Loading...
HomeMy WebLinkAbout20171058 Ver 1_401 Application_2017082200 AI�LMG cc ��,�� LAND MANAGEMENT GROUP INC. Environmental Consultants July 31, 2017 TO: Mr. Tom Charles US Army Corps of Engineers 69 Darlington Avenue Wilmington NC 28403 2 0 1 7 1 05 8 RE: House of Raeford: Wallace Slaughter Facility Site Improvements; Duplin County, NC NWP 39 Application Dear Tom: Enclosed is a NWP 39 application for your review. It is submitted on behalf of House of Raeford Farms. Their existing slaughterhouse experienced a fire earlier this year and it is no longer operational. Since that time, the facility has been closed and its employees have been out of work. The purpose of the proposed project is to convert the existing freezer building to a slaughterhouse and get the facility back in production as quickly as possible. Permanent impacts to 0.061 acre of a jurisdictional ditch are needed to construct ancillary buildings, employee parking, and truck turn- around areas for the new slaughterhouse. Additionally, 0.01 acre of temporary ditch impact is needed for a sediment basin. Enclosed are the PCN form, site maps, and site plan. We have also enclosed a revised wetlands map and PJD form per your direction. Please let me know if you have any questions or need additional information in order to issue the NWP. Thank you for your assistance with this project. Sincerely, t Kim Williams Environmental Scientist Encl. cc: Mr. Chris Murray, House of Raeford Mr. Paul Shivers, Highfill Engineering Mr. Chad Coburn, NC DWR www.lmgroup.net • info@[mgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Avenue, Suite 15 • Wilmington, NC 28403 I Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the ® Section 404 Permit ❑Section 10 Permit Corps: 1 b. Specify Nationwide Permit (NWP) number. 39 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ___TkYes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ® Yes ❑ No ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation ❑ Yes ® No of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes ® No below. 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: 2b. County 2c. Nearest municipality / town: 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no. 3g. Fax no. 3h. Email address House of Raeford: Wallace Slauahter Facilitv Site Improvements Duplin Wallace N/A N/A House of Raeford Farms, Inc Chris Murray P.O. Box 40 Rose Hill, NC 28458 910-990-7921 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) NIA 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Kim Williams 5b. Business name (if applicable): Land Management Group, Inc. 5c. Street address: 3805 Wrightsville Avenue, Suite 15 5d. City, state, zip: Wilmington, NC 28403 5e. Telephone no.: (910) 452-0001 5f. Fax no.: (910) 452-0060 5g. Email address: kwilliams@lmgroup.net Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 238600573853; 238600585107; 238600573340; portion of 238600681140; portion of 238600469904 1 b. Site coordinates (in decimal degrees): Latitude: 34.755589 N, Longitude: -78.049346W (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: - 45.3 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Fussell Mill Branch & Duff Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C; Sw 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Much of the tract currently supports an existing poultry processing plant. Other areas to the south and east are undeveloped and forested. Adjacent land use is agriculture or undeveloped and forested. 