Loading...
HomeMy WebLinkAbout20070410 Ver 1_More Info Received_200810035410 Trinity Road Palisades II, Suite 320 Raleigh, NC 27607 Tel: (919) 233-9178. Fax: (919) 233-0144 October 2, 2008 01-0410 Mr. Andy Williams U.S. Army Corps of Engineers 6508 Falls of the Neuse Road, Suite 120 Raleigh, North Carolina 27615 131514/005 Subject: City of Greensboro Lake Townsend Dam Spillway Replacement Individual 404 Permit (SAW# 2007-00895-241) Dear Mr. Williams: This letter is in reference to discussions you have held with Ms. Shearin Dramby regarding the placement of demolition materials within the impacted area of the Townsend Dam Spillway Replacement Project. Upon completion of the new dam and spillway, portions of the existing spillway, intake and pump house will require demolition. Demolition material will include mass and reinforced concrete from spillway buttresses, retaining walls, and the intake pump station. Much of the demolition will need to be performed underwater and we propose to dispose of this demolition material underwater between the existing and new spillways. This location is within the existing impact boundaries defined in the approved Section 404 Permit (SAW# 2007-00895-241) and 401 Water Quality Certification (DWQ- 2007-0410). On behalf of the applicant, Brown and Caldwell is requesting a letter of verification that the above referenced activity is allowable under the previously issued Section 404 Permit and 401 Water Quality Certification. Feel free to contact me should you have any questions or require additional information. Very truly yours, BROWN AND CALDWELL Abby Rokosch Watershed Scientist AR:tt Enclosure ° OCT 3 2008 DENR - WATER QUALITY WETLANDS AND STORWATER BRANCM cc: Ian McMillan, DWQ; Melinda King, City of Greensboro; Robert Cannon, Schnabel Engineering; Robert Teem, Brown and Caldwell \\bcra101\projects\Greensboro\Townsend Dam- 1 30603\Permitting\Demolition\USACE Impacts Verification Letter.doc E n v i r o n m e n t a l E n g i n e e r s C o n s u 1 t a n t s