Loading...
HomeMy WebLinkAboutAddington Crossing Subdivision - 2017-08-11-O&M Signed SheetOperation & Maintenance Agreement Project Name: Project Location: Addington Crossing 5416 Hudson Church Road Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & corresponding O& Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level Spreader/VFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present User Defined BMP Present: :WN, 4 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party Title & Organization, Street address. City, state, zip: Phone number(s): Email: Signature: I Date: Z 7, /Y/OA) ,aNotary Public for the State o�ff � Na2i�ii C/"OIIu1,4 County of J�fif p!—k i io y/o Cc'f (/ , do hearby certify that (yLl 41t)J d A V S 0,4) personally appeared before me this 97 day of �(ANt .2o! i and acknowledge the due execution of they Op�errgons and Ma/i9tenance Aciregi nt. Witness m iaW and official seal, —/� �YAYY6iae. b ' 01 P, 2 s pOMMIS9�Ee PIPES z. PU500 J? FNBLj \� My commission expires STORM -EZ 6/2612017 Version 1.4 O&M Manual Page 1 of 3 ENVIRONMENTAL• GEOTECHNICAL BUILDING SCIENCES • MATERIALS TESTING July 21, 2017 Mr. Robert Cash, P.E. Cardno 9800 Southern Pines Blvd. Suite I Charlotte, INC 28273 7606 Whitehall Executive Center Drive, Suite 800 Charlotte, NC 28273 +1 704 529 3200 www.atcgroupservices.com RE: Report of Seasonal High Water Table Evaluation Potter Road Site Wesley Chapel, North Carolina Dear Mr. Cash: Based on ATC's review of the Preliminary Geotechnical Report prepared by others and dated February 10, 2016, our review of the area topographical map, and our experience in the Piedmont area of North Carolina, we provide the below Estimated Seasonal Water Table Elevations for the proposed Detention Ponds planned for the site. Detention Pond Location Estimated Seasonal High Groundwater Elevation, ft. Bio -retention Basin #1 (TP -4) 608 Blo-retention Basin #2 (TP -3) 585 Bio -retention Basin #3 (TP -2) 580 Bio -retention Basin #4 (TP -1) 580 If a "Final Geotechnical Report' is prepared for the site, we recommend the installation of temporary monitoring wells in the area of the proposed detention ponds in order to verify the elevations provided herein. Respectfully Submitted, ATC Associates of N.C., P.C. Joseph G.Schold, P.E. Principal Geotechnical Engineer Reg. NC No. 21736 Joe.schold@atcassociates.com W Q d w W O U O LL N W F - Z CW G W J a a r`L o m -x m 1 Jmdd9 <C 0 EE0 F- m c LM -E a , U a m El EL mmm3co>a rn day0 5 o m o nUL> .LY.E�N mmo $aOm-m mw oULo "aol1gmmmmt„ mo HtraS°vOaEmt 1L'0 '1l .',E .dP •Nd t m c m r rn m U 0 O L U U � N�6U�NmNZ�NUomNNLm NaOorn�0CrncEmc. cUcymaNmmOOE O o o Z m T c m OmN U) O�UQ� U N O o a E N w N m o OI l0 E c :Si 42 L C '� a N Z O L O N N a S W ar m m aw o £ a Q N c'm o a y c ma e m E n R N G E O N m O N a T Z 3 m e—j 0 E E D U F Li E N O O m ` O` V Z'+ r oc aoE a aV T••U Qu'ova.yNga`rn. mmd�'�mnCNcm JdoUC LCary0aNvOd0M�mO3N0cmcmn LO� a�3cvEo cNmmNmf aa� C m'�Tc rn day0 5 o m o nUL> .LY.E�N mmo $aOm-m mw oULo "aol1gmmmmt„ mo HtraS°vOaEmt 1L'0 '1l .',E .dP •Nd t U 0 O U U N�6U�NmNZ�NUomNNLm NaOorn�0CrncEmc. cUcymaNmmOOE Z _waU'mEUVmC OmN U) O�UQ� U Q7 O Z OmN U) O�UQ� J H Lu 0 z m m rn 0 0 o C EL Li \rcjo,_ \\ ` 660971 6 / A5 611 62I--------� \ I\ I613 I � / \ I I I 614 ---------- \ 615 / Z/ //// 620// I -- ____� 616 617 _ f OUTLET STRUCTURE I \ (SEE DETAIL THIS SHEET— I rC�EA�OUT/r / __---- Ir� 1 II 3.- I I I I I �� I I I I I I I I I iN I I l I i Il l lI/I/ iI rr r// II i i 1 1 I I I I I III I 111111 II �� I—I � r4P(w r r /Yo �it j � BIORETENTION r— // POND #1 52' 10, INiENA i ROC4 FORE6AY / % ASEWN / / / / /' / 4 / 3:1 RIP RAP APRON Lu of 2� y�` / HW 100 H 100A 6/6 N �61p'_ I I I 1 DRY DETENTION BASIN #1 FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES * CONTRACTOR TO ENSURE MIX HAS A P -INDEX BETWEEN 10 AND 30. * CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE). RIP RAP BERM BOTTOM ELEVATION d50=6", CLASS B 3, OF PRETREATMENT ELEV. 616.00 FOREBAY CLEAN OUT PIPE TO --- ---- BE CAPPED ---------- 100 YR. STORM ELEVATION: 616.33 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — __________ _______________ __ ___ ___________------- 50 YR. ST ORMELEVATION:616.20_________ _ _ _ 25 YR. ORM ELEVATION: 616.04 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _y — — — — — — — — — — — — — — — — — ----------------------- ----- — 10 YR. STORM ELEVATION_ 615.76 - - — — — — — — — — — — — — — — — — — — — -----------4--------------- — — — — —WATERQUALITYDETENTIONELEVATION:614.93 — — — — i _ SURFACE ELEVATION: 614.00 ------------ SHWT ELEVATION: 608 4" PERFORATED UNDERDRAIN @ 0.50%� AASHTO M288 CLASS 2 NON -WOVEN GEOTEXTILE FILTER FABRIC 8" OF WASHED STONE UNDERDRAIN OUTLET TO CONNECT INTO STRUCTURE' INV = 610.83 BIORETENTION POND #1 CROSS SECTION NOT TO SCALE WEIR EL.= 614.93 r- D• D '• t01:'8F PIPIE „ _ D ► ELEV = 612.50 • D ► • 2�'• i TOP OF BOX ELEV. 617.20 TOP OF BERM ELEV = 617.00 TOP OF EMERGENCY SPILLWAY ELEV = 616.00 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL \ STRUCTURE SEE DETAIL THIS SHEET - WEIR ON ALL FOUR (4) SIDES KEY RIP RAP MINIMUM DEPTH OF 2' '1 0 4" PVC INV. IN=610.83 UNDERDRAIN TIE-IN 4.0' 4.0' O� OP \ IANDLE MANHOLEFRAME AND LID TO BE PLACED DIRECTLY OVER STAIRS o ELEVATED TOP P -� 614.93 / 1\0 oQ Op'P\ NOTE: 1. CORE OPENINGS TO ACCOMMODATE PROPOSED PIPES. (REFER TO PLAN SHEET FOR SIZE AND LOCATION OF PIPE) TYPICAL CONCRETE OPEN THROAT DETAIL INV = 610.83 NOTES 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. NOT TO SCALE 617.20 SEEPAGE COLLAR 24" RCP INV. OUT=610.58 LEGEND ium PROPERTY LINE m CO rn RIGHT-OF-WAY (ROW) — — — — — — — SETBACK O m U PARCEL LINE 1:811.01 CONCRETE SIDEWALK J � OJ BACK OF CURB (FC) O Q J U �0� EDGE OF PAVEMENT (EP) — CENTER LINE OF PAVEMENT a W DRAINAGE EASEMENT o SANITARY SEWER EASEMENT FEMA 100 YEAR FLOODPLAIN Q CREEK — POND — WETLANDS - - - STREAM BUFFER — CENTERLINE OF SWALE O ROCK FOREBAY ROCK FOREBAY HATCH z MAJOR CONTOUR O MINOR CONTOUR v ) z MAJOR CONTOUR Of z MINOR CONTOUR 0627.00 SPOT ELEVATION Olt ium U-+ � w m CO rn o 0 00 CV Carolina > z & J J m W D 0 O m U Www.n 1:811.01 - ' 0 10 20 40 1 INCH = 20 FEET 0 o d N U-+ � w m CO rn o 0 00 CV . cq Q > z & J J m W D 0 O m U W � o Z O rn 10� Z , uJ I- O =Lp\j J � OJ Q W ()f O Q J U �0� H a W o � Q Z J O Q U LL O Z C� z Z ::D O V J v ) z 0 o Of z U ::D J Z U w O ~ W U' U J Z � Z Q Lu J U)J U) Q Q Lu m Q U m U) H z Lu O 0 Lu 0 Lu 0 Z O C) F_ �w U U U) 0 0 Q W Q o CD LO 0 4t .0 C A "--97/27/2017 �O : 'FESS/o •. � '; • O % = SEAL t 033448 • �'►NCINE`:•' ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 107/27/2017 DRAWN I HK DESIGNED JW CHECKED RC PROJECT # CALATL1603 SHEET TITLE BASIN 1 DETAIL SHEET NUMBER C-509 I— W W 2 U) J H W 0 z CO Q CID 0 L9 U co I_ o C EL Li LEGEND // \\�\ - /g9� / / // / / / // / / /r i R•PROPERTY LINE RIGHT-OF-WAY (ROW) — — — — — — — SETBACK PARCEL LINE CONCRETE SIDEWALK / / / I BACK OF CURB (FC) � �c'QpS� �/l I � / EDGE OF PAVEMENT (EP) r0000 CENTER LINE OF PAVEMENT — 1 ✓ J / / // j / 9e� / \ \ \ \ \ \ ( / / /�� I / DRAINAGE EASEMENT li SANITARY SEWER EASEMENT FEMA 100 YEAR FLOODPLAIN CREEK J / / / CENTERLINE / / / OF STREAM / \ \ \ \ \ \ \ / / / POND WETLANDS \ J / i/ / _yI— — / I \ \ \ \ \\ \\ \ / I \ f / - - - STREAM BUFFER o I \ \ I / / / CENTERLINE OF SWALE _—__—_--—/— � j --_r-- -- — ��— �/—/ --\— ��— � \�--—���v'�— ✓`j� _L_ \ �c_/—/_/�//� �__\i/_ i��\� /_�� \ �_ �/\ /�_\=i\��A�/� �i_�\ __�\'\ / �� \���j\V ����`/�IIIILIIIIII� � /\/—�/� i // �— \//_ \'/ /— �i�/ / �/// /--"\//� /= �aIIIII� _//�\/, ///%\/ '_— i-- — --__�I�—I I— A—�S�- — 'T�—E=6o/ oM— y \— _E -- — Ni ;--/— — —/i--- — , —\_�\— \— \ — ,\—t° � — \_ -A—�\'�, \_ \ �\ 0 —v4 \ \ /I I I/ I o1 Io / II / I I�I I/ �I I�I I ) I 10 '0 � �QQ� � , tIHI �1p J J ROCK FOREBAY ROCK FOREBAY H ATCH MAJOR CONTOUR MINOR CONTOUR 59 594 MAJOR CONTOUR 595596 MINOR CONTOUR 0627.00 SPOT ELEVATION 597 O z 598 U) 00- �zD�1598 --- . 57596 \ 595 OUTLET 599 STRUCTURE 53 (SEE DETAIL CLEANOUT THIS SHEET) M ST BIORETENTION i 3:1 cn \6" PVC ww POND #2 3:1 � INTENANC m\ m r. RE INTENA�T EASEME 4.0' SEEPAGE COLLAR \ROCKFOREBAY 593 1 4.0' 594 AOP N 596 f59 .27 IDLE 597 5g7 \ MANHOLEFRAME 598 598AND LID TO BE `b PLACED DIRECTLY CENTERLINE oOVER STAIRS OF110 RIP RAP APRON 7 @ 2.00% ELEVATED TOP 599 1 5 600 �8 605 597.03 o -5I ( CB 201 CB 214 P599600 HW 2000 6o2 660,5' 36" RCP 06 INV. OUT=589.33 607 608 9 594.03 \�6�594.03 6 \\ 614--- I I——--�--�-- I -�— —L— /--— 615 I I ---I - \0 16 616 V I I I / / / / / / / / // // 617 I I / / / / / / 4" PVC 618 \ \ I A I / / / / / / / / / / / I / / / / UNDEINV. IN=589.8 RDRAIN TIE -$N FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. RIP RAP BERM d50=6" CLASS B SC250 LINER 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES * CONTRACTOR TO ENSURE MIX HAS A P -INDEX BETWEEN 10 AND 30. * CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE). BOTTOM ELEVATION ELEV. 595.00 3' OF PRETREATMENT FOREBAY CLEAN OUT PIPE TO ELEV. 593.00 BE CAPPED 100 YR. STORM ELEVATION: 595.62 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 5 — — — — — — — — — — — — — — — — — — — _______________ _ 50YR.STORMELEVATION:595.44 ���----------------------- --- --------------------- 25 YR. STORM ELEVATION: 595.26--------- ______ —_7_b4_R._�'ai�1Gf�CE4_A7fOf�_535.bf—_—_—_—_—_---- RO WATER QUALITY DETENTION ELEVATION: 594.03 %4110y Cti---- — SURFACE ELEVATION: 593.00 — — — — — — — WEIR EL.= 594.03 r- D• D '• fOT:'OF PIPt ,• _ D ► ELEV = 691.50 • D ► • 36R' • i TOP OF BOX ELEV. 597.03 TOP OF BERM ELEV = 598.00 TOP OF EMERGENCY SPILLWAY ELEV = 597.00 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET - WEIR ON ALL FOUR (4) SIDES KEY RIP RAP MINIMUM DEPTH OF 2' NOTE: 1. CORE OPENINGS TO ACCOMMODATE PROPOSED PIPES. (REFER TO PLAN SHEET FOR SIZE AND LOCATION OF PIPE) TYPICAL CONCRETE OPEN THROAT DETAIL NOT TO SCALE N . LEE a> Carolina www.nc811.or9 W - ' — — — — — — — — — — — — — -- \ \ FITT ELEVATION: 8" OF WASHED STONE INV = 589.83 NOTES 4' PERFORATED UNDERDRAIN @ 0.50% UNDERDRAIN OUTLET 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY AASHTO M288 CLASS 2 NON -WOVEN TO CONNECT COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. GEOTEXTILE FILTER FABRIC INTO STRUCTURE 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INV = 589.83 INFILTRATION RATE IS AT LEAST 1 IN/R. BIORETENTION POND #2 CROSS SECTION 0 10 20 40 NOT TO SCALE 1 INCH = 20 FEET o d 0 a> U-+ LL W �-+ H m CO 0 o 0 00 CV . cq > z W E ? O - O 0oUu- W of o O O=Lc\I �Z Z , uJ J � Q _j � � J O QLu H W o � Q z J 'O Q U O Z v z Z O UJ Cn z 0 o 01. z U J Z U w W O F_ Q ~Q � U' U J Z Q J � /� VJ vJ 0 Q Lu m Q U m U) H z W O 0 W Y 0 Of W 0- 0 Ln Z O O z F_ W U U) U) 0 0 0 Q W Q o in LID0 4t -'97/27/2017 :�O :•F ESS�o•. • O % = SEAL t 033448 •••:GINE:•' .T i ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 107/27/2017 DRAWN I HK DESIGNED JW CHECKED RC PROJECT # CALATL1603 SHEET TITLE BASIN 2 DETAIL SHEET NUMBER C-51 0 H W W U) J H W 0 M z CO Q m L9 U co I_ \ \ RET WALL \\\ \ W/ALUMlN ENCE V (SEE DETAIL v \ v \ \SHE ET C-707) 1 � _ 40,2�F \\ \\ \\ \\ \ LLLL / I m / II QLu �J— \ Lu L0 :p :pL0 Ctl \ OUTLET � M \ STRUCTURE (SEE DETAIL THIS SHEET) BIORETENTION ST �IP RAP POND #3 APRON % WLS I I 1I wis W1S 313.01' F 0" R P I I I I I FEMA 100 YR I \ \ h STM / svs �M' I FLO�yDPLAIN r / "� I I I I 1 I STM 4 o`O WLS I I I I I I I I I II \II I I I o S I� I I I \ w \ 3•� �/ 4 PVC h� �cbcbc� ROCK FOREBAYANOUT ^� i I 1 5 586 / / / / I I 1 1 1co 587 � �/� W 588.., /< W owe // \ zQ //// /// j/ __/ / / / I I / /7 if --> �� // / �/_ / /C --J �_�JT� // �✓ ------ / Oct` 15 ZD , FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. 3' RIP RAP BERM BOTTOM ELEVATION d50=6", CLASS B ELEV. 587.00 OF PRETREATMENT FOREBAY ELEV. 585.00 M — — — — — — — — — — — — — — — — — — �E -------------- \�\ SHWT ELEVATION: 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES • CONTRACTOR TO ENSURE MIX HAS A P -INDEX BETWEEN 10 AND 30. • CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE). / CLEAN OUT PIPE TO ' • t ' '• BE CAPPED 100 YR. STORM ELEVATION: 586.96 — — — — — — — — — — — — — — — — — — — — — — TO — — — — — — 701`75T6 — — — — — — — — — — — — — — — — — •. _YR.STORMELEVAT85 _______ , 25 7R. -TT ORM ELEVATION: 586.73_ 10 YR. STORM ELEVATION: 586.55 _ -------------- -------------------------- �n/EfFfEL.