2,400 2,400 332 289 Townhome Lot 2,400 2,400 333 288 Townhome Lot 2 400 2,400 334 287 Townhome Lot 2,400 2,400 335 286 Townhome Lot 2,400 2,400 336 285 Townhome Lot 2,400 2 400 337 284 Townhome Lot 2,400 2,400 338 283 Townhome Lot 2,400 2,400 339 282 Townhome Lot 21400 2,400 340 281 Townhome Lot 2,400 2,400 341 280 Townhome Lot 2,400 2,400 342 279 Townhome Lot 2,400 2 400 343 278 Townhome Lot 2,400 2,400 344 30'-40' Lot 2,400 2,400 345 30'-40' Lot 2 400 2,400 346 30'-40' Lot 2,400 2,400 347 30'-40' Lot 2,400 2,400 348 - 30'-40' Lot 2,400 2 400 349 168 Townhome Lot 2,400 1,200 1,200 350 169 Townhome Lot 2,400 2,400 351 170 Townhome Lot 2 400 2,400 352 171 Townhome Lot 2,400 2,400 353 172 Townhome Lot 2,400 2,400 354 173 Townhome Lot 2,400 2,400 355 174 Townhome Lot 2,400 2,400 356 175 Townhome Lot 2,400 2 400 357 176 Townhome Lot 2,400 2400 BRIAR CHAPEL MASTER IMPERVIOUS AREA SUMMARY - PHASE 4 Construction Drawin Lot # Plat Lot # Maximum Im ervious Per Lot impervious Surface Treated Per Stormwater Mana ement Facili g Lot Type Impervious Area [sfj WQ Pond #1 WQ Pond #2 WQ Pond #3 WQ Pond #4 WQ Pond #5 WQ Pond #6 Bypass 358 177 Townhome Lot 2,400 2,400 359 178 Townhome Lot 2,400 2,400 360 179 Townhome Lot 2,400 2,400 361 180 Townhome Lot 2,400 2,400 362 302 30'-40' Lot 2,400 2,400 363 303 30'-40' Lot 2,400 2,400 364 304 30'-40' Lot 2,400 2,400 365 305 30'-40' Lot 2,400 2 400 366 306 30'-40' Lot 2,400 2 400 367 307 30'-40' Lot 2,400 2,400 368 308 30'-40' Lot 2,400 2,400 Total Lot Impervious 1,384,450 198,150 339,200 105,250 315,950 106,050 117,500 202,350 Roadwa /All a Impervious 870,904 172,670 211,498 66,513 235,745 123,004 61,474 0 Sidewalk Impervious 199,536 43,578 51,591 14,839 53,881 25,834 9,813 0 Clubhouse Impervious Area 172,062 0 0 0 0 70,567 101,495 0 Amenity Impervious Area 4,356 4,356 0 0 0 0 0 0 Totals= 2,631,308 418,754 602,189 186,602 605,576 325,455 290,282 202,350 Notes: 1. Maximum Impervious Per Lot Information includes house footprint, driveway, sidewalk, patio, etc. 2. Total impervious number includes Bypass. 3. Half of CD Lot # 349 is shown as bypass in this exhibit. This bypass area will be treated by a WQ Pond in the future Phase 5 North 4. The back halves of CD Lot # 606, 607, 608 are shown as bypass in this exhibit. This bypass area will be treated by a WQ Pond in the future Phase 5 South • RAINFALL DATA BRIAR CHAPEL - PHASE 4 NEW-05042 W 00 P, O 0 r rn O ,a 'xI?,ININININ N ?, rs N IN 11 N . y ? t?/1 atl N VI .O-i N ? (r c a y ? a d 0 O O rn t- 00 O d CV O rq OO O O O C, In M DD 7 DD ? W) O ?T t- 00 O r- 7 N N W) O Irl O, In M rn 00 r` kn M N O O O y kn oo ?o O r` kn b N O 1 O (7, r` ? 00 ,--? 00 M o0 vi M {kn..? ny.? d y oo --? V M N N N ',y ?O ?n o0 N ?O ?D v? V 'y ^-? O O M o0 ?O N n 7 N N O --? N N M M 7 ?/1 ?o kn 00 7 N --? --? 0 0 0 N N M M M O y? b b b? d y O N --? ?n V r O V oo Q ?? N M ?n .-. r N? rn N i/p? W d O -? -? (V N M M 1' w) O O O zzzzzz _ U w y d ~ o-v too NO rn ? m rn d 0 ?'' "? ? d vl N 00 O W 00 N v1 'd :A CC d? M rn .--? ? 7 ?O M O ?O d vl h r N N 00 V1 M - ^? n", co "?' v O O --? N (V N M 7 d' ?O ?n m N ^? O O O O z v o p o y oc - z ?S Dorn - v o v mo d 49 o ovoo n ? t\0?n z or10 OM a4)? v,?or -- - - - - r`r`or`t- rnO vry a N -+ M N of O O--? N N [+1 M A N y ?n V V N O O O cc w F a Fl ? a N Q y? ad. A b y y?? z d ;; +d,, ?? • A z i-i ?l kn N ~ ti M V N M b~ N N Gp? M .0.1 nil tOy b N M `O •i N W ? p„ o 0 N O • ? N ? O g 'n t- O 0 0 0 0 0 0 0 ^+ M ^M' ^?' N M n b C? M 0 0 0 0 0 3 0 0 M Ir y? 7? M 3 vl N M O 00 vl ',y N li}3 M ?O P M l? N 0 0 0 0 0 0 0 --? N M d 01 [? M C0 7 O? ?O rl? Fa 4 0 0 0 0 0 0 0 ^-? N 7 'y 3 d N M 7 0o t? i? 0 0 0 0 0 0 --? N vi k i d O N V l- x N N M ?n O V N oo ?D a ? N 0 0 0 0 0? --? N M ?O z w o N ? q O • • • I + .4 r ?r rs, ,f 1 r .? _ `+ 1= J ?-_- i i f i/ e C? CV ?"'?1 - - --' 7 -j- 1 -?? ?_? 1 ?.? r =-alai ?; -- r y ? i f1 t 5? V/• r 1 - , I v o rI ------------ rf - °'?j c3 I t% k i1 ? `L e i i t ? t ?i k 4• - ? ( t : i J?F _ E Ii , f °1 a tz.? f I ? 1 i5 V I S'OC 1. 1f. U ?? 1 1 ?9?. %-1 ?.. - ? - I a 1 fJ ? + r ,' , t r _ ? ?r•---"?°V"°",.` \ ,. `. ? ? ?. ? 1. - ? ? y l !- _ ` c RQ, ? t t 1 t e ?{ 5 ti.. • ;.' _ . l - i I i 0 E • - f f d ?t F't 7j II I r ?a V I -1 1 ? 1 1 I I I _ '7 C3 rl ?1 1 I 1 _ c ,. I .i • a ?..R_ _ -. -- ? "i ---- - ? -?- -- f .? ?;?,?)? ?, _ - ?' ? _ ?) - ? .? ? °-?"? ? ? ? .: -' , , 1 1. ? _ } _ ??_ ?4? ? \, ? .. ? ? ?? ?r ?i . i? , ? Jr ,? ? ? i _` i •• f _ , ?,_ ~ ?! ( i ,. ,, - ?- { .._ - t - _ ? - i. - ?.. _ _ ; ? .) ?. ?I ___.. _. ? - - ` III r - - ? '? r _ s ,I /,, ?rt ? ? li •. _?' -. .__. ? ?? _ l .-. 1. ? 3.. 1 ! - a i.? (i e- ?= F ? ? ?. 1, .??. ?7 • E • Ii I I? I l ?. • SOILS DATA C, t BRIAR CHAPEL - PHASE 4 NEW-05042 r•r r•a y .. ' y •' .,., , n,e:. ? ' ,.„? p .. ! ? ., `. ? ?, Mh lWts? ? . , r " w ,? '' ?. •,• ?S ???.w +?.?Y,,. I ? r h?l y.'??h ?.,._...'„.,.. W ? •r,: ? u ? . 1 j .?? ?? "'"?'? r? r ? r'" ?jh4 ?? ??. .? 1 {&?p3 k' !.*, ??vtlti ?';?.?, tr, l P' .,,?"rt^?y? .W "? r Y q vp?t r (p 44, Y :? b o ' F 9 K .,y Su i r ? "h p ?,,,ti?. ?'?, ? Yh`gR rd' `gam y, ?d NI,nY'».„? I???r•„A'}f ?.? ?G: y a Y ".j¢ 1Y n, o m ' , c' M ` AVIS, 1 de v r{ : ' I , ?•," V yR '"_ ? ? z r ,,y?1 w ? ? ^„ LA Fw d P ,;3 tt L? a'?,.J ^r t, ? `?, d i ` -• „ ? k .? , , war-- ? ' ?P y Yc? t c? el •,, y a?yl W4, AP .• „ Fl?L .?.+m ? ? % :. •? ? . ! W? •? :.h`pr ??•u. ? ? WY 1 .. t ? ? f ?, ,4 f+-,y,•?;ml* ? ? ra 1 ? ?.. ', .:?i ? ;?1 y fA w ' S I1;. cn7 ?. ^}.,y? ,?.SlC 'i)f•t.V' a 1' 1Ma Y?., ??kA' rub ,, J;yY .?. M L ?r „: ;??; Yy ,(?,*.? ,,, .°, !F ?•?. '? r,r--^""""r ' ,t •. ?ti , ?" `?~ ? S,•,ry???"'.?`.? y__. ?,,,,,..,a, ,? ? ... '.. ?s ? kG!F ?(; r''"Cl 1?,.? ~A??. . • ) 1? ?.t' C. t ? lea.. > t..,. - , .. , ?_ .:••?"i'? ?? . _ ._ r „_ .. _? , .., 5r ,r, ` .- ,, {' ,;fir ,??"`,l?.k ;:?,- ?° ., m m Y?1 ? a:g. bra ?? +rz-.?.w, • r qua la« *? ?. ' _., . {C"? iw..,.,.????d I?vF ? ,,,4s., , fl .,.v.? ?? ?: ? - ?' ?rM rwr t? ? A 'y: 2 ? '? '."R 1 ^i•?'' ",W" c'; .. ;?'? w wxse? ?.? •u ? f ?rl ?r.::?.t?d' __.., t?„ ??>_ )•? sic M -^? ? ? .; ?? h 4 y t ," ?Smw' ? ?^+r lr, :? j ...,... :i M ?° Ir` c'` t {? a ? d;'. .a r ?:• .°'Me»i..w+`r"4°„ ? .f !"+.F? ? >` ??..' f?}0 t q ILL y?J 1 Iiv w * Y Ito ? .r,,;? °' ... .. • ''. ` t Wit ? ?` ?` ;; o»... ,_ ? 11 ... Y' .y ? ?,? ?,?`^T?it ''J '?'? n7Y;t,? ? 3{ ?? "?$f¢: •? - ` ?,?'+?'^ti.....,5'"^•- •,,?'•, ...II , t ? h'1 yta `r Y A ? f 1' `t ! Y ? VD9 ^'? Pik ?p"b. S ?\!• ?s. •` 1 ``{V3 ui ?.+,? r fig Irk ;,? ¢ ? - t",. ?' ? t11 ??' t't y?e s „ '? .r _ r?•. Rul' t. 9d7?t ? "•y I k y, oV ??- , s n f ??' oau epj ," ? 1 } h '?4.r1? » ?k h•? „„„w,1?. , . t i e p ? N Si ?w E '? U o Cn ^riU o ? 1-L• ^Vi o'o N C ? e inea4;N C( G? C U ? en L } ? E S3 U cn a? X m U 0 tyl ,.. 7< ? r• ? L. Cl. Q. ? C Cb U C O N co Y UJ G rnro? Od.C X QC)V Nw 0) Q) co co 0- 0.:3 c`3 Uj OE: Y ? ? cFl Y{ ro ? z '.) ',? p r? d L+r? r t t ,? ? r rx • PROJECT NO. NEW-05042 FILENAME: NEW05042-SOILS SCALE: 1 r m 200' DATE: 10-10-2008 BRLAR CHAPEL _ PHASE 4 CHATHAM COUNTY, NORTH CAROLINA POST-DEVELOPMENT SOILS EXHIBIT THE JOHN R. McADAMS COMPANY, INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.0. BOX 14005 ZIP 27709-4005 (919) 361-5000 BRIAR CHAPEL WATERSHED SOIL NEW-05042 INFORMATION WQ POND #1 W-> Watershed soils - To WQ Pond #1 Symbol Name Soil Classification 37C Wedowee Sandy Loam B 37D Wedowee Sandy Loam B 37E Wedowee Sandy Loam B 39C Wedowee Sandy Loam B 5A Chewacla & Wehadkee D References: 1) SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. %HSGB= 95% %HSGD= 5% J. FINCH, PE 10/10/2008 _> Conclusion Watershed soils are from 'HSG B' and 'HSG D' soils. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve numbers. Cover Condition SCS CN - HSG B SCS CN - HSG D • Impervious 98 98 Open 61 80 Wooded 55 77 Cover Condition Composite SCS CN Impervious 98 Open 62 Wooded 56 0 BRIAR CHAPEL WATERSHED SOIL J. FINCH, PE NEW-05042 INFORMATION 10/10/2008 WQ POND #2 •=> Watershed soils - To WQ Pond #2 Symbol Name Soil Classification 37C Wedowee Sandy Loam B 37D Wedowee Sandy Loam B 37E Wedowee Sandy Loam B 39C Wedowee Sandy Loam B 5A Chewacla & Wehadkee D References: 1) SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. % HSG B = 99% %HSGD= 1% _> Conclusion Watershed soils are from 'HSG B' and 'HSG D'soils. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve numbers. Cover Condition Impervious Open SCS CN - HSG B 98 61 SCS CN - HSG D 98 80 Wooded 55 77 Cover Condition Composite SCS CN Impervious 98 Open 61 Wooded 55 0 BRIAR CHAPEL WATERSHED SOIL NEW-05042 INFORMATION WQ POND #3 Watershed soils - To WQ Pond #3 Symbol Name Soil Classification 37C Wedowee Sandy Loam B 37D Wedowee Sandy Loam B 37E Wedowee Sandy Loam B 39C Wedowee Sandy Loam B References: 1) SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. HSG B = 100% J. FINCH, PE 10/10/2008 => Conclusion Watershed soils are from 'HSG B' and 'HSG D'soils. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve numbers. • Cover Condition SCS CN - HSG B Impervious 98 Open 61 Wooded 55 0 BRIAR CHAPEL WATERSHED SOIL J. FINCH, PE NEW-05042 INFORMATION 10/10/2008 WQ POND #4 *---> Watershed soils - To WQ Pond #4 Symbol Name Soil Classification 37C Wedowee Sandy Loam B 37D Wedowee Sandy Loam B 39C Wedowee Sandy Loam B 57B Vance Sandy Loam C References: 1) SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. %HSGB= 92% %HSGC= 8% _> Conclusion Watershed soils are from 'HSG B' and 'HSG D'soils. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve numbers. Cover Condition SCS CN - HSG B SCS CN - HSG C Impervious • Open 98 61 98 74 Wooded 55 70 Cover Condition Composite SCS CN Impervious 98 Open 62 Wooded 56 0 BRIAR CHAPEL WATERSHED SOIL J. FINCH, PE NEW-05042 INFORMATION 10/10/2008 WQ POND #5 •_> Watershed soils - To WQ Pond #5 Symbol Name Soil Classification 37C Wedowee Sandy Loam B 37D Wedowee Sandy Loam B 37E Wedowee Sandy Loam B 39C Wedowee Sandy Loam B 57B Vance Sandy Loam C 5A Chewacla & Wehadkee D References: 1) SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. % HSG B = 98% %HSGC= 0.8% %HSGD= 1.4% • _> Conclusion Watershed soils are from 'HSG B' and 'HSG D'soils. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve numbers. Cover Condition SCS CN - HSG B SCS CN - HSG C SCS CN - HSG D Impervious 98 98 98 Open 61 74 80 Wooded 55 70 77 Cover Condition Composite SCS CN Impervious 98 Open 61 Wooded 55 0 BRIAR CHAPEL WATERSHED SOIL J. FINCH, PE NEW-05042 INFORMATION 10/10/2008 WQ POND #6 *_> Watershed soils - To WQ Pond #6 Symbol Name Soil Classification 37C Wedowee Sandy Loam B 37D Wedowee Sandy Loam B 37E Wedowee Sandy Loam B 39C Wedowee Sandy Loam B 57B Vance Sandy Loam C References: 1) SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. %HSGB= 52% % HSG C = 48% _> Conclusion Watershed soils are from 'HSG Band 'HSG D'soils. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve numbers. Cover Condition is Impervious SCS CN - HSG B 98 SCS CN - HSG C 98 Open 61 74 Wooded 55 70 Cover Condition Composite SCS CN Impervious 98 Open 67 Wooded 62 0 ooos-19S (616) ' ' VMnOW3 H1HON Ajxnoo Prv1MVHO 80-Ol-OI :ayre 0 d 4001-60442 dIZ 90011 XOB ON •XHYd 31ONVINI HOHYaSaH Q`dn8 sJSn 000'Z l mI 'foJ 9?PYoNi uqof mLL 3o aoreuip V ?uiaaaui6u?o?3® Piadj jo Hvmu X3-ObOSOM3N :anvNava M3-ZVO9OM3NON ,aaroad r ))i , v V ++ ` { ?,' ,. !; ! S , % - ?,, `?` ,; ` ?`,•-.- ,,,. \\,\, ? ? ?,; ?..,. ''I ,rr ?.. ? ? ?,,-r. l J `?^??. '1 1 • <• `` 'r, , ? ?i(4„ ?.l f ? fjr 1?, ??. i ?r„?? ,'°• • { l +, `'1 av" -t `??'''i i[ .. ".:s. ?'al {` i \..>I ?. _ 'I ', \- a?' `\ ` it 1 •i P' f • to ' ?! . :.". ,>? + `? r ?\ t ? ? ?" °^,, ,?... 1 'G , LS 'i' l ! i ?' ? •,.'ii li y ?\?_ ? ?: t'? ? t t ? ( t'?r7?`~' rl'??' ,t?l , ' r t .• r y j t ,` 111 t , r ' ? ,,. -„...,.. ,t '. ,.. ?'°Jf'r1 .. `-. \ Ir?i ? 4-.'?t ,` r ;v ?, '?d ??,?p ?/°""..••. ?,-w::r`? k)1? ?Y "`_'? .-? ??7? r? .'•+..,. , ti. • ro _ / [y 1 • - ?` ? ?. ? ?x 1. • p ?-3 A 1'• '? rc? 'V l v ? ? r; ? ? r t7) ?, - • ?,.? ' gt ? \„ .. J x \ i ' •..Isk \'r .. ?' t' ,? S ?J.? p..' ..? r :, k t i d(-? ?' '/^ tY '?, ??S`S ?p?'? "''?„ /°y°`. rl-`,• 1 q• • •....t J .? •' ? krJ y' ?, itLLl V , , Y M o - . 1 ,r t r r ?tJ . ' u 1 ,. 1 4 1 r' 3 ?- f , 7, ,v ell r /f EJE • • ! l n \\44 ' r .. • ?,+•' J-•C !d } Y? { 111 ?? ?. ? ... .tom. J l , l _. d ?,ry rY, r ' « s ° ! , t fin, ti s1f?',??? . 111 ( ../ 1111 - _ ` E ?..?..? ' ? • .. ?"N ('' ? ?.., ? fib. ? /'? ? - `\.?tf ? ` ?? ?n l , r k `? N"i ':.. + , - I _ Ie- t, -,".neµ\f "y`,'y;, e ? 'III,{ ? ?, lf". ?'t ,/? ? .,,:. ?'+MY,' ?4a'" .?"' /'+.-""`'•..I ^+., ) f"? ... a1 - l ff , , • FEMA FL OODPLAIN MAP 0 0 BRIAR CHAPEL - PHASE 4 NEW-05042 OF- 0009-19C (616) 9001-60442 dIZ 900f1 X09 '0'd ON 'XHYd 87JNY191 HOtIY8S8t1 , VMnOHVD HJAOH AJMOD ?VHD T T(9? ATll V 1 V 114 cIGOnl1ra VZ WSa L lo 90-O L -O L :alto ,00s l :3IY?S A ?I 6nedmo? S-Uw4N -d ugof ou 3o aoiaietp v 6UIJOGUIBU3o?3 I I ® ? qSdVHD HVrdEl X3-Zti0SOM3N :anrNava X3-ZtOGOM3N•oN.L33road ?.? / I 1 ?? fM I?Il_IM }I • POST-DEVELOPMENT HYDROLOGIC CALCULATIONS • 0 BRIAR CHAPEL - PHASE NEW-05042 BRIAR CHAPEL HYDROLOGIC CALCULATIONS J. FINCH, PE NEW-05042 Post-Development-To WQ Pond #1 10/10/2008 • • L SCS CURVE NZJMBERS Cover Condition COMPOSITE SCS CN Comments Impervious 98 Open 62 Assume good condition Wooded 56 Assume good condition Water 100 P 1` D?SP11iENT To WQ Pond #1 A. Watershed Breakdown Total Number of 60' Residential Lots = 20.5 lots Assumed Impervious Area Per 60' Residential Lot = 3700 square feet Total Impervious Area from 60' Residential Lots = 1.74 acres Total Number of 70' Residential Lots = 0.5 lots Assumed Impervious Area Per 70' Residential Lot = 4000 square feet Total Impervious Area from 70' Residential Lots = 0.05 acres Total Number of 80' Residential Lots = 18 lots Assumed Impervious Area Per 80' Residential Lot = 4300 square feet Total Impervious Area from 80' Residential Lots = 1.78 acres Total Number of 90' Residential Lots = 5 lots Assumed Impervious Area Per 90' Residential Lot = 4500 square feet Total Impervious Area from 90' Residential Lots = 0.52 acres Total Number of 100' Residential Lots = 3.5 lots Assumed Impervious Area Per 100' Residential Lot = 4600 square feet Total Impervious Area from 100' Residential Lots = 0.37 acres Total Number of Custom #2 Residential Lots = 1 lots Assumed Impervious Area Per Custom #2 Residential Lot = 4300 square feet Total Impervious Area from Custom #2 Residential Lots = 0.10 acres Total Roadway/Alleyway Impervious Area = 3.96 acres Total Sidewalk Impervious Area = 1.00 acres Total Amenity Impervious Area = 0.10 acres Contributing Area SCS CN Area [acres] Comments On-site open 62 11.94 Assume good condition On-site impervious 98 9.61 - On-site wooded 56 0.00 Assume good condition On-site water 100 0.65 - Off-site open 62 0.00 Assume good condition Off-site impervious 98 0.00 - Off-site wooded 56 0.00 Assume good condition Off-site water 100 0.00 • Total area = 22.20 acres 0.0347 sq.mi. Composite SCS CN = 79 BRIAR CHAPEL HYDROLOGIC CALCULATIONS J. FINCH, PE NEW-05042 Post-Development-To WQ Pond #1 10/10/2008 J B. Time of Concentration Information Time of concentration was assumed to be a conservative 5 minutes Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) = 0.0500 hours Time Increment = 0.87 minutes (= 0.29*SCS Lag) 0 BRIAR CHAPEL HYDROLOGIC CALCULATIONS J. FINCH, PE NEW-05042 Post-Development-To WQ Pond #2 10/13/2008 r? • 1. SCS CURVE NUI<1BERS Cover Condition COMPOSITE SCS CN Comments Impervious 98 Open 61 Assume good condition Wooded 55 Assume good condition Water 100 Il: POST-DEVELOPbIEN?I?'"` To WQ Pond #2 A. Watershed Breakdown Total Number of 50' Residential Lots = 18.5 lots Assumed Impervious Area Per 50' Residential Lot = 3400 square feet Total Impervious Area from 50' Residential Lots = 1.44 acres Total Number of 60' Residential Lots = 36 lots Assumed Impervious Area Per 60' Residential Lot = 3700 square feet Total Impervious Area from 60' Residential Lots = 3.06 acres Total Number of 70' Residential Lots = 20 lots Assumed Impervious Area Per 70' Residential Lot = 4000 square feet Total Impervious Area from 70' Residential Lots = 1.84 acres Total Number of 80' Residential Lots = 12 lots Assumed Impervious Area Per 80' Residential Lot = 4300 square feet Total Impervious Area from 80' Residential Lots = 1.18 acres Total Number of 100' Residential Lots = 1.5 lots Assumed Impervious Area Per 100' Residential Lot = 4600 square feet Total Impervious Area from 100' Residential Lots = 0.16 acres Total Number of Custom #4 Lots = 1.0 lots Assumed Impervious Area Per Custom #4 Lot = 4600 square feet Total Impervious Area from Custom #4 Lots = 0.11 acres Total Roadway/Alleyway Impervious Area = 4.86 acres Total Sidewalk Impervious Area = 1.18 acres Contributing Area SCS CN Area [acres] Comments On-site open 61 13.90 Assume good condition On-site impervious 98 13.83 - On-site wooded 55 0.00 Assume good condition On-site water 100 0.58 - Off--site open 61 0.00 Assume good condition Off-site impervious 98 0.00 - Off-site wooded 55 0.00 Assume good condition Off-site water 100 0.00 Total area = 28.31 acres 0.0442 sq.mi. • Composite SCS CN = 80 • BRIAR CHAPEL NEW-05042 HYDROLOGIC CALCULATIONS Post-Development-To WQ Pond #2 B. Time of Concentration Information Time of concentration was assumed to be a conservative 5 minutes J. FINCH, PE 10/13/2008 Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) 0.0500 hours Time Increment= 0.87 minutes (= 0.29*SCS Lag) E • • BRIAR CHAPEL NEW-05042 1. SCS CURVE NUMBERS HYDROLOGIC CALCULATIONS Post-Development-To WQ Pond #3 Cover Condition COMPOSITE SCS CN Comments Impervious 98 Open 61 Assume good condition Wooded 55 Assume good condition Water 100 H. POST-DEVELOPMENT _> To WQ Pond #3 A. Watershed Breakdown Total Number of 80' Residential Lots = 13 lots Assumed Impervious Area Per 80' Residential Lot = 4300 square feet Total Impervious Area from 80' Residential Lots = 1.28 acres Total Number of 100' Residential Lots= 6 lots Assumed Impervious Area Per 100' Residential Lot = 4600 square feet Total Impervious Area from 100' Residential Lots = 0.63 acres Total Number of Custom #1 Residential Lots = 2 lots Assumed Impervious Area Per Custom # 1 Residential Lot = .4200 square feet Total Impervious Area from Custom #I Residential Lots = 0.19 acres Total Number of Custom #3 Residential Lots = 3 lots Assumed Impervious Area Per Custom #3 Residential Lot = 4450 square feet Total Impervious Area from Custom #3 Residential Lots = 0.31 acres Total Roadway/Alleyway Impervious Area = 1.53 acres Total Sidewalk Impervious Area = 0.34 acres J. FINCH, PE 10/23/2008 Contributing Area SCS CN Area [acres] Comments On-site open 61 5.84 Assume good condition On-site impervious 98 4.29 - On-site wooded 5.5 0.00 Assume good condition On-site water 100 0.40 - Off-site open 61 0.00 Assume good condition Off-site impervious 98 0.00 - Off-site wooded 55 0.00 Assume good condition Off-site water 100 0.00 Total area = 10.53 acres 0.0164 sq.mi. Composite SCS CN = 78 B. Time of Concentration Information Time of concentration was assumed to be a conservative 5 minutes 0 Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) = 0.0500 hours Time Increment = 0.87 minutes (= 0.29*SCS La • • BRIAR CHAPEL NEW-05042 L SCS CURVE NUMBERS HYDROLOGIC CALCULATIONS Post-Development-To WQ Pond 94 Cover Condition COMTOSITE SCS CN Comments Impervious 98 Open 62 Assume good condition Wooded 56 Assume ood condition Water 100 H. POST-DEVELOPMENT,' _> To WQ Pond #4 A. Watershed Breakdown Total Number of 50' Residential Lots = 52.5 lots Assumed Impervious Area Per 50' Residential Lot = 3400 square feet Total Impervious Area from 50' Residential Lots = 4.10 acres