Loading...
HomeMy WebLinkAbout20050732 Ver 40_Stormwater Approval_20170823i 7ot water Resources I'ncinmmcncd QuBlib' August 23, 2017 Mr. Lee Bowman NNP Briar Chapel LLC 1312 Briar Chapel Parkway Chapel Hill NC 27515 Subject: APPROVAL OF STORMWATER MANAGEMENT PLAN Briar Chapel — Phase 13 Section 1 and 2 Dear Mr. Bowman: ROY COOPER (iuretvor MICHAEL S. REGAN S. JAY ZIMMERMAN 011 "t [r DW R # 05-0732 v40 Chatham County The Division of Water Resources (Division) recently reviewed the proposed stormwater management plan (SMP) for the subject project as required by Individual 401 Water Quality Certification #3567 issued by the Division on February 3, 2017. Submittal of the SMP satisfies Condition No. 3 of the 401 Certification for this Phase of the project and is subject to the requirements below. 1. The Division approves the SMP consisting of one (1) wet detention basins (ponds) and one (1) stormwater wetland and all associated stormwater conveyances, inlet and outlet structures, and grading and drainage patterns depicted on plan sheets dated July 26, 2017, which are incorporated by reference and are enforceable by the Division. The following conditions also apply [15A NCAC 02H .0506(b)(5)]: a. The maximum allowable drainage area for the approved Wet Detention Basin #33 shall be 662,805 square feet and the maximum allowable built -upon area within that drainage area shall be 341,446 square feet. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the Division. [15A NCAC 02H .0506(b)(5)] b. The maximum allowable drainage area for the approved Stormwater Wetland #34 shall be 79,797 square feet and the maximum allowable built -upon area within that drainage area shall be 51,544 square feet. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the Division. [15A NCAC 02H .0506(b)(5)] c. The approved SCMs shall be constructed and operational before any permanent building or other structure is occupied at the site. [15A NCAC 02H .0506(b)(5)] d. The SMP may not be modified without prior written authorization from the Division. [15A NCAC 02H .0506(b)(5)] State of North Carolina I Environmental Quality I Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919 807 6300 NNP -Briar Chapel LLC DWR# 2005-0732 v40 Page 2 of 2 e. Maintenance activities for the wet detention basin and stormwater weltand shall be performed in accordance with the notarized C&M agreements signed by Mr. Lee Bowman of NNP Briar Chapel LLC on July 14, 2017. The 0&M agreement shall transfer with the sale of the land or transfer of ownership/responsibility for the Stormwater Control Measures (SCMs). The Division shall be notified promptly of every transfer. [15A NCAC 02H .0506(b)(5)] f. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at httPs:Hedocs.deq.nc.gov/Forms/Certificate-of-Completion). [15A NCAC 02H .0506(b)(5)] Please contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.eov if you have any questions or concerns. Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: DWR 401 & Buffer Permitting Branch File Gareth Avant, McKim & Creed (via email) DWR RRO Filename: 050732v40Bria rCha pel Phasel3Sec la nd2(Chatha m)_SM P_approva I