Loading...
HomeMy WebLinkAboutUS 221 Rutherfordton Bypass (2)Michael F Easley, Governor William G Ross Jr, Secretary North Carolina Department of Environment and Natural Resources Coleen H Sullins, Director Division of Water Quality October 13, 2008 CERTIFIED MAIL RETURN RECEIPT REQUESTED Dr Greg Thorpe, PhD, Manager Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina, 27699-1548 Dear Dr Thorpe Re Proposed US 221 Rutherfordton Bypass from US 74 Bypass to SR 1366 in Rutherford County, State Project No 8 1891001, WBS No 34400 1 1, TIP R-2233B This letter is in reference to the application for the proposed US 221 Rutherfordton Bypass in Rutherford County The project is being planned in accordance with the 404/NEPA Merger '01 agreement The purpose of the permit application is to submit public input on the proposed reasonable and feasible alternatives At this time, the selection of a preferred alternative has not occurred Pursuant to 15A NCAC 2H 0507 (a), this application is not considered complete and does not qualify as the formal application for a 401 Water Quality Certification Therefore, our 60-day time limit has not been activated We look forward to participating in future team meetings on this project Thank you for your comments If you have any questions, please contact meat (919) 733-5715 Sincerely, d Brian Wrenn Transportation Permitting Unit cc David Baker, US Army Corps of Engineers Asheville Field Office Marla Chambers, NCWRC Chris Milrtscher, US EPA Kathy Matthews, US EPA Mike Parker, NC DWQ, Washington Regional Office File Copy Node Carolina Transportation Permitting Unit ° "'tuA"Ilm 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone 919-733-17861 FAX 919 733-6893 / Internet http //h2o enr state nc us/ncwetlands An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper D w. $UT[ 6 t- STATE OF NORTH CAROLINA OCT 1 , CJ R. ?8 '?y7TFR DEPARTMENT OF TRANSPORTATION MICHALI. F EASE EY GOVER\OR October 3, 2008 US Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 ATTN Mr David Baker NCDOT Coordinator LYNDO TIPPETT SECRETARY SUBJECT Clean Water Act /Section 404 Merger Application for the Proposed US 221 Rutherfordton Bypass from US 74 Bypass to SR 1366 (Roper Loop Road), Rutherford County, NC DOT Division 13, State Project 8 1891001, WBS No 34400 1 1, TIP R-2233 B The following application, including separate attachments for (1) A Summary Report of the Clean Water Act/Section 404 Merger Application for the subject project, (2) ENG Form 4345, and (3) mailing list (labels), is submitted for your consideration As you are aware, this project was selected for treatment under Merger 01 At this juncture, the Regulatory Division has provided concurrence on Purpose and Need, the selection of Detailed Study Alternatives and bridge locations and lengths A State Draft Environmental Impact Statement (SDEIS) was prepared and signed on August 29, 2008 Please issue your public notice at the earliest opportunity, so we can jointly proceed toward selecting the LEDPA (Least Environmentally Damaging, Practicable Alternative) which meets the purpose and need of the project following analysis of public input Once the LEDPA is selected and approved, efforts will be undertaken to further minimize impacts to wetlands and riparian buffers in the LEDPA corridor and to propose suitable compensatory mitigation to offset unavoidable impacts The attached Summary Report information is a summary of relevant project details and is provided to assist in the Section 404 regulatory review of the project Please note more detailed information is available in the SDEIS MAILING ADDRESS NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1548 MAIL SERVICE CENTER RALEIGH NC 27699 1548 TELEPHONE 919 733-3141 FAX 919 733-9794 WEBSITE WWW DOH DOT STATE NC US LOCATION TRANSPORTATION BUILDING 1 SOUTH WILMINGTON STREET RALEIGH NC 10/3/2008 US Army Corps of Engineers Page 2 Enclosed, too. you will find a completed ENG form 4345. mailing labels and drawings depicting the project This letter and attachments, along with the previously distributed EIS. should provide sufficient information for the issuance of a Public Notice for the project The hearing for this project will be held before December of this year Thank you fro your prompt attention to this application. If you have any questions, or need additional information, please contact Ms Jameelah E1-Amin at (919) 733-7844 extension 362 or Mr Brett Feulner at (919) 715-1488 Thank you for your prompt attention to this application Smcerel , Ph ProjecDevelopment and Environmental Analysis Branch GJT/je cc w/attachment Brian Wrenn, NCDWQ (7 copies) Marla Chambers, NCWRC Chris Militscher, USEPA - Raleigh. NC Marella Buncick. USFWS David Chang, PE, Hydraulics Mark Staley, Roadside Environmental Greg Perfetti, PE, Structure Design Jay Swain, PE, Division Engineer Roger Bryan, Division Environmental Officer Phil Harris, Natural Environment Unit Carla