Total Number of 60' Residential Lots = 28.5 lots Assumed Impervious Area Per 60' Residential Lot = 3700 square feet Total Impervious Area from 60' Residential Lots = 2.42 acres Total Number of Centex Residential Lots = 8 lots Assumed Impervious Area Per Centex Residential Lot = 4000 square feet Total Impervious Area from Centex Residential Lots = 0.73 acres Total Roadway/Alleyway Impervious Area = 5.41 acres Total Sidewalk Impervious Area = 1.24 acres J. FINCH, PE 10/23/2008 Contributing Area SCS CN Area [acres] Comments On-site open 62 10.91 Assume good condition On-site impervious 98 13.90 - On-site wooded 56 0.00 Assume good condition On-site water 100 0.83 - Off-site open 62 0.00 Assume good condition Off-site impervious 98 0.00 - Off-site wooded 56 0.00 Assume good condition Off-site water 100 0.00 Total area = 25.64 acres 0.0401 sq.mi. Composite SCS CN = 83 B. Time of Concentration Information Time of concentration was assumed to be a conservative 5 minutes Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) 0.0500 hours Time Increment = 0.87 minutes (= 0.29*SCS Lag) 0 BRIAR CHAPEL HYDROLOGIC CALCULATIONS J. FINCH, PE NEW-05042 Post-Development-To WQ Pond #5 10/23/2008 • • • 1. SCS CtiRVE NUMBERS Cover Condition COMPOSITE SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume ood condition Water 100 II. POST-DEVELOPMENT, _> To WQ Pond #5 A. Watershed Breakdown Total Number of 30'-40' Residential Lots = 13 lots Assumed Impervious Area Per 30'-40' Residential Lot = 2400 square feet Total Impervious Area from 30'-40' Residential Lots = 0.72 acres Total Number of 50' Residential Lots = 2.5 lots Assumed Impervious Area Per 50' Residential Lot = 3400 square feet Total Impervious Area from 50' Residential Lots = 0.20 acres Total Number of 60' Residential Lots = 10 lots Assumed Impervious Area Per 60' Residential Lot = 3700 square feet Total Impervious Area from 60' Residential Lots = 0.85 acres Total Number of 70' Residential Lots = 2 lots Assumed Impervious Area Per 70' Residential Lot = 4000 square feet Total Impervious Area from 70' Residential Lots = 0.18 acres Total Number of 90' Residential Lots = 2 lots Assumed Impervious Area Per 90' Residential Lot = 4500 square feet Total Impervious Area from 90' Residential Lots = 0.21 acres Total Impervious Area from Information Center Lot = 8000 square feet Total Impervious Area from Information Center Lot = 0.18 acres Total Number of Custom #5 Lots = 1.0 lots Assumed Impervious Area Per Custom #5 Lot = 4350 square feet Total Impervious Area from Custom #5 Lots = 0.10 acres _ Total Clubhouse Area = 1.91 acres Assumed Clubhouse % Impervious = 85% Total Impervious Area from Clubhouse Area = 1.62 acres Total Roadway/Alleyway Impervious Area = 2.82 acres Total Sidewalk Impervious Area = 0.59 acres Contributing Area SCS CN Area [acres] Comments On-site open 61 6.22 Assume good condition On-site impervious 98 7.47 - On-site wooded 55 0.00 Assume good condition On-site water 100 0.33 - Off-site open 61 0.00 Assume good condition Off-site impervious 98 0.00 - Off-site wooded 55 0.00 Assume good condition Off-site water 100 0.00 Total area = Composite SCS CN = 14.02 acres 0.0219 sq.mi. 82 • 0 BRIAR CHAPEL NEW-05042 HYDROLOGIC CALCULATIONS Post-Development-To WQ Pond #5 B. Time of Concentration Information Time of concentration was assumed to be a conservative 5 minutes Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) = 0.0500 hours Time Increment = 0.87 minutes (= 0.29*SCS Lag) J. FINCH, PE 10/23/2008 • C, BRIAR CHAPEL NEW-05042 I. SCS CURVE NUMBERS HYDROLOGIC CALCULATIONS Post-Development-To WQ Pond #6 Cover Condition COMPOSITE SCS CN Comments Impervious 98 Open 67 Assume good condition Wooded 62 Assume good condition Water 100 U. POST-DEVELOPMENT- _> To WQ Pond #6 A. Watershed Breakdown Total Number of 30'-40' Residential Lots = 5 lots Assumed Impervious Area Per 30'-40' Residential Lot = 2400 square feet Total Impervious Area from 30'-40' Residential Lots = 0.28 acres Total Number of 50' Residential Lots = 9.5 lots Assumed Impervious Area Per 50' Residential Lot = 3400 square feet Total Impervious Area from 50' Residential Lots = 0.74 acres Total Number of Townhome Lots = 30.5 lots Assumed Impervious Area Per Townhome Lot = 2400 square feet Total Impervious Area from Townhome Lots = 1.68 acres Total Clubhouse Area = 2.74 acres Assumed Clubhouse % Impervious = 85% Total Impervious Area from Clubhouse Area = 2.33 acres Total Roadway/Alleyway Impervious Area = 1.41 acres Total Sidewalk Impervious Area = 0.23 acres J. FINCH, PE 10/23/2008 Contributing Area SCS CN Area [acres] Comments On-site open 67 3.14 Assume good condition On-site impervious 98 6.66 - On-site wooded 62 0.00 Assume good condition On-site water 100 0.27 - Off-site open 67 0.00 Assume good condition Off-site impervious 98 0.00 - Off-site wooded 62 0.00 Assume good condition Off-site water 100 0.00 Total area = 10.08 acres 0.0157 sq.mi. Composite SCS CN = 88 B. Time of Concentration Information Time of concentration was assumed to be a conservative 5 minutes Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) 0.0500 hours Time Increment = 0.87 minutes (= 0.29*SCS La • m a a ? a 3 D a° _ Add link 1 Route 1 Route 2 O a° C? Type.... Master Network Summary Page 2.01 Name.... Watershed File.... X:\Projects\NEW\NEW-05042\Storm\WQPOND#1(REV8-22-07).PPW MASTER DESIGN STORM SUMMARY • Network Storm Collection: RDU Total Depth Rainfall Return Event ----- in Type ------- 1-Yr ------ 3.0000 --------- Synthetic ------- Curve 100-Yr 8.0000 Synthetic Curve 10-Yr 5.3800 Synthetic Curve 25-Yr 6.4100 Synthetic Curve --------------------------- ICPM CALCULATION TOLERANCES Target Convergence= .000 cfs +/- Max. Iterations = 35 loops ICPM Time Step = 1.00 min Output Time Step = 1.00 min ICPM Ending Time = ------------------- 2100.00 --------- min --- RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun *POND OUTLET JCT 1 34071 *POND OUTLET JCT 100 377985 *POND OUTLET JCT 10 186608 *POND OUTLET JCT 25 260316 TO WQ POND 1 AREA 1 95777 TO WQ POND 1 AREA 100 443870 TO WQ POND 1 AREA 10 252358 TO WQ POND 1 AREA 25 326210 WQP1(FB) POND 1 95777 WQP1(FB) POND 100 443871 WQ21(FB) POND 10 252358 WQP1(FB) POND 25 326210 WQP1(FB) OUT POND 1 95894 WQP1(FB) OUT POND 100 443977 WQPl(FB) OUT POND 10 252454 WQP1(FB) OUT POND 25 326305 WQPl(MP) POND 1 95894 WQP1(MP) POND 100 443977 WQP1(MP) POND 10 252454 WQP1(MP) POND 25 326305 Max Qpeak Qpeak Max WSEL Pond Storage min cfs ft cu.ft 1423 .43 -------- ------------ 720.00 163.32 724.00 66.87 722.00 110.08 716.00 41.00 715.00 188.68 715.00 108.83 715.00 140.02 716.00 41.00 715.00 188.68 bE f 5 Y POOL vF? V'? rv 715.00 108.83 - (. ( 715.00 140.02 718.00 38.82 415.33 2342 717.00 181.48 415.96 7056 717.00 104.73 415.66 4778 717.00 134.66 415.78 5721 718.00 38.82 717.00 181.48 717.00 104.73 717.00 134.66 C, S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 1:39 PM Date: 8/28/2007 • Type.... Master Network Summary Page 2.02 Name.... Watershed File.... X:\Projects\NEW\NEW-05042\Storm\WQPOND#1(REV8-22-07).PPW ------------------------------- ICPM CALCULATION TOLERANCES ------------------------------- Target Convergence= .000 cfs +/- Max. Iterations = 35 loops ICPM Time Step = 1.00 min Output Time Step = 1.00 min ICPM Ending Time = 2100.00 min ------------------------------- MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) • • Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun min cfs ft cu.ft ----------- ------ ---- ------ ---------- --------- -------- WQP1(MP) OUT POND 1 34071 1423.00 .43 77681 WQPl(MP) OUT POND 100 377985 720.00 163.32 110259 WQP1(MP) OUT POND 10 186608 724.00 66.87 97370 L WQP1(MP) OUT POND 25 260317 722.00 110.08 103614 414.41 MAN R%o L S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 1:39 PM Date: 8/28/2007 HEC-HMS Project: NEW-05042 Basin Model: To VVQP#2 is WQP#2 To WQP#3 WQP#3 To WQP#4 WQP#4 To VV0P#5 WQP#5 To UVQP#6 WQP#6 0 HMS * Summary of Results Project NEW-05042 Run Name : 1-Year Post Start of Run l0Oct08 0000 Basin Model : Post-Development End of Run llOct08 0000 Met. Model : 1-Year Storm Execution Time 270ct08 1037 Control Specs : 1-Minute dT Hydrologic Discharge Time of Volume Drainage Element Peak Peak (ac Area (cfs) ft) (sq mi) To WQP#2 58.725 10 Oct 08 1157 2.9427 0.044 WQP#2 0.44578 10 Oct 08 2400 0.42435 0.044 To WQP#3 19.613 10 Oct 08 1157 0.98595 0.016 WQP#3 0.14517 10 Oct 08 2400 0.13482 0.016 To WQP#4 61.605 10 Oct 08 1156 3.0899 0.040 WQP#4 1.0645 10 Oct 08 1823 0.79585 0.040 To WQP#5 32.098 10 Oct 08 1157 1.6086 0.022 WQP#5 0.40314 10 Oct 08 2140 0.39949 0.022 To WQP#6 30.036 10 Oct 08 1156 1.5208 0.016 WQP#6 1.1097 10 Oct 08 1345 0.49307 0.016 • 0 • WATER QUALITY POND #1 FINAL DESIGN CALCULATIONS 0 r? BRIAR CHAPEL - PHASE 4 NEW-05042 0009-T9E (B T6) SIId. Q Z# QHOd Auwn6 uawtb ' ' `•' ' 900-60443 dIZ 90061 X09 0 d ON 'XHVd 37`JNtlI2IJ. HJHYHSHH ,.• ? ? VNnCHVD HRION '.LiMOD WWUVHO lsa SNMQLswwri M V N fficnvH ' ° i ? Is r 8 i r I C SH0A3AH[lS/SHHNNY'Id/SHHHNIJN8 = I <v wzi E1442 VNI70HYO H,LNON 'WdHH(l0 Y ' OVOH lZdVHD SMM 39 109-0 AMH'Wn ' W ,R z °p Q La ? N I F d ? s ' ? ° i ? rn..? r wr a >«a m n t IIAH.UHAYd OSBS TOZ Hllas ( ON al ?,?,? .???H ? fig- fix ?7?r ?d 1?1 ?T TT?nvT?.WN?T ^ r? T SNV l 0J?!A./11Q00 t aS VHd z z i a f11Ll V Y 1l J ' : dy "46 " : ?'_ - nFx .r.nrs :raa.ea-au ru T . . r ? T fi Q SN V(IVD N 2I NHOP HH.L , , sNmslAH a :HHNao V I S Q ?/ 1 j? HVMg i NORTH i 4 ? c c e ? R a N F f S a a _ c xo - v i C n G a 9 0 b? PC o d: g Y o ° ?g?g ry.ma W P s$ 8 i 'va °-a ? g y2 8 "z o Z Ypo< °bgIBWt6„$a-?> V3.m? W?=d " dHg?° 5 ?°k O osaWi k°??z Wir"?a (A -IP"?9? as"°aai8L5840t igg-? 1-W in Wm W8,1 - ?? R9ois W= ? W g ,Sam Wm >g ?m W gn a5 W H, Q Wad C r. k6g c€ as °s: ? lin &o q? ym-4??j% 985f g`z 1 8 ?8q? 3 rc.• ?? $ P4; ? 5 8 =??a <°zmk' 8'd o°ucp u c??i° k.ww? a ?? E S5? ?k'Pi e WW Hilgi -1H ? a a ?e 3? e m g ? 0 ° A S R° ro ma a s _°d O 0E d v g W 3'We aW, p- ?F? ° a n O XWX a r q X8 yjX6Njg 2, $ s o eR SS?3 s tag x gy5 C!, 64 IR" 9i fl, I aWO Cw € Q?x =_ ?ja m o?aY g8g 2a b? "W? Sly WWW 3-s pp 2 ka 2p oo ?x -Y z o,???m?z S? S >° a Q o? Sz > Y 68 o?u 13 0 ffi `sak'es O 3?kx? 58Nm d. b Y? °??`°<b zs i a 0 v P g g 'WX F 'sgg? g3 ?? ??a °>^ 2 SW? &W Zom9 o y?c b a Ya;i So3z°" =Wa < ?zg _ e a? 8 a 8W- 8CsWx??!!? i.°8°_ :g :° ° zS.. p Ys '< °SYY?- Yzd o 0 W w Y a wffi 8-, ?^? p11S 5=95 m W '!!'31 °?' am>F~ ot ° d W x po a€ isW?? s8 ?o ?Jxg ??Z_.?°=?W °9;? Via"?$W m c 415, o ;W saa- ?: u? ak" N% S Wz x ? . yr ?'oS H o c ? n €- ?° o_ `?` u ®°< 9a s 4 a8 BL $ ° xP a ioK'"-< 11 9. 8°Wg ? $ y at a s<W g ? F $ _kW e? k°? G 4 "jW Wt: $° °s?yFY?u° 3 g;8? C g o sa o K S l' bd o baW?g ?? a- °"« ?,5° rn g = E "< 8?Y`gy _: b E YP <W 3 W 1H .gr§ ? R"im L' ze?i ?z? -k k? s ?&a ?w g n?W sc? aQz ° z o €W? d C 8 ofnW < ""- _= Y S ? $3 ox g? _ W oks 7 s-g= ?g 1049H, ld. 'g ? a Vas ?V ??? ? 8-a a g ?? Pg 7S a ?i 8" Sm=- z"Wb ° ?a°gs ffi k moPomSy o s k u'm" H 0 c A x q7 gak'? X8oW E! P3u? o Y+ o <' ' °q`>,.. j"'DmS S ° J g21WW gig- < ?? <Sg zW J Q o ? zm=° ?i H Nil XI 8 ? i2g ''SH ° o d '" GAS ?' s ?oF - m o? 212 a o si"lrc i•-j°<°< g`?`' ?W F? gY< ?Wi S.y?? 3jw SAY m P n S? YS DO 8=a uaBskzW agI- zEu W 3}u? °? s sg' ??{? ?ko Pk Y Q Pffi W Ws mza ? $ GYa?bPS t?xso?Wa8W?" >WLy???4 WW : 61 1 a n - '^ 8 § ?'w°g o; i ? WmW °s ?$8 W o balu?W ?_??d 3<W o ua Ye=`= z ?> $ I9 2 WWCi x 50 io 4 , =m k i FxeW€ uN"s?3$=mu ? 8 ?o?me? g ; o?o? ffi L m FL ?m s ?gz LL Y a? z€ v hWS?=6 s ?r¢¢ 1¢$f p $ "dw 3 W nff (/] U f2 p ? < G -XoRE ° '' .T 9W <W<p G K " < {_5 $_? j?"?? ??g= g; yyg$ g z TWyO"Y ?_ fl< ?W$°m?? smWa pj°"W ° "r{u Fo as ?$ 70 8iwq°"2 k'so s 80 uWW Z W>g„z?W kgg S Sgk•?zwz"W > ?? 8n $o ? su 3Ku '< ?.? $ 8m $? ffi iW: o gO ?R $jS szam"8z?? O W'?8z ] 3Y?B !"N ??t 3 a r. ? oz:zS $o m o'a f98 - %i FWx ats °8 HWU yi ua gig R ri ?oW94< ?+" @? ?tWgt ?FUZ ?' Y=3s: oW i tsQ ?a i$g Pi ` qo 8 °F8'e®b 3k S" ?p t $ °W oWiW is ?W U s bV mi"?aSW S g°-?"W m"Su o H >eR4 oo xS °z0 j ag? ?-4? so kz w , ?a ?k 8aG' ?S 8oY > " 4", T .a d ?^ R° W 94 5m'bk'z°? 8 LY 8M olnSs ] yS3 " a a i d S o? aka°MW"'Z ®- <" k'kg' _ gym" oSp, W ?° aE 80 °: .ffi ?< _ ? a EI< ; o ?z3 g yy - ' g? $ 8=W Q 3" ?o o SB gg gg?? orc ous =tW? z oW_ L5 k^ > ?_ " _®F?pp®Y?WOW.BoQ ?: gBP $$ m > $j 5> b 3 '3 3 g Y wW° 4' P "3 kd u? o &W2 'm ui §zWp mLSu o oo?? z ?um=Y 1 Y 6° 'udY S°1?g 'a 'ju ° -°ssHo g" s7 n i c" i H oSWSxp U Z ® m d W??4 b ° PW ? u x C5 ?o? s kWk :a am 19 <pa m _<? < S _?a W = =H W? $ _ ae££M& 'zzW o $ W -g3 ? _?? ? n o. ° • ° " c maa 7' ,.o o and as a4 d ? o ri' m .i8159 O ??Bmj?Y?3? • 0 • LbZ•Z: L 'eAjo;euyl 'V4V LVZS:O L LOOZ/z6/0l '6Mp• Lod-Zb0SOM3N\s6uimeja luaaano\sBumeja uoi;oni;suoo\wjo;s\Zb050-M=i -4M3N\s;oafoJd\:X BRIAR CHAPEL WQP#1(FOREBAY) J. FINCH, PE NEW-05042 10/10/2008 • • Storage vs. Stage 8000 7000 y = 7403.7x' ossa 6000 R2 = 1 LL 5000 p, 4000 A rn 3000 2000 1000 0 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Stage (feet) Ks = 7403.7 b = 1.0534 Stage-Storage Function Project Name: Briar Chapel Designer: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) i 115.0 0.0 6869 415.5 0.5 -7400 7135 3567 3567 0.50 416.0 1.0 7946 7673 3837 7404 1.00 C7 BRIAR CHAPEL S-SFXN-WQP#1(FOREBAY) J. FINCH, PE NEW-05042 10/10/2008 • _> Stage - Storage Function Ks = 7403.7 b = 1.0534 Zo = 415 415.00 0 0.000 415.20 1359 0.031 415.40 2820 0.065 415.60 4323 0.099 415.80 5853 0.134 416.00 7404 0.170 Ll BRIAR CHAPEL WQP#1(MAIN POOL) J. FINCH, PE NEW-05042 10/10/2008 Stage-Storage Function Project Name: Briar Chapel Designer: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 C7 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 410.0 0.0 19068 412.0 2.0 22861 20965 41929 41929 2.01 414.0 4.0 26508 24685 49369 91298 3.95 416.0 6.0 31020 28764 57528 148826 6.05 Storage vs. Stage 160000 --'- 140000 14se y = 18801 x' 120000 R2 = 0.9996 V 100000 rn 80000 60000 40000 20000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (feet) Ks = 18801 b = 1.1498 0 BRIAR CHAPEL S-SFXN-WQP#1(MAIN POOL) J. FINCH. PE NEW-05042 10/10/2008 Stage - Storage Function Ks = 18801 b = 1.1498 Zo = 410 Elevation Stora e [feet] [cq [acre-feet] 410.00 0 0.000 410.20 2955 0.068 410.40 6556 0.151 410.60 10450 0.240 410.80 14546 0.334 411.00 18801 0.432 411.20 23186 0.532 411.40 27682 0.635 411.60 32276 0.741 411.80 36957 0.848 412.00 41716 0.958 412.20 46548 1.069 412.40 51446 1.181 _ 412.60 56405 1.295 412.80 61422 1.410 413.00 66493 1.526 413.20 71615 1.644 413.40 76785 1.763 413.60 82001 1.882 413.80 87260 2.003 414.00 92561 2.125 • 414.20 97902 2.248 414.40 103282 2.371 414.60 108698 2.495 414.80 114149 2.621 _ 415.00 119635 2.746 415.20 125153 2.873 415.40 130704 3.001 415.60 136285 3.129 415.80 141896 3.257 416.00 147536 3.387 0 • Type.... Outlet Input Data Page 2.01 Name.... WQP1(FB) File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 415.00 ft Increment = .20 ft Max. Elev.= 416.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed • C7 Structure ----------------- Weir-Rectangular Weir-Rectangular TW SETUP, DS Channel S/N: 6217012070C3 PondPack Ver. 8.0058 No. Outfall E1, ft E2, ft ---- ------- --------- --------- W2 <---> TW 415.000 416.000 W1 <---> TW 415.000 416.000 The John R. McAdams Company Time: 1:45 PM Date: 10/10/2008 • Type.... Outlet Input Data Name.... WQP1(FB) OUTLET STRUCTURE INPUT DATA • • File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. W2 Weir-Rectangular ---------------- 1 415.00 ft 40.00 ft 3.000000 Weir TW effects (Use adjustment equation) Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. Weir TW effects SIN: 6217012070C3 PondPack Ver. 8.0058 Wl Weir-Rectangular ---------------- 1 415.00 ft 25.00 ft 3.000000 (Use adjustment equation) a A Page 2.02 The John R. McAdams Company Time: 1:45 PM Date: 10/10/2008 Type.... Outlet Input Data Page 1.01 Name.... WQP1(MP) File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 410.00 ft Increment = .20 ft Max. Elev.= 416.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Orifice-Circular OR ---> TW 410.000 416.000 Weir-Rectangular WR ---> TW 413.600 416.000 TW SETUP, DS Channel • • SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 1:46 PM Date: 10/10/2008 • LJ Type.... Outlet Input Data Name.... WQP1(MP) Page 1.02 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = OR Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 410.00 ft Diameter = .2500 ft Orifice Coeff. _ .600 Structure ID = WR , Structure Type = Weir-Rectangular"'V --------- ---- - ---------------- # of Openings = 1 ay Crest Elev. = 413.60 ft O i? Weir Length = 50.00 ft Weir Coeff. = 3.000000 Weir TW effects (Use adjustment equation) Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES ... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 It Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 1:46 PM Date: 10/10/2008 • • • Type.... Composite Rating Curve Name.... WQPI(MP) Page 1.07 File.... X:'\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: WS Elev, Total Q Elev. Q ft cfs -------- 410.00 ------- .00 410.20 .06 410.40 .12 410.60 .16 410.80 .19 411.00 .22 411.20 .24 411.40 .27 411.60 .29 411.80 .31 412.00 .32 412.20 .34 412.40 .36 412.60 .37 412.80 .39 413.00 .40 413.20 .41 413.40 .43 413.60 .44 413.80 13.86 414.00 38.35 414.20 70.02 414.40 107.47 414.60 149.90 414.80 196.74 415.00 247.60 415.20 302.17 415.40 360.17 415.60 421.42 415.80 485.72 416.00 552.93 S/N: 6217012070C3 PondPack Ver. 8.0058 ***** COMPOSITE OUTFLOW SUMMARY **** -------- Converge TW Elev Error ft +/-ft -------- ----- Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Notes ------------------------- Contributing Structures None contributing OR OR OR OR OR OR OR OR OR OR OR OR OR OR OR OR OR OR +WR OR +WR OR +WR OR +WR OR +WR OR +WR OR +WR OR +WR OR +WR OR +WR OR +WR OR +WR OR +WR The John R. McAdams Company Time: 1:46 PM Date: 10/10/2008 Type.... Master Network Summary Page 2.01 Name.... Watershed File.... X.\Projects\NEW\NEW-05042\Storm\WOPOND#1(REV8-22-07).PPW MASTER DESIGN STORM SUMMARY Network Storm Collection: RDU Total Depth Rainfall Return Event in Type ------------ 1-Yr ------ 3.0000 ---------- Synthetic ------ Curve 100-Yr 8.0000 Synthetic Curve 10-Yr 5.3800 Synthetic Curve 25-Yr 6.4100 Synthetic Curve --------------------------- ICPM CALCULATION TOLERANCES Target Convergence= .000 cfs +/- Max. Iterations = 35 loops ICPM Time Step = 1.00 min Output Time Step = 1.00 min ICPM Ending Time = -------------------- 2100.00 --------- min -- RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol • Node ID *POND OUTLET Type JCT Event 1 cu.ft Trun 34071 *POND OUTLET JCT 100 377985 *POND OUTLET JCT 10 186608 *POND OUTLET JCT 25 260316 TO WO POND 1 AREA 1 95777 TO WO POND 1 AREA 100 443870 TO WO POND 1 AREA 10 252358 TO WO POND 1 AREA 25 326210 WOP1(FB) POND 1 95777 WOP1(FB) POND 100 443871 WOP1(FB) POND 10 252358 WOPI(FB) POND 25 326210 WOP1(FB) OUT POND 1 95894 WOP1(FB) OUT POND 100 443977 WOPl(FB) OUT POND 10 252454 WOP1(FB) OUT POND 25 326305 WQP1(MP) POND 1 95894 WQP1(MP) POND 100 443977 WQP1(MP) POND 10 252454 WOPI(MP) POND 25 326305 Max Opeak Opeak Max WSEL Pond Storage min cfs ft cu.ft 1423.00 --- --- --- ------ ---- .43 720.00 163.32 724.00 66.87 722.00 110.08 716.00 41..00 715.00 188.68 715.00 108.83 715.00 140.02 716.00 41.00 715.00 188.68 715.00 108.83 715.00 140.02 718.00 38.82 717.00 181.48 717.00 104.73 717.00 134.66 718.00 38.82 717.00 181.48 717.00 104.73 717.00 134.66 • f V?c.i.YT? ? +? ?G t 415.33 2342 415.96 7056 415.66 4778 415.78 5721 r t SM 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time; 1°39 PM Date: 8/28/2007 • Type..., Master Network Summary Page 2.02 Name.... Watershed File..., X:\Projects\NEW\NEW-05042\Storm\WOPOND#I(REV8-22-07).PPW ------------------------------- ICPM CALCULATION TOLERANCES ------------------------------- Target Convergence= .000 cfs +/- Max. Iterations = 35 loops ICPM Time Step = 1.00 min Output Time Step = 1.00 min ICPM Ending Time = 2100.00 min ------------------------------- MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (1Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) • • Return HYG Vol Opeak Opeak Node ID Type Event cu.ft Trun min cfs ----------- WOP1(MP) ------ OUT ---- POND ------ 1 ---------- 34071 --------- 1423.00 -------- .43 WOP1(MP) OUT POND 100 377985 720.00 163.32 WOP1(MP) OUT POND 10 186608 724.00 66.87 WOP1(MP) OUT POND 25 260317 722.00 110.08 Max Max WSEL Pond Storage ft cu.ft 413.43 77681 '- 414.66 110259 414.18 97370 414.41 103614 MAft?, S/N. 