Loading...
HomeMy WebLinkAbout20170940 Ver 1_REVISED_B4544PCN tables_20170803C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): � Wetlands � Streams - tributaries ❑ Buffers � Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem orar T Fill/Mechaniz- � Yes � Corps Site �/2 � P❑ T ed Clearing Riparian � No � pWQ 0.03 Site �/2 � P❑ T Excavation Riparian � Yes � Corps <0.01 ❑ No ❑ DWQ Fill/Mechaniz- � Yes � Corps Site 2� P❑ T ed Clearing Riparian � No � pWQ 0.15 Fill/Mechaniz- � Yes � Corps site 2�3 � P❑ T ed Clearing Riparian � No � DWQ 0.02 Fill/Mechaniz- � Yes � Corps Site 3� P � T ed Clearing Riparian � No ❑ DWQ <0.01 Site 1❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 0.20 2g. Total wetland impacts Permanent 2h. Comments: See Wetland Permit Impact Summary sheet for details. Hand clearing in riparian wetlands totals 0.04 ac. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact number - (PER) or jurisdiction stream length (linear Permanent (P) or intermittent (Corps - 404, 10 width feet) Temporary (T) (INT)? DWQ — non-404, (feet) other) Site 1/2 ❑ P� T Fill Black River � PER � Corps 40 <0.01 ac ❑ INT ❑ DWQ Site 2/3 � P � T Fill Black River � PER � Corps 40 21 If ❑ INT ❑ DWQ Site 2/3 ❑ P� T Fill Black River � PER � Corps 40 0.02 ac. ❑ INT ❑ DWQ Site ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 21 ft P 0.02 ac.T 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number — waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) (if applicable) or Temporary T 02 � P❑ T Fill slope Borrow pit 0.05 02/3 � P � T Fill slope Swamp/Open <0.01 water 02 ❑ P� T Fill slope Borrow pit/swamp 0.02 02/3 ❑ P� T Fill slope Swamp/Open <0.01 water 4f. Total open water impacts 0.05 Permanent 0.02 Temporary 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: