Loading...
HomeMy WebLinkAbout20071995 Ver 1_More Info Received_20081021t I've 1000 W. Morehead, Suite 20( Post Office Box 35624 Charlotte, NC 28235 (704) 372-1885 (704) 372-3393 FAX 3505 Koger Blvd., Suite 205 Duluth, GA 30096 (770) 452-0797 (770) 936-9171 FAX 4348 Southpoint Boulevard Suite 310 Jacksonville, FL 32216 (904) 730-9777 (904) 730-7766 FAX 10800 Midlothian Turnpike Suite 302 Richmond, VA 23235 (804) 794-1185 (804) 378-0923 FAX 454 S. Anderson Road Suite3, BTC 517 Business Technology Center Rock Hill, SC 29730 (803) 980-4970 (803) 980-4099 FAX 4975 LaCross Road Suite 314 Charleston, SC 29406 (843) 329-1048 (843) 329-1049 3739 National Drive Suite 128 Raleigh, NC 27612 (919) 791-0108 (919) 791-0960 FAX 6405 Metcalf Suite 516 Overland Park, KS 66202 (913) 789-0800 (913) 789-0802 (Fax) STV/RALPH WHITEHEAD ASSOCIATES, INC. Consulting Engineers Charlotte Atlanta Jacksonville Richmond Raleigh Kansas City Charleston Rock Hill To: NCDENR Division of Water Quality Raleigh Regional Office 3800 Barrett Drive Raleigh, North Carolina 27609 WE ARE SENDING YOU: LE=R OF U ° A H2HffUGOL Date: 10/14/08 Job No. 3202 Attention: Ian McMillan o'l - IggS RE: Individual 404 Permit Application RAI Hartley Drive Widening and Extension High Point, Guilford County, NC Attached Under separate cover via the followin items: Shop Drawings Prints Specifications Copy of Letter Plans Change Order Samples Copies Date No. Description 1 10/14/08 1 Additional information as requested. The se are transm For Approval itte d as checked below: Approved as submitted For your use Approved as noted As requested Returned for corrections For Bids Due 1? For review & comment Resubmit copies for approval Submit copies for distribution Return corrected prints Prints returned after loan to us Remarks Attached, please find one copy of the additional information requested by the NCDWQ for the Individual Permit application for the Hartley Drive Widening and Extension Project for the City of High Point in Guilford County, NC. If you need any additional information or have questions, please do not hesitate to contact Michael lagnocco at (704) 372-1885. Thank you Co to Keith Pugh, P.E., City of High Copy Point, NC Signed Michael lagnocco, PWS If enclosures are not as indicated, kindly notify us at once WIVIA1 OCT 21 2008 N:\PROJ\3202\HighPoint-Charlotte\Environmental\Permit\DWQ Transmittal Ind Permit RAI 2.doc Vin rR OUA11Ty ELANDS AND SyoR wATER BRMW STV/Ralph Whitehead Associates i00o Wes' Morahead :Gir:=e , Suire 200 Charioite, fJorth Ca-oIiii a ?3 2()8 (704) 372-1835 fa.x:(704)372-3393 October 14, 2008 Via FEDERAL EXPRESS North Carolina Division of Water Quality Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, NC 27107 O C fi 2 Y 2008 S N S rOER?MV IM %*a Attention: Ms. Sue Homewood Subject: Response to Second Request for Additional Information Hartley Drive Widening and Extension City of High Point, Guilford County, NC DWQ #07-1995 USACE Action I.D. #2006-20795 RWA Project No. 3202000 Dear Ms. Homewood, This letter has been prepared to address the second request for additional information that has been received from the North Carolina Division of Water Quality (NCDWQ) regarding the above referenced project. A response to each of the requests that were made is presented. A copy of the letter requesting the additional information that has been received is attached to this response letter. 1. For the three proposed Dry Detention Basins please submit the BMP Supplemental Forms and O&MForm. These forms can be found on the Divisions website: http://h2o.enr.state.nc.us/su/bmp forms htm. Please ensure that all items noted on Worksheet #2: Checklists are clearly identified on the engineering plans. The BMP Supplemental Forms and O&M Form for the detention basins have been completed and are attached in the revised Stormwater Management Design Study and Erosion and Sediment Control - Julv 25, 2008. All of the items that are noted on Worksheet #2 are clearly identified on the revised Detention Basin Grading Detail engineering plan (sheet 2-D) that is also attached. 2. The EEP mitigation acceptance letter submitted with the application is no longer valid. Please provide a new EEP mitigation letter. The EEP letter submitted with the application was updated at your request on 1/9/08 and was valid until July 9, an employee-owned company providing quality service since 1912 Ms. Sue Homewood October 14, 2008 Page 2 2008. A request for an updated EEP acceptance letter was made on June 27, 2008. The EEP acceptance letter (valid until 7/9/08) and the request for an updated EEP acceptance letter are attached. 3. Please provide construction details for the boulder (toe protection) installation and the cross vane installation with the stream relocation/restoration area. A construction detail illustration of stream bank stabilization (toe protection) installation using the line of boulders and the cross vane installation using the project areas rocks has been included in the updated Stream Relocation and Wetland Mitigation Engineering Plan (sheet 17) that is attached. 4. Please provide a planting plan for the stream buffer on the north side of the channel that includes the standard planting density as indicated in the Stream Mitigation Guidelines document found on the USA CE website: http://www.saw.usace.army.mil/WETLANDS/Mitigation/stream mitigation html. The Division acknowledges that planting density will not be feasible in the riparian buffer between the stream and the roadway, however some tree and shrub vegetation will be required to be planted immediately adjacent to the stream bank. Conversations with Sue Homewood subsequent to receiving this request for additional information indicated that the mitigation planting plan was acceptable as is by the NCDWQ. No changes are required. Please do not hesitate to contact either of the undersigned at 704-372-1885, if you have any questions. Sincerely, STV/RALPH WHITEHEAD ASSOCIATES, INC. Brandon Phillips, H.M.M. Sr. Environmental Specialist Michael A. lag o c , P.W.S. Senior Scientist cc: Keith Pugh, P.E., City of High Point Ian McMillan, DWQ STORMWATER MANAGEMENT DESIGN STUDY AND EROSION AND SEDIMENT CONTROL C11- 1IRS HARTLEY DRIVE WIDENING AND EXTENSION HIGH POINT, NORTH CAROLINA July 25, 2008 Prepared By: Edward Vance, P.E. Md Kamrul Huda, E.I. Heather Bryant, E.I. 0%%1111111// / CA iQ ??pQ:• SS / ? .4 SE L = 10 9 ???i?gR011J; o JA??`?\ oSgpOSgr?ou p8 STV/RALPH WHITEHEAD ASSOCIATES, INC. CHARLOTTE, N.C RWA No. 3202000 06-25-'08 13 ; 05 FROM-NCDENR-WSRO 336-771-4630 T-606 P003/004 F-439 Michael F. Easlcy, Governor William G. Russ Jr., Secretary North Carolina Department of fim ironmcnt and Natural Resources Coleen 11. Sullins, Director Division of Water Quality June 16, 2008 DWQ# 07-1995 Guilford County CERTIFIED MAIL: 7007 0220 0004 0732 7131. RETURN RECEIPT REQUESTED Mr. Keith Pugh City of High Point PO Box 230 High Point, NC 27261. Re: Section 401 Water Quality Certification for the 1-lartley Drive Widening and Extension Dear Mr. Pugh: On November 28, 2007, the North Carolina Division of Water Quality (Division) received your application for a 401 Individual Water Quality, to impact 0.349 acres of wetlands and 518 linear feet of an unnamed tributaries to Rich Fork in Guilford and Davidson Counties in order to construct the Hartley Drive Widening and Extension. 171e Division received additional information on May 6, 2008. After review of this additional information the Division has determined that additional information is again required in order that we may determine your project's compliance with 15A NCAC 2B.0500. The DWQ will require this information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, we will place this project on hold as incomplete until we receive this additional information, and if we do not receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506. Please provide the following infonnation so that we may continue to review your project. For the three proposed Dry Detention Basins please submit the BMP Supplement Forms and O&M Form. These forms can be found on the Division's website: am://h2o.enr.state.nc.us/su/bmp forms.htm. Please ensure that all items noted on Worksheet #2: Checklist are clearly identified on the engineering plans. 2. The ECP mitigation acceptance letter submitted with the application is no longer valid. Please provide a new EEP mitigation letter. Please provide construction details for the boulder (toe protection) installation and the cross vane installation within the stream relocation/restoration area. One Not thCarolina Naluivily North Carolina Division of Water Quality 595 hllaughtotvn Street Phone (336) 771-.5000 Customer Service Winston-Salem Regional Office Winston-Salem, NC 27107 Pax (336) 771-4630 1-877-623-6749 Internet: .Or? An Equal Opportunity/Affirmative Action Employer - 50% Recycledl10% Post Consumer Paper 06-25-'08 13:05 FROCK-NCDENR-?SRO 336-771-4630 T-606 P004/004 F-439 Mr. Keith Pugh Hartley Dr. Extension June 16, 2008 Page 2 4. Please provide a planting plan for the stream buffer on the north side of the channel that includes the standard planting density as indicated in the Stream Mitigation Guidelines document found on the USACE websitc: http://www.saw,tisace.army.mil/WETLANDS/M itigation/stream mitigation html. The Division acknowledges that planting density will not be feasible in the riparian buffer between the stream and the roadway, however some tree and shrub vegetation will be required to be planted immediately adjacent to the stream bank. Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to Sue Homewood at the address on this letterhead, and a copy to Tan McMillan N. C. Division of Water Quality, Wetlands/401 Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no Ionger want to pursue this project and we will consider the project as returned. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. If you have any questions, please contact Sue Homewood, DWQ, Winston-Salem Regional Office, at 336-771-4964 or sue.homewood&cmail.net. Sincerely, (&- e-"4----- Steve W. Tedder Regional Supervisor DWQ Winston-Salem Regional Office cc: Andy Williams, U. S. Array Corps of Engineers, Raleigh Regulatory Field Office Michael lagmoceo, P.W.S., STV/Ralph Whitehead Associates, 100 West Morehead Street, Suite 200, Charlotte, NC 28208 - DWQ Winston-Salem Regional Office .DWQ Wetlands/401 Unit DWQ Central Files co Stem PROGRAM July 9, 2008 Keith Pugh, P.E. City of High Point 3301 Stafford Drive High Point, NC 28208 Project: Hartley Drive Extension and Widening County: Guilford The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net. Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the following table. Yadkin Stream (feet) Wetlands (acres) Buffer I Buffer II 03040101 (Sq. Ft.) (Sq. Ft.) Cold Cool Warm Ri arian Non-Ri arian Coastal Marsh Impacts 0 0 538 0 0.376 0 0 0 Credits 0 0 1,076 0 0.752 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information, please contact Valerie Mitchener at (919) 715-1973. Expiration of Acceptance: January 9, 2009 Sincerely, Willia D. Gilmore, PE Director cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Andy Williams, USACE-Raleigh Sue Homewood, NCDWQ-Winston-Salem Michael Lagnocco, agent File 3 VIO U 0 R"toYr, ... EdtZWjKg... Pro t7" Oar Stag MUM North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 /www.nceep.net Permit Number: (to be provided by DWQ) Drainage Area Number: Dry Extended Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): 0 does 9 does not incorporate a vegetative filter at the outlet. This system (check one): ? does Q does not incorporate pretreatment other than a forebay. Important maintenance procedures: - The drainage area will be managed to reduce the sediment load to the dry extended detention basin. - Immediately after the dry extended detention basin is established, the vegetation will be watered if needed until the plants become established (commonly six weeks). - No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. - The vegetation will be maintained in and around the basin. - Once a year, the embankment will be inspected. After the dry extended detention basin is established, it will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem; How I will remediate the problem: The entire BMP Trash/debris is resent. Remove trash and debris. The perimeter of the dry Areas of bare soil and /or Regrade the soil if necessary to remove extended detention basin erosive gullies have formed. the gully, and then plant a ground cover and water, if needed, until it is established. Provide lime and a one-time fertilizer a lieation. Form SWU40I- Dry Detention O&M- REV 3 Rev by City of High Point ^ /5:,k Page 1 of 4 2006..14.10 NCDVNk-DWQ Dry. Llcccnm 8"in O&M &pvm,, s Hartle-y PQW I [4 0 oar 21 2008 MnA S AND STORNq &RANCH Permit Number (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: Haw I will remediate the problem: The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if a licable Erosion is occurring in. the Regrade the swale if necessary to smooth swale (if applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. original design depth (see Remove the sediment and dispose of it in diagram below). a location where it will not cause impacts to streams or the BMP. Erosion has occurred or riprap Provide additional erosion protection is displaced. such as reinforced turf matting or riprap if needed to prevent firture erosion problems Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than s ra in . The main treatment area Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth (see the sediment and dispose of it in a diagram below). location where it will not cause impacts to streams or the BMP. Re-vegetate disturbed areas immediately with sod (preferable) or seed protected with securely staked erosion mat. Water is standing more than 5 Check outlet structure for clogging. If it days after a storm event. is a design issue, consult an appropriate rofessiona Weeds and noxious plants are Remove the plants by hand or by wiping growing in the main treatment them with pesticide (do not spray). area. Form SWU401- Dry Detention O&M-REV 3 - Rev by City of High Point Page 2 of 4 ?Mfi_lo-Io NC.mr NR_DWQ D" J)mc tim Uasia o&M. AWeem"%s lfaAky Pad i. Permit Number: (to be provided by D6f"Q) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs or trees have started to Remove shrubs or trees immediately. ow on the embankment. Grass cover is unhealthy or Restore the health of the grass cover -- eroding. consult a Eofessional if necessary. Signs of seepage on the Consult a professional. downstream face. An annual inspection by an Make all needed repairs. appropriate professional indicates that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged. Repair or lace the outlet device. The receiving water Erosion or other signs of damage Contact the NC Division of Water has occurred at the outlet. Quality 401 Oversight Unit at 919-733- 1786 The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into the accumulated sediments. When the basin. depth reads 837.5 feet in the main pond, the sediment shall be removed. When the basin depth. reads N/A feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Sediment Removal N/A IIT Temporary Pool Elevation I 842.5 of Sediment Removal Elev. $3 7,5 Te --------- ------------- ---- Bottom Elevation $36.0 25%/ 6rary Pool plume Bottom on N/A Sediment Sedim Storage FOREBAY MAIN POND Storage Form SWU401- Dry Detention O&M-REV 3 -- Rev by City of High Point Page 3 of 4 200&10.10 NCDSNR•DWQ Dry DeUMm )Wain G&M AgrCCn=ta Hatky Pont 1 Permit Number:_ (to be provided by DWQ) Drainage Area Number: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party, Project name: Hartley Drive Extension BMP drainage area number; Dry Detention Basin #1 Print name: W. Chris Thompson, P.E. Title: Director of Public Services Address: P4 Box 230, High Point, NC 27261 Phone: (336) 883-3215 Signature: Date: zo-/z/{08 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, L)f,d,, pJ' f R(? , a Notary Public for the State of O , Count of L&dAJpJn , do hereby certify that 1nM4.1. ,, personally appeared before me this Itj`? day of 2and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, OFFICIAL SEAL WoUn Pub ft • Nafi C*M W RANDOLPH COUNTY DOA T. MASON SEAL My commission expires: d Form SWU401- Dry Detention O&M-REV 3 - Rev by City of High Point Page 4 of 4 ZOM-10-10 NCDEhB•llWQ rWy Daention Hasin O&M Agromwnu Hanky Pond 1 Permit Number: (to be provided by DWQ) Drainage Area Number: Dry Extended Detention Basin Operation and Maintenance Agreement l will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does 0 does not incorporate a vegetative filter at the outlet. This system (check one): ? does 19 does not incorporate pretreatment other than a forebay. Important maintenance procedures: - The drainage area will be managed to reduce the sediment load to the dry extended. detention basin. - Immediately after the dry extended detention basin is established, the vegetation will be watered if needed until the plants become established (commonly six weeks). - No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. - The vegetation will be maintained in and around the basin. - Once a year, the embankment will be inspected. After the dry extended detention basin is established, it will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem; How I will remediate the problem: The entire BMP Trash/debris is present. Remove trash and debris. The perimeter of the dry Areas of bare soil and /or Regrade the soil if necessary to remove extended detention basin erosive gullies have formed. the gully, and then plant a ground cover and water, if needed, until it is established. Provide lime and a one-time fertilizer application. Form SWU401- Dry Detention O&M-REV 3 - Rev by City of High Point Page l of 4 2008-10.10 ACDENR-DWQ Dry Dctcntion Basin O&M Agnenxnts Hmmicy Pond 2 Permit Number. (to be provided by DWQ) Drainage