Loading...
HomeMy WebLinkAboutAddington Crossing Subdivision - 2017-08-15-Revised Plan Sheets C-509-C-512File: W:\CalAtlantic\Potter Road\Civil\DWG\04_Sheets\C-509 BASIN DETAIL SHEETS.dwg, Tab: C-509 BASIN #1 DETAILPlot Stamp: 8/15/2017 2:40:20 PM - Laurin HallnerADDINGTON CROSSINGCAL ATLANTICWESLEY CHAPEL, UNION COUNTY, NORTH CAROLINADESIGNED SHEET NUMBER PROJECT # CHECKED DRAWN DATEDATE#DESCRIPTIONBYCALATL1603 07/27/2017 ROBERT L. CASH, P.E. NC LICENSE No. 033448 07/27/2017 HK JW RC SHEET TITLE05/10/20171ADJUSTMENT C-501 PER DUKE COMMENTS BASIN 1 DETAILC-509 BASIN 1 DETAIL DRY DETENTION BASIN #1 0 1 INCH = 20 FEET 401020 ɓ LEGEND 627.00 614.93 FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES *CONTRACTOR TO ENSURE MIX HAS A P-INDEX BETWEEN 10 AND 30. *CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE). AASHTO M288 CLASS 2 NON-WOVEN GEOTEXTILE FILTER FABRIC OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET - WEIR ON ALL FOUR (4) SIDES CLEAN OUT PIPE TO BE CAPPED 8" OF WASHED STONE 3:1 (M A X.) 2.50' WEIR EL.= 614.93 4" PERFORATED UNDERDRAIN @ 0.50% 50 YR. STORM ELEVATION: 616.20 SURFACE ELEVATION: 614.00 WATER QUALITY DETENTION ELEVATION: 614.93 UNDERDRAIN OUTLET TO CONNECT INTO STRUCTURE' INV = 610.83 INV = 610.83 25 YR. STORM ELEVATION: 616.04 24" 24" RCP INV.OUT=610.58 KEY RIP RAP MINIMUM DEPTH OF 2' RIP RAP BERM d50=6", CLASS B ELEV. 616.00 3' RIP RAP d50=6", CLASS B TOP OF EMERGENCY SPILLWAY ELEV = 616.00 617.20 TOP OF BERM ELEV = 617.00 10 YR. STORM ELEVATION: 615.76 100 YR. STORM ELEVATION: 616.33 4" PVC INV.IN=610.83 UNDERDRAIN TIE-IN 18"IWSNOTES 1.NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2.MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. SEEPAGE COLLAR TOP OF PIPE ELEV = 612.50 SHWT ELEVATION: 608 8" TOP OF BOX ELEV. 617.20 File: W:\CalAtlantic\Potter Road\Civil\DWG\04_Sheets\C-509 BASIN DETAIL SHEETS.dwg, Tab: C-510 BASIN #2 DETAIL SHEETPlot Stamp: 8/15/2017 2:47:16 PM - Laurin HallnerADDINGTON CROSSINGCAL ATLANTICWESLEY CHAPEL, UNION COUNTY, NORTH CAROLINADESIGNED SHEET NUMBER PROJECT # CHECKED DRAWN DATEDATE#DESCRIPTIONBYCALATL1603 07/27/2017 ROBERT L. CASH, P.E. NC LICENSE No. 033448 07/27/2017 HK JW RC SHEET TITLE05/10/20171ADJUSTMENT C-501 PER DUKE COMMENTS BASIN 2 DETAILC-510 BASIN 2 DETAIL 0 1 INCH = 20 FEET 4010 20 ɓ LEGEND 627.00 FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. AASHTO M288 CLASS 2 NON-WOVEN GEOTEXTILE FILTER FABRIC OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET - WEIR ON ALL FOUR (4) SIDES CLEAN OUT PIPE TO BE CAPPED 8" OF WASHED STONE 3:1 (M A X.) 2.50' WEIR EL.= 594.03 4" PERFORATED UNDERDRAIN @ 0.50% 50 YR. STORM ELEVATION: 595.44 SURFACE ELEVATION: 593.00 WATER QUALITY DETENTION ELEVATION: 594.03 SC250 LINER UNDERDRAIN OUTLET TO CONNECT INTO STRUCTURE INV = 589.83 INV = 589.83 25 YR. STORM ELEVATION: 595.26 36" KEY RIP RAP MINIMUM DEPTH OF 2' RIP RAP BERM d50=6", CLASS B ELEV. 595.00 3' RIP RAP d50=6", CLASS B TOP OF EMERGENCY SPILLWAY ELEV = 597.00 TOP OF BERM ELEV = 598.00 10 YR. STORM ELEVATION: 595.01 100 YR. STORM ELEVATION: 595.62 STO R M D R AI N T O P INV. S E E P L A N 36" RCP INV. OUT=589.33 4" PVC INV. IN=589.83 UNDERDRAIN TIE-IN 597.03 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES * CONTRACTOR TO ENSURE MIX HAS A P-INDEX BETWEEN 10 AND 30. * CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE).18"IWSNOTES 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. SEEPAGE COLLAR SHWT