Dagmno, Natural Environment Unit Brett Feulner, Natural Environment Unit Jameelah El-Amin, PE. PDEA w/out attachment Scott McLendon, USAGE, Wilmington Majed Al-Ghandour, Project Management/Scheduling Unit Art McMillan, PE, Highway Design Jay Bennett, PE, Roadway Design Jay McInnis, PE, PDEA Drew Joyner, PE, Human Environment Unit SUMMARY REPORT Clean Water Act /Section 404 Merger Application for the Proposed US 221 Rutherfordton Bypass from US 74 Bypass to SR 1366 (Roper Loop Road), Rutherford County, NCDOT Division 13, State Project 8 1891001, WBS No 34400 1 1, TIP R-223313 INTRODUCTION The North Carolina Department of Transportation (NCDOT) proposes to construct a US 221 Rutherfordton Bypass mostly on new location The proposed project is approximately nine miles long The proposed project is included in the approved 2009-2015 North Carolina Transportation Improvement Program (TIP) The project is identified as TIP Project R-2233B The initial right of way acquisition and construction for the project are scheduled for state fiscal years 2011 and 2014, respectively Four alternatives for the project are still under consideration (see Figure 2) The proposed US 221 Rutherfordton Bypass will be constructed as a four-lane median divided roadway with 12-foot lanes and 10-foot grass shoulders (4 feet paved) A 46-foot median is proposed for the project A 23-foot raised median and curb and gutter with a ten-foot berm is proposed for portions of the proposed bypass routed along existing US 74Alternate A design speed of 70 MPH is also proposed for new location portions of the project A total right of way width of approximately 300 feet is proposed for new location portions of the proposed bypass Narrower right of way widths ranging from 115 feet to 250 feet are proposed for portions of the project which involve widening existing roads Full control of access is proposed for new location portions of the project Partial control of access (one access per parcel for properties with no other access) is proposed for portions of the project which involve widening existing roads Fencing will be placed at the right of way line between access points Adverse impacts to the human and natural environments will be minimized for the proposed project through corridor selection and design shifts within the corridors for the four alternatives still under consideration NEPA DOCUMENTATION A US 221 Rutherfordton Bypass has been shown on the Rutherfordton Thoroughfare Plan since 1976 Nine alternatives were initially developed for this protect (see Section 2 2 of the EIS) The state draft environmental impact statement for the project was approved on August 29, 2008 PURPOSE AND NEED The purpose of the project is to reduce congestion, improve safety, and improve travel time for traffic using the US 221 corridor in the vicinity of Rutherfordton The proposed project will address the following needs • Substandard roadway geometry that does not meet the 60 MPH design speed requirements • Projected high traffic volumes • Excessive travel time The NEPA/404 merger team concurred on the purpose and need for the project on December 14, 2000 COST ESTIMATES Preliminary cost estimates for each alternative still under consideration are presented in Table 1 These figures include cost estimates for construction, right-of-way, utility relocation and wetland and stream mitigation Table 1 Proiect Cost Estimates (millions) ALT.3 ALT.4 ALT.6 US 74A A LT. T. A Right Of Way Acquisition $49 0 $600 $450 $460 Utility Relocation $1 7 $16 $20 $25 Wetland/Stream Mitigation $6 0 $43 $70 $50 Construction $1660 $1530 $1800 $1460 Total Cost $223 0 $219 0 $234 0 $2000 LOGICAL TERMINI The proposed US 221 Rutherfordton Bypass has logical termini The project will extend from the US 74 Bypass to SR 1366 (Roper Loop Road) The proposed bypass is a usable facility and is a reasonable expenditure even if no additional transportation improvements are made in the area Construction of the proposed bypass will not restrict consideration of alternatives for other reasonably foreseeable transportation improvements ALTERNATIVES Prelimman Study Alternatives Transportation System Management (TSM) Transportation Systems Management consists of adding low-cost transportation improvements to increase the capacity of an existing facility TSM strategies typically involve minor roadway improvements that improve the operational characteristics of a facility while minimizing capital outlay and inconvenience to motorists There are two main types of TSM minor roadway improvements operational and physical TSM physical and operational roadway improvements typically are effective in solving site-specific capacity, safety and use problems in urban areas Most of these measures are not applicable to US 221 because of existing conditions Travel Demand Management (TDM) Travel Demand Management (TDM) strategies include staggered work hours, ridesharmg, and high occupancy