Loading...
HomeMy WebLinkAboutNC0023086_Water Treatment Plant Replacement_20140324PO Box 128 Fontana Dam, NC 28733 828-498-2107 March 10, 2014 e' : y` FIKk(vAC 7o_&c 0,;104'C1 Doug Newhouse Environmental Engineer, Funding -Application Reviewer/Contact Technical Services Branch - Loans and Grants Unit Public Water Supply Section - Division of Water Resources NC Department of Environment & Natural Resources 1611 Mail Service Center Raleigh, NC 27699-1611 Olivia Collier, ARC Program Manager Division of Community Assistance 100 East Six Forks Road, Second Floor Raleigh, NC 27609 Marquis Crews, Grants Manager NC Rural Economic Development Center 4021 Carya Drive Raleigh, NC 27610 Philip McMullan, Program Manager Economic Investments, TVA Economic Development P.O. Box 292409, OCP 2A Nashville, TN 37229-2409 Tim Gamble, Mayor 828-498-2114 g VIE 00 [MAR 2 4 ?0 14 PnRu RE: Fontana Village Water Treatment Plant Replacement (ARC Grant # NC -16314, Rural Center Grant # 2009-174-40101-102) Dear Mr. Newhouse, Ms. Collier, Mr. Crews, and Mr. McMullan: In taking over the project to build a new water treatment plant to serve the Fontana Community, the Town of Fontana Dam has taken ownership of the existing water plant, and assumed the role of applicant for the Rural Center and Appalachian Regional Commission (ARC) grants, as well as the DWSRF loan through the NC Department of Environment and Natural Resources (NCDENR). At this time, the Town has completed the transfer of the ARC grant from Graham County to the Town, and reapplied for the DWSRF loan through NCDENR. The Town is currently still awaiting LGC approval of the Town assuming the debt obligation presented by the DWSRF loan. Having been before the LGC for over a year, the Town had hoped to have an answer before now. However, additional requirements have been set forth by the LGC that the Town must meet in order to obtain their approval. The Town has been diligently working to meet those requirements, and we ask for your patience as we continue to work towards the goal of constructing a new water plant. Once the LGC approves the loan, then all other funds can be deemed secured, which will then allow the Town to complete the necessary requirements set forth by the Rural Center to have that grant transferred to the Town. Please accept this letter as a formal request by the Town, asking that NCDENR, the ARC, and the Rural Center continue to retain the funds committed to this project. We understand that the transitions underway at the State level could cause unassigned funds to be incorporated back into the State's General Fund, and we are hereby requesting that the funds associated with this project not be transferred to the NC General Fund as unassigned funds. Thank you for your assistance, and if there is anything else you might require from the Town of Fontana Dam, please feel free to contact me at any time. Sincerel , TI GAMBLE Mayor, Town of Fontana Dam CC: Timothy Romocki Vincent Tomaino Mike Dowd Ellen McKinnon Gordon Myers Jeannie Stewart