==5$575 •: — — — — WATER QUALITY DETENTION ELEVATION: 585.63 • 11 �• P SURFACE ELEVATION: 585.00 ► ► aw' '• TOF'OF PIPt . ELEV = 683.5(1 2.50'. ' ; n 1 �. : • 3�'• • i FPER'FORA 8" OFWASHED STONETED UNDERDRAIN @ 0.50% UNDERDRAIN OUTLET — AASHTO M288 CLASS 2 NON -WOVEN TO CONNECT GEOTEXTILE FILTER FABRIC INTO STRUCTURE INV. = 581.83 BIORETENTION POND #3 CROSS SECTION NOT TO SCALE TOP OF BOX ELEV. 588.75 TOP OF BERM ELEV = 588.00 TOP OF EMERGENCY SPILLWAY ELEV = 587.00 INV = 581.83 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET - WEIR ON ALL FOUR (4) SIDES KEY RIP RAP MINIMUM DEPTH OF 2' NOTES 1� r 1.0 . / 5.75 1 0 585.75 4" PVC INV. IN=581.83 tOP kz ANDLE MANHOLE FRAME AND LID TO BE PLACED DIRECTLY OVER STAIRS o ELEVATED TOP VOQ \� NOTE: 1. CORE OPENINGS TO ACCOMMODATE PROPOSED PIPES. (REFER TO PLAN SHEET FOR SIZE AND LOCATION OF PIPE) TYPICAL CONCRETE OPEN THROAT DETAIL NOT TO SCALE 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. 588.75 LEGEND LEE PROPERTY LINE — — RIGHT-OF-WAY (ROW) — — — — — — — SETBACK O M U PARCEL LINE W of o Z O cn CONCRETE SIDEWALK J � Z 0 CD BACK OF CURB (FC) DQ O J ujH EDGE OF PAVEMENT (EP) — CENTER LINE OF PAVEMENT W a W DRAINAGE EASEMENT o SANITARY SEWER EASEMENT FEMA 100 YEAR FLOODPLAIN Q CREEK — POND — WETLANDS - - - STREAM BUFFER — CENTERLINE OF SWALE O ROCK FOREBAY ROCK FOREBAY HATCH V Z MAJOR CONTOUR O MINOR CONTOUR Cn Z MAJOR CONTOUR Z MINOR CONTOUR 0627.00 SPOT ELEVATION SEEPAGE COLLAR 30" RCP INV. OUT=581.58 Na. LEE Carolina m CO rn o 0 0 CV . Q >z00 www.nc811.or9 O M U - ' 0 10 20 40 1 INCH = 20 FEET 0 o d N U-+ � W m CO rn o 0 0 CV . Q >z00 (U ? 0 O M U ui W of o Z O cn , Of ZuJ O=Lc\I J � Z 0 CD Q � � DQ O J ujH W a W o � V Q Z J o L.L Q U N� L.L O Z V Z Z O UJ Cn Z O o Z U J Z U w O Q W Z Q U' U J Z Q uj VJ _j W 0 Q Q w m Q U m 07 H z W O 0 W `S 0 Of W 0- 0 Z O C.) z W U U cn 0 0 0 Q W Q o in LO O ♦♦♦�� - --97/27/2017 �O : 'F E S Sid•. � '; • O % 9 ; = SEAL t 033448 ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 07/27/2017 DRAWN I HK DESIGNED JW CHECKED RC PROJECT # CALATL1603 SHEET TITLE BASIN 3 DETAIL SHEET NUMBER C-51 1 H W W U) J H W 0 Z CO Q m N L9 U co I_ o C EL Li FEMA 100 YR � FLOODPLAIN / \\ 86 A \\ \ \ � \ OUTLET 588 STRUCTURE 689 (SEE DETAIL 1�G z / THIS / i v \ 5 \ /L 5� BIORETENTION\" 5 POND #4 CLEANOUT 4" PVC 405 \RROP. L� Q �,y5 - ---- Us -- s`9� SEEPAGE COLLAR 4.0' \ HW 500 RIP RAP \ �gp \ \ IOPANDLE Q�RON O� MANHOLE FRAME ���\ / \ AND LID TO BE - O / \ PLACED DIRECTLY \G'L s HW 400 5), \ OVER STAIRS 5 v 9/� 0 �S' \ \ / I* - �� \ \ \ \ \ \ \ ELEVATED TOP % ! s8 \ o "[� 6 RIP RAP\ 1a S8j APRON / \ \ I 589.15 \ DCB 501 '\pQ C70 \ � 590 — \ � � .. • • \\ \ 591 O� .. CB 502 F� .; • -c J// 36" RCP INV.OUT=580.95 592 � �1 V � 595 _ � � � � � \ 585.98 585.98 \ sIQ - J \ 11119` 5g3 - - v 4" PVC INV. IN=581.8 99 UNDERDRAIN TIE-IN 6'00 \ — y94 \ 61 - �C .001CB 4 \ e0 CB 505 0' ` _ \ \ NOTE: 1 CORE (REFER TO PIIAN SHGS O ET FOR IZE AND TE PROPOSED LOCATION OF PIPE) TYPICAL CONCRETE OPEN THROAT DETAIL 7.sVWT ELEVATION: 580. 8" OF WASHED STONE 4" PERFORATED UNDERDRAIN @ 0.50% 7UNDERDRAIN OUTLET AASHTO M288 CLASS 2 NON -WOVEN TO CONNECT GEOTEXTILE FILTER FABRIC INTO STRUCTURE INV. = 581.83 BIORETENTION POND #4 CROSS SECTION NOT TO SCALE TOP OF BOX ELEV. 589.15 TOP OF BERM ELEV = 589.00 TOP OF EMERGENCY SPILLWAY ELEV = 588.00 INV = 581.83 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET KEY RIP RAP MINIMUM DEPTH OF 2' NOTES 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. NOT TO SCALE LEGEND 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RIGHT-OF-WAY (ROW) RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED 8-10% FINES (SILT AND CLAY) FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND * CONTRACTOR TO ENSURE MIX HAS A P -INDEX RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL BETWEEN 10 AND 30. * INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY — MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE). BOTTOM ELEVATION RIP RAP BERM DRAINAGE EASEMENT OF PRETREATMENT d50=6", CLASS B 3 SANITARY SEWER EASEMENT FOREBAY ELEV. 587.00 CLEAN OUT PIPE TO FEMA 100 YEAR FLOODPLAIN ELEV. 585.00 BE CAPPED CREEK — 100 YR. STORM ELEVATION: 587.69 ------------------------- --- --------------------- — — — — — — — — — — — — — — — — — — — — — — — — — — — - — — — -------------------- — — — 50 YR. STORM ELEVATION: L---------7.38 , . •, — — — SL— — — — — — - - - YR. STORM ELEVATION: 587.19 ,— L -----------— — — — — — — — — — — — — — — -------------- ----- — — — — — — — — — — — — — — — — — — — — — — 9 — — — — — — — — — — — — — — - — — —25 --------- — - — — 10 YR. STORM ELEVAL.------ON: 586.94 ' — — — — — — — — — — — — — — — — — — — — ^ WATER QUALITY DETENTION ELEVATION: 585.98 WEIR EL.= 585.98 — — — — — — — — — — — — — — — — — — — r7` — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — v Z • ► �• ►• • P • O SURFACE ELEVATION: 585.00 ► ► — — • . '• ►. TOROF BERM 01. z ► ELEV = 83.55 250' ; n Lu Z Q Q U' U J Z Q a•o•aaoaa•aaaa•o .�� ►••: Q Q Lu v A. ► 7.sVWT ELEVATION: 580. 8" OF WASHED STONE 4" PERFORATED UNDERDRAIN @ 0.50% 7UNDERDRAIN OUTLET AASHTO M288 CLASS 2 NON -WOVEN TO CONNECT GEOTEXTILE FILTER FABRIC INTO STRUCTURE INV. = 581.83 BIORETENTION POND #4 CROSS SECTION NOT TO SCALE TOP OF BOX ELEV. 589.15 TOP OF BERM ELEV = 589.00 TOP OF EMERGENCY SPILLWAY ELEV = 588.00 INV = 581.83 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET KEY RIP RAP MINIMUM DEPTH OF 2' NOTES 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. NOT TO SCALE LEGEND LEE PROPERTY LINE — — RIGHT-OF-WAY (ROW) — — — — — — — SETBACK — ah,' PARCEL LINE W o Z O CONCRETE SIDEWALK J O OJ BACK OF CURB (FC) O Q J U Cum EDGE OF PAVEMENT (EP) — CENTER LINE OF PAVEMENT a W DRAINAGE EASEMENT o SANITARY SEWER EASEMENT FEMA 100 YEAR FLOODPLAIN Q CREEK — POND — WETLANDS - - - STREAM BUFFER — CENTERLINE OF SWALE O ROCK FOREBAY ROCK FOREBAY HATCH v Z MAJOR CONTOUR O MINOR CONTOUR — — MAJOR CONTOUR 01. z MINOR CONTOUR 0627.00 SPOT ELEVATION Na. LEE Carolina m � o 0 4 I 00 04 Www.0011.or9 cu W ? O — ah,' 0 10 20 40 1 INCH = 20 FEET 0 O E N L- LL W m � o 0 4 I 00 04 N N . > Z o cu W ? O O 0oULL Lu W o Z O , Of ZLLI O=�� J O OJ P_ Q W ()f O Q J U Cum H a W o � U Q z J O L.L Q U O Z v Z Z O UJ Cn z 0 o 01. z U J Z U w O 0 - Q Lu Z Q Q U' U J Z Q �J U I J �\j v / M Q Q Lu m Q U m U) z W O U W Y 0 Of W 0- 0 Z O_ U z Of W U U U) 0 0 0 Q LU Q o 0 0 -'97/27/2017 �\ .•F E S S�� ••• % • ,•�� 033448 • •'•;�GINE;•' .T i ROBERT L. CASH, P.E. INC LICENSE No. 033448 DATE 07/27/2017 DRAWN I HK DESIGNED JW CHECKED RC PROJECT # CALATL1603 SHEET TITLE BASIN 4 DETAIL SHEET NUMBER C-512 Ex -1 Ex -2 Ex WS Ex -2 Ex -HH Ex HH XCP1 Ex -PR XCPI (new Subcat) Subcat Reach on Link BP -1 DR -1 DET1 (BP 2) et 7 DET2 Det -2 P-1 �7�.IPond 2 CP3 DR -2 Culvert\\\\2J DR -2 CP1 CPI DET3 / Det 3 P-3 LLLCCC Det Pond 3 BP -4 Basin T USI Revision WS1 Detention R Prepared by Cardno HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Printed 8/15/2017 Page 2 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 BP -1 0.00 0.00 492.0 0.0103 0.013 36.0 0.0 0.0 2 DET1 0.00 0.00 138.0 0.0057 0.013 24.0 0.0 0.0 3 DET2 0.00 0.00 944.0 0.0200 0.013 24.0 0.0 0.0 4 DET3 0.00 0.00 586.0 0.0100 0.013 24.0 0.0 0.0 5 P-1 610.83 610.58 45.2 0.0055 0.013 24.0 0.0 0.0 6 P-2 589.83 589.33 43.8 0.0114 0.013 36.0 0.0 0.0 7 P-3 581.83 581.58 33.0 0.0076 0.013 30.0 0.0 0.0 USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment BP -1: BP -1 Runoff = 26.58 cfs @ 12.27 hrs, Volume= 115,438 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non -grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41 % Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 4 Subcatchment BP -1: BP -1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph 26:/ 26.58 cfs _� � �e 124�hr y� ❑Runoff -I 24 I I I 1 "- e4 Rei nfal L:5.20" 22 + --R nq" _I_= 5.71 $-�ac 20 18 J —1 1 L L q =X15.438-cf -Ru -o - -I - u 16 c 14 t t e;h=2.02" Olov� Lin -ih-=-' ,6t4' LL 12 L L L -Tc-30-01 nein 10 8:/ —-rl rt rt l l l rt 6:/ t- 4 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment BP -2: BP -2 Runoff = 66.42 cfs @ 12.20 hrs, Volume= 267,721 cf, Depth= 1.64" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non -grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment BP -2: BP -2 Hydrograph I 70-//66.42 cfs 65 ype 11 24 r 60 1"- ea% Riinfa11:�5.2F�" 55 - --�unof -�L a=451153-�ac 50 45 1 —Rr�ff-Volt me=2�7, 21 c N -Run-o"e t2.�4" 40 -I1" Lin ih �,4tW 0 35 LL 30 L L 1 -Tc-52503 Min 25 20 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment BP -4: Basin T Runoff = 3.29 cfs @ 12.14 hrs, Volume= 11,732 cf, Depth= 1.28" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 109,957 58 Meadow, non -grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unsaved Kv= 16.1 fas 18.9 1,153 Total N 3 0 LL 0 Subcatchment BP -4: Basin T Hydrograph 3.29 cfs Type II 24 -hr 10 -Year Rainfall=5.20" Runoff Area=109,957 sf Runoff Volume=11,732 cf Runoff Depth=1.28" Flow Length=1,153' Tc=18.9 min CN=58 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment DET1: Det 1 Runoff = 14.39 cfs @ 11.98 hrs, Volume= 29,745 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet 15 14 Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow 1lyp 1+24 -hr 13d�aK Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Rnf�11�5.2�0" 11 Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 10 1 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' R�nc ff Yolk mp =�9,745�qf � n= 0.013 6.5 488 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET1: Det 1 Hydrograph 16 15 14 14.39 cfs 1lyp 1+24 -hr 13d�aK Rnf�11�5.2�0" 11 rt t Ru1.".I. Asea` =176,424-�sf r 10 1 R�nc ff Yolk mp =�9,745�qf � 9 — — Runoff-Depth=-2.02" LL $ - Flo�v��en�gthl=488' 6 1 rt rt fit- l - - IT6=6-.� nihn r 5 I i -4 4 4 3 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment DET2: Det -2 Runoff = 36.26 cfs @ 12.02 hrs, Volume= 83,550 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 40 Sheet Flow, Sheet +-r t t Runoff Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale 32 _ 1 -1 -T 7 T Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 I Shallow Concentrated Flow, Gutter � I_ Ru ti -off Are�4�5, 48L f 26 Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 1 Runoff -Depth= -2.02' 0 201�Ow 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale 14 12 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total Subcatchment DET2: Det -2 Hydrograph 40 +-r t t Runoff 38 36.26 cfs 36 - I - rt rt -r fi - - - - II -24 -hr 32 _ 1 -1 -T 7 T � yp A(j Y��IRainfalls .216" 30 - 28 1 Z I L � I_ Ru ti -off Are�4�5, 48L f 26 Runoff olu 3 "f 24 22 1 Runoff -Depth= -2.02' 0 201�Ow LL 18 16 - -1 - �Tc�:9� rritn 14 12 10 8- 6 4 I 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment DET3: Det 3 Runoff = 23.46 cfs @ 12.02 hrs, Volume= 56,519 cf, Depth= 2.97" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow cfs - - - Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow - Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 20 19 18 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' -T -7 T7 T7 n= 0.013 10.5 936 Total ■Runoff Subcatchment DET3: Det 3 Hydrograph 26 2a 23 23.46 cfs - - - - – - — —IY 1124 r 2; - I— -16 -furl Rahn6l l�5.26" 20 19 18 1 7 -T -7 T7 T7 RuOD#Areap=48,""f ;6 - t I� �6, f w 15 6Y°�� Run-off-Depo- h Q.97" 0 12 _ i=1a�ven�gth96' 11 10 - -4 J- fc=-A 0.6 r>i+n 8 7 _ t 5 I -44 ;I 4 4- 1 0 0 5 10 15 20 25 30 35 40 45 Time 50 55 (hours) 60 65 70 75 80 85 90 95 ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment DR -1: DR -1 Runoff = 31.35 cfs @ 11.96 hrs, Volume= 62,093 cf, Depth= 2.97" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -1: DR -1 Hydrograph ❑Runoff 325 cfs iy 30 28 -L L L r p� 1124hr L26 ali�n#11��5.2��• tI t- r- fj• u Are- �2.50,4"Qq�f 24 22 ,8 Runoff -Depth 2.97' �II STC --5.6 rrin 16 LL 14 + d1=�9 12 10 1 :11L 8 4 All t 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment DR -2: DR -2 Runoff = 20.30 cfs @ 11.96 hrs, Volume= 40,204 cf, Depth= 2.97" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -2: DR -2 Hydrograph ❑Runoff 2120.30 cfs - - - - 1 20 Y I F24� r 19 18 -1 I I :EE E 146-Y�a-I "nfi11�526 17 16 — —1 4 4 k- RUArea�='I-$2J92-Sf 14 I t t � 1�r4 �� - O, J4�cf X 12 Runoff-De�h=2.97•• 3 11 - 1 I �T-5� rWM LL 10 9 4 --t4 C N=ft9 8 7 l - - - t-- l l l -1- fi 6 - - - 5 4 -I ::11 1 LE: [I I I I A a 11: 3 2 4 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment Ex -1: Ex WS #1 Runoff = 106.30 cfs @ 12.20 hrs, Volume= 424,141 cf, Depth= 1.71" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN DescriDtion 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non -grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet -1 1 - + Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc - = - - - Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel - t 4+- I Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total I w 0 LL Subcatchment Ex -1: Ex WS #1 Hydrograph 106.30 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff -tya-- 11 1% 1 -1 1 -4 - 1 1 -410-Yea# "nfall=54!' -1 1 - + I �u-goff-j"a=?,9T3,Q921-s# ��nolff�oi� 1-cf gunoff e4 - = - - - I I TIlovy Lein glih=;466' - - - - I I - I -1 :I Ic�25.11"Odn - t 4+- I I 1--- 7 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment Ex -2: Ex -2 Runoff = 19.08 cfs @ 12.26 hrs, Volume= 82,757 cf, Depth= 2.19" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Shallow 20 19 19.08 Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 1 Shallow Concentrated Flow, Shallow 18 17 Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow j Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' 1 "`.I' ea` = 7 13 n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, �AT ��Sf w 12 0 19 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment Ex -2: Ex -2 Hydrograph 20 19 19.08 cfs —1 -T --r -r 1 4yp� II 2 4 --hr 18 17 -46- I 6nII�J.2n 16 15 j 1 "`.I' ea` = 7 13 �AT ��Sf w 12 0 19 fi RunoffMeoh=2.19" I_ _IbV1Fl Le�ngh,43' 7 / 6 ��1-L r ia 5 4 4 4- 3 2 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment Ex -HH: Ex HH Runoff = 17.77 cfs @ 12.26 hrs, Volume= 77,837 cf, Depth= 2.19" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet 19 18 17.77 cfs Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex -HH: Ex HH 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph I —4 ■Runoff 19 18 17.77 cfs —I iyp� 1124--thr 17 1615 I— Ind-�F�a�IRinfll.2�'• 14 I— RuArea�:4Z7X4�sf 13 12 Y_ I /�f w 11 Runoff-Depfh=2.19" 10-r 0 I W Uel - EE -i 2V8 LL 7 7 - 1 1 --4- 5 5 4 1 -4 4- 11 1 I --4 4 3 2 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment Ex -PR: (new Subcat) Runoff = 7.61 cfs @ 11.90 hrs, Volume= 12,735 cf, Depth= 1.28" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 119,354 58 Meadow, non -grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex -PR: (new Subcat) Hydrograph 8 7.61 cfs Typ� 1124 hr 1 1 d-Y�ar IRainf�11=15.210" 6 1 I Runoff Areap119,15+sf 5 rF F -R4Y°[#"1e-2'5f Runoff Depth=1.28" 0 4 Tc-O.rrn U- CN=%8 3 -1 A I L L 2 0 Time (hours) ■ Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 16 Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 2.02" for 10 -Year event Inflow = 14.39 cfs @ 11.98 hrs, Volume= 29,745 cf Outflow = 9.83 cfs @ 12.05 hrs, Volume= 25,995 cf, Atten= 32%, Lag= 3.9 min Primary = 9.83 cfs @ 12.05 hrs, Volume= 25,995 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 615.76' @ 12.05 hrs Surf.Area= 5,478 sf Storage= 7,874 cf Plug -Flow detention time= 97.4 min calculated for 25,995 cf (87% of inflow) Center -of -Mass det. time= 35.7 min ( 883.4 - 847.7 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=9.82 cfs @ 12.05 hrs HW=615.76' (Free Discharge) L1=Culvert (Passes 9.82 cfs of 29.97 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 9.82 cfs @ 2.98 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=614.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 17 Pond P-1: Det Pond 1 Hydrograph T T 1— _J 14.39 cfs ■ Inflow outflow _ Incl" 4re�=i 76i 44t4�f IN Primary 16 / f ■ Secondary 15 / I —Pe-Ok 11-I0"64 5.716' 14 / 13 Storagin=7,$74 f / 12 11 / 9.83 cfs _ 4 11 10 / 9 -4 -k 1 - 1 1-1 A 4- .44 / LL / X 4- 1 1 I 7 / 6 / L L 5 - — — 3 / 2 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 18 Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 2.02" for 10 -Year event Inflow = 36.26 cfs @ 12.02 hrs, Volume= 83,550 cf Outflow = 31.97 cfs @ 12.06 hrs, Volume= 77,724 cf, Atten= 12%, Lag= 2.6 min Primary = 31.97 cfs @ 12.06 hrs, Volume= 77,724 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.01' @ 12.06 hrs Surf.Area= 9,300 sf Storage= 13,406 cf Plug -Flow detention time= 56.6 min calculated for 77,716 cf (93% of inflow) Center -of -Mass det. time= 19.1 min ( 869.4 - 850.3 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=31.94 cfs @ 12.06 hrs HW=595.01' (Free Discharge) LrCulvert (Passes 31.94 cfs of 65.32 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 31.94 cfs @ 3.25 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 19 Pond P-2: Det Pond 2 Hydrograph fi l -F I-� t t- l I n t 36.26 cfs 40 ; Inflow Are6=496,548 4 38/ 36 31.97 cfs f - Peak Elev=595.01' { 32 / _Storage=13,4o6f 28 i 11� + 4- 11 - 1 26 / y 24 v 2220 / / fi fi i LL18 / 1 16 14 / / 111 4-- 11--1 4- 11 - 1 12 / 10II rt rt lI rt 1 i ,ice%ziiiiiiiiM,00iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM.WN=11MMMI, LInflow ary USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 20 Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 2.97" for 10 -Year event Inflow = 23.46 cfs @ 12.02 hrs, Volume= 56,519 cf Outflow = 18.88 cfs @ 12.08 hrs, Volume= 50,081 cf, Atten= 20%, Lag= 3.7 min Primary = 18.88 cfs @ 12.08 hrs, Volume= 50,081 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.55' @ 12.08 hrs Surf.Area= 10,463 sf Storage= 14,314 cf Plug -Flow detention time= 91.6 min calculated for 50,076 cf (89% of inflow) Center -of -Mass det. time= 35.2 min ( 859.0 - 823.8 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=18.86 cfs @ 12.08 hrs HW=586.55' (Free Discharge) L1=Culvert (Passes 18.86 cfs of 44.05 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 18.86 cfs @ 2.94 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 21 EMI LInflow ary Pond P-3: Det Pond 3 Hydrograph T7 T T T T / 23.46 cfs Inflow Area=228,069 sf 26 24/ T T Peak Elev=586.55' 22 / 18.88 cfs Storage 14,314 cf 20 — 18 / T T I T T T 1-1 T T / H T 1-1-1 4--1 1 X14 / 1 1 1 1 1 1 1 1 1I _012 LL 10 / 8:/ 6/ 1 1 1 1 1 1 1 1 1 EMI LInflow ary USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 22 Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 1.94" for 10 -Year event Inflow = 140.15 cfs @ 12.11 hrs, Volume= 639,256 cf Primary = 140.15 cfs @ 12.11 hrs, Volume= 639,256 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 23 Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 1.85" for 10 -Year event Inflow = 119.25 cfs @ 12.15 hrs, Volume= 548,970 cf Primary = 119.25 cfs @ 12.15 hrs, Volume= 548,970 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 24 Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 1.82" for 10 -Year event Inflow = 142.07 cfs @ 12.22 hrs, Volume= 584,735 cf Primary = 142.07 cfs @ 12.22 hrs, Volume= 584,735 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment BP -1: BP -1 Runoff = 37.11 cfs @ 12.25 hrs, Volume= 158,349 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non -grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41 % Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 26 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Subcatchment BP -1: BP -1 Hydrograph 1 -4 --k Z- 4 + ❑Runoff s$ 37.11 cfs 1 -4-4- 11 1 1 �Y� �4-hr + +-2 - i eaf �lnfall�.10n 32 30-1 1 t t t I— 1 -4�unP"r�a=�5.17�1 8�ac 26 N 24 - 1 rt rt fi n oT m 8 4�cf 1 -Rum f wh�-2.�i'• 0 20 1 1 L L C 1 141" L-4ng-- h--�,6�4' LL18CWin 16 12 4- — 1 1 1 I --t 10 8 — — 6 4 - 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment BP -2: BP -2 Runoff = 97.28 cfs @ 12.20 hrs, Volume= 378,973 cf, Depth= 2.32" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non -grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc + — 1 1 4 � I Ype ii -24 --by 97.28 cfs Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel t �J5= e R iinfi�all 6.��" s0-1 75 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total ■Runoff Subcatchment BP -2: BP -2 Hydrograph 105 100-/// 95 1 —t 4 + — 1 1 4 � I Ype ii -24 --by 97.28 cfs 90 85 -I -tt t �J5= e R iinfi�all 6.��" s0-1 75 Z I Z �Mrrqff�4re�al=5.�s3 laic 65 4 1� ��ff�o�I,r3�f 3 Bunof 60 0 50 = 1 -4 + apfh2.32' Tiova L�n �h=%466' LL 45 t l I I D jc=�2513-Min 40V- 25 20-//I— -I 1 -4 -� 4- 15-/// 10 — — — 5- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment BP -4: Basin T Runoff = 5.12 cfs @ 12.12 hrs, Volume= 17,251 cf, Depth= 1.88" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 109,957 58 Meadow, non -grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unsaved Kv= 16.1 fas 18.9 1,153 Total Subcatchment BP -4: Basin T Hydrograph ■ Runoff 5.12 cfs 5- Type II 24 -hr 25 -Year Rainfall=6.20" 4 Runoff Area=109,957 sf Runoff Volume=17,251 cf 3 Runoff Depth=1.88" Flow Length=1,153' LL Tc=18.9 min 21 1 CN=58 1A I M 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment DET1: Det 1 Runoff = 19.78 cfs @ 11.98 hrs, Volume= 40,803 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet -T T 1 Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow I C�24 r Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow +- I— 1-26 -furl "n6l l�6.20" } 17 16 Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer t --l RuA�"�'T6,424�sf14 f 155 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' ::1a I I:E n= 0.013 6.5 488 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET1: Det 1 Hydrograph 22 -T T 1 20 19 19.78 cfsyp I C�24 r 18 - 4 + +- I— 1-26 -furl "n6l l�6.20" } 17 16 —1rt t t t --l RuA�"�'T6,424�sf14 f 155 ::1a I I:E YW� T"Olrlicf i 13 12 -1 — — — — Wunoff-Depth= LL 1a i=��vl4en6tri=488' 9 - +- I— 1 1-1 -ITc:6� rain f 8 7rt 6 rt — t- -1 -1 rt - - 5 4 - -T T T 17 -T T Z 3 2 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment DET2: Det -2 Runoff = 49.97 cfs @ 12.01 hrs, Volume= 114,609 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total 0 0 49.97 cfs 1 VA Subcatchment DET2: Det -2 Hydrograph L L I -T -T T 7- I �ype IT24- r 1 25 -Yea% Riinfa11:�6.20" Rynoff area=4P5,g481 sf -R�nc ff Vol�me=114, Ovcf -Ru Yof -Depths . I8" 41" L4nc�h -4,548' I- -I -i T-p=9�3 m i n TN 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment DET3: Det 3 Runoff = 30.21 cfs @ 12.02 hrs, Volume= 73,319 cf, Depth= 3.86" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 10.5 936 Total Subcatchment DET3: Det 3 Hydrograph I 32 30.21 cfs 30-x 0 - 4yp I11--24fi r 28-/ -26 -furl Rai nW W66.2b" 266 24 ' — fZu 0o Are�2Z8,909�f 20 22-Rr�ffyol�mp -73,19-111 18 — — — — Runoff -Depth= -3.86" 0 16 = T T 1 �lawea�gt 936' ,4 TTI -fc=h0-.6 rrtin 12 8 6 I- T T T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment DR -1: DR -1 Runoff = 40.22 cfs @ 11.96 hrs, Volume= 80,549 cf, Depth= 3.86" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -1: DR -1 Hydrogrraaph - 40.22 42 40 cfs■Runoff 4y p� I F�24-�h r 38 36 - — - 7 -T -T -F F:��-�F�a�IR inf ll�6.2 • 34 32 -t + RU00# Areap2�0,493td 26 rt fi t- IR�n9ff-Y°l�� �04�4"! N V 24 �inOffeh.� 0 22 TC -5-.6r i n LL 20 — 18 - 1 -+ I -I 1 1 --4 -+ CIN --t9 16 14 1 rt rt 1 1 1 -t rt t r-12 10 8 - 6 4 1+ +- i 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment DR -2: DR -2 Runoff = 26.04 cfs @ 11.96 hrs, Volume= 52,155 cf, Depth= 3.86" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -2: DR -2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph 28 26 26.04 cfs - �— I y IL24 r ❑Runoff 24 I � � � � I I ��-�F�a�I R�inf�11�6.2��• 22 20-/ - T F F Run� Are�'�,'��f 18 _ 9"�u2,55f 16 c 14 rt Runoff De th=3.86" �T LL 12 + 5J6 r�n 10 g (149 IT 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment Ex -1: Ex WS #1 Runoff = 153.99 cfs @ 12.20 hrs, Volume= 596,369 cf, Depth= 2.41" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN DescriDtion 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non -grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc 4 + 4 � � 1 ype II 24 -hr Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel --2"ear Rainfl 114.20!' 130 120 � Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total ■Runoff Subcatchment Ex -1: Ex WS #1 Hydrograph 170 153.99 160 150 cfs F 1 -4 4 + 4 � � 1 ype II 24 -hr 140 --2"ear Rainfl 114.20!' 130 120 � 1 1 1 1 F1tu�r of IA a=2,973,P9213`f _ 10o -I Bu nIf f Vol1� j — _ 69J d I Runoff-0epth- 4� N 0 80-90- . TIlovy Le�ngih=�4"' 60 50 _ _ -I I��1LI _ I I����I I 40 30 20 10 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment Ex -2: Ex -2 Runoff = 26.28 cfs @ 12.24 hrs, Volume= 112,247 cf, Depth= 2.96" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) L 20.7 150 0.0430 0.12 Sheet Flow, Shallow -2gnp"r"=4�4�31i sf 18 Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 16 0 14 Shallow Concentrated Flow, Shallow fi -rF�lov�r o Ling h 3,43' Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow 10 8 T -F Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' 1 1 1-1-T �N_-�0 n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, + T T- Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total Subcatchment Ex -2: Ex -2 Hydrograph 28 26 26.28 cfs fi ype 11 24 -hr 24 L L L 45 -Ty ea% RiinfaI1;�610" 22 20 -2gnp"r"=4�4�31i sf 18 L L I��"o-�[ fu n th 4 96 f 16 0 14 fi -rF�lov�r o Ling h 3,43' LL 12 -Tc=�305 nen 10 8 T -F F 1 1 1-1-T �N_-�0 4 A + T T- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment Ex -HH: Ex HH Runoff = 24.45 cfs @ 12.26 hrs, Volume= 105,575 cf, Depth= 2.96" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex -HH: Ex HH Hydrograph I L 26 24.45 cfs 24-/ - —I ype 11 24r 22 25 -Yea% Riinfa11:�6.20" 20 Rgngff �r"=4?7,�2Ai of 18 N 16 �� 5,�47c-itf w -Rind epth=2. 