3b. List the total estimated acreage of all existing wetlands on the property: - 6.2 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 214 LF of intermittent stream 3d. Explain the purpose of the proposed project: The existing slaughterhouse experienced a fire earlier this year, which severely damaged it to the point where it will need to be demolished. Since that time, the facility has been closed and 800 of its employees have been out of work. The purpose of the proposed project is to convert the existing freezer building to a slaughterhouse and get the facility back in production as quickly as possible. Impacts to a jurisdictional ditch are needed to construct ancillary buildings, employee parking, and truck turn -around areas for the new slaughterhouse. 3e. Describe the overall project in detail, including the type of equipment to be used: This project includes converting the existing freezer to a slaughterhouse as well as relocating the chicken offloading area, the chicken live storage areas, and employee parking to be convenient to the new building. To accomplish this, HOR needs to re- route and fill in an existing jurisdictional ditch. The jurisdictional ditch to be filled is approximately 0.061 acres (668'x 4'). The ditch will be re-routed along the property line and will eventually tie back in to wetlands in the southern part of the site. HOR also will install a sedimentation basin BMP to comply with erosion control permit requirements. The basin will temporarily impact 0.01 acre (122'x 4') of a ditch. The relocated ditch will be routed to the sedimentation basin until all of the site has been stabilized and then the sedimentation basin will be removed and the ditch will be reconnected to the old ditch and restored. Track hoe, loader, dump truck, bob cat, and other standard construction equipment will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Paul Farley Land Management Group, Inc. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Tom Charles of the USACE verbally approved the wetland line at a site meeting on 7/12/17. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Fl Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts N/A If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts N/A If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. -- 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary (T) 01 ®P ❑ T N/A Fill/Reroute RPW 0.043 02 ®P ❑ T N/A Fill/Reroute RPW 0.018 03 ❑ P ®T N/A Sediment Basin RPW 0.010 04 ❑P❑T 0. Total open water impacts 0.071 4g. Comments: 5. Pond or Lake Construction NIA If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number of pond P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) N/A If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse E] Tar -Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? El Yes B1 ❑P❑T ❑ No ❑Yes B2 ❑P❑T ❑ No El Yes B3 ❑P❑T ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 D. Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. All wetlands and streams within the site have been avoided. Ditch impacts are needed to construct facilities and parking associated with the new slaughterhouse. This ditch extends into the site and impacts were needed to utilize adjacent uplands. The ditch will be rerouted along the property line and will eventually tie back into wetlands. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Silt fencing will be used during construction to reduce sediment from eroding into jurisdictional areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank NIA 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program NIA 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments.- omments:5. 6.Complete if Using a Permittee Responsible Mitigation Plan NIA 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ N/A 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan N/A 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? Undetermined at this time 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Per engineer, project is exempt from stormwater. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review N/A 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review N/A ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been El Yes El No attached? 5. DWQ 401 Unit Stormwater Review N/A 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval El Yes El No letter.) Comments: N/A 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This project will not provide access or utilities to adjacent properties. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater generated by this project will tie into the local municipality. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted_ ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC Natural Heritage Program website was used to determine the presence of federally -listed species. No federally listed species are known to occur on or within a one-half mile of the site_ No impacts to federally -listed species are anticipated to occur from this project. S. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? F[--] Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Fisheries Essential Fish Habitat Mapper GIS program was used to determine the presence of Essential Fish Habitat. No EFH is known to occur within or adjacent to the site. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC State Historic Preservation Office HPOWEB GIS mapping resource was used to determine the presence of cultural or historic resources. No cultural or historical resources were noted within the site. Two surveyed properties (DP0404 & DP0828) are located in close proximity to the site. No impacts to any historic resources will occur from the project. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? F0 Yes No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? The NC Floodplain Mapping Information System website was used to determine the boundaries of the 100 -year floodplain. Portions of the property are located within the 100 yr floodplain. However, all of the proposed improvements will occur outside of the floodplain. Kim Williams U ""^�_ 7131/2017 Applicant/Agent's Signature Applicant/Agent's Printed Name (Agent's signature is valid only if an authorization letter from the applicant Date is provided.) Page 11 of 11 LMG �.,a se r.v, v,�crai r...�ronnzu rn. 'on�sn:�n rs AGENT AUTHORIZATION FORM TO WHOM IT MAY CONCERN: I/we, the undersigned, hereby authorize Land Management Group, Inc. (LMG) to act as our agent in the determination of jurisdictional wetland boundaries on the subject property, House of Raeford Tract By way of this form, I/we additionally authorize access to the site by representatives of the US Army Corps of Engineers (COE) and the NC Division of Coastal Management (NC DCM) for the purpose of reviewing the flagged wetland boundary and providing a final jurisdictional determination. Any questions regarding the jurisdictional determination should be directed to LMG. Please provide the following information: Property Address and Parcel ID Number: See attached Current Property Owner Name: See attached Owner Address and Phone Number: See attached Please answer the followine questions (circle Yes or No): 1. Are you the current owner of the property? 