Area ?dumber: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable) Erosion is occurring in the Regrade the swale if necessary to smooth swale (if applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated. and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. original design depth (see Remove the sediment and dispose of it in diagram below). a location where it will not cause impacts to streams or the BMP. Erosion. has occurred or riprap Provide additional erosion protection is displaced. such as reinforced turf matting or riprap if needed. to prevent future erosion problems Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth (see the sediment and dispose of it in a diagram below). location where it will not cause impacts to streams or the BMP. Re-vegetate disturbed areas immediately with sod (preferable) or seed protected with securely staked erosion mat. Water is standing more than 5 Check outlet structure for clogging, If it days after a storm event. is a design issue, consult an appropriate professional. Weeds and noxious plants are Remove the plants by hand or by wiping growing in the main treatment them with pesticide (do not spray), area. Form SWU441- Dry Detention O&M REV 3 - Rev by City of High Point Page 2 of 4 2008-ID-10 NCDENR-DWQ Dry Detention Sarin O&M Rgrremeam Hanley Pond 2 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs or trees have started to Remove shrubs or trees immediately. ow on the embankment. Grass cover is unhealthy or Restore the health of the grass cover - eroding. consult a professional if necessary. Signs of seepage on the Consult a professional. downstream face. An annual inspection by an Make all needed repairs. appropriate professional indicates that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged.. Repair or lace the outlet device. The receiving water Erosion or other signs of damage Contact the NC Division of Water has occurred at the outlet. Quality 401 Oversight Unit at 919-733- 1786 The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into the accumulated sediments. When the basin depth reads 838.5 feet in the main pond, the sediment shall be removed. When the basin depth reads NIA feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Sediment Removal :lev. N/A fe onuy _ olum 25% Bottom Elevat on NfA Sediment Storage FOREBAY Temporary Pool Elevation ' 840.2 of Te Sediment Removal Elev. 838.5 ----------------------- ---- Bottom Elevation 837.5 25%/ Form SATIA01- Dry Detention O&M--REV 3 - Rev by City of High Point 2008-10-10 N-CDUNR-UWQ Dry DOVAim Elwin O&M Agrtcmcnts Hanky Pngd 2 MAIN POND Pool Storage Page 3 of 4 Permit Number. _ (to be provided by DWQ) Drainage Area Number: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Hartley Drive Extension B.MP drainage area number: Dry Detention Basin #2 Print name: W. Chris Thompson. P.E. Title: Director of Public Services Address: PO Box 230, High Point, NC 27261. Phone: (336L883-3215 Signature: Date: /Q - /r{-eb Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident ofyhe subdivision has been named the president. I, ?j( , L C I ) IA44CL .C , a Notary Public for the State of County of !Y , do hereby certify that Yxo lkr_%_ personally appeared before me this Q day of and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, OFFICIAL SEAL ewura F01b - aerm Egn" RANDOLPH COUNTY DOHA T. MASON SEAL My commission expires: Form SWU401- Dry Detention O&M-REV 3 - Rev by City of Iiigh Point 2008-10-10 NCDM-DWQ Dry Dete tim Benin O&M Agree-M HmUey Yard 2 Page 4 of 4 Permit Number: _ (to he provided by DWQ) Drainage Area Number: Dry :Extended Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system (check one)- 0 does Q does not incorporate a vegetative filter at the outlet. This system (check one): © does 0 does not incorporate pretreatment other than a forebay. Important maintenance procedures: - The drainage area will be managed to reduce the sediment load to the dry extended detention basin. - Immediately after the dry extended detention basin is established, the vegetation will be watered if needed until the plants become established (commonly six weeks), - No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. - The vegetation will be maintained in and around the basin.. - Once a year, the embankment will be inspected. After the dry extended detention basin is established, it will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon. request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element.: Potential problem: How I will remediate the roblem: The entire BMP Trash/debris is resent. Remove trash and debris. The perimeter of the dry Areas of bare soil and /or Regrade the soil if necessary to remove extended detention basin erosive gullies have formed, the gully, and then plant a ground cover and water, if needed, until it is established. Provide lime and a one-time fertilizer application. Form SWLJ401- Dry Detention O&M-REV 3 - Rev by City of High Point Page 1 of 4 NMI Q-10 NCDF_NR-DWQ lhy Eweminn D-in O&M Ap-m ut:. Ramey Pond 3 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: Row I will remediate the problem: The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable). sediment off-site, The pipe is cracked or Replace the pipe. otherwise damaged (if . applicable) Erosion is occurring in the Regrade the Swale if necessary to smooth swale (if applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible, original design depth (see Remove the sediment and dispose of it in diagram below). a location where it will not cause impacts to streams or the BMP. Erosion has occurred or riprap Provide additional erosion protection is displaced. such as reinforced turf matting or riprap if needed to prevent future erosion problems Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth (see the sediment and dispose of it in a diagram below). location where it will not cause impacts to streams or the BMP. Re-vegetate disturbed areas immediately with sod (preferable) or seed protected with. securely staked erosion mat. Water is standing more than 5 Check outlet structure for clogging. If it days after a storm event. is a design issue, consult an appropriate professional. Weeds and noxious plants are Remove the plants by hand or by wiping growing in the main treatment them with pesticide (do not spray). area. Dorm SWU401- Dry Detention O&M--REV 3 - Rev by City of High Point Page 2 of 4 2008-10-10 NCDEAR-DUIQ Dry Detention Basin OMMAgreements Hartley Pond 3 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element; Potential problem: How I will remediate the problem: The embankment Shrubs or trees have started to Remove shrubs or trees immediately. ow on the embankment. Grass cover is unhealthy or Restore the health of the grass cover - eroding. consult a professional if necessary. Signs of seepage on the Consult a professional, downstream face. An annual inspection by an Make all needed repairs. appropriate professional indicates that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged. Repair or lace the outlet device. The receiving water Erosion or other signs of damage Contact the NC Division of Water has occurred at the outlet. Quality 401 Oversight Unit at 919-733- 1786 The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into the accumulated sediments. When the basin depth reads 845.5 feet in the main pond, the sediment shall be removed, When the basin depth reads N/A feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Temporary Pool Elevation I 846.7 Sediment Removal _1ev. j?j/A Te rary . ool Hil 'Te rary Pool olm Sediment Removal Elev. olume 25°l0 845.0 25%. Sediment Storage Bottom. Eleva on N/A Sediment Bottom Elevation t- Storage FOREBAY MAIN POND Form S WU401- Dry Detention O&M-REV 3 - Rev by City of High Point Page 3 of 4 20W10-10 NCDENR•DWQ Dry Dereraim Basin O&M ngreanxms Hutuy rout 3 Permit Number: (to be provided by DWQ) Drainage Area :Number: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Hartley Drive Extension BMP drainage area number: Dry Detention Basin #3 Print name: W. Chris Thompson, P.E. Title: Director of Public Services Address: PO Box 230, High Point, NC 27261. Phone: (336) 883-3215 Signature: f4.- Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident 4 the subdivision has been named the president. I, , a Notary Public for the State of County of `Kt? , do hereby certifthat u zos-z _personally appeared before me this ! .C ytday of c , and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, OFFICIAL SEAL NOW PWM - NoM ea.%. RANDOLPH COUNTY DONA T. MASON SEAL My commission expires: daw" Form 5WU401- Dry Detention O&M REV 3 - Rev by City of High Point Page 4 of 4 :00&10.10 Nc 01WR-DWQ Dry Dowtim Basin O&M AgreemMs flu ft Pond 3 Permit No. (to be provided by DWQ) fiRtw2A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. O??¢ WA7F,, G >b? &I, o V f PROJECT INFORMATION Project name Hartley Drive Contact person Brandon Phillips, C.H.M.M. Phone number Date Drainage area number TI, DESIGN INFORMATION Site Characteristics Drainage area 426,668.00 ft' Impervious area 329,314!00 ftz % Impervious 0.77 Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 2:90 in Rational C, pre-development N/A (unitless) Rational C, post-development N/A' (unitless) Rainfall intensity: l-yr, 24-hr storm N/A in/hr Pre-development 1-yr, 24-hr peak flow 23.04 ft'/sec Post-development 1-yr, 24-hr peak flow 24.72 ft'/sec Pre/Post 1-yr, 24-hr peak control 1.68 ft'/sec Storage Volume: Non-SR Waters Design volume 15,158.00 ft3 Sediment storage volume provided N/A ` ft3 OK Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre-development 1-yr, 24-hr runoff volume ft3 Post-development 1-yr, 24-hr runoff volume ft3 Basin Design Parameters Drawdown time 0.52 days OK SHWT elevation Unknown - fmsl Basin bottom elevation 836.00 fmsl #VALUE! Storage elevation 837.50 fmsl Basin side slopes 40 :1 OK Top elevation 844.50 fmsl OK Freeboard provided 1.00 ft OK Basin Bottom Dimensions Basin length 20.00 ft Basin width 10.00 ft Length to width ratio 2.00 :1 OK Additional Information Total runoff volume captured by basin 21.15 ac-in Forebay is required Forebay provided N (Y or N) Is basin in a recorded drainage easement? Y (Y or N) OK Does basin capture all runoff at ultimate build-out? Y (Y or N) OK Is a sediment depth indicator included? N (Y or N) A sediment depth indicator must be included. Does the basin include a drain? Y (Y or N) OK Form SW401-Dry Extended Detention Basin-Rev.2 Parts I. & II. Design Summary, Page 1 of 1 Dry ;Detention Basin #1; Outfall'A' Permit (to be provided by DWQ) Ill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. v?-Z 1. Plans (1" 50' or larger) of the entire site showing: 4 Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), :J Basin dimensions, -Fmtfefisr ,ter IJ Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and Boundaries of drainage easement. A 2. Plan details (1" = 30' or larger) for the bioretention cell showing: - Basin dimensions - Pretreatment system, - Maintenance access, - Outlet structure, - Overflow device, - Flow distribution detail for basin inflow, and - Vegetation specifications. A-D 3. Section view of the dry detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. 's Ui 6 . 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. N ) -A 9. A copy of the deed restrictions (if required). !? ,A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Dry Extended Detention Basin-Rev.2 Part III. Required Items Checklist, Page 1 of 1 Permit No. (to be provided by DWQ) O??F W ATF9oG 6 STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. 1. PROJECT INFORMATION Project name Hartley Dnve Contact person Brandon Phillips, C.H.M.M, Phone number 704-372-1885 Date 9-Jul-08 Drainage area number Dry Detention' Basin #2; Outfall'E &:K Ill. DESIGN INFORMATION Site Characteristics Drainage area 266,716:00 ft2 Impervious area 116,305.00 ftz % Impervious 0.44 Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.90 in Rational C, pre-development N/A (unitless) Rational C, post-development N/A (unitless) Rainfall intensity: 1 -yr, 24-hr storm N/A in/hr Pre-development 1-yr, 24-hr peak flow 6;84 ft3/sec Post-development 1-yr, 24-hr peak flow 7.28 ft3/sec Pre/Post 1-yr, 24-hr peak control 0.44 ft3/sec Storage Volume: Non-SR Waters Design volume 26,483.00 ft3 Sediment storage volume provided N/A ft3 OK Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre-development 1-yr, 24-hr runoff volume ft3 Post-development 1-yr, 24-hr runoff volume ft3 Basin Design Parameters Drawdown time 0.51 days OK SHWT elevation Unknown fmsl Basin bottom elevation 837.50 fmsl #VALUE! Storage elevation 838.50 fmsl Basin side slopes 4.0 :1 OK Top elevation 843.00 fmsl OK Freeboard provided 2.80 ft OK Basin Bottom Dimensions Basin length 60.00 ft Basin width 20.00 ft Length to width ratio 3.00 :1 OK Additional Information Total runoff volume captured by basin 5.79 ac-in Forebay is not required Forebay provided N (Y or N) Is basin in a recorded drainage easement? Y (Y or N) OK Does basin capture all runoff at ultimate build-out? Y (Y or N) OK Is a sediment depth indicator included? N (Y or N) A sediment depth indicator must be included. Does the basin include a drain? Y (Y or N) OK Form SW401-Dry Extended Detention Basin-Rev.2 Parts I. & II. Design Summary, Page 1 of 1 Permit No (to be provided by DWQ) 1111. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, STa.#Av.% ATe1L - Off-site drainage (if applicable), DE51Ga - Delineated drainage basins (include Rational C coefficient per basin), •S?J iD - Basin dimensions, --Pretreetm+en4 spsteTh, W IA. Maintenance access, Proposed drainage easement and public right of way (ROW), - Overflow device, and Boundaries of drainage easement. A 2. Plan details (1" = 30' or larger) for the bioretention cell showing: Basin dimensions - Pretreatment system, - Maintenance access, Outlet structure, - Overflow device, Flow distribution detail for basin inflow, and Vegetation specifications. 3. Section view of the dry detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. 1>9.5 Ic"I Tv D 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. a ( A 9. A copy of the deed restrictions (if required). 1-? A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Dry Extended Detention Basin-Rev.2 Part III. Required Items Checklist, Page 1 of 1 Permit No. (to be provided by DWQ) 0 WAT eRQv STORMWATER MANAGEMENT PERMIT APPLICATION FORM '-o NC©ENR 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. 1. PROJECT INFORMATION Project name Hated Drive Contact person Brandon Phillips,'C.H.M.M. Phone number 704-.372-.1885 Date 9Jul-08 Drainage area number Dry Detention Basin #3;,Outfall'I & X ll. DESIGN INFORMATION Site Characteristics Drainage area 56,628.00 fe Impervious area 24,830.00 ftz % Impervious 0.44 Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.90 in Rational C, pre-development N/A (unitless) Rational C, post-development N/A (unitless) Rainfall intensity: 1 -yr, 24-hr storm N/A in/hr Pre-development 1-yr, 24-hr peak flow 1.07 ft3/sec Post-development 1-yr, 24-hr peak flow 1.66 ft3/sec Pre/Post 1-yr, 24-hr peak control 0.59 ft'/sec Storage Volume: Non-SR Waters Design volume 35,206!00 ft3 Sediment storage volume provided N/A ft3 OK Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre-development 1-yr, 24-hr runoff volume ft3 Post-development 1-yr, 24-hr runoff volume ft3 Basin Design Parameters Drawdown time 0.51 days OK SHWT elevation Unknown fmsl Basin bottom elevation 845.00 fmsl #VALUE! Storage elevation 845.50 fmsl Basin side slopes 4.0 :1 OK Top elevation 852.00 fmsl OK Freeboard provided 5.30 ft OK Basin Bottom Dimensions Basin length 60.00 ft Basin width 30.00 ft Length to width ratio 2.00 :1 OK Additional Information Total runoff volume captured by basin 1.23 ac-in Forebay is not required Forebay provided N (Y or N) Is basin in a recorded drainage easement? Y (Y or N) OK Does basin capture all runoff at ultimate build-out? Y (Y or N) OK Is a sediment depth indicator included? N (Y or N) A sediment depth indicator must be included. Does the basin include a drain? Y (Y or N) OK Form SW401-Dry Extended Detention Basin-Rev.2 Parts I. & H. Design Summary, Page 1 of 1 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST ? Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the bioretention cell showing: Basin dimensions Pretreatment system, Maintenance access, Outlet structure, - Overflow device, - Flow distribution detail for basin inflow, and - Vegetation specifications. 3. Section view of the dry detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Dry Extended Detention Basin-Rev.2 Part III. Required Items Checklist, Page 1 of 1 jj IN 04 3 y a 7 , , 0 V \ \ J Q \ \ 0 ° \\ \ \ c 1° \ \\ \??? \ o co -0 m z \ \ N p m - - - \ _ Y 9*9 W z co 0 ' H CO) 0 N\_ - CO WO i`a i v W W w 0.99 1 r IV* T RE Of tgu ot` W +_. _1 Z et :1 IN H w 41 vovo i:¦oo ° W Z I O ? Oz Z O z O CO V CO Q W Q Q RpRp 1 W Z DILL i o 3IZ D ; b?? O -?: ? f ' L^, / / CO z vJ O O 02 0 \ 0 Z3 So 10 vra - U O g 5 p a C f t ?? I ?. ` \ \ \? \ , \ \ \ \ w w o 4 dZ2 6 g? ?. IE 0R ? 1 ill T, 0 o Q 00 Za. 28- fit r?-'•„i- /C. '..ti.! ??.. ice r ?7? ° ?' ?'?? _ + 66/Li/8 , e "DP"aZ1HS-AMOH-ZOZE V ° a d\FQMpQO?{\Zuco?,y6cH\Z0Z?0\OZ/ b1??01 C STORMWATER MANAGEMENT DESIGN STUDY AND EROSION AND SEDIMENT CONTROL HARTLEY DRIVE WIDENING AND EXTENSION HIGH POINT, NORTH CAROLINA July 25, 2008 • Prepared By: Edward Vance, P.E. Md Kamrul Huda, E.I. Heather Bryant, E.I. o ?Esslp ' 2. ??'yy 9 •a SEAL • 0 93 8 ??Y ??igR0111 d?D o I TO OC .`NP?P11??? STV/RALPH WHITEHEAD ASSOCIATES, INC. CHARLOTTE, N.C RWA No. 3202000 • PROPOSED ROADWAY IMPROVEMENTS OF HARTLEY DRIVE TABLE OF CONTENTS Introduction ........................................................................................................................ I Existing Conditions ..................................................................................................1 Proposed Conditions ................................................................................................1 Disturbed Area ........................................................................................................1 General Soils Description ........................................................................................2 Hydrology ...........................................................................................................................2 Rational Method .......................................................................................................2 Runoff Coefficient ...................................................................................................2 Rainfall Intensity and Time of Concentration .........................................................3 Drainage Area ..........................................................................................................3 Stormwater Quality and Quantity ............................................................................3 Sediment and Erosion Control .........................................................................................4 • Results .................................................................................................................................4 0 i r? LIST OF TABLES Table 1: Soil Description ....................................................................................................2 Table 2: Runoff Coefficients for Rational Formula ............................................................3 LIST OF FIGURES Figure 1: Location Map ........................ Figure 2: Soil Map .......................................................... Figure 3: Guilford County FEMA Map .......................... Figure 4: Drainage Map .................................................. ................................................5 ................................................6 ................................................7 ................................................8 LIST OF APPENDICES • Appendix A: Pre vs. Post Outfall Analysis ................. Appendix B: Culverts ................................................. Appendix C: Roadside Channels ................................ Appendix D: Inlet/Gutter Capacity ............................. Appendix E: Storm Drainage Systems ...................... Appendix F: Bridge Deck Drainage .......................... Appendix G: Outlet Protection .................................. Appendix H: Sediment and Erosion Control Details. is ..............................................A-1 to A-32 ..............................................B-1 to B-12 ..............................................C-1 to C-3 . ..............................................D-1 to D-3 ...............................................E-1 to E-5 ...............................................F-1 to F-2 ...............................................G-1 to G-13 ............................................... H-1 to H-6 ii • Introduction STV/Ralph Whitehead Associates, Inc. (STV/RWA) entered into a contract with the City of High Point to provide professional engineering services for the proposed roadway extension of Hartley Drive. The project consists of extending the current Hartley Drive through undeveloped land to connect from Main Street to Westover Drive. The purpose of this report is to document and define the design procedures that were used to analyze the hydrology and hydraulics of the proposed roadway improvements. Design calculations were performed in accordance with the "City of High Point Storm Drainage System Design Manual" dated February 1, 1994 and the "Guidelines for Drainage Studies and Hydraulic Design" by NCDOT dated 1999. Existing Conditions The project begins approximately 3 miles northwest of downtown High Point along North Main Street. The existing portion of Hartley Drive currently ends with a cul-de-sac. The surrounding land-use near the project beginning is Commercial, Institutional, and Multi-Family. The project crosses an Unnamed Tributary of Rich Fork Creek which is a FEMA regulated floodplain as shown on Figure No. 3, Flood Insurance Rate Map No. 3710689100J; Dated June 18, 2007. Proposed Conditions • The project consists of widening and extending Hartley Drive from North Main Street to Westover Drive. The length of the project is approximately 5800'. Westover Drive will be realigned to create a new "T" intersection with the new Hartley Drive, and Ingleside Drive will create a new "4-Leg" intersection with Hartley Drive. The project will provide a more convenient access route to North Main Street for the residential areas in West High Point and Davidson County. Disturbed Area Approximately 4.0 acres of land will be disturbed. This area was calculated between the cut/fill slope lines on the project not including the existing pavement that will remain. • N:\PROJ\3202\Desi gn\Hydro\Report\Narrative.doc • General Soils Description • Location Map Soil Name Description Permeability (in/hr) Erodibility Factor (Approx. Sta. No) Symbol Value Well drained; surface layer is 7" dark brown sandy loam; subsoil is 11" mottled brownish yellow sandy 10+00 to 25+00 Wilkes sandy loam (upper part) & yellowish brown clay loam 2.0 - 6.0 surface 0.28 32+40 to 35+00 WkC loam 6 to (lower part); underlying is 52" yellowish brown clay 0.2 - 0.6 subsoil 0.32 37+50 to 53+50 10% slopes loam (upper part) & yellowish brown loamy coarse sand (lower art. Well drained; surface layer is 7" dark brown sandy 25+00 to 30+00 Wiles sandy loam; subsoil is 11" mottled brownish yellow sandy 35+00 to 37+50 loam, loam (upper part) & yellowish brown clay loam 2.0 - 6.0 surface 0.28 53+50 to 58+00 WkE 15 to 45% (lower part); underlying is 52" yellowish brown clay 0.2 - 0.6 subsoil 0.32 61+00 to 64+00 slopes loam (upper part) & yellowish brown loamy coarse sand (lower art. Poorly drained; surface layer is 12" brown sandy loam(upper part) and pale brown silt loam (lower Chewacla part); subsoil is 58" mottled brown sandy loam 30+00 to 32+40 Ch loam, (upper part), mottled light brownish gray loam and 0.6-2.0 0.28 frequently silt loam (middle part) and mottle light brownish gray flooded and strong brown clay loam (lower part); underlying is 90" mottled dark bluish a clay loam. Poindexter Well drained; surface layer is 4" sandy loam and to 58+00 to 61+00 and Zion 13" of sandy clay loam; subsoil to 36" is gravelly 2.0 - 6.0 surface 0 28 64+00 to 70+51 PnD sandy loamy, sandy loam; underlying material to 80" is weathered 0.2 - 0.6 subsoil 8 to 15 /° bedrock. slopes Table 1: Soil Description (Source: USDA Soil Survey of Guilford/Davidson Counties, N.C.) Hydrology Rational Method The Rational Method was used to determine the peak runoff for all drainage areas less than 200 acres. Q=CIA Where:Q = Peak discharge of drainage basin (c.f.s.) C = Runoff Coefficient (Ratio of Runoff to Rainfall) I = Average Rainfall Intensity for a Duration Equal to the Time of Concentration (in./hr.) A = Drainage Area Contributing to the Design Location (ac.) Runoff Coefficient The runoff coefficients are based on the characteristics of the drainage area and assuming that the area is developed based on its zoning. The coefficient values were selected based on the City is of High Point's Design Manual. N:\PROJ\3202\Design\Hydro\Report\Narrative.doc 2 • T e of Development Runoff Coefficient Minimum Allowable Runoff Coefficient 0.40 Residential, one acre or larger 0.40 Residential, 1/3 acre up to 1 acre lots 0.55 Residential, less than 1/3 acre lots 0.65 Apartment, cluster, condominium, light industrial and office development 0.80 Paved areas 0.95 Table 2: Runoff Coefficients for Rational Formula Rainfall Intensity and Time of Concentration There is a direct relationship between the time of concentration and the rainfall intensity. The City of Greensboro's Intensity-Duration-Frequency Curves were used to determine the rainfall intensity for the design storm based on the calculated time of concentration. A minimum time of 10 minutes was used for small drainage basins. Drainage Area The drainage areas for the closed systems were delineated using "Micro Station" utilizing the field survey and the proposed roadway alignment. • Stormwater Quality and Quantity To provide some level of storm water runoff quantity and quality control, three dry detention basins were designed at three drainage outfall locations: outfalls A, E&K, and I&J ( See Figure No. 4). All dry detention basins were designed for 2-, 10-, 25-, and 100-year 24-hour storm events using Urban Hydrology & Detention Pond Modeling Software "PondPACK v10.0" developed by Bentley Systems, Inc. A minimum basin side slope of 4H:1V was used. For each basin, a minimum of 1 foot freeboard was provided between the100-year water surface elevation and the basin overflow invert. The pre- vs. post- outfall analysis was performed using the SCS Graphical Peak Discharge method for the 2-, 10-, 25- and 100-year, 24-hour storm events for each of the dry pond outfalls. The Rational Method was used to calculate the peak runoff rates for the outfalls that did not require a hydrograph for pond routing. The detailed calculations are provided in Appendix 'A' of this report and correspond to the enclosed Drainage Area Map (Figure No. 4). N:\PROJ\3202\Desi gn\Hydro\Report\Narrative. doc 3 • Sediment and Erosion Control The following NCDOT standards sediment and erosion control practices are proposed for this project: silt fence, inlet protection, and vegetative measures. The goal is to treat all sediment- laden stormwater as close to the source as possible before it reaches the drainage system. 1. Riprap Outlet Protection (NCDOT STD 876.02) will be used at the ends of the storm drain pipes to protect the receiving channel from scour by reducing the discharge velocity and dissipating the energy. 2. Silt Fence (NCDOT STD 1605.01) will be placed along the perimeter of the disturbed area where runoff is in sheet flow or concentrated flow less than 1.0 cfs. Silt Fence will act as a sediment filter by retarding flow and promoting deposition. 3. Inlet Protection (NCDOT STD 1632.03) will be placed around drop inlets and catch basins to help prevent sediment from entering the storm drain system. 4. Rock Silt Checks (NCDOT STD 1633.02) will be placed in roadside ditches and are intended to reduce erosion in the channel by restricting the velocity. 5. Rock Sediment Dams (NCDOT STD 1634.01) will be placed at the outfall locations as shown on the Erosion Control Plans and are used to remove sediment from construction runoff where the total drainage area is less than 5 acres. 6. Construction Entrance (NCDOT STD 1607.01) will be placed near the beginning of the project to minimize the spread of sediment to off site areas. 7. A level spreader will be placed at Outfall `A' below the detention basin in order to • convert the concentrated pipe flow to sheet flow. Sediment and erosion control devices should be inspected weekly and after each storm event. Any damage to devices should be repaired immediately, and any silt accumulated should be removed. All disturbed areas should be covered with temporary or permanent vegetation as soon as practical. All devices should be properly maintained during all phases of construction and be removed once the area has been stabilized. Results Specific design criteria and calculations for pre- and post-construction outfall analysis, culverts, roadside channels, inlet/gutter capacity, storm drainage systems, bridge deck drainage, outlet protection, and sediment and erosion control details appear in the following appendices. Pre- and Post- Outfall Analysis .............................................................. Appendix A Culverts .................................................................................................. Appendix B Roadside Channels ................................................................................. Appendix C Inlet/Gutter Capacity .............................................................................Appendix D Storm Drainage Systems ........................................................................ Appendix E .................Appendix Bridge Deck Drainage ............................................................ Outlet Protection .................................................................................... Appendix G Sediment and Erosion Control Details ...................................................Appendix H • N:\PROJ\3202\Desi gn\Hydro\Report\Narrative.doc 4 • • ? \ L, 1 .qp c ? l 1 \ J g 1_L' w •???` \ __ ! ?_??. :fig ? ????? - t Source: USGS North Carolina Quadrangle for High Point West Quadrangle GUILFORD COUNTY STV/RALPH WHITEHEAD ASSOCIATES, INC. NORTH CAROLINA CONSULTING ENGINEERS P.O. BOX 35624 Hartley Drive Roadway Improvements CHARLOTTE, NORTH CAROLINA 28235 Location Map SCALE: t'=2000' FIG. NO. I PAGE NO. 5 o0 M O C) O N ? ? N O) 7 m a m ?o ?nn o nq m ?nn o I1? 00 0 T N O N O >, N O 7:=. (0 Cl) O O O U) O O 0U m r- 0 z N to O O O O O O N 1?O O O C w o d m N ? N .r C zQ z0 F164, IIAa- o V,? Ne ol? ? 0 • pl U °1 L ? (0 N C 3 pEl 61 20 N E = m a E U a O 33 l i 1 J O U L LL r v ay°°3 a wW O ?omo? to `l C W CQC a ° E N m O O a O N F G r ?? CO U D C ", O Z- W = m = 00 .2oc a<ra: .?: v c ° uJ ~ ? u Qa om n DES Z ?O s'? _ C i>) oa oo? ? ? ? ? afS`on G Z o •c- F M '! 1ioT,' t'fl 0O E 00 Lu O J Z ?y E?? W z «F°EEQ z=?', Q c c?«W 49 z Al LL v ~ Q = r' a r c Q ? - ` O J r C m a-0 = d Z Fri ? - ao ; °a0 L O w W o 1,: > as p CO >> C. u O c p N F o 2; E N 00...,;??' o E m L o?? W a?L?o 0 ?r W ?, z W O _ U . y? Z 11 O a W 0 z J= - = F LL Z_ -- U G L Y O. O o LL a m O r LL d_ v o n (D W aE0 ?? W G --- __ ° U E 00 V N m a o E m ° y E N_ ? m V N0 M W O fE ? ?6Yd lL W U Li ? F p < z c F o u d u d .n F`c-4m No. 3 P ie t4t-1 • APPENDIX A PRE VS POST OUTFALL ANALYSIS • D?gwpS ??A?2 Y?E?a 0 • • Pre vs. Post Outfall Analysis Watershed `A' Description Watershed `A' currently flows from Main Street across the private commercial property to the north of Hartley Drive and then to an Unnamed Tributary of Rich Fork Creek. The proposed improvement to Hartley Drive includes curb & gutter and a closed drainage system. This proposed drainage system will convey the storm water runoff to a new detention pond located on the YMCA site near the existing cul-de-sac at the end of Hartley Drive. The new pond will then discharge to the 100-year floodplain of the same Unnamed Tributary of Rich Fork Creek. Watershed Characteristics Data Watershed No. Area (acres) Time of Curve Number Concentration (min) Pre-dev. Post-dev. A 9.8 15 91 93 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 1-Year 24-Hour 23.04 24.72 2-Year 24-Hour 27.81 29.48 5-Year 24-Hour 38.58 40.16 10-Year 24-Hour 42.70 44.24 100-Year 24-Hour 64.78 66.10 Post-Development Routed Basin Peak Discharge Rates, Maximum Water Surface Elevations, and Free Board Storm Event Routed Discharge Rate (cfs) Max. Water Surface Elevation (ft) Free Board (ft) 1-Year 24-Hour 21.98 840.22 3.3 2-Year 24-Hour 25.22 840.84 2.7 5-Year 24-Hour 37.53 841.64 1.9 10-Year 24-Hour 41.77 841.81 1.4 100-Year 24-Hour 64.26 842.55 1.0 Outfall A_Summary A-1 • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive (3202) 1 IN Consulting Engineers SUBJECT: Watershed No. A SHEET 1000 W. Morehead Street P.O. Box 35624 CALcD BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK•D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tc) Check One: 21 Present ? Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow Path #1 Path #2 Path #3 Segment ID 1. Surface Description (table 3-1) ......................................... Smooth' 2. Mannings roughness coefficient, n (table 3-1) .............. 0.011 3. Flow Length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, P2 ............................................ in. 3.36 5. Land slope, s .................................................................. ft. /ft. 0.0040 6. Tt = .007 (nL)" Compute Tt ....................... hr. 0.0375 0.0000 0.0000 P2 0.s S0.4 • Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Paved 8. Flow length, L ....................................................................... ft. 600 9. Watercourse slope, s ................................................... ft. /ft. 0.0040 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 1.29 11. Tt = L Compute Tt ....................... hr. 0.1296 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a .............................................. ft.2 13. Wetted perimeter, pW ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ............................................................ ft. /ft. 16. Manning's roughness coefficient, n ................................... 17a. V = 1.49r2/3s,/2 Compute V ................................ ft. /sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 5.00 18. Flow length, L ...................................................................... ft. 1500 • 19. Tt = L Compute Tt ..................................................... hr. 0.0833 0.0000 0.0000 3600 V 20. Total, T, (add Ttin steps 6, 11, and 19) ......................... hr. 0.2505 0.0000 0.0000 21. Watershed Total, T, (maximum, Path #1, #2, or #3) ... l??.?C.11 A D- ..I, 0.25 Hour A-2 • • • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive, (3202) 2 Consulting Engineers SUBJECT: Watershed No. A SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 OF Charlotte, NC 28235 (704) 372-1885 CHECWD BY: EJV DATE: 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: El Present ? Developed Runoff Curve Number oit name over description CN* Area Product and hydrologic group (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; unconnected /connected impervious area ratio) ?+ - "' r-4 L on iz `r r14 L M_ u- 0 acres El mi^2 l o/0 of CN x area B Paved Road 98 2.300 225.400 B Commercial and Business 92 5.700 - 524.400 B Medium Residential 85 1.200 102.000 B Open Space 69 0.600 41.400 - H + Totats =_> 9.800 893.2-0-0- * Use only one CN source per line CN (weighted) = total product = 893.200 91.143 Use CN =___> 91 total area 9.800 I Runoff Frequency ........................................................... yr Rainfall, P (24-hour) ........................................ in Runoff, Q ............................................................ in (Use P and Chl with table 2.1, figure 2-1, or equations 2-3 and 2-4) 11-+4,11 A D- vle Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 1` 2 5 10 100 ' 2.90 3.36 4.40 4.80 6.96 ; 1.98 2.41 3.40 3.79 5.90 A-3 • RALPH WHITEHEAD ASSOCIATES, INC. JoB: Hartley Drive (3202) 3 Consulting Engineers SUBJECT: Watershed No. A SHEET 1000 W. Morehead Street P.O. Box 35624 CALCD BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: D Present ? Developed • 1. Data Drainage area ........................................Am = 0.015 miZ (acres/640) Runoff curve number ........................... CN = 91 (From CN Et Runoff worksheet) Time of concentration ........................ T,; = 0.25 hr (From Tc worksheet) Rainfall distribution .................................... = Il (I, IA, II, III) Pond and swamp areas spread thoroughout watershed ............................. = 00 percent of Am ( 0 ) acres or miZ covered) 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................................... it Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 1 2 5 10 100 2.9 3.4 4.4 4.8 7.0 4. Initial abstraction, la ................................................ in 0.198 0.198 0.198 0.198 0.198 (Use CN with table 4-1) 5. Compute I./P ............................................................. 0.07 0.06 0.04 0.04 0.03 6. Unit peak discharge, q .. ........ .......................... csm/in 730 730 730 730 730 (Use T, and la/P with exhibit 4- II ) 7. Runoff, Q .................................................................. in 1.98 2.41 3.40 3.79 5.90 (From CN & Runoff worksheet) 8. Pond and swamp adjustment factor, Fp .................... 1.00 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) 9. Peak discharge, qp ............................................ ft3/s 23.04 27.81 38.58 42.70 64.78 (Where qp = q„AmQFp) Outfall_A_Pre.xls A-4 • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley; Drive (3202); 1 ?f Consulting Engineers SUBJECT: Watershed No. A SHEET ?/ 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK•D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tc) Check One: ? Present 7 Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow Path #1 Path #2 Path #3 Segment ID 1. Surface Description (table 3-1) ......................................... Smooth 2. Manning's roughness coefficient, n (table 3-1) .............. 0.011 3. Flow Length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, PZ ............................................ in. 3.36 5. Land slope, s .................................................................. ft. /ft. 0.0040 6. Tt = .007 (nL)°'8 Compute Tt ....................... hr. 0.0375 0.0000 0.0000 P2 0.5 50.4 Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Paved 8. Flow length, L ....................................................................... ft. 600 9. Watercourse slope, s ................................................... ft. /ft. 0.0040 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 1.29 11. Tt = L Compute Tt ....................... hr. 0.1296 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a ............................................... ft.2 13. Wetted perimeter, PW ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ............................................................ ft. /ft. 16. Mannings roughness coefficient, n ................................... 17a. V = 1.49r "sln Compute V ................................ ft. /sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 5.00 18. Flow Length, L ...................................................................... ft. 1500 S 19. Tt = L Compute Tt ..................................................... hr. 0.0833 0.0000 0.0000 3600 V 20. Total, T, (add Ttin steps 6, 11, and 19) ......................... hr. 0.2505 0.0000 0.0000 21. Watershed Total, Tc (maximum, Path #1, #2, or #3) ................................................................ 0.25 Hour • • • RALPH WHITEHEAD ASSOCIATES, INC. Joe: Hartley Drive (3202) 2 IN Consulting Engineers SUBJECT: Watershed No. A SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'DBY: HSB' DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: ? Present [I Developed Runoff Curve Number Soil name over description CN" Area Product and hydrologic (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; unconnected/ connected impervious area ratio) N N a on is N a, o5n iz ED acres [:1 ml-2 o of CN x area B Paved Road 98 - 3.600- 352.800 B Commercial and Business 92 5.400 496.800 B Medium Residential 85 > 0.500 42.500 B Open Space 69 0.300 20.700 Totals =_> 9.800 912.800 Use only one CN source per line CN (weighted) = total product = 912.800 = 93.143 Use CN =___> 93 total area 9.800 Runoff Frequency ........................................................... yi Rainfall, P (24-hour) ........................................ it Runoff, Q ............................................................ it (Use P and CN with table 2-1, figure 2-1, or equations 2-3 and 2-4) A n..-...,i.. Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 1 2 5 10 100 2.90 3.36 4.40 4.80 6.96 2.16 2.60 3.61 4.00 6.13 A _A • RALPH WHITEHEAD ASSOCIATES, INC. JoB: Hartley Drive (3202) 3 IN Consulting Engineers SUBJECT: Watershed No. A SHEET 1000 W. Morehead Street P.O. Box 35624 CALCD BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECICD BY: EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: ? Present 0 Developed 1. Data Drainage area ........................................Am = 0.015 mil (acres/640) Runoff curve number ........................... CN = Time of concentration ........................ Tc = Rainfall distribution...... Pond and swamp areas spread thoroughout watershed ............... Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 1 2 5 10 100 2.9 3.4 4.4 4.8 7.0 93 (From CN Et Runoff worksheet) 0.25 hr (From Tc worksheet) Il (I, IA, II, III) = 0.0 percent of Am ( 0 ) acres or mil covered) • 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................................... in 4. Initial abstraction, la ................................................ in 0.151 0.151 0.151 0.151 0.151 (Use CN with table 4-1) 5. Compute la/P ............................................................. 0.05 0.04 0.03 0.03 0.02 6. Unit peak discharge, q .. ....... ...........................tsm/in 730 730 730` 730 730 (Use Tc and la/P with exhibit 4- II ) 7. Runoff, Q .................................................................. in 2.16 2.60 3.61 4.00 6.13 (From CN Er Runoff worksheet) 8. Pond and swamp adjustment factor, Fp .................... 1.00 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) 9. Peak discharge, qp ............................................ ft3/s 24.72 29.48 40.16 44.24 66.10 • (Where qp = q.AmQFp) Outfall_A_Post.xls A-7 xxxxxxxxxxxxxxxxxxxxxx MASTER SUMMARY xxxxxxxxxxxxxxxxxxxxxx • Watershed....... Master Network Summary ............. 1.01 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\PROJ\3202\Design\Hydro\PondPack\DryDetentionBasin#1\BASINI_POST.PPW MASTER DESIGN STORM SUMMARY Network Storm Collection: HighPoint Total Depth Return Event in Dev 1 2.9000 Dev 2 3.3600 Dev 5 4.4000 Dev 10 4.8000 Dev 25 5.5200 Dev100 6.9600 Rainfall Type Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) • • Return HYG Vol Node ID ------------ Type ----- ---- Event ------ ac-ft Trun ---------- BASIN #1 AREA 1 1.763 BASIN #1 AREA 2 2.123 BASIN #1 AREA 5 2.948 BASIN #1 AREA 10 3.268 BASIN #1 AREA 25 3.846 BASIN #1 AREA 100 5.008 *OUTFALL A JCT 1 1.761 *OUTFALL A JCT 2 2.121 *OUTFALL A JCT 5 2.946 *OUTFALL A JCT 10 3.266 *OUTFALL A JCT 25 3.844 *OUTFALL A JCT 100 5.005 Return HYG Vol Node ID Type Event ac-ft Trun ------------ POND 1 ----- ---- IN POND ------ 1 ---------- 1.763 POND 1 IN POND 2 2.123 POND 1 IN POND 5 2.948 POND 1 IN POND 10 3.268 POND 1 IN POND 25 3.646 POND 1 IN POND 100 5.008 POND 1 OUT POND 1 1.761 POND 1 OUT POND 2 2.121 POND 1 OUT POND 5 2.946 POND 1 OUT POND 10 3.266 POND 1 OUT POND 25 3.844 POND 1 OUT POND 100 5.005 Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft ac-ft --------- 12.0500 -------- 24.72 -------- ------------ 12.0500 29.48 12.0500 40.16 12.0500 44.24 12.0500 51.56 12.0500 66.10 12.1000 21.98 12.1000 25.22 12.1000 37.53 12.1000 41.77 12.0500 49.38 12.0500 64.26 Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft ac-ft --------- 12.0500 -------- 24.72 -------- ------------ 12.0500 29.48 12.0500 40.16 12.0500 44.24 12.0500 51.56 12.0500 66.1 12.1000 21.98 840.22 .114 12.1000 25.22 840.84 .152 12.1000 37.53 841.64 .213 12.1000 41.77 841.81 .228 12.0500 49.38 842.08 .254 12.0500 64.26 842.55 .300 A-8 E • • Pre vs. Post Outfall Analysis Watershed `B' Description Watershed `B' is currently undeveloped and sheet flows directly into an Unnamed Tributary to Rich Fork Creek. The proposed roadway drainage will be picked up in a closed drainage system and will outfall into the same tributary near the northwest corner of the proposed bridge. Increased concentrated flows will be attenuated by using a riprap apron at the end of the outfall pipe. Watershed Characteristics Data Watershed No. Area (acres) Time of C-Value Concentration (min) Pre-dev. Post-dev. B 0.18 10 0.55 0.95 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 10-Year 0.56 0.97 outfall B_summazy.doc A-9 • • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 3202-000 1 Consulting Engineers SUBJECT: Pre vs. Post Evaluation SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB - DATE: 14-Feb-08 or Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV, DATE: 14-Feb-08 1 PRE VS. POST OUTFALL EVALUATION GIVEN: Outfatl Location: Road Name Hartley Drive Sta. 30+65 (RT) Basin I. D. Outfall'B' Weighted C-value (PRE) Landuse Sub-area C Minimum 0.00 0.40 Residential (>1 ac) 0.00 0.40 Residential (<lac) 0.18 0.55 Commercial, etc. 0.00 0.80 Paved 0.00 0.95 Weighted C-value (PRE) = 0.55 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5.70 in. /hr. Drainage Area = 0.18 ac. SOLUTION: Peak Runoff (Qy) = C " I A Where: Percent Change (0) = 100 " 1QPOST - QPREI / QPRE Q10(PRE) = 0.56 c.f.s. A = 0.41 c.f.s. r n__ n__r n_a.-__1 ?. ??L?J Weighted C-value (POST) Landuse Sub-area C Minimum 0.00 0.40 Residential (>lac) 0.00 0.40 Residential (<'1ac) 0.00 0.55 Commercial, etc,. 0.00 0.80 Paved 0.18 0`.95 Weighted C-va lue (POST) = 0.95 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5,70 in./hr. Drainage Area = 0.18 ac. Q = Peak Discharge (cfs) Y = Storm Event (Year) C = Runoff Coefficient I = Rainfall Intensity (in/hr) - Based on time of concentration A = Drainage Area (Acre) Where: A = Change (10 Year Storm) QPOsT = Post-construction Discharge (cfs) QPRE = Pre-construction Discharge (cfs) Q10(POST) = 0.97 c.f.s. A-10 E • • Pre vs. Post Outfall Analysis Watershed `C' Description Watershed `C' is currently undeveloped and sheet flows directly into an Unnamed Tributary to Rich Fork Creek. The proposed roadway drainage will be picked up in a closed drainage system and will outfall into the same tributary near the southwest corner of the proposed bridge. Increased concentrated flows will be attenuated by using a riprap apron at the end of the outfall pipe. Watershed Characteristics Data Watershed No. Area (acres) Time of C-Value Concentration (min) Pre-dev. Post-dev. C 0.5 1C 0.55 0.95 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 10-Year 1.57 2.71 Outfall C_Summary.doc A-11 RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 3202-000 1 Consulting Engineers SUBJECT: Pre vs. Post Evaluation SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 1 PRE VS. POST OUTFALL EVALUATION GIVEN: Outfall Location: Road Name Hartley Drive Sta. 31+50 (LT) Basin I. D. Outfall 'C' Weighted C-value (PRE) Landuse Sub-area C Minimum 0.00 0.40 Residential (> 1 ac) 0.00 0.40 Residential (<lac) 0.50 0.55 Commercial, etc. 0.00 0.80 Paved 0.00 0.95 Weighted C-value (PRE) = Time of Concentration= Rainfall Intensity (10 yr.) = Drainage Area = SOLUTION: Peak Runoff (Qy) = C * I ' A • 0.55 10 min. 5.70 in./hr. 0.50 ac. Where Percent Change (A) = 100 * [QPOST - QPREI / QPRE Q10(PRE) 1.57 c.f.s. 0 = 1.14 c.f.s. • Pre=-Post Rational Method Weighted C-value (POST) Landuse Sub-area C Minimum 0.00 0.40 Residential(>lac) 0.00 0.40 Residential (<1ac) 0.00 0.55 Commercial, etc. 0.00 0.80 Paved 0.50 0.95 Weighted C-va lue (POST) = 0.95 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5.70 in./hr. Drainage Area = 0.50 ac. Q = Peak Discharge (cfs) Y = Storm Event (Year) C = Runoff Coefficient I = Rainfall Intensity (in/hr) - Based on time of concentration A = Drainage Area (Acre) Where: 0 = Change (%) - (10 Year Storm) QPOsT = Post-construction Discharge (cfs) QPRE = Pre-construction Discharge (cfs) Q10(POST) 2.71 c.f.s. A-12 • • • Pre vs. Post Outfall Analysis Watershed `D' Description Watershed `D' is currently undeveloped and sheet flows directly into an Unnamed Tributary to Rich Fork Creek. The proposed roadway drainage will be picked up in a closed drainage system and will outfall into the same tributary near the southeast corner of the proposed bridge. Increased concentrated flows will be attenuated by using a riprap apron at the end of the outfall pipe. Watershed Characteristics Data Watershed No. Area (acres) Time of C-Value Concentration (min) Pre-dev. Post-dev. D 2.52 10 0.55 0.92 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 10-Year 7.90 13.21 Outfall D_Summary.doc A-13 • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 3202-0011 1 Consulting Engineers SUBJECT: Pre vs. Post Evaluation SHEET 1000 W. Morehead Street P.O. Box 35624 CALcD BY: HSB' DATE: 14-Feb-08 OF Charlotte, NC 28235 (704) 372-1885 CHECK•D BY: EJV DATE: 14-Feb-08 1 PRE VS. POST OUTFALL EVALUATION GIVEN: Outfall Location: Road Name Hartley Drive Sta. 35+00 (LT) Basin 1. D. Outfall'D' Weighted C-value (PRE) Landuse Sub-area C Minimum 0.00 0.40 Residential (>lac) 0.00 0.40; Residential (<lac) 2.52 0.55 Commercial, etc." 0.00 0.80 Paved 0.00 0.95 Weighted C-value (PRE) = 0.55 Time of Concentration= " 10 min. Rainfall Intensity (10 yr.) = 5.70 in. /hr. Drainage Area = 2.52 ac. SOLUTION: Peak Runoff (Qy) = C ' I * A Where: Percent Change (0) = 100 " [QPOST - QPREI / QPRE Q10(PRE) = 7.90 c.f.s. A = 5.31 c.f.s. • Weighted C-value (POST) Landuse Sub-area C Minimum 0.00 0.40 Residential (>lac) 0.00 0.40 Residential (<lac) 0.18 0.55 Commercial, etc. 0.00 0.80 Paved 2.34 0.95 Weighted C-va lue (POST) = 0.92 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5.70 in. /hr. Drainage Area = 2.52 ac. Q = Peak Discharge (cfs) Y = Storm Event (Year) C = Runoff Coefficient I = Rainfall Intensity (in/hr) - Based on time of concentration A = Drainage Area (Acre) Where: 0 = Change (10 Year Storm) QPosT = Post-construction Discharge (cfs) QPRE = Pre-construction Discharge (cfs) Q1o(POST) = 13.21 c.f.s. A-14 • 0 Pre vs. Post Outfall Analysis Watershed `E' & `K' Description Watershed `E' & `K' currently outfalls on the east side of Ingleside Drive. There is an existing detention basin located in the path of the proposed alignment of Hartley Drive which will be relocated to the northeast quadrant of the new 4-way intersection. The pre- and post- flows will generally remain the same. Watershed Characteristics Data Watershed No. Area (acres) Time of Curve Number Concentration (min) Pre-dev. Post-dev. E & K 6.1 12 75 76 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 1-Year 24-Hour 6.84 7.28 2-Year 24-Hour 9.31 9.80 5-Year 24-Hour 15.56 16.21 10-Year 24-Hour 18.12 18.81 100-Year 24-Hour 32.63 33.44 Post-Development Routed Basin Peak Discharge Rates, Maximum Water Surface Elevations, and Free Board Storm Event Routed Discharge Rate (cfs) Max. Water Surface Elevation (ft) Free Board (ft) 1-Year 24-Hour 6.75 838.65 4.3 2-Year 24-Hour 9.26 838.87 4.1 5-Year 24-Hour 15.32 839.30 3.7 10-Year 24-Hour 17.77 840.47 2.5 100-Year 24-Hour 30.98 840.21 2.8 Outfall E_K_Summary A-15 • RALPH WHITEHEAD ASSOCIATES, INC. JoB: Hartley Drive (3202) 1 ?J Consulting Engineers SUBJECT: Watershed No. E a K SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D Br: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tc) Check One: 7 Present ? Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. • Sheet flow Path #1 Path #2 Path #3 Segment ID 1. Surface Description (table 3-1) ......................................... Woods 2. Manning's roughness coefficient, n (table 3-1) .............. 0.400 3. Flow length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, P2 ............................................ in. 3.36 5. Land slope, s .................................................................. ft. /ft. 0.1100 6. Tt = .007 (nL)°'a Compute Tt ....................... hr. 0.1766 0.0000 0.0000 P2 0.5 50.4 Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Unpaved 8. Flow length, L ....................................................................... ft. 110 9. Watercourse slope, s ................................................... ft. /ft. 0.3700 10. Average velocity, V (figure 3-1) ........................ ft./sec. 9.81 11. Tt = L Compute Tt ....... hr. 0.0031 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a ...............................................ft.' 13. Wetted perimeter, pW ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ............................................................ ft. /ft. 16. Manning's roughness coefficient, n .................................. 17a• V = 1.49r2"s'/2 Compute V ft. /sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 5.00 18. Flow length, L ...................................................................... ft. 300 S 19. Tt = L Compute Tt ..................................................... hr. 0.0167 0.0000 0.0000 3600 V 20. Total, T, (add Tt in steps 6, 11, and 19) ......................... hr. 0.1964 0.0000 0.0000 21. Watershed Total, T, (maximum, Path #1, #2, or #3) ..... 