6 3 14 L L -0I" Length=4,2�8' 0 LL 12 Tc731A rein 10 -170 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment Ex -PR: (new Subcat) Runoff = 11.40 cfs @ 11.90 hrs, Volume= 18,725 cf, Depth= 1.88" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 119,354 58 Meadow, non -grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex -PR: (new Subcat) Hydrograph ■ Runoff 12 11.40 cfs — iy p� 1f 24--4h r 10 fi t- 1-26 Year RaMM114.210" 9 1 11 1 Fuooff Areap:l19,1541sf 8 —RffYOIi p =8, 25�f 7 Runoff Depth=1.88" 0 6 fi I— �Tc�-0- rr�n LL 1 1 1 1 1 1 1 1 1 (dN=t8 5 4 A -i I L 3 2 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 38 Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 2.78" for 25 -Year event Inflow = 19.78 cfs @ 11.98 hrs, Volume= 40,803 cf Outflow = 15.45 cfs @ 12.03 hrs, Volume= 37,052 cf, Atten= 22%, Lag= 3.2 min Primary = 15.26 cfs @ 12.03 hrs, Volume= 37,029 cf Secondary = 0.19 cfs @ 12.03 hrs, Volume= 24 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.04' @ 12.03 hrs Surf.Area= 5,806 sf Storage= 9,462 cf Plug -Flow detention time= 76.0 min calculated for 37,052 cf (91 % of inflow) Center -of -Mass det. time= 28.2 min ( 866.7 - 838.5 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=15.24 cfs @ 12.03 hrs HW=616.04' (Free Discharge) L1=Culvert (Passes 15.24 cfs of 31.02 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 15.24 cfs @ 3.44 fps) Secondary OutFlow Max=0.17 cfs @ 12.03 hrs HW=616.04' (Free Discharge) L3= Broad -Crested Rectangular Weir (Weir Controls 0.17 cfs @ 0.48 fps) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 39 ■ Inflow E Outflow 0 Primary ❑ Secondary '• • Det '• • ..... • i i •76,42'44f- 22 4— ' • • J. i • • • • • - 1 I oo ■ Inflow E Outflow 0 Primary ❑ Secondary USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 40 Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 2.78" for 25 -Year event Inflow = 49.97 cfs @ 12.01 hrs, Volume= 114,609 cf Outflow = 45.34 cfs @ 12.05 hrs, Volume= 108,782 cf, Atten= 9%, Lag= 2.3 min Primary = 45.34 cfs @ 12.05 hrs, Volume= 108,782 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.26' @ 12.05 hrs Surf.Area= 9,587 sf Storage= 15,719 cf Plug -Flow detention time= 44.2 min calculated for 108,782 cf (95% of inflow) Center -of -Mass det. time= 15.8 min ( 856.8 - 841.1 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=45.31 cfs @ 12.05 hrs HW=595.26' (Free Discharge) LrCulvert (Passes 45.31 cfs of 67.46 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 45.31 cfs @ 3.56 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 41 Pond P-2: Det Pond 2 Hydrograph T t I + 49.97 cfs 55 51 �I I� T T T T T 3!i LL 20 I% ill T T T ■ Inflow Outflow Inflow Are6=496,548 4 lS Se onda rY Peak Elev=595.26' Storage=15,719 cf ����%//////////////////////////////////////////////////////. �I I� T T T T T ����%//////////////////////////////////////////////////////. USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 42 Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 3.86" for 25 -Year event Inflow = 30.21 cfs @ 12.02 hrs, Volume= 73,319 cf Outflow = 25.33 cfs @ 12.08 hrs, Volume= 66,881 cf, Atten= 16%, Lag= 3.4 min Primary = 25.33 cfs @ 12.08 hrs, Volume= 66,881 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.73' @ 12.08 hrs Surf.Area= 10,753 sf Storage= 16,160 cf Plug -Flow detention time= 77.4 min calculated for 66,881 cf (91 % of inflow) Center -of -Mass det. time= 31.3 min ( 847.7 - 816.4 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=25.31 cfs @ 12.08 hrs HW=586.73' (Free Discharge) L1=Culvert (Passes 25.31 cfs of 45.14 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 25.31 cfs @ 3.24 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 43 1 1 i i Pond P-3: Det Pond 3 Hydrograph — i --] T L 30.21 cfs — 1lnile m JLre�=�2 fth f 1 25.33 cfs h i ■ Inflow ■ Outflow ■ Primary ■ Secondary 1 1 1 f �1 L ::POk lEI$v05U.7' 1 L L I I 1 L I I __jSl°rape� ,Ij6"f T L 1-1-1 Z L F T T T F I S T T L III Z L ITIS T Z ITI —T T C L 111 1 L 11 T L I1 1 T T T 111 T TAT T T II T T ■ Inflow ■ Outflow ■ Primary ■ Secondary 1 1 1 USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 44 Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 2.68" for 25 -Year event Inflow = 199.15 cfs @ 12.09 hrs, Volume= 882,742 cf Primary = 199.15 cfs @ 12.09 hrs, Volume= 882,742 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Hydrograph 220 Go ir,I _ ❑Inflow ❑ Primary 210 199.15 cfs - - - - 1 __I __ JJ__� --I 4loTV �e"= i1 200 ,51-0 190-------- 1- 180 170----I-1--1E:EI-1-1- 160 150 140 Imo+ k-1 1 I�+-1 1-1 I-+ 130 N V 120 1--- - rt 3 110 - - 0 100 " 90 T 1 I I 80 — 70 I I + +-I 1 - 60 50 40 30 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 45 Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 2.57" for 25 -Year event Inflow = 170.78 cfs @ 12.14 hrs, Volume= 763,706 cf Primary = 170.78 cfs @ 12.14 hrs, Volume= 763,706 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph L L 190 ❑Inflow ❑ Primary 180 170.78 cfs L L C I I_ Inflow Area=3,569,650 sf 170 160 ILLLCIILLIIL _ 150 140 L L L LI L L L LI L 130 120 ILLLLIIILLLIIIIL N 110- 100 L L 0 90 "80 LSII��LIII� 70.. 60 ' - 50 40 30 20 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 46 Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 2.53" for 25 -Year event Inflow = 202.92 cfs @ 12.21 hrs, Volume= 814,192 cf Primary = 202.92 cfs @ 12.21 hrs, Volume= 814,192 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Hydrograph F11-1 nflow 210r2C2.92 cfs Inflow Area=3,854,747 sf ❑ Primary 200 190 180- 170- 1rt t t� 1 I t t l I 160— 150 " T F 7 -1 T 7 -T 140 N 130 2, 1201 + + -+ 3 110— "71 T" 90 80 70 + 1-1 + 1 1-1 I-+ 60 "" 50 40 30 20 " 10 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment BP -1: BP -1 Runoff = 46.12 cfs @ 12.24 hrs, Volume= 195,033 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non -grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41 % Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 48 Subcatchment BP -1: BP -1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph ❑Runoff 48 46 46.12 cfsl 7 -T T � E e r 44 - - - -+- - - —HT2 — y L — �V� if�nfia �7.n 40 36 1 4 I— — nqf :�LNa =:T5.TI8:Fac N 3o _ E�r�"—O--�:t=:;5 IRLffbhf 28 0 24.42 - I t -+ t I— JI" Cen ih �,6t4' LL 22 20 - -T�" 18 t L C I I I 14 12 1$ _ -�t --L78 4 -I - 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 49 Summary for Subcatchment BP -2: BP -2 Runoff = 123.94 cfs @ 12.20 hrs, Volume= 475,634 cf, Depth= 2.91" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non -grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total 13 12 11 10 80 80 3 70 0 LL 60 40 30 20 10 ' 0 0 Subcatchment BP -2: BP -2 Hydrograph 123.94 cfs ype 1124! hr 60-lfie-f Riin6114-41" R1u n gff_,4rep=45.11531ac Runoff VI o fum 4T5,%?4-I dRunoff ept .91' *Il" Length=�,4"' Tc=25 i3-nein �N-I63 1 -4 4 4- 7 -T F- 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) _ rt r ype 1124! hr 60-lfie-f Riin6114-41" R1u n gff_,4rep=45.11531ac Runoff VI o fum 4T5,%?4-I dRunoff ept .91' *Il" Length=�,4"' Tc=25 i3-nein �N-I63 1 -4 4 4- 7 -T F- 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment BP -4: Basin T Runoff = 6.74 cfs @ 12.12 hrs, Volume= 22,138 cf, Depth= 2.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 109,957 58 Meadow, non -grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unsaved Kv= 16.1 fas 18.9 1,153 Total Subcatchment BP -4: Basin T Hydrograph 6.74 cfs Type II 24 -hr 6 50 -Year Rainfall=7.01" Runoff Area=109,957 sf 5 -Runoff Volume=22,138 cf 4 Runoff Depth=2.42" Flow Length=1,153' LL 3 Tc=18.9 min CN=58 0 1'6 25 30 35 80 85 90 95 0 40 45 50 55 60 65 70 75 Time (hours) ❑ Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 51 Summary for Subcatchment DET1: Det 1 Runoff = 24.31 cfs @ 11.98 hrs, Volume= 50,255 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet 20 RuqoffArea�=tT642440 Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow Runoff-Depth=3.42 - Flow thl=488' ,0 12 Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow PN=08 Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 6.5 488 Total Subcatchment DET1: Det 1 Hydrograph 26 24 24.31 cfs 11t2-4 hr 22 _yp -50-YearAalinfa11=7.011" 20 RuqoffArea�=tT642440 18 T T -R" ff-yol�ur�e-�0,�55Tcf 16 w 14 Runoff-Depth=3.42 - Flow thl=488' ,0 12 e;� -�Tc=6-.� rain 10 PN=08 4 it 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 52 Summary for Subcatchment DET2: Det -2 Runoff = 61.54 cfs @ 12.01 hrs, Volume= 141,159 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total Subcatchment DET2: Det -2 Hydrograph 65 61.54 cfs 60 -� - -I ype 11 24 -hr 55 �I 60 -Yea% Riinfall:7.61" 50 Ry ngff fir" =A 15,;48�Sf 45 w 40 �_ 1-Rr� l `�Qxn'�"'°-e=141�59 II cf uof-Delath�.42 0 35-///I- - -01" Lengih--1,548' il: 30 Tcq--" min 25 20 "=168 15 4- 4 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 53 Summary for Subcatchment DET3: Det 3 Runoff = 35.73 cfs @ 12.02 hrs, Volume= 87,280 cf, Depth= 4.59" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet 38 36 Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow 35.73 34 32 /-1 Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow 2$ - Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer - 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' I��Y°t� m�re7,80 f w 22 n= 0.013 10.5 936 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET3: Det 3 Hydrograph 40 38 36 cfs -Type 11 24 --hr' 35.73 34 32 /-1 1 --j -L -L 13d-Y�arIRAn6114.61 2$ - fZu 0of� Ar ae =-Z8,"9�sf I 24 - I��Y°t� m�re7,80 f w 22 Runoff -Depth -4.59" 20 i= lo�ven- th= 96• I LL 18 16 -fc=A 0-.6 niln I 14 12 -1 4 4 L L --1 4 `_fr` -79 10 8 - 4 4 I 4 I 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 54 Summary for Subcatchment DR -1: DR -1 Runoff = 47.46 cfs @ 11.96 hrs, Volume= 95,887 cf, Depth= 4.59" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -1: DR -1 Hydrograph ❑ Runoff 50 47.46 cfs iyp� 1h`24 -hr 45 56 -Year -I RArII6114.01" 40 Runoff Area=250,4934sf 35 R n ff Yo1unj5,Q"7+cf 30 Runoff Depth=4.59" 0 25�TC�-5 rrn LL20 T -r r bN-=- 9 15 7 T 7- 101 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment DR -2: DR -2 Runoff = 30.73 cfs @ 11.96 hrs, Volume= 62,086 cf, Depth= 4.59" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -2: DR -2 Hydrograph 32 301 28 30.73 cfs { – — — — yp II 24 -hr IJy(j-�F�IRinf117.0.. 26- 24Z J I L Lu p o' I' Area�--Tq2,TWL f 20 rt rt -r 1 � ��� 2'7 f y 18 0 -f t =4.5� Runoff -Depth --4.5-9" � 16 FL 14 T 5. rr�in N C=9 12 10 A I L L I I I A -L I L 8 6t —1 T T F I— 1 —1 7 7 7 T T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 56 Summary for Subcatchment Ex -1: Ex WS #1 Runoff = 195.05 cfs @ 12.20 hrs, Volume= 745,495 cf, Depth= 3.01" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN DescriDtion 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non -grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc cfs I -4 4 - + Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total ■Runoff Subcatchment Ex -1: Ex WS #1 Hydrograph 210 210 4- 195.05 200 190 cfs I -4 4 - + — 4� I ype 1124 �,- fi l AO�e� Reiinf�114.6 r' 180 160 � 1: :EF u jofflA-a=2,9'73,"21-sf 150 140 1301/ - -Ru7o me=745,495 -ef Runoff De���+{{.,�.�fi' 120 - v / 0 100 = -I -4TIlov� Ldngih= 466' LL go-, - jc=2513-M n 80 60 - I�1 1 E E I I ISI :E 40 - 4- 30-/// 20 — — — 10- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 57 Summary for Subcatchment Ex -2: Ex -2 Runoff = 32.36 cfs @ 12.24 hrs, Volume= 137,310 cf, Depth= 3.63" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 28 26 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 � Shallow Concentrated Flow, Shallow � I�I� Rff Iu doff De ' th=3.��f 3 zo 18-I— o Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow -L Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' 12 10O n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, — — —1 — —4 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total Subcatchment Ex -2: Ex -2 Hydrograph 34 32 32.36 cfs -t - t t 1 fi fi y{1e W24 ---hr 30 66=1%f ea�% Ri i n#fa 11:4.'F �$•' 28 26 fr=44,3�'f By°�I_I_ T `T 24 w 22- _ � � � � � � � I�I� Rff Iu doff De ' th=3.