vehicle (HOV) lanes Staggered work hours, flex-time, or modified workweeks can be implemented by large employers along the corridor who experience congestion at the entrances to their businesses Although the US 221 corridor does contain some large businesses, it is not expected that such adjustments to work schedules would significantly reduce peak hour traffic volumes within the study area Given the predominantly rural nature of the project area, public transportation or ridesharing are unlikely to result in substantial reductions in the amount of traffic along US 221 in the project area Alternate Modes of Transportation Alternate modes of transportation would include bus or rail passenger service Intercity bus service to the Rutherfordton area is provided by Greyhound Lines Inc via a terminal located in Spindale There is no passenger rail service available in Rutherford County The abandoned railroad that runs from Forest City to Rutherfordton is currently used as a walking trail The Rutherford County Transit Department provides subscription and dial-a-ride transportation services for authorized residents of Rutherford County No fixed-route transit service is currently provided in the county Given the predominantly rural nature of the project area, bus transit is unlikely to result in substantial reductions in the amount of traffic along US 221 in the project area 3 "No-Build" Alternative This alternative would avoid the environmental impacts anticipated to occur as a result of the proposed project, but would not meet the purpose and need of the project Construct Bypass Constructing a US 221 bypass of Rutherfordton would meet the purpose and need of the proposed project A bypass would reduce congestion, improve safety, and improve travel time for traffic using the US 221 corridor in the vicinity of Rutherfordton Nine bypass alternatives were initially developed for the proposed project Preliminary Bypass Alternatives Nine bypass alternatives were initially developed for the proposed project Six of these alternatives were presented to the public at a citizens informational workshop held on August 23, 2001 An additional alternative was suggested at the workshop Of these, four alternatives were chosen for detailed study by the NEPA/404 merger team (see Section 2 3 of the SDEIS) Table 2 presents impacts of all of the preliminary bypass alternatives Impact estimates were refined as studies progressed The preliminary bypass alternatives are shown on Figure 3 Table 2 US 221 Bvaass Preliminary Alternatives Comparison US Improve West 74A Exist. Alt.I Alt.2 Alt.3 Alt.4 Alt.5 Alt.6 B . B . Residential 108 85 171 151 162 134 149 115 90 Relocatees Business 49 11 31 23 20 19 21 11 23 Relocatees National Register 1 district 1 I 1 1 I I None None Listed Properties Wetlands Affected (ac.) 1 6 1 2 22 1 8 2 1 20 1 3 24 1 5 NWI S re m 2,733 14,270 12,148 5,794 5,906 10,497 13,113 12,692 3,834 t ft Imp Length New Location 02 90 95 91 90 93 86 96 3 3 (miles) Total Length 123 128 123 11 6 128 109 94 128 11 6 (miles) i Impacts are based on total corridor width All impacts presented are based on readily available environmental intormation, no field surveys were pertormed initially NWI-National Wetland Inventory 4 The NEPA/404 merger team agreed to eliminate Bypass Alternative 1 prior to the citizens informational workshop because it would impact a proposed county landfill, would impact the largest amount of streams and would also affect a property listed on the National Register of Historic Places Bypass Alternatives 2, 3, 4, the Western Bypass Alternative, the US 74A Bypass Alternative and Improve Existing were all presented at the workshop Local officials suggested Alternative 5 at the workshop Alternative 6 was developed following the informational workshop in order to reduce the impact of Alternative 5 on the Gilbert Town historic district Alternative 2, Alternative 5, the Western Bypass Alternative and Improve Existing were dropped from consideration by the NEPA/404 merger team following the workshop These alternatives are discussed below Alternative 2 was eliminated because it would affect the most homes, would affect a large amount of streams and would potentially impact an industrial complex Alternative 5 was eliminated because it would potentially affect Gilbert Town, a site which is now listed on the National Register of Historic Places The Western Bypass was eliminated because it will not serve the towns of Spindale and Ruth as well as a bypass on the eastern side of Rutherfordton and it would divert the least amount of traffic from existing US 221 Additionally, this alternative would affect a water supply watershed and other alternatives would not The Improve Existing Alternative was the one least favored by the public and local officials This alternative was eliminated because constructing a one-way pair downtown would potentially impact the historic district in