HomeMy WebLinkAbout20171049 Ver 1_Build Maps_20170818 (2)•,
See Sheet �-A For I ndex of Sheets
BEGI1� TIP PR OJECT 8-5864
-L- STA.12 + 25.00
TO B USICI�
BEGI1� C01�STR UCTI011t
-L- STA. IO + 28.00
�� �� � � ��� � � ���
I/�� 1 ` • 1 � 1 �•� . . �`•�� 1 ��` 1 1 1 �� I,� 1 1 � � �\ ll ' �
�
LOCA TI01�1: BRIDGE 1�0. 49 0 VER BR O W1�S CREEI� 01� 1�1C 80
TYPE OF WORI�: GRADII�G, PA VI1�G, DRAII�AGE, A1�D STR UCTURE
BEGI11t BRIDGE
—L— STA.13 + 94.88
BEGI11� APPROACH SLAB
—L— STA.13 + 84.00
-------
—L — (NC 80)
—DET —
BEGI11l DETO UR BRIDGE
DET— STA.14 + 12. SO
�
O
i
BEGI1� DETOUR C01�STR UCTI01�1
-L- STA.10 + 36.71
DET- STA. l0 + 36.71
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
THIS IS NOT A CONTROL OF ACCESS PROJECT.
��
. . �
.. .
—L— STA. l4 + 47.13
E1�D APPROACH SLAB
—L— STA.14 + 58.00
E1�D TIP I'R OJECT 8-5864
-L- STA. IS + 70.00
_---- --------------
—L — (NC 80) TO MICA VILLE
---------�---------------�
\ E11�D DETO UR BRIDGE
DET— STA.14 + 67.50
E1�D DETOUR
-L- STA.18 + 14.'
DET- 18 + 24.07
C01�STR UCTI01�1 \
E1�D C01�STR UCTI01��
-L- STA. l9 + 7�.00
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES DESIG11t DATA PROJECT LEI�GTH
Prepared In tl� Offlce of: HYDRAULICS E1VGIIVEER
ADT 2018 = 2600 DIVISI01� OF HIGHWAYS
50 25 0 50 l0o ADT 2038 = 2900 LENGTH ROADWAY TIP PROJECT B-5864 = 0.055 MILE 1000 Birch Ridge Dr., Raleigh Nc, 27610 �� p� ��apyy Qqo
K = 9 p�0 2012 STANDARD SPECIFICATIONS ��? �poQ
PLANS p— 70 % LENGTH STRUCTURE TIP PROJECT B-5864 = 0.010 MILE P.E. � �
SIGNATURE: rvi ,,
50 25 0 50 l00 T= 4 %* TOTAL LENGTH TIP PROJECT B-5864 = 0.065 MILE RIGHT OF WAY DATE: KEVIN E. MOORE, PE �� �
PROJECT ENGINEER ROADWAY DESIG11t �
V— 50 MPH JANUARY 26, 2017
PROFILE HORIZONTAL E11tGI11tEER �
Q
� ) * TTST =1% DUAL = 3% ��p o �Q Q�
00
10 5 0 10 20
FUNC CLASS = LETTI11lG DATE: NATHAN N. ADIMA, PE ���p�
MAJOR COLLECTOR JANUARY 16, ZO�H I'ROJECT DESIGN ENGINEER
PROFILE (VERTICAL) REGIONAL TIER P�E�
SIGNAT URE:
BOU11lDARIES AND PROPERTY.•
State Line ----- -----
County Line --- ----
Township Line -- --
City Line - -
Reservation Line - -
Property Line
Existing Iron Pin �
Property Corner �
Property Monument 0
Parcel/Sequence Number �23
Existing Fence Line -X X X-
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
Existing Wetland Boundary - - - -W�B- - - -
Proposed Wetland Boundary W�B
Existing Endangered Animal Boundary EAB
Existing Endangered Plant Boundary EPB
Existing Historic Property Boundary HPB
Known Contamination Area: Soil - '�• •�•
Potential Contamination Area: Soil - � �
Known Contamination Area: Water - '•' '•'
Potential Contamination Area: Water - � �
Contaminated Site: Known or Potential �' ?