��f 3 zo 18-I— o — –0I" L4ngih=�,4A 33 LL 16 14 -L — — — AZ r#—In 12 10O _ _ _ _ 8 6 — — —1 — —4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 58 Summary for Subcatchment Ex -HH: Ex HH Runoff = 30.09 cfs @ 12.26 hrs, Volume= 129,148 cf, Depth= 3.63" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex -HH: Ex HH Hydrograph I L - ❑Runoff 32 30.09 cfs 30Typle "4� r 28T- 68=1%eai' Rainfall:7.61" 26 24 'I 4 4- Rgngff �►r"=4?7,�24isf 22-////l w 20 -Ru-no ep#h=3.6� 0 16 _i rt rt fi — F�1" Lin -h -4,2t- u 14 T T c I3" no 12 8 6 4 t t 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment Ex -PR: (new Subcat) Runoff = 14.69 cfs @ 11.90 hrs, Volume= 24,030 cf, Depth= 2.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 119,354 58 Meadow, non -grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex -PR: (new Subcat) Hydrograph 16 -f4�� ■Runoff 15 14.69 Cfs i � � � i I iyp� 14 13 -7 T T 1i24 -hr Ij-5�6-�Y{ a/�rlRAnffi1Q1 12 + LF QTTOFV � U O tire`. =�",`4-5"f 11 _ 10 n ff- Ot M =! 41 0 d 9Runoff - - TT - De h=2.42" �T 0$ O-.�rr�n v. 71� t t t- I --i -t (N =t8 6 4 3 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 60 Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 3.42" for 50 -Year event Inflow = 24.31 cfs @ 11.98 hrs, Volume= 50,255 cf Outflow = 20.81 cfs @ 12.02 hrs, Volume= 46,505 cf, Atten= 14%, Lag= 2.5 min Primary = 18.62 cfs @ 12.02 hrs, Volume= 45,875 cf Secondary = 2.19 cfs @ 12.02 hrs, Volume= 630 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.20' @ 12.02 hrs Surf.Area= 5,980 sf Storage= 10,395 cf Plug -Flow detention time= 65.0 min calculated for 46,505 cf (93% of inflow) Center -of -Mass det. time= 24.9 min ( 857.4 - 832.5 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=18.61 cfs @ 12.02 hrs HW=616.19' (Free Discharge) L1=Culvert (Passes 18.61 cfs of 31.60 cfs potential flow) L2=Custom Weir/Orifice (Orifice Controls 18.61 cfs @ 3.72 fps) Secondary OutFlow Max=2.17 cfs @ 12.02 hrs HW=616.19' (Free Discharge) L3= Broad -Crested Rectangular Weir (Weir Controls 2.17 cfs @ 1.12 fps) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 61 Pond P-1: Det Pond 1 Hydrograph + �— I � 4 - Inflow Inflow Area=X176,414 sf 26 / 20.81 cfs Peak Elev=616.20' 24- 22 18.62 cfs Storage=10,395 cf 20 18 X16 49cfs 14 2 12T T T 10 4—II-64 i 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) O Inflow O outflow ■ Primary ■ Secondary USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 62 Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 3.42" for 50 -Year event Inflow = 61.54 cfs @ 12.01 hrs, Volume= 141,159 cf Outflow = 56.55 cfs @ 12.05 hrs, Volume= 135,333 cf, Atten= 8%, Lag= 2.1 min Primary = 56.55 cfs @ 12.05 hrs, Volume= 135,333 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.44' @ 12.05 hrs Surf.Area= 9,799 sf Storage= 17,474 cf Plug -Flow detention time= 37.9 min calculated for 135,318 cf (96% of inflow) Center -of -Mass det. time= 14.4 min ( 849.4 - 835.1 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=56.48 cfs @ 12.05 hrs HW=595.44' (Free Discharge) LrCulvert (Passes 56.48 cfs of 68.99 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 56.48 cfs @ 3.79 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 63 ■ Inflow ■ Outflow ■Primary ■Secondary Inflow Are�i=496,6�48--s-f® • ■ -, i • i . I% //////////////////////////////------////////////////////////////////////// ■ Inflow ■ Outflow ■Primary ■Secondary USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 64 Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.85' @ 12.07 hrs Surf.Area= 10,957 sf Storage= 17,489 cf Plug -Flow detention time= 69.5 min calculated for 80,842 cf (93% of inflow) Center -of -Mass det. time= 29.4 min ( 840.9 - 811.4 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=30.62 cfs @ 12.07 hrs HW=586.85' (Free Discharge) L1=Culvert (Passes 30.62 cfs of 45.89 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 30.62 cfs @ 3.33 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 4.59" for 50 -Year event Inflow = 35.73 cfs @ 12.02 hrs, Volume= 87,280 cf Outflow = 30.65 cfs @ 12.07 hrs, Volume= 80,842 cf, Atten= 14%, Lag= 3.2 min Primary = 30.65 cfs @ 12.07 hrs, Volume= 80,842 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.85' @ 12.07 hrs Surf.Area= 10,957 sf Storage= 17,489 cf Plug -Flow detention time= 69.5 min calculated for 80,842 cf (93% of inflow) Center -of -Mass det. time= 29.4 min ( 840.9 - 811.4 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=30.62 cfs @ 12.07 hrs HW=586.85' (Free Discharge) L1=Culvert (Passes 30.62 cfs of 45.89 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 30.62 cfs @ 3.33 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 65 Pond P-3: Det Pond 3 Hydrograph II � II I—I 35.73 cfs — — 4- 1 1 � 40 1- rt 38 Peak Elev=586.85' l� 'In 36 34 30 Rr .65 cfs 32 30 I l rt fi l I-� -r t-- 1-1 -1 rt 28 26 � � IIS � � II � � 24 22 rt , 3 20 ; c 18 LL 16 14 12 10 4- 1 1 � 1 r flow Area=228,009 sf 1- rt fi Peak Elev=586.85' �Stwap--IT,AO"f fi l I l rt fi l I-� -r t-- 1-1 -1 rt III � � IIS � � II � � rt —I T ---------------- ■ Inflow ■ Outflow D Primary ❑ Secondary USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 66 Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 3.31" for 50 -Year event Inflow = 249.95 cfs @ 12.05 hrs, Volume= 1,091,320 cf Primary = 249.95 cfs @ 12.05 hrs, Volume= 1,091,320 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 67 Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 3.19" for 50 -Year event Inflow = 213.97 cfs @ 12.14 hrs, Volume= 948,391 cf Primary = 213.97 cfs @ 12.14 hrs, Volume= 948,391 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Hydrograph E 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) + - ❑Inflow 220213.97 cfs fi fi _ Inflow Area=3,569,650 sf ❑ Primary 210 200 III --T 4- 4 190 180 CIIIIII 170 160 150 I�+��I I�+��I I4 140 N V 130 1 L L I I 3 120 -1 0 110 LL 100 — II II 90 70 60 50 fi fifi 40 30 E 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 68 Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 3.15" for 50 -Year event Inflow = 255.38 cfs @ 12.20 hrs, Volume= 1,011,954 cf Primary = 255.38 cfs @ 12.20 hrs, Volume= 1,011,954 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 69 Summary for Subcatchment BP -1: BP -1 Runoff = 55.85 cfs @ 12.24 hrs, Volume= 234,956 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non -grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41 % Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 70 Subcatchment BP -1: BP -1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph I � � � � � � + + ❑Runoff 60 55 55.85 cfs fi ype 11 24-h r 50 1d0 -Yea% Rainfan4.66" 45 J L L L F unOff �Ar�a 15.7T18Lc 40 �R�nc ff Volum=234,,9!6�cf Runoff�epth=4.12 35 0 30 F�lov�► Lin h--'i,6t4' " 25 I I I I I I I I I jTc�30�1 nfiin I 20 - — - — �N�68 15 t t t 10 5 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 71 Summary for Subcatchment BP -2: BP -2 Runoff = 153.13 cfs @ 12.20 hrs, Volume= 582,036 cf, Depth= 3.56" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non -grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel 4 -kx-010-Yeas Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total E 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment BP -2: BP -2 Hydrograph 170- 153.13 160 150-//_ cfs —I Type 114! hr pe 140 -4 4 -kx-010-Yeas 130 120 _ -1 1 L �Nnpff�mr=�g5�.�531ac 110 �, 100 / -t -F T T- I B� � If ff�e =_ �fr„ 90 3 80 TIlovy L -�h==�4�' ng o LL 70 60 - - -4 4 -k D jc�254 MM —l�=63 40 30 T E 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 72 Summary for Subcatchment BP -4: Basin T Runoff = 8.53 cfs @ 12.12 hrs, Volume= 27,591 cf, Depth= 3.01" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 109,957 58 Meadow, non -grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 18.9 1,153 Total Subcatchment BP -4: Basin T Hydrograph 9 8.53 c01 fs 8 �yp� I 4-frr 1I46 -Y6ar Ralin&IkT8� 7 Runoff Area=109,9571sf 6 Runoff Volume=7,591 Icf 5 Run-off Depth --3.0-V' FtwwILengt]�,=�-16 a 4 Tc=18.0 rr in 3 1 1 1 1 1 1 CIN=58 2-/ 1 I I I i i 1 I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 73 Summary for Subcatchment DET1: Det 1 Runoff = 29.18 cfs @ 11.98 hrs, Volume= 60,542 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' I— Ru qo{. Area --'I76,424�sf r 22 20 n= 0.013 6.5 488 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET1: Det 1 Hydrograph 32 30 29.18 cfs iyp� 28 26 lto�Y��rR�infll7.8" 1124-- it 24 I— Ru qo{. Area --'I76,424�sf r 22 20 I�nn1 fY�0,4 Cf 18 Runoff -Depth= -4.12" 16 _ i Iol Nie; thl=488' LL 14 12 fi t f- -JTc=6-.� rain 10 1 1 1 PN =-15-8 � 8 6 1 1 1 1 4-// + + 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 74 Summary for Subcatchment DET2: Det -2 Runoff = 74.00 cfs @ 12.01 hrs, Volume= 170,054 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet I , 4 4 80 75 7 4.00 cfs Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale 701zrt 65 Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter 4 Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer -1 1 L L 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' 45 n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale - -T Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET2: Det -2 Hydrograph -+t- I , 4 4 80 75 7 4.00 cfs -L I -L L HL241h r 701zrt 65 rt fi I-40 "- ea% Riin&04.8t" 4 -Ryno"r"=AM ;;A Sf 55 50 -1 1 L L I�t7nc "O'u'=��70 .54- cf -Oepth=4. " 45 unof 0 4o - -T T - 41"T �lLnh T,58' LL 35 - T- 25 20 15 10 " 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 75 Summary for Subcatchment DET3: Det 3 Runoff = 41.54 cfs @ 12.02 hrs, Volume= 102,180 cf, Depth= 5.38" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet + _ — Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow � y eH124-hr Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow 1— 1-fi6O=l�re4 RWAM14.96" 338 6 32 Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer E E7 1 ��"���I/ `r � 8�— f w 26 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' 1 - n= 0.013 10.5 936 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET3: Det 3 Hydrograph 46 + _ — 41.54 44 442 cfs 4 � � y eH124-hr 0 1— 1-fi6O=l�re4 RWAM14.96" 338 6 32 � I � E E7 1 ��"���I/ `r � 8�— f w 26 1 - I��luh 5f 3 22 0 -1 rt t fi F v� en# tl ----936' 9 LL20I�����I—I 18 I I�c=ll0 16, 149 12 ,$ _I 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 76 Summary for Subcatchment DR -1: DR -1 Runoff = 55.08 cfs @ 11.96 hrs, Volume= 112,256 cf, Depth= 5.38" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -1: DR -1 Hydrograph ❑ Runoff 55 55.08 cfs � i wry e 124 r 50 1 100 -Yea% Riinfa11=�7.96" 45 1— Rgngff fir"=Z O,93isf 40 1 Rrnc ff Yol�mn 11256 d F 35 Runoff epth=5.38" 0 30 T Tc�=" din LL 25 Y (;N=179 15 10 T T T T T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 77 Summary for Subcatchment DR -2: DR -2 Runoff = 35.66 cfs @ 11.96 hrs, Volume= 72,685 cf, Depth= 5.38" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -2: DR -2 Hydrograph J � � � � ■Runoff 35.66 cfs — — — — — — — — - I 36 —I _ I-typ W24 --hr 34 32 1 h 0646ar- R,a� nf- 114.66" 30 28 24 - 1 -4 7--- --22 2 2 Runoff-Depth=5.36" Tc -5 in LL 18 16 _ 1 4 1- --t 4 cN=tg 14 10 8 —1 4 + 4 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 78 Summary for Subcatchment Ex -1: Ex WS #1 Runoff = 239.75 cfs @ 12.19 hrs, Volume= 909,251 cf, Depth= 3.67" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN DescriDtion 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non -grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total 1 1 U, 1 3 0 1 LL 1 Subcatchment Ex -1: Ex WS #1 Hydrograph 239.75 cfs I fi -r- 1 -jype 1124! hr L I 160 --Year RainfaII47AV �unlo#IA"a=?,93,Q921-s# -R n7ffVo�llme=9�9,�51__II�f flunoff-bepth=3.6r *Iov� Lengih= 466' Tc=�25 ]3- n) n -I64 1 4 4 7 -T 0 5 10 15 0 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 79 Summary for Subcatchment Ex -2: Ex -2 Runoff = 38.91 cfs @ 12.24 hrs, Volume= 164,476 cf, Depth= 4.34" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 38.91 cfs 20.7 150 0.0430 0.12 Y4 r36} Sheet Flow, Shallow — fi t t---460--Ye4 Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 L Shallow Concentrated Flow, Shallow I 26 --kI��476�f Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow -Runoffel2th 41ov� tin ih=3,4�3' I 20 LL '$ Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' t� -I -T�3" o f 16 1214 n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment Ex -2: Ex -2 Hydrograph 40 38 38.91 cfs Y4 r36} 34 — fi t t---460--Ye4 Riin-fa11*7.96" f 3a Z Z L I 26 --kI��476�f Vlff�j`re�=4i43'ILsf 24 3: 22 0 + -Runoffel2th 41ov� tin ih=3,4�3' I 20 LL '$ 1t t� -I -T�3" o f 16 1214 C 1 0 I 18 I 6 A 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 80 Summary for Subcatchment Ex -HH: Ex HH Runoff = 36.16 cfs @ 12.26 hrs, Volume= 154,699 cf, Depth= 4.34" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet - ype FF24! -h r Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc L Adutea% Rlin-fan47- r 28 Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel 44 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff Subcatchment Ex -HH: Ex HH Hydrograph 40 38 36 36.16 cfs 1 - ype FF24! -h r 34 � 32 L Adutea% Rlin-fan47- r 28 LLL L L L 4�_R"r"=4?7,j24Tsf 44 L L L I� —Riin o�;t=!