Loading...
HomeMy WebLinkAbout20171062 Ver 1_PCN Form Submission_20170824Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 8/24/2017 8:20:38 AM (Start Event) Accept by Carpenter,Kristi 8/24/2017 3:48:48 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: August 29, 2017 5:00 PM 8/24/2017 8:21 AM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 28, 2017 Ver 1.8 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx A. Processing Information County (or Counties) where the project is located:* Chatham Is this a NCDOT Project?* C� Yes �' No (NCDOT only) T.I.P. or state project number: SF-180094 WBS # 176P.8.R.124 (for f�1CDOT use only) � 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 03 - Maintenance 1c. Type(s) of approval sought from the DWR:* check all that apply r 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express �7 Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: I For the record only for Corps Permit: 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? * C•' Yes !" No C•' Yes C' No If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No 1f. Is the project located in any of NC's twenty coastal counties?* C' Yes �' No B. Applicant Information 1a. Who is the Primary Contact?* � Benjamin Furr 1b. Primary Contact Email:* benjamin.furr@hdrinc.com 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (919)900-1613 1d. Who is applying for the permit? r Owner r Applicant (other than owner) rJ AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT - Division 8 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) Art King 2d.Address Street Address Address Line 2 �Y Fbstal / Zip Code 2e. Telephone Number: (xxx)xxx-x�cx (910)944-2344 2f. Fax Number: (xxx)x�c-�ocx 2g. Email Address:* acking@ncdot.gov 4. Agent/Consultant (if applicable) 4a. Name: i Ben Furr 4b. Business Name: (if applicable) ICA Engineering, Inc. 4c. Address State / Rovince / F�gion Country Street Address 5121 Kingdom Way, Suite 100 Address Line 2 Qty Raleigh Fbstal / Zip Code 27607 4d. Telephone Number: (919)900-1613 (xxx)xxx-xxxx 4e. Fax Number: (xxx)xxx-x�cx 4f. Email Address:* benjamin.furr@hdrinc.com Agent Authorization Letter Rease provide the Agent Authorization Letter if you are subrritting this docurrent. agent authorization form signed.pdf FlLE IYFE M 1ST BE FiJF State / R-ovince / I�gion NC Country US 47.9KB C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Bridge Replacement over Dry Creek (Bridge 94 on SR 1520) 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Pittsboro 1d. Driving directions* If it is a new project and can not easily be found in a G� rrapping system Rease provide directions. From Pittsboro, take NC-87 N for 0.2 miles then at the traffic circle take the 2nd exit onto Old Graham Rd/Old NC 87, drive 6.3 miles to project site. 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) wa 2b. Propertysize: (in acres) wa 2c. Project Address Street Address Bridge No. 94 over Dry Creek on Old Graham Road (SR 1520) Address Line 2 �� Fbstal / Zip Code State / Rovince / Region Country 2d. Site coordinates in decimal degrees I Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.802065 -79.2067733 ex:34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Dry Creek 3b. Water Resources Classification of nearest receiving water:* WS-IV; NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Cape Fear RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use in the vicinity of the project is currently forested or maintained roadside. Dry Creek is located within the project limits. Dry Creek is a perennial tributary 20 to 30 feet wide with gravel/cobble substrate, consistent bed and banks, and riffle/pool profile. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) qick the upload button or drag and drop files here to attach docurrent Chatham_94_USGS_Topo.pdf 301.34KB Fle type rrust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Gick the upload button or drag and drop files here to attach docurrent soil map_94.pdf 698.65KB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrdtent and perennial) 100 4f. Explain the purpose of the proposed project: The purpose of the project is to replace Bridge No. 94 over Dry Creek on SR 1520 with a single span bridge. 4g. Describe the overall project in detail, including the type of equipment to be used: The ewsting three-span bridge will be replaced with a single-span bridge on ewsting alignment. The roadway approaches will be widened to accommodate the new bridge and Class II rip rap will be placed around the bridge abutments. A floodplain bench will be excavated betv�en the right top of bank and the rip rap abutment protection. 2:1 roadway fill slopes with guardrail will be used to minimize buffer impacts. Standard heavy highway construction equipment will be used to construct the project (excavators, dump trucks, etc.). Traffic will be maintained with an off-site detour. 4h. Please upload project drawins for the proposed project. Gick the upload button or drag and drop files here to attach docurrent Chatham_094_buffer permit drawings.pdf 1.57M6 Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C' Yes �' No f" Unknown Comments: Sb. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary C' Approved 6' Unknown Corps AID Number: 6carrple: SAVw2017-99999 Sc. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Ben Furr ICAEngineering, Inc. 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Jurisdictional Determinations were not requested for this project. 5d1. Jurisdictional determination upload C7ick the upload button or drag and drop files here to attach docurrent Fle type rrust be FCF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes �' No �' Unknown ' 7. Future Project Plans 7a. Is this a phased project?