BUILDINGS AND OTHER CULTURE:
Gas Pump Vent or U/G Tank Cap O
Sign �
Well °
w
Small Mine �'
Foundation 0
Area Outline
Cemetery fi
Building
School �
Church �
Dam
HYDROLOGY.•
Stream or Body of Water --- ---
Hydro, Pool or Reservoir �____�
Jurisdictional Stream �S —
Buffer Zone 1 Bz �
BufFer Zone 2 Bz 2
F I ow Arrow � --- ---
Disappearing Stream �--- ---
Spring �'��-�_.-.�
Wetland �
Proposed Lateral, Tail, Head Ditch
� FLOW
False Sump �
� " I' .,�� `I' I �:' (�)� I ���° .� (�) I'� " I' I'-I � �' . �� I'� (�) I ., I \ . ��. , II)� �i' I :�� I (�) \ (�) I .�" I'I � �� I'I ���i' . �� �'" �
� � ' � ' : �
�- � � �- � �� .„ ,
_
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
RIGHT OF WAY.•
Baseline Control Point
Existing Right of Way Marker
Existing Right of Way Line
Proposed Right of Way Line
Proposed Right of Way Line with
Iron Pin and Cap Marker
Proposed Right of Way Line with
Concrete or Granite R1W Marker
Proposed Control of Access Line with
Concrete C/A Marker
Existing Control of Access
Proposed Control of Access
Existing Easement Line
Proposed Temporary Construction Easement -
Proposed Temporary Drainage Easement
Proposed Permanent Drainage Easement
Proposed Permanent Drainage / Utility Easement
Proposed Permanent Utility Easement
Proposed Temporary Utility Easement
Proposed Aerial Utility Easement
CSX TRANSPORTATION
O
MILEPOST 35
0
SWITCH
����
Proposed Permanent Easement with
Iron Pin and Cap Marker
ROADS AND RELATED FEATURES:
Existing Edge of Pavement —
Existing Curb —
�
0
.
W
.
W
.
��
� W
in� �
.. _. ��
�c�
�A,
E
E
TDE
PDE
DUE
PUE
TUE
AUE
0
Proposed Slope Stakes Cut --- �---
Proposed Slope Stakes Fill --- F---
Proposed Curb Ramp cR
Existing Metal Guardrail T T T
Proposed Guardrail T T T T
Existing Cable Guiderail n n �
Proposed Cable Guiderail n n n n
Equality Symbol �
Pavement Removal
T�EGETATIDN.•
Single Tree
Single Shrub
�
�
Hedge
Woods Line � � � � � �
Orchard
Vi neya rd
EXISTI11lG STRUCTURES.•
MAJ O R:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall -
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm Sewer Manhole
Storm Sewer
UTILITIES.•
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed Joint Use Pole
Power Manhole
Power Line Tower
Power Transformer
U/G Power Cable Hand Hole
H-Frame Pole
U/G Power Line LOS 6(S.U.E.*)
U/G Power Line LOS C(S.U.E.*)
U/G Power Line LOS D(S.U.E.*)
TELEPHONE:
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
Telephone Cell Tower
U/G Telephone Cable Hand Hole
U/G Telephone Cable LOS B(S.U.E.*) -
U/G Telephone Cable LOS C(S.U.E.*) -
U/G Telephone Cable LOS D(S.U.E.*) -
U/G Telephone Conduit LOS 6(S.U.E.*)
U/G Telephone Conduit LOS C(S.U.E.*)
U/G Telephone Conduit LOS D(S.U.E.*)
U/G Fiber Optics Cable LOS B(S.U.E.*)
U/G Fiber Optics Cable LOS C(S.U.E.*)
U/G Fiber Optics Cable LOS D(S.U.E.*)
