HomeMy WebLinkAbout20052010 Ver 1_DCM Permit_20081022Permit Class
RENEWAL
MAINTENANCE-5
10 Permit Number
05 172-05
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources r= L5 BV D
and v
Coastal Resources Commission D
O C T 2 2 2008
,V"t ermt DENR - WATER QUAUTY
for WETLANDS AND STORMWATER BRANCH
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Exxon Mobile Chemical Co. c/o Greg Ferrone,13501 Katy Freeway, Houston, TX 77079
Authorizing development in New Hanover County at adj. to the Cape Fear River, at 3340 River
Road in Wilmington, NC , as requested in the permittee's letter dated 9/10/08
This permit, issued on October 13, 2008 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to the original of Permit No. 172-05, which was issued on 12/8/05, and
copies of both documents shall be readily available on site when Division personnel inspect the project
for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
Maintenance Clause
3) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of
any maintenance work authorized by this permit, and that notification include:
A. The number of the original permit;
B. A statement that no dimensional changes are proposed;
C. A copy of the original permit plan(s) with cross-hatching indicating the area to be maintained
and the area to be used for dredge spoil, and the estimated amount of material to be removed,
D. The date of plan revision and the permittee's signature shown anew on the original plan.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit shall be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work shall cease when the permit expires on
December 31, 2013
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
`J Jamey Gregson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
NfKIM CREED
September 10, 2008
Jason Dail
127 Cardinal Ext.
Wilmington, NC 28405
RE: ExxonMobil Dredging Permit Application
3340 River Road
Wilmington, NC, 28412
?yy
Jason,
This letter is intended to serve as the request to extend the ExxonMobil Dredging Permit No
172-05 for an additional 3 years from January 1, 2009 to December 31, 2012. Enclosed is a
check made out to NCDENR for the required $100 fee.
Please call if you need any additional information.
Sincerely
William
Egan o.,°ew
William J. Egan, Jr. PE/LS
Enclosures
Existing Dredge Permit - 172-05
License No. DACW21-3-06-3906
380 Cleveland Place
Virginia Beach, Va. 23462
Ph. (757)431-1002