Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0020389_Pretreatment Compliance Audit_20170815
i., iy Water Resources E` ARONH[NTAL ©UAMTY August 15, 2017 Mr. Matt Zapp Town Manager Town of Benson PO Box 69 Benson, NC 27504 Subject- Pretreatment Compliance Audit Town of Benson WWTP NPDES Permit No. NCO020389 Johnston County Dear Mr. Zapp ROY COOPER Got tyror MICHAEL S. REGAN St Croo"y S. JAY ZIMMERMAN Defector RECEIVED/NCDENWR AUG 18 2017 Water Quainy Permitting Section On July 21, 2017, Monti Hassan of the Pretreatment, Emergency Response, and Collection Systems (PERCS) Unit and Cheng Zhang of the Raleigh Regional Office (RRO) conducted a Pretreatment Compliance Audit of Town of Benson's pretreatment program The assistance given by Mr. Paul Allen, the wastewater superintendent and pretreatment coordinator, was greatly appreciated. The audit report is attached Findings during the inspection were as follows: 1. Town of Benson has one Significant Industrial User (SIU), which is not a Categorical Industrial User (CIU). It was noted that the SIU was not in significant non-compliance (SNC) during the two most recent semi-annual periods 2. The pretreatment inspection file review included Chicopee Inc (Permit No 0001). It was noted that the permit review letter and Slug/Spill Control Plan could not be located. Industrial permit files need to be better organized. The POTW and SIU completed monitoring as required by the IUPs during the first semi-annual period of 2017. The SIU had two BOD limit violations in January 2017. At the time of the audit, no enforcement actions were taken against these violations. The POTW must take enforcement actions as specified by the Enforcement Response Plan. It was noted that compliance judgement was not conducted appropriately, violations identified from POTW sampling must be included when judging compliance. 4. A review of the files containing the pretreatment program elements was conducted These files were available for review All elements were up to date Please be reminded that an update of the Industrial Waste Survey is due by June 1, 2018 5. As a modified program, the POTW is not required to sample for Short Tenn Monitoring Plan (STMP) monitoring currently. Monitoring will resume one year before the next update of Headworks Analysis is due (April 1, 2020). Division of Water Re,,olllces, Raleigh Regional Office, water Quality Operations Section bttp //deq ne gov/aboutfdrvr5ions/t,,<rter-resources 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone (919) 791-4200 Location 3800 Barrett Drive, Raleigh, NC 27609 Fax (919) 788-7159 6. The scheduled SIU inspection hac to be canceled due to power outrage at the industry. Thank you for your continued support of the Pretreatment Program. If you have any questions or comments, please call Cheng Zhang at (919) 791-4200 (or email: cheng zhang@ncdenr gov) ,Sincerl, Danny Smtf h Water Quality Regional Supervisor Raleigh Regional Office Enclosure 2017 Benson PT Audit Form CC Monti Hassan, DWQ - PERCS Unit Central Files Cheng Zhang, RRO Paul Allen, 770 Hannah Creek Rd, Four Oaks NC 27524 M L; NORTH CAROLINA DIVISION OF WATER RESOURCES ,PRETREATMENT AUDIT REPORT Background Information [Complete prior to audit, re-�ievv Program Into Database Sheet(s)] 1 Control Authority (P01 W) Name Town of Benson NNNNTP 2 Control Authority Representative(,) Paul Allen 3 Title(s) Wasteyvater Superintendent 4 Addre„ of POT'%V Mailing 770 Hannah Creek Road Cray Four Oaks Zip Code 27524 Phone Number 9198942373 Fax Number 9198945808 E -Mail pallen r tovvnofbenson com Audit Date 7 21 2017 6 Last Inspection Date 7 26 2016 Inspection Type ❑ PC I ❑ Audit 7 Has Program Completed All Requirement,, from the Pre%loU, Inspection and Pr <__>ram Into