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 1:39 PM Date: 8/28/2007 BRIAR CHAPEL S-SFXN-WQP#1(MAIN POOL) J. FINCH; PE NEW-05042 10/13/2008 • _> Stage - Storage Function Ks= 18801 b= 1.1498 Zo = 410 Elevation Stora a 100-Year Worst Case [feet] [cf] [acre-feet] [cfl [acre-feet] 410.00 0 0.000 - 410.20 2955 0.068 - 410.40 6556 0.151 - 410.60 10450 0.240 - 410.80 14546 0.334 - - 411.00 18801 0.432 - - 411.20 23186 0.532 - 411.40 27682 0.635 - 411.60 32276 0.741 - - 411.80 36957 0.848 - 412.00 41716 0.958 - 412.20 46548 1.069 - 412.40 51446 1.181 - 412.60 56405 1.295 - - 412.80 61422 1.410 - - 413.00 66493 1.526 - 413.20 71615 1.644 - - 413.40 76785 Y 1.763 - 413.60 82001 1.882 0 0.000 413.80 87260 2.003 _ 5259 0.121 414.00 92561 2.125 10561 0.242 414.20 97902 2.248 15902 0.365 414.40 103282 2.371 21281 0.489 414.60 108698 2.495 26697 0.613 414.80 114149 2.621 32148 0.738 415.00 119635 2.746 37634 0.864 415.20 125153 2.873 43152 _0991- 415.40 130704 3.001 48703 1.118 415.60 136285 3.129 54284 1.246 415.80 141896 3.257 59895 1.375 416.00 147536 3.387 65536 1.504 100' ir- ttioRST to?SC Rov nw4 0 Type.... Composite Rating Curve Page 1.04 Name.... WQP1(MP100YR) File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** • WS Elev, Total Q Notes ------ --- ------ -- Converg e ------------- ------------ Elev. Q TW El ev Error ft -------- cfs ------- ft ----- +/-ft Contributing Structures 413.60 .00 - Free -- ----- Outfall -------------- WR ------------ 413.80 13.41 Free Outfall WR -?, 414.00 37.89 Free Outfall WR f 414.20 69.55 Free Outfall WR "Op 414.40 106.99 Free Outfall WR 414.60 149.40 Free Outfall WR .??{.1V 414.80 196.24 Free Outfall WR fr n? jv N^'- 415.00 247.08 Free Outfall WR 415.20 301.64 Free Outfall WR 41.5.40 359.63 Free Outfall WR 415.60 420.87 Free Outfall WR 415.80 485.17 Free Outfall WR 416.00 552.35 Free Outfall WR S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:50 AM Date: 10/13/2008 Type.... Master Network Summary Page 2.02 Name.... Watershed File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN(100YR).PPW ------------------------------- TCPM CALCULATION TOLERANCES ------------------------------- Target Convergence= .000 cfs +/- Max. Iterations = 35 loops ICPM Time Step = 1.00 min Output Time Step 1.00 min ICPM Ending Time = 2100.00 min ------------------------------- MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) • E Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID - - --- - Type - Event cu.ft Trun min cfs ft cu.ft ------- -- WQPl(MP) -- --- POND ------ 1 ---------- -- 95894 --------- 718.00 -------- 38.82 -------- ------------ WQP1(MP) POND 100 443977 717.00 181.48 WQP1(MP) POND 10 252454 717.00 104.73 WQP1(MP) POND 25 326305 717.00 134.66 WQP1(MP) POND 2 132605 717.00 54.60 WQP1(MP) OUT POND 1 96177 723.00 33.53 413.96 9617 WQPl(MP) OUT POND 100 444297 720.00 165.28 414.67 28545 WQP1(MP) OUT POND 10 252807 721.00 93.69 4. 19371 WQP1(MP) OUT POND 25 326584 720.00, 121.62 414.47 23149 WQP1(MP) OUT POND 2 132994 722.00 48.01 414.06 12267 j. N G tit sit"#) SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:01 AM Date: 10/13/2008 BRIAR CHAPEL Below NWSE J. FINCH, PE NEW-05042 10/10/2008 Stage-Storal Project Name: Designed By: Job Number: Date: 7e Function Briar Chapel J. Finch, PE NEW-05042 10/10/2008 Contour (feet) Stage (feet) Contour Area (SF) Average Contour Area (SF) Incremental Contour Volume (CF) Accumulated Contour Volume (CF) Estimated Stage w/ S-S Fxn (feet) 404.0 0.0 9324 406.0 _ 2.0 11085 _ 10205 20409 20409 2.02 408.0 4.0 13021 12053 24106 44515 3.88 410.0 6.0 19068 16045 32089 76604 6.11 • Storage vs. Stage 90000 80000 70000 ,955 y . 8795.1x' LL 60000 R2 = 0.9978 50000 rn m 40000 ` o N 30000 20000 10000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (feet) Ks = 8795.1 b = 1.1955 0 BRIAR CHAPEL Forebay J. FINCH, PE NEW-05042 10/10/2008 Stage-Storaa • Project Name: Designed By: Job Number: Date: le Function Briar Chapel J. Finch, PE NEW-05042 10/10/2008 Contour (feet) Stage (feet) Contour Area (SF) Average Contour Area (SF) Incremental Contour Volume (CF) Accumulated Contour Volume (CF) Estimated Stage w/ S-S Fxn (feet) 409.0 0.0 2126 _ 411.0 2.0 3547 2837 - 5673 5673 2.01 413.0 4.0 51 l8 4333 65 14338 3.92 415.0 6.0 6869 5994 11987 26325 6.07 • Storage vs. Stage 30000 25000 Y = 2142.3x' 3906, LL 20000 R2 = 0.9991 U 15000 A U) 10000 5000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (feet) Ks 2142.3 b = 1.3906 11 BRIAR CHAPEL NEW-05042 BRIAR CHAPEL - WO POND #1 DESIGN .:....... . z:. Per NCDENR "Stormwater Best Management Practices ", the forebay volume should equal about 20% of the total basin volume. A. Water Quality Pond - Below Normal Pool Volume Volume 76604 ft3 B. Forebay Volume Volume = 26325 ft3 Forebay = 34% Impervious Area = x.%.61 acres Drainage Area = 22.2acres % Impervious = 43.3% total Below NP Volume 76604 cf Surface Area 19068 sf • Average Depth = 4.02 ft __> From the NCDENR Stormwater BMP Handbook (4/99), the required SA/DA rati o for 85% TSS Removal in the Piedmont is as follows: 4.0 4.02 5.0 Lower Boundary => 40.0 1.43 1.25 Site % impervious => 43.3 1.53 L53 1.33 Upper Boundary => 50.0 1.73 1.50 Area Required = 14749 sq.ft. Area Provided = 19068 s .ft. YES J. FINCH, PE 10/10/2008 0 BRIAR CHAPEL WQPond#1 J. FINCH, PE NEW-05042 10/10/2008 1" RUNOFF VOLUME CALCULATION SHEET • Project Name: Briar Chapel Checked by: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 410.0 0.0 19068 412.0 2.0 22861 20965 41929 41929 2.01 414.0 4.0 26508 24685 49369 91298 3.95 416.0 6.0 31020 28764 57528 148826 6.05 • Storage vs. Stage 160000 140000 1 1498 Y = 18801x 120000 RZ = 0.9996 V 100000 rn 80000 a 60000 rn 40000 20000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (feet) Ks = 18801 b = 1.1498 Calculation of Runoff Volume required for Storage The runoff to the water quality pond for the 1" storm runoff requirement is calculated by simply multiplying the total watershed area draining to the water quality pond times the runoff depth. Total Drainage Area to WQ Pond = 22.20 acres Runoff Depth = 1 inches Therefore, total runoff from precipitation in question = 80586 CF This amount of runoff must be stored in the pond above normal pool elevation, and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. C7 BRIAR CHAPEL WQPond#1 J. FINCH, PE NEW-05042 10/10/2008 Calculation of depth required for runoff storage pool (above normal pool) • Normal pool depth (above'invert) = 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 80586 CF Stage (above invert) associated with this storage = 3.55 feet Therefore, depth required above normal pool for storm storage = 3.55 feet 42.55 inches Set crest of principal spillway at stage = 3.55 feet and EL = 413.55 feet • At principal spillway crest, storm pool storage provided = 80693 CF 0 BRIAR CHAPEL - PHASE 4 WQP#I J. FINCH, PE NEW-05042 10/13/2008 Inverted Siphon Design Sheet D orifice = # orifices = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Normal Pool = Orifice Invert = WSEL @ 1" Runoff Volume = • 3 inch 1 18801 1.1498 0.60 410.00 feet 0 cf 410.00 feet 413.55 feet WSEL (feet) Vol. Stored (cf) Siphon Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 413.55 80693 0.437 413.24 72720 0.417 0.427 7972 18683 412.94 64860 0.396 0.406 7860 19352 412.63 57123 0.373 0.385 7737 20123 412.32 49520 0.350 0.362 7603 21027 412.01 42067 0.324 0.337 7453 22113 411.71 34782 0.297 0.311 7285 23452 411.40 27692 0.267 0.282 7090 25170 411.09 20833 0.232 0.249 6859 27507 410.79 14260 0.192 0.212 6573 30997 410.48 8069.3 0.140 0.166 6191 37254 Drawdown Time = 2.84 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 1.713 feet Orifice composite loss coefficient = 0.600 Cross-sectional area of 2" orifice = 0.049 sf Q= 0.3093 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 3.02 days Conclusion : Use 1 - 3" Diameter PVC Inverted Siphon to drawdown the accumulated volume from the 1.0" storm runoff, with a required time of about 2.84 days. 0 BRIAR CHAPEL SWMF #1 -15" RCP Drawdown Pipe NEW-05042 Anti-Seep Collar Design Sheet 0 This sheet will, given the barrel length of interest and minimum seep collar projection from the barrel, determine the number of anti-seep collars to place along the barrel section, and the expected spacing of the collars. Design Requirements => Anti-seep collars shall increase the flow path along the barrel by 15%. Anti-seep collars shall be spaced a maximum of 14X the minimum collar projection or 25 feet, whichever is less. J.V. FINCH, PE 11/16/2006 Anti-Seep Collar Design => SWMF # • Flow Length Min. Calc'd # Max. # of Use Pond along barrel Projection of collars Spacing collars to Spacing Spacing ID (feet) (feet) required (feet) irse i" (feet) OK? I - 15" RCP 21.0 1.60 0.98 22.4 1.00 10. j YES Note: Ifspacing to use is greater than the maximum spacing, add collars until the spacing to use is equal to or less than the maximum spacing allowable for the collar design. Anti-seep collars shall be used under the structural fill portions of all berms/dams unless an approved drainage diaphragm is present at the downstream end of the barrel. C? BRIAR CHAPEL SWMF #1 - 15" RCP J.V. FINCH, PE NEW-05042 11/16/2006 Anti-Seep Collar Design Sheet 0 This sheet will, given the barrel length of interest and minimum seep collar projection from the barrel, determine the number of anti-seep collars to place along the barrel section, and the expected spacing of the collars. Design Requirements => Anti-seep collars shall increase the flow path along the barrel by 15%. Anti-seep collars shall be spaced a maximum of 14X the minimum collar projection or 25 feet, whichever is less. Anti-Seep Collar Design =_> SWMF # Flow Length Min. Calc'd # Max. r # of ' Use Pond along barrel Projection of collars Spacing ; collars,to , Spacing Spacing ID (feet) (feet) required (feet) usg ° (feet) ,: OK? L - 15" RCP 46.0 1.75 1.97 24.5 " '2.00 - 15.33333 YES • Note : If spacing to use is greater than the maximum spacing, add collars until the spacing to use is equal to or less than the maximum spacing allowable for the collar design. Anti-seep collars shall be used under the structural fill portions of all berms/dams unless an approved drainage diaphragm is present at the downstream end of the barrel. 0 BRIAR CHAPEL Stormwater Management Facility #1 J. FINCH, PE NEW-05042 10/2/2007 Inverted Siphon Design Sheet D siphon = 8 inches No. siphons = 1 Ks= 18801 b= 1.1498 Cd siphon = 0.60 Normal Pool Elevation = 410.00 feet Volume @ Normal Pool = 0 CF Siphon Invert = 410.00 feet WSEL @ Principal Spillway Crest = 413.60 feet • WSEL (feet) Vol. Stored (cf) Siphon Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 413.600 82001 3.033 413.289 73899 2.885 2.959 8102 2738 412.977 65912 2.729 2.807 7987 2846 412.666 58049 2.563 2.646 7863 2972 412.354 50323 2.386 2.474 7726 3123 412.043 42748 2.194 2.290 7574 3308 411.732 35346 1.984 2.089 7403 3543 411.420 28141 1.749 1.867 7205 3859 411.109 21171 1.478 1.614 6970 4320 410.797 14491 1.143 1.310 6680 5097 410.486 8200.1 0.605 0.874 6291 7198 Drawdown Time = 0.45 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 1.633 feet Orifice composite loss coefficient = 0.600 X-Sectional area of 1 - 8" Orifice = 0.349 ftZ Q = 2.1480 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 0.44 Ls -onclusion : Use 1 - 8" Diameter Orifice to drawdown the accumulated volume from the principal spillway elevation down to normal pool elevation, with a required time of about 0.49 days. 0 BRIAR CHAPEL WQP#1-EMERGENCYDP J. FINCH, PE NEW-05042 10/2/07 NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 3 Flow depth (ft) = 0.67 slope S in %: 0.50% Outlet velocity (fps) = 8.594 pipe diameter D in in.: 8 Manning number n : 0.014 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 0.67 Outlet velocity (fps) 8.59 Apron length (ft) 4.00 AVG DIAM (inches) STONE CLASS THICKNESS (inches) 3 A 9 >> 6 B 22« 13 B or 1 22 23 2 27 CALCULATION: Minimum TW Conditions: W = Do + La = 1.25' + 4' = 5.25 ft CONCLUSION: USE NCDOT CLASS `B' RIP RAP 4'L x 6'W x 22" THK C7 • WATER QUALITY POND #2 FINAL DESIGN CALCULATIONS E 0 BRIAR CHAPEL - PHASE 4 NEW-05042 00oS-I9£ (010) MNJZG Z# QNOd MYIV118 HLrII o 900'P-6044a dIZ 9004I X09 '0'd .`'?? , '-'•!„ h''. N r o Q m ON 'Xtltld 3'[ONtlI9.L HOiItl3S88 • , ; VNTIOHVO KI2ION'AMOO INVHLVHO 'SdMSNMQL SWVCI9m v Nimum o N d SHOA3A9[IS/SHHNNPId/S9aaNIJNa ?;? << vz'y_ = £ILLE VNTI09tl0 H.LHON •HtlH9n0 IOz arms •avoa a77IA3J La tld OS QVOTI'INdVHO SmNmv io5-ST '.LfNFI 'S'n 3 voi 0 r° Q Q ?1 II ` IddY1I0? I1 ? ' . A BS WHO UVrdE[- M 'O"I"I "M SI Vgcl 1KA7OT T ?1 UISNOD V 2SVTd l?l 1C1 V LWll l?l Y 1?7 V iZ 3 s 0 a V ? l ? ' ;??o +d ? , o ,?? p 4 c c ? r z SYQdQdDYQ 2I NHOI' HH,L :SNOISIA2H :9axmo ? 1Q VHD HVMS i = a U z 0 F NORTH F z 0 U C O z 0 mg c? w r; ?W o"wo ? o"j H. z„?o? mW?a 3 O Roo'2 X00 G[CJ, ?w°NZ ?W?w wpb O a " 'Z o Wm° WPM mw? om, wa m' w :???F Lw 4?w =w w?= ?mWm °poLL-?? ???Ya W ¢az wi ot,wz i aym{PAN lea- w ?KJ{Y N.luw° GCW °mY ? 5 ?? ~ sw w ~ 83 wg m;?w w°°a e OO 24LI" A I NI4o- .5-H. 0d'o? C oo: ? aw?w oiO= ° s=W ??? 8 pu a s & =o? Po~°R ru°o tg z w0s, mu pC' Y& a 18 o iyV Zm]Zm 3o 3Fw N °Oj °z' x,I° oW W ERA ?4 ~ M. ??? C7 A8 ? -zo % <9 ?Y C o E n ? ? oP ?N c < 's c Q mZ "? u6 z: " ?a :G ? a 3 °g i? s'o ?? H ?F 1 16 C. a R i v m z ? s a ? o U z 4 R S" o8° °aw ?_? ? -°j4o4 zg?w t4 u- z <oi. on o-wG o Yo wow °„p. T? QQ J g?o- 2o?WZ w2 & OW O " wWw go -?=w i2H ,y wN vo is °?"w" ?WY:zo g R A2. p & „8 W Mc'oW oW O :mzf 4z wz. u ? M 0 . w o e 05 AT P3 muN ? O XV9 mwo wSa;?wa°° ?W? °p° ?? ?_? o ° w =w ;S= .e$8%?-.m" hsGa"? ? H oY<" Fri 2? ° oG° o R' 8R " w Z o _ ;t „o "S"„woo zM j. g En ow ..Z o? w ~3 ?- zc Zi JOaw?3o W O 96 S *L'o 0 O Q? Y" 439 j F {Ipxp gywU [?Q^?]Jy C¢=4 ??iIUG i?<2 ? ;moo ri 20 yy" w?" I?==.jw? Z F?3 jno o- o. o; O Wu ?zkWgo? EW °xm S=" mw W zy, 1 °= W? o om ww? 0? °m" U' W zm y ?_ < §ua mW? ego °? w y u?? o 3b yznmb ;Jo m a W? "?? s=? ? ?w $Ygz w NN W =N 2 'oh M- A rn °a l oM- --? -!2 a -H y o Lz .1 92 - 4 m Riga .. °4 muW a 3 ?po w ma dO;";° pmoi'^? -w ° woo"<?" ~u ` -? fob o <~` iK' ui`W m.gE! o< N o-v=i u e oo? 'oo° mk'w Fyyin 37 eoa ?' m; ??a°u'e mW oo ?a°mu 'C<i ° Z w"Im wz I 's ? 2 w Du O~ O O " j W ° O?p< w "X52 ?.Qz w J y } _2 ZZ S m? 4 9 w4?m o65g 6m4 15 ??" ZJ?°41 j :9 2 KjV?2U m¢ z Zm.0 1v?9. l7J? i 6H.8" ?g u; ° jom ~?m o m? op8 ?'o m w G ip Y' g ng"ka Sao W In soma w iw >xgo °o C M ?Wgffim s m4R oa?€ u $ o m RXIV oW? ???w m s "° ° mu< 6 o' O Isom '4- riwYo .C a mo ~_wW mi a.?W °io -oo- • 0 • ZrLbZ'Z L 'L'Aloleugl 'WH 6C:90:l L L00Z/Z6/0L '6mP'Zdd-Z4090M3N\s6umeJG lu9jjno\s6uimea4 uoilonj;suoo\wjolS\Zb040-M?3,4M3N\sIoafoad\:X BRIAR CHAPEL WQP#2 J. FINCH, PE NEW-05042 10/10/2008 • • Stage-Storage Function Project Name: Briar Chapel Designer: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn rf .t? if-tr rcM NR) (CF) (CF) (feet) 419.5 0.0 25110 420.0 0.5 26023 567 25 12783 12783 0.51 X22.0 2.5 29817 27920 55840 68623 2.41 424.0 4.5 33836 31827 63653 132276 4.42 426.0 6.5 38395 36116 72231 204507 6.61 426.25 6.75 38826 38611 9653 214160 6.90 Ks = 26549 b = 1.0809 0 BRIAR CHAPEL SS FXN - WQP#2 J. FINCH, PE NEW-05042 10/10/2008 • • Stage - Storage Function Ks= 26549 b = 1.0809 Zo = 419.5 Elevation Stora e [feet] [cf] [acre-feet] 419.50 0 0.000 419.70 4662 0.107 419.90 9861 0.226 420.10 15285 0.351 420.30 20859 __O.4_79 420.50 26549 0.609 420.70 32332 0.742 T 420.90 38194 0.877 421.10 44125 1.013 421.30 50116 1.150 421.50 56161 1.289 421.70 62255 1.429 421.90 68394 1.570 422.10 74575 1.712 422.30 80794 1.855 422.50 87050 1.998 422.70 93339 2.143 422.90 99661 2.288 423.10 106012 2.434 423.30 112392 2.580 423.50 118800 2.727 423.70 125233 2.875_ 423.90 131691 3.023 424.10 138173 3.172 424.30 144678 3.321 ^424.50 151205 3.471 424.70 157752 3.621 424.90 164321 3.772 425.10 170909 3.924 425.30 177516 4.075 425.50 184142 4.227 425.70 190785 4.380 425.90 197446 4.533 426.10 204124 4.686 426.25 209143 1 4.801 r? • Type.... Outlet Input Data Page 1.01 Name.... WQP2 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 419.50 ft Increment = .20 ft Max. Elev.= 426.25 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) <---> Forward and Reverse Both Allowed Structure ----------------- No. - Outfall E1, ft E2, ft Weir-XY Points --- ES ------- ---> TW --------- 424.500 --------- 426.250 Orifice-Circular SI ---> TW 419.500 426.250 Inlet Box RI ---> BA 423.600 426.250 Culvert-Circular BA ---> TW 414.000 426.250 TW SETUP, DS Channel • • SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 Type.... Outlet Input Data Page 1.02 Name.... WQP2 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = .ES Structure Type = Weir-XY Points ------------------------------------ # of Openings = 1 WEIR X-Y GROUND POINTS X, ft Elev, ft --------- --------- .00 426.25 5.25 424.50 35.25 424.50 40.50 426.25 Lowest Elev. = 424.50 ft Weir Coeff. = 3.000000 Weir TW effects (Use adjustment equation) Structure ID = SI Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 419.50 ft • Diameter 2500 ft Orifice Coeff. .600 • SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • Type.... Outlet Input Data Name.... WQP2 Page 1.03 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type = Inlet Box ----- ------- ----------------- # of Openings ------- = 1 Invert Elev. = 423.60 ft Orifice Area = .6000 sq.ft Orifice Coeff. = 36.000 Weir Length = 24.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 • C7 S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 .7 Type.... Outlet Input Data Name.... WQP2 Page 1.04 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type ---------------- = Culvert-Ci rcular -- No. Barrels ------------ = 1 ------ Barrel Diameter = 3.5000 ft Upstream Invert 414.00 ft Dnstream Invert = 413.00 ft Horiz. Length = 68.00 ft Barrel Length = 68.01 ft Barrel Slope = .01471 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .005885 Kr - .5000 HW Convergence = .001 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.153 T2 ratio (HW/D) = 1.299 Slope Factor = -.500 • Use unsubmerged inlet control Form 1 equ. below Tl elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at Tl & T2... At T1 Elev = 418.04 ft ---> Flow = 63.00 cfs At T2 Elev = 418.55 ft ---> Flow = 72.00 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • Type.... Outlet Input Data Name.... WQP2 Page 1.05 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES ... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs E • S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • • • Type.... Composite Rating Curve Name.... WQP2 Page 1.17 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: WS Elev, Total Q Elev. Q ft cfs -------- 419.50 ------- .00 419.70 .06 419.90 .12 420.10 .16 420.30 .19 420.50 .22 420.70 .24 420.90 .27 421.10 .29 421.30 .31 421.50• .32 421.70 .34 421.90 .36 422.10 .37 422.30 .39 422.50 .40 422.70 .41 422.90 .43 423.10 .44 423.30 .45 423.50 .47 423.60 .47 423.70 2.75 423.90 12.32 424.10 25.96 424.30 42.68 424.50 62.00 424.70 91.76 424.90 130.67 425.10 187.06 425.30 213.13 425.50 243.06 425.70 276.63 425.90 313.71 SIN: 6217012070C3 PondPack Ver. 8.0058 ***** COMPOSITE OUTFLOW SUMMARY **** -------- Converge TW Elev Error ft +/-ft -------- ----- Free Outfall Free Outfall Free Outfall Free Outfall Free outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Notes ------------------------- Contributing Structures (no Q: ES,SI,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI (no Q: ES,RI,BA) SI,RI,BA (no Q: ES) SI,RI,BA (no Q: ES) SI,RI,BA (no Q: ES) SI,RI,BA (no Q: ES) SI,RI,BA (no Q: ES) ES,SI,RI,BA ES,SI,RI,BA ES,SI,RI,BA ES,SI,RI,BA ES,SI,RI,BA ES,SI,RI,BA ES,SI,RI,BA The John R. McAdams Company Time: 2:26 PM Date: 10/10/2008 • • Type.... Composite Rating Curve Name.... WQP2 Page 1.18 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes ---------------- -------- Converge ------------------------- Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures -------- ------- -------- ----- -------------------------- 426.10 354.18 Free Outfall ES,SI,RI,BA 426.25 386.72 Free Outfall ES,SI,RI,BA SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 HMS * Summary of Results for WQP#2 Project : NEW-05042 Run Name : 1-Year Post • Start of Run 10Oct08 0000 Basin Model Post-Development End of Run 11Oct08 0000 Met. Model 1-Year Storm Execution Time 10Oct08 1523 Control Specs 1-Minute dT Computed Results Peak Inflow 58.725 (cfs) Date/Time of Peak Inflow 10 Oct 08 1157 Peak Outflow 0.44578 (cfs) Date/Time of Peak Outflow 10 Oct 08 2400 Total Inflow 1.25 (in) Peak Storage 2.5184(ac-ft) Total Outflow 0.18 (in) Peak Elevation 423.22(ft) 0 HMS * Summary of Results for WQP#2 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run 11Oct08 0000 Execution Time 100ct08 1523 Run Name : 2-Year Post • Computed Results Basin Model Post-Development Met. Model 2-Year Storm Control Specs 1-Minute dT Peak Inflow 86.087 (cfs) Date/Time of Peak Inflow : 10 Oct 08 1205 Peak Outflow 2.9808 (cfs) Date/Time of Peak Outflow : 10 Oct 08 1502 Total Inflow 1.71 (in) Peak Storage 2.8786(ac-ft) Total Outflow 0.55 (in) Peak Elevation 423.70(ft) L' HMS * Summary of Results for WQP#2 Project : NEW-05042 Run Name : 10-Year Post Start of Run 10Oct08 0000 Basin Model Post-Development End of Run 11Oct08 0000 Met. Model 10-Year Storm Execution Time 10Oet08 1523 Control Specs 1-Minute dT Computed Results Peak Inflow 136.58 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 49.950 (cfs) Date/Time of Peak Outflow 10 Oct 08 1216 Total Inflow 3.22 (in) Peak Storage 3.3774(ac-ft) Total Outflow 2.04 (in) Peak Elevation 424.38(ft) C7 0 HMS * Summary of Results for WQP#2 Project : NEW-05042 Run Name : 25-Year Post • Start of Run 10Oct08 0000 Basin Model Post-Development End of Run 11Oct08 0000 Met. Model 25-Year Storm Execution Time 10Oet08 1524 Control Specs 1-Minute dT Computed Results Peak Inflow 167.15 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 110.39 (cfs) Date/Time of Peak Outflow 10 Oct 08 1210 Total Inflow 4.15 (in) Peak Storage 3.6933(ac-ft) Total Outflow 2.96 (in) Peak Elevation 424.80(ft) • 0 HMS * Summary of Results for WQP#2 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run 11Oct08 0000 Execution Time 100ct08 1524 Run Name : 100-Year Post • Basin Model Post-Development Met. Model 100-Year Storm Control Specs 1-Minute dT Computed Results Peak Inflow 214.38 (cfs) Peak Outflow 192.35 (cfs) Total Inflow 5.62 (in) Total Outflow 4.42 (in) Date/Time of Peak Inflow 10 Oct 08 1204 Date/Time of Peak Outflow 10 Oct 08 1207 Peak Storage 3.9546(ac-ft) Peak Elevation 425.14(ft) 0 BRIAR CHAPEL SS FXN - WQP#2(100Yr) J. FINCH, PE NEW-05042 10/13/2008 • => Stage - Storage Function Ks = 26549 b = 1.0809 Zo = 419.5 • Elevation Storage 100-Year Worst Case [feet] [cf] [acre-feet] [cf] [acre-feet] 419.50 0 0.000 - 419.70 i 4662 0.107 - v - ? 419.90 9861 0.226 - I - 420.10 15285 0.351 - 420.30 T 20859 v 0.479 - 420.50 26549 0.609-- L- v ____- 420.70 420.90 32332 38194 0.742 0.877 - - - - 421.10 44125 1.013 - - 421.30 5y 0116 1.150 _ 421.50 56161 1.289 ^ 421.70 i e 62255 1.429 - 421.90 8394 1.570 - - 422.10 74575 1.712 422.30 80794 1.855 - _ - ? 422.50 87050 1.998 - ( v - _ 422.70 93339 2.143 - - 422.90 99661 2.288 - 423.10 106012 2.434 423.30 112392 2.580 - 423.50 _ 118800 2.727 423.60 1 122013 2.801 0 0.000 423.80 128459 2.949 6446 0.148 424.0_ 424.20 W134929 1LL 3.098` 3.247 12916 F _19410 0.297 0.446 424.40 _ 424.60 147938 ?. 154476 3.396 3.546 1 25925 32463 I 0.595 0.745 424.80 161034 _3.697 39021 L 0.896 425.00 167612 3.848 45599 1.047 425.20 174210 3.999 52197 1.198 425.40 180827 4.151 _ 58813 1.350 425.60 187461 4.304 65448 1.502 425.80 194113 4.456 _ 72100 1.655 426.00 200783 4.609 78770 1.808 426.20 207469 4.763 85456 -961- 426.25 209143 4.801 87130 2.000 100-1t2 cftsr- ?Z'?"-fNv6 (&?T" 0 • • • Type.... Composite Rating Curve Name.... WQP2(100YR) ***** COMPOSITE OUTFLOW SUMMARY **** File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: WS Elev, Total Q Elev. Q ft cfs -------- 423.60 ------- .00 423.80 6.44 424.00 18.21 424.20 33.46 424.40 51.52 424.50 61.47 424.60 74.87 424.80 109.75 425.00 152.21 425.20 199.04 425.40 227.06 425.60 258.82 425.80 294.15 426.00 332.93 426.20 375.06 426.25 386.12 SIN: 6217012070C3 PondPack Ver. 8.0058 Notes ------ -- Converge ------------- ------------ TW El ev Error ft +/-ft Contributing Structures ------ Free -- ----- - Outfall ------------- (no Q: ES,RI ------------ ,BA) Free Outfall RIBA (no Q: ES) Free Outfall RIBA (no Q: ES) Free Outfall RIBA (no Q: ES) Free Outfall RIBA (no Q: ES) Free Outfall RIBA (no Q: ES) Free Outfall ES,RI,BA Free Outfall ES,RI,BA Free Outfall ES,RI,BA Free Outfall ES,RI,BA Free Outfall ES,RI,BA Free Outfall ES,RI,BA Free Outfall ES,RI,BA Free Outfall ES,RT,BA Free Outfall ES,RT,BA Free Outfall ES,RI,BA Page 1.09 ov" It&-RW uooir C/6? a The John R. McAdams Company Time: 10:51 AM Date: 10/13/2008 HMS * Summary of Results for WQP#2 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run 110ct08 0000 Execution Time 130ct08 1115 Run Name : 100-YrPost(WC) • Basin Model Post-Dev(100YrWC) Met. Model 100-Year Storm Control Specs 1-Minute dT Computed Results Peak inflow 214.38 (cfs) Peak Outflow 197.31 (cfs) Total inflow 5.62 (in) Total Outflow 5.60 (in) Date/Time of Peak inflow 10 Oct 08 1204 Date/Time of Peak Outflow 10 Oct 08 1206 Peak Storage 1.1924(ac-ft) Peak Elevation 425.19(ft) 0 BRIAR CHAPEL BELOW NWSE J. FINCH, PE NEW-05042 10/10/2008 Stage-Storat S Project Name: Designed By: Job Number: Date: ,e Function Briar Chapel J. Finch, PE NEW-05042 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour. Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 413.0 0.0 7195 114.0 1.0 8934 8065 8065 8065 1.03 416.0 3.0. 12919 10927 21853 29918 2.85 417.5 4.5 16354 14637 21955 51872 4.36 418.0 5.0 19863 18109 9054 60927 4.94 419.5 6.5 25110 22487 33730 94656 6.95 • Ks = 7761.3 b = 1.2901 • 1 OF 4 BRIAR CHAPEL FOREBAY 1 J. FINCH, PE NEW-05042 10/10/2008 E • Storage vs. Stage 12000 10000 2971 y = 1470.6x a 8000 R2 = 0.9989 v w 6000 y 4000 2000 0 0.0 1.0 2.0 3.0 4.0 5.0 Stage (feet) Ks = 1470.6 b = 1.2971 • 2OF4 Stage-Storage Function Project Name: Briar Chapel Designed By: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 413.0 0.0 1275 414.0 1.0 1696 1486 1486 1486 1.01 4ib.0 3.0 2708 2202 4404 5890 2.91 417.5 4.5 3616 3162 4743 10633 _ 4.60 • CJ BRIAR CHAPEL NEW-05042 Storage vs. Stage 9000 8000 7000 1 3672 y = 953.81 x a 6000 R2 = 0.9987 5000-- 4000-- 3000 h 2000 1000 0 0.0 1.0 2.0 3.0 4.0 5.0 Stage (feet) Ks = 953.81 b = 1.3672 3OF4 FOREBAY 2 Stage-Storage Function Project Name: Briar Chapel Designed By: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 413.0 0.0 792 414.0 ................................ 1.0 ._.,.................? .- 1138 .,.......-..._. .. ,.. _ . 965 965 965 1.01 416.0 . 3.0 . . . . ... 1999 ..............-....m......_.., 1569 ................. ,..... 3137 ........._..,................... 4102 _------ .... .............. .. .. 2.91 417.5 4.5 2793 2396 3594 7696 4.61 J. FINCH, PE 10/10/2008 BRIAR CHAPEL VOLUME AND SURFACE AREA CHECK J. FINCH, PE NEW-05042 10/13/2008 IFJOW4Y Per NCDENR "Stormwater Best Management Practices ", the forebay volume should equal about 20% of the total • basin volume. A. Water Quality Pond - Below Normal Pool Volume Volume = 94656 ft3 B. Forebay Volume Volume = 18329 ft3 Forebay = 19% Impervious Area = 1.3.83 acres Drainage Area = 29.3 31 acres % Impervious = 48.9% Cotal Below NP Volume 94656 cf Surface Area 25110 sf Average Depth = 3.77 ft -=> From the NCDENR Stormwater BW Handbook (4/99), • in the Piedmont is as follows: the required SA/DA ratio for 85% TSS Removal 3.0 3.77 4.0 Lower Boundary => 40.0 1.73 1.43 Site % impervious => 48.9 2.02 1.77 1.70 Upper Boundary => 50.0 2.06 1.73 Area Required = 21837 sq.ft. Area Provided = 25110 s .ft. YES • 1 OF 1 BRIAR CHAPEL WQPond#2 J. FINCH, PE NEW-05042 10/10/2008 • 1" RUNOFF VOLUME CALCULATION SHEET Project Name: Briar Chapel Checked by: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 419.5 0.0 _ 25110 420.0 0.5 26023 25567 12783 12783 0.51 422.0 2.5 29817 27920 55840 68623 2.41 424.0 4.5 33836 31827 63653 132276 4.42 426.0 6.5 38395 36116 72231 204507 6.61 426.3 6.8 38826 38611 9653 214160 6.90 Calculation of Runoff Volume required for Storage The runoff to the water quality pond for the 1" storm runoff requirement is calculated by simply multiplying the total watershed area draining to the water quality pond times the runoff depth. Total Drainage Area to WQ Pond = 28.31 acres Runoff Depth = I inches Therefore, total runoff from precipitation in question = 102765 CF This amount of runoff must be stored in the pond above normal pool elevation, and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. 0 KS = 26549 b = 1.0809 BRIAR CHAPEL WQPond#2 J. FINCH, PE NEW-05042 10/10/2008 Calculation of depth required for runoff storage pool (above normal pool) • Normal pool depth (above invert) = 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 102765 CF Stage (above invert) associated with this storage = 3.50 feet Therefore, depth required above normal pool for storm storage = 3.50 feet 41.97 inches Set crest of principal spillway at stage = 3.50 feet and EL = 423.00 feet At principal spillway crest, storm pool storage provided = 102833 CF • BRIAR CHAPEL - PHASE 4 WQP#2 J. FINCH, PE NEW-05042 10/13/2008 Inverted Siphon Design Sheet D orifice = # orifices = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Normal Pool = Orifice Invert = WSEL @ 1" Runoff Volume = r? 3 inch 26549 1.0809 ' 0.60 419.50 feet 0 cf 419.50 feet 423.00 feet WSEL (feet) Vol. Stored (cf) Siphon Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 423.00 102833 0.434 422.69 93074 0.413 0.423 9759 23049 422.38 83391 0.392 0.403 9683 24052 422.07 73792 0.369 0.381 9599 25219 421.77 64286 0345 0.357 9506 26603 421.46 54884 0.319 0.332 9402 28285 421.15 45602 0.291 0.305 9282 30392 420.84 36460 0.260 0.276 9142 33148 420.53 27488 0.225 0.243 8972 36995 420.22 18733 0.183 0.204 8755 42969 419.92 10283.3 0.127 0.155 8449 54523 Drawdown Time = 3.76 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 1.688 feet Orifice composite loss coefficient = 0.600 Cross-sectional area of 2" orifice = 0.049 sf Q= 0.3070 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 3.88 days Conclusion : Use 1 - 3" Diameter PVC Inverted Siphon to drawdown the accumulated volume from the 1.0" storm runoff, with a required time of about 3.76 days. 0 BRIER CHAPEL SWMF #2 - 12" DIP J.V. FINCH, PE NEW-05042 7/13/2006 • This sheet will, given the barrel length of interest and minimum seep collar projection from the barrel, determine the number of anti-seep collars to place along the barrel section, and the expected spacing of the collars. Design Requirements => Anti-seep collars shall increase the flow path along the barrel by 15%. Anti-seep collars shall be spaced a maximum of 14X the minimum collar projection or 25 feet, whichever is less. Anti ,Seep Collar Design => SWMF A Flow Length Min. Calc'd # Max. # of Use Pond along barrel Projection of collars Spacing collars to Spacing Spacing ID (feet) (feet) required (feet) use (feet) OK? 2 - 12" DIP 67.0 2.53 1.99 25 2.00 ' 22.33333 YES • Note: Ifspacing to use is greater than the maximum spacing, add collars until the spacing to use is equal to or less than the maximum spacing allowable for the collar design. Anti-seep collars shall be used under the structural fill portions of all berms/dams unless an approved drainage diaphragm is present at the downstream end of the barrel. Anti-Seep Collar Design Sheet 0 BRIER CREEK WATER QUALITY POND #2 J.V. FINCH, PE NEW-05042 7/13/2006 0 Input Data ==> Square Riser/Barrel Anti-Flotation Calculation Sheet Inside length of riser = 6.00 feet Inside width of riser = 6.00 feet Wall thickness of riser = 6.00 inches Base thickness of riser = 8.00 inches Base length of riser = 7.00 feet Base width of riser = 7.00 feet Inside height of Riser = 9.60 feet Concrete unit weight = 142.0 PCF OD of barrel exiting manhole = 52.50 inches Size of drain pipe (if present) = 8.0 inches Trash Rack water displacement = 79.39 CF Concrete Present in Riser Structure ==> Total amount of concrete: Base of Riser = 32.667 CF Riser Walls = 124.800 CF • Opening for barrel = 7.517 CF Opening for drain pipe = 0.175 CF Note 1C Products Es:_ unk Y t_ of manhole wncretc at '42. Total Concrete present, adjusted for openings = 149.776 CF Weight of concrete present = 21268 lbs Amount of water displaced by Riser Structure ==> Displacement by concrete = 149.776 CF Displacement by open air in riser = 345.600 CF Displacement by trash rack = 79.390 CF Total water displaced by riser/barrel structure = 574.766 CF Weight of water displaced = 35865 lbs Calculate amount of concrete to be added to riser ==> Safety factor to use = 1.15 Must add = 19977 lbs concrete for buoyancy • Adjust for openings: Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Buoyant weight of this concrete = 79.60 PCF Buoyant, with safety factor applied = 69.22 PCF Therefore, must add = 288.613 CF of concrete Standard based described above = 32.667 CF of concrete Therefore, base design must have = 321.280 CF of concrete 1 OF 2 BRIER CREEK WATER QUALITY POND #2 J.V. FINCH, PE NEW-05042 7/13/2006 • Calculate size of base for riser assembly ==> Length = 10.000 feet Width = 10.000 feet Thickness = 39.0 inches Concrete Present = 325.000 CF OK Check validity of base as designed ==> Total Water Displaced = 867.099 CF Total Concrete Present = 442.109 CF Total Water Displaced = 54107 lbs Total Concrete Present = 62779 lbs Actual safetyfactor = 1.16 Results of design ==> C J Base length = 10.00 feet Base width = 10.00 feet Base Thickness = 39.00 inches CY of concrete total in base = 12.04 CY Concrete unit weight in added base >= 142 PCF OK 2OF2 BRIAR CHAPEL NEW-05042 0 NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 49.97 Flow depth (ft) = 1.56 slope S in %: 1.47% Outlet velocity (fps) = 12.052 pipe diameter D in in.: 42 Manning number n : 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 3.5 Outlet velocity (fps) 12.05 Apron length (ft) 28.00 B. IHNATOLYA, El 8/28/07 AVG DIAM STONE THICKNESS • (inches) CLASS (inches) 3 A 9 6 B 22 »13 B or 1 22« 23 2 27 CALCULATION: Minimum TW Conditions: W = Do + La = 3.5' + 28' =31.5 ft CONCLUSION: USE NCDOT CLASS W RIP RAP 28'L x 32'W x 22" THK • ECDesign(R)2000 Channel Analysis Report Channel Design Channel Name: Fmerpenc;v snillwav - Pond #7 Units: Fake. Design life: 1700 months Design Criteria Vegetation and Soil Channel Geometry Flow/Velocity Flnw Rate M) Vegetated Yes Vegetation Class 1) Soil Filled No Bed Slope (ft/ft) Inn Req. Freeboard (ft) .000 Channel Len th (ft) 70000 Discharge (cf/s) 110410 Flow Duration (hrs) 7 Avg. Velocity (ft/s) 7 410 g Channel Side Slopes H:1 V) i non t (H:1 V) 1 nnn Channel Bend False Bend Radius (ft) non Outside Bend Bottom Width (ft) in non Channel Depth (ft) 1 500 Required Factor 1 15 of Safety Results Avg. Flow Depth (ft) Velocity (ft/s) Shear Stress (lbs/sgft) Pass Quantity Lining Materials Computed max Allowed Safet Facto Computed ax A owed Safety Factor (SY) Left PYR AMAT 727n 71 690 1 nnn 4 540 R Ron 1 940 Y I R9 Bottom PYR AMAT 7 970 71 690 7 760 5 410 R Ron 1 61n Y 911 11 Right PYR AMAT 7 770 71 690 1 non 4 540 R Ron 1 94n Y 16 89 Calculation Results: Flow Depth (ft) Flow Area (ft) Hydraulic Radius (ft) Opposite 'n' 4'in Left Wetted Perimeter (ft) 11 570 Bottom Wetted Perimeter (ft) Right Wetted Perimeter (ft) Total Wetted Perimeter (ft) 410 Avg. Velocity (ft/s) 047 Avg. Discharge (cf/s) 1 170 30.000 1 370 19 740 7 4in 11041n WATER QUALITY POND #3 FINAL DESIGN CALCULATIONS C7 • BRIAR CHAPEL - PHASE 4 NEW-05042 0005-T9Q We) ,•,,,"", , S'wiau £# QNOd ALPIVIIS,azl A dlz 5009T XOH 'O'd 900$1-6044? . ...•.•• Q U] . ON 'XHVd 3IJNVIH L HOlItl3S321 . •. VKnOUV0 HMON AIM00 IRVHLVHO 'SdIHSNdAQL ° g o n CY) Ul Q S$OA3AHRS/SH3NNVId/SH33NION3 EN < < i ?' = : c N UT442 YNn0HYJ HdHON 'NVHHHO ' SWV(IUM$NMQIVHQVOH rIZdVH0 SNNVIP I09-91 'AA&H 'S' I] 3 o m m z m QI Fa • 0 NI ` kNd dN00 W o ` Sa T02 3.LIfIS OtlOH 371IA3.LL3Atl3 0595 'Xl"' ` - SlyVId 111ATOT T 1 flLLVI Iy TN0D i.? ?TCtVTw7 V 17Td 1H V O LS ?l Y 1 z w ° a , T ? 7 /?? ? 7 • - o ' I lRdax3 xvrxs cINN / ?I ? \ ?? ? \ ? L z l . ? . ? 7 T ? SN V (I V `DW 2I Ni3O1 HHl :SNOISIA3H :H3NM0 N / ? ?J ? ? ?? ? A/ `? rfl 1`i? y c 9 C ; a- hip z 0 F NORTH ? a X 0 V a 0 a 0 w a w <? z U N I V? U z z a ? U p z w z 0 P W. s F t g9l,W=1 t.m W WW: ? ?w3$ °?w? n SPH _? z„soot OW?a o pow ;a , Y??z 0 opmsw %sY WPB U ?g 4? m aa z ? o g -U, GZW 4is -qq d-. w W R' oWa j?w°?3 a Fgx _ z ?w mm ° Y w w ° WO°o g¢S 'Wo z? YiUp ~ V ?iu 9z Oy LNG 3°2 ?O yj :W,m? zs:rcN poi z7W ??Fmm° ia` Nei ?rco8 g'? :- ,w '?$? o Yes Tn a5 i o o? Y z[?k'o s ?rc x~x - W~4 w? Nuon 3E. az 70 7 ?0 "aow g°? - 'g?WSssBo= wg p;w W as a '? -P3. '_ uu C -ffiil § m - ° LL?F 02 Ln ZZ<, i GYM O w? ? ?? m o? wW Q. t om O? =o kiO41- W .P. ooai cmaSo a 4? ''WW zW°6=N=? `W' ?z°aws$ poi °° : ugs ug°o ,z Zzo ??w? O NWk=c`?= .•7 ?zo om ?i z N&rc igx p Sugw o?i? 81 V w im JAS p qzz? ?Wx W ot °'m m w€Nm ?•?y7oo °i2' -U?g' fn .49 ?nE os? b=m t3 Xl g?x °O ?" 3 Rw3 mac ozmoz Ir""? _? NoE RM 1. 1. -1 1 z. z, I Wom "w g?WY z mL iE- dLW= ?a eta=? w aF €g°-` o. m58}0 .ossw m sjo ?d F w HAY E ? zm F 0 gn?5u pw? <wG °c u6 z,- o w R 3_W€Ww oou J °?o o" i ° WO 0 `09 j z°yS F? o, r a$ m „w xyzN (ACa bao? 'msg°= 'o CL ogwm0g ooo o rn ?i Wow 08,-? W2 WoQ o;o- Ywo?w. 40 A - O'l ?Gi~?mu f0? mc? roaa?Wa UN°9 L o WF m o ? aC ?i ?4 ?y(on w? ?Do ° . za nova a ?$ ? o U? 5 Oww mo & - F9 oW :.aY 285- og? ? W$m? o°kmYFO 39og ?w 6P. O. C.. ziwt 0,$3 SNZm° O i. °mY rca <?? O g`°' ' m ?u °z zw? m S ?G o ^SO W Yg< _ me WF °m o Y j$$mW ;W A'm o 2-`acs mmo$ ?° -o X03 N &o 'To. o'g ?? moo c o3m wo °o$ °m o? .00 z ??x~ R zj°z<Om ogo I_ z °.anW m F2- 3 2 3 ,ll?yye? ]_ o g 2 <m N?N OFIVn? _ Sw g UhN im OQ WT. ?r w ?Ox m __ m+m? Nm? $ zW mrzj o??g° °"us2Y hoo owv? -m? ?? o2NN ? "? rc 08 gym= ioj 3 og ° -MA SW? TgV Sze pW z? zu o<W?+? m??b ?2°m$ of z tj?ma»<= m? p°: - fi ?gk imp SEE hYo .w_ ?? e??sw ?.