ELEVATION: 585' TOP OF PIPE ELEV = 591.50 8" TOP OF BOX ELEV. 597.03 File: W:\CalAtlantic\Potter Road\Civil\DWG\04_Sheets\C-509 BASIN DETAIL SHEETS.dwg, Tab: C-511 BASIN #3 DETAIL SHEETPlot Stamp: 8/15/2017 2:46:44 PM - Laurin HallnerADDINGTON CROSSINGCAL ATLANTICWESLEY CHAPEL, UNION COUNTY, NORTH CAROLINADESIGNED SHEET NUMBER PROJECT # CHECKED DRAWN DATEDATE#DESCRIPTIONBYCALATL1603 07/27/2017 ROBERT L. CASH, P.E. NC LICENSE No. 033448 07/27/2017 HK JW RC SHEET TITLE05/10/20171ADJUSTMENT C-501 PER DUKE COMMENTS BASIN 3 DETAILC-511 BASIN 3 DETAIL 0 1 INCH = 20 FEET 4010 20 ɓ LEGEND 627.00 FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. AASHTO M288 CLASS 2 NON-WOVEN GEOTEXTILE FILTER FABRIC OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET - WEIR ON ALL FOUR (4) SIDES CLEAN OUT PIPE TO BE CAPPED 8" OF WASHED STONE 3:1 (M A X.) 2.50' WEIR EL.= 585.75 4" PERFORATED UNDERDRAIN @ 0.50% 50 YR. STORM ELEVATION: 586.85 SURFACE ELEVATION: 585.00 SHWT ELEVATION: 580.00 UNDERDRAIN OUTLET TO CONNECT INTO STRUCTURE INV. = 581.83 INV = 581.83 25 YR. STORM ELEVATION: 586.73 30" KEY RIP RAP MINIMUM DEPTH OF 2' RIP RAP BERM d50=6", CLASS B ELEV. 587.00 RIP RAP d50=6", CLASS B TOP OF EMERGENCY SPILLWAY ELEV = 587.00 TOP OF BERM ELEV = 588.00 10 YR. STORM ELEVATION: 586.55 100 YR. STORM ELEVATION: 586.96 STO R M D R AI N T O P INV. S E E P L A N 585.75 30" RCP INV. OUT=581.58 4" PVC INV. IN=581.83 588.75 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES * CONTRACTOR TO ENSURE MIX HAS A P-INDEX BETWEEN 10 AND 30. * CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE).18"IWSNOTES 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. SEEPAGE COLLAR 8" TOP OF PIPE ELEV = 583.50 WATER QUALITY DETENTION ELEVATION: 585.63 TOP OF BOX ELEV. 588.75 File: W:\CalAtlantic\Potter Road\Civil\DWG\04_Sheets\C-509 BASIN DETAIL SHEETS.dwg, Tab: C-512 BASIN #4 DETAIL SHEETPlot Stamp: 8/15/2017 2:46:24 PM - Laurin HallnerADDINGTON CROSSINGCAL ATLANTICWESLEY CHAPEL, UNION COUNTY, NORTH CAROLINADESIGNED SHEET NUMBER PROJECT # CHECKED DRAWN DATEDATE#DESCRIPTIONBYCALATL1603 07/27/2017 ROBERT L. CASH, P.E. NC LICENSE No. 033448 07/27/2017 HK JW RC SHEET TITLE05/10/20171ADJUSTMENT C-501 PER DUKE COMMENTS BASIN 4 DETAILC-512 BASIN 4 DETAIL 0 1 INCH = 20 FEET 4010 20 ɓ LEGEND 627.00 FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. AASHTO M288 CLASS 2 NON-WOVEN GEOTEXTILE FILTER FABRIC OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET CLEAN OUT PIPE TO BE CAPPED 8" OF WASHED STONE 3:1 (M A X.) 2.50' WEIR EL.= 585.98 4" PERFORATED UNDERDRAIN @ 0.50% 50 YR. STORM ELEVATION: 587.38 SURFACE ELEVATION: 585.00 SHWT ELEVATION: 580.00 UNDERDRAIN OUTLET TO CONNECT INTO STRUCTURE INV. = 581.83 INV = 581.83 25 YR. STORM ELEVATION: 587.19 36" KEY RIP RAP MINIMUM DEPTH OF 2' RIP RAP BERM d50=6", CLASS B ELEV. 587.00 RIP RAP d50=6", CLASS B TOP OF EMERGENCY SPILLWAY ELEV = 588.00 TOP OF BERM ELEV = 589.00 10 YR. STORM ELEVATION: 586.94 100 YR. STORM ELEVATION: 587.69 STO R M D R AI N T O P INV. S E E P L A N 585.98 36" RCP INV. OUT=580.95 4" PVC INV. IN=581.83 UNDERDRAIN TIE-IN 589.15 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES * CONTRACTOR TO ENSURE MIX HAS A P-INDEX BETWEEN 10 AND 30. * CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE).18"IWSNOTES 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. SEEPAGE COLLAR 8" TOP OF BERM ELEV = 583.50 WATER QUALITY DETENTION ELEVATION: 585.98 TOP OF BOX ELEV. 589.15