0.20 Hour A-16 • • 171 RALPH WHITEHEAD ASSOCIATES, INC. Jos: Hartley Drive (3202) 2 IN Consulting Engineers SUBJECT: Watershed No. E Et K SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: _ HSBDATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK•D BY: EJV DATE: 14-Feb'=08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: E Present ? Developed Runoff Curve Number Soil name Cover description CN* Area Product and hydrologic group (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; unconnected/ connected impervious area ratio) N Q) ? F- N 2 03» u- N 2 own u- 11 acres ? mi-2 ? % of CN x area B Paved 'Road 98 1.100 107.800 B Commercial and Business 92 0.000 0.000 B Low' Residential 70 5.000 ' 350.000 B Institutional 88 0.000 0.000 Totals =_> 6.100 457-80-0- * Use only one CN source per line CN (weighted) = total product = 457.800 75.049 Use CN =___> 75 total area 6.100 I Runoff Frequency ........................................................... yr Rainfall, P (24-hour) ........................................ in Runoff, Q ............................................................ in (Use P and CN with table 2.1, figure 2-1, or equations 2-3 and 2-4) !1..14.11 P V Dr- vIc Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 1 2 5 10 100 2.90 3.36 ` 4.40 4.80 6.96 0.90 1.20 1.97 2.29 4.11 A-17 RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive (3202) 3 IN Consulting Engineers SUBJECT: Watershed No. E & K SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 OF Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: D Present ? Developed 1. Data Drainage area ........................................ A. = 0.010 mi2 (acres/640) Runoff curve number ........................... CN = 75 (From CN Et Runoff worksheet) Time of concentration ........................ Tc = 0.20 hr (From Tc worksheet) Rainfall distribution .................................... = 11 (I, IA, II, III) Pond and swamp areas spread thoroughout watershed ............................. = 0.0 percent of Am ( 0 ) acres or mi2 covered) Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 1 2 5 10 100 2.9 3.4 4.4 4.8 7.0 • 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................................... in 4. Initial abstraction, la ................................................ in 0.667 0.667 0.667 0.667 0.667 (Use CN with table 4-1) 5. Compute la/P ............................................................. 0.23 0.20 0.15 0.14 0.10 6. Unit peak discharge, q .. ........ .......................... tsm/in 750 750 780 780 790 (Use Tc and la/P with exhibit 4- II ) 7. Runoff, Q .................................................................. in 0.90 1.20 1.97 2.29 4.11 (From CN Ft Runoff worksheet) 8. Pond and swamp adjustment factor, Fp .................... 1.00 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) 9. Peak discharge, qp ............................................ (Where qp = q„AmQFp) ft3/s 6.84 9.31 15.56 18.12 32.63 Outfall E K Pre.xls A-18 RALPH WHITEHEAD ASSOCIATES, INC. Jo& Hartley Drive (3202) 1 Consulting Engineers SUBJECT: Watershed No. E $ K SHEET 1000 W. Morehead Street P.O. Box 35624 CALC•D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK•D BY: EJV DATE: 14-Feb=08 3 TIME OF CONCENTRATION (Tc) Check One: E Present 7 Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow Path #1 Path #2 Path #3 Segment ID 1. Surface Description (table 3-1) ......................................... Woods 2. Manning 's roughness coefficient, n (table 3-1) .............. 0.400 3. Flow length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, Pg ............................................ in. 3.36 5. Land slope, s .................................................................. ft. /ft. 0.1100 C. 6. Tt = .007 (nL)°'s Compute Tt ....................... hr. 0.1766 0.0000 0.0000 Pzo.5 S0.4 Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Unpaved 8. Flow length, L ....................................................................... ft. 110 9. Watercourse slope, s ................................................... ft. /ft. 0.3700 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 9.81 11. Tt = L Compute Tt ....................... hr. 0.0031 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a ............................................... ft.2 13. Wetted perimeter, p„ . ......................................................... ft. 14. Hydraulic Radius, r = a / pN, Compute r ......................... ft. 15. Channel slope, s ............................................................ ft. /ft. 16. Manning's roughness coefficient, n .................................. 17a. V = 1.49r"'s'12 Compute V ..... ft./sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 5.00 • 18. Flow Length, L ...................................................................... ft. 300 19. Tt = L Compute Tt ..................................................... hr. 0.0167 0.0000 0.0000 3600 V 20. Total, Tc (add Tt in steps 6, 11, and 19) ......................... hr. 0.1964 0.0000 0.0000 21. Watershed Total, Tc (maximum, Path #1, #2, or #3) 0.20 Hour A-19 • • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive (3202) 2 IN Consulting Engineers SUBJECT: Watershed No. E Et K SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 or Charlotte, NC 28235 (704) 372-1885 CHECK•D BY: EJV DATE: ' 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: ? Present P-1 Developed Runoff Curve Number Soil name over description CN" Area Product and hydrologic group A) (appendix (cover type, treatment, and hydrologic condition; percent impervious; unconnected/ connected impervious area ratio) N N v 25 F- N a, ? :3 on li N -4 2 on LL 0 acres E] ml^2 o ? /o of CN x area B Paved Road 98 1.400 137.200 B Commercial and Business 92 0.000 0.000 B Low Residential 70 4.700 329.000 B Institutional 88 0.000 0.000 Totals =_> 6.100 466.200 Use only one CN source per line CN (weighted) = total product = 466.200 76.426 Use CN =___> 76 total area 6.100 Runoff Frequency ........................................................... yi Rainfall, P (24-hour) ........................................ it Runoff, Q ............................................................ in (Use P and CN with table 2-1, figure 2-1, or equations 2.3 and 2-4) (h 1tfall F V Pnct xlc Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 1 2 5 10 100 2.90 3.36 4.40 4.80 6.96 0.95 1.26 2.05 2.37 4.22 A-90 RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive (3202) 3 Consulting Engineers SUBJECT: Watershed No. E Et K SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY. HSB DATE: 14-Feb-08 OF Charlotte, NC 28235 (704) 372-1885 CHECK'D BY. E.JV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: ? Present E Developed • • 1. Data Drainage area ................... ..................... A, = 0.010 Mil (acres/640) Runoff curve number ........................... CN = 76 (From CN Et Runoff worksheet) Time of concentration ........................ Tc = 0.20 hr (From Tc worksheet) Rainfall distribution .................................... = II (I, IA, II, III) Pond and swamp areas spread thoroughout watershed .......................... 2. Frequency ................ 3. Rainfall, P (24-hour) .............. = p.p percent of A, ( 0 ) acres or mil covered) ............... yr ............... in Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 1 2 5 10 100 2.9 3.4 4.4 4.8 7.0 4. Initial abstraction, la ................................................ in 0.632 0.632 0.632 0.632 0.632 (Use CN with table 4-1) 5. Compute la/P ............................................................. 0.22 0.19 0.14 0.13 0.09 6. Unit peak discharge, q .. ....... ............................ sm/in 750 750 780 780 790 (Use Tc and la/P with exhibit 4- 11 ) 7. Runoff, Q .................................................................. in 0.95 1.26 2.05 2.37 4.22 (From CN a Runoff worksheet) 8. Pond and swamp adjustment factor, Fp .................... 1.00 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) - - 9. Peak discharge, qp ............................................ ft3/s 7.28 9-80 J 16.21 18.81 33.44 (Where qp = q„ AR,QFp) Outfall_E K_Post.xls A-21 MASTER SUMMARY Total Depth Return Event in Dev 1 2.9000 Dev 2 3.3600 Dev 5 4.4000 Dev 10 4.8000 Dev 25 5.5200 Dev100 6.9600 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (True= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) is • Return HYG Vol Node ID ------------ ---- Type ---- Event ------ ac-ft Trun ---------- -- - *OUTFALL E & K JCT 1 .482 *OUTFALL E & K JCT 2 .643 *OUTFALL E & K JCT 5 1.043 *OUTFALL E & K JCT 10 1.206 *OUTFALL E & K JCT 25 1.510 *OUTFALL E & K JCT 100 2.147 POND 2 IN POND 1 .482 POND 2 IN POND 2 .643 POND 2 IN POND 5 1.043 POND 2 IN POND 10 1.206 POND 2 IN POND 25 1.510 POND 2 IN POND 100 2.147 Return HYG Vol Node ID Type Event ac-ft Trun ----------- POND 2 -- ---- ---- OUT POND ------ 1 ---------- .482 POND 2 OUT POND 2 .643 POND 2 OUT POND 5 1.043 POND 2 OUT POND 10 1.206 POND 2 OUT POND 25 1.510 POND 2 OUT POND 100 2.147 WATERSHED E & K AREA 1 .482 WATERSHED E & K AREA 2 .643 WATERSHED E & K AREA 5 1.043 WATERSHED E & K AREA 10 1.206 WATERSHED E & K AREA 25 1.510 WATERSHED E & K AREA 100 2.147 Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft -------- ac-ft- ------------ --------- 12.0500 -------- 6.75 12.0500 9.26 12.0500 15.32 12.0500 17.77 12.0500 22.13 12.0500 30.98 12.0500 7.28 12.0500 9.80 12.0000 16.21 12.0000 18.81 12.0000 23.60 12.0000 33.44 Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft ------- ac-ft ------------ --------- 12.0500 -------- 6.75 - 838.65 .031 12.0500 9.26 838.87 .041 12.0500 15.32 839.30 .066 12.0500 17.77 839.47 .077 12.0500 22.13 839.72 .095 12.0500 30.98 840.21 .138 12.0500 7.28 12.0500 9.80 12.0000 16.21 12.0000 18.81 12.0000 23.60 12.0000 33.44 A-22 • • Pre vs. Post Outfall Analysis Watershed `G' Description Watershed `G' is currently undeveloped and is located at the confluence of two small perennial streams. There is a proposed 60" diameter concrete pipe culvert at this outfall which will be buried 1.0' below the existing ground line. Watershed Characteristics Data Watershed No. Area (acres) Time of C-Value Concentration (min) Pre-dev. Post-dev. G 36.96 25 0.40 0.45 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 10-Year 58.34 66.03 Outfall G_Summary.doc A-23 • • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 3202-000 1 ?f Consulting Engineers SUBJECT: Pre vs. Post Evaluation SHEET ?/ 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB' DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK•D BY: EJVDATE: 14-Feb-08 1 PRE VS. POST OUTFALL EVALUATION GIVEN: Outfall Location: Road Name Hartley Drive Sta. 52+85 (LT) Basin I. D. Outfall'G' Weiehted C-value (PRE) Landuse Sub-area C Minimum 36.96 0.40 Residential (>lac) 0.00 0.40 Residential (<1ac) 0.00 0:55 Commercial, etc. 0.00 0.80 Paved 0.00 0.95 Weighted C-value (PRE) = 0.40 Time of Concentration= 25 min. Rainfall Intensity (10 yr.) = 3.97 in. /hr Drainage Area = 36.96 ac. SOLUTION: Peak Runoff (Qy) = C ' I ' A Where: Percent Change (O) = 100 * [QPOST - QPRE] / QPRE Q10(PRE) = 58.69 c.f.s. 0 = 7.34 c.f.s. Weighted C-value (POST) Landuse Sub-area C Minimum 33.56 0.40 Residential (>1ac) 0.00 0.40 Residential (<lac) 0.00 0.55 Commercial, etc. 0.00 0.80 Paved 3.40 0.95 Weighted C-va lue (POST) = 0.45 Time of Concentration= 25 min. Rainfall Intensity (10 yr.) = 3.97 in. /hr. Drainage Area = 36.96 ac. Q = Peak Discharge (cfs) Y = Storm Event (Year) C = Runoff Coefficient I = Rainfall Intensity (in/hr) - Based on time of concentration A = Drainage Area (Acre) Where: 0 = Change (%) - (10 Year Storm) QPOST = Post-construction Discharge (cfs) QPRE = Pre-construction Discharge (cfs) Q1O(POST) = 66.03 c.f.s. A-24 • • • Pre vs. Post Outfall Analysis Watershed `I' & `J' Description Watershed `I' & `J' is located at the tie-in point with Westover Drive. Westover Drive will be realigned to form a new "T" intersection with Hartley Drive. A new detention pond will be located in the abandoned roadway right-of-way. The outfall from the proposed pond will flow to the existing roadside ditch along Westover Drive. Watershed Characteristics Data Watershed No. Area (acres) Time of Curve Number Concentration (min) Pre-dev. Post-dev. I & J 1.3 10 70 76 Pre-Development and Post-Develo went Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 1-Year 24-Hour 1.07 1.66 2-Year 24-Hour 1.57 2.24 5-Year 24-Hour 2.83 3.67 10-Year 24-Hour 3.36 4.24 100-Year 24-Hour 6.40 7.46 Post-Development Routed Basin Peak Discharge Rates, Maximum Water Surface Elevations, and Free Board Storm Event Routed Discharge Rate (cfs) Max. Water Surface Elevation (ft) Free Board (ft) 1-Year 24-Hour 1.31 845.67 6.3 2-Year 24-Hour 1.77 845.80 6.2 5-Year 24-Hour 2.86 846.09 5.9 10-Year 24-Hour 3.28 846.18 5.8 100-Year 24-Hour 5.54 846.70 5.3 Outfall I_J_Summary A-25 • RALPH WHITEHEAD ASSOCIATES, INC. JoB: Hartley Drive (3202) 1 IN Consulting Engineers SUBJECT: Watershed No. I Et J SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 or Charlotte, NC 28235 (704) 372-1885 CHECK•D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tc) Check One: E] Present ? Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow Path #1 Path #2 Path #3 Segment ID 1. Surface Description (table 3-1) ......................................... Grass 2. Manning's roughness coefficient, n (table 3-1) .............. 0.240 3. Flow Length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, P2 ............................................ in. 3.36 0.0600 5. Land slope, s .................................................................. ft. /ft. r? L_J 6. Tt = .007 (nL)°'g Compute T........................ hr. 0.1496 0.0000 0.0000 Pio.s S0.4 Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Unpaved' 8. Flow Length, L ....................................................................... ft. 100 9. Watercourse slope, s ................................................... ft. /ft. 0.0600- 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 3.95 11 Tt = L Compute Tt ....................... hr. F-0-.0-07-071 1 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a .............................................. ft.' 13. Wetted perimeter, pr .. ......................................................... ft. 14. Hydraulic Radius, r = a / p,., Compute r ......................... ft. 15. Channel slope, s ............................................................ ft. /ft. 16. Manning's roughness coefficient, n .................................. 17a• V = 1.49r "s' /Z Compute V ft. /sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 18. Flow length, L ...................................................................... ft. • 19. Tt = L Compute Tt ..................................................... hr. 0.0000 0.0000 0.0000 3600 V 20, Total, T. (add Ttin steps 6, 11, and 19) ......................... hr. 0.1566 0.0000 0.0000 21. Watershed Total, Tc (maximum, Path #1, #2, or #3) ................................................................ 0.16 Hour A-?h • • • RALPH WHITEHEAD ASSOCIATES, INC. JoB: Hartley Drive (3202) 2 Consulting Engineers SUBJECT: Watershed No. I Et J SHEET 1000 W. Morehead Street P.O. Box 35624 CALCD BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECKD BY: EJV r DATE: 94-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: 2 Present ? Developed Runoff Curve Number Soil name over description CN` Area Product and hydrologic group (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; unconnected/ connected impervious area ratio) N to T v a=n U_ I N -4 on acres ? mi^2 070 of CN x area B Paved Road 98 B Commercial and Business 92 B Low Residential 70 1.300 91.000 B Open Space 69 Totals =_> 1.300 91.000 Use only one CN source per line CN (weighted) = total product = 91.000 70.000 Use CN =___> 70 total area 1.300 Runoff Frequency ........................................................... yl Rainfall, P (24-hour) ........................................ it Runoff, Q ............................................................ it (Use P and CN with table 2-1, figure 2-1, or equations 2-3 and 2-4) Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 1 Z 5 10 100 2.90 3.36 4.40 4.80 6.96 0.66 0.92 1.60 1.89 3.59 A -')7 • RALPH WHITEHEAD ASSOCIATES, INC. JoB: Hartley Drive (3202) 3 IN Consulting Engineers SUBJECT: Watershed No. I rt J SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: Q Present ? Developed L_J 1. Data Drainage area ........................................Am = 0.002 mil (acres/640) Runoff curve number ........................... CN = 70 (From CN Ft Runoff worksheet) Time of concentration ........................ T, = 0.16 hr (From Tc worksheet) Rainfall distribution .................................... = 11 (I, IA, II, III) Pond and swamp areas spread thoroughout watershed ............................. = 0.0 percent of Am ( 0 ) acres or mi' covered) 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................................... it 4. Initial abstraction, la ........................... (Use CN with table 4-1) 5. Compute la/P .............................. 6. Unit peak discharge, q„ ........... (Use Tc and la/P with exhibit 4- Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 1 2 5 10 100 2.9 3.4 4.4 4.8 7.0 ...... in 0.857 0.857 0.857 0.857 0.857 ................ 0.30 0.26 0.19 0.18 0.12 .............. rsm/in 600 635 650 655 665 II ) 7. Runoff, Q ................................................. (From CN Et Runoff worksheet) .. in 0.66 0.92 1.60 1.89 3.59 8. Pond and swamp adjustment factor, Fp .................... ? 1.00 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) 9. Peak discharge, qp ............................................ ft 3/S 1.07 1.57 2.83 3.36 6.40 (Where qp = q„ AmQFP) Outfall_I J_Pre.xls A-28 • RALPH WHITEHEAD ASSOCIATES, INC. JoB: Hartley Drive (3202) 1 IN Consulting Engineers SUBJECT: Watershed No. I Et J SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tc) Check One: 0 Present 0 Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow Path #1 Path #2 Path #3 Segment ID 1. Surface Description (table 3-1) ......................................... Grass 2. Manning's roughness coefficient, n (table 3-1) .............. 0.240 3. Flow Length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, P2 ............................................ in. 3.36 5. Land slope, s .................................................................. ft. /ft. 0.0600 6. Tt = .007 (nL)°'8 Compute Tt ....................... hr. 0.1496 0.0000 0.0000 P20.5 S0.4 IS Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Unpaved 8. Flow length, L ....................................................................... ft. 100 9. Watercourse slope, s ................................................... ft. /ft. 0.0600 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 3.95 11. Tt = L Compute Tt ....................... hr. 0.0070 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a .............................................. ft.2 13. Wetted perimeter, p„ . ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ............................................................ ft. /ft. 16. Manning's roughness coefficient, n ................................... 17a. V = 1.49r113s1 n Compute V ................................ ft. /sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 18. Flow length, L ...................................................................... ft. • 19. Tt = L Compute Tt ..................................................... hr. 0.0000 0.0000 0.0000 3600 V 20. Total, T, (add Ttin steps 6, 11, and 19) ......................... hr. 0.1566 0.0000 0.0000 21. Watershed Total, T, (maximum, Path #1, #2, or #3) ............ 0.16 Hour A-?9 • • • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive (3202) 2 IN Consulting Engineers SUBJECT: Watershed No. 1 8: J SHEET 1000 W. Morehead Street P.O. Box 35624 CALrD BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: ? Present 0 Developed Runoff Curve Number Soil name over description CN` Area Product and hydrologic group (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; unconnected/ connected impervious area ratio) N H "' N j on ? c N °° ii ? acres [] m1^2 of CN x area B Paved 'Road 98 0.300 29.400 B Commercial and Business 92 B Lowv Residentiat 70 1.000 70.000 B Open Space 69 Totals =_> 1.300 99.400 " Use only one CN source per line CN (weighted) = total product = 99.400 = 76.462 Use CN =___> 76 total area 1.300 Runoff Frequency ........................................................... yr Rainfall, P (24-hour) ........................................ in Runoff, Q ............................................................ in (Use P and CN with table 2-1, figure 2-1, or equations 2-3 and 2-4) !1,'+4'11 1 1 0-+ -1r Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 1 2 5 10 100 2.90 3.36 4.40 4.80 6.96 0.95 1.26 2.05 2.37 4.22 A_10 • RALPH WHITEHEAD ASSOCIATES, INC. JoB: Hartley Drive (3202) 3 IN Consulting Engineers SUBJECT: Watershed No. I Et J SHEET 1000 W. Morehead Street P. 0. Box 35624 CALCD BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHEM BY: EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: ? Present 0 Developed 1. Data Drainage area ........................................ A. = Runoff curve number ........................... CN = 0.002 mil (acres/640) 76 (From CN It Runoff worksheet) Time of concentration ........................ Tc = 0.16 hr (From Tc worksheet) Rainfall distribution .................................... = II (I, IA, II, III) Pond and swamp areas spread thoroughout watershed ............................. = 0.0 percent of Am ( 0 ) acres or miZ covered) Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 1 2 5 10 100 2.9 3.4 4.4 4.8 7.0 • 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................................... in 4. Initial abstraction, la ................................................ in 0.632 0.632 0.632 0.632 0.632 (Use CN with table 4-1) 5. Compute la/P ............................................................. 0.22 0.19 0.14 0.13 0.09 6. Unit peak discharge, q .. ....... ........................... csm/in 600 635 6`50 655 665 (Use Tc and la/P with exhibit 4- II ) 7. Runoff, Q .................................................................. in 0.95 1.26 2.05" 1 2.37 4.22 (From CN a Runoff worksheet) 8. Pond and swamp adjustment factor, Fp .................... 1.00 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) 9. Peak discharge, qp ............................................ ft3/s 1.66 2.24 3.67 4.24 7.46 • (Where qp = q.AmQFP) Outfall_I J_Post.xls A-31 xxxxxxxxxxxxxxxxxxxxxx MASTER SUMMARY xxxxxxxxxxxxxxxxxxxxxx • Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\PROJ\3202\Design\Hydro\PondPack\DryDetentionBasin#3\BASIN3 POST.PPW MASTER DESIGN STORM SUMMARY Network Storm Collection: HighPoint Total Depth Return Event in Dev 1 2.9000 Dev 2 3.3600 Dev 5 4.4000 Dev 10 4.6000 Dev 25 5.5200 Dev1 00 6.9600 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method ( *Node=Outfall; +Node =Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs ft ac-ft *OUTFALL I & J JCT 1 .103 12.1000 1.31 *OUTFALL I & J JCT 2 .137 12.1000 1.77 *OUTFALL I & J JCT 5 .222 12.1000 2.86 *OUTFALL I & J JCT 10 .257 12.1000 3.26 *OUTFALL I & J JCT 25 .322 12.1000 4.08 *OUTFALL I & J JCT 100 .457 12.1000 5.54 POND 3 IN POND 1 .103 12.0000 1.66 POND 3 IN POND 2 .137 12.0000 2.24 POND 3 IN POND 5 .222 12.0000 3.67 POND 3 IN POND 10 .257 12.0000 4.24 POND 3 IN POND 25 .322 12.0000 5.29 POND 3 IN POND 100 .457 12.0000 7.46 Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID ---------- --- Type ---- ---- Event ------ ac-ft ---------- Trun hrs cfs ft ac-ft POND 3 OUT POND 1 .103 -- --------- 12.1000 -------- 1.31 -------- 645.67 ------------ .010 POND 3 OUT POND 2 .137 12.1000 1.77 845.80 .015 POND 3 OUT POND 5 .222 12.1000 2.86 646.09 .027 POND 3 OUT POND 10 .257 12.1000 3.28 646.16 .032 POND 3 OUT POND 25 .322 12.1000 4.06 646.35 .042 POND 3 OUT POND 100 .457 12.1000 5.54 646.70 .063 WATERSHED I & J AREA 1 .103 12.0000 1.66 WATERSHED I & J AREA 2 .137 12.0000 2.24 WATERSHED I & J AREA 5 .222 12.0000 3.67 WATERSHED I & J AREA 10 .257 12.0000 4.24 WATERSHED I & J AREA 25 .322 12.0000 5.29 WATERSHED I & J AREA 100 .457 12.0000 7.46 • A-32 • APPENDIX B CULVERTS • L.J CULVERTS • DESIGN CRITERIA: Secondary Routes (Major, City Thoroughfares) ................................. 50-year storm Secondary Routes ................................................................................................................... 25-year storm Headwater Elevation ............................................................................... 24" freeboard at low point in road Allowable HW/D Ratio .................................................................................................................1.2 or less Culvert Calculations The FHWA computer program HY-8 was used to perform the hydraulic analysis to size and analyze the proposed culverts. For thoroughfare roads, the culverts were designed for the 50-year storm, and checked using the 100-year event for road and structure flooding. Tailwater For culverts that discharged to a defined channel, the tailwater depth was the normal depth for the design storm. The downstream channel cross section was entered into HY-8 for open channel calculations. • Buried Pipe For environmental considerations, all culvert pipes were upsized one pipe diameter in order to bury the inverts below the existing stream bed. E B-1 • TI0 O O .o .o N ttz E c N?, F o 0 ov x m = w • co w m to 0 in co J ]C ?' u u 10 co M fV u z O M , - co W p o a a O sn v D ? ? M O l w = C y N W L Z = O x ? 3 0 a 0 ? c c a • (•J),) l,ouanbaJ3 g g', do:Jano / Poold A A •n913 'M'H 'JA 001, 4 10 N W 'laA aapno 'jA 01, o: a / MH 'JIB 05 Ln 10 0 0 (IP $ D'. 'na13 "M'H 'JIB 05 -: ("j;/'jj) M ado15 adi d o o 0 0 0 0 UMOO:JanUI 1 p 1 o' O M Do a d n :Janul _ °o: M co W 3 0 a a - ( "IP g o E yISual adld N o v v Jajaweia adid E v leuaaew u L) v a; a, LA ? (s ; o) JeaA 00l o Y a ;;oun-d leao _ ; N N n ;;ouna TIO ('$';•o) teak 5Z W H ` 7 ;;ouna lean 2 c > U N (s ;'o) Jea), 01, ° N ° u ;;ounb Tejo oct, o u t E v (Jy/ ul) JeaA 001, Allsualul )le;uiea c o W 0 LL. an U. c ('Jy/•UL) JeaA 05 E c ` L N N O C) z o [,I!sualul IleplM c D o L: n o a r A;tsuaaUllle;ULed i g o ?' E v u u n = ('J4/'ul) JeaA O1, M g M g a, p }' L CO s Ln C ° 1,;?suaJul lle;uie'd c ° _ a . a c L) u O on : 0 Z ('ULW) 0 CL L v N .G an E ?y ouoo;o awl ? : L c ('7e) Cl? a E oL to ?+ ?° L m a d, eaJV AMU(] ° o c to ae a .? Jt: u juapl;;aoo 7 o ; o E c . ;ouna c ; y . 0 N N n ('11 ) o o v 3 0 3 3 UOI?eAa13 /?eMPEOa ? O .+ a >` o co Ln E ;0 -j to w Q SULPling weaJlsdn z z v E ' a', w `c u u F- ? + y y a h 3 ui c Ln ° ` = m H to ? N '0'lulse 9 a z t` CC • 0 • APPENDIX C SHEET 3 OF 8 EXRrelPL 5 (51 vE/v NYDROLl3GIC CONAOUR 5.0 DRRINRGE AREA 35 RG SMRL L RRER FULL OU51NF 55 Rn15WER Q 10= 39 x 1.4 = 54.& CF. .5 j v ? O 3 2, 000 ia00 g00 600 400 200 ?E ghjA Q16 50 x' $ 00 131- ?10 -- 0.5 UN un v ;zi O j O ? ? f0RyEDEVE RoPM NT ..0 Q4 V ro 8 ?o 4 2 05 1,000 6 00 4,00 -? 202 t goo 50 ?fc U1 ? 30 V 20 Q !0 0 FRCTORS FOR FREQUENC155 1. t aQ 5 CURVE yRLUE X 1.75 95 ??^^ 825 x 0b = u X l •8 Q? _ 50 1•3`J, _ (oP C--& ,50 it Q OO rr rr x 50 () • $5? - 9 3 CXS Qoo = 5o(a.t5)= log c-'s RUNOFF FROM UR BAN RRERS NORTH CRROLINR 57E XIGHWRY COMY15510N URN I ?.9 C 200.3 CHART C 200.3 Q- 2 BASIN I.D.: Culvert #47 (PROPOSED) LOCATION: Hartley Drive - STA. 53+85 lr ?I u 1 OF 3 CURRENT DATE: 04-14-2008 FILE DATE: 4/14/2008 CURRENT TIME: 14:46:39 FILE NAME: 47 FHWA CULVERT ANALYSIS .. ................................ ..... HY-8, VERSION 6 .1 ........ ............. ........... ...... tJ AA?,AAAA.AA.AAAAAA.?.AAAA AA,A.A.??.AAA. ?.AA.AAA. A.AAAAA?.?. A.A.??.A ?.A.A.A.AAAAA ??.AAAAAA AA.AA.AA.AA A.AA? 3 C 3 SITE DATA • 3 CULVERT SHAPE, MATERIAL, INLET 3 3 U AAAAAAAAAAAAAAAAA AAAAAAAA t?AAAAA AAAAAAA AAAPA AAAAApAPA PAbA1? AAA?AAA b" 3 L 3 INLET OUTLET CULVERT 3 BARRELS 3 3 V 3 ELEV. ELEV. LENGTH 3 SHAPE SPAN RISE MANNING INLET 3 3 NO.3 (ft) (ft) (ft) 3 MATERIAL (ft) (ft) n TYPE 3 3 1 3 817.40 809.00 200.18 3 1 RCP 4.50 4.50 .012 CONVENTIO NAL3 3 2 3 3 3 3 3 3 3 3 3 4 3 3 3 3 5 3 3 3 3 6 3 3 3 A, ?? AAAA.AAAA?.A.A.P,AAAA.AA AAAA.A,A.?X?A? J?A?.P.A.A.? X?AA.bA.?X??. AA.A.P. AAA.A?,A.???.A .?,?,?.AA.A?.A AAAAP.?,b?. A.AAU SUMMARY OF CULVERT FLOWS (cfs) FILE: 47 DATE: 4/14/2008 ELEV (ft) TOTAL 1 2 3 4 5 6 ROADWAY ITR 820.28 50.0 50.0 0.0 0.0 0.0 0.0 0.0 0.00 1 • 820.48 55.8 820.68 61.6 55.8 61.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 1 1 820.87 67.4 67.4 0.0 0.0 0.0 0.0 0.0 0.00 1 821.06 73.2 73.2 0.0 0.0 0.0 0.0 0.0 0.00 1 821.24 79.0 79.0 0.0 0.0 0.0 0.0 0.0 0.00 1 821.42 84.8 84.8 0.0 0.0 0.0 0.0 0.0 0.00 1 821.61 90.6 90.6 0.0 0.0 0.0 0.0 0.0 0.00 1 821.69 93.0 93.0 0.0 0.0 0.0 0.0 0.0 0.00 1 821.99 102.2 102.2 0.0 0.0 0.0 0.0 0.0 0.00 1 822.18 108.0 108.0 0.0 0.0 0.0 0.0 0.0 0.00 1 A 839.00 344.9 AAP.AA.?.???.?.A.AAAAAAAA.A 344.9 AAAAAAA.?,A 0.0 AAAAAA?.A. 0.0 A.?.AAAAAA 0.0 AAAA 0.0 ?.A,A,A.??.?.A.?, 0.0 OVERTOPPING AA.A.AA.AAAAAAAAAAA.A.AAA? SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: 47 DATE: 4/14/2008 HEAD HEAD TOTAL FLOW % FLOW ELEV (ft) ERROR (ft) FLOW (cfs) ERROR (cfs) ERROR 820.28 0.000 50.00 0.00 0.00 820.48 0.000 55.80 0.00 0.00 820.68 0.000 61.60 0.00 0.00 820.87 0.000 67.40 0.00 0.00 821.06 0.000 73.20 0.00 0.00 821.24 0.000 79.00 0.00 0.00 821.42 0.000 84.80 0.00 0.00 821.61 0.000 90.60 0.00 0.00 821.69 0.000 93.00 0.00 0.00 • 821.99 822 18 0.000 0 000 102.20 00 108 0.00 0 00 0.00 00 0 . ......... . ..... . . ........ . .... . ...... A <1> TOLERANCE (ft) .AAAAAAAAA?i?,2?,A.A?,At?fi?.b = 0.010 A.fi.?.t?t?fifi?.A AA.?.b,tip.k?X 1ti112i?.bb.A fiklXiXiA. <2> TOLERANCE ($) ?.bAbAXit?Alit?X?.fi?.fi.AAbp = 1.000 .A.?.?.AA,Ab b?ib?k? B- BASIN I.D.: Culvert #47 (PROPOSED) LOCATION: Hartley Drive - STA. 53+65 • 2 OF 3 CURRENT DATE: 04-14-2008 FILE DATE: 4/14/2008 CURRENT TIME: 14:46:39 FILE NAME: 47 PERFORMANCE CURVE FOR CULVERT 1 - 1( 4.50 (ft) BY 4.50 (ft)) RCP DIS- HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL CRIT. OUTLET TW OUTLET TW FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH DEPTH DEPTH VEL. VEL. (cfs) (ft) (ft) (ft) <F4> (ft) (ft) (ft) (ft) (fps) (fps) 50.00 820.28 2.88 2.88 1-S2n 1.01 2.03 1.03 1.83 17.94 4.69 55.80 820.48 3.08 3.08 1-S2n 1.07 2.16 1.11 1.94 18.12 4.84 61.60 820.68 3.28 3.28 1-S2n 1.12 2.28 1.08 2.05 20.81 4.97 67.40 820.87 3.47 3.47 1-S2n 1.18 2.38 1.23 2.15 18.93 5.09 73.20 821.06 3.66 3.66 1-S2n 1.23 2.49 1.29 2.25 19.41 5.20 79.00 821.24 3.84 3.84 1-S2n 1.29 2.59 1.35 2.34 19.65 5.31 84.80 821.42 4.02 4.02 1-S2n 1.34 2.70 1.42 2.43 19.73 5.41 90.60 821.61 4.21 4.21 1-S2n 1.39 2.79 1.47 2.56 20.10 5.55 93.00 821.69 4.29 4.29 1-S2n 1.40 2.82 1.48 2.61 20.32 5.60 102.20 821.99 4.59 4.59 5-S2n 1.47 2.96 1.56 2.69 20.77 5.68 108.00 822.18 4.78 4.78 5-S2n 1.51 3."05 1.62 2.77 20.89 5.77 E1. inlet face invert 817.40 ft E1. outlet invert 809.00 ft E1. inlet throat invert 0.00 ft El. inlet crest 817.40 ft • ***** SITE DATA ***** CULVERT INVERT ************** INLET STATION 0.00 ft INLET ELEVATION 817.40 ft OUTLET STATION 200.00 ft OUTLET ELEVATION 809.00 ft NUMBER OF BARRELS 1 SLOPE (V/H) 0.0420 CULVERT LENGTH ALONG SLOPE 200.18 ft ***** CULVERT DATA SUMMARY ***************** ******* BARREL SHAPE CIRCULAR BARREL DIAMETER 4.50 ft BARREL MATERIAL CONCRETE BARREL MANNING'S n 0.012 INLET TYPE CONVENTIONAL INLET EDGE AND WALL SQUARE EDGE WITH HEADWALL INLET DEPRESSION NONE • B- BASIN I.D.: Culvert #47 (PROPOSED) LOCATION: Hartley Drive - STA. 53+85 C, • CURRENT DATE: 04-14-2008 CURRENT TIME: 14:46:39 FILE DATE: 4/14/2008 FILE NAME: 47 3 OF 3 A,AAAAA.?.AA.A.A,AA,A,AAAAA.P.?.P.A.?.A,AA.AAAA.A.A.?.A?????,P.A.?.AAAAA.A,?,A.A.A.?.A.AAAA.AAAAAAAAAAAAA.A.AA,A.A.A AA .. .. . . ... .. ... .. .. .. .. . . . . ... .. ... TAILWATER AAA.A.A,?.?,AAP.?.A,?,A?,AAAA.A,A.A,?AAAAAAAA.AA,??.?.AA.AA.A.A.AAAAAA,A.A.A.AAA?,A,?.A.A.AA,A.bA?. A, A.?.A.A.A.A.A.AP,AP,A?A ******* REGULAR CHANNEL CROSS SECTION **************** BOTTOM WIDTH 4.00 ft SIDE SLOPE H/V (X:1) 1.0 CHANNEL SLOPE V/H (ft/ft) 0.010 MANNING'S n (.01-0.1) 0.035 CHANNEL INVERT ELEVATION 809.00 ft CULVERT NO.1 OUTLET INVERT ELEVATION 809.00 ft ******* UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL FLOW W.S.E. FROUDE DEPTH VEL. SHEAR (cfs) (ft) NUMBER (ft) (f/s) (psf) 50.00 810.83 0.701 1.83 4.69 1.14 55.80 810.94 0.704 1.94 4.84 1.21 61.60 811.05 0.707 2.05 4.97 1.28 67.40 811.15 0.710 2.15 5.09 1.34 73.20 811.25 0.713 2.25 5.20 1.40 79.00 811.34 0.715 2.34 5.31 1.46 84.80 811.43 0.718 2.43 5.41 1.52 90.60 811.56 0.720 2.56 5.55 1.60 93.00 811.61 0.722 2.61 5.60 1.63 102.20 811.69 0.724 2.69 5.68 1.68 108.00 811.77 0.725 2.77 5.77 1.73 AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA.A.AAAAA.AA.AA.A.AAA.AAAA?iAAA? ROADWAY OVERTOPPING DATA ROADWAY SURFACE PAVED EMBANKMENT TOP WIDTH 40.00 ft CREST LENGTH 100.00 ft OVERTOPPING CREST ELEVATION 839.00 ft • B- • C RALPH WHITEHEAD ASSOCIATES, INC. Consulting Engineers JOB: SUBJECT: Hartley Drive (3202) #47 - Buried Pipe 1 SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: AMA DATE: 14-Mar-06 OF Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: DATE: 1 Area of Buried Pipe Structure No. #47 Road Name Hartley Dr. Sta. 53+85 Determine the area of a buried pipe to the area of the designed pipe. GIVEN: Design Pipe Diameter (in) = 54 Buried Pipe: D = Pipe Diameter (in) 60 r= Pipe radius (ft) 2.5 d = Depth Buried (ft) 1.0 SOLUTION: Determine the area of the buried pipe. • 0 (radians) = 2 (arccos [ (r-d)/r ]) _ Atotal (ft z) _ 7[ rZ = Area of the Segment = Asn (ft) = [ r2(0 - sin 0)] / 2 = Area of the buried pipe = Ab,rid = Apipe - Aseg = CHECK: Diameter of area buried (in) = (4 * Abud d / 700.s = CONCLUSION: • Boded Pipe Area.xls 1.85 19.63 2.80 16.84 55.6 > 54 = Ddesign (in) B-7 GL)Iv 1- 3a C7 • APPENDIX C SHEET 3 OF 8 r XFild PL GIVEN = 1000 NYDROLD3TIC CONTOUR S. 0 2,000 ORRINR6E RRER 35 RC- OO 5MRL L RRER FULL SU51NE 55 /,000 RN5WER Q /Or 39 x l 4 = 54.6 CF5. e oo 400 600 1400 a -? 2oo o ? 200. T a v ? - t/00 goo 1 6O _ 4-1 ? 0 3 ? ? 5O v? sib L .1'S !O Q 20 .01 os a ro v Q? Q? z ?? W 4, w ? v, 2 z ? zZil >W ?? p GURY, 5 GORREc7' ON 5 i FoR DEVE LOPh1 NT FRC7OR5 FOR FREQUENCJES 1 t ?Q O CURVE RGUE X 1.75 it 8 s 4 r It x 1:35 8?r Q,o'_ a5 cis a/ o rt ; X k !3 Q.tS v` 35)- cfs a6crx a5 (1•?,?= y? ca Q?cv a5 ?a.?5?= 5H C'Ps RUNOFF FRohf UR 9RN RR rq5 NORM CRROLINR 51/1 NIGHWRY CoAllyl5510N JRN,! 7a G200.3 CHART C 200.3 3-8 BASIN I.D.: Culvert #30 (PROPOSED) LOCATION: Hartley Drive - STA. 40+67 • 1 CURRENT DATE: 04-14-2008 FILE DATE: 4/14/2008 8 CURRENT TIME: 14:50:45 FILE NAME: 30 FHWA CULVERT ANALYSIS HY-8, VERSION 6.1 UAAAAAAAAAAAA AAAAAAAAA AAAAXiXibt?n bba5a?b ri?riririri?ri ?b?b ??ri?ria?8ri nrifiirTtfi TTTTtrTT Tn 3 C 3 SITE DATA 3 CULVERT SHAPE, MATERIAL, INLET G 3 3 U AAAPAAAA AAAAA AAAAAbZi ?Ziriffb?St i?fi?h?$? b??riri ???bbbnb rififirX5fi5 TiTfirXhh Tr 3 L 3 INLET OUTLET CULVERT 3 BARRELS 3 3 V 3 ELEV. ELEV. LENGTH 3 SHAPE SPAN RISE MANNING INLET 3 3NO.3 (ft) (ft) (ft) 3 MATERIAL (ft) (ft) n TYPE 3 3 1 3 834.00 830.00 119.06 3 1 RCP 3.00 3.00 .012 IMPR SDT REC 3 3 2 3 3 3 3 3 3 3 3 3 4 3 3 3 3 5 3 3 3 3 6 3 3 3 A,AAAAAAA?AAAA AAAAAAAAL1 Z1b??Sbbbb 2lb?ririribZ l?bri?tib8 b???? bri?fii73?h hhhXTitfix TTrfi?firXT X? U SUMMARY OF CULVERT FLOWS (cfs) FILE: 30 DATE: 4/14/2008 ELEV (ft) TOTAL 1 2 3 4 5 6 ROADWAY ITR 835.59 25.0 25.0 0.0 0.0 0.0 0.0 0.0 0.00 1 835.73 27.9 27.9 0.0 0.0 0.0 0.0 0.0 0.00 1 • 835.88 836.02 30.8 33.7 30.8 33.