-ER mg Pn? d?z o z 1, Zti6bZ,Z l Wlo;euyl 'INV Ob:EE 6l LOOZ/ZZ/Ol '6MP'Ead 4b090M3N\s6uinneJ • Q;uaJm0\s6uimeaa uogoni;suoo\wjo;S\Lb090-M3NW\3N\S;oafald\:X BRIAR CHAPEL WQP#3 NEW-05042 Stage-Storage Function . Project Name: Briar Chapel Designer: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 J. FINCH, PE 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (fP.er) (feet) (SF) (SF) (CF) (CF) (feet) 433.0 0.0 17411 434.0 1.0 19144 18278 18278 18278 1.01 436.0 3.0 22779 20962 41923 60201 2.95 438.0 5.0 26641 24710 49420 109621 5.06 C? Storage vs. Stage 120000 100000 y = 18164x''... R2 = 0.9996 LL 80000 p> 60000 r y 40000 20000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) Ks= 18164 b = 1.1086 BRIAR CHAPEL SS FXN - WQP#3 J. FINCH, PE NEW-05042 10/10/2008 • => Stage - Storage Function Ks= 18164 b= 1.1086 Zo = 433 Elevation Storage feet _ cfJ [acre-fe 433.00 0 0.000 433.20 3050 0.070 433.40 6577 0.151 433.60 10310 0.237 433.80 _ 14183 0.326 434.00 18164 0.417 434.20 22233 0.510 434.40 26376 0.606 434.60 30584 0.702 434.80 34850 0.800 435.00 39168 0.899 435.20 43533 0.999 435.40 _ 47942 1.101 435.60 52390 1.203 435.80 56876 1.306 436.00 61397 1.409 436.20 65951 1.514 436.40 70536 1.619 436.60 75150 1.725 436.80 79792 1.832 • 437.00 8446F--7-939 437.20 89155 2.047 437.40 93874 2.155 437.60 98615 2.264 437.80 103380 2.373 438.00 108166 1 2.483 0 Type.... Outlet Input Data Page 1.01 Name.... WQ23 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 433.00 ft Increment = .20 ft Max. Elev.= 438.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice-Circular SI ---> TW 433.000 438.000 Inlet Box RI ---> BA 435.500 438.000 Culvert-Circular BA ---> TW 426.500 438.000 TW SETUP, DS Channel • SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 Type.... Outlet Input Data Name.... WQP3 Page 1.02 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = SI Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 433.00 ft Diameter = .1667 ft Orifice Coeff. _ .600 Structure ID = RI Structure Type ----------------- = Inlet Box ------------- ------ # of Openings = 1 Invert Elev. = 435.50 ft Orifice Area = .6000 sq.ft Orifice Coeff. = 16.000 Weir Length = 16.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 is • S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • Type.... Outlet Input Data Name.... WQP3 Page 1.03 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type ----------------- = Culvert-Circular ------------------- No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 426.50 ft Dnstream Invert = 426.00 ft Horiz. Length = 73.00 ft Barrel Length = 73.00 ft Barrel Slope = .00685 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb - .012411 Kr = .5000 HW Convergence = .001 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.157 T2 ratio (HW/D) = 1.303 Slope Factor = -:500 is Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 428.81 ft ---> Flow = 15.55 cfs At T2 Elev = 429.11 ft ---> Flow = 17.77 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • Type.... Outlet Input Data Name.... WQP3 Page 1.04 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES ... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs • C7 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • Type.... Composite Rating Curve Name.... WQP3 Page 1.10 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** • is WS Elev, Total Q Notes -------- -------- ------ -- Converge ----------- -------------- Elev. Q TW El ev Error ft cfs ft +/-ft - - Contributing Structures ------------------------- -------- 433.00 ------- .00 ------ Free -- --- - Outfall (no Q: SI,RI,BA) 433.20 .04 Free Outfall SI (no Q: RIBA) 433.40 .06 Free Outfall SI (no Q: RI,BA) 433.60 .08 Free Outfall SI (no Q: RIBA) 433.80 .09 Free Outfall SI (no Q: RI,BA) 434.00 .10 Free Outfall SI (no Q: RIBA) 434.20 .11 Free Outfall SI (no Q: RI,BA) 434.40 .12 Free Outfall SI (no Q: RIBA) 434.60 .13 Free Outfall SI (no Q: RIBA) 434.80 .14 Free Outfall SI (no Q: RI,BA) 435.00 .15 Free Outfall SI (no Q: RI,BA) 435.20 .15 Free Outfall SI (no Q: RI,BA) 435.40 .16 Free Outfall SI (no Q: RIBA) 435.50 .16 Free Outfall SI (no Q: RI,BA) 435.60 1.68 Free Outfall SI,RI,BA 435.80 8.06 Free Outfall SI,RI,BA 436.00 17.15 Free Outfall SI,RI,BA 436.20 28.30 Free Outfall SI,RI,BA 436.40 41.17 Free Outfall SI,RI,BA 436.60 46.83 Free Outfall SI,RI,BA 436.80 47.36 Free Outfall SI,RI,BA 437.00 47.89 Free Outfall SI,RI,BA 437.20 48.41 Free Outfall SI,RI,BA 437.40 48.93 Free Outfall SI,RI,BA 437.60 49.44 Free Outfall SI,RI,BA 437.80 49.94 Free Outfall SI,RI,BA 438.00 50.44 Free Outfall SI,RI,BA SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 HMS * Summary of Results for WQP#3 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run 11Oct08 0000 Execution Time 100ct08 1523 Run Name : 1-Year Post • Basin Model Post-Development Met. Model 1-Year Storm Control Specs 1-Minute dT Computed Results Peak Inflow 19.613 (cfs) Peak Outflow 0.14517 (cfs) Total Inflow : 1.13 (in) Total Outflow 0.15 (in) Date/Time of Peak Inflow 10 Oct 08 1157 Date/Time of Peak Outflow 10 Oct 08 2400 Peak Storage 0.85114(ac-ft) Peak Elevation 434.90(ft) 0 HMS * Summary of Results for WQP#3 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run 110ct08 0000 Execution Time 100ct08 1523 Run Name : 2-Year Post C, Basin Model Post-Development Met. Model 2-Year Storm Control Specs 1-Minute dT Computed Results Peak Inflow 29.209 (cfs) Peak Outflow 0.45553 (cfs) Total Inflow 1.57 (in) Total Outflow 0.31 (in) Date/Time of Peak Inflow 10 Oct 08 1205 Date/Time of Peak Outflow 10 Oct 08 1804 Peak Storage 1.1208(ac-ft) Peak Elevation 435.44(ft) 0 HMS * Summary of Results for WQP#3 Project : NEW-05042 Run Name : 10-Year Post • Start of Run 100ct08 0000 Basin Model Post-Development End of Run 11Oct08 0000 Met. Model 10-Year Storm Execution Time 10OCt08 1523 Control Specs 1-Minute dT Computed Results Peak Inflow 47.778 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 9.6887 (cfs) Date/Time of Peak Outflow 10 Oct 08 1225 Total Inflow 3.03 (in) Peak Storage 1.3245(ac-ft) Total Outflow 1.75 (in) Peak Elevation 435.84(ft) is r? HMS * Summary of Results for WQP#3 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run 11Oct08 0000 Execution Time 100ct08 1524 Run Name : 25-Year Post • Computed Results Basin Model Post-Development Met. Model 25-Year Storm Control Specs 1-Minute dT Peak Inflow 59.117 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 24.320 (cfs) Date/Time of Peak Outflow 10 Oct 08 1215 Total Inflow 3.94 (in) Peak Storage 1.4765(ac-ft) Total Outflow 2.65 (in) Peak Elevation 436.13(ft) 0 HMS * Summary of Results for WQP#3 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run 11Oct08 0000 Execution Time 100ct08 1524 Run Name : 100-Year Post rI Basin Model Post-Development Met. Model 100-Year Storm Control Specs 1-Minute dT Computed Results Peak Inflow 76.695 (cfs) Peak Outflow 46.417 (cfs) Total Inflow 5.39 (in) Total Outflow 4.08 (in) Date/Time of Peak Inflow 10 Oct 08 1204 Date/Time of Peak Outflow 10 Oct 08 1210 Peak Storage 1.7173(ac-ft) Peak Elevation 436.59(ft) 0 BRIAR CHAPEL SS FXN - WQP#3(100Yr) J. FINCH, PE NEW-05042 10/13/2008 • __> Stage - Storage Function Ks= 18164 b= 1.1086 Zo = 433 • Elevation Storage 100-Year Worst Case [feet] [cf] [acre-feet] [cf] [acre-feet] 433.00 0 0.000 - 433.20 3050 0.070 - 433.40 6577 0.151 - - 433.60 10310 0.237 - 433.80 14183 0.326 - - 434.00 1 18164 0.417 - - 434.20 22233 0.510 - - 434.40 26376 0.606 - - 434.60 30584 0.702 - 434.80 34850 0.800 - - 435.00 39168 0.899 - 435.20 43533 0.999 - - 435.40 47942 1.101 435.50 50161 1.152 0 F 0.000 435.70 54629 1.254 4468 0.103 435.90 59132 1.357 8971 T 0.206 436.10 63670 1.462 13509 0.310 436.30 68240 1.567 18078 0.415 _ 436.50 72839 1.672 2678 0.521 436.70 77468 1.778 27306 _ 0.627 436.90 82123 1.885 31962 0.734 437.10 _86805 1.993 36644 0.841 437.30 91511 2.101 41350 0.949 437.50 96242 2.209 46080 1.058 _437.70 100995 __ 2.319 50834 1.167 437.90 105770 _ 2.428 55609 1.277 438.00 108166 _ 2.483 M58005 1.332 p, Tw G 0 C7 • Type.... Composite Rating Curve Name.... WQP3(100YR) Page 1.07 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: WS Elev, Total Q Elev. Q ft cfs -------- 435.50 ------- .00 435.70 4.29 435.90 12.14 436.10 22.31 436.30 34.35 436.50 46.36 436.70 46.89 436.90 47.42 437.10 47.94 437.30 48.45 437.50 48.96 437.70 49.47 437.90 49.96 438.00 50.21 SIN: 6217012070C3 PondPack Ver. 8.0058 ***** COMPOSITE OUTFLOW SUMMARY **** Notes ------ -- Converge --------- TW El ev Error ft ------ +/-ft -- -- Contributing Stru ctures Free --- - Outfall ----------------- (no Q: RIBA) -------- Free Outfall RIBA Free Outfall RI,BA Free Outfall RI,BA Free Outfall RIBA Free Free Outfall Outfall RI, BA RI,BA Free Outfall RIBA , Free Outfall RI,BA fit e 4 W Free Outfall RI,BA LA, Free Outfall RI,BA Q jn o Free Outfall RI, BA Free Outfall RIBA Free Outfall RI,BA The John R. McAdams Company Time: 10:52 AM Date: 10/13/2008 HMS * Summary of Results for WQP#3 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run llOct08 0000 Execution Time 130ct08 1115 Run Name : 100-YrPost(WC) • Computed Results Basin Model Post-Dev(100YrWC) Met. Model 100-Year Storm Control Specs 1-Minute dT Peak Inflow 76.695 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 47.209 (cfs) Date/Time of Peak Outflow 10 Oct 08 1210 Total Inflow 5.39 (in) Peak Storage 0.69148(ac-ft) Total Outflow 5.37 (in) Peak Elevation 436.82(ft) 0 BRIAR CHAPEL WO POND #3 J. FINCH. PE NEW-05042 Below NWSE 10/10/2008 Stage-Storage Function Project Name: Briar Chapel Designed By: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 426.5 0.0 2961 427.0 0.5 5053 4007 2004 2004 0.52 428.0 1.5 6010 5532 5532 7535 1.44 430.0 3.5 8293 7152 14303 21838 3.23 432.0 5.5 14114 11204 22407 44245 5.54 433.0 6.5 17411 15763 15763 60008 6.99 is Storage vs. Stage 70000 -- ------ 60000 50000 y = 4692x'.3108 40000 R2 = 0.9966 d rn 2 30000 20000 10000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (feet) Ks = 4692 b = 1.3108 0 BRIAR CHAPEL WQ POND #3 J. FINCH, PE NEW-05042 Forebay #1 10/10/2008 Stage-Stora ge Function • Project Name: Briar Chapel Designed By: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated C ontour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 427.0 0.0 767 _ 428.0 1.0 1002 885 885 885 1.00 430.0 3.0? 1619 1311 2621 3506 2.94 431.0 4.0 2014 1817 1817 5322 4.07 0 Storage vs. Stage 6000 5000 .zas? y = 879.56x' 4000 R2 = 0.9993 U rn 3000 2000 1000 0 -F-- 0.0 1.0 20 3.0 4.0 5.0 Stage (feet) Ks 879.56 b = 1.2831 0 BRIAR CHAPEL WQ POND #3 J. FINCH, PE NEW-05042 Forebay #2 10/10/2008 Stage-Storage Function • Project Name: Briar Chapel Designed By: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 427.0 0.0 1004 428.0 1.0 1277 1141 1141 1141 1.00 430.0 3.0 1936 _ 1607 3213 4354 2.95 431.0 4.0 2310 2123 2123 6477 4.06 is Storage vs. Stage 7000 - - - 6000 Y = 11 35.3x' 2435 5000 R2 = 0.9995 LL U 4000 rn 0 3000 2000 1000 0 0.0 1.0 2.0 3.0 4.0 5.0 Stage (feet) Ks = 1135.3 b = 1.2435 0 BRIAR CHAPEL NEW-05042 BRIAR CHAPEL - WO POND #3 DESIGN Per NCDENR "Stormwater Best Management Practices", the forebay volume should equal about 20% of the total basin volume. A. Water Quality Pond -Below Normal Pool Volume Volume = 60008 cf B. Forebay Volumes Forebay 1 Volume = 5322 cf Forebay 2 Volume = 6477 cf % Forebay = 20% Impervious Area = 4.29 acres Drainage Area = 1(),5 acres % Impervious = 40.7% Cotal Below NP Volume 60008 cf Surface Area 17411 sf Average Depth = 3.45 ft > From the NCDENR Stormwater BMP Handbook (4/99), the required SA/DA ratio for 85% TSS Removal in the Piedmont is as follows: • .3.0 3.45 4.0 Lower Boundary => 40.0 1.73 1.43 Site % impervious => 40.7 1.75 1.62 1.45 Upper Boundary => 50.0 2.06 1.73 Area Required = 7428 sf Area Provided. = 17411 sf YES J. FINCH, PE 10/10/2008 BRIAR CHAPEL WQPond#3 J. FINCH, PE NEW-05042 10/10/2008 • is 1" RUNOFF VOLUME CALCULATION SHEET Project Name: Briar Chapel Checked by: L Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 433.0 0.0 17411 434.0 1.0 19144 18278 18278 18278 1.01 436.0 3.0 22779 20962 41923 60201 2.95 438.0 5.0 26641 24710 49420 109621 5.06 Storage vs. Stage 120000 100000 -------- ''066 y - 18164x R2 = 0.9996 50000 LL U rn 60000 0 N 40000 20000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) Ks = 18164 b = 1.1086 Calculation of Runoff Volume required for Storage The runoff to the water quality pond for the V storm runoff requirement is calculated by simply multiplying the total watershed area draining to the water quality pond times the runoff depth. Total Drainage Area to WQ Pond = 10.53 acres Runoff Depth = 1 inches Therefore, total runoff from precipitation in question = 38224 CF This amount of runoff must be stored in the pond above normal pool elevation, and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. C, BRIAR CHAPEL WQPond#3 J. FINCH, PE NEW-05042 10/10/2008 Calculation of depth required for runoff storage pool (above normal pool) Normal pool depth (above invert) = 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 38224 CF Stage (above invert) associated with this storage = 1.96 feet Therefore, depth required above normal pool for storm storage = 1.96 feet 23.48 inches Set crest of principal spillway at stage = 1.96 feet and EL = 434.96 feet • At principal spillway crest, storm pool storage provided = 38301 CF 0 BRIAR CHAPEL - PHASE 4 WQP#3 J. FINCH, PE NEW-05042 10/13/2008 Inverted Siphon Design Sheet D orifice = # orifices = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Nonnal Pool = Orifice Invert = WSEL @ 1" Runoff Volume = 2 inch 1 18164 1.1086 0.60 433.00 feet 0 cf 433.00 feet 434.96 feet WSEL (feet) Vol. Stored (cf) Siphon Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 434.96 38301 0.144 434.79 34605 0.137 0.140 3696 26339 434.62 30947 0.130 0.133 3658 27413 434.45 27332 0.122 0.126 3616 28660 434.27 23762 0.114 0.118 3569 30137 434.10 20245 0.106 0.110 3517 31925 433.93 16787 0.097 0.101 3458 34159 433.76 13398 0.086 0.091 3389 37073 433.59 10091 0.075 0.080 3307 41125 433.42 6889 0.061 0.068 3202 47397 433.25 3830.1 0.042 0.051 3059 59486 • Drawdown Time = 4.21 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 0.938 feet Orifice composite loss coefficient = 0.600 Cross-sectional area of 2" orifice = 0.022 sf Q= 0.1018 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 4.36 days Conclusion : Use 1 - 2" Diameter PVC Inverted Siphon to drawdown the accumulated volume from the 1.0" storm runoff, with a required time of about 4.21 days. 0 BRIER CHAPEL $WMF #3 - 8" DIP B. Ihnatolya, El NEW-05041 7/19/2006 Anti-Seep Collar Design Sheet • This sheet will, given the barrel length of interest and minimum seep collar projection from the barrel, determine the number of anti-seep collars to place along the barrel section, and the expected spacing of the collars. Design Requirements =_> Anti-seep collars shall increase the flow path along the barrel by 15%. Anti-seep collars shall be spaced a maximum of 14X the minimum collar projection or 25 feet, whichever is less. Anti-Seep Collar Design => SWMF Flow Length Min. Calc'd # Max. # of Use. Pond along barrel Projection of collars Spacing collars to Spacing Spacing ID (feet) (feet) required (feet) use (feet) OK? #3 - 8" DIP 67.0 2.53 1.99 25 2.00 22.33333 YES • Note: If spacing to use is greater than the maximum spacing, add collars until the spacing to use is equal to or less than the maximum spacing allowable for the collar design. Anti-seep collars shall be used under the structural fill portions of all berms/dams unless an approved drainage diaphragm is present at the downstream end of the barrel. C, BRIAR CHAPEL - POND #3 CKP-05041 .Input Data =_> Sauare Riser/Barrel Anti-Flotation Calculation Sheet Inside length of riser = 4.00 feet Inside width of riser = 4.00 feet Wall thickness of riser = 6.00 inches Base thickness of riser = 8.00 inches Base length of riser = 8.00 feet Base width of riser = 8.00 feet Inside height of Riser = 9.00 feet Concrete unit weight = 142.0 PCF OD of barrel exiting manhole = 31.50 inches Size of drain pipe (if present) = 8.0 inches Trash Rack water displacement = 38.00 CF Concrete Present in Riser Structure =_> Total amount of concrete: Adjust for openings: Base of Riser = 42.667 CF Riser Walls = 81.000 CF Opening for barrel = 2.706 CF Opening for drain pipe = 0.175 CF B. IHNATOLYA, El 7/14/2006 Note: NC Products lis:q ur t wt. of nvrnhok xmcv?:L, PC',% • Total Concrete present, adjusted for openings = 120.786 CF Weight of concrete present = 17152 lbs Amount of water displaced by Riser Structure =_> Displacement by concrete = 120.786 CF Displacement by open air in riser = 144.000 CF Displacement by trash rack = 38.000 CF Total water displaced by riser/barrel structure = 302.786 CF Weight of water displaced = 18894 lbs Calculate amount of concrete to be added to riser =_> Safety factor to use = 1.15 lrL:: n:rf:, if .;.s ar hiNF eo Must add = 4576 lbs concrete for buoyancy Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Buoyant weight of this concrete = 79.60 PCF Buoyant, with safety factor applied = 69.22 PCF Therefore, must add = 66.115 CF of concrete Standard based described above = 42.667 CF of concrete • Therefore, base design must have = 108.782 CF of concrete 1 OF 2 BRIAR CHAPEL - POND #3 CKP-05041 0 Calculate size of base for riser assembly =_> Length = 8.000 feet Width = 8.000 feet Thickness = 21.0 inches Concrete Present = 112.000 CF Check validity of base as designed =_> OK Total Water Displaced = 372.120 CF Total Concrete Present = 190.120 CF Total Water Displaced = 23220 lbs Total Concrete Present = 26997 lbs Actual safetyfactor = 1.16 Results of design => r? E OK B. IHNATOLYA, El 7/14/2006 Base length = 8.00 feet Base width = 8.00 feet Base Thickness = 21.00 inches CY of concrete total in base = 4.15 CY Concrete unit weight in added base >= 142 PCF 2OF2 • BRIAR CHAPEL NEW-05042 NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 9.6885 Flow depth (ft) = 1.02 slope S in %: 0.685 Outlet velocity (fps) = 6.003 pipe diameter D in in.: 24 Manning number n : 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results • Pipe diameter (ft) 2.00 Outlet velocity (fps) 6.00 Apron length (ft) 12.00 AVG DIAM STONE THICKNESS (inches) CLASS (inches) 3 A 9 >> 6 B 22« 13 B or 1 22 23 2 27 CALCULATION: Minimum TW Conditions: W = Do + La = 2' + 12' 14 ft CONCLUSION: USE NCDOT CLASS W RIP RAP 12'Lx141Wx22"THK B. IHNATOLYA, El 9/4/07 0 • WATER QUALITY POND #4 FINAL DESIGN CALCULATIONS 0 11 BRIAR CHAPEL - PHASE NEW-05042 :)N 'MllYd fl'IONVI'tl.l. H?NY8S321 :.- 61441 VNnOVVO HISDN '/IYHUn(I SAMMM NL%C7V9C(VC)H T3dVHO S,NNVW IP 1099-91 A H '8'01 y N O I( 0009-190 ( TO) SmvisQV#amodMxwnoHama pw 'Old 9004-80402 dIZ 9004f X08 '0'd Sa0A3A1L(1S/S2i3NNY'Id/S'd33NlON8 I" R `? ' r ? 3AYd I02 'OYOT ai 9 9 rm ? dd Y?I O 0 ` a ?, Ems h ! J. 0 0 10 11I ?3avxa s-artx SN YId NIOLI UMNIOO t, aSHHd M i o e ¢ 0- O ?I I ?I ...............? ,, dt,? •r Ktio-rwr 4o..um r moat u .umr f ?? T/? t r t TT ?Q r ® ti ? - swda??r?•? uxor ?x,L ,I . • ;sNOlSlA82i ;HSNx0 ?y ?/ ?/ .. ¦ D H ISd V 1 tl rdg g Y y A e N g 1 I bq? I?-- -r 5 Y • 0 Ito ? > b ? r Ila ?' • ? ? ? \ rya I I a o 8 r 4 ?R d [ 6 4 A 966OZ Z :L '4cu'?P 'Wd Zl ZO Z 800Z/)Z/06 '0mP'Vad-£V09OM3N\sbu mega juajjn3\s6wmejp uoilonjasuoZ)\uaaolS\ZV090-M3N\M3N\g?oe(oad:X BRIAR CHAPEL WQP#4 J. FINCH, PE NEW-05042 10/10/2008 Stage-Storage Function Project Name: Briar Chapel Designer: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 • Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 419.0 0.0 36163 420.0 1.0 38543 37353 37353 37353 1.00 422.0 3.0 43604 41074 82147 119500 2.96 424.0 5.0 48782 46193 92386 211886 5.04 Storage vs. Stage 250000 --- 200000 '.0712 y = 37188x R2 = 0.9998 U. 150000 °M rn 0 100000 y 50000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) Ks = 37188 b = 1.0752 0 BRIAR CHAPEL SS FXN - WQP#4 J. FINCH, PE NEW-05042 10/10/2008 Stage - Storage Function Ks= 37188 b = 1.0752 Zo = 419 Elevation • 419.00 0 0.000 419.20 6590 0.151 419.40 13885 0.319 419.60 21472 0.493 419.80 29255 0.672 420.00 37188 0.854 420.20 45242 1.039 420.40 53397 1.226 420.60 61641 1.415 420.80 69964 1.606 421.00 78356 1.799 421.20 86811 1.993 421.40 95325 2.188 421.60 103892 2.385 421.80 112509 2.583 422.00 121172 2.782 422.20 129879- --T982 422.40 138627 3.182 422.60 147414 3.384 422.80 156238 3.587 423.00 165096 3.790 423.20 173988 3.994 423.40 182912 4.199 423.60 191867 _ 4.405 423.80 200851 4.611 424.00 209863 i 4.818 • Type.... Outlet Input Data Page 1.01 Name.... WQP4 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel • Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 419.00 ft Increment = .20 ft Max. Elev.