Loading...
HomeMy WebLinkAbout20111881 Ver 2_More Info Received_20170818 rcc 4 ilithl- • C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project(check all that apply): ❑Wetlands ®Streams-tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number— Type of impact Type of wetland Forested (Corps-404, 10 Area of impact Permanent(P)or (if known) DWQ—non-404, other) (acres) Temporary(T) W1 ❑ P ❑T El Yes El Corps ❑ No ❑ DWQ W2 ❑ P❑T Oyes ❑ Corps 0 N ❑ DWQ W3 ❑ P ❑T ❑Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑T El Yes El Corps ❑ No ❑ DWQ W5 ❑ P ❑T ID yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑T ID yes El Corps ❑ No ❑ DWQ 2g.Total wetland impacts 2h. Comments:There are no wetland impacts associated with this project 3. Stream Impacts If there are perennial or intermittent stream impacts(including temporary impacts)proposed on the site,then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER)or (Corps-404, 10 stream length Permanent(P)or intermittent DWQ—non-404, width (linear Temporary(T) (INT)? other) (feet) feet) Impact 1; Map 1 Utility Crossing Water Fork ® PER ® Corps 12 60 ❑ P®T ��Yjr ❑ INT ® DWQ Impact 2; Map 1 ® PER ® Corps UtilityCrossingUT to Water Fork 4 45 ❑ P®T ❑ INT ® DWQ Impact 3; Map 2 i 0 PER ® Corps ID P®T 7J Utility Crossing Water Fork DINT ® DWQ 12 50 3h.Total stream an tributary impacts 155 3i.Comments: Linear/ afootage of temporary impacts includes the footprints of coffer dams to be used during utility installation nts Page 5of11 PCN Form—Version 1.3 December 10, 2008 Version