Loading...
HomeMy WebLinkAboutNC0089699_Notes from ECT Meeting_20161130/Zolc �� Lrr-rn IY Sc's%,uc. 7 y stlko�-4KAJ(� 6ryn r sCPA- 61 Ao+ �pped, --- ___ _ S-yrm v)c�t-�r - _.1 U ha - sum it NTE/DEQ Meeting Agenda November 30, 2016 Location: Archdale Building —9th Floor Conference Room Time: 1:30 PM EDT NTE Attendees: Garrett Weeks — NTE Ted Sullivan, P.E. — NTE Christopher Wu - ECT Bill Lester - LKC Engineering Adam Kiker— LKC Engineering • Introductions DEQ Attendees: Teresa Rodriguez, P.E. Sergei Chernikov, P.E. John Hennessy Derek Denard • Project description (By NTE) o Project overview and location ■ Dedicated cooling and process water to be provided by Rockingham County o Water balance o Proposed schedule • NPDES Permitting o Qualification under NCG500000 ■ NTE discharge is comprised of non -contact cooling tower blowdown and low - volume wastes (i.e., reverse osmosis reject water, approved biocides) ■ Applicability of effluent limit guidelines/monitoring requirements ■ Schedule for receipt of general permit o How are 316(b) requirements satisfied through the NOI process? ■ How does 316(b) review impact schedule? o Can County serve as NPDES permittee? o Stormwater permitting ■ General vs. individual permit ■ If necessary, schedule for obtaining an individual permit