� � � �
Vineyord
CONC
J CONC WW I
`
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
U/G Water Line LOS B(S.U.E*)
U/G Water Line LOS C(S.U.E*)
U/G Water Line LOS D(S.U.E*)
Above Ground Water Line
TV:
coNc Hw TV Pedestal
TV Towe r
�--------� U/G TV Cable Hand Hole
��B U/G TV Cable LOS 6(S.U.E.*)
U/G TV Cable LOS C(S.U.E.*)
0 U/G TV Cable LOS D(S.U.E.*)
U/G Fiber Optic Cable LOS B(S.U.E.*)
s
U/G Fiber Optic Cable LOS C(S.U.E.*)
U/G Fiber Optic Cable LOS D(S.U.E.*)
•
•
O
►1
�
�
-O-
O
a
�
HH
GAS :
Gas Valve
Gas Meter
U/G Gas Line LOS B(S.U.E.*)
U/G Gas Line LOS C(S.U.E.*)
U/G Gas Line LOS D(S.U.E.*)
Above Ground Gas Line
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Above Ground Sanitary Sewer
SS Forced Main Line LOS B(S.U.E.*)
SS Forced Main Line LOS C(S.U.E.*)
SS Forced Main Line LOS D(S.U.E.*)
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
Utility Unknown U/G Line LOS B(S.U.E.*)
U/G Tank; Water, Gas, Oil
Underground Storage Tank, Approx. Loc. -
A�G Tank; Water, Gas, Oil
Geoenvironmental Boring
U/G Test Hole LOS A(S.U.E.*)
Abandoned According to Utility Records -
End of Information
-W- -
W
A/G Water
- -T�- - -
TV
- - - -TV FO- - -
- -TV FO-
TV FO
0
�
— —�— —
— —G— —
—c—
a�c cas
�
O
55
A/G Sanitary Sewer
— — — —FSS— — — -
— — F55 — —
FSS
•
a
�
Os
- 7UTL -
0
UST
0
�
0
AATU R
E.O.I.
r-�
POINT
1
2
3
4
GPS2
GPS1
DESCo
B�-1
B�-2
B�-3
B�-4
B5864-2
B5864-1
NORTH
7813950�546
7818(�6 0 7396
782375038��
782777 0 ��J52
782�760�63�
7834410839�
���������������������������*������������
BM1 E�EVRTION = 2731076
N 781846 E 1�52�46
� STRTION 14+290�� 35 �EFT
8"SPIKE IN 36" POP��R
���������������������*����*����*��������
, �
. /� �
. , '
. .
` `' / �
` � I
� � m
.
,�NI
�
��
� I
� �
I� I
NCDOT BASELI11lE MONUME11lT (BL-2)
LOCALIZED PROJECT COORDINATES
1V = 781806.7396
E = 1052060.6078
-L- POT STA. l3 + 51. 99 =
I V� I DR Vl- POT STA.10 + 00.00
3 � LOCALIZED PROJECT COORDINATES
N = 78I766.0866
� � E = I052073.4934 \
I� II
�I � I
��
/� � I
� I I��
� , �
/ � � �
i �
/ � i
\ , �
� �
- � � = �-
TO B USICK � , � NC 80
B�_�� /
r �
\ �
I
\ � -L- STA. l2 + 25. 00 �
BEG TIP PROJECT B-5864
�I LOCALIZED PROJECT COORDI11lATES
I�OI N = 78I639.5592
E = I052062.6634
1 ��I
I'�' c�
� �I
I� xl
I bl
I �
NCDOT BASELINE M0111UME11lT (BL-l)
LOCALIZED PROJECT COORDI11lATES
N = 781395.0546
E = 1052060.8423
NOTES:
ERST
1�52�6�08423
1�52�6�06�78
1�521110592�
1�52281o�J84�
1�5226�a(�36�
1�5221�0744�
S UR T�EY
E�EV�TION
2733071
273305�
2757012
2785032
27960��
28190�1
,'--'�
� �
, ,
, �
� �� �`�
� � ��
� �
� � ` '� ' ��
. ,
i . ,� � i
� ` �
� '� � �
i\ �� BM#1 �r 1'�'��
i � -Ir STA 14+29.00 ' �
i � 35' LEFT � �
i _ � - - � � ELEV. = 2731. 76' � i
, __-- �
. � � ,
' , \ � N
i i , � , �
i i � � �
i GR i i - - � `i
, , �
� � , �
� � GR � . I�
i � � �
' ` � �.
� �
�--- ----' BL-2 '�.
.