= 424.00 tt OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No Outfall El, It E2, It ----------------- ---- ------- --------- --------- Orifice-Circular SI ---> TW 419.000 424.000 Inlet Box RI ---> BA 421.550 424.000 Culvert-Circular BA ---> TW 414.300 424.000 TW SETUP, DS Channel ._ • • S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:28 AM Date: 10/27/2008 Type.... Outlet Input Data Name .... WQP4 Page 1.02 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title.._ Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = SI Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev-_ = 419.00 ft Diameter = _2500 ft Orifice Coeff_ _ .600 Structure ID = RI Structure Type -------- = Inlet. Box --------- # of openings ------------- = 1 ------ Invert Elev. = 421.55 ft Orifice Area = .6000 sq.ft Orifice Coeff. = 36.000 Weir Length = 24.00 ft Weir Coeff. = 3.000 K, Submerged = _000 K, Reverse = 1.000 Kb,Barrel = .000000 {per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 is • S/N: 6217012070C3 PondPack Ver. 8.0058 The John R_ McAdams Company Time: 10:28 AM Date: 10/27/2008 • F_ I L Type.... Outlet Input Data Name.... WQP4 Page 1.03 File .... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type = ------ - Culvert-Ci rcular --- --------- No. Barrels ----------- 1 ------ Barrel Diameter - 3.5000 ft Upstream Invert 414.30 ft Dnstream Invert = 414.00 ft Horiz. Length = 54.00 ft Barrel Length = 54.00 ft Barrel Slope = .00556 ft/ft OUTLET CONTROL DATA ___ Mannings n = .0130 Ke = _5000 (forward entrance loss) Kb = .005885 (per.ft of full flow) Kr _ _5000 (reverse entrance loss) +-: HW Convergence = S .001 +/- ft INLET CONTROL DATA._ Equation form Inlet Control K Inlet Control M Inlet Control c Inlet Control Y T1 ratio (HW/D) T2 ratio (HW/D) Slope Factor 1 .0098 2.0000 .03980 .6700 1.157 1.304 -.500 Use unsubmerged inlet control Form 1 equ_ below Tl elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2 ... At Tl Elev = - 418.35 ft ---> Flow = 63.00 cfs At T2 Elev = 418.86 ft ---> Flow = 72.00 cfs • S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:28 AM Date: 10/27/2008 • Type.... Outlet Input Data Name.... WQP4 Page 1.04 File.... X:\Projects\NEW\NEW-05092\Storm\Construction Drawings\SWM£DESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES. .. Maximum Iterations- 30 Min. TW tolerance = _01 ft Max. TW tolerance = .01 ft Min_ HW tolerance = _01 ft Max. HW tolerance = .01 ft Min. Q tolerance = _10 cfs Max. Q tolerance = .10 cfs • • S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:28 AM Date: 10/27/2008 • Type.... Composite Rating Curve Name.... WQP4 Page 1.10 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title._. Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: ***** COMPOSITE OUTFLOW SUMMARY • • WS Elev, Total Q Notes -------- -- Converge - Elev. Q TW E. lev Error ft -------- cfs ----- ft +/-ft Contributing Structures 419.00 -- .00 ----- Free --- ----- - Outfall ------------------------- (no Q: SI,RI,BA) 419.20 .06 Free Outfall SI (no Q: RI,BA) 419.40 .12 Free Outfall SI (no Q: RIBA) 419.60 .16 Free Outfall SI (no Q: RI,BA) 419.80 _19 Free Outfall SI (no Q: RIBA) 420.00 _22 Free Outfall SI (no Q: RIBA) 420.20 .24 Free Outfall SI (no Q: R1,BA) 420.40 .27 Free Outfall SI (no Q: RIBA) 420.60 .29 Free Outfall SI (no Q: RIBA) 420.80 _31 Free Outfall ST (no Q: RIBA) 421.00 .32 Free Outfall SI (no Q: R1,BA) 421.20 .34 Free Outfall ST (no Q: RIBA) 421.40 .36 Free Outfall SI (no Q: RIBA) 421.55 AvJ 7' Free Outfall SI (no Q: RI,BA) 421.60 Lf8,_ Free Outfall SI,RI,BA 421.80 9-.19 Free Outfall SI,RI,BA 422.00 22.14 Free Outfall SI,RI,BA 422.20 38.15 Free Outfall SI,RI,BA 422.40 56.85 Free Outfall SI,RI,BA 422.60 77.91 Free Outfall SI,RI,BA 422.80 101.08 Free Outfall SI,RI,BA 423.00 122.13 Free Outfall SI,RI,BA 423.20 124.05 Free Outfall SI,RI,BA 423.40 125.92 Free Outfall SI,RI,BA 423.60 127.77 Free Outfall SI,RI,BA 423.80 129.59 Free Outfall SI,RI,BA 424.00 131.40 Free Outfall SI,RI,BA S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:28 AM Date: 10/27/2008 HMS * Summary of Results for WQP#4 Project : NEW-05042 Run Name : 1-Year Post . Start of Run : l0Oct08 0000 B i M d l P as n o e ost-Development End of Run 11Oct08 0000 Met. Model 1-Year Storm Execution Time : 27Oct08 1037 Control Specs 1-Minute dT Computed Results Peak Inflow : 61.605 (cfs) Date/Time of Peak Inflow : 10 Oct 08 1156 Peak Outflow : 1.0645 (cfs) Date/Time of Peak Outflow : 10 Oct 08 -1823 Total Inflow : 1.44 (in) Peak Storage : 2.3573(ac-ft) Total Outflow : 0.37 (in) Peak Elevation 421.57(ft) 0 s HMS * Summary of Results for WQP#4 Project : NEW-05042 Start of Run l0Oct08 0000 End of Run 11Oct08 0000 Execution Time 270ct08 1038 Run Name : 2-Year Post • Computed Results Basin Model Post-Development Met. Model 2-Year Storm Control Specs 1-Minute dT Peak Inflow 88.386 (cfs) Date/Time of Peak Inflow 10 Oct 08 1205 Peak Outflow : 4.4413 (cfs) Date/Time of Peak Outflow 10 Oct 08 1245 Total Inflow 1.94 (in) Peak Storage : 2.4637(ac-ft) Total Outflow : 0.86 (in) Peak Elevation : 421.68(ft) 0 HMS * Summary of Results for WQP#4 Project : NEW-05042 Run Name : 10-Year Post Start of Run 10O t08 0000 Ba in Mod l P t-D l t c s e : os eve opmen End of Run 11Oct08 0000 Met_ Model : 10-Year Storm Execution Time 270ct08 1038 Control Specs : 1-Minute dT Computed Results Peak Inflow 134.39 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 59.587 (cfs) Date/Time of Peak Outflow : 10 Oct 08 1213 Total Inflow 3.52 (in) Peak Storage 3.2083(ac-ft) Total Outflow 2.40 (in) Peak Elevation 422.43(ft) 0 HMS * Summary of Results for WQP#4 Project : NEW-05042 Run Name : 25-Year Post Start of Run : 100ct08 0000 Basin Model Post-Development End of Run IlOct08 0000 Met. Model 25-Year Storm Execution Time 27Oct08 1038 Control Specs 1-Minute dT Computed Results Peak Inflow 161.92 (cfs) Date/Time of Peak Inflow : 10 Oct 08 1204 Peak Outflow 101.97 (cfs) Date/Time of Peak Outflow 10 Oct 08 1210 Total Inflow : 4.47 (in) Peak Storage 3.5955(ac-ft) Total Outflow 3.35 (in) Peak Elevation 422.81(ft) • • HMS * Summary of Results for WQP#4 Project : NEW-05042 Run Name : 100-Year Post Start of Run : l0Oct08 0000 Basin Model Post-Development End of Run : 11Oct08 0000 Met. Model 100-Year Storm Execution Time : 270ct08 1038 Control Specs 1-Minute dT Computed Results Peak Inflow 204.35 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow : 125.77 (cfs) Date/Time of Peak Outflow 10 Oct 08 1210 Total Inflow 5.97 (in) Peak Storage 4.1821(ac-ft) Total Outflow : 4.85 (in) Peak Elevation 423.38(ft) • 0 BRIAR CHAPEL SS FXN - WQP#4(100Yr) J. FINCH, PE NEW-05042 10/13/2008 • => Stage - Storage Function Ks= 37188 b = 1.0752 Zo = 419 • Elevation Stora a 100-Year Worst Case [feet] [cf] [acre-feet] [cfJ [acre-feet] 419.00 0 0.000 - - 419.20 6590 0.151 - 419.40 13885 0.319 - 419.60 21472 0.493 - - 419.80 29255 0.672 - 420.00 37188 0.854 - 420.20 45242 1.039 - 420.40 53397 1.226 420.60 61641 1.415 - 420.80 69964 1.606 - - _ 421.00 78356 1.799 - - 421.20 86811 1.993 421.40 95325 2.188 - - 421.55 101745 2.336 0 0.000 421.75 110350 2.533 8605 0.198 421.95 119002 2.732 17257 0.396 422.15 127699 2.932 25953 0.596 422.35 136437 3.132 34691 0.796 422.55 145214 3.334 _ 43469 _ 0.998 422.75 154029 3.536 52283 1.200 422.95 162879 3.739 61133 1.403 423.15 423.35 423.55 423.75 171762 180678 189625 198602 3.943 4.148 4.3_53 4.559 70017 i 78933 87880 96857 1.607 1.812 2.017 2.224 _ W 423.95 207607 _ - 4.766 105862 2.430 424.00 209863 4.818 108117 2.482 O6 • u Type.... Composite Rating Curve Name.... WQP4(100YR) Page 1.07 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN_PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes - - Converge ------------ Elev. Q TW E lev Error ft CfS ft +/-ft Contributing Structures 421.55 .00 Free - Outfall ------------------ (no Q: RIBA) ------- 421.75 6.44 Free Outfall RI,BA 421.95 18.21 Free Outfall RIBA 422.15 33.46 Free Outfall RIBA 422.35 51.52 Free Outfall RI BA f. 422.55 72.00 Free Outfall RIBA 422.75 94.65 Free Outfall RI, BA VAiew coo 422.95 127.19 Free Outfall RIBA 423. 15 123.10 Free Outfall RI, BA rlQ?7j/1??. 423.35 124.97 Free Outfall RI,BA 423.55 126.81 Free Outfall RIBA 423.75 128.64 Free Outfall RIBA 423.95 130.44 Free Outfall RIBA 424.00 130.88 Free Outfall RIBA I S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:29 AM Date: 10/27/2008 HMS * Summary of Results for.WQP#4 Project : NEW-05042 Run Name : 100-YrPost(WC) • Start of Run 10Oct08 0000 Basin Model Post-Dev(100YrWC) End of Run 11Oct08 0000 Met. Model 100-Year Storm Execution Time : 270ct08 1044 Control Specs 1-Minute dT Computed Results Peak Inflow 204.35 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 125.81 (cfs) Date/Time of Peak Outflow 10 Oct 08 1210 Total Inflow 5.97 (in) Peak Storage 1.9061(ac-ft) Total Outflow 5.95 (in) Peak Elevation 423.44(ft) • C. BRIAR CHAPEL Below NWSE J. FINCH, PE NEW-05042 10/10/2008 Stage-Storage Function • Project Name: Briar Chapel Designed By: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Contour (feet) Stage (feet) Contour Area (SF) Average Contour Area (SF) Incremental Contour Volume (CF) Accumulated Contour Volume (CF) Estimated Stage w/ S-S Fxn (feet) 413.0 0.0 19559 414.0 1.0 21120 20340 20340 _ 20340 1.02 416.0 3.0 24394 22757 45514 65854 2.92 417.0 4.0 26107 25251 25251 91104 3.90 419.0 6.0 36163 31135 62270 153374 6.22 Ks = 19966 b = 1.1151 0 BRIAR CHAPEL Forebay J. FINCH, PE NEW-05042 10/10/2008 • Stage-Storage Function Project Name: Briar Chapel Designed By: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Contour (feet) Stage (feet) Contour Area (SF) Average Contour Area (SF) Incremental Contour Volume (CF) Accumulated Contour Volume (CF) Estimated Stage w/ S-S Fxn (feet) 413.0 0.0 6896 414.0 1.0 7524 7210 7210 7210 1.00 416.0 3.0 8854 8189 16378 23588 2.98 417.0 4.0 9557 9206 9206 32794 4.03 • Storage vs. Stage 35000 30000 y = 7196.4x' 0saa 25000 R2 = 0.9999 LL v 20000 Gf 0 15000 N 10000 5000 0 0.0 1.0 2.0 3.0 4.0 5.0 Stage (feet) Ks = 7196.4 b = 1.0888 • BRIAR CHAPEL Volume Check J. FINCH, PE NEW-05042 10/23/2008 BRIAR CHAPEL - WO POND #4 DESIGN Per NCDENR "StormwaterBestManagement Practices ", the forebay volume should equal about 20% of the total basin volume. A. Water Quality Pond - Below Normal Pool Volume Volume = 153374 cf B. Forebay Volume Forebay Volume = 32794 cf Forebay = 21% I?? .t1l A? t;:faC?. € Impervious Area = i3.90 acres Drainage Area = 25.6 i acres % Impervious = 54.2% Total Below NP Volume 153374 cf Surface Area 36163 sf Average Depth = 4.24 ft From the NCDENR Stormwater BMP Handbook (4/99), the required SA/DA ratio for 85% TSS Removal in the Piedmont is as follows: 4.0 4.24 5.0 Lower Boundary => 50.0 1.73 1.50 Site % impervious => 54.2 1.86 L 79 1.59 Upper Boundary => 60.0 103 1.71 . Area Required = 20012 sf Area Provided = 36163 sf YES C: BRIAR CHAPEL WQPond#4 J. FINCH, PE NEW-05042 10/10/2008 1" RUNOFI • Project Name: Checked by: Job Number: Date: Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 419.0 0.0 36163 420.0 1.0 38543 37353 37353 37353 1.00 422.0 3.0 43604 41074 82147 119500 2.96 ? 424.0 5.0 48782 46193 92386 211886 5.04 E Storage vs. Stage 250000 200000 i 1112 y = 37188x U. 150000 R2 = 0.9998 m rn 0 100000 50000 0 0.0 1.0 2.0 3.0 4.0 5.0 &0 Stage (feet) P VOLUME CALCULATION SHEET Briar Chapel J. Finch, PE NEW-05042 10/10/2008 KS= 37188 b = 1.0752 Calculation of Runoff Volume required for Storage The runoff to the water quality pond for the V storm runoff requirement is calculated by simply multiplying the total watershed area draining to the water quality pond times the runoff depth. Total Drainage Area to WQ Pond = 25.64 acres Runoff Depth = I inches Therefore, total runoff from precipitation in question = 93073 CF This amount of runoff must be stored in the pond above normal pool elevation, and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. 0 BRIAR CHAPEL WQPond#4 J. FINCH, PE NEW-05042 10/10/2008 Calculation of depth required for runoff storage pool (above normal pool) • Normal pool depth (above invert) = 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 93073 CF Stage (above invert) associated with this storage = 2.35 feet Therefore, depth required above normal pool for storm storage = 2.35 feet 28.17 inches Set crest of principal spillway at stage = 2.35 feet and EL = 421.35 feet At principal spillway crest, storm pool storage provided = 93191 CF • .7 BRIAR CHAPEL - PHASE 4 NEW-05042 WQP#4 Inverted Siphon Design Sheet D orifice = # orifices = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Normal Pool = Orifice Invert = WSEL @ 1" Runoff Volume = 3 inch 1 37188 1.0752 0.60 419.00 feet 0 cf 419.00 feet 421.35 feet WSEL (feet) Vol. Stored (cf) Siphon Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 421.35 93191 0.352 421.14 84379 0.335 0.344 8813 25648 420.94 75630 0.317 0.326 8749 26808 420.73 66952 0.299 0.308 8678 28165 420.52 58351 0.279 0.289 8600 29783 420.31 49839 0.257 0.268 8512 31763 420.11 41428 0.234 0.245 8411 34269 419.90 33135 0.208 0.221 8293 37592 419.69 24987 0.178 0.193 8149 42329 419.48 17023 0.141 0.159 7964 49964 419.28 9319.1 0.092 0.117 7703 66123 Drawdown Time = 4.31 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 1.1 13 feet Orifice composite loss coefficient = 0.600 Cross-sectional area of 2" orifice = 0.049 sf Q= 0.2493 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 4.33 days Conclusion : Use 1 - 3" Diameter PVC Inverted Siphon to drawdown the accumulated volume from the 1.0" storm runoff, with a required time of about 4.31 days. J. FINCH, PE 10/13/2008 0 r? This sheet will, given the barrel length of interest and minimum seep collar projection from the barrel, determine the number of anti-seep collars to place along the barrel section, and the expected spacing of the collars. Design Requirements => Anti-seep collars shall increase the flow path along the barrel by 15%. Anti-seep collars shall be spaced a maximum of 14X the minimum collar projection or 25 feet, whichever is less. J. FINCH, PE 7/28/2006 Anti-Seep Collar Design -> r? BRIAR CHAPEL WATER QUALITY POND #4 - 12" DIP NEW-05043 Anti-Seep Collar Design Sheet WQP P Flow Length Min. Calc'd # Max. # of Use Pond along barrel Projection of collars Spacing `collars to Spacing Spacing ID (feet) (feet) required (feet) use (feet) OK? 4 - 12" DIP 39.0 1.50 1.95 21 2.00 13 YES Note: Ifspacing to use is greater than the maximum spacing, add collars until the spacing to use is equal to or less than the maximum spacing allowable for the collar design. Anti-seep collars shall be used under the structural fill portions of all berms/dams unless an approved drainage diaphragm is present at the downstream end of the barrel. • BRIAR CHAPEL NEW-05043 • Input Data =_> Square Riser/Barrel Anti-Flotation Calculation Sheet Inside length of riser = Inside width of riser = Wall thickness of riser = Base thickness of riser = Base length of riser = Base width of riser = Inside height of Riser = Concrete unit weight = OD of barrel exiting manhole = Size of drain pipe (if present) _ Trash Rack water displacement = Concrete Present in Riser Structure =_> Total amount of concrete: Adjust for openings: 6.00 feet 6.00 feet 6.00 inches 8.00 inches 7.00 feet 7.00 feet 6.95 feet 142.0 PCF 52.50 inches 8.0 inches 79.39 CF Base of Riser = 32.667 CF Riser Walls 90.350 CF Opening for barrel = 7.517 CF Opening for drain pipe = 0.175 CF J. FINCH, PE 7/28/2006 Note. NC inducts fis u1E wt. of n,r:nh:,le pmt ;z to k '411 PC-F. • Total Concrete present, adjusted for openings = 115.326 CF Weight of concrete present = 16376 lbs Amount of water displaced by Riser Structure =_> Displacement by concrete = 115.326 CF Displacement by open air in riser = 250.200 CF Displacement by trash rack = 79.390 CF Total water displaced by riserlbarrel structure = 444.916 CF Weight of water displaced = 27763 lbs Calculate amount of concrete to be added to riser =_> Safety factor to use = 1.15 (,c wcLn:;nd '_.15 or lrighc_ I Must add = 15551 lbs concrete for buoyancy Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Buoyant weight of this concrete = 79.60 PCF Buoyant, with safety factor applied = 69.22 PCF Therefore, must add = 224.668 CF of concrete Standard based described above = 32.667 CF of concrete • Therefore, base design must have = 257.334 CF of concrete 1 OF 2 BRIAR CHAPEL NEW-05043 • Calculate size of base for riser assembly =_> Length = 10.000 feet Width = 10.000 feet Thickness = 31.0 inches Concrete Present = 258.333 CF €:1.K Check validity of base as designed =_> Total Water Displaced = 670.582 CF Total Concrete Present = 340.992 CF Total Water Displaced = 41844 lbs Total Concrete Present = 48421 lbs Actual safety factor = 1.16 f1.K Results of design =_> • • Base length = 10.00 feet Base width = 10.00 feet Base Thickness = 31.00 inches CY of concrete total in base = 9.57 CY Concrete unit weight in added base >= 142 PCF J. FINCH, PE 7/28/2006 2OF2 Briar Chapel-WQ Pond #4 Project # NEW-05043 VELOCITY DISSIPATOR DESIGN 18 Designed By: B. Ihnatolya Velocity Dissipator - WQ Pond #4 NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 59.59 Flow depth (ft) = 2.35 slope S in %.- 0.556 Outlet velocity (fps) = 8.660 pipe diameter D in in.: 42 ''-- - - Manning number n : 0.013 NRCD Land Quality Section NFDOT Dissipator Design Results s Pipe diameter (ft) 3.50 Outlet velocity (fps) 8.66 Apron length (ft) 28.00 AVG DIAM STONE THICKNESS (inches) CLASS -------- (inches) ----- -- 3 A ------- 9 6 B 22 »13 Borl 22« 23 2 27 Width Calculation WIDTH = La + Do WIDTH = 28.0 + 3.5 WIDTH = 31.5 FEET CONCLUSION Use 14" DIA NCDOT Class `2' Rip Rap 28'L x 31.5'W x 22"Thick U • WATER QUALITY POND #5 FINAL DESIGN CALCULATIONS 40 BRIAR CHAPEL - PHASE 4 NEW-05042 0005-19e (610) s nvraa S# QNOd A rWflO HRLVAA Q 5004-80L42 d12 50041 XOH '0'd ,•••• •' ....... o g ON 'XHtld 3'IONYIH.L HONV3S3N ... ? .... ?. VNITOHV3 HMON'AIRnOO IRVHlVHD'SdIHSNMOZ SHOA3AHfLS/SHHNNV'Id/SH33NION3 EILL2 YN170HYa HIHON 'NVHH(10 T02 3J HI5 'OYOH ZITA3 LLHAYd 0505 Sy VrrHM3qNIMG'5M(jVO-I'jZWHO S.NMM 3j? IOS-SI .LMH S II w 3 Q d 'ANddIHO0 ONI =_ ""° _ . . Ozz'z?avHOx?nxs-axrt SNVId NOr?nxLSNOD V HSVHd z = w Z o - : ? / ?[? Q SI?dQdOI?I 2I NH0f HH,L :SNOIS1A3H :HHNAO Cl 1?t1 V 11? a 5 I V A S l I ?\ I ? I : \. ?\ \ \ ?z 1 1 r`? ., A \ , \ \ m z 0 ?m8 a ° s 9 xw= :1 „ tipp.j- $ w h mho $? i d? H-I 9855 n wW ?° . Y arcs rn V'$v°?a ffi''ud s_3 mw - x$'M W 8vepz, 16 S-isw ? '^a o wG ?H H Yac'flp-. t$ l ?W sm g a?jg03 aYm$ °? k Q 'may t:f ?w I.-He ?w°o z. NA t R an G7€w os° i<J Y a w to !t?`< o ?a $LS w? S"z?og<° .amg=? =?sgc y?8' x a$Nigg = Q < & xza?i?°" mz°? ? owo O w j $ mw°eb °?Nw om?o o' oa 42 ao$ '"o rc OP'? . sZ$ po oow F Y a?YW w < ?zyi" we"aw ?+ •w??k °u Yzjt ?oiw `y I?na1 oJa"°Waa W,. `2=$zu y sSw o Yw?a sn .A'i ?i???m'? maGFa $^ w Y?o°=z`ns <ux a % $b?_?E"??`o $°?"< Ym F p ?- ?m wa w fA ?O°' o3??a f(?? 3 0„ - 0. to e?y m`V,60- J-.. z w ? ° r*<ww o Tlmu IN u t ' F?S°w W °<a_o"iLy '?i zpw'?w- ?w °?"u=O?