�,�� flu noe th4 3� f 22 3 20 - -*laver Lin ih k,268' LL 18 14 12O 10 6 T48 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 81 Summary for Subcatchment Ex -PR: (new Subcat) Runoff = 18.32 cfs @ 11.90 hrs, Volume= 29,948 cf, Depth= 3.01" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 119,354 58 Meadow, non -grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex -PR: (new Subcat) 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph —� - - Runoff 19 18 18.32 cfs y I I-24- h r 17 16 fit t- Ind Y6 — R A n6I W7.86" 15 14 - —1-rr— Kul o Ar a p= ' 1 ", j54�Sf 12 1 1 1� E �r9f f- � 9' f 11 -I 11�E Runoff Dep�#h= " AT 010 8 O. 7 6 I 5 4 3 2 1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 82 Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.33' @ 12.02 hrs Surf.Area= 6,129 sf Storage= 11,218 cf Plug -Flow detention time= 57.0 min calculated for 56,792 cf (94% of inflow) Center -of -Mass det. time= 22.8 min ( 849.9 - 827.1 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=20.94 cfs @ 12.02 hrs HW=616.33' (Free Discharge) L1=Culvert (Passes 20.94 cfs of 32.09 cfs potential flow) L2=Custom Weir/Orifice (Orifice Controls 20.94 cfs @ 4.19 fps) Secondary OutFlow Max=4.88 cfs @ 12.02 hrs HW=616.33' (Free Discharge) L3= Broad -Crested Rectangular Weir (Weir Controls 4.88 cfs @ 1.48 fps) Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 4.12" for 100 -Year event Inflow = 29.18 cfs @ 11.98 hrs, Volume= 60,542 cf Outflow = 25.87 cfs @ 12.02 hrs, Volume= 56,792 cf, Atten= 11 %, Lag= 2.2 min Primary = 20.96 cfs @ 12.02 hrs, Volume= 54,964 cf Secondary = 4.91 cfs @ 12.02 hrs, Volume= 1,828 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.33' @ 12.02 hrs Surf.Area= 6,129 sf Storage= 11,218 cf Plug -Flow detention time= 57.0 min calculated for 56,792 cf (94% of inflow) Center -of -Mass det. time= 22.8 min ( 849.9 - 827.1 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=20.94 cfs @ 12.02 hrs HW=616.33' (Free Discharge) L1=Culvert (Passes 20.94 cfs of 32.09 cfs potential flow) L2=Custom Weir/Orifice (Orifice Controls 20.94 cfs @ 4.19 fps) Secondary OutFlow Max=4.88 cfs @ 12.02 hrs HW=616.33' (Free Discharge) L3= Broad -Crested Rectangular Weir (Weir Controls 4.88 cfs @ 1.48 fps) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 83 Pond P-1: Det Pond 1 Hydrograph LInflow29.18 cfs wi Idol Are '1 / 6���f Pnma dary 32 — – — 3o j 25.87 cfs — 4-- I I —PeOk F-10" .33' 28 i - �5fo—ra—ae r -M 18 -CC -f 26 24 22 20.96 cfs -I I � I I ! I - y 20 / v18 16 0 I-1 L I I-1 T L I I A T LL 14 / 12 I -TSI IST 10 -I-I1LI a 4.91 cfsL I T =F ITT T I T T 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 84 Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.62' @ 12.04 hrs Surf.Area= 10,009 sf Storage= 19,253 cf Plug -Flow detention time= 33.3 min calculated for 164,228 cf (97% of inflow) Center -of -Mass det. time= 13.4 min ( 843.1 - 829.7 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=68.51 cfs @ 12.04 hrs HW=595.62' (Free Discharge) LrCulvert (Passes 68.51 cfs of 70.48 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 68.51 cfs @ 4.02 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 4.12" for 100 -Year event Inflow = 74.00 cfs @ 12.01 hrs, Volume= 170,054 cf Outflow = 68.61 cfs @ 12.04 hrs, Volume= 164,228 cf, Atten= 7%, Lag= 2.0 min Primary = 68.61 cfs @ 12.04 hrs, Volume= 164,228 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.62' @ 12.04 hrs Surf.Area= 10,009 sf Storage= 19,253 cf Plug -Flow detention time= 33.3 min calculated for 164,228 cf (97% of inflow) Center -of -Mass det. time= 13.4 min ( 843.1 - 829.7 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=68.51 cfs @ 12.04 hrs HW=595.62' (Free Discharge) LrCulvert (Passes 68.51 cfs of 70.48 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 68.51 cfs @ 4.02 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1—Detention R Type // 24 -hr 100- Year Rainfall= 7.86 " Prepared • • • Printed8/15/2017 HydroCADO 10.00-19 s/n 08568 @ 2016 HydroCAD Software Solutions LLC Page 85 • 11 ' •, _ . • . .. • y i 1 �1 I I 1 1 1 1 �1 1 •1 1 :1 •1 USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 86 Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 5.38" for 100 -Year event Inflow = 41.54 cfs @ 12.02 hrs, Volume= 102,180 cf Outflow = 36.36 cfs @ 12.07 hrs, Volume= 95,742 cf, Atten= 12%, Lag= 3.0 min Primary = 36.36 cfs @ 12.07 hrs, Volume= 95,742 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.96' @ 12.07 hrs Surf.Area= 11,146 sf Storage= 18,749 cf Plug -Flow detention time= 63.2 min calculated for 95,742 cf (94% of inflow) Center -of -Mass det. time= 28.0 min ( 834.9 - 807.0 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=36.33 cfs @ 12.07 hrs HW=586.96' (Free Discharge) L1=Culvert (Passes 36.33 cfs of 46.58 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 36.33 cfs @ 3.44 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 87 ■ Inflow E Outflow 0 Primary ❑ Secondary Vnho'wi • Peak • • • • • • i • jr %i - I j% ///////////////////////////------//////////////////////////////------ ■ Inflow E Outflow 0 Primary ❑ Secondary USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 88 Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 4.00" for 100 -Year event Inflow = 305.36 cfs @ 12.05 hrs, Volume= 1,318,695 cf Primary = 305.36 cfs @ 12.05 hrs, Volume= 1,318,695 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 89 Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 3.87" for 100 -Year event Inflow = 260.68 cfs @ 12.14 hrs, Volume= 1,150,268 cf Primary = 260.68 cfs @ 12.14 hrs, Volume= 1,150,268 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 90 Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 3.82" for 100 -Year event Inflow = 312.43 cfs @ 12.20 hrs, Volume= 1,228,426 cf Primary = 312.43 cfs @ 12.20 hrs, Volume= 1,228,426 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph ❑ Inflow Primary 340EI 312.43 cfs —� — 320 Inflow Area=3,854,747 sf 300 1- 280 -I 260 AT -L1: TT 240 220 T T T T I 7 T T T I in 200 X180 T T F1 T T T F1 T 0 160 140 TTT I ITTTI I I IT 120 Tt�I I I�Tt- I I I IA 100 0 - -4T - 6 60 4n 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Ex -3 Ex W #3 Ex -4 Ex -4 XCP2 XCP2 Subcat Reach on Link ODR -3 DET -4 BP -3 O D -3 Det 4 P-4 Det Pond 4 ZCP CP2 USI Revision WS2-Detention Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 2 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 DET -4 0.00 0.00 333.0 0.0100 0.013 24.0 0.0 0.0 2 P-4 581.83 580.95 58.8 0.0150 0.013 36.0 0.0 0.0 USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment BP -3: Runoff = 102.87 cfs @ 12.65 hrs, Volume= 737,137 cf, Depth= 1.71" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN DescriDtion 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non -grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet - Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 - Shallow Concentrated Flow, Shallow Conc L2 Ype I41 -r 90 - Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Runoffot -77 _37 cf Iv w 65 0 601 0 55 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 4 1 1 I Ic7 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total ■Runoff Subcatchment BP -3: Hydrograph 115 - 110 105 100 102.87 cfs -- - - L2 Ype I41 -r 90 - fi t 1- 1 �IIU= 4�e I� Inflall .2� ' 80-Fur�o#IAra--,17,71�f 75 70 1 Runoffot -77 _37 cf Iv w 65 0 601 0 55 Runoff epth-4. Ti"Ling-fh=�2�2' LL 50 45 4 1 1 I Ic7 30 20 15 10 - - - 5 / 0 0 5 10 15 20 25 30 35 40 45 50 Time (hours) 55 60 65 70 75 80 85 90 95 ■Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment DET -4: Det 4 Runoff = 40.89 cfs @ 12.04 hrs, Volume= 103,287 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet 4 4- -k- 44 40 cfs Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow 01 36 _ Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow - Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer fi 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' 24 0 22 —1 ::1 J n= 0.013 11.7 827 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET -4: Det 4 Hydrograph 4 4- -k- 44 40 cfs — T Yr 0.89 01 36 _ 'W2r4- —�l - e$f �l�ll�5.20n 3� - Iqngffj►re=61212sf 30 28 w 26 fi I�� 1 °=9�387�cf -Ru -no 2.�" 24 0 22 —1 ::1 J I L� Wftz E F�w�e�gtY�-8iT 18 14 --1- - - t--_ 711Q 12 10 _ 6 4 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment DR -3: DR -3 Runoff = 30.75 cfs @ 11.97 hrs, Volume= 59,943 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff Subcatchment DR -3: DR -3 Hydrograph 34 32 30.75 30 cfs { — -Yyp� II 24 -hr _ 28d-aF�a� Rinf115.2�• 26 24 -1 1 L L L goOpff Area�=�5,POLf 1 1Rrq�Yo1 �"9,"f 222 0 18 R �ff�T� .ir�in 0 16 5� LL 14 C�N=68 12 10 11 A-1 1 L L LI I I A -L I L 6' I-1 -1 T 1-1-1 7 7 7 T T - 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment Ex -3: Ex WS #3 Runoff = 96.35 cfs @ 12.65 hrs, Volume= 703,872 cf, Depth= 1.64" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non -grazed, HSG C 118.450 63 Weighted Average 118.450 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 100 95 Sheet Flow, Sheet - hype 11'24 -hr Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 E I Shallow Concentrated Flow, Shallow Conc 85 Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow -R f o me=703, 2_I-ef Runoff Lt.6e F 55 o - - -t Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 -rt- l l l l I je�8 J- � 40 30 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 - Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total ■ Runoff Subcatchment Ex -3: Ex WS #3 Hydrograph 105 100 95 96.35 cfs - hype 11'24 -hr 90 85 -1 -T T E I I :AIO-.Yea-f "nf6ll:i�&&' 85 Iu1n f . rem -1' 8 0 70 66 -R f o me=703, 2_I-ef Runoff Lt.6e F 55 o - - -t -+ + -Depth Tlovy Lein glfh=�;2k' 50 LL 45 / - -trt -rt- l l l l I je�8 J- � 40 30 ::1 Z I� I 11�� T IS I 25 20-//- 0 - - 15 1 10 - 4 5- 0-, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment Ex -4: Ex -4 Runoff = 14.43 cfs @ 12.41 hrs, Volume= 91,449 cf, Depth= 1.08" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, Bot.W=5.00' D=2.00' Z= 6.07' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex -4: Ex -4 Hydrograph 16- 15-/ 615 14.43 cfs 144yI24 r 13 10 Y�arIRiinfill 5l& 12 -r t —Runoff- krep=1,014,""f 11 10 R7nc�f�/ol�ue--�91,49f w 9 - Runoff -Depth= -1.08" U 3 8 f W Le --4,7 il LL 7 6 -tc �9� mein 5 �PN=-�5 4 3 F 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 8 Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 2.02" for 10 -Year event Inflow = 40.89 cfs @ 12.04 hrs, Volume= 103,287 cf Outflow = 36.74 cfs @ 12.09 hrs, Volume= 95,642 cf, Atten= 10%, Lag= 2.7 min Primary = 36.74 cfs @ 12.09 hrs, Volume= 95,642 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.94' @ 12.09 hrs Surf.Area= 10,274 sf Storage= 16,625 cf Plug -Flow detention time= 60.3 min calculated for 95,642 cf (93% of inflow) Center -of -Mass det. time= 20.7 min ( 873.3 - 852.6 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83' 36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 580.95' S=0.0150'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=36.69 cfs @ 12.09 hrs HW=586.94' (Free Discharge) L1=Culvert (Passes 36.69 cfs of 64.62 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 36.69 cfs @ 3.20 fps) te3 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cal Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 9 ■ Inflow ■ Outflow ■ Primary ■ Secondary '• • Det '• • ..... 