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 1 1 836.15 36.6 36.6 0.0 0.0 0.0 0.0 0.0 0.00 1 836.28 39.5 39.5 0.0 0.0 0.0 0.0 0.0 0.00 1 836.41 42.4 42.4 0.0 0.0 0.0 0.0 0.0 0.00 1 836.54 45.3 45.3 0.0 0.0 0.0 0.0 0.0 0.00 1 836.57 46.0 46.0 0.0 0.0 0.0 0.0 0.0 0.00 1 836.78 51.1 51.1 0.0 0.0 0.0 0.0 0.0 0.00 1 836.90 54.0 54.0 0.0 0.0 0.0 0.0 0.0 0.00 1 841.00 AAA. A.Abp.AAAAAA 110.5 110.5 AAAAAAzitibtib?ri?Si?hn 0.0 b??85ri?? 0.0 b8?S??? 0.0 ?bt;hi; 0.0 t?fifixfi?;Tfi 0.0 TTs??fiTfifi OVERTOPPING xTT?S?Ii???rifi ri AAAAAAAAAAAAA SUMMARY OF AAAbAA hk121 ITERATIVE A'4 ?bZ1 Z1??'? SOLUTION '?`flb'?11'flZ1'0 ERRORS `?`fl'?f1DIIII FILE: II21'nS1 '/? 30 '?'n T'n SST `n T 'n iT 'n 'n iT 'riX `n 'n 'n SST i(.. .• it i( St is .. DATE: 4/14/2008 .. HEAD HEAD TOTAL FLOW % FLOW ELEV ( ft) ERROR (ft ) FLOW (cf s) ERROR (cfs) ERROR 835.59 0.000 25.00 0.00 0.00 835.73 0.000 27.90 0.00 0.00 835.88 0.000 30.80 0.00 0.00 836.02 0.000 33.70 0.00 0.00 836.15 0.000 36.60 0.00 0.00 836.28 0.000 39.50 0.00 0.00 836.41 0.000 42.40 0.00 0.00 836.54 0.000 45.30 0.00 0.00 836.57 0.000 46.00 0.00 0.00 836.78 0.000 51.10 0.00 0.00 • 836.90 0.000 54.00 0.00 0.00 <1> TOLERANCE (ft) = AAQQL1'AA,AP.A`QQQ'QA'AAAAA'A'A 0.010 21'0'0'?'??b?'C1 D'?`?'0'n'o'?? h'o'$bSZiZi <2> TOLERANCE ($) fiti`dh71'niT'n`n'n'nfiT'n'n'n'nfi'n'n'n = 1.000 'n'n'n'n'nitfi fi'ri ic.... t. BJ BASIN I.D.: Culvert #30 (PROPOSED) LOCATION: Hartley Drive - STA. 40+67 • CURRENT DATE: 04-14-2008 CURRENT TIME: 14:50:45 PERFORMANCE CURVE FOR CULVERT 1 - 1( DIS- HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL FLOW ELEV. DEPTH DEPTH TYPE DEPTH (cfs) (ft) (ft) (ft) <F4> (ft) 25.00 835.59 1.59 1.59 1-S2n 0.90 27.90 835.73 1.73 1.73 1-S2n 0.95 30.80 835.88 1.88 1.88 1-S2n 1.00 33.70 836.02 2.02 2.02 1-S2n 1.05 36.60 836.15 2.15 2.15 1-S2n 1.10 39.50 836.28 2.28 2.28 1-S2n 1.14 42.40 836.41 2.41 2.41 1-S2n 1.19 45.30 836.54 2.54 2.54 1-S2n 1.24 46.00 836.57 2.57 2.57 1-S2n 1.25 51.10 836.78 2.78 2.78 1-S2n 1.32 54.00 836.90 2.90 2.90 1-S2n 1.36 E1. inlet face invert 834.00 ft E1. inlet throat invert 833.66 ft E • 2 OF 3 FILE DATE: 4/14/2008 FILE NAME: 30 3.00 (ft) BY 3.00 ( ft) ) RCP CRIT. OUTLET TW OUTLET TW DEPTH DEPTH DEPTH VEL. VEL. (ft) (ft) (ft) (fps) (fps) 1.61 0.94 1.43 13.31 3.95 1.70 0.99 1.52 13.62 4.07 1.80 1.05 1.60 13.95 4.18 1.88 1.11 1.68 14.14 4.29 1.96 1.16 1.76 14.47 4.38 2.04 1.22 1.83 14.61 4.47 2.12 1.27 1.90 14.90 4.56 2.19 1.33 1.98 15.03 4.65 2.20 1.34 2.03 15.03 4.71 2.32 1.42 2.10 15.53 4.78 2.38 1.47 2.16' 15.61 4.85 E1. outlet invert 830.00 ft El. inlet crest 834.00 ft ***** SITE DATA ***** CULVERT INVERT ************** INLET STATION 0.00 ft INLET ELEVATION 834.00 ft OUTLET STATION 130.00 ft OUTLET ELEVATION 830.00 ft NUMBER OF BARRELS 1 SLOPE (V/H) 0.0308 CULVERT LENGTH ALONG SLOPE 119.06 ft ***** CULVERT DATA SUMMARY BARREL SHAPE BARREL DIAMETER BARREL MATERIAL BARREL MANNING'S n INLET TYPE INLET EDGE AND WALL INLET DEPRESSION ************************ CIRCULAR 3.00 ft CONCRETE 0.012 IMPR SDT RECT BEVELED EDGE TOP (15-26 DEG WINGWALL) NONE ***** SIDE-TAPERED RECTANGULAR IMPROVED INLET *** FACE WIDTH 8.50 ft SIDE TAPER (4:1 TO 6:1) (X:1) 4.00 B-1 BASIN I.D.: Culvert #30 (PROPOSED) LOCATION: Hartley Drive - STA. 40+67 • • CURRENT DATE: 04-14-2008 CURRENT TIME: 14:50:45 FILE DATE: 4/14/2008 FILE NAME: 30 3 OF 3 ................................. TAILWATER ******* REGULAR CHANNEL CROSS SECTION **************** BOTTOM WIDTH 3.00 ft SIDE SLOPE H/V (X:1) 1.0 CHANNEL SLOPE V/H (ft/ft) 0.010 MANNING'S n (.01-0.1) 0.035 CHANNEL INVERT ELEVATION 830.00 ft CULVERT NO.1 OUTLET INVERT ELEVATION 830.00 ft ******* UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL FLOW W.S.E. FROUDE DEPTH VEL. SHEAR (cfs) (ft) NUMBER (ft) (f/s) (psf) 25.00 831.43 0.670 1.43 3.95 0.89 27.90 831.52 0.674 d 1.52 4.07 0.95 30.80 831.60 0.677 1.60 4.18 1.00 33.70 831.68 0.679 1.68 4.29 1.05 36.60 831.76 0.682 1.76 4.38 1.10 39.50 831.83 0.684 1.83 4.47 1.14 42.40 831.90 0.686 1.90 4.56 1.19 45.30 831.98 0.689 1.98 4.65 1.24 46.00 832.03 0.690 2.03 4.71 1.27 51.10 832.10 0.692 2.10 4.78 1.31 54.00 832.16 0.694 2.16 4.85 1.35 ROADWAY OVERTOPPING DATA ROADWAY SURFACE PAVED EMBANKMENT TOP WIDTH 40.00 ft CREST LENGTH 100.00 ft OVERTOPPING CREST ELEVATION 841.00 ft • B-1 C RALPH WHITEHEAD ASSOCIATES, INC. Consulting Engineers JOB: SUBJECT: Hartley Drive (3202) #30 - Buried Pipe 1 SHEET 1000W. Morehead Street P.O. Box 35624 CALCD BY: AMA DATE: 14-Mar-06 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: DATE: 1 Area of Buried Pipe Structure No. #30 Road Name Hartley Dr. Sta. 40+67 Determine the area of a buried pipe to the area of the designed pipe. GIVEN: Design Pipe Diameter (in) = 36 Buried Pipe: D = Pipe Diameter (in) 42 r= Pipe radius (ft) 1.75 d = Depth Buried (ft) 0.6 SOLUTION: Determine the area of the buried pipe. • 0 (radians) = 2 (arccos [ (r-d)/r ]) _ Atotal (ft 2) ° 7t r2 = Area of the Segment = ASeg (ft') = [ r2(0 - sin 0)] / 2 = Area of the buried pipe = Aburied = AP;p, - Aieg = CHECK: Diameter of area buried (in) = (4 " Aburied / 7C)0.5 = CONCLUSION: • Buried Pipe AreaAs 1.71 9.62 1.10 8.52 39.5 > 36 = DdeMgn (in) B-12 • APPENDIX C ROADSIDE CHANNELS • 0 ROADSIDE CHANNELS • DESIGN CRITERIA: Discharge ....................................................................................................................................10-yr storm Minimum Slope ................................................................................ 0.5 % (desirable), 0.30% (acceptable) Permissible Shear Stress (for Class `C' Vegetation) .................................................................... 1.00 lb/ft2 Permissible Shear Stress (for Class I Riprap) ............................................................................... 3.00 lb/ft2 Permissible Shear Stress (for Class II Riprap) .............................................................................. 4.00 lb/ft2 Flow Depth Flow depth is an iterative process using the Manning's equation combined with the continuity equation: Q = [1.486 A R" Sv2] / n Where: Q = discharge (cfs) n = Manning's roughness coefficient A = cross-sectional area (ft) R = hydraulic radius (ft) • S = slope (ft/ft) Shear Stress Shear stress is calculated from the following equation from HEC 15: Td=vdS Where: Td = shear stress (lb/ ft2) V = unit weight of water (62.4 lb/ ft) d = flow depth (ft) S = slope (ft/ft) The permissible shear stress approach was used to analyze the proposed channels. If the computed shear stress is less than the permissible for the particular lining, then the channel is assumed to be stable. The initial calculation assumes a class `C' vegetative lining with a permissible shear stress of 1.00 lb/ ft2 as indicated in Table 2, page 36 of HEC 15. If the "shear comment" column on the following spreadsheets indicates "FIX," then an alternate lining was used. • C-1 F LL' LL WO N 0 -- 0 c v rn ?? W W AS O ? c: o, L C] C1 > Cl co 6 L3 = ? C1 S O: co F- } r O u co m 0 [] u Sc a s u u • N 0Lr) 0 l11 r L N Z O M CO O o 0 +J N ? a L M1 C N N LLJ L) F W Z co C ? S O V) 0 J to L) ° v • C v L E N U L C N EL E a, E o v ra w = v N C L a? CL, O r v a? a F+ O C tU ?. V _ S L v E c 3t o? 1- to V tL d C Q L a m a a -? O L ; N u C N OJ •C t0 S LE E L .? m a z o v ? o 0 o ° co Y d L O J rn ++ C] c O L U a+ CC N O F- L p u O 0 O O C ] 0 o O O O O O O O 0 0 9 .1) ? N M .O t T r n O C. N P T r %0 In 6 0 0 ri ri m O m O r N n v rn M M N O O O O W 0 o tr r r` Ln CO Ln t` M t\ T N N ? M g : O N O Ln O ? O O O $ 10 C O O %D O O O O u•, rn a n .o u•, 0 0 0 .0 .0 .0 wi r+i r+i J Z O O N L N ? '0 ID 'D j O O In IT I j in Ln co co co C, C, 'D Ln O ti f n + n rn + 10 + 10 I .o .O 10 L a o p o G N N c _O L A of O W E ? O J LL `^ E o ;? ? N N u 4 N v O N • 0 0 7 7 I 7 vt ?? W W 1 H H n3 p p C' y 1- > C L] G? T C1 m 7 ?3 2 W = o. o u m m W O 0 [O L) Y Q V U • v Ln N CO 1 Y1 M N Z o M - co v w p o Q a U O N Q) Q L V N W N to CO x C N W ? Z c x ? 3 0 as v, o L OC U ? U 7 L O N P ID N W_ [l b a ? F L U C T N b ?D = L O 4/ E Z o v Q 0 o 0 ? 11 m C N L E N O V L C ar a E a E 0 0 u QJ v Ln - L CL . O ? R ? aL U o c W 4 L O O A 2 N I N i C N Q 41 O ' N N C E T L a a, 0 f0 a0.. Q d L CL u+ o a0 0 0 o In + o P .o c o t ? T LA O O W H CL I' N O A F- + N .L L 0 0 C O L u d L O D W E a O J LA E o ',s U N O O C ] ? C ] 0 0 0 0 0 O 0 0 0 0 D D O D O O O O O O 0 0 0 0 0 0 a, ID M m o0 O Ln to o0 In Ln [n ?n In O O O O O n n N f` f\ N N N N N W ? N P O h CG C0 O D N N N N N N 0 0 0 6 0 N M D P M .D In Ur .. P i Ln ui Iri vn ui n P P P ' u1 •7 7 N ?D N R N D N al 7 _ 1T N 0 0 0 0 0 X 0 0 0 0 0 P P P P P 10 0 10 0 10 0 10 0 10 0 O O O O O Ln v Ln 00 C; 0 0 0 of `• N N N N N U v o 0 V • APPENDIX D INLET/GUTTER CAPACITY • 0 INLET/GUTTER CAPACITY • DESIGN CRITERIA: Storm Event .......................................................................................................................................10 year Maximum Gutter Spread .......................................................................................................................... 8 ft Gutter Spread The "City of High Point Storm Drainage System Design Manual" set two limits for the gutter spread. The flow shall not encroach within 8 feet of the street centerline and the width of the flow shall not exceed 10-feet from the face of curb. Based on these limits the allowable spread on Hartley Drive is 8 feet. Flow Depth Using the maximum flow width and various slopes for the road, the flow depth and capacity can be determined. To determine capacity, the Manning's equation combined with the continuity equation is used: Q = 11.486 A R"' Si,"'] / n Where: Q = discharge (c.f.s.) n = Manning's roughness coefficient A = cross-sectional area (ft.2) • R = hydraulic radius (ft.) SL= Longitudinal slope (ft./ft.) To determine the maximum spacing to contain the flow within the allowable spread, the Rational Method and the maximum Q is used to solve for the spacing length. Curb Inlet Capacity All inlets are spaced to catch the 10-year storm event and so that the flow does not exceed the maximum allowable gutter flow. Furthermore, the spacing should be set so the flow is within the maximum allowable volume to curb inlets. Drop Inlet Capacity The capacity of rectangular grates for drop inlets is determined from an equation that relates the flow to head and opening area. Q = CA(2gh)"2 x (2/3) Q = Capacity (cfs) C = Orifice Coefficient (0.6 for square edges / 0.8 for rounded edges) A = Net area of opening (ft2) g = 32.2 ft/sec2 h =allowable head (ft) Yard Inlet Capacity • The capacity for the yard inlet is determined using the Chart for "Yard Inlet Capacity"(page 17-18, "City of High Point Storm Drainage System Design Manual"). D-1 • r W ILOL' N N co co O O a a a a P ? tii w O O lD O m y `° am= _ co = 4 °o V O ad N y N ? C V N_ ?- m m p o cc m w c c 0 0 m J W y=j ? U v • G V U ' =1 a = m u v C E E E ? E. m > R v a? L a r4 co z cn N 0 W M d Q ? C O O N N Q N i? O4 u W t2 N ? W c N c.n = a za 3 0 Qa' 0 c D D • x LZ G rCr ?' ~. O r N r M ?. 'IT r CD r h r aD r O N N N Ct N C W CO co O r n . in r r N M; N C ?: CD N M N C W ? O R. Q? ^ w O O o co CD N N 'IT O co M o w M O O O O M O N to N M co CO O to M CD to O O O o O r O r ?- O r r N r O O a O O C O C O O O C O 0 0 0 0 0 0 O o 0 0 0 o 0 r t?C O) N !? O W CD N LO ? N M co CD O OO UO (A CA N M to O N 0 M r U) N OD CA C, CO U) (A CD r O M O Cl) Cl) co O t` r 00 M. It It ti tD tD tc0 to to UO Cl) M M M ti M to 0 v CD v CD CD C/2 .0 R. CD r co O CD ti <n OM to co M h 0) M r N CA O LO V OD O Co M U Lo CD O N co 0) r N r N f` CO F- LO O I 0) Itt O 0 r` m r a) .- a o 0 0 - - o - r - 0 0 0 0 0 0 0 o r o 0 0 o L " ti a) co o M U') O Cl) CA LO CA N CA O O h CO) N CO O 1- Cl) to D) CD O CD N t[) . T CA O O co 0) O O) a) c0 co 1- lD W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r O O o 0 0 0 0 y 0 0 0: o O 0 0 0 O 0 O o O' O 0 0 0 0 0 0 O 0 O 0 O 0 0 0 01 0 . 0 . 0 0: 0 O' C) 0 0 0 0 O- 0 O 0 O 0 O- 0 ^ N N. N M. M M M Cl) Cl) M M M M O N O N O N. O M O M O N O N! O N. O' M O N O N O F O O O O O O 0 O 0 O 0 O 0 O O 0 O 0 0 0 + 0 0 O 0 0 0 0 0 0 0 0 0o 0 0 0 0 , p 0 O O co CO CD to to to LO co co CO CO O O o co u0 O , co . to ' 11- co 0) aO CA CO a) - O to O to O to ta ? M M, M M LO 0 in , 0 LO O II- O? r` :O h O. h O- 0) Itt 0) - a) ?t 0) M M . c M O . M O: v- ?t- M M M. ' O 0 O O O'. O 0' O q . O` O O O O O O O O: ' O: 0: O O O ' 0 0 Cl 0` 0 0 , 0 0 0 0 0 0 0` 0 0 0 0 0 0 0 0 0 0 0 vi y r O co CO N O h h t? CD CD h O) t- O M UO LO O O C7 O h M U7 O v O CO It CO CO r 4: CJ v F CD O h 0 O r N r Uf r O r . r . r N r O O O r r O O 0 r ? O r r r r r r N Cy r Lo o) O to to O N co M CO N CA M CA M h N U O C N U a CD CD O r CD N N r CO CD O CO O O 'IT O Ch V) to 7 O r 7 0 0 0 0 o r ?-- O r r r O O - 0 O O r O r r O r j a? ^ co I- (D O CO N M M C > L Co Ih CO 0 co h M N CO It O N O O C a- r N N M N ' co M N N ? N r r r N r N M r V IT M qT 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 6 O O O O O C O O Q 4 C N f, O ^ V N ' N . co N N N wt .D CT Ln ?"? O' r r N ri N CO N ..-:.O N M N N A • F w LL O N 2 CO Co Q C. n a a a v v a a 0 0 0 _ CO = LL o L) o ?+ N Q1 M, C F Co Co m w O D N V • O = lJ 2 IV4 tV Z ? r Cq N Co M Q p o O a^ N Cn a v oa LLi W C W N W Z 3 an d 7 O Jq U U ? D N o a OF 7 ? C U C (n E d > t m CL 0 O w S aL lei N V C Co O N Lo C O r N CO C O CD LO C r O CD 'D c i S - N N W M V V W M V V w to V V W Lo V V L y o ? F a w V Co - O O Co CD V O d' r r O r 0 CD O O O Co (` O O v cc I- m O 0 o r 0 O O O O O O a V ? M V Cf M N 0 I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 w O M h r Co Co N 0 01 V ti ti N N Co d' U) N O O " N m m Co M O t` N V h M 0 U) N O N N U7 N r N ?! ) N n V tD 6 V 0 0 N 0 v CD Co m 0 m In 0 0 U) 0 U> 0 U) CID O. w r O O a N r CD O a a a m O U) M O Co V OD C Co O O) M CA CD O Co m Co f? 0 V) Co CD CA OR I? OR CD Cq CY r r 0 o 0 0 r o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U) Co V M N CD U) O CD CO O O O Co U) CD N U) U) Co M W Co U) to m O to Co m O 01 a m O a to CD CD ti CD 0 0 1- 0 0 0 O O O O O r O 0 o r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 y 0 0 0 0 0 o 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 M N N' N N N N N N N N N N' N N. N N N N. N N N F 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a? M. o a 0 Lo LO a Ln Lo o U') in Lo o' 0 0 0 0 0 0 0 aD U) U) U). N h N rl- N N N . N t` ti N CD CD O (D CD to to (D C M M' CO a O O. O O 0 O O O O O M CO M M Co M CO CA 0 . O O O O O O O O 0 0 0 0 0 0 O O O O O O O O a 0 0` 0' 0 0 0 0 0 0 0' 0 0 0 0 0 0 0 0 0 0 0 0 N V N O O cD Co Co Co V N O O Co h O U) CA I` U) M f` O 4" O r ti r V M. 0 m 0 a 0 r r l Co 0 l M 0 0 CO N 0 U) o 0 0 CD 0 q r- CM r N r O r M r CM r N i a N O Co O O ~ O Co O V Co n O Co t.- O O N N O Co CO r W M CA CO r CD M Co Co U) qT (D M O r CD m Co t` Co o 0 0 0 o 0 o 0 0 0 o r o o o r o 0 0 0 17, Ca , C Co O . o a M O a O N CO to M ; a (D O CD CD M O O - C V N r 0 O . N N N : r r N r r r r M ' N N N r M CV N r ' O C C O ' O C C , O G O O C G O 0 6 C O C G O O A I-W Q ,6 ? Ov I,. V '. M Co O V m IT Ln V N M CT M r N V %D V N U1 :. O . W) CC V Cn • V ' m In 1n 01 V 'D V . S N N N M .. . M Q APPENDIX E STORM DRAINAGE SYSTEMS 0 • STORM DRAINS DESIGN CRITERIA: Storm Event ................................................................................................................................10 yr storm Minimum Time of Concentration ................................................................................................10 minutes Minimum Rainfall Intensity ........................................................................................................... 5.70 in/hr Minimum Slope ..........................................................................................1.0 % (for 24" dia. and smaller) Minimum Slope ............................................ meet full flow velocity of 6 ft/sec (for pipes larger than 24") Minimum Pipe Size ........................................................................................................................15-inches Minimum Cover ......................................................................................................2.0(1.0' for yard inlets) Time of Concentration If the water path to the inlet was less than 500-feet, the minimum time of concentration, 10 minutes, was used. If the length of the water path exceeded 500-feet, the time of concentration to the inlet was calculated based on the "City of High Point Storm Drainage System Design Manual". • Rainfall Intensity Rainfall intensities for storm drainage calculations came from the "City of High Point Storm Drainage System Design Manual," (Pages 9). Rainfall Runoff The Rational Method was used to estimate the rainfall runoff to each storm drainage system. Pipe Capacity The pipe capacity can be calculated using the Manning's equation combined with the continuity equation: Q (cfs) _ 11.486 A R213 Slit] / n Where: R = Hydraulic Radius (ft) = A / P P (ft) = Wetted Perimeter of Flow A (ft) = Flow Area S = Slope (ft/ft) n = Manning's Roughness Coefficient • Hydraulic software, Geopak Drainage, was used to analyze and determine pipe sizes for the closed systems. The software uses the Manning formula to determine the hydraulic characteristics of the storm drain. The computer program's internal design preferences and drainage library were set to the City of High Point design standards. E-1 RALPH WHITEHEAD ASSOCIATES, INC. ?j' ? Consulting Engineers V 1000 W. Morehead Street P.O. Box 35624 Charlotte, NC 28235 (704) 372-1885 Construction Storm Drainage From Structure To Structure pipe Pipe Structures Elevations Elevations Diameter Length Slope From To Top Invert Top Invert (m) (ft) SYSTEM -A 37 231 JOB: l ai`ft Qq.V 3Z0yU0t) SUBJECT: Storm Drainage Design CALC'D BY: :f DATE. : -t CHEWD BY EJV .`: DATE: 1ES-? Remarks 1 SHEET OF 2 C#3-?b x:33-"?1 U"J4,fFl :'ts4?J.gt4 L2533.Y3. €' 1}itldUV J6< ?? I,r3o 51-16A C8-16 852.93 850.72 854.43 850.54 15, 18 1.Q0 C8-17 C8-18 853.51 847.00 84519 < B4C136,, 36 220 3.02 Of-17A CB-17 85200 848.92 853;51 1.84.8,75. . 