* C' Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. No D. Proposed I m pacts I nventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r Streams-tributaries �J Buffers r Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites I impacted. '" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply. r Neuse r Catawba r Goose Creek r Other 6b. Impact Type r Tar-Pamlico r Randleman �J Jordan Lake 6c. Per or 6d. Stream name Te mp Bridge - Allowable P Dry Creek Location and 6cerrpt, Allowable, allowable w/ rritigation F�rrrenent (F) or Terrporary (� Road Crossing - Allowable P Dry Creek Location and C errpt, Allowable, allowable w/ rritigation F�rrranent (F) or Terrporary (� 6h. Total buffer impacts: Temporary impacts Permanent impacts: Zone 1 0.00 Zone 1 4,264.00 Zone 2 0.00 Zone 2 1,303.00 6e. Buffer 6f. Zone 1 6g. Zone 2 mitigation impact impact required? No 4,171 104 (squarefeet) (squarefeet) No 93 1,199 (squarefeet) (squarefeet) Total buffer impacts 6i. Comments: Zone 1 4,264.00 Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. aick the upload button or drag and drop files here to attach docurrent Chatham_094_buffer permit drawings.pdf Fle rrust be FDF Zone 2 1,303.00 E. Impact Justification and Mitigation � 1. Avoidance and Minimization 1.57M6 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The project has been designed to minimize environmental impacts. 2:1 roadway fill slopes were used to minimize buffer impacts and there will be no grading or fill material placed below existing top of bank to avoid stream impacts to Dry Creek. Grated inlets and pipes will be used to collect and discharge bridge storm water through rip rap outlet protection to dissipate energy and provide diffuse flow. E�asting concrete sills along the banks will be retained to minimize impacts to the bank of the channel underneath the bridge. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Construction will be conducted from high ground on each side of the bridge. No temporary crossings will be used to construct the new bridge. Erosion control measures will be installed to maintain sediment on-site during construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes C•' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The project will not impact streams or wetlands. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? C� Yes C' No 1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached Stormwater Plan. 1c. What is the overall percent imperviousness of this project? % 1d. Who will be responsible for the review of the Stormwater Management Plan?* � Certified Local Government r DWR 401 & Buffer Permitting Branch I 2. Diffuse Flow Plan r DEMLR Stormwater Review rJ DWR Transportation Permitting Branch 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C� Yes C' No 2b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. Include a plan that fully documents how diffuse flow will be maintained. If, due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined I in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form What documentation are you providing? � Level Spreader fJ Other BMP (check all that apply) Diffused Flow Documentation Gick the upload button or drag and drop files here to attach docurrent Stormwater Plan_94.pdf 39.88KB Fle type rrust be FDF 5. DWR 401 Stormwater Review 5a. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached? r Yes l" No Stormwater Management Plan Upload Gick the upload button or drag and drop files here to attach docurrent Stormwater Plan_94.pdf 39.88KB i CHATHAM_094_176P-8-R-124_ESC_Package.pdf 3.42M6 file type rrust be pdf G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* G Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* G Yes C' No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPAor SEPAfinal approval letter.)* G Yes C' No NEPA or SEPA Final Approval Letter Gick the upload button or drag and drop files here to attach docurrent AttachmentG.pdf 20.42K6 FlLE IYFE MJST BE FDF 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes C•' No 2b. Is this an after-the-fact permit application?* C' Yes �' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes �' No 3b. If you answered "no," provide a short narrative description. The bridge is being replaced in its e�asting location as a tv�ro-lane bridge. Additional development is not e�ected as a result of this project. I 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. i f�llA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* �' Yes l" No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes �' No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is this a DOT project located within Division's 1-8?* C�' Yes C' No 5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* � NC Natural Heritage Program database and USFWS List of Endangered Species known to occur in Chatham County. Habitat for NLEB is present. Effects of NCDOT projects on NLEB in Chatham County have been addressed through a Programmatic Biological Opinion (May 4, 2015). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* EFH mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* f Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* SHPO 7c. Historic or Prehistoric Information Upload qick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* �' Yes �' No 8b. If yes, explain how project meets FEMA requirements: I HEGRAS models indicate that no structures or property owners will be adversely affected as a result of the proposed bridge replacement. 8c. What source(s) did you use to make the floodplain determination?* Chatham County FIS Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent Fle rrust be F�F Signature * rJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Benjamin Nelson Furr Signature cYlc:�r! �l!•t. �C. Date 8/24/2017 Initial Review Is this project a public transportation project? C�' Yes C' No Only change this if the project has been reassigned. i Has this project met the requirements for acceptance in to the review process?* �' Yes C' No BIMS # Assigned* 20171062 Version#* 1 Reviewing Office * Central Office - (919) 707-9000 Select Project Reviewer* April Norton:eads\arnorton