Rutherfordton Based on comments received from citizens, impacts associated with these alternatives and the lengths of the alternatives, the merger team agreed to drop them from the project study Detailed Study Alternatives Detailed environmental surveys were performed for four alternatives Preliminary designs were prepared for the alternatives, as well The four alternatives currently under consideration for the project are discussed below These four alternatives will be presented at a public hearing for citizen comment A preferred corridor will be selected following the public hearing All of these alternatives are shown on Figure 2 Table 3 presents a comparison of the four alternatives and the alternatives are described individually below Alternative 3 Alternative 3 would involve widening existing US 221 and constructing a bypass This alternative is located on the east side of Rutherfordton Existing US 221 would be widened to four lanes with a median from US 74 Bypass to near SR 2194 (Poors Ford Road) North of SR 2194 ( Poors Ford Road), a bypass on new location would be built around the east side of Rutherfordton, crossing SR 2201 (Thunder Road), US 74 Business/US 221 Alternate and US 64 before connecting back with existing US 221 at SR 1536 (Old US 221) north of Rutherfordton US 221 would then be widened from SR 1536 (Old US 221) to SR 1366 (Roper Loop Road) The total length is 8 5 miles Alternative 4 Alternative 4 would involve widening existing US 221 and constructing a '.shallow" bypass of downtown Rutherfordton Existing US 221 would be widened to four lanes with a median from US 74 Bypass to SR 2271 (Industrial Park Road), dust south of downtown Rutherfordton A bypass on new location would be constructed from SR 2271 (Industrial Park Road) extending around the east side of downtown Rutherfordton and connecting back with existing US 221 near the existing US 64 interchange US 221 would then be widened from US 64 to SR 1366 (Roper Loop Road) The total length is 9 3 miles Alternative 6 Alternative 6 would involve widening existing US 221 and constructing a bypass This alternative is on the east side of Rutherfordton Existing US 221 would be widened to four lanes with a median from US 74 Bypass to near SR 2194 (Poors Ford Road) North of SR 2194 (Poors Ford Road), a bypass on new location would be built around the east side of Rutherfordton, crossing SR 2201 (Thunder Road) and US 74 Business/US 221 Alternate At US 74 Business/US 221 Alternate, Alternative 6 continues east of the Town of Ruth, crossing US 64 and SR 1520 (Rock Road) before tying into existing US 221 north of SR 1367 (Thompson Road) US 221 would then be widened from north of SR 1367 (Thompson Road) to SR 1366 (Roper Loop Road) The total length is 9 4 miles US 74A Bypass Alternative The US 74A bypass alternative would involve widening existing US 221 to four lanes with a median from US 74 Bypass to SR 2194 (Poors Ford Road) North of SR 2194 (Poors Ford Road), a bypass on new location would be constructed connecting existing US 221 with existing US 74 Alternate at US 74 Business/US 221 Alternate Existing US 74 Alternate would be widened to multi-lanes from US 74 Busmess/US 221 Alternate to north of US 64 North of US 64, the bypass would be extended on new location, connecting SR 1536 (Old US 221) and existing US 221 US 221 would then be widened to SR 1366 (Roper Loop Road) The total length is 8 7 miles 6 Table 3 Detailed Study Alternatives US 74A ALT.3 ALT.4 ALT 6 ALT. T. A Residential 99 163 91 88 Relocatees Business 27 43 26 32 Relocatees Wetlands Affected 0 8 0 6 1 3 0 7 (ac.) NWI Stream Impacts 12,063 8,734 13,113 9,200 ft.) Dwarf-Flowered Heartleaf Impacts 4120 1723 371 5 371 5 s ft. Length New Location 9 1 3 5 8 6 3 3 (miles) Total Length 8 5 9 3 9 4 8 7 miles Total Cost (mil) 1 $223 0 $219 0 $2340 $200 0 Impacts based on field surveys WATERS OF THE UNITED STATES Impacts and Mitigation Jurisdictional Streams "Waters of the United States" will be impacted by the proposed project Streams within the project area are part of the Broad River Basin Three mayor stream systems, Stonecutter Creek. Cleghorn Creek and Hollands Creek flow through the project area The project is located within the NC Division of Water Quality sub-basin 03-08-02 and US Geological Survey sub-basin 03050105 These streams are shown on Figure 2 Streams in the study area are described in Table 4 below 7 Table 4 Streams to Protect Studv Area Stream ID Bank Height feet Channel Width (feet) Stream Determination B 6-8 2-4 Perennial IB 1-4 3-4 Perennial UTIB 2-6 1-3 Perennial A 1-5 2-5 Perennial 2ZZ 1-10 1-3 Perennial IC 1-2 6-10 Perennial UT1C 1-2 1-4 Perennial 2UTIC 1-3 1-4 Perennial 3UTIC 1-4 <1 Perennial UT2UTIC 1-4 1-2 Perennial 2A 6-12 05-3 Perennial 4UT2A 05 1 Perennial u r2A 2-4 05-1 Perennial 2U F2A 3-4 05 Perennial 3U r24 2-4 1-2 Perennial 5UT2A 2-3 1 Perennial 213 upstream 4-5 05 Perennial 213 downstream 6-10 1-3 Perennial UT213 4-6 2-3 Perennial 2UT213 3-5 05-1 Perennial UTIUT2B 2-3 1-2 Perennial ID 2-10 2-4 Perennial UT1D 6-20 4-6 Perennial IE 1-3 4-6 Perennial UTIE 1 4 Perennial 2C (Stonecutter Creek) 10-25 1-4 Perennial UT2C 2-3 05-3 Perennial UTUT2C 1 5 05 Perennial 3A 0-1 1-4 Perennial 2F 1-10 3-6 Perennial 2G downstream 2-10 6-8 Perennial 2UT2G 4-9 3-5 Perennial 3-2C upstream (Stonecutter Creek) 2-4 8-20 Perennial I1 1-6 8-15 Perennial UTIJ 1-3 2-6 Perennial 3-2C downstream (Stonecutter Creel.) 