15 17 1.00 CS-18 PO-21 845,19 83907 :8385Q:: 637,00 36 44 4,70 SYST EM - B CB-20 PO-72 933.47 830.89 >$1 Q .7 : $t)3:50 15 96 21.76 SYST EM - C CE-19 CB-29 839.43 836.35 830 SD:: $ 5 :: ; 1 a 155 5.70 C8=21 PO 22 830.50 827,42 813.25 8'12 DES:: 15 80 35,27 SYST EM - D s:24 • E-2 RALPH WHITEHEAD ASSOCIATES, INC. Consulting Engineers V 1000 W. Morehead Street P.O. Box 35624 Charlotte, NC 28235 (704) 372-1885 Construction Storm Drainage Strucures From Structure Elevations To Structure Elevations Pipe Diameter Pipe Length Slope From To Top Invert Top Invert (m) (ft) B-28 CS-29 834.21 831.13 834.21 830.70 15 43 1,00 8-29 CS-27 834.21 830.50 826.93 <829.85 ; 15 289 334 SYST EM - E B 31 CB 32 845 33 842 33 844 7n 841 7D ' 15 41 1 54 JOB: Hartley Q J. .e 320X100 2 SUBJECT: Storm Drainage Design SHEET CALC'D BY: HSB DATE: 10 Ma.:8 OF CHEK'D BY EJ DATE: V) Mar 0K 2 Remarks CB-32 CB-34 844.70 841.60 644,17 840,78: : 15 57 1,44 CB-34 CB-36 844.17 840.68 848.88 540.DD 15 49 1 39 CB-36 PO-55 843.88. 840.39 84-2.25: !840 OD 15 29 1.34 SYST EM - F CB-38 CB-39 642.30 840,06 -841.96 838.88 15 ' 28 4,21 GB-39 CB-41 841.96 838.68 840.711 836.68 15 198 1.01 CB-4Q GB749 841-00 837.92 84077 836.78 > 15 32 3-56 GB:4;? . 8Q 77, . :36.58. &40,02 3.35,08 15 ; 15Ci O$-42 P? 56 S4» ik2.: $3 JB.: B35 25j : 833 0 1. 15 148 ! i3Q SYST EM - G :13-49 CH-4G ? 839.3fl ? t SYSTEM - H ;13-50' CB:. B43.68 1 ;8-51 RO-50 844.17 2 .13-52 CB-53 652.60 i B-53 ? CB-51 852.37 i SYSTEM - 3E-54> C8-55 854.00 ?i ;13-55 PO-73 859.95 i SYSTEM - J >$ 56 PO-BD 855.24 !1 SYSTEM - K i 838.79 15 101 3 810.25 R09.00 15 > 72 i 837.94 832.18: 15 30 2 837.94 832.16 15 99 2 !838,79 834.86 15 ' 100 944.17 , 639.98 1$ 62 3 U025 a38-25] 15 66 2: 852.37: 848.82: 1 15 7D I :Rrq 9t, I`RaF ';R :I ?'85 t;25: 85f ,00 15 ! 77 j `2,79 i 843,48 635.89 24; 35 2,78: r 843.04', 837.64'. 15 32 4 i:3 i :83O,55 830,55 36 37 14;43 E-3 RALPH WHITEHEAD ASSOCIATES, INC. JOB l artley Q&6 3.220200.0 1 W L-(?T-v Consulting Engineers SUBJECT Storm Drainage Design Data SHEET 1000 W. Morehead Street P.O. Box 35624 CALL D BY ?i5@ DATE _ 1i3-Illca608; OF Charlotte, NC 28235 (704) 372-1885 CHEKD BY DATE 1fl rear D$ 2 Engineering Storm Drainage Schedule-1 Structures Drainage Basin 10-Year Flow Full Pipe Full Pipe Basins C Length Tc (min) Intensity Capacity Velocity From To Inlet Pipe (ft) (in/hr) Inlet Pipe (cfs) (ft/sec) (ac) (ac) (cfs) 1(cfs) Remarks SYSTEM - A C6-100 CI-101< 0,06 a05-11t, 95 81 10 &7 0.43 0.4.3*-.-'. 6.41 5.22 G1-101 CB-102 0.116 0 19;. -0-65 81 10 5,7 0.60 1 D3 6.28 5.11 CB 102 CB-I03 0.26: 0.45 !0.95 957 30 57 1.41 .2438 6.32 5.15 CB-103 MH-10.19 0.64 0,95 125 10 57 1.03 3.35 6.28 5.12 MH-1 :: CB-2' Wa' 0,6 Wa n/a 10 5.7 n/a 3.35 " 6.28 5.12 CB-2 3B-4 016 0.80 0.95125 10 5,7 0.87 4'.'6{320.81 11.78 C13-3 CB-6 0.15 01.15 ti.95 125 10 57 0.81 a.81 12.22 9.96 CB-4 CS-7 017 0,97 'fl,95 180 10 5.7 0.92 4.92 13.57 7.68 CB-5 CB-6' 0.13 0,13 0195 350 10 57 0.70 070 7.03 5.73 CB--& CB-9 0.13 0 .41 ().951 180 105.7 : 0.70 2,19 `r 9.78 7.97 C5-7 CB-9 0,28 6.05 0.95 240 10 57 't ! 1.41 28.93:. 5133 7.26 C>P-BA MR-8 0,02 0,02 0195 60 10 5.7 !' 0.11 .0.11 18.57 15.13 MH-8 CB-7' n/a 4,82 ( W a n/a 10 5.7 n/a 24167> 39.85 8.12 sB-9: CB 3D 0.27 6.73 ss0.95 24010 5,7 1.46 32.15 69.45 9.83 EX-9th MH-8 4,80 4,80 0,90 450 10 5.7 24.62 24 S2". 65.02 20.70 CB-10 CB-12 0,29: 7.43 0.95 210 10 53 ! 1.57 9459> 54.70 7.74 G1-11CB410 0.41 1141 0.65 54 10 5,7 1.52 ..1.52! 18.11 5.76 CB-12 CB-14 0,38 r7,81 0.95 140 10 5.7 2.06 3618:: 51.23 7.25 M-13 CB-14 0.27 0,95 210 10 5.7 1.46 1.dfi>8.78 7.15 . C`B-14 CB-15 0,22 0,95 280 10 5.7 1.19 37 971 51.23 7.25 CB-15 CB-16 0.33 0.95 170 10 5,7 1.79 39.1352.19 7.38 CB-16 CB-17 0.33 0,95 150 10 517 1.79 4D7p 93.40 13.21 G4-16A CB-16 0,16 0,16 a.55 150 10 53 0.50 0.55::: 7.08 5.77 C8-17 CB-18 0.29 9.58 03.95 150 10 57 1.57 42.25` 125.86 17.81 G3-17A CB-17 0.17 0.17 0,55 145 10 5.7 0.53 0.53 7.02 5.72 CB-18 PO-21 0.23 9.81 0.95 220 10 51 : 1.25 43139:: 157.00 22.21 outlet into Pond 1 s _.._.. SYSTEM - B CB-20 PL)-72 OAS 0.18 ! Q-95 .::254 lo 5.7 0.97 6,9.7_ : 1_6_.3.8_ 13.35 Energy Dissapator: Riprap d5D=6", L=7ft, W=8.3ft SYSTEM - C CB-19 ICS-.2-1i., 0.36 fl 3,6 0 95 300 10 5,7 1.95 1:95 ' 16.74 13.64 CB-21 PQ-22 014 0150 ' 0,95 153 10 51 a 0.76 '2.69 ' 15.41 12.56 Energy Dissapator. Riprap d50=6", L=6ft, W=3.7ft SYSTEM - D CB-22 CB-24 0:27 0,27; 0195 26B 10 5 7` 1.46 1 ". 6 13.84 11.28 C8-23 PO-56 0.40 2.52 >0.95 112 10 5 7 i' 2.17 12 $&; 56.39 17.95 Energy Dissapator. Riprap d50=8", L=17ft, W=19ft CB-24 ,CB-23 018 2,12 0,95 ss112 10 5.7 0.97 1079 24.68 7.86 G1-25 ('CB-24 13.18 0.18 0.55 Z30 10 5,7 « ! 0.56 058 22.16 18.05 GB 26 CB 27 01.36 0.30 `03.95 300 10 5.7 1.62 1,82 20.68 16.85 • CB-27 tCE-24 629 11+19 0,95 300 10 5.7 1.57 7 9Z 11.44 6.47 CB-283 CB-29 0.42 03.42 0,95 300 10 5,7 2.27 22r: 7.04 5.74 [I CB-29 CB-27 0.48 0,90 0,95 450... 10. 5,7 2.60 4 85. 12.82 10.45 E-4 RALPH WHITEHEAD ASSOCIATES, INC. "77/7 Consulting Engineers 1000 W. Morehead Street P.O. Box 35624 Charlotte, NC 28235 (704) 372-1885 Structires Drainage Basis Basin 10-Year Full Pipe Full Pipe it V l From To Inlet (ac) Pipe (ac) C Length Tc (min) Intensity (in/hr) L P Capacity (cfs) oc y e (ft/sec) Remarks SYSTEM -E CB-31; CB-32 . .O,DB 0 08 0 95 : kQO .: 10 5 7 0.43 0,43 f 8.70 7.09 CB-32 CB w34 0.10 0.181 0.95 100 10 5,7 0.54 09 >" 8.39 6.84 CB-34 C6-36 0.69 0,87 0.95 100 10 5.7 3.74 `4.66 8.29 6.76 CB-36< '0-55 0 48` 1.35 0.95 100 10 5,7 2.60 7.20 8.17 6.66 Outlet into Pond 2 SYSTEM - F CB-38 ' CB-39 0.26 0.28 0.95 280 10 5.7 1.41 1.43 14.33 11.67 CB-39 CB-41 022 0.48 0.95 280 10 57 ! 1.19 2.59 7.05 5.75 CB-40 CB-41 123 0.23 >0,95 200 10 57 1.25 1.25". 13.35 10.88 GB-41< CB-42 011$ 0.89 0.95 200 10 5.7 0.97 4,70 7.01 5.71 42. CB PC)-58 0,15' 304_: ;0,95 150 3f1'. 5.7 0.81 5 43> 7.02 5.72 Energy Dissapator: Riprap d50=6", L=16ft, W=7.7ft . SYSTEM - G CEi43 G13 ?l 05 D 23 ;;0.95 138 3`0 5.7 1.57 1 -ST: 11.85 9.66 CB-44 6.'&46 0 { 0 f : .>0.95 288 10, > 5.7 ' ` 0.70 070 6.99 5.70 u6-45 PO-47 0.1E 1.18 0.95 70 30 5.7 0.97 S. © 19.85 16.18 Energy Dissapator. Riprap d50=6", L=18ft, W=8.5ft CB-46 CB-45 0,1$ 0.53 0-95 70 10 57 0.97 -272.;: 20.10 16.38 C548 CB-45 0.20 10.20 10.95 252 10 5.7 1.08 1 AB > 13.48 10.99 CB-49 CB-46 020 020 0.95 252 10 5.7 1.08 1.68-1 8.18 6.67 SYSTEM - H CB-50 CB-51 0124 0,241 0.95 240 30 57 1.30 1-j' 7.03 5.73 IC5-51 P0?50 0.23 1.18 0.95 240 10 5.7 1.25 S 32. 10.66 8.68 Energy Dissapator: Riprap 60=6", L=1 Oft, W=11.3ft CB-52 CB-53 0,36 _:Q,36 0,95 240 10 57 1.95 1,95 ; 7.04 5.74 CB-53 CB-51 0.35 0,71 0.95 350 10 5,7 1.90 3.87 13.34 10.87 SYSTEM - I GI-54' 'CB-55 13.96 06 0.55 140 10 51 3.01 3.03 ! 7.09 5.78 CB-55 PO-73 0109 11 ,05 0,95 350 10 5 7 ;: 0.49 3.49' 6.04 4.92 Outlet into Pond 3 SYSTEM - J PQ-80 D.3 0.3 < 0 95 300 30 5,7 1.62 1.6.2 11.74 9.57 Outlet into Pond 3 C5-56 ? SYSTEM - K CB-33 EX-75 0,20 0.44 0.95 53 10 57 1.08 11.66 9.50 CB-35 C6-33 0,24 0-24 0.95 50 30 5.7 1.30 1.30 50.23 15:99 FX-75 Pn-76 nla 0.44 n/a n/a 10 5.7 n/a 2.38.: 593.56 47.23 Energy Dissapator. Riprap d50=6", L=611t, W=4.4ft E-5 • APPENDIX F BRIDGE DECK DRAINAGE 1? 0 • • • BRIDGE DECK DRAINAGE DESIGN CRITERIA: Rainfall Intensity ............................................................................................ 4.0 in/hr (maximum drivable) Design Spread .......................................................................................................... 8.5 ft from face of curb Spread Spread calculations from the following equations from HEC-21: Q = (0.56 / n) SJ'-' Where: Q = Lo = L= WP n= C= i= SX = S= T= 7 S0.5 T2.67 & Lo = (43560 Q) / (C I Wp) Full Gutter Flow (c.f.s.) Maximum Distance to First Drain (ft.) Length of Bridge (ft.) Width of Pavement (ft.) Manning's Roughness Coefficient Runoff Coefficient Rainfall Intensity (in./hr.) Cross Slope (ft./ft.) Longitudinal Slope (ft./ft.) Design Spread (ft.) For deck drainage 6-inch scupper drains at 12-foot centers will be included to help maintain the gutter spread. The scuppers will be eliminated in areas directly over channel. F-1 RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 1 ? Consulting Engineers SUBJECT: Bridge Deck Drainage/Spread SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 19-Jun-07 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: DATE: 1 DETERMINE IF BRIDGE SCUPPERS ARE REQUIRED GIVEN: Length of Bridge Including Approach Slabs (L) = Width of Pavement Contributing to Gutter Flow (WP) = Manning's Roughness Coefficient (n) = Bridge Deck Cross Slope (S,,) = Rational Runoff Coefficient (C) = Allowable Width of Flow, Spread (T) = Design Rainfall Intensity (1) = Longitudinal Bridge Deck Slope (S) = Proposed Posted Speed Limit = Average Daily Traffic (ADT) =r SOLUTION: • Calculate the Maximum Allowable Distance to the First Scupper (L°). 24393.6*S„1.67*SO.5*T2.67 L = = 862 ft. ° C*n*I*Wp Calculate Actual Gutter Spread (TS) at End of Bridge. 2.67 C*n*I*Wp L _ 59.816 TS 24393.6 * SX1.67 * S1.5 TS = 4.63 ft. TS < T ======> SCUPPERS ARE NOT REQUIRED E BridgeGutterSpread. xls 200 ft. 30 ft. 0.016 0.0208 ft. /ft. 0.95 8 ft. 5.50 in. /hr. 0.0490 ft. /ft. mph vehicles F-2 APPENDIX G OUTLET PROTECTION • 0 Ou*Iet a I 3 ' iarnet¢r f S B3 g La - " Y i }``?4 R v b 40 30 20 r -LL T A, ' IT 3 _ 17 D sCha r en, -2 ,f' ''nr '7n S a. • e :. ---i - _ .'n-I.? on5 _: ° _°_Y071 `. n se a :m CC A -I • • sG is l i ou'llet o { ° tea. r i t 40 b>: h ME H L r ?,+1 13 ZD 40 .oo Discharge (tt3,S_?r) -h e .. v _ ?_°_ Bey--.:.3 • 1.303 ? f1 'Po --Ia S}vcaiov, 3 v 6 -,-T ENERGY DISSIPATOR TO SHEETFLOW CONDITIONS -a outiet i ` - 5.3 • 0 2n TO 3 z la ao i ? 3 t 2 J v ds ?o ?? 7 - Q;z 5? on 31-r (PQ ?_-r 0 ENERGY DISSIPATOR TO WELL-DEFINED CHANNEL. ?L ? i i pipe I 3rr .? _ La t 3 s ?. S f' ? ?. ! a f tlo I? • --iii ?; 3 5 Discharze ? M' zta? ] .. :sa t'? can _Tjr iaS_i S M y.t La`.. .=? .-,-y .. _ , • ?s i a m 1Do» G-N Outiet pipe ti 3TT'a?tSf 1?S± ``? ---La ? !y yam,` ?,? 19 1 -`-. l C'"' 1 i -:.j #..??., S i f 4 ? _ ?_ n 4 ? •Y .l?U ,r ?? "tom ? 1 It Z3v Boa DDO, ?15C`:n w° I:?"1S?C} snurnes ash. su V 1k°_ at on i vy _^.:1l. C4 -? • • E f W J9. L3. Outlet ar ter e.„ .? kk) 01. t, 30 z? ?J i30 Discharge 01 l ? V j o 3 3 n} JS .a b' ...? L?^.. to ene:'R,. Sou--:2 USDA 30? ?0 --I G 1ot-3o ?.T • ENERGY DISSIPATOR TO A WELL-DEFINED CHANNEL. ~u T { } fy ?w i"i'?^ w I • is s' 9D 70 a4 Yom. ' .E,. l 6V ` f r { 7 3fga S_`. t``- .t ? Se ?? rte- ?g 5ju-t-I chn 5 t+ RD , -1-- 0 ENERGY DISSIP TO A WELL-DEFINED CHANNEL tI .tfot v3 # t_ PE:)°- 1 L i 1 Le ; I 1 r LAD= ? Lei,_ (Coy • 3 • ijW ? '0 a 60 t E - Jul ire Discharve t; *s<s C .. ..? ...?.. a....;('....?? .?.: ? .-. ?.?i.? ?_?? ? ?Lv. .. ... `. .sue ' v. .. ...._1T ?..?}?.. ..w.i4t?i j:......a ._. Y.. ..d and ?n a k CA -I - ENERGY DISSIPATOR. • TO A WELL-DEFINED CHANNEL T Tai lw Or > tit 133: f 1 .c s r? i F s ? 5O r L 41 rv _ ._ 4 n? j J •, i _ p.. jj1W 70 s t i 60 - --1 7 a's i s .1 { bvL .fL ?f '? ?f.?-...?? ? ?? ? ., # 7• X111 -•.? t ttt _?'gt.(' AJJI F ? ? N 3 5 3 50 100 333 <3J X333 Discharge (f*3•sec) eneTrg'y • 6 TH vp- 50 5? 55 + Lts -?-T EENG T SHEETFLOW CONDITIONS pit w Grp ` = °-a PiDe eC c at- .3 .u r?7 Discs.--ge `?sac 77 • __ h J /ts _ 1 n - 73 EER Y I PM O - • T HEETFLW CONDITIONS. 3p o 3 = ..1?F T• }?3. D 90 pipe i?^s `4 7-7 1, P AR 5 i?-• ?y r 4 3 b ?. t b - F _ W _ 7 7_1 I cLf i3a 230 Soo 003 3 j 1? 2 Discharge (ii?'Sec) • _I J ENERGY I IPAT • TO SHEETFLOW CONDITIONS 3p, r i ! 1 w ° vp' } rD v Uii $"t -ar-,etor cb- PEE It-1 J, 40 ?.. ?' 20 • {.j. D...~? ...? .:?, ??_ '` •6My. i ? t j} .. i 3 i. i.. i,_ i...; .i,• •; ? ?"'?i.? 1 ?/} !. Tit 1 L i f E 20 3 r (ischc o? s.`sec) • -?? w .. -. .. .. .~: ;1.?? i?a:.y.. .^x.13 s0Wr _ ("-l:a • • 0 Fo--70 x4-13 Z7' ENERGY DISSIPATOR TO SHEETFLOW CONDITIONS ?MJ i c P } } vUii°t l poe wJ met or ilua`?r < MCC An 2-0?5 C s 13 Ja? Mc e?:.=an a n_" .a anti _7-Y b b hao. L) .., :Dot) • APPENDIX H SEDIMENT AND EROSION CONTROL DETAILS LIST OF DETAILS 1. Standard Pipe Outlet Erosion Control Device 2. Standard Silt Fence Detail 3. Standard Stormwater Inlet Protection Measures 4. Standard Temporary Stone Ditch Check 5. Standard Temporary Silt Check Dam 6. Temporary Construction Entrance Detail • 0 • • • 0-N `HOI31`dd r 04 SA`dMHDIH JO NOISIAIO NOIlb'laOdSN`dkil d0 '1d30 S13unO 3dId IV ddd dId dOd 30Ine dNIlObb'0 H1dON W ti d0 31`d1S HOd ONIM` 80 adVONd1S HSIlON3 N ? a ru. All, V C m N n N Oq °q OCJ o I a CA) ? z O r N N v r N GNq m M co O W r fo to 3 V N M a ti r r N N c o a In t o to W ? a ru? O °C CL w s L- C t!'l h T T (D N N O N m Cyi? ? co z T r cm W in t` O U ~ ro. 6 to N O O N O O O N to m p Q m, T r N W M to (p N CD T 2 a = N ¢ o N cg It r- r to o m cg o ° ? ? r N N M v v o H (A H H D CA Q 3 0 to r` Q+ r N N m ? (OD ? CrD N ? F to W A ~ ad 0 ¢ a to ti O v N N M m vyi z N N M to CO r r O U ° T T r- N CM M V v to mo ll ° x Q STATE OF NORTH CAROLINA DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH, N.C. K Q U. c\I y W O a Q IL IL o¢a J Q H lS Q m M ••Uyy W W N 00 zta_vc> W g x 0 W a 0 Q a ° JI \ a. m C0 z O H U W ,C,/ a1I z Z J a a z 00 ~ W N + co w nWs Q ~ °0 ~ w y V) uj Z -j O 3 2 Luz 1.4 z W 7 LU :D W 9L IL co LL Q¢ 0 °a° a"D¢ LY o x a --co ?N Oco y d. y y ¢gg tS U U as H toN S r r 2 1 ? Ft- / i ENGLISH STANDARD DRAWING FOR GUIDE FOR RIP RAP AT PIPE OUTLETS ?N O Wh W co y it % E • • 'O'N `H0131VU S,kVMHDIH AD NOISIAIO NOIiVidOdSNVdl J0 '1d3O VNIlOUVO HiBON JO 31ViS ?- w W LL H 43: F- 2 ? ? O H = 3H IXQ co co El O W LL Z J W F- 0 LL W? Z r Q W M W J J ? Q H 2 co Z H g O U o° Ln ? Ln Q J J O 2 F- en STATE OF I/-UE NORTH CAROLINA DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH, N.C. 3ON3d IIIS AUVHOdW31 80J 0NIMVU0 CUVONd1S HSIlON3 -III N I- ? ]] CL Z III L --- U) m ° ---, U ------ Q LL Z W I U. x 1 -----------------: O F- 1 o OZ O I v+ cH I -L Z f CD WW II X ? J H LL cc - Q W W U w a _ m W U ? W F- J H LL W W Q LL O > co m 2 Z W Co \ LL ZN m co W O W Oa 1-4 r QLQLa-z W J ?QI=- u0:t0 W W W CD - M3 W LQL F=-~= ?Q} ?OF-?L=F- La w ~}il9 Z J W Q F } m W W 31=-Z0LLLL~W F-w"Qc~i? cAW OJHW<ODUO W W W CA?fDU0maLliCc LL J O ZLLa LL?" LUZ Z F?Oco OQ? co< ENGLISH STANDARD DRAWING FOR r LL TEMPORARY SILT FENCE ° O W t°G y r T O O 0 O T .7 • • 'O'N `HJI31VU SAVMHDIH 30 NOISIAIG ° NOI1V1dOdSNVd1 30 '1d3O F`N VNIIOUVO H1dON ,3, 3dAl dddl 1N3WIa3S 131NI )13011 W 30 31ViS 9 _ 803 ONIMVUG OUVONV1S HSIl9N3 r W Z J O Q 14 N < 3c ¢ I X O v mz J W? LL UL cn CD U J W fD W CL fy a .o ..o......n W a ? >- Z ¢ L p 1' m W N cr cc w I W W Z O 'K J a H V W III LL y III v LU W N D O .° D O. . D. O w- C3 ?. z T Z p. °. N N O do. ?? } y N z y O. O O. O LL c Z O 0 o =n ° . of U CD p M w J Cy W z W. a ¢ 3= =W W ~ M CD 1 LU Z •NZp 3 NJ2T'c03m o 0 _a¢ ? o? =Zw8} =F- F W N •=Zf-N¢ILL Z fA CAy?Z XXXX Z z 2 OJ W 3 W a 2 J a ?- W z ¢ V W O O LLO O Z W= J Z Q Y a O 0 W O ?¢HLU"LL F LnZQ CT?nnCL 0WIL 30FMLL JCn Wes' 2]LuO02JV0W W W d O?acc m0-1 wcnF ZCNa=WMo? <ZLoa COW W W W Z g Z w= w Mw = W Q_• Ww W=? w WZ"(0- 1'-Jd7 FZ)==W a?W7i-+p71n 0cn z m 2 aF-O fn -Oa O = w w J Q - W W nQ a 3 X> 3 mz 0 .y O'O.• Q'O.' ?0.' N 00 J LLJ W M Z" a o o ,.. ?.. a z W a C =? . d a I W W z N 0 0:. ? J a V c v I U.3 F W p ?. v o ...,..c O:' z w H :Q p ? o 61 0 a 1 a NN z? J O W O Q ? ¢ pZ yu STATE OF 7-06 ENGLISH STANDARD DRAWING FOR M NORTH CAROLINA ROCK INLET SEDIMENT TRAP TYPE 'C' U. c DEPT. OF TRANSPORTATION - N DIVISION OF HIGHWAYS ~ M RALEIGH, N.C. W y =r N it 'f • • • 'O'N `H9I31" L N LL ¦ SAVMHDIH JO NOISIAIO O NOIld1HOdSNVdl d0 '1d30 `dNIlOUVO H18ON 3dAl N33H3 IIIS NOOV AUVHOdW31 c? JO 31`d1S UOd ONIMVUO OUVONVIS HSIlJN3 N z a x O S F- W O U. w0 ZZ LL 0 co W O LU a H ' W Z J 0 1.4 fA z N O U) CL N 0 Lz N F. OZZ F- W J Q OZ " W m x a U w - W Z ra _ to N0 O F-F-Q OZN H a YCA Z U UH W CD W I-W0 V) 2 Z p NJ O z Cc C) w LL W I- ¢ H 00z iww ° Ha _ z Q fn LL H Q9 f/) N N W Q¢ r O W Z rcw m j WO mZOQ U>- W m \ LO m H W LL I- / W f f1Q 0(L 0 J W UU) W / U) Q z t Q O 1f) H to ft " Q W • U J J -J LU ?- Z v O0 U W Z W = y 0 g 9 F-0 a W Z N 09 H-00 no< m p - LL Z O W F f9 O ~ L S ' Q Q W t a ? < a ? a y LL F Oct) O < O yJW O a mN >' V W O N H •2 ? F- W f< i- p w 0 fq J U ¢ W Z O H N W CO) N N O V S V H H O W UJI s O H H ? H O w O W V Q Q F- STATE OF 17-06 ENGLISH STANDARD DRAWING FOR NORTH CAROLINA TEMPORARY ROCK SILT CHECK TYPE 'B' o DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS w RALEIGH, N.C. co r ?1 A • SAVMHDIH JOINOSIAIO o NOIlVldOdSN`Ul 30 '1d30 F `dNIIOUVO H18ON Vv 3dAl Wda lN3WIa3S )110a ANYHOdW31 JO 3l`d1S 803 ONIMVHO OUVONViS HSIl9N3 J O F 2 J O 16 Q ¢ p U H y • i J Q 2 H U 2 0 O Z LC U- N Z ? O O O t- LL CD F- Z CL t- w Q in 2 N O CL 0 w z J w 2 O W d: = z 5 w w O O cn Uaac g c; U Z Z O W Z W W W W 2 > W0Z GAt-?0 000 000 J Z w 0 Q Z W 0 W W Z O co F Y co) U N J 2 O z N O r U STATE OF It-up ENGLISH STANDARD DRAWING FOR r C NORTH CAROLINA TEMPORARY ROCK SEDIMENT DAM TYPE 'A' DEPT. OF TRANSPORTATION r DIVISION OF HIGHWAYS W cv) RALEIGH, N.C. = r- i4_r, • • • 'O'N `HDI31Vl T r SA`dMHDIH JO NOISIAIO NOIlViHOdSNVHI 30 ' 1d3O VNIlOUVO H18ON 30NVHIN3 NOI onHISN00 13A` UB W ? JO 31ViS a0d ONIM` UO OUVONV1S HSIlON3 r w N W N 0 J O ?- N W J W Q 0 F - CC: Q O J CL U) C0 LLJ ? Z CL Cl) W N 2 U) Q O O J W CO 1-4 W W O Q 3: W Z CA H? Q C3 U tN-4 = W W 2 0 Q F- C= O f- =0mQ ¢H0 w Q F- O O J W Z N Z f-N? U» O W W O OOW2 2N? U Q M F- ?Z F- WW •0 U W •"M0LU Z== CC CCU LL " W ZmWF- w W ~ ? W CC: LL >JOLL Z W ZZW = 000020 0?O OHS Cn =H F- F-- "Z U0F- Cn aLu 0 :O>-U¢Y LL WO D O>ZJ JmCAU O CC H F- NLLomw=CAW WO Q ?0?f-NYQM=V OHw CC CAH W UCAUHZo H Z ?-F- ZWcAQ?OZF- F }O Z 0 OQNCCF-2U~W Um CAW " Z=C -?O ZJLLO on w z Q?-Z CL-i"LL100 - J W' Z CC =w"=o< > W W Zal I ? F-ZQOF-HCLQCA[LU?N C9 f- ZOm =mxC -WZZmwZ w u 0 o w oz <<=WW W WZMF- ? H WZ WQ ?CAWJCA`°4?QWW00W=F-JW a-iYF-J YO?ZF-CLo-•?F-WWUS >UQQM- " QQ >Zm0 F' ••OOU QCC}wUJOHm W CACCCCO}m=w JOJCCQ?WCA} ?CLF-Jm?F-CL?UJQCL?ZO70CCF O Z r N 00 l!) O yo ?y c' w F- Z CL 0 0 Cn z Q Cn cA z Q N J U CD W Z O F- Cn 2 Q W Z W U r•i CL Q LL W F- J N LL W Q J CL W F- O Z STATE OF ` -"ENGLISH STANDARD DRAWING FOR r C NORTH CAROLINA GRAVEL CONSTRUCTION ENTRANCE • DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS W RALEIGH, N.C. y r