Shcet(,) " ❑ Yes ❑ No If No Explain 8 In the la,t year ha, the POTW experienced any NPDES or Shidge Permit compliance problems ❑ Yep ❑ No If Yes Explain One BOD «eekly a--erage Ntolat►on of NPDES Permit 9 I, POTW under an Order That Includes Pretieatment Conditions', ❑ Ye, ❑ No Ordei Type and Number Aje. Milestone Date, Beira, Met'' ❑ Yes ❑ No ❑ NA Parameters Covered Under Order ICIS Coding Jlam Program Permit Numbci N 1C1010 12 10 13 18 19 \1%1 DD YY 7 121 117 10 Current Number of Significant Industrial Users (SIU,,)" t 1 Number of SIUs ��ith No IUP, or a ith an Expned IUP' 12 Numbei of SIU, Not Inspected by POTW in La,t Calcndai Yeai z 13 Number of SIU, Not Sampled by POTW in Last Calendar Year's 14 Number of SIU, in SNC for Limits Violation, During Eithei of Last 2 Semi -Annual Periods) 15 Numbei of SIUs to SNC for Reporting During Either of La,t 2 Semi -Annual Peiiod>" 16 Numbei of SIUs it SNC �N ith Pietreatment Schedulc'a 17 Numbei of SIUs on Schedule,') 18 Current Number of Categoiteal Industiial Useis (CIU„)” 19 Numbei of CIU, in SNG" I 0 0 0 0 0 0 0 0 0 �U. 1 1%L` l XXXIt111V1L` L\ 1 L 1XV"X%-'llVX L` LL' 1V1L` 1\ 10 r JP. V 11.' VV - 1,U V1G W TU 1 VV L11GJ, VGllly F%-) 1 VV 11d6 GUyy U1 UdUll FIUgldlll 1:1G111GI1L in their File. comnlete with all sunnortme documents and PFRCS Annroval Tetter_ and dates consistent with Program Info Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 5/18/2015 ® Yes ❑ No 9/24/2015 ® Yes ❑ No 4/1/2020 Industrial Waste Survey (IWS) 6/4/2013 ® Yes ❑ No 7/29/2013 ® Yes ❑ No 6/1/2018 Sewer Use Ordinance (SUO) 4/5/2013 ® Yes ❑ No 4/11/2013 ® Yes ❑ No Equipment Enforcement Response Plan (ERP) 4/16/2009 ® Yes ❑ No 6/2/2009 ® Yes ❑ No Additional Sampling and/or Analysis Long Term Monitoring Plan (LTMP) 10/31/2013 ® Yes ❑ No 1/7/2014 ® Yes ❑ No Legal Authority (Sewer Use Ordinance-SUO) 21 Do you have any towns and/or areas from which you receive wastewater which are not in your annexed jurisdiction? ® Yes ❑ No If yes, Please list these towns and/or areas Town of Four Oaks 22 If yes to #21, Do you have current Interjurisdictional Agreements (IJAs) or other Contracts9 ® Yes ❑ No ❑ NA A copy, if not already submitted, should be sent to Division 23 If yes to #21, Have you had any trouble working with these towns or districts ❑ Yes ® No ❑ NA If yes, Explain 24 Date of Last SUO Adoption by Local Council 5/14/2013 25 Have you had any problems interpreting or enforcing any part of the SU09 ❑ Yes ® No If yes, Explain Enforcement (Enforcement Response Plan -ERP) 26 Did you send a copy of the ERP to your industries" ® Yes ❑ No If no, POTW must send copy within 30 days 27 Have you had any problems interpreting or enforcing any part of the ERP (i e any adjudication, improper enforcement, etc? ❑ Yes ® No If yes, Explain 28 List Industries under a Schedule or Order and Type of Schedule or Order Resources 29 Please Rate the FollowinE S=Satisfactory M=Mammal U=Unsatisfactory Rating Explanation, if Unsatisfactory Personnel Available for Maintaining Two fulltime personnel POTW's Pretreatment Program ®S ❑M ❑U Access to POTW Vehicles for 4 vehicles (one dedicated to pretreatment) Sampling, Inspections, and ®S ❑M ❑U Emergencies Access to Operable Sampling One sampler, split samples with contract lab Equipment ®S ❑M ❑U Availability of Funds if Needed for Additional Sampling and/or Analysis ®S ❑M ❑U Reference Materials Books, manuals ®S ❑M ❑U Staff Training (i e Annual and Plan to attend 2018 PAR and HWA workshop Regional Workshops, Etc ) ®S ❑M ❑U Computer Equipment (Hardware and Three PCs, internet Software) ®S ❑1'I ❑U 30 Does the POTW have an adequate data management system to run the pretreatment program9 ®Yes ❑ No Explain Yes or No Microsoft Excel spreadsheets 31 How does the POTW