�\ GR ��
. __,
DRVI- POT STA. Il +21.75'
END TIP PROJECT B-5864
LOCALIZED PROJECT COORDIIVATES
1V = 781781.1932
E = I052189.9052
��
�
I
�
�
�
�
�
�
� STRTION
C01�lTROL
OFFSET
OUTSIDE PROJECT �IMITS
13+�1 0 4(� 160 31 �T
OUTSIDE PROJECT �IMITS
OUTSIDE PROJECT �IMITS
OUTSIDE PROJECT �IMITS
OUTSIDE PROJECT �IMITS
1. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING
PROJECT CONTROL DATA AT:
HTTPS://CONNECT.NCDOT. GOV/RESO URCES/LOCATION/
THE FILES TO BE FOUND ARE AS FOLLOWS:
B5864 LS_CONTROL.TXT
SITE CALIBRATION INFORMATION HAS NOT BEEN PROVIDED FOR THIS PROJECT. IF FURTHER
INFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
• INDICATES GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL
BY THE NCDOT LOCATION AND SURVEYS UNIT.
PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM.
NETWORK ESTABLISHED FROM EXISTING HARN MONUMENTATION
SEE GPS CALIBRATION SHEET FOR HORIZONTAL AND VERTICAL COORDINATE VALUES.
DR V2- POT STA.10 + 00.00
BEG C011tSTRUCTION
LOCALIZED PROJECT COORDINATES
1V = 781893.IO19
E = 1051988.5567
SHEET 8-�864
-L- POC STA.1 S + 70.00
END TIP PROJECT B-5864
LOCALIZED PROJECT COORDINATES
/ N = 781983.31I8
E = 105209I.9709
i
� ,
� ,
i �
� � � _ -, \` NCDOT BASELINE MONUME11tT (BL-3)
� � �� `� LOCALIZED PROJECT COORDINATES
�
�� �\ N = 782375.3800
` E = 1052111.5920
� c� �
���
�
� `
, � �� .
� -
i �. .
` R ,
/ � � G
� . .
, � ,
. -
PROJECT REFERENCE NO.
B-5864
Location and
z
D
0
z
��
w
� c�
z��
D p
N
0
SHEET NO.
1-C-1
S u rve
NCDOT GPS M0111UME11lT (B5864-I)
LOCALIZED PROJECT COORDINATES
N = 78344I.8390
E = 1052219.7440
, . ,
. --- �
_ -� ---- � �- B L - 3
-L- NC 80 � � _
���
----- t S 04^58'S2.02"W ____________
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - �
- � - - - - - -
_ TO MICAVILLE � � � 1 809.11 _ _
g4„ w_ _
� - . � %�, -� • , - � � >12. _ _
, ` � � �� �-; � �.- �� \ \N TIE LINE B5864-2 �N 04 466.62' B5864-I
, - - , � , , �22 -� > w
�\ �� ` � GR i ' ,�GR� TI g3 �29 �� �E � N �g 201-�6;23 � � TIE LINE
��\ '------ - , -� ., .. ; /�/i ELI�rE y-�l TIE LINE
--- -------- �
�'--------SOIL � � � i �
----------- ., � � , � BL-4
-L- POT STA.14 + 85.60 = \ � ; '
DRV2- POT STA.10+96.53 ' � NCDOT BASELINE M0111UME11lT (BL-4)
LOCALIZED PROJECT COORDIIVATES ,' ��. ' LOCALIZED PROJECT COORDINATES
. , �, �
1V = 781899.2098 . ��,' , � � 1V = 782777.0052
E = I052084.8880 � ,' E = 1052281.0840
NCDOT GPS MONUMENT (B5864-2)
LOCALIZED PROJECT COORDI11lATES
11� = 782976.9630
E = 1052260.0360
NOTE: DRAWING NOT TO SCALE
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "B-5864-1"
WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 7834q1.8390(ft) EASTING: 1052219.7440(ft)
ELEVATION: 2819.91(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99979956
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"B-5864-1 " TO -L- 12+25. 00 STAT I ON I S
S 04° 58' 52. 02" W 1, 809.11 '
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
N
O
N
i
w
�
BE�/N APPROACH SLAB
.-�- sra.i3+84.00
,T-1
TYPE-I I I
END APPROACH SLAB
-L - ST A. l4 +58.00
�'? AT-,
ao
I TYPE-III .c
TYPE- I� i TYPE-Ilr ��
AT-1 M AT-1
�o
BEG/N BR/DG END BRIDGE
-L - ST A. l3 +94.88 -L - ST A. l4 +47.13
DETAIL SHOWING PAVEMENT TO BRIDGE RELATIONSHIP
� APPROACH SLAB
u �DA�L MORRIS GIBBS
DB ? PG ? `
� �
I
�1
�
�' � �, �
��,
TO BUSICK o
0
0
��
� S 03°33'S9"' W gROKEN I �
Q 111,74' CONCRETEI'
/ I WALL I
/ � I
BST PARKING
\ CELO METHODIST CHURCH
� DB m PG 478
'� 5��� 2 3
? O� S9,F
DETAIL A
STANDARD BASE DITCH
( Not to Scale)
Natural Natural
Ground ?•� �•.� Ground
d �
Geotextile g Min. D= 0.5-3.0 Ft.
