HomeMy WebLinkAboutNC0089699_Notes from ECT Meeting_20161130/Zolc �� Lrr-rn
IY
Sc's%,uc. 7 y
stlko�-4KAJ(� 6ryn r
sCPA- 61 Ao+ �pped, ---
___ _
S-yrm v)c�t-�r -
_.1 U ha - sum it
NTE/DEQ Meeting Agenda
November 30, 2016
Location: Archdale Building —9th Floor Conference Room
Time: 1:30 PM EDT
NTE Attendees:
Garrett Weeks — NTE
Ted Sullivan, P.E. — NTE
Christopher Wu - ECT
Bill Lester - LKC Engineering
Adam Kiker— LKC Engineering
• Introductions
DEQ Attendees:
Teresa Rodriguez, P.E.
Sergei Chernikov, P.E.
John Hennessy
Derek Denard
• Project description (By NTE)
o Project overview and location
■ Dedicated cooling and process water to be provided by Rockingham County
o Water balance
o Proposed schedule
• NPDES Permitting
o Qualification under NCG500000
■ NTE discharge is comprised of non -contact cooling tower blowdown and low -
volume wastes (i.e., reverse osmosis reject water, approved biocides)
■ Applicability of effluent limit guidelines/monitoring requirements
■ Schedule for receipt of general permit
o How are 316(b) requirements satisfied through the NOI process?
■ How does 316(b) review impact schedule?
o Can County serve as NPDES permittee?
o Stormwater permitting
■ General vs. individual permit
■ If necessary, schedule for obtaining an individual permit