recover the cost of the Pretreatment Program from their mdustries9 Explain From wastewater budget Public Perception/ Participation 32 Are there any local issues affecting the pretreatment program (e g odor, plant closing, new or proposed plants)9 ❑ Yes ® No If yes, Explam 33 Has anyone from the public ever requested to review pretreatment program files9 ❑ Yes ® No If yes, Explain procedure If no, how would the request be addressed9 34 Has any industry ever requested that certain information remain confidential from the public? ❑ Yes ® No If yes, Explain procedure for determining whether information qualified for confidential status, as well as procedure for keeping files confidential from public If no how would the request be addressed? 35 In addition to annual inspection, does the POTW periodically meet with industries to discuss pretreatment? ® Yes ❑ No 36 Is the public notified about changes in the SUO or Local Limits9 ❑Yes ® No 37 Were all industries in SNC published in the last notice9 ❑ Yes ❑ No ®NA Permitting (Industrial Waste Survey-IWS) 38 How does the POTW become aware of new or changed Users'? Utility accounts, town planning department 39 Once the POTW becomes aware of new or changed Users, how does the POTW determine which industries have the reasonable potential to adversely impact the WWTP and therefore require a new permit or a permit revision (Who is an SIU9) Based on flow, pollutant discharge, categorical status, vIAHL criteria, process flow 40 Does the POTW receive waste from any groundwater remediation projects (petroleum, CERCLA) or landfill leachate9 ❑Yes ®No If Yes, How many are there9 Please list each site and how it is permitted, if applicable 41 Does the POTW accept waste by (mark if applicable) ® Truck ❑Dedicated Pipe ❑ NA 42 If the POTW accepts trucked waste, what controls are placed on this waste? (example designated point, samples drawn, manifests required) At designated point, random sampling done 43 How does the POTW allocate its loading to mdustries9 Mark all that apply ❑ Uniform Limits ® Historical Industry Need ❑ By Surcharge ® Categorical Limits ❑ Other Explain Other 44 Review POTW's copies of current allocation tables for each WWTP Are there any over allocations? ❑ Yes ® No If yes, what parameters are over allocated? 45 If yes to #44, What is being done to address the over allocations9 (short-term IUPs, HWA to be revised, pollutant study, etc ) N/A 46 Does the POTW keep pollutant loading in reserve for future growth / safety? ® Yes ❑ No If yes, what percentage of each parameter 10% 47 Has the POTW experienced any difficulty in allocation (for example adjudication by an industry) ❑ Yes ® No If yes, Explain 48 How does the POTW decide on which pollutants to limit in the perrmts? Monitor for9 (for example were only those pollutants listed on the application limited, categorical parameters, NPDES Pollutants of Concern) Based on POCs, NPDES permit limits, categorical status 49 How does the POTW decide what the monitoring frequency should be for the various pollutants in industry permits? Explain SIU monitoring: monthly; POTW monitoring: once/six months Permit Compliance ' 50 Does the POTW currently have or during the past year had any permits under adjudication? ❑ Yes ® No If yes, which mdustnes9 What was (will be) the outcome of the adjudication 51 Demonstrate how the POTW fudges compliance This should include compliance judgment on all violations of limits, reporting requirements, and permit conditions, as well as for SNC Compare monthly monitoring data to IUP limits; stamp receipt dates of SIU monitoring reports, use PERCS compliance judgement sheet 52 Does the POTW use the Division's model mspect-on form or equivalent? ® Yes ❑ No If no, does the POTW form