Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20170940 Ver 1_B-4544_HYD_WISS_(Sep 2014)_20170818
WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS an xisting xisting Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure FillIn FillIn in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) Site 1/2 -L- 13+60 to 14+86 Bridge 134 < 0.01 < 0.01 0.01 0.02 < 0.01 97 Site 2 -L- 14+86 to 19+14 Roadway Fill Slope 0.11 0.03 0.05 0.02 Site 2/3 -L- 19+14 to 20+16 Bridge 133 0.01 0.01 0.01 0.02 21 81 Site 3 -L- 20+16 to 20+75 Roadway Fill Slope < 0.01 < 0.01 < 0.01 TOTALS*: 0.13 < 0.01 0.07 0.04 0.05 0.04 21 178 0 *Rounded totals are sum of actual impacts NOTES: Revised 2013 10 24