40.89 cfs 4- • 42 1- 1 -Pe-OkIE10"50.94 40 • n • 36 34 32 30 28 24 o 18 16 12 x /////////////////////////////////////////// ////////////////////////////////////////////////////////////////////////////// ■ Inflow ■ Outflow ■ Primary ■ Secondary USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 10 Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 1.75" for 10 -Year event Inflow = 110.30 cfs @ 12.65 hrs, Volume= 892,722 cf Primary = 110.30 cfs @ 12.65 hrs, Volume= 892,722 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph 1 1 -4 - ❑ Inflow EIPrimary 110.30 120- 115 cfs —I Inflow Area=6,135,229 sf 110 - — 105 -1t t� I I l t l l 100 95 90 1 + 1-1 -4+ 1 1-1 85 I LI I TSI I I I� 780 5 3 60 55 50 -1-4+ 1 1 I���I I I� 45 40 35 30 - - - - - -VIII- 20 _ 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 11 Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 1.55" for 10 -Year event Inflow = 108.18 cfs @ 12.59 hrs, Volume= 795,321 cf Primary = 108.18 cfs @ 12.59 hrs, Volume= 795,321 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph I L L— I I - F11-1 nflow ❑ Primary 1os.1s cfs „0 _ Inflow Area=6,174,630 sf 105 I�T��11I��� 100 95 85 80 75 n 70 65 3 60 ° 55 LL50—t+��I I—f I� 45 40 II 35I 30 - - - - II- 20 _ 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment BP -3: Runoff = 149.78 cfs @ 12.65 hrs, Volume= 1,036,461 cf, Depth= 2.41" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN DescriDtion 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non -grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 - Sheet Flow, Sheet T I 125--1Ye* RiainfaI14.2V' _4 4 Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 L Shallow Concentrated Flow, Shallow Conc Runoff Voiume 1,036,461- f I I -Runoff- IDe�h�2.�V - T T Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 7. &nji n Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total 16 15 14 13 12 11 10 w v 9 0 8 LL Subcatchment BP -3: Hydrograph -f -F -y T T ISI 111"24 -hr - T I 125--1Ye* RiainfaI14.2V' _4 4 1_ I Ru�of Ar a775,1167,W Sf -1 L L L Runoff Voiume 1,036,461- f I I -Runoff- IDe�h�2.�V - T T I I -f 16* Length 15,Z�T 7. &nji n ==$I, 1 51 1 1 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment DET -4: Det 4 Runoff = 56.52 cfs @ 12.04 hrs, Volume= 141,683 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET -4: Det 4 Hydrograph V 60 56.52 cfs 55 ype 11 24 -hr 50 25-Yeai• Riinall6." 45 Rgngff �j►re�=6�12,�121 sf 40 R n ff Yol mMpth-=2.787"141, 83 cf 35 F Rluno, 0 30 I- I— — —Flaw Length=827' "25 Tc711jMin 20 �N 68 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment DR -3: DR -3 Runoff = 42.17 cfs @ 11.96 hrs, Volume= 82,226 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR -3: DR -3 Hydrograph Runoff 42.17 44 42 cfs - I I I t L C I I I F�24-�h r 40 38 -y - 1 A 4 + 4 I— 1-26 -furl RaWf " 114.26 36 34 t t-�- RUAr"�=3�5,P"f 32 30 28 - 1 rgTyo-�"2,�26-f 24 Runoff-Depth=2.7$•• 22 - I 1 - - - - - 1 1 1 1 -T C56 n�M- _0 LL 20T:T7� 18 GTN�8 16 14 - 12 10 17 -T 7 L L 1 I71 a T -E 8 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment Ex -3: Ex WS #3 Runoff = 141.96 cfs @ 12.60 hrs, Volume= 996,367 cf, Depth= 2.32" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non -grazed, HSG C 118.450 63 Weighted Average 118.450 I I I I ype 1124 hr 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet I I I I ype 1124 hr 130 --4 Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 -1 Shallow Concentrated Flow, Shallow Conc T 7- f � RuInD rea�l 18. r mo' I 100 90 - Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 A Shallow Concentrated Flow, Shallow T L I I -FlI" L�ngih=�2�2' 70 U- 60 1 Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 4 - 4- �N 163 40 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 1 L 20 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total ■Runoff Subcatchment Ex -3: Ex WS #3 Hydrograph 150141.96 140 cfs I I I I ype 1124 hr 130 --4 -4- --2"ea# Rainfa114.20!' 120 110 � -1 7 T 7- f � RuInD rea�l 18. r mo' I 100 90 - T T -Rrnolff- o� 9916,�7--II d1 Runoff -Depth 2.32" w o $° ' -� A T T L I I -FlI" L�ngih=�2�2' 70 U- 60 1 T T T 1 1 Tc758.1tn" 1 50 4 - 4- �N 163 40 30 1 L 20 10 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment Ex -4: Ex -4 Runoff = 23.98 cfs @ 12.41 hrs, Volume= 138,207 cf, Depth= 1.63" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, Bot.W=5.00' D=2.00' Z= 6.07' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex -4: Ex -4 Hydrograph 26 23.98 cfs 24-//// Type 124 -hr 22 -//25 -Yea% Rainfa11;i6.20" 20 Runoff Arpa=1,014 GA Sf 16 Runoff Volume=1� 8�O7�I cf 16 -Rutnoff-bepth=1.63" w - 14- - 4 -f I" Lengih x,74-1' 3 12 10 Tc=,3%x2 n#n l l "-5 6 1 12030 41 4 1 5 5 0 61 0 :1 90 95 ❑Runoff USI Revision WS2-Detention Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 17 Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 2.78" for 25 -Year event Inflow = 56.52 cfs @ 12.04 hrs, Volume= 141,683 cf Outflow = 52.07 cfs @ 12.08 hrs, Volume= 134,037 cf, Atten= 8%, Lag= 2.4 min Primary = 52.07 cfs @ 12.08 hrs, Volume= 134,037 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.19' @ 12.08 hrs Surf.Area= 10,620 sf Storage= 19,244 cf Plug -Flow detention time= 47.0 min calculated for 134,024 cf (95% of inflow) Center -of -Mass det. time= 17.0 min ( 860.3 - 843.3 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83' 36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 580.95' S=0.0150'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=52.04 cfs @ 12.08 hrs HW=587.19' (Free Discharge) L1=Culvert (Passes 52.04 cfs of 66.83 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 52.04 cfs @ 3.60 fps) te3 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS2-Detention Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 18 Pond P-4: Det Pond 4 Hydrograph L I L 56.52 cfS ■El Inflmow ' Inflow Area=612,6'12-sf E Outflow ❑ Se onda ry 60 52.07 cfs Peak Elev=587.19' 55 / — —I Storage=19,244 cf 50 45 40 X w 35 ° ° 30 / L L_ 11 LL 25:/ / -1 -J- t— I --t t 2():// ////////////////////////////////////// iiiii%////////////////////////////////////////////////////////////////////// USI Revision WS2-Detention Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 19 Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 2.45" for 25 -Year event Inflow = 159.65 cfs @ 12.59 hrs, Volume= 1,252,724 cf Primary = 159.65 cfs @ 12.59 hrs, Volume= 1,252,724 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph I- T L II ❑Inflow 170 159.65 cfs T T L Inflow Area=6,135,229 ❑ Primary 160 _ sf 150 ITTTTI 1 1 T - 140 130 ITTTT I ITTTT I IT 120 I�Tfi�I I�rt�l1 1 Irt 110 N 100 I�Tfi�III�T��III� 3900 80 " I T��I I�TI I I IA 70 70 60 50 40�- 30 gn 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 20 Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 2.20" for 25 -Year event Inflow = 161.70 cfs @ 12.59 hrs, Volume= 1,134,573 cf Primary = 161.70 cfs @ 12.59 hrs, Volume= 1,134,573 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs N V 3 0 LL Link XCP2: XCP2 Hydrograph ii 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment BP -3: Runoff = 190.21 cfs @ 12.65 hrs, Volume= 1,295,633 cf, Depth= 3.01" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN DescriDtion 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non -grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc Length Slope (min) (feet) (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total Subcatchment BP -3: Hydrograph � + I t- I -� -� t t- 210 ■Runoff 20900 190.21 cfs I -T� y� I12 V 180 170-'/ - 1 15&--1Ye4r Rlainfall*7.OT' 50 - - 4 4 � ea 5,167, 87- 140 - Runoff Volme=11,2J5,I633-£# 130 k 1 w 120 unoff De h�.61" 100 -I - - - I Io* L n91th= 2 ' o - LL 90 80 l 1 rt T t- l 11 I I7 60 / J� I� I I I 1 1 -1 -L -L L- 50 40 -4 4- I 1 A 4 4- 30 20 - 4 - - 10 / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment DET -4: Det 4 Runoff = 69.73 cfs @ 12.04 hrs, Volume= 174,505 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet 75 70-, cfs Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow 65 Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow J T Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 1 t 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' R�nc�ff�C�ol�m=74,505 cf kr w 3 40 n= 0.013 11.7 827 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff Subcatchment DET -4: Det 4 Hydrograph 75 70-, cfs hype W24� r 69.73 65 60- eai• Rainfal[:4.61" � 60 55 J T T L nQ 50 N 45 1 t R�nc�ff�C�ol�m=74,505 cf kr w 3 40 u-off-bepth�3.�" - Flaw-Length=8�7' 35 30 1-1 TI T - n -I c=11 j Win 25 t// I� _ — 8 20 15 T T L 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment DR -3: DR -3 Runoff = 51.78 cfs @ 11.96 hrs, Volume= 101,274 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct N V 3 0 LL Subcatchment DR -3: DR -3 Hydrograph 51.78 cfs 10 W T _I I —i -�y4e U 244 --hr 60=Yea% Fain-falC2�7.61- F- T- -Rgngff Area=355,-�3�sf -Rr� �yoh 374J2 f ep# 4 I I Ti=S.IO n� in I A 4 X46$ T T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment Ex -3: Ex WS #3 Runoff = 182.01 cfs @ 12.59 hrs, Volume= 1,250,502 cf, Depth= 2.91" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non -grazed, HSG C 118.450 63 Weighted Average 118.450 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 200 1990- 0 / Sheet Flow, Sheet _ � I y 11 24-�- Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 -I Shallow Concentrated Flow, Shallow � - ►r"=1� 8.�501ae 130 -:runoff Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Z I L: I I- --Run�off�De�h--L2.�t' 110 a 100 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total ■Runoff Subcatchment Ex -3: Ex WS #3 Hydrograph 1 200 1990- 0 / 182.01 cfs _ � I y 11 24-�- 160 15"=1Ye-a r Rfiainfa1W7.0V' 150 -t -I T � - ►r"=1� 8.�501ae 130 -:runoff Rlungff, Volume -1,250,502 120 Z I L: I I- --Run�off�De�h--L2.�t' 110 a 100 I -Flog Unglth 14,2 2' 80-/ Tc=58 mm, � I63 60 -4 4 4 4- 50 40 30 � 20 - 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment Ex -4: Ex -4 Runoff = 32.62 cfs @ 12.41 hrs, Volume= 180,171 cf, Depth= 2.13" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet - Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Runoffs Arga=1,014,QA8�sf Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, - lour L�ngih=�,7�1' Bot.W=5.00' D=2.00' Z= 6.07' Top.W=29.00' —I T T T —To�� Win n= 0.035 Earth, dense weeds 39.2 3,721 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment Ex -4: Ex -4 Hydrograph 36 T 34-32.62 32 cfs T T ype 1L24 --hr - 1 -4 4 -60 --Yea% R i nfa I W7.61VI 28 26 Runoffs Arga=1,014,QA8�sf 24 22 Runoff -V f Runoffuepth=2.13" 20 0 18--I - lour L�ngih=�,7�1' 16 —I T T T —To�� Win 12 10 — T T T -' — T -T 8 6 TT T T T 4-// � — 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 50 -Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 26 Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 3.42" for 50 -Year event Inflow = 69.73 cfs @ 12.04 hrs, Volume= 174,505 cf Outflow = 64.80 cfs @ 12.08 hrs, Volume= 166,860 cf, Atten= 7%, Lag= 2.3 min Primary = 64.80 cfs @ 12.08 hrs, Volume= 166,860 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.38' @ 12.08 hrs Surf.Area= 10,852 sf Storage= 21,277 cf Plug -Flow detention time= 40.3 min calculated for 166,842 cf (96% of inflow) Center -of -Mass det. time= 15.4 min ( 852.7 - 837.3 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83' 36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 580.95' S=0.0150'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=64.73 cfs @ 12.08 hrs HW=587.37' (Free Discharge) L1=Culvert (Passes 64.73 cfs of 68.45 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 64.73 cfs @ 3.87 fps) te3 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 27 ■ Inflow ■ Outflow ■ Primary ■ Secondary '• • �- '• • _ 1 / 1 i 1 I% //////////////////////AO A--////////------ 1 1 1 1 1 1 .1 1 SI •1 ■ Inflow ■ Outflow ■ Primary ■ Secondary USI Revision WS2-Detention Type 1124 -hr 50 -Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 28 Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 3.06" for 50 -Year event Inflow = 202.45 cfs @ 12.59 hrs, Volume= 1,563,767 cf Primary = 202.45 cfs @ 12.59 hrs, Volume= 1,563,767 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 Hydrograph ❑ Inflow ❑Primary 220 210 202.45 cfs Inflow Area=6,135,229 sf 200 190 — 180 — 170 t t 160 150 140 -Z:7FI I -1T77FI I 7 -T N 130 120 -f + I I + I I -+3 110 i—°° 100 171 T T F- 71 T 7 E 90 80 70 �-I I I + I 1-1 I4 60 FOCII���� 450 0 30 iu 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 50 -Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 29 Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 2.78" for 50 -Year event Inflow = 208.34 cfs @ 12.59 hrs, Volume= 1,430,673 cf Primary = 208.34 cfs @ 12.59 hrs, Volume= 1,430,673 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph + ± _ ❑Inflow 230 220 208.34 cfs 1 Inflow Area= 6 174 630_sf ❑ Primary 210 i - 7 7 200 � tt- I I t I� 190 180 170 1-4 1 1 -- 4��I � I� 160 I t fiVI I t t- I I I Irt _1150 40 130 21 120 1 -4 -4 c 110 LL 100 - + - - - + - 90 80 I -4 -4 4- 60 + + 40 30 i 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment BP -3: Runoff = 234.32 cfs @ 12.64 hrs, Volume= 1,580,233 cf, Depth= 3.67" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN DescriDtion 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non -grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet - Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc -iy� I 41 p�. 