Max. d = 3.0 Ft.
*When B is < 6.0' 6=2.0 Ft.
Type of Liner= CLASS II Rip-Rap
�ROM STA. 14+24.5 TO STA. 14+37 -L- LT
�
AXLE S 03°59'37" W
61,54' E
m �
z �
;'� � �
� ��
z v= �
� W Z I
- o W
��� �Z
�' � 2 5
_o �_
� N a BE�
� -L -
Z
��
RETAI N
.�`
-DRV l -
Pl Sto 10+60.44
�= 4/° 03' 0/.3" (LT 1
D = l63° 42' 08.0"
L = 25.08'
T = l3.10'
R = 35.00'
SE = SEE PLANS
�
/ �
� �
\ �
� � �
✓ O
�
�
�
DETAIL B
SPECIAL LATERAL BASE DITCH
( Not to Scale)
Natural 1 Fill
Ground ?.� p �-' Slope
� Min. D = 2.5 Ft.
6=2.0 Ft.
FROM STA. 15 + 04 TO STA. 15 + 50 -L- LT
DETAIL C
SPECIAL LATERAL 'V' DITCH
( Not to Scale)
Natural � `L�1 Fill
Ground ?.� Slope
D
Min. D=1.0 Ft.
FROM STA. 15 + 50 TO STA. 15 + 88 -L- LT
S 01°07'20" W
, /
Pl Sto 10+93.40
0 = 54° 3/' 46.1" (RT )
D = l63° 42' 08.0" �
L = 33.3/' �
T = 18.04' !
�
R=35.00' m
SE = SEL�PLANS
�
m �
�
.� \ m
�
g� �
`�
�m
\ �� r
z �� O
�
6, m DEAN E. & SHANNONm HR�SAWN
o,', �B 106 PG 211. SECO TRACT
�
METAL P ST m
�f �� I � � i �
��� l� I'� I�I 1 ' �
� i i
00°I5'16"
S 21°q3'S6" W
19,70'
DETAIL D
STANDARD BASE DITCH
( Not to Scale)
Natural Natural
Ground 2.� ,L.1 Ground
D
Min. D = 2.5 Ft.
B = 2.0 Ft. �
FROM STA. 15 + 50 TO STA. 15 + 74 -L- LT
Pl Sto l5 +77.69
p= 0° 30' 46.0" (LT l
D = 0° 59' S9.7"
L = 5/.28'
T = 25.64'
R = 5,730.00'
SE = SEE PLANS
�� i i �
��---' � O
DETAIL E
RIP RAP AT EMBANKMENT
( Not to Scale)
Ditch �,0'min• �
Grade �, 2'0
GEOTEXTILE J
Type of Liner=41.0 TONS,CL II Rip-Rap
Geotextile=40 sy
FROM STA. 14 + 24 TO STA. 14 + 47 -L- LT
-L -
Pl Sto 18+85.27 Pl Sto 20+42.09
0= 4° 00' 10.7" (RT J 0= l3° 24' 2/.7" (RT 1
D= 3° l8' 00.6" D= 7° 00' 00.0"
L = l2/.30' L = l9/.5/'
T = 60.67' T = 96.20'
R = 1,736.14' R = 8/8.5/'
83�/NA 2 �11
►�I AD
--� iv u�-uts'UU" �
N 02°26'46" E , � ^ 36v0 '
176,77' � � � , � � � � ��\ I � t
� � �9�3„F _ I i/ �
� � � � S8°8('\ � � I ' � OAXLE
�� G+ i \_' �-- I1o59� -------'i
, � � � S 04°27'00" W 95049' � �
� � �
� � i
�7�,� �/ ' � � � \ '�'j \'-��_ ------ �
; ,
� � -'�-/ / ,' % � w o cn ,'
�
�� /
O � < o 0
� ^ i `9 � v �v m cn w�
C '�
W W � v r i9 0 0�
�� � ❑� rrl �''i O �
%"� ��. � O � i i �, �� 2� m � � 18e03'
\ DAVID GURLEY � i i� o �'
� -' �- --- -- - .., �,� T, __
I I I L J/C/. /T � UJ.VV
I I�
I I
I I
I I
I I �I I
W
N N
� O
� O
� �
�
PROJECT REFERENCE NO.
