Loading...
HomeMy WebLinkAbout20052010 Ver 1_DCM Permit_20081022Permit Class RENEWAL MAINTENANCE-5 10 Permit Number 05 172-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources r= L5 BV D and v Coastal Resources Commission D O C T 2 2 2008 ,V"t ermt DENR - WATER QUAUTY for WETLANDS AND STORMWATER BRANCH X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Exxon Mobile Chemical Co. c/o Greg Ferrone,13501 Katy Freeway, Houston, TX 77079 Authorizing development in New Hanover County at adj. to the Cape Fear River, at 3340 River Road in Wilmington, NC , as requested in the permittee's letter dated 9/10/08 This permit, issued on October 13, 2008 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to the original of Permit No. 172-05, which was issued on 12/8/05, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. Maintenance Clause 3) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance work authorized by this permit, and that notification include: A. The number of the original permit; B. A statement that no dimensional changes are proposed; C. A copy of the original permit plan(s) with cross-hatching indicating the area to be maintained and the area to be used for dredge spoil, and the estimated amount of material to be removed, D. The date of plan revision and the permittee's signature shown anew on the original plan. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2013 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. `J Jamey Gregson, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee NfKIM CREED September 10, 2008 Jason Dail 127 Cardinal Ext. Wilmington, NC 28405 RE: ExxonMobil Dredging Permit Application 3340 River Road Wilmington, NC, 28412 ?yy Jason, This letter is intended to serve as the request to extend the ExxonMobil Dredging Permit No 172-05 for an additional 3 years from January 1, 2009 to December 31, 2012. Enclosed is a check made out to NCDENR for the required $100 fee. Please call if you need any additional information. Sincerely William Egan o.,°ew William J. Egan, Jr. PE/LS Enclosures Existing Dredge Permit - 172-05 License No. DACW21-3-06-3906 380 Cleveland Place Virginia Beach, Va. 23462 Ph. (757)431-1002