Loading...
HomeMy WebLinkAbout20171061 Ver 1_Build Maps_201708231.INSTALL PROPOSED EROSION CONTROL MEASURES 2. INSTALL SPECIAL STILLING BASIN FOR PUMPED EFFLUENT (MIN. VOLUME = 120 CY) 3. INSTALL IMPERVIOUS DIKES AND 2@24" TEMPORARY FLEXIBLE PIPES FOR DAILY FLOW 4. INSTALL TRAFFIC CONTROL MEASURES AND DIVERT TRAFFIC TO ONE LANE OVER EXISTING BRIDGE. 5. REMOVE A PORTION OF EXISTING BRIDGE AND INSTALL TEMPORARY SHORING 6. CONSTRUCT UPSTREAM PORTION OF PROPOSED CULVERT INCLUDING UPSTREAM CHANNEL IMPROVEMENTS. AND COMPLETE ROADWAY IMPROVEMENTS OVER THE PROPOSED CULVERT. 7. INSTALL TRAFFIC CONTROL MEASURES AND DIVERT TRAFFIC TO ONE LANE OVER PROPOSED CULVERT Z �� � � �; O Q + �N�S �78 TB TB-�TB� � ,� ze � D�S N �REEK UNGE�/ re�_i te F 3 �e/% / ts� / �c� WOODS/ — / / G � � ��0�2 S� �\k ���N � � 45 gW j� � �- � C OOW DS " � ��� �� G G ��,� �y,\S��N�' ��; STILLING IMPERVIOUS DIKE WOODS — 11 � —�_� :M O RY W � FLEXIBLE PIPE IMPERVIOUS DIKE TEMPORARY SHORING �W w` � X� OX �O � � \ \ � . � . . � _ WOODS PROJECT REFERENCE NO. SHEET NO. - - 1223 Jones Franklin Rd. ETHERILL Raleigh, N.C. v6o6 ENGINEERING License No. F-o377 Bus: 919 851 8077 Fax: 919 851 6107 rRan�sroarnnoN aurvNmwoes�cN - sa�oceis.auauae oEs��N CML/SRf DESIGN - GIS/GPS - CONSTRUCfION OBSERVAlION , / • , ■ ■ ■ ■ ■ 8. REMOVE REMAINDER OF EXISTING BRIDGE 9. COMPLETE CONSTRUCTION OF PROPOSED CULVERT INCLUDING DOWNSTREAM CHANNEL IMPROVEMENTS AND ROADWAY IMPROVEMENTS. lO.REMOVE IMPERVIOUS DIKES, SPECIAL STILLING BASINS AND TEMPORARY PIPES. 11.DIVERT TRAFFIC ONTO PROPOSED ROADWAY AND COMPLETE ROADWAY IMPROVEMENTS. Z �� � ' A� O p + WOODSI� _rs Ts ,S i8-�7B� WOODS I� �\ X w m ��ze �S�K � � OX pUNGEON / 76 TB— �\ O e// /� F � �Sg \ /t �S � W�O� g = \ � �.� te T � �NG � � �C—_X e _ e � � �y��S��N�' �� - � -.� C WOODS r,. G �� \ � WO�DS � �r�\�-,�� � �w �a OGZ � . G�� re � o� � \ �