B -5864
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
4
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
142,����EIP
42'46" E
� � �J6.��
�
�''<. _
LEWIS J. McENTYRE. Jr,
BRENDA SUE McENTYRE
LYNDON 0. BURG�N &
RITA WILSON �
DB 35
- S 3 PG 225 �
�� �
�
S 74°00'll" E �
45,08'------ ,
�-- -, ,
�'-- --- �
-- _, ,,
1 ,�
,�
HTR � _ - ' � � �
\ - i
�-� �
� '
� i
�
N 25°59'49" E �
� I
��o��� �
� .� � �
�EE SHEETS 5& 6 FOR PROFILE�
N
�
N
1
W
�
26
>IL MORRIS GIBBS
DB ? PG ?
�
AXLE S 03°59'37" W
61,54'
v
Q�J��
Pl Sta l0 +99.86
0= l9° 4/' 22.5" fRT )
D = l6° 5/' 06.1„
L = 116.84'
T = 59.00'
R = 340.00'
SE = SEE PLANS
�o
� N 2/°3g,39„
� RiW MON D I� � O,6, E
i �
� 1 �
a` o
� � I '�' �n V
� �
�
\ z � �
� ' Icn
� � �
��������
��
� ,, ,, � � �, � o
�
�, �, , � � � � � � ��
\ ,, ��r �
� � �
� I o�l L
�
�
� �mi
Z iil � i� � N
i
m �� � � j
� II x � �
w � I
z o x �� -DE _ �T I
� � Z
�\ � � W O �� 60.Op,
� 6? � Z II
�' o � � 2 5 � � �
� � � � �� I �
N � I I
1 � Z ��� II ' �I
� II � I \�i
+`��� � � '��' / ,�
� �� ,ti I ��� �
II =_ __ \ ia„
II � ,
Nc ao �/ ° ,
22' BST �I
EXISTING R/Wq I I� � �
BL-\ � ��
\ � �
S "I
o�
� � �
rnI
O �
WOOD � �
CROSS � �I
I z
v� I
�
, ��
TO BUSICK o
0
0
��— �2
33'59"' W BROKEN I �
a74� CONCRETEI'
, WALL I
BST PARKING
� _ �
� �
�OC7� �
CELO METHOD�ST CHURCH
DB m PG 4 78
S�'�- 2 3
O� Sp°�,
/ / �
� �
`� ti BROWNS CREEK BAPTIST CHURCH
o�`" DB 265 PG 210. FIRST TRACT
, �.
�
FROM STA.11+30 TO 12+56 -DET- RT
DETAIL I
TEMPORARY RIP RAP AT EMBANKMENT
( Not to Scale)
10'min.
