Loading...
HomeMy WebLinkAbout20061798 Ver 6_More Info Received_20081008V""4 6P"M" DEPARTMENT OF PUBLIC UTILITIES POST OFFICE BOX 2234 SMITHFIELD, N.C. 27577 (919) 989-5075 September 26, 2008 RD 0WL9 D Parker Development Limited, LLC . 12620 Port Chester Ct O CT 8 2008 Raleigh, NC 27614 DENR - WATER QUALITY Attn: Ronald J. Mikesh 1M1 ELANDS AND STORMWATER BRANCH Re: Summerwind Plantation Subdivision-Phase 1-A Stormwater Management Statement and Plan Dear Mr. Mikesh: We have reviewed the responses to the plan review letter dated August 2, 2007 and the revised information to the stormwater management for the proposed Summerwind Plantation Subdivision-Phase IA. The stormwater management plan has been approved with the following stipulations: 1. Please be advised that the total nitrogen calculations must be revised as subsequent phases are proposed for development. 2. Please be reminded that attenuation and downstream impacts must be fully addressed for all future phases of the development. A copy of this letter will be forwarded to the Planning Office for their files. If you have any questions or need additional information, please contact me at (919) 209-8333 or by email at jamie.guerrero@johnstonnc.com. Sincerely, .AL Jamie Guerrero, PE Stormwater Administrator cc: Berry Gray - Planner Chandra Coats, PE - Utilities and Environmental Engineer Robert Tucker, PE - Wetherill Engineering Printed on recycled paper co