~F " q rc?i?---{{ swo°wz"? G? a (/?'aOw w ao ?$? O i? u HO wm v, s`u2i1 $??a i i ooa. N? d U' ?$?a$o ffiGo?aw ?0 ?m? ` <yNamz a?omeo A m k' ?A yFa=?a 0pF? ?i ? W z_ ww??m w y?mm =?o °_ taw w 05 jwe= j=oo?a Sgo7W a w&??W? swTHw ?? PL +m i<m „m° aw rn oa ? aaF ? a 3? :ah8,49 ? -?<c o Y. W €wa ?: r 3 W $ m? wW 9wxw; o4" g 30,w w w o=_?; 3 Swb °"? a=off 8S CYffi 3 o ?: Yszdmo 41. z?} ° °m _2 zJ5. Z- w_ 2% G8v_i ° Za=LL zw ,?„Kg 3x m .a ° uz= x ? ?_ =a8 g= W_ 8 _ w 3s G w 8 ^.° .` °RR Y+ -. yak';m com$"z" a ?mw w'Sa iz 9,. 6 m W? (`W z< - ow: ?° -z? °° za ?NSt w°Ho y a?? - & fys Wo g?ig?3 rn s¢"k' oar , oo jpa age"w w x haw 7FO g g ?LLaagwk ' ' o? _ s ,9 us -8 w7 ao W.i m S k ooo< -3- G a Ca 32 uw $ G?o?w3 " p`o a 1s?3 s w? owaW -Zuo ?i CPR W Wgoa Y < w?Y NgW s z? g°mw?w" :m? Apo haw N $ >' z za cm7V ° lr?wTa o- uoj? ou?m u a? -j§3 u zm ?wO ?' awa 8y°u-? m oa w Y b? ?w $ N ww 4E $ w- 8z ?V-W,° yy 5 3 y Y" xg? iwi oSgi _9 m? i0 ?bR= : w X, 7' how`?3S°a i z??: m_ %a g° u H ?3# 1w1 E.otgt $? ` „a'? Yw=? u?j. -3 o6-u.4 O?s3 w H6 I k x$?p I ° 1: `- o rM b 'y O " W s- g°8oN?93§ ] y-°g 7 PAN g r?. o w= =$Y YZ„w$ ??o z x Rw ' o= wo ° -.e ex W z ?s" -0,58 ?o8 x di-'$ ? o o B ? wr H, ?w ? ?ww $ a < w m ?a $ o a ?w ?aWm 3? 3Gt= elm" aR y a! § yam: a? _ -" a= w$ aU_ as -? =r °° ° h X°?°? z n ?= Fum°€a °o 1 Mme a=r??? mmw HA 1:8-zy w o m 0 aNs?Wrr? ry g :xom?"?_ ? =$ c7 5 U ?? ts? am O -yo?$ IN :??w? rim e?3?o 2g m0 • • • Z17 L4Z'Z: L 'eAloleu4l 'Wb' 9L:Z L: L L /OOZ/ZZ/OL '5MP'9ad-17V090M3N\s5ulmeJa luajano\s6uimejQ uoilonalsuOO\wJOIS\bbOSO-M=jNW13N\SlOafoJd\:X BRIAR CHAPEL WQP#5 J. FINCH, PE NEW-05042 10/10/2008 Stage-Storag e Function • Project Name: Briar Chapel Designer: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 • Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 434.5 0.0 14468 436.0 1.5 16829 15649 23473 23473 1.51 438.0 3.5 20163 18496 36992 60465 3.45 440.0 5.5 23757 21960 43920 104385 5.56 Storage vs. Stage 120000 -? 100000 y = 14669x"444 80000 R2 = 0.9996 LL U rn 60000 A 0 N 40000 20000 0 F - ? 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) Ks = 14669 b = 1.1444 0 BRIAR CHAPEL SS FXN - WQP#5 J. FINCH, PE NEW-05042 10/10/2008 Stage - Storage Function Ks = 14669 b= 1.1444 Zo = 434.5 Elevation • 434.50 0 0.000 434.70 2325 0.053 434.90 5140 0.118 435.10 8176 0.188 435.30 11363 0.261 435.50 14669 0.337 435.70 18072 0.415 435.90 21559 0.495 436.10 25119 0.577 436.30 28743 0.660 436.50 _ 32426 0.744 436.70 36163 0.830 436.90 _ 39950 0.917 437.10 43782 1.005 437.30 47657 1.094 437.50 51572 1.184 437.70 55526 1.275 437.90 59515 1.366 438.10 63538 1.459 438.30 67593 1.552 438.50 71680 1.646 438.70 75796 1.740 438.90 79941_ 1.835 439.10 18144113 1.931 439.30 r 88311 _ 2.027 439.50 92534 2.124 0 Type.... Outlet Input Data Page 1.01 Name.... WQP5 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 434.50 ft Increment = .20 ft Max. Elev.= 440.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft orifice-Circular SI ---> TW 434.500 440.000 Inlet Box RI ---> BA 437.750 440.000 Culvert-Circular BA ---> TW 428.350 440.000 TW SETUP, DS Channel • • S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • Type.... Outlet Input Data Name.... WQP5 Page 1.02 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = SI Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 434.50 ft Diameter = .2500 ft Orifice Coeff. _ .600 Structure ID = RI Structure Type = Inlet Box ----------------- # of Openings ------------ = 1 ------- Invert Elev. = 437.75 ft Orifice Area = .6000 sq.ft Orifice Coeff. = 25.000 Weir Length = 20.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 • • SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 Type.... Outlet Input Data Name.... WQPS Page 1.03 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type ----------------- = Culvert-Circular ------------------- No. Barrels = 1 Barrel Diameter = 3.0000 ft Upstream Invert = 428.35 ft Dnstream Invert = 428.00 ft Horiz. Length = 64.00 ft Barrel Length = 64.00 ft Barrel Slope = .00547 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .007228 Kr = .5000 HW Convergence = .001 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.158 T2 ratio (HW/D) = 1.304 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At Tl Elev = 431.82 ft ---> Flow = 42.85 cfs At T2 Elev = 432.26 ft ---> Flow = 48.97 cfs • SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • Type.... Outlet Input Data Name.... WQPS Page 1.04 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES ... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs • C7 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 0 • Type.... Composite Rating Curve Name.... WQP5 Page 1.10 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: WS Elev, Total Q Elev. Q ft cfs -------- 434.50 ------- .00 434.70 .06 434.90 .12 435.10 .16 435.30 .19 435.50 .22 435.70 .24 435.90 .27 436.10 .29 436.30 .31 436.50 .32 436.70 .34 436.90 .36 437.10 .37 437.30 .39 437.50 .40 437.70 .41 437.75 .42 437.90 3:91 438.10 12.86 438.30 24.93 438.50 39.44 438.70 56.03 438.90 74.48 439.10 94.61 439.30 106.50 439.50 107.69 439.70 108.86 439.90 110.02 440.00 110.60 SIN: 6217012070C3 PondPack Ver. 8.0058 ***** COMPOSITE OUTFLOW SUMMARY **** -------- Converge TW Elev Error ft +/-ft -------- ----- Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Qutfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Notes ------------------------- Contributing Structures (no Q: SI,RI,BA) SI (no Q: RI,BA) SI (no Q: RIBA) SI (no Q: RIBA) SI (no Q: RIBA) SI (no Q: RIBA) SI (no Q: RI,BA) SI (no Q: RIBA) SI (no Q: RIBA) SI (no Q: RI,BA) SI (no Q: RI,BA) SI (no Q: RI,BA) SI (no Q: RI,BA) SI (no Q: RI,BA) SI (no Q: RI,BA) SI (no Q: RIBA) SI (no Q: RI,BA) SI (no Q: RIBA) SI,RI,BA SI,RI,BA SI,RI,BA SI,RI,BA SI,RI,BA SI,RI,BA SI,RI,BA SI,RI,BA SI,RI,BA SI,RI,BA SI,RI,BA SI,RI,BA The John R. McAdams Company Time: 2:26 PM Date: 10/10/2008 HMS * Summary of Results for WQP#5 • Project : NEW-05042 Start of Run 10OCt08 0000 End of Run 11Oct08 0000 Execution Time l0Oct08 1523 Run Name : 1-Year Post Computed Results Basin Model Post-Development Met. Model 1-Year Storm Control Specs 1-Minute dT Peak Inflow 32.098 (cfs) Date/Time of Peak Inflow 10 Oct 08 1157 Peak Outflow 0.40314 (cfs) Date/Time of Peak Outflow 10 Oct 08 2140 Total Inflow 1.38 (in) Peak Storage 1.2126(ac-ft) Total Outflow.: 0.34 (in) Peak Elevation 437.56(ft) 0 HMS * Summary of Results for WQP#5 • Project : NEW-05042 Start of Run 10Oct08 0000 End of Run 11oct08 0000 Execution Time 100ct08 1523 Run Name : 2-Year Post • Computed Results Basin Model Post-Development Met. Model 2-Year Storm Control Specs 1-Minute dT Peak Inflow 46.392 (cfs) Date/Time of Peak Inflow 10 Oct 08 1205 Peak Outflow 2.2369 (cfs) Date/Time of Peak Outflow 10 Oct 08 1351 Total Inflow 1.86 (in) Peak Storage 1.3225(ac-ft) Total Outflow 0.78 (in) Peak Elevation 437.80(ft) 0 HMS * Summary of Results for WQP#5 C7 Project : NEW-05042 Start of Run 10oct08 0000 End of Run. llOct08 0000 Execution Time l0Oct08 1523 Run Name : 10-Year Post • Computed Results Basin Model Post-Development Met. Model 10-Year Storm Control Specs 1-Minute dT Peak Inflow 71.518 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 36.332 (cfs) Date/Time of Peak Outflow 10 Oct 08 1212 Total Inflow 3.42 (in) Peak Storage 1.6259(ac-ft) Total Outflow 2.32 (in) Peak Elevation 438.46(ft) 0 HMS * Summary of Results for WQP#5 Project : NEW-05042 Run Name : 25-Year Post Start of Run l0Oct08 0000 Basin Model Post-Development End of Run 1lOct08 0000 Met. Model 25-Year Storm Execution Time l0Oct08 1524 Control Specs 1-Minute dT Computed Results Peak Inflow 86.607 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 63.562 (cfs) Date/Time of Peak Outflow 10 Oct 08 1209 Total Inflow 4.36 (in) Peak Storage 1.7788(ac-ft) Total Outflow 3.26 (in) Peak Elevation 438.78(ft) E C, HMS * Summary of Results for WQP#5 • Project : NEW-05042 Start of Run l0Oct08 0000 End of Run 11Oct08 0000 Execution Time 10Oct08 1524 Run Name : 100-Year Post • Basin Model Post-Development Met. Model 100-Year Storm Control Specs 1-Minute dT Computed Results Peak Inflow 109.88 (cfs) Peak Outflow 94.669 (cfs) Total Inflow 5.85 (in) Total Outflow 4.75 (in) Date/Time of Peak Inflow 10 Oct 08 1204 Date/Time of Peak Outflow 10 Oct 08 1207 Peak Storage 1.9315(ac-£t) Peak Elevation 439.10(ft) • BRIAR CHAPEL SS FXN - WQP#5 (100Yr) J. FINCH, PE NEW-05042 10/13/2008 Stage - Storage Function Ks = 14669 b= 1.1444 r? Zo = 434.5 Elevation Storage 100-Year Worst Case [feet] [cf] [acre-feet] [cf] [acre-feet] 434.50 0 0.000 - 434.70 2325 0.053 - 434.90 5140 0.118 - 435.10 8176 0.188 - 435.30 11363 0.261 435.50 14669 0.337 435.70 18072 0.415 - 435.90 21559 0.495 - - 436.10 25119 0.577 - - 436.30 28743 0.660 - - 436.50 32426 0.744 436.70 36163 0.830 - , - 436.90 39950 0.917 - - 437.10 43782 _ 1.005 - 437.30 47657 1.094 - - 437.50 51572 1.184 437.70 55526 1.275 - 437.75 56520 1.298 0 0.000 437.95 60517 1.389 3998 0.092 438.15 64549 _ _ 1.482 8029 0.184 438.35 68612 1.575 12093 ( 0.278 438.55 72706 1.669 16187 0.372 438.75 76830 1.764 20310 0.466 438.95 80981 1.859 24461 0.562 439.15 85160 1.955 28640 E_ 0.657 v 439.35 89364 2.052 32844 0.754 439.55 93594 2.149 37074 0.851 439.75 97848 2.246 41328 0.949 _ 439.95 102125 2.344 ? 45605 1.047 440.00 103198 2.369 46678 1.072 100-4 "zr C& PVT-0 G 0 • • Type.... Composite Rating Curve Name.... WQP5(100YR) Page 1.07 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: WS Elev, Total Q Elev. Q ft cfs -------- 437.75 ------- .00 437.95 5.37 438.15 15.18 438.35 27.89 438.55 42.93 438.75 60.00 438.95 78.87 439.15 105.09 439.35 106.29 439.55 107.46 439.75 108.62 439.95 109.77 440.00 110.05 SIN: 6217012070C3 PondPack Ver. 8.0058 ***** COMPOSITE OUTFLOW SUMMARY **** Notes Converge - ---------- TW Elev Error ft +/-ft Contributing Structures -------- ----- -------------------------- Free Outfall (no Q: RIBA) Free Outfall RI,BA Free Outfall RIBA Free Outfall RIBA Free Outfall RI, BA Free Free Outfall Outfall RIBA RI,BA ?? Free Outfall RIBA Free Outfall RI,BA O Free Free Outfall Outfall RIBA RI,BA (A --11 rb Free Outfall RI,BA ! Free Outfall RI,BA 5S The John R. McAdams Company Time: 10:53 AM Date: 10/13/2008 HMS * Summary of Results for WQP#5 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run 1lOct08 0000 Execution Time 130ct08 1115 Run Name : 100-YrPost(WC) • Basin Model Post-Dev(100YrWC) Met. Model 100-Year Storm Control Specs 1-Minute dT Computed Results Peak Inflow 109.88 (cfs) Peak Outflow 97.970 (cfs) Total Inflow 5.85 (in) Total Outflow 5.84 (in) Date/Time of Peak Inflow 10 Oct 08 1204 Date/Time of Peak Outflow 10 Oct 08 1207 Peak Storage 0.63120(ac-ft) Peak Elevation 439.10(ft) 1I '1 u BRIAR CHAPEL Below NWSE J. FINCH, PE NEW-05042 10/10/2008 Stage-Storage Function • Project Name: Briar Chapel Designed By: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 428.0 0.0 ( 4696 ( j 430.0 2.0 6389 5543 11085 11085 1 2 05 432.0 L 4.0 432 4 5 1 5 j 8191 8672 7290 8432 14580 4216 1 25665 1 29881 . 3.86 4 33 . . - 434.0 - 6.0 6 I 13783 11228 16841 46722 6.07 _ 434.5 _ 5 1468 1 _... 14126 - -7063 537851 W' 6.74 C, Storage vs. Stage 60000 -- - ----- -- 50000 y = 4269.5x'.1214 a 40000 R2 = 0.9945 U 30000 a 0 N 20000 10000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (feet) Ks = 4269.5 b = 1.3274 0 BRIAR CHAPEL Forebay J. FINCH, PE NEW-05042 10/10/2008 • Stage-Storage Function Project Name: Briar Chapel Designed By: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) - T28.0 0.0 j 1428 430.0 2.0 2130 1779 1 3558 3558 2.00 432.0 4.0 2901 2516 5031 J 8589 3 98 432.5 4.5 3110 3006 ! 1.503 10092 4.52 • Storage vs. Stage 12000 - - - - ---- 10000 Y = 1463.3x' 2801 LL 8000 R2 = 0.9999 U m 6000 m `o 4000 2000 0 0.0 1.0 2.0 3.0 4.0 5.0 Stage (feet) 1s = 1463.3 b = 1.2807 0 BRIAR CHAPEL Volume Check J. FINCH, PE NEW-05042 10/23/2008 BRIAR CHAPEL - WO POND #5 DESIGN Per NCDENR "Stormwater Best Management Practices ", the forebay volume should equal about 20% of the total basin volume. A. Water Quality Pond - Below Normal Pool Volume Volume = 53785 cf B. Forebay Volume Forebay Volume = 10092 cf Forebay = 19% Impervious Area = 7.47 acres Drainage Area = 1' 14.:2 acres % Impervious = 53.28% Total Below NP Volume 53785 cf Surface Area 14468 sf Average Depth = 3.72 ft __> From the NCDENR Stormwater BMP Handbook (4/99), the required SA/DA ratio for 85% TSS Removal • in the Piedmont is as follows: 3.0 3.72 4.0 Lower Boundary => 50.0 2.06 Site % impervious => 53.3 2.17 Upper Boundary => 60.0 -140 Area Required = 11758 sf Area Provided = 14468 sf YES 1.73 1.93 1.83 2.03 0 BRIAR CHAPEL WQPond#5 NEW-05042 1" RUNOFF VOLUME CALCULATION SHEET Project Name: Briar Chapel Checked by: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 434.5 0.0 ? 114468 436.0 1.5 ?-- 16829 15649 23473 23473 1.51 438.0 3.5 + 20163 18496 36992 60465 3.45 440.0 5.5 23757 21960 43920 104385 5.56 Storage vs. Stage 120000 10000° q y = 14669x1'14'4 LL 80000 R2 = 0.9996 U rn 60000 r 40000 20000 i 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) Ks = 14669 b = 1.1444 Calculation of Runoff Volume required for Storage The runoff to the water quality pond for the 1 " storm runoff requirement is calculated by simply multiplying the total watershed area draining to the water quality pond times the runoff depth. Total Drainage Area to WQ Pond = 14.02 acres Runoff Depth = 1 inches Therefore, total runoff from precipitation in question = 50893 CF This amount of runoff must be stored in the pond above normal pool elevation, and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. J. FINCH, PE 10/10/2008 0 r? ?J BRIAR CHAPEL WQPond#5 J. FINCH, PE NEW-05042 10/10/2008 Calculation of depth required for runoff storage pool (above normal pool) Normal pool depth (above invert) = 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 50893 CF Stage (above invert) associated with this storage = 2.97 feet Therefore, depth required above normal pool for storm storage = 2.97 feet 35.58 inches Set crest of principal spillway at stage = 2.97 feet and EL = 437.47 feet At principal spillway crest, storm pool storage provided = 50983 CF • 0 BRIAR CHAPEL - PHASE 4 WQp45 J. FINCH, PE NEW-05042 10/13/2008 Inverted Siphon Design Sheet • D orifice = # orifices = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Normal Pool = Orifice Invert = WSEL @ 1" Runoff Volume = C, 3 inch 1 14669 1.1444 0.60 434.50 feet 0 cf 434.50 feet 437.47 feet WSEL (feet) Vol. Stored W) Siphon Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 437.47 50983 0.398 437.21 45961 0.380 0.389 5022 12916 436.96 41007 0.360 0.370 4953 13391 436.70 36128 0.340 0.350 4879 13940 436.44 31331 0.318 0.329 4797 14586 436.18 26626 0.295 0.306 4706 15364 435.93 22023 0.269 0.282 4603 16328 435.67 17539 0.241 0.255 4484 17573 435.41 13196 0.209 0.225 4342 19282 435.15 9030 0.172 0.191 4167 21873 434.90 5098.3 0.123 0.147 3931 26671 Drawdown Time = 199 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 1.423 feet Orifice composite loss coefficient = 0.600 Cross-sectional area of 2" orifice = 0.049 sf Q= 0.2819 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 2.09 days Conclusion : Use 1 - 3" Diameter PVC Inverted Siphon to drawdown the accumulated volume from the 1.0" storm runoff, with a required time of about 1.99 days. 0 BRIAR CHAPEL WATER QUALITY POND #5 - 12" DIP NEW-05044 1?1 This sheet will, given the barrel length of interest and minimum seep collar projection from the barrel, determine the number of anti-seep collars to place along the barrel section, and the expected spacing of the collars. Design Requirements ==> Anti-seep collars shall increase the flow path along the barrel by 15%. Anti-seep collars shall be spaced a maximum of 14X the minimum collar projection or 25 feet, whichever is less. J. FINCH, PE 8/24/2006 Anti-Seep Collar Design ==> WQP h • Anti-Seep Collar Design Sheet Flow Length Min. Calc'd # Max. # of Use Pond along barrel Projection of collars Spacing collars to Spacing Spacing ID (feet) (feet) required (feet) use (feet) OK? 5 - 12" DIP 54.0 2.03 1.99 25 2.00 I S I ES Note : If spacing to use is greater than the maximum spacing, add collars until the spacing to use is equal to or less than the maximum spacing allowable for the collar design. Anti-seep collars shall be used tinder the structural fill portions of all berms/dams unless an approved drainage diaphragm is present at the downstream end of the barrel. 0 BRIAR CHAPEL NEW-05044 .Input Data ==> Square Riser/Barrel Anti-Flotation Calculation Sheet Inside length of riser = Inside width of riser = Wall thickness of riser = Base thickness of riser = Base length of riser = Base width of riser = Inside height of Riser = Concrete unit weight = OD of barrel exiting manhole = Size of drain pipe (if present) = Trash Rack water displacement = 5.00 feet 5.00 feet 6.00 inches 8.00 inches 6.00 feet 6.00 feet 9.40 feet 142.0 PCF 45.50 inches 8.0 inches 61.74 CF Concrete Present in Riser Structure ==> Total amount of concrete: Adjust for openings: • Base of Riser:;-- 24.000 CF Riser Walls = 103.400 CF J. FINCH, PE 8/10/2006 Note. 1C Products Jis,,: urit wt. c.f m::nJa;Je cz:ttcvete at i;> Nt`. . Opening for barrel = 5.646 CF Opening for drain pipe = 0.175 CF Total Concrete present, adjusted for openings = 121.580 CF Weight of concrete present = 17264 lbs Amount of water displaced by Riser Structure ==> Displacement by concrete = 121.580 CF Displacement by open air in riser = 235.000 CF Displacement by trash rack = 61.740 CF Total water displaced by riseribarrel structure = 418.320 CF Weight of water displaced = 26103 lbs Calculate amount of concrete to be added to riser ==> Safety factor to use = 1.15 ? o; Must add = 12754 lbs concrete for buoyancy Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Buoyant weight of this concrete = 79.60 PCF Buoyant, with safety factor applied = 69.22 PCF Therefore, must add = 184.264 CF of concrete Standard based described above = 24.000 CF of concrete • Therefore, base design must have = 208.264 CF of concrete 1 OF 2 BRIAR CHAPEL NEW-05044 • Calculate size of base for riser assembly =_> Length = 9.000 feet Width = 9.000 feet Thickness = 31.0 inches Concrete Present = 209.250 CF OK Check validity of base as designed =_> Total Water Displaced = 603.570 CF Total Concrete Present = 306.830 CF Total Water Displaced = 37663 lbs Total Concrete Present = 43570 lbs Actual safetyfactor = 1.16 OK Results of design => • Base length = 9.00 feet Base width = 9.00 feet Base Thickness = 31.00 inches CY of concrete total in base = 7.75 CY Concrete unit weight in added base >= 142 PCF J. FINCH, PE 8/10/2006 2OF2 BRIAR CHAPEL NEW-05044 • NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 36.33 Flow depth (ft) = 1.91 slope S in % : 0.547 Outlet velocity (fps) = 7.640 pipe diameter D in in.: 36 Manning number n : 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 3.00 Outlet velocity (fps) 7.64 Apron length (ft) 18.00 • AVG DIAM STONE THICKNESS (inches) CLASS (inches) 3 A 9 >> 6 B 22« 13 B or 1 22 23 2 27 CALCULATION: Minimum TW Conditions: W = Do + La = 3.0' + 18' = 21.0 ft CONCLUSION: USE NCDOT CLASS `B' RIP RAP 18'L x 21'W x 22" THK J. FINCH, PE 10/13/08 0 • WATER QUALITY POND #6 FINAL DESIGN CALCULATIONS • • BRIAR CHAPEL - PHASE 4 NEW-05042 0009-199 (018) \.•1..,,,,,,. guvi a 9# (mod mriv IB 2 awm < - ' ' ,, ^ o Q v 5004-60448 dIZ 90041 X08 0 d ON 'XHVd H'IONVIHJ, HOHVHSHH . 