Ditch �,0'min• �
Grade f 1.0'
GEOTEXTILE �
Type of Liner= 1.0 TON,CL B Rip-Rap
Geotextile=ll sy
FROM STA. 14 + 59 TO STA. 14 + 85 -DET- RT
-DET - ST A. l0 +36.7/
-L - ST A. l0 +36.7/
Pl Sto l2+17.45
�_ l9° 56' 06.8" fLTI
D = l6° 5/' 06.1"
L = 118.30'
T = 59.75'
R = 340.00'
SE = SEE PLANS
S 01°07'20" W
S 01°q0'30" W �
15025'
FROM STA. 14 + 71 TO STA. 16 + 14 -DET- RT FROM STA. 17 + 81 TO STA. 18 + 08 -DET- RT
,�
� O
�
o�
�, w DEAN E. & SHANNON CHR�SAWN
o,? DB 106 PG 211, SECOND TRACT
�
METAL POST
� � ,
I I i i
( i i i
= � � ,� I � 1 �. � � �
S 21°q3'S6" W
19, 70'
/5
�� i i �
\\'-----� ,�� o
-DET-
Pl Sto l6 +54.25 Pl Sto l7 +69.98
0= l9° 38` 18.7" fLTI �_ l9° 22' 26.2" IRTJ
D= l6° 5/' 06.1" D= l6° 5/' 06.1„
L = 116.54' L = 114.97'
T = 58.85' T = 58.04'
R = 340.00' R = 340.00'
SE = SEE PLANS SE = SEE PLANS
�— 2011
NA� $�/NA
N 02°26'46° E
176077' �
��
��, �j< N
r ��� ��
, S ��9�3„F
�`� T` / 5 i 8°86" ,
S
2S �q� �9 >„ .
PROJECT REFERENCE NO.
B -5864
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2B -/
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�i ..,.,�
!,'� Itl
- - _ - - - - - - - �AXLE � � -- - � � �
11,59� i �
S 04°27'00" W 95,49' � �I �
�
8� � �-�-� ------� � � � �`
o � �
� o � t
�o � ❑ � �� v� w� c�,
� �, �� � � W o �
i �, � � 2� � � � 18,03'— � � ��
� � — 142,56'
EIP
N�� I`^ '�' EIP N Q4°42'46" E��-�
�''��,'r�,-
,� � �` LEWIS J. McENTYRE. Jr,
y BRENDA SUE McENTYRE
� L YNDON D. BURGW &
� RITA WILSON ,' - "
� � DB 353 PG 225 � � � �,�
� � , �
, � Z
S 74°00'll" E i / �
_45,08' - - _ � �
� ---- �
� , i
�
�------------ � ,-� i ��
, � , i
�
' � ` i �w
HTR � __--- � � � /
\", �, , i
��, � i �
� � ,
i � �
� , �
N 25°59'49" E � � � v �
10,00'
i �
i i
s��� _� i
330 ,
��O 9,3 � „ \ '
� �� � � % /
FOR —DET— PROFILE SEE SHEET 5
- _���� �� ��. ■
1 � ������ ��. 1
� � �����- --
����� I�� 1
i�17���■�►�1'�' I I
i� ��!!►\� w! I 1
■■■■■■■■10
0�u���•��
■A■�■��l■■
i:v ■iv ■■
CJfi3�' ■■
■■��1■ . �
u�.����.�•���_
� r ��■� �� �r i� ■
� ■ �r �� ■
�■�■i ■ii
■■ ■■u
■■■■■■■■■■
iiiiiiiiii
i�■�■�■iiiiii
;��R� .C��[�D�
.■�■_�.■�■
::::: ::::
iii■�■iiiii
iiiiiiiiii
■■■■■■■■■■
�`��,e e■�
■ ■ ■■
■■■■■ ■■■■
�■��������
����������
■■■■■■■■■■
I{,�7■ ■1 II 1� ■
����������
uiiiiiiu
■■■■■■■■■■
iiiiiiiiii
i�■�■�■iiiiii
,�%�� ��i►%i
:::::�::::
..... ....
iii■�■iiiii
iiiiiiiiii
■■■■■■■■■■
����������
■■■■■■■r-�
■■■■■■■� ■�'
■■■■■■■� ■r,
■��■■■■
■ ■�Ir � �
s■ur��
-�■■■�� �
■■■ini���,
■■ ���
■■ ■■■■
. � � �
iiiiiiiiii
iiiiiiiiii
■■■■■■■■■■
ii■iiiiiii
■■■■■■■■■■
��: �■ .��: ■
�i��■u�uu■
:::::.0 " ; s,
...o
■■o■■� �
ii■iii■s�i
■■■■■■■- C
iiiiii�
J�\:.A ���
■■■■■�■■■■
�■uW �n�
■■■■■■■■■■
:::::E::::
�'::: ::::