7S or No 2. If you are not the current owner, do you have a option to purchase or a contract to purchase that allows for environmental due -diligence including the determination of wetlands? Yes or No 3. If you answered no to the questions above, do you have an existing easement? Yes or No Name of Individual/Entity:mt, a��"ii�F��/f✓� Cil! Signature of Authorized Representative: 1 Date: Z vvww.lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 L:\WETLANDS\2016 WETLANDS FILES\40-16-061A--- House of Raeford, Paul Shivers\maps "Boundaries are approximate and are not meant to be absolute. Map Source: ArcGIS Open Street Map SCALE 1" = 1 mile (when printed at 11 "x17") House of Raeford 4LMG Duplin County, NC Figure 1 www.lmgroup.net Vicinity Map May 2017 3805 Wrightsville Avenue LMG # 40-16-061A Wilmington, NC 28403 Phone: 910.452.0001 Fax: 910.452.0060 U PROJECT"' AREA �'_ . al 3 L:\WETLANDS\2016 WETLANDS FILES\40-16-061A--- House of Raeford, Paul Shivers\maps *Boundaries are approximate and are not meant to be absolute. Map Source: USGS Duplin County GIS Mosaic � l � Esri, HERE, DeLorme, Mapmylndia, © OpenStreetMap contributors _ SCALE 1" = 500' (when printed at 11"x17") House of Raeford LMG Duplin County, NC _ Figure 2 www.lmgroup.net Topographic Map May 2017 3805 Wrightsville Avenue LMG # 40-16-061A Wilmington, NC 28403 Phone: 910.452.0001 Fax: 910.452.0060 r # r PROJECT AREA ' M1 f 7 FPO % r ' .s S fi.' fi r" a *� � ,�tti �F `?^''. J • '.'e 100000 it w lik lX e _ a s 4 A " 7. /' lS. f i v s' A. or y� « �""� ?•s� 4.. � � s �'.r �� _ I y A . 314 , � � sb,�- F `x.'�''' i j Iw F � `w r aq k L r F L:\WETLANDS\2016 WETLANDS FILES\40-16-061A--- House of Raeford, Paul Shivers\maps Boundaries are apppproximate and are not meant to be absolute. Map Source: 2016 VC One Map SCALE 1" = 300' (when printed at 11 "x17") House of Raeford LMG Duplin County, NC4z ���,�,A�.,,...�.�,..:,,:..., t„�,,,�,,,.,,�,,,.,,,�,,,,,,r,,,; � Figure 4 www.lmgroup.net Aerial Photograph May 2017 3805 Wrightsville Avenue LMG # 40-16-061A Wilmington, NC 28403 Phone: 910.452.0001 Fax: 910.452.0060 10♦ AS (,b x Al ZZT) 03NOONVBV SI NISV6 3e MID 1143104I123S 83J -AV ♦ 35 :(Alelodwal) a37V1SNI 33N33 IRS • /" f#13edwllaleM usdp I � 'SONV113M eanLS10 ION 00 '4011C 'X3 341 01 13NNVHO 031411 SSV80 0368n'ISIONa ♦ '� //j j/j / \�\\ \ IJUW"63d 10314NC038 ONV NISVB NNW38 01 SONVl-L3M ♦ ♦ � /// // \\ NO11V1N3WI03S NI 1113 '30NV8aniSIC 332S TIV 30 N0113ldW00 NOd^_ ♦ ♦ 1 3Nn3381 C3SOdO8d/ ♦ 4 ♦♦♦ js //y HDi1C 3OVNN8C 30 3l 10/ j % \\\� // ` S L' 1-C3/ \ B 049 XOaddV NOnV3: ♦ / j5 _ J =� �_ //i �`` =\�. • �/�j / / a3ZnIBVIS 3e 01 S3dC'p 85 • �y q�O 301S L :£ NISVB 11x3 . (L'L-03/S 33S) 'SAVO \ cg 4' L NIH11M 03Zn18v1S 38 Ol 13NNVHD \ \ \ 03Nn-SSV89 1N3NVNa3d � \ • a 65 � • 1U� 8311314s � 1 • Ql'! 30"DIS 3An eV (01-03/90-z 33S) v HO.UG NOISa3Mo a3Nn J, n (,b x 3l 89r) .� dV8 dl8 AkW80dW31 £b0'0 :T#lOedwllaleM uadp 1 \ • 111 \\\------. 