2•`'..........':",' VNl'I02IV"J fLL2ION '1LIl4[l00 YQVKI.dHD'SdIHSNAAO,L ° < ° SHOAHAHnS/SHHNNV'Id/SHHHNIONH ETLLZ VNTIOHVO HJ.HON 'WVHHfIO ' SnVrYRM;} NIMQ'Ivaavou plZdVH0 S.NNVYq V 108-41 .1SA .S.n 3 3 z `° ? a o?i `?Nda oo v u+ w - = d IOZ HJJfIS OVOH H771AHJ.LHAVd 0905 z z ` lZdVH3 HVrdll-dam spa No ? a n x Ls D u o ?ZsVxa z 0 a od ° " .,_. _ m o ? j ? ? ? \ ? ? j? r t S dQdO 1?IHOI' 3H.I sNolslAHa :aaNxo ISd V HD Q V M9 ° oW €°04 EI w?0E aYW? ?°W m= oW $w a F° - ? oW o?YoN,y? Z _in 9,o ow 1. Pz l W p4 Po? ° N w '^ N caw Li 5n w° m?zs IP o o ?o= ww3-3{-9 O W {{ryjy7 tw aw d? O? 3L A?J p3 N., °g U OWW HSU m : N W? ? ?ffi o jr O4+ N i4ob o A we <? y]`? 3 oN ??? ?orc -no o z C-? So wL 34 Qu° m w ?W ?J o Jz wuim slo °G° zi. ? egorr'°°?? r?a pVy°y eX'O o$c?i iN oY3z m? mz.G oj$ 3 gw;`u C7 m$" WS; dN x? i d84 '_" ss$?' ?a w?J=o °?€ N"' N"€ sx? mOq'z omo= -° 3wG a_Li SOm 40 - Pi 0 i ? O?Z I'? 1s U? g ?QK -yFQ a nuN?? KSU 3igy?j ?.,2 4i 2~; s ,?y$$ { ?? ° =d rt Sd'° ?03 ??34¢ FE6 rv is eljw, L,4 4 ? ?UO 3?xV,Z6 i J Oz y?y? 3 s pa' M SS r 6W _w ° _ ??<¢- tL rii O ?O 1=11 y4 ?.jnp k0 ¢?Y 6?4 €4? O ?1 W 4NW P ° Xm WW `ci o °? c8? ao? Ww- z RI $ V oip.- m=g .9g? zo2.i ?a m ? Imo =d d°W ho ohs " mm0 L; =a x ? --o jJ; Ha MpiiH ?oaWWwzw?o Wye j. w D! HL . d,- 10 O X03 m; ..... wo-Z ma m a € w??= a o Iwo „oe m, 2?_ W ?s mae" W~o? .W? 7 C ° -U., z g?°FoNW k? ] Gib wm ?o° j °z Cj s°oyW ?iz?-w mm" a? sve z" n mom; oW ?W? n =p? m.o NSW6 1?a _ Wg 06Wm3 -e iw '. oWOm w "u;oim°J a p? N°°w w ? rc usi ww 8 x? . m° a->?, ° aka _ .2-,g c 8w WSs e s Yo im .6 N3mo ?RDZ° o??>o -00 • 'e?( • • znt7z Z L loleuyl Wt19£:9£:l l LOOZ/ZZ/OL 6MP 94d bb090M9N\s6ulaneJa luenno\s6uimej4 uoilonilsuoo\wjolS\tib090-M3N\M3N\sl38foJd\:X BRIAR CHAPEL WQP#6 J. FINCH, PE NEW-05042 10/10/2008 • C7 Stage-Storage Function Project Name: Briar Chapel Designer: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 451.0 0.0 12334 452.0 1.0 13 756 13045 13045 13045 1.01 454.0 3.0 16861 15309 30617 43662 2.94 456.0 5.0 20175 18518 37036 80698 5.07 Storage vs. Stage 90000 -- --- 80000 70000 y = 12951 x11271 LL 60000 R2 = 0.9995 U 50000 2 40000 N 30000 20000 10000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) Ks= 12951 b = 1.1271 9 BRIAR CHAPEL SS FXN - WQP#6 J. FINCH, PE NEW-05042 10/10/2008 Stage - Storage Function Ks= 12951 b= 1.1271 Zo = 451 Elevation Storage [feet] [cf] [acre-fe 451.00 0 0.000 451.20 2111 0.048 451.40 4611 0.106 451.60 7282 0.167 451.80 10071 0.231 452.00 12951 0.297 452.20 15906 0.365 452.40 18924 0.434 452.60 21997 0.505 452.80 25120 0.577 453.00 28287 0.649 453.20 31495 0.723 453.40 34741 0.798 453.60 38021 0.873 453.80 41333 0.949 454.00 44675 1.026 454.20 48046 1.103 454.40 51444 1.181 454.60 54867 1.260 454.80 58315 1.339 455.00 61785 1.418 • 455.20 65278 1.499 455.40 68792 1.579 455.60 72327 1.660 455.80 75881 1.742 456.00 79453 1.824 ?J Type.... Outlet Input Data Page 1.01 Name.... WQP6 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel • Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 451.00 ft Increment = .20 ft Max. Elev.= 456.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice-Circular SI ---> TW 451.000 456.000 Inlet Box RI --->' BA 454.000 456.000 Culvert-Circular BA ---> TW 448.250 456.000 TW SETUP, DS Channel • • SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • Type.... Outlet Input Data Name.... WQP6 Page 1.02 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = SI Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 451.00 ft Diameter = .1667 ft Orifice Coeff. _ .600 Structure ID = RI Structure Type = Inlet Box ----------------- # of Openings ------------- = 1 ------ Invert Elev. = 454.00 ft Orifice Area = .6000 sq.ft Orifice Coeff. = 25.000 Weir Length = 20.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 r ? L • SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 • Type.... Outlet Input Data Name.... WQP6 Page 1.03 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type ----------------- = Culvert-Circular ------------------- No. Barrels = 1 Barrel Diameter = 3.0000 ft Upstream Invert = 448.25 ft Dnstream Invert = 448.00 ft Horiz. Length = 48.00 ft Barrel Length = 48.00 ft Barrel Slope = .00521 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .007228 Kr = .5000 HW Convergence = .001 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.158 T2 ratio (HW/D) = 1.304 Slope Factor = -.500 E u Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 451.72 ft ---> Flow = 42.85 cfs At T2 Elev = 452.16 ft ---> Flow = 48.97 cfs SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 u Type.... Outlet Input Data Name.....WQP6 Page 1.04 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES ... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs • • S/N: 6217012070C3 The John R. McAdams Company PondPack Vex. 8.0058 Time: 2:26 PM Date: 10/10/2008 Type.... Composite Rating Curve Page 1.10 Name.... WQP6 File.... X:\Projects\NEW\NEW-0504 2\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel • Project Comments: ***** COMPOSITE OU TFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- -------- Conver ge ----------- -------------- Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures - --- ------------------- -------- 451.00 ------- .00 -------- ----- Free Outfall -- - (no Q: SI,RI,BA) 451.20 .04 Free Outfall SI (no Q: RI,BA)" 451.40 .06 Free Outfall SI (no Q: RIBA) 451.60 .08 Free Outfall SI (no Q: RIBA) 451.80 .09 Free Outfall SI (no Q: RI,BA) 452.00 .10 Free Outfall SI (no Q: RI,BA) 452.20 .11 Free Outfall SI (no Q: RI,BA) 452.40 .12 Free Outfall SI (no Q: RI,BA) 452.60 .13 Free Outfall SI (no Q: RI,BA) 452.80 .14 Free Outfall SI (no Q: RI,BA) 453.00 .15 Free Outfall SI (no Q: RI,BA) 453.20 .15 Free Outfall SI (no Q: RI,BA) 453.40 .16 Free Outfall SI (no Q: RIBA) 453.60 .17 Free.Outfall SI (no Q: RI,BA) 453.80 .17 Free Outfall SI (no Q: RIBA) 454.00 .18 Free Outfall SI (no Q: RI,BA) 454.20 5.55 Free Outfall SI,RI,BA 454.40 15.37 Free Outfall SI,RI,BA 454.60 28.08 Free Outfall SI,RI,BA 454.80 43.13 Free Outfall SI,RI,BA 455.00 60.21 Free Outfall SI,RI,BA 455.20 79.09 Free Outfall SI,RI,BA 455.40 80.61 Free Outfall SI,RI,BA 455.60 82.16 Free Outfall SI,RI,BA • 455.80 83.69 Free Outfall SI,RI,BA 456.00 85.18 Free Outfall SI,RI,BA • SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:26 PM Date: 10/10/2008 HMS * Summary of Results for WQP#6 ?/1 11J u Project : NEW-05042 Start of Run 10Oct08 0000 End of Run llOct08 0000 Execution Time : 10Oct08 1602 Run Name : 1-Year Post • Computed Results Basin Model Post-Development Met. Model 1-Year Storm Control Specs 1-Minute dT Peak Inflow 30.036 (cfs) Date/Time of Peak Inflow 10 Oct 08 1156 Peak Outflow : 1.1097 (cfs) Date/Time of Peak Outflow 10 Oct 08 1345 Total Inflow 1.82 (in) Peak Storage 1.0393(ac-ft) Total Outflow 0.59 (in) Peak Elevation 454.03(ft) 0 HMS * Summary of Results for WQP#6 1, 1J u Project : NEW-05042 Start of Run 100ct08 0000 End of Run 11Oct08 0000 Execution Time 100ct08 1603 Run Name : 2-Year Post is Basin Model Post-Development Met. Model 2-Year Storm Control Specs 1-Minute dT Computed Results Peak Inflow 41.733 (cfs) Peak Outflow 6.1305 (cfs) Total Inflow 2.36 (in) Total Outflow 1.13 (in) Date/Time of Peak Inflow 10 Oct 08 1204 Date/Time of Peak Outflow 10 Oct 08 1226 Peak Storage 1.1076(ac-ft) Peak Elevation 454.21(ft) 0 HMS * Summary of Results for WQP#6 Project : NEW-05042 Run Name : 10-Year Post u Start of Run End of Run Execution Time 100ct08 0000 Basin Model Post-Development llOct08 0000 Met. Model 10-Year Storm 100ct08 1603 Control Specs 1-Minute dT • Computed Results Peak Inflow 59.022 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 41.226 (cfs) Date/Time of Peak Outflow 10 Oct 08 1209 Total Inflow 4.03 (in) Peak Storage 1.3290(ac-ft) Total Outflow 2.80 (in) Peak Elevation 454.77(ft) L' HMS * Summary of Results for WQP#6 Project : NEW-05042 Run Name : 25-Year Post Start of Run 100ct08 0000 Basin Model Post-Development End of Run 11Oct08 0000 Met. Model 25-Year Storm Execution Time 100ct08 1603 Control Specs 1-Minute dT Computed Results Peak Inflow 69.471 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 58.728 (cfs) Date/Time of Peak Outflow 10 Oct 08 1207 Total Inflow 5.02 (in) Peak Storage 1.4111(ac-ft) Total Outflow 3.79 (in) Peak Elevation 454.98(ft) • 0 HMS * Summary of Results for WQP#6 Project : NEW-05042 Run Name : 100-Year Post Start of Run l000t08 0000 Basin Model Post-Development End of Run 11Oct08 0000 Met. Model 100-Year Storm Execution Time l0Oct08 1603 Control Specs 1-Minute dT Computed Results Peak Inflow 85.609 (cfs) Date/Time of Peak Inflow 10 Oct 08 1204 Peak Outflow 75.929 (cfs) Date/Time of Peak Outflow 10 Oct 08 1207 Total Inflow 6.56 (in) Peak Storage 1.4854(ac-ft) Total Outflow 5.33 (in) Peak Elevation 455.17(ft) • 0 BRIAR CHAPEL SS FXN - WQP#6 (100Yr) J. FINCH, PE NEW-05042 10/13/2008 • 0 Stage - Storage Function Ks = 12951 b = 1.1271 Zo = 451 Elevation Storage 100-Year Worst Case [feet] [cf] [acre-feet] [cf] [acre-feet] 451.00 0 0.000 - - 451.20 2111 0.048 - - 451.40 4611 0.106 - - 451.60 7282 0.167 - - 451.80 10071 0.231 - - 452.00 12951 0.297 - 452.20 15906 0.365 - 452.40 18924 0.434 - - 452.60 21997 0.505 - - 452.80 25120 0.577 - 453.00 28287 0.649 - 453.20 31495 0.723 - 453.40 34741 0.798 ( - - 453.60 38021 0.873 - - 453.80 41333 0.949 - 454.00 44675 1.026 0 0.000 454.20 48046 1.103 3371 0.077 454.40 51444 1.181 6769 0.155 454.60 54867 1.260 10192 0.234 - 454.80 58315 1.339 13639 0.313 455.00 61785 1.418 17110 0.393 455.20 65278 1.499 20603 0.473 455.40 68792 1.579 24117 0.554 455.60 72327 _ 1.660 27651 0.635 455.80 75881 _ 1.742 31205 0.716 - 456.00 79453 1.824 34778 1 0.798 joLje% t uANM esgE OA.T 0 G r J • Type.... Composite Rating Curve Name.... WQP6(100YR) Page 1.07 File.... X:\Projects\NEW\NEW-05042\Storm\Construction Drawings\SWMFDESIGN.PPW Title... Project Date: 7/10/2006 Project Engineer: Jeremy Finch, PE Project Title: Briar Chapel Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** • WS Elev, Total Q Notes --- -- ------ -- Converge ----------------------- -- Elev. Q TW El ev Error ft - cfs % ft +/-ft Contributing Structures ------- 454.00 ------- .00 ------ Free -- ----- Outfall ------------------------ (no Q: RIBA) -- 454.20 5.37 Free Outfall RI,BA 454.40 15.18 Free Outfall RIBA 454.60 454.80 27.89 42.93 Free Free Outfall Outfall RI,BA RI,BA ud}? 455.00 455.20 60.00 78.87 Free Free Outfall Outfall RI,BA RIBA ,L 0 455.40 80.39 Free Outfall RI,BA 455.60 81.93 Free Outfall RI,BA .0 455.80 83.46 Free Outfall RI,BA P 456.00 84.95 Free Outfall RIBA S/N: 6217012070C3 PondPack Ver. 8.0058 The John R. McAdams Company Time: 10:54 AM Date: 10/13/2008 HMS * Summary of Results for WQP#6 • Project : NEW-05042 Start of Run 100ct08 0000 End of Run 11Oct08 0000 Execution Time 130ct08 1115 Run Name : 100-YrPost(WC) • Basin Model Post-Dev(100YrWC) Met. Model 100-Year Storm Control Specs 1-Minute dT Computed Results Peak Inflow 85.609 (cfs) Peak Outflow 76.021 (cfs) Total Inflow 6.56 (in) Total Outflow 6.55 (in) Date/Time of Peak Inflow 10 Oct 08 1204 Date/Time of Peak Outflow 10 Oct 08 1207 Peak Storage 0.46092(ac-ft) Peak Elevation 455.17(ft) u BRIAR CHAPEL Below NWSE J. FINCH, PE NEW-05042 10/10/2008 Stage-Storai Project Name: Designed By: Job Number: Date: Te Function Briar Chapel J. Finch, PE NEW-05042 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 444.0 i 0.0 ; 2551 _ _. 446.0 448 0 2 0 3954 5650 4 0 3253 4802 1 6505 9604 6505 16109 -- 2.06 86 r-1 . . _ 22204 . 8 449.0 5.0 { 6539 6095 6095 450.0 6.0 9426 7983 _ 7983 30186 5.96 451.0 7.0 12334 1 10880 p 10880 1 41066 f 7.38 • Storage vs. Stage 45000 40000 35000 y = 2303.9x1.441 LL 30000 RZ = 0.9934 25000 rn c 20000 15000 10000 5000 i 0 0.0 2.0 4.0 6.0 8.0 Stage (feet) Ks = 2303.9 b = 1.441 0 BRIAR CHAPEL Forebay J. FINCH, PE NEW-05042 10/10/2008 Stage-Storal Project Name: Designed By: Job Number: Date: re Function Briar Chapel J. Finch, PE NEW-05042 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn 444.0 0.0 621 ; i 446.0 2.0 1212 s 917 1833 1833 2 01 .__._ _ . 024 . -' 448.0 4.0 1979 1 1596 3191 1 50_24 3.95 449.0 5.02426 2203 i 2203 -? 7227 ?5.05 • Storage vs. Stage 8000 - - 7000 y = 651.05x1487 6000 R2 = 0.9995 V 5000 4000 y 3000 2000 1000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) Ks = 651.05 b = 1.487 0 BRIAR CHAPEL Volume Check J. FINCH, PE NEW-05042 10/23/2008 BRIAR CHAPEL - WO POND #6 DESIGN 1L. FORE$AY?ULUM? ?HECIf , Per NCDENR "Stormwater Best Management Practices", the forebay volume should equal about 20% of the total basin volume. A. Water Quality Pond - Below Normal Pool Volume Volume = 41066 cf B. Forebay Volume Forebay Volume = 7227 cf Forebay = 18% Impervious Area acres Drainage Area acres • % Impervious = 66.07% Total Below NP Volume 41066 cf Surface Area 12334 sf Average Depth = 3.33 ft __> From the NCDENR Stormwater BW Handbook (4/99), the required SA/DA ratio for 85% TSS Removal in the Piedmont is as follows: Lower Boundary => 60.0 Site % impervious => 66.1 Upper Boundary => 70.0 Area Required = 11186 sf Area Provided = 12334 sf OK 3.0 3.33 4.0 2.-40 2.03 2.69 Z55 2.25 2.88 2.40 0 BRIAR CHAPEL WQPond#6 J. FINCH, PE NEW-05042 10/10/2008 • L` 1" RUNOFF VOLUME CALCULATION SHEET Project Name: Briar Chapel Checked by: J. Finch, PE Job Number: NEW-05042 Date: 10/10/2008 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 451.0 0.0 12334 452.0 1.0 13 756 13045 13045 mm 13045 1.01 454.0 3.0 16861 15309 30617 43662 2.94 456.0 5.0 20175 18518 37036 80698 5.07 Storage vs. Stage 90000 80000 - - 70000 y = 12951x'.1271 9995 R2 = 0 60000 . LL 50000 m 40000 0 N 30000 20000 10000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) Ks= 12951 b = 1.1271 Calculation of Runoff Volume required for Storage The runoff to the water quality pond for the 1" storm runoff requirement is calculated by simply multiplying the total watershed area draining to the water quality pond times the runoff depth. Total Drainage Area to WQ Pond = 10.08 acres Runoff Depth = 1 inches Therefore, total runoff from precipitation in question = 36590 CF This amount of runoff must be stored in the pond above normal pool elevation, and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. 0 BRIAR CHAPEL WQPond#6 J. FINCH, PE NEW-05042 10/10/2008 Calculation of depth required for runoff storage pool (above normal pool) • Normal pool depth (above invert) 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 36590 CF Stage (above invert) associated with this storage = 2.51 feet Therefore, depth required above normal pool for storm storage = 2.51 feet 30.16 inches Set crest of principal spillway at stage = 2.52 feet and EL = 453.52 feet At principal spillway crest, storm pool storage provided = 36705 CF E BRIAR CHAPEL - PHASE 4 WQP#6 J. FINCH, PE NEW-05042 10/13/2008 Inverted Siphon Design Sheet • D orifice = # orifices = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Normal Pool = Orifice Invert = WSEL @, 1" Runoff Volume = 2 inch 1 12951 1.1271 0.60 451.00 feet 0 cf 451.00 feet 453.52 feet WSEL (feet) Vol. Stored (cf) Siphon Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 453.52 36705 0.164 453.30 33125 0.156 0.160 3580 22384 453.08 29588 0.148 0.152 3537 23238 452.86 26098 0.140 0.144 3490 24225 452.64 22660 0.131 0.135 3438 25387 452.42 19280 0.121 0.126 3380 26785 452.20 15966 0.111 0.116 3314 28516 451.98 12728 0.100 0.105 3238 30749 451.77 9581 0.087 0.093 3147 33802 451.55 6548 0.071 0.079 3033 38400 451.33 3670.5 0.052 0.062 2878 46763 Drawdown Time = 3.48 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 1.218 feet Orifice composite loss coefficient = 0.600 Cross-sectional area of 2" orifice = 0.022 sf Q= 0.1159 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 3.66 days Conclusion : Use 1 - 2" Diameter PVC Inverted Siphon to drawdown the accumulated volume from the 1.0" storm runoff, with a required time of about 3.48 days. 0 BRIAR CHAPEL WATER QUALITY POND #6 - 12" DIP NEW-05044 • Anti-Seep Collar Design Sheet This sheet will, given the barrel length of interest and minimum seep collar projection from the barrel, determine the number of anti-seep collars to place along the barrel section, and the expected spacing of the collars. Design Requirements => Anti-seep collars shall increase the flow path along the barrel by 15%. Anti-seep collars shall be spaced a maximum of 14X the minimum collar projection or 25 feet, whichever is less. J. FINCH, PE 8/23/2006 Anti-Seep Collar Design ==> WQP t • Flow Length Min. Cale'd # Max. # of tine Pond along barrel Projection of collars Spacing collars to Spacing Spacing ID (feet) (feet) required (feet) use (feet) OK? `6 - 12" DIP 50.0 1.88 1.99 25 2.00 16.66661 YES Note : If spacing to use is greater than the maximum spacing, add collars until the spacing to use is equal to or less than the maximum spacing allowable for the collar design. Anti-seep collars shall be used under the structural fill portions of all berms/dams unless an approved drainage diaphragm is present at the downstream end of the barrel. 0 BRIAR CHAPEL NEW-05044 .Input Data =_> Square Riser/Barrel Anti-Flotation Calculation Sheet Inside length of riser = 5.00 feet Inside width of riser = 5.00 feet Wall thickness of riser = 6.00 inches Base thickness of riser = 8.00 inches Base length of riser = 6.00 feet Base width of riser = 6.00 feet Inside height of Riser = 5.75 feet Concrete unit weight = 142.0 PCF OD of barrel exiting manhole = 45.50 inches Size of drain pipe (if present) = 8.0 inches Trash Rack water displacement = 61.74 CF Concrete Present in Riser Structure =_> Total amount of concrete: • Base of Riser = 24.000 CF Riser Walls = 63.250 CF J. FINCH, PE 8/23/2006 Note. \C F:oducts 3ist_ uric w', of n;;:nhoJc cx:ne ete at i 42 Opening for barrel = 5.646 CF Opening for drain pipe = 0.175 CF Total Concrete present, adjusted for openings = 81.430 CF Weight of concrete present = 11563 lbs Amount of water displaced by Riser Structure =_> Displacement by concrete = 81.430 CF Displacement by open air in riser = 143.750 CF Displacement by trash rack = 61.740 CF Total water displaced by riser/barrel structure = 286.920 CF Weight of water displaced = 17904 lbs Calculate amount of concrete to be added to riser =_> Safety factor to use = 1.15 (n-,w`rnnj,,^.i: _..S"); It giw-o Must add = 9026 lbs concrete for buoyancy • Adjust for openings: Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Buoyant weight of this concrete = 79.60 PCF Buoyant, with safety factor applied = 69.22 PCF Therefore, must add = 130.406 CF of concrete Standard based described above = 24.000 CF of concrete Therefore, base design must have = 154.406 CF of concrete 1 OF 2 BRIAR CHAPEL NEW-05044 • Calculate size of base for riser assembly ==> Length = 9.000 feet Width = 9.000 feet Thickness = 23.0 inches Concrete Present = 155.000 CF Check validity of base as designed ==> OK. Total Water Displaced = 417.920 CF Total Concrete Present = 212.430 CF Total Water Displaced = 26078 lbs Total Concrete Present = 30165 lbs Actual safetyfactor = 1.16 Results of design ==> • • OK Base length = 9.00 feet Base width = 9.00 feet Base Thickness = 23.0 inches CY of concrete total in base = 5.74 CY Concrete unit weight in added base >= 142 PCF J. FINCH, PE 8/23/2006 2OF2 BRIAR CHAPEL NEW-05044 • NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 41.749 Flow depth (ft) = 2.16 slope.S in % : 0.521 Outlet velocity (fps) = 7.670 pipe diameter D in in.: 36 Manning number n : 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 3.00 Outlet velocity (fps) 7.67 Apron length (ft) 18.00 B. IHNATOLYA, EI 9/21/07 AVG DIAM STONE THICKNESS (inches) CLASS (inches) 3 A 9 >>6 B 22« 13 B or 1 22 23 2 .27 CALCULATION: Minimum TW Conditions: W = Do + La = 3.0' + 18' =21.0 ft CONCLUSION: USE NCDOT CLASS W RIP RAP 18'L x 21'W x 22" THK 0