include all Division data? ❑ Yes ❑ No 53 Were all SIUs evaluated for the need of a slug/spill control plan during their most recent inspections? ® Yes ❑ No If no, Explain POTW could not locate the updated SPCP. 54 What criteria are used to determine if a slug/spill control plan is needed? Based on industries' potential impact 55 What criteria does the POTW use to deteiTmne if a submitted slug/spill control plan is adequate? Ensure contact information is up to date and accurate 56 How does the POTW decide where the sample point for an SIU should be located At the end of the pipe before discharging to put -lie sewer 57 Has the POTW established a procedure to ensure that representative samples will be taken by the POTW or SIU each time (example correct location, proper programming of sampler, clean equipment, swirling the sample bucket uniformly) POTW ® Yes ❑ No SIU ® Yes ❑ No If yes, Explain 58 Who performs sample analysis for the POTW for Metals Environmental 1 Conventional Parameters POTW lab Organics Environmental 1 59 Explain the Chain of Custody Procedure used for both in house and commercial lab samples Fill out COC, date and time of samples collected, signed by the collector -Long/Short Term Monitoring Plan (L/STMP) and Headworks Analysis (HWA) 60a Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ❑ YES ❑ NO ® NA 60b Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ❑ YES ❑ NO ® NA 60c Is LTMP/STMP Data Maintained in Table or Equivalent? ❑ YES ❑ NO ® NA Is Table Adequate? ® NA 60d All LTMP/STMP effluent data on Discharge M=onitoring Report (DMR)? ® NA Division Inspector, verify yourself' 60e If NO to any above, list violations 60f Should any Pollutants of Concern be Eliminate from or Added to LTMP/STMP9 ❑ YES ® NO If yes, which ones? Eliminated Added 61 Do you complete your own headworks analysis (H Vv A) 9 ❑ Yes ® No If no, who completes your HWA? The Wooten Company Phone (252)757--1096 62 Do you have plans to revise your HWA in the near future? ❑ Yes ® No If yes, what is the reason for the revision (mark all that apply) ❑Increased average flow ❑More LTMP data available Explain ❑Resolve over allocation 05 year expiration ❑NPDES limits change ❑Other 63 In general, what is the most limiting criteria of your HWA9 ❑Inhibition ® Pass Through ❑Sludge Quality 64 Do you see any way to increase your loading in the future (Example obtaining more land for sludge disposal)? ❑ Yes ® No Explain i 65 Do you plan any significant changes to the pretreatment program or changes to the WWTP that may affect pretreatment9 66 User Name 1 Chicopee, Inc 2 3 67 IUP Number 0001 68 Does File Contain Current Perrrut? ® Yes ❑ No 11 ❑Yes ❑ N—o-11 ❑Yes ❑ No 69 Permit Expiration Date J 12/31/2021 70 Categorical Standard Applied (I E 40 CFR, Etc,' Or N/A I N/A 71 Does File Contain Permit Application Completec Within One Year Prior ® Yes ❑ No❑Yes ❑ No ❑ Yes ❑ No to Permit Issue Date 72 Does File Contain Inspection Completed Within Last Calendar Year? ® Yes ❑ No1 ❑ Yes ❑ No ❑ Yes ❑ No 73 a Does File Contain Slug/Spill Control Plan? a ❑Yes ®No a ❑Yes ❑No a FO Yes ❑No b If No, is One Needed9 (See Inspection Form from POTW) b [-]Yes ❑No b ❑Yes ❑No b ❑Yes ❑No 74 For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑NoNN/A ❑Yes❑No❑N/A Orgamc Management Plan (TOMP)? F❑Yes❑No❑N/A 75 a Does File Contain Original Permit Review Letter from Divisions ❑Yes ®No a ❑Yes No a ED] es ❑No b All Issues Resolved Fb ❑Yes❑No❑N/A b ❑Yes❑No❑N/A b ❑Yes❑No❑N/A 76 During Most Recent Semi -Annual Period, Did POTW Complete its ® Yes ❑ NoF ❑ Yes ❑ No ❑ No Sampling as Required by IUP, including Flow? 1[7Ws 77 Does File Contain POTW Sampling Cham -Of -Custody Forms9 ®Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 78 During Most Recent Semi -Annual Period, Did SIU Complete its ®Yes❑No❑N/A❑Yes❑No❑N/A ❑Yes❑No❑N/A Sampling as Required by IUP, including Flow 79 During Most Recent Semi -Annual Period, Did SIU submit all reports on ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A time 80a For categorical IUs with Combined Wastestream Formula (CWF), does ❑Yes❑No®N/A ❑Yes❑No❑N/A❑Yes❑No❑N/A file include process/dilution flows as Required by IUP? 80b For categorical IUs with Production based limits, does file include ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A production rates and/or flows as Required by IUPC 1 1 81 During Most Recent Semi -Annual Period, Did POTW Identify All ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Limits Non -Compliance from Both POTW and SIU Sampling? 82 Dunn- Most Recent Semi -Annual Period, Did POTW Identify All ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Reporting Non -Compliance from SIU Sampling? 83 a Was POTW Notified by SIU (Within 24 Hours) of All Self- a ®Yes❑No❑N/A a ❑Yes❑No❑N/A a ❑Yes❑No❑N/A Monitoring Violations? b Did Industry Resample and submit results to PO—_W within 30 Days9 b ❑Yes❑No®N/A b ❑Yes❑No❑N/A b ❑Yes❑No❑N/A c If applicable, did POTW resample and obtain res-ilts within 30 days of becoming aware of SIU limit violations in the POTW's sampling of SIU9 c ❑Yes❑No®N/A c ❑Yes❑No❑N/A c ❑Yes❑No❑N/A 84 During Most Recent Semi -Annual Period, Was SIU in SNCL ❑ Yes ® No I ❑ Yes ❑ No 1 ❑ Yes ❑ No 85 During Most Recent Semi -Annual Period, Was Enforcement Taken as ❑Yes®No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Specified in POTW's ERP (NOVs, Penalties, timing, etc )9 86 Does File Contain Penalty Assessment Notices ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 87 Does File Contain Proof Of Penalty Collection9 ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 88 a Does File Contain Any Current Enforcement Orders9 a ❑Yes❑NouN/A ❑Yes❑No❑N/A a ❑Yes❑No❑N/A b Is SIU in Compliance with Order? b ❑Yes❑No®N/A Fb ❑Yes❑No❑N/A b ❑Yes❑No❑N/A 89 Did POTW Representative Have Difficulty in Obtaining Any Requested ® Yes ❑ No ❑Yes ❑ No ❑ Yes ❑ No Information For You9 FILE REVIEW COMMENTS: 73 — Slug/Spill Control Plan could not be located 75 — IUP review letter could not be located 81 — The SIU had two BOD violations in January 2017 85 — The POTW did not take enforcement against the BOD violations as required by the ERP 111 11\Vl 1JV 11V1\ 11..1V I.VLll\V• Main Program Permit Number MM/DD/YY INICIO IO 1 I I I I 1 I 1 1 Industry Inspected 2 Industry Address 3 Type of Industry/Product 4 Industry Contact Title Phone Fax 5 Does the POTW Use the Division Model Inspection Form or Equivalent9 ❑ Yes ❑ No 6 Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly9 Comments A Initial Interview ❑ Yes ❑ No B Plant Tour ❑ Yes ❑ No C Pretreatment Tour ❑ Yes ❑ No D Sampling Review ❑ Yes ❑ No E Exit Interview ❑ Yes ❑ No Industrial Inspection Comments: Industrial inspection had to be canceled due to power outrage at the industry Audit SUMMARY AND COMMENTS: Audit Comments The program experienced setbacks due to the sudden death of the previous coordinator and needs improvement in file organization, taking enforcement actions within the timeframe specified in the ERP. and compliance judgement. Requirements Issue NOV for the BOD violations in January 2017. Request industry to submit updated Slug/Spill Control Plan. Violations from POTW sampling must be included when judging compliance. Recommendations The coordinator is encouraged to attend pretreatment workshops (PAR, IUP, HWA etc.) provided by the Division. NOD: ❑ Yes NOV: ❑ Yes QNCR: ❑ Yes POTW Rating: Satisfactory ❑ Marginal ® Unsatisfactory ❑ Audit COMPLETED BY: Monti Hassan PERCS. and Cheng Zhang, Raleigh Regional Office DATE: 7/21/2017