2-8 20-30 Perennial 2UT3-2C 0-1 12-16 Perennial Stream ID Bank Height feet Channel Width (feet) Stream Determination 3UT3-2C 0-2 0-3 Intermittent becoming Perennial 3UT3-2C 6-14 2-16 Perennial 4U13-2C 6-20 3-4 Perennial UT4UT3-2C 1-4 1-3 Perennial 3E 12 1-8 Perennial Ul3E 1-9 3-6 Perennial 3D (North of US 74) 0-8 4-12 Perennial 3C upstream 0-2 1-4 Intermittent becoming Perennial 3C do«n,tream 2-6 4-10 Perennial 3UT3C 0-2 1-3 Perennial 4UT3C 0-1 1-3 Intermittent 3B 0-6 1-4 Perennial 3D (South of US 74) -4 3 6-10 Intermittent becoming Perennial UT313 0-6 1-8 Perennial 1 Y 2-4 4-6 Perennial UTIY 1-2 1-2 Perennial 2UTIY 0-6 1-10 Perennial 3UTIY 1-2 2-6 Perennial 2.1 1-2 3 Perennial IG 3-15 3 Perennial UT 1 G 4 3-5 Perennial 2H 20 3-4 Perennial UT21-1 20 4-6 Perennial 2G upstream (Cle horn Creek) 3-10 20-35 Intermittent becoming Perennial 3UT2G 8-12 4 Perennial 4UT2G 4-20 3-4 Perennial 5UT2G 15 2-3 Perennial 6UT2G 1-18 3-8 Perennial UT6UT2G 1-3 3 Perennial 3-2Ur6UT2G 2-6 1-4 Perennial 3-3UT6UT2G 2-4 1-4 Perennial 3-4UT6UT2G 1-4 2-4 Perennial 3-5UT6UT2G 1-2 1-2 Perennial 3UTUT3r 2-3 4-8 Perennial 2UTUT3F 2-8 1-6 Perennial 3F (Hollands Creek) 6 6-15 Perennial Stream ID Bank Height feet Channel Width (feet) Stream Determination L1 rUl 31 2 3 Perennial IJ13F 3-4 3-5 Perennial 21A L11 2K 05 1 Perennial UTUT2K 1-5 1-5 Perennial U1 2K 1-5 1-3 Perennial UT 1 HC 1-40 2-20 Perennial UT3X 2-12 3-6 Perennial UTUT3X 1-9 3-6 Perennial 3X 3-12 8-20 Perennial 3G (Hollands Creek) 5-10 10-15 Perennial UT3G 3-6 3-4 Perennial 3UTUl3G 2-8 1-3 Perennial UTUl3G 1-3 1-2 Perennial 2UTUT3G 1-4 1-3 Perennial UT2UrUT3G 1-3 1-3 Perennial 2UT1HC 1-2 1-3 Perennial UT3 UT I HC 1-2 1-2 Perennial 3UTIHC 1-3 1-5 Perennial 31 2-10 6-40 Perennial UTUTIFIC 2 3 Perennial UTIHC 2-25 2-10 Perennial IHC (Holland,, Creek) 12 4-6 Perennial 2K (Hollands Creek) 2-4 12-18 Perennial 2UT2K 3-4 5 Perennial 3UT2K 3 6 Perennial I K 1-2 4-6 Perennial UTIK 0-3 0-1 Perennial 3H 1-8 2-20 Perennial 2UTIK 0-1 1-3 Intermittent 3UTIK 0-1 1-3 Intermittent 4UTIK 0-3 2-3 Perennial 5UT1K 0-2 2-3 Perennial UT3J 2-4 2-4 Perennial 3.1 1-5 2-4 Perennial UT I N 2-8 1-6 Perennial IN 2-8 3-8 Perennial 2UT1N 2-3 2-3 Intermittent becoming Perennial 10 Bank Channel Stream Stream ID Height Width (feet) Determination feet Intermittent becoming 1M 1-3 2-4 Perennial 3M 2-4 2-3 Perennial UT3M 1-4 3-4 Perennial 2UT3K 3-20 2-4 Perennial All streams in the study area have been assigned a Best Usage Classification of C or WS-V Stonecutter Creek, Cleghorn Creek and Hollands Creek are the mayor streams in the study area which have a Best Usage Classification of C, C and WS-V respectively Anticipated impacts to streams of the current study alternatives are presented on Table 5 below Table 5 Antics ated Effects on Streams Alternative 3 4 6 US74A Stream Impacts Feet 12,063 8,730 13,113 9,200 Wetlands Wetlands in the project study area were field delineated using the current Corps of Engineers methodology The anticipated impacts to jurisdictional wetlands in the project study area shown on Table 6 and Figure 2 Table 6 Anticipated Effects on Wetlands Alternative 3 4 6 US74A Wetlands Affected (Acres) 08 06 13 0 7 Floodplains Rutherford County and the Town of Rutherfordton are participants in the National Flood Insurance Program The Hydraulics Unit will coordinate with the Federal Emergency Management Agenc; (FEMA) to determine if a Conditional Letter of Map Revision (CLOMR) and a subsequent final Letter of Map Revision (LOMR) are required for the project 11 Mitigation NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional wetland and stream impacts and to provide compensatory mitigation for jurisdictional impacts Avoidance Given the number of streams and wetlands in the project area, total avoidance of surface waters and wetlands by this project is not feasible Minimization Most of the alternatives still under consideration for the project have been retained because they have the lowest impacts on wetlands and streams Alignments within the study corridors have been developed to minimize impacts to wetlands and streams The NEPA/404 merger team has concurred on wetland areas which should be bridged by the alternatives Impacts to wetlands and streams will be considered in the selection of the preferred alternative for the project Additional minimization measures will be considered as the project progresses Compensatory Mitigation It is expected wetland and stream mitigation