09----\`� • ,�� • fr�/ \ 713N0V8 10313: GNOd 301 3813 W083 11 • �' HOLO 3OVNIVaO 30 -n - 09 - ■ ` 091 XOaddV NOIW38 83113HS ONIOVOINn f • �i f •t 38033814( • (,4 x Al OOZ) 83WW1: 3e 8T0"0 /M NI' :Zp lmdwl IaleM uadp oNV 31014 • s 1 `Q HOLO 01 ONKTUne YIOa3 SNNW 3008 T1V1SNII • �1 IS f • • • l Z-' • / ■ 10x1 NDLO , ■ Ol. ONIGl1ns f, 1 W0a3 SNIVaO 3008 TTVISNI 1 \ o, _, ■ .0 • ■ r JP • f a3Aon3a 3e Ol GVd 313001400 ONV ■ N1VM3OI5 X3 ' z'ON 1111 ' C -ON V38V ONix`ill+d � y9 ♦ ♦ Og. Od w 714 � / � uirnc 7uL r 1S ■ 1N3WIa3S 8313V �Vo 03'lV1SNI 3DN33 il1S Lt`il ■ ■ (0'L-G3/LO-Z 33S) 30N33 { ■ 1lIS AaV80dW31 ZI• (:-�/9C-Z'4'£"Z't 335) NIStlB \ N3104103S 18"OdIV431 .Doz X .S6 0'09 098"86499ZZ £46"SL£L9£ 8 0'05 9 L S 6bb99ZZ 696Z0£L9£ L 0'09 6£8'9Z459ZZ 91£ 9£4L9£ 9 O'Os ZOZ'84499ZZ CLZ-444L9£ s L9 969'911699ZZ 954 9£SL% b Lb L99"9LB98ZZ ZS6'£9£L9£ £ 1.9 19Z'40998ZZ 999Z6£L9£ Z 1.4 001": L969ZZ 69£'99sL9£ L A3t3 away3 00"m % lmd 09 = „L -31VOS Nb'ld -1024iNO3 NOISO�J] l ,OZT = „ T :31VOS .♦ ♦ osZ OzL 09 0c o 09 • ♦ SWD-q DIHdVZII) � f f f • • • • No • SNWA ITS kWbOdR31 � 93RVI IS 3 WMA NNNIM � mwis S113MM 11011.08 ■ ; \ • ■ Sf Ab S) "d;d `n ■ • • • L _�-1- f (0'1.-G3/bl-Z 33S) "d1.1 f \ Od ■ �---� 3Nn3a 31 'X3 • ,JJ- f NOLL3310ad 131N! dOaG T ■ Ir O3MISV1S 3e 011 S3 0 S y 'is• • • • a i • i ••. f 301S L:£ NISVB 83WWIxS sir' 3S (0'L -03/90-Z 33S)� i 83Nn 13N Mv815 /M a f • f ` '■ 9 `\\\ . HD110 NOIS83A10 Q:"OdW31 • • (0' I-a3/s0-Z 33S) \ / ���� • VHaJJONOISlI3IAMI 3Nn 13N MVaLS /M 8 3Nn LV3L11333 \ o A8Va0dW31 � � L � AlIAVaO d1MM ■ �� (L' L -03i 80-Z'b'£'Z' L 33S) NISVB • �` (0' L -03/91-Z !/ ' �. \ \ \ / � � i • a3WWIN5 AaVa0dW31 ,081 x ,59335) 'dA1 31llVMtwo � / ♦♦ �i s- (Z't-03/90-Z'£'Z'l 335} NISVB • • : * 5/NlYn 30x03 \ Jf • i i • • ♦ ♦ -01 03508088 1N3WI03s A8v8odw3l ,9£1. x .ss f i • y HOIVM 01 Mnu aNy NOILV313a \ \ \ � A ■ 35 3AOW3a \ \\\ '� C388fll510 38 Ol 1014 \ \ ♦ f ssNlallne 9IJL151X3 S 1 00 = �A313 801 £■ 3-IOHNVW \ �� • `0�, d3UI O f • • i.� . e `a31VMWa0=J lu qu Xl f ".-,i i i• i i • i • /� -vu _ 1 i i • • �(0l-(13/90-Z 335) a3Nn i aBeW AN MVa1S /M 0 HLL0 q . 1401583140 )aV80dW31 Q /; 3LLN313a 3x13 ONmli ISM 38 11VHS NISVB ma MOOS dD8 _4Z • G31VOO138 38 O1 S3aiM -1 / yWVDIS 01 103NNO0 ■ Ano H11M a3MO1 -X3 ■ NNaO W801S '1V1SNI 00"99 ;1313 NOLLVaNn03 / f ■ XNV13� 0 � dG1XNIVI 1331S_W30Vao • V3aV a388n1.S10 TV101 LI£ 10101 V38V ONnOA036 RLMON00 30 NOLLaOd 1 6'L 4 V3VV ONn0A3311 313NON60 30 NOLINOd Z' L O£ dOOlad00 NOLL01181SN00 NNW 33803 83M35 z e£ (0388fMO 38 Ol ION) aNOd 831VMWa015 "X3 x31108 • 80018HOO N01101181SN00 a3M3S AllA"D V38V 01130 ommine L ZL V£ V3aV NOLLVOU100W dl4W 831108 dIHO DOOM M3N 33S)dA! 3111VM 1LVM3Maa N3na1 30 NOLL808 Avwmdc Nona! 30 NOMAW NOWOOV WOOH W31813373aNOd -Z 33S 30N3nO3S 3DIA83S 3813 1.'9 z Z'ON V31W ONIx8Vd NISOa3 x03 :AiON L ON V38V ONINSV6 f VON V38V ONlxavd 1 96 1 V3dV DMITMO 03SOd08d 1112kao 0 SiWJ/ VAW SN,bily nalv0 v3ijv 03&inisic f NOWOOV PIOOSf 3A08V-SOdOad f ■ T/0RiL031313 I • x31108 • f . (0"1-03/91-Z dIH3 DOOM • t . 33S)dA! 3111VM -Z 33S 30N3nO3S ■ . f j NISOa3 x03 :AiON f • 000 • ' 40, • i.,iai'i '� • i �---�_. 0131141 f • - ♦♦ xcVI 3111 8080 f AVM3n1aG zonal L ON V3av ■ ONIxaV(:i ■ \ Z V3YV CM@Mrd 0 ■ � SV32N , w LDNI>IdVd N33ML3e 301M ! AVM3AI80 ,4Z I 03Avd38 38 01 V36V ■ 'X3- f---wo Y -4w C38an1SIO-"4 8 " ONlxavd 1lVHdSb i f - - - • • • to.---. f . '. >` • . • s • I ■ (0'3315) 3 0-Z , • �,!'� (Z" i-03/4 33S) DIS i dVWdW31 !,q . ' ♦ "dA1 NOLL03108d as � .. -.., • lb • 1 • ♦ ' :a `00'314.0-9) oY • • • • • p • • . • Tlbpa ,)& ■ • •so as AD so