220 Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 -44 Shallow Concentrated Flow, Shallow + I I-10O-Yeir Rainfall*.W' iso _ Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Runoff Vol urne:--1,S80,233-e# Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 w a 130 -4 4 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total ■Runoff Subcatchment BP -3: Hydrograph 260 - 250 230 230 234.32 cfs - -iy� I 41 p�. 220 210 - -44 + I I-10O-Yeir Rainfall*.W' iso _ 170 -!'''7'7 Runoff Vol urne:--1,S80,233-e# 160 150 50 fi �u� ff-tDe�th-".�' w a 130 -4 4 1- f log v Length -O -,2$T 0120 LL -57f& min : `T`7 1 00 90 60 50 - -t-++ f- 11 1-+ i I- 40- 20 - - - - / 10 0- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment DET -4: Det 4 Runoff = 83.96 cfs @ 12.04 hrs, Volume= 210,226 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet 90 85 cfs Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow 80 75 Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow _ Z Z Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer — 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' w 50 n= 0.013 11.7 827 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET -4: Det 4 Hydrograph 90 85 cfs -�y�e ft�24 h r 83.96 80 75 -1 1 L L L- 1 -466 -Yea% Fiinfa11;17.9670- " 65 _ Z Z L �qrrarff�j►re�=6�1212�sf 60j/ 55 _ — _Y � O,� 6�cf 11 — -Rurroepth= w 50 .1-2 c 45 FJs�wengtY--837' LL 40 35 rt n* 30 p 25 20 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment DR -3: DR -3 Runoff = 62.10 cfs @ 11.96 hrs, Volume= 122,005 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR -3: DR -3 Hydrograph 65 60 62.10 I cfs - -�y4e U 24 -hr ❑Runoff 55 1100 -Yea% Resin-fa11�7.86" 503O�sf 45 y 40 - R n ff of m 1 2&05 d - I_ � of�eRth=4. " — -Ru 335 IT5I01 0 25 20 15 + 10 5 T T F T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment Ex -3: Ex WS #3 Runoff = 225.90 cfs @ 12.59 hrs, Volume= 1,530,246 cf, Depth= 3.56" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non -grazed, HSG C 118.450 63 Weighted Average 118.450 -1- 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet Z -1- L _ i i -, -LL 220 Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc 200 - Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 - - Shallow Concentrated Flow, Shallow fi M� f r = 01C61 I Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Runoff Volume=1 X50 - 1 - 4 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total ■Runoff Subcatchment Ex -3: Ex WS #3 Hydrograph 250 Z -1- L _ i i -, -LL 220 225.90 cfs _ -t 4 + I -+ �y� 1 �4 � 200 - -10(PY"r R�airfall4.W' 190 180 - - - - fi M� f r = 01C61 I 17o - Runoff Volume=1 X50 - 1 - 4 4 1 �u`noff-Dep h=3.�F w 140 - 130 I L I I I --FlOr Lng 0 120 LL 110 100 -4 -L �C 4 � IS I 90 80 60 t t t- l 1 1 1 fi 1 450 0 30 20 - J -L 4- / 10 10 0 0--5' 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment Ex -4: Ex -4 Runoff = 42.35 cfs @ 12.38 hrs, Volume= 227,418 cf, Depth= 2.69" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet I u9offII'A" ,014 r -r �8 Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow 24 0 22 41" L� gih �,7i1' Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, --4 -4� 12 10 Bot.W=5.00' D=2.00' Z= 6.07' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex -4: Ex -4 Hydrograph 46 � � � ■Runoff 44 42 42.35 cfs - fi ? IF24-hr 38 y� I -400-Yea% Rainfal14.86" 36 3432 I u9offII'A" ,014 r -r �8 I� �� � =2 7�1f w 26 —Rano th=2 24 0 22 41" L� gih �,7i1' ` 18 18 J2 -L L — — — — -JC r iirl 16 14 --4 -4� 12 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 35 Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.69' @ 12.09 hrs Surf.Area= 11,233 sf Storage= 24,710 cf Plug -Flow detention time= 35.5 min calculated for 202,581 cf (96% of inflow) Center -of -Mass det. time= 14.4 min ( 846.3 - 832.0 ) Volume Invert Avail.Storage Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 4.12" for 100 -Year event Inflow = 83.96 cfs @ 12.04 hrs, Volume= 210,226 cf Outflow = 71.04 cfs @ 12.09 hrs, Volume= 202,581 cf, Atten= 15%, Lag= 3.5 min Primary = 71.04 cfs @ 12.09 hrs, Volume= 202,581 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.69' @ 12.09 hrs Surf.Area= 11,233 sf Storage= 24,710 cf Plug -Flow detention time= 35.5 min calculated for 202,581 cf (96% of inflow) Center -of -Mass det. time= 14.4 min ( 846.3 - 832.0 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83' 36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 580.95' S=0.0150'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=71.03 cfs @ 12.09 hrs HW=587.69' (Free Discharge) L1=Culvert (Inlet Controls 71.03 cfs @ 10.05 fps) L2=Custom Weir/Orifice (Passes 71.03 cfs of 87.50 cfs potential flow) te3 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS2-Detention Type 1124 -hr 100-YearRainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD@10.00-19 s/n08568 @2016 HydroCAD Software Solutions LLC Page 36 83 cfS — — — — — — — — — — - InhOwIAre�=&12,M2--S-f 71 IA-ciQj Peak Elev=587.69' Storage=24,7-1 O-cf 11 :E E I --I L I I I 4- 1-1 -4 t t t T T- 1-1 -1 T --------------- 2�! 101, %1 -i Ip" 01 $ 2�! 0110 ;01?� I u 5 - I.-' I ------------ -1 1111 USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 37 Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 3.73" for 100 -Year event Inflow = 249.22 cfs @ 12.59 hrs, Volume= 1,904,819 cf Primary = 249.22 cfs @ 12.59 hrs, Volume= 1,904,819 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 38 Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 3.42" for 100 -Year event Inflow = 259.65 cfs @ 12.59 hrs, Volume= 1,757,664 cf Primary = 259.65 cfs @ 12.59 hrs, Volume= 1,757,664 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary August 15, 2017 Mr. Robert D. Patterson, PE North Carolina Department of Environmental Quality Storm Water Permitting Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, INC 27699-1612 Re: Response to Comments —Addington Crossing Subdivision - Permit No. SW3170304 Mr. Patterson: carucina Shaping the Future Cardno is pleased to provide the attached Addendum No. 3 to the Storm Water Management Plan for Addington Crossing Subdivision. The addendum includes a response to comments provided by your office dated June 26, 2017. The comments from the above referenced letter have been reproduced below and addressed as follows: 1. Provide the missing signed and sealed cover page for the supplement form. An original copy of the signed supplement form has been provided as an attachment to this correspondence. 2. Provide the missing signed and notarized cover page for the O&M agreement to show the revision from the dry basins to bioretention cells. An original copy of the signed and notarized O&M agreement has been provided as an attachment to this correspondence. 3. Revise the DA sizes in part IV.10 on SWU-101 to be consistent with the calculations. The drainage area sizes have been revised. A copy of the revised SWU-101 form has been provided as an attachment to this correspondence. 4. Provide a soils report that shows the SHWT elevations at each SCM per bioretention M DC1. A copy of the original geotechnical letter detailing the SHWT levels have been included as an attachment to this correspondence. 5. Revise C-509-512 to specify "washed" stone for around the underdrains. The details have been revised as requested. 9800 Southern Pine Boulevard Suite I Charlotte, North Carolina 28273 Phone (704)927-9700 Fax (980) 422-0938 vmv.cardno.conn V�O Cardna Shaping the Fulure Page 2 August 15, 2017 In addition to the response to comments above, several items related to the SWMP have been revised. These revisions were based upon feedback from other review entities. These revisions include the following: • Minor revisions have been made to the proposed basin maps to adjust a couple of areas not being routed correctly. There were also a couple of revisions to the Tc values for several basins. The revisions are as follows: - Increased Basin A due to bypass Swale. - Decreased Basin E due to bypass Swale. - Adjusted the Tc of Basin E due to there no longer being channel flowjust before the basin and also due to the reduction in basin area. - Adjusted the Tc of Basin L due to there no longer being channel flow just before the basin. • Detention calculations have been revised to show the volume of the pond beginning at ground level and disregarding the media storage volume as well as the volume of the rock berm separating the forebay. The effects from exfiltration and underdrains have also been disregarded. • There have been several storm drain inlets that have been added to the project to help reduce several areas of high spread. • The twin 60 inch culvert crossing has been revised to reflect the change in hydrology mentioned above. If you have any questions or need any additional information pertaining to the response to comments, please do not hesitate to contact me. Since "ert Cash, PE Project Manager Cardno (NC) Inc. Enclosures 5 m J a L0 0 0 ( N 0- E c DET 1 AREA DATA WATERSHED (WS) WS AREA (AC) CN TC AREA E 4.05 68.00 1.17 TOTAL 4.05 68.00 6.50 DET 2 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA I 11.38 68.00 1.17 TOTAL 11.38 68.00 9.30 DET 3 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA L 5.23 68.00 1.17 TOTAL 5.23 79.00 10.50 BYPASS 1 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA B 10.42 68.00 1.17 AREA C 5.30 68.00 79.00 TOTAL 15.72 68.00 30.10 BYPASS 2 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA A 41.86 63.00 1.17 AREA K 3.19 63.00 79.00 TOTAL 45.05 63.00 25.30 DIRECT RELEASE 1 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN AREA D 1.42 79.00 AREA F 1.17 79.00 AREA G 0.74 79.00 AREA J 2.42 79.00 TOTAL 5.75 79.00 DIRECT RELEASE 2 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN AREA H 0.96 79.00 AREA M 0.79 79.00 AREA N 1.98 79.00 TOTAL 3.72 79.00 BYPASS 4 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA T 2.53 58.00 18.90 TOTAL 2.53 58.00 18.90 COMPARISON PRE TO POST DEVELOPMENT CONCENTRATION Q25 (CfS) Q100 (cfs) CONCENTRATION Q25 (Cfs) Q100 (cfs) POINT (WS) o 0 N POINT (WS) z o -c U) XCP1 202.92 312.43 CP1 197.72 309.74 XCP2 161.70 259.65 CP2 163.56 254.79 o Q J U �Q� N/A N/A CP3 (CULVERT ONLY) 178.06 280.14 TOTAL RUNOFF 364.62 572.08 TOTAL RUNOFF 361.28 564.53 (XCP1+XCP2) (CP1+CP2) TC=19.7 MINS-- j EX POND \ S3CHANNEL � NAGE ` - v \ 1 \ \ \ V \ \ \ V A 1 \ FLOW (2) �� X EN AR 7' 150 K OY -��U E R \ �`\ s_� - "'z \ - -- l �/ /l �% �✓ \ �l l 18 7 �v /Z- 2zp�tisso 3 / CP2 163.6/254.8 E -AR PRICE MIL DE 3 REEK �\ 1 �%� \_ SHA LOW CONC W G�( VA - - ET FL W (PAV \< A I� \\L� =118' L=96' D T3 TC=7.2 MINS T I I E CHAN DIRECT ( s / - 6' RELEA 2 1 I I I V I I I I I r�\ \ \ \ / /i V A � DET3 / -SHA W CONC PE DRAT bpi DRAINAGE AREA Y \ FLOW A y ' \ I I \ 1 I \I \ \ \ ( o BYPASS 2 /UNPAVED) L -A3 (DE 3) / \ 97.7/309.7 A1-74 \ -- A I \ I I I \ I I I I / A v �% CHANNEL FLOW I 1 I A/ \_� fit -MINS DRAINAGE BYPASS 3 TC=4.2 MINS \ AREA K \ BYPASS \ =-T SS 1 CHANNEL FLOW -IEET FLOW \ \ - - L-232 / l l �'V� 1 �� - - / �P�AINA - - I v ` , TC#.3 MINS P3 ,-26.5 MINS o / \ /\ / / \/ \ , \ \ /- - - r / / % Jf�TERMITTEN / --- ii/ - _ - DRAINAGE AREA A � ^ _ _ - - -- � ,� RISDIGTIO��i_- - \\ ---- i -moi \ - ,NAGE L v v v v v - N - -- ,- yyA'D DRAINAGE BYPASS 2 SHALLOW CONC. / / / / ` - \L - - - - - - _ BA1 - AREA H - / /�_ �\ - FLOW / -- - � � - � �HANPIEL --- L=1162/// / // / V / -V� _ �� TC= .1 MINS," / / �\ `� i'-0 SIVA-LL-O W- �> �i�- �L_=1.9)i5�� DRAINAGE �FtOW A � - -DET R N 1 � � TC=3.8 MINS AREAL ' \ \ PACED) � ` V P HANNECt 140' MIN TAN L \ -- \\ \ `�DET 1S� ET 7-_� v v v F OW v \ \ \= 50' \ D T 1) L - TC 4.1 MIN 1 I \\\ 1 I I MIN / EH BYPASS2 T2S \ V l \ \ I) / v NC F SHEET FLOW 1 PIPE v PAVED I \ \ I NPAVE ( ) I I \ / � I � B ASS \ \ ) � , I D IP 1 \ \ \ L= 150' \ \ I / 7 - I j \ I / CH�1NN L L = 154 I I TC=15 MINS / INS ARE 1 I I o M TC NEM I I I I I I I ( I NS BYPAss CHANN 1 V I I \ L = 199' � � � �RAINgGE BYP'A+ - -_ ET FL UV / ------/INV=sz76/�%� _ - -_T_ _ - _\---- _PO E - -- - - - - - - -- --- - I o I \ \ \ \ \ _ / \\_624s \ \ TT RRDSf� 1357 A I I v v \ v v v y TC=2O 7� MIN N ( I - \ \ V v (60 Pl1BLI R/w - - - - - - - -- / v v v �v B 4 v \ �O�"TER RD �R 35�T I EX.