will be required for the project Final decisions regarding wetland and stream mitigation requirements will be made by the US Army Corps of Engineers and the NC Division of Water Quality On-site mitigation will be used as much as possible The Ecosystem Enhancement Program (EEP) will be used for remaining mitigation requirements beyond what can be satisfied by on-site mitigation FEDERALLY-LISTED THREATENED AND ENDANGERED SPECIES As of January 31, 2008 the United States Fish and Wildlife Service (USFWS) lists five federally protected species are listed for Rutherford County Table 7 lists these species and their federal status 12 Table 7 Federallv-Protected Species in Rutherford County Common Name Scientific Name Federal Status* Biological Conclusion Indiana bat M ous sodahs E No Effect Dwarf-flowered heartleaf Hexastyhs nani lora T May Affect-Likely to Adverse) Affect Small whorled o onia Isotria medeoloides T No Effect White irisette Sis rinchnan dichotoinum E No Effect Rock gnome lichen Gymnoderma lineare E No Effect *E (Endangered)- A taxon "in danger of extinction throughout all or a significant portion of its range" T (Threatened) - A taxon "likely to become endangered within the foreseeable future throughout all or a significant portion of its range " Field surveys for the project were performed in May, July, August and September 2003 No habitat exists in the project area for white irisette and rock gnome lichen No hibernacula for the Indiana bat are present within the project study area, however, appropriate roosting habitat is present No known occurrence of Indiana bat has been reported within the project vicinity Habitat for the small whorled pogonia is present in several areas within the study area, however, no individuals of this species was located Habitat for the dwarf-flowered heartleaf is present within the study area and one previously undocumented population was also identified within the project study area Additional coordination with the US Fish and Wildlife Service (USFWS) will be conducted on the project's effects on the dwarf flowered heartleaf prior to completion of the final environmental document CULTURAL RESOURCES Historic Resources An intensive level historic architectural survey was conducted within the area of potential effect (APE) of all the detailed study corridors for the proposed project The APE included areas that may be physically and/or visually affected by the proposed project Three properties listed on the National Register of Historic Places are located within the APE of the project Eight properties in the study area were determined to be eligible for the National Register 13 Properties Listed on the National Register The Rutherfordton-Spindale Central High School ranks among the state's notable schools erected during the consolidation era of the 1920s Architect, Hugh White, designed this handsome, red brick, Classical Revival building on a dramatic hilltop site The prominent landscape architect, Earle Summer Draper, of Charlotte designed the grounds to emphasize the buildings public presence According to the 1992 National Register Nomination, the school is significant in the areas of education and architecture The Main Street Historic District (Rutherfordton) is a well-preserved histonc district encompassing Rutherfordton's commercial core The blocks of contiguous, red brick, commercial buildings reflect the town's rapid growth with the arrival of the railroad during the late nineteenth and early twentieth centuries According to the 1995 National Register Nomination, the historic district is eligible for commerce, politics and government and architecture Gilbert Town is a historical site in Rutherfordton It is associated with the Battle of Kings Mountain during the American Revolution Both the British and American armies camped at this location within days of each other prior to the battle Gilbert Town was added to the National Register of Historic Places in August 2006 Properties Eligible for the National Register The Proposed Boundary Expansion of Main Street Historic District (Rutherfordton) is a site bounded by North Main, Carnegie, North Washington, and Fernwood streets It is recommend that the boundaries of the existing historic district be expanded to encompass nearby churches and residences that were built during the same period as the Main Street business district Dunkard's Creek Baptist Church is located on the east side of US 221 near SR 2194 Constructed ca 1900, Dunkard's Creek Baptist Church is a well-preserved one story, weatherboard church A small cemetery associated with the church stands in a grove of trees dust east of the church The Homer and Bertha Sparks House is located on the east side of Railroad Avenue facing the railroad corridor The Homer and Bertha Sparks House ranks among the town's finest remaining early twentieth century residences The Robert J Norris House is located on the southeast corner of