Loading...
HomeMy WebLinkAboutNC0022406_Extension Request Approval_20170818Water Resources Environmental Quality August 18, 2017 Ed Sullivan Duke Energy 526 South Church Street Mail Code EC13K Charlotte, North Carolina 28202 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Subject: Belews Creek Steam Station Interim Action Plan Schedule Updates — Request for Extension of Milestone Dates Dear Mr. Sullivan: The North Carolina Department of Environmental Quality (DEQ) received your request for extension of the deadlines for completing the interim actions at the Belews Creek Steam Station letter dated July 17, 2017 (attached). DEQ is hereby approving the request for extension. DEQ understands that, meeting the milestone dates is contingent upon several things including issuance of NPDES permits, permitting through other agencies, and DEQ review and comment on additional submitted Basis of Design reports. In the letter, Duke assumes that DEQ will review and return comments to the Basis of Design packages within 10 business days. Please note that there are no regulatory requirements for timeframes to review these documents and that DEQ may require additional time to review and provide comments. The proposed schedules do not anticipate additional submittals after comments are received for the 100% Basis of Design. However, DEQ will review and may provide comments on the 100% Basis of Design package, which may require additional submittal(s) to address any concerns. If the anticipated milestone dates in this request are altered, please inform the DEQ Winston-Salem Regional Office and Central Office via email, documenting the reasons for any changes. If you have any questions, please feel free to contact Shuying Wang (Winston-Salem Regional Office) at (336) 776-9800 or Steve Lanter (Central Office) at 919-807-6444. State of North Carolina I Environmental Quality I Division of Water Resources Water Quality Regional Operations Section 1636 Mail Service Center I Raleigh, North Carolina 27699-1636 919-707-9129 Sincerely, S. ay 'mmerman, P.G., Director Division of Water Resources Attachment: Interim Action Plan Schedule Update — Belews Creek Steam Station letter from Duke Energy dated July 17, 2017 cc: WSRO WQROS Regional Office Supervisor WQROS Central File Copy Page 2 of 2 DUKE ENERGY. July 17, 2017 Mr. S. Jay Zimmerman, Director Division of Water Resources North Carolina Department of environmental Quality 1611 Mail Service Center Raleigh, North Carolina 27699-1611 Subject: Interim Action Plan Schedule Update Belews Creek Steam Station Dear Mr. Zimmerman: 526 South Church Street: Mail Code EC13K Charlotte, North Carolina 28202 980.373.3719 In a letter dated March 28, 2017, DEQ documented acceptance of Duke Energy's milestone schedules for the Accelerated Remediation sites submitted in February 2017. In that letter DEQ stated that, "If the anticipated milestone dates in this request are altered, please inform the appropriate DEQ Regional Office and Central Office via email, documenting the reasons for any changes:' Duke Energy is providing the enclosed updated schedule for the Belews Creek project to formally request schedule extension. The schedule has been adjusted for the following two items: 1) the extended DEQ review period for the 60% Basis of Design, 2) uncertainty with timing of NPDES permit modifications that are required to complete start-up of the systems. If you have comments and/or questions, please direct them to me at 980-373-3719. Sincerely, D. Edwin M. Sullivan, PE Director— Waste & Groundwater Programs Environmental, Health & Safety Enclosure: Interim Action Plan Schedule Updates - Belews Creek Steam Station Cc: Jim Wells — Duke Energy Enclosure Belews Creek Steam Station Interim Action Plan Schedule Update to DEQ July 17, 2017 • 30% Design Submitted to DEQ • 60% Design Submittal to DEQ (DEQ review comments received June 30, 2017) • 100% Design Submittal to DEQ • Final Regulatory Approvals for Construction (includes 100% BOD, Well Recovery, E&SC, etc. excludes NPDES Permit Modification) • Begin Extraction Well and Treatment System Construction • NPDES Permit or DEQ Authorization Anticipated • Extraction Well and Treatment System Begin Operation Completed December 29, 2016 Completed March 31, 2017 September 22, 2017 October 13, 2017 October 20, 2017 November 1, 2017 January 26, 2018 Note: For scheduling purposes and as directed by DEQ in the January 30, 2017 conference call, we assume DEQ will review and return comments to the Basis of Design packages within 10 business days. Extraction Well and Treatment System operation schedule is contingent upon receipt of the NPDES permit modification or other DEQ authorization to direct the extracted groundwater into the ash basin on or before the anticipated date. The current schedule does not anticipate additional submittals after comments are received for the 100% BOD (i.e. any additional required submittals after 100% BOD will delay the anticipated start date.)