Railroad Avenue and US 64 in Ruth Built around the 1880s, the Robert J Norris House is a traditional, two story, single pile dwelling which has a well-preserved main block decorated with late nineteenth century sawnwork Ruth Elementary School is located on the south side of US 64, 0 2 mile east of US 221 This well-preserved school was constructed in 1929 The main facility is a one story, red brick building with Colonial Revival details 14 The Washington Geer House is located on the north side of US 64 at SR 1539 Although now vacant and in disrepair, the house retains notable original features as well as elements added in the 1920s Gilboa United Methodist Church is located on the east side of SR 1532, 0 3 mile south of SR 1533 Constructed in 1886 and expanded in 1925, Gilboa United Methodist Church is a substantially intact, one story, frame church A small cemetery stands to the north of the church, dust beyond the abandoned railroad bed This property was evaluated in the survey but is no longer within the project's APE Yelton's Flour Mill is located on West Main Street in Spindale, dust east of US 74 A (Railroad Avenue) The Mill was built in 1915 and experienced several expansions up into the 1950's The core of the complex is comprised of a four-story gable-roof structure which houses milling and ventilation equipment Project effects on historic properties are shown on Table 8 below Table 8 Effects on Historic Properties US 74A Historic Property ALT. 3 ALT. 4 ALT. 6 ALT. Rutherfordton- No No Adverse No Adverse Spindale Central High Adverse No Effect Effect Effect School Effect Main Street Historic No Effect No Effect No Effect No Effect District Gilbert Town No Effect No Effect No Adverse Effect No Effect Main Street Historic No Effect No Adverse No Effect No Effect District Expansion Effect Dunkard's Creek No Effect No Adverse No Effect No Effect Baptist Church Effect Homer and Bertha No Effect No Effect No Effect No Adverse Sparks House Effect Robert I Norris No Adverse No Effect No Effect No Adverse House Effect Effect Ruth Elementary Adverse Adverse No Effect No Adverse School Effect Effect Effect Washington Geer No Effect No Effect No Adverse No Effect House Effect No Adverse Yelton's Flour Mill No Effect No Effect No Effect Effect *Gilboa United No Effect No Effect No Effect No Effect Methodist *This property was evaluated in the suvery but is no longer within the project's APE Ruth Elementary School would be adversely affected by Alternatives 3 and 4 because they would require land from the school 15 The State Historic Preservation Office (HPO) concurred with these findings on June 6, 2008 The related correspondence and concurrence forms are included in Appendix A of the SDEIS Archaeological Resources Due to the number of detailed study alternatives and the recent inclusion of Gilbert Town on the National Register of Historic Places, an intensive archaeological survey has not been initiated A thorough archaeological investigation will be conducted after the selection of the preferred corridor HAZARDOUS MATERIALS Based on research utilizing the Geographic Information System (GIS), five to six known groundwater incidents could be impacted by the current study corridors GIS also identified one landfill and one Superfund site within the project corridor The Rutherford County Landfill is located south of Rutherfordton between US 221 and US 74A on the north side of SR 2201 (Thunder Road) The Superfund site is listed as Reeves Brothers and is west of Railroad Avenue, between Oak Street and Reeves Street Reeves Brothers is an inactive Superfund site (ID# NC-D08367616) A detailed field reconnaissance survey will be performed following selection of the preferred corridor REGULATORY APPROVAL The NCDOT hereby submits a merger application form for R-2233B so public review of this project for regulatory purposes can commence This submittal is in accordance with step four of the guidelines for integrating project review under the National Environmental Policy Act and Section 404 of the Clean Water Act 16 END PROJECT L m 64 64 l r 'Ruth TI ?11 NJ 1 \ Ao? C ?? .... .. ?r - C Spindale City= Forest/ 1 n? _ / _J +q NORTH CAROLINA DEPARTMENT - $ t OF TRANSPORTATION DIVISION OF HIGHWAYS BEGIN 74 ?r PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS BRANCH 74 PROJECT / VICINITY MAP US 221 ?' '' `?? RUTHERFORDTON BYPASS 0 0.5 1 2 RUTHERFORD COUNTY I -T-12 - , - TIP PROJECT R-22338 Miles BY: J.TORTORELLA FIGURE 1 1 { / i 011 /? I\ a ?O9C O I A L T E R N A T I V E I ALTERNATIVE 2 Mt. Vernon ALTERNATIVE 3 _ -••- • AL T E R N A T I V E 4 A L T E R N A T I V E 5 --- - A L T E R N A T I V E 6 U S 7 4 A B Y P A S S AL T E R N A T I V E ,;? - - -. WESTERN ALTERNATIVE I M P R O V E E X I S T I N G " - U S 2 2 1 A L T E R N A T I V E \ RUTH _ - - - X 'i ON iEIc SPINDALIt \ /I D xxt O 74 ® ` O II, r ,p ALEXANDER 11 MILLS KILOMETERS 0 1 2 3 o, MILES NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS BRANCH PRELIMINARY ALTERNATIVES RUTHERFORDTON BYPASS RUTHERFORD COUNTY TIP PROJECT R-2233B FIGURE 3 APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB APPROVAL NO 0710-003 (33 CFR 325) Expires December 31, 2004 Public reporting burden for this collection of information is estimated to average 10 hours per response, although the majority of applications should require 5 hours or less This includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of • information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service Directorate of Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003), Washington, DC 20503 Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number Please DO NOT RETURN your form to either of those addresses Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity PRIVACY ACT STATEMENT Authority Rivers and Harbors Act, Section 10, 33 USC 403 Clean Water Act, Section 404, 33 USC 1344, Marine Protection, Research and Sanctuaries Act, 33 USC 1413, Section 103 Principal Purpose Information provided on this form will be used in evaluating the application for a permit Routine Uses This information may be shared with the Department of Justice and other federal, state, and local government agencies Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity An application that is not completed in full will be returned ITEMS 1 THRU 4 TO BE ILLED BY THE CORPS 1 APPLICATION NO 2 FIELD OFFICE CODE 3 DATE RECEIVED 4 DATE APPLICATION COMPLETED ITEMS BELOW TO BE F LLED BYAPPLICAN 5 APPLICANTS NAME 8 AUTHORIZED AGENT'S NAME AND TITLE (an agent is not required) North Carolina Department of Transportation Project Development & Environmental Analysis 6 APPLICANTS ADDRESS 9 AGENT'S ADDRESS 1548 Mail Service Center Raleigh, NC 27699-1548 7 APPLICANTS PHONE NOs W/AREA CODE 10 AGENTS PHONE NOs W/AREA CODE a Residence a Residence b Business 919-733-3141 b Business 11 STATEMENT OF AUTHORIZATION I hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request supplemental information in support of this permit application APPLICANT'S SIGNATURE DATE NAME, LOCATION, AND DESCRIPTION OR PROJECT OR ACTIVITY 12 PROJECT NAME OR TITLE (see instructions Proposed US 221 Rutherfordton Bypass in Rutherford County, NC 13 NAME OF WATERBODY, IF KNOWN (if applicable) 14 PROJECT STREET ADDRESS (if applicable) Stonecutter Creek, CleQhorn Creek and Hollands Creek 15 LOCATION OF PROJECT Rutherford County NC COUNTY STATE 16 OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) Section, Township, Range, LaULon, and/or Accession; s Parcel Number, for example Proposed bypass would extend from US 74 Bypass to SR 1366 (Roper Loop Road) 17 DIRECTIONS TO THE SITE Please see attached vicirnty map and cover letter 18 Nature of Activity (Description of protect include all features) Construct a US 221 Rutherfordton Bypass as a four-lane median divided facility on multi-lane right of way mostly on new location in Rutherford County It will cross several wetlands and streams 19 Project Purpose (Describe the reason or purpose of the project see instructions) ENG FORM 4345 Jul 97 EDITION OF FEB 94 IS OBSOLETE (Proponent CECW-OR) The purpose of the project is to reduce congestion, improve safety, and improve travel time for traffic using the US 221 corndor in the vicinity of Rutherfordton USE BLOCKS 20-22 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20 Reason(s) for Discharge Construction of the proposed US 221 Rutherfordton Bypass will result in roadway fill in wetlands and surface waters 21 Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards Fill from roadway 22 Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) See Merger Permit Application Letter 23 Is Any Portion of the Work Already Complete? Yes - No X IF YES, DESCRIBE THE COMPLETED WORK 24 Addresses of Adjoining Property Owners, Lessees, Etc Whose Property Adjoins the Waterbody (if more than can be entered here please attach a supplemental list) See attached mailing labels 25 List of Other Certifications or Approvals/Denials Received from other Federal, State, or Local Agencles for Work Described in This Application AGENCY TYPE APPROVAL IDENTIFICATION NUMBER DATE APPLIED DATE APPROVED DATE DENIED Would include but is not restricted to zoning, building and flood plain permits 26 Application is hereby made for a permit or permits to authorize the work described in this application I certify that the information in this application is complete and accurate I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applica DATE SIGNATURE OF AGENT DATE The app*tion/ust be signed flay the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the st ment in block 11 has been filled out and signed 18 U S C Section 1001 provides that Whoever in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10 000 or imprisoned not more than five years or both ENG FORM 4345 Jul 97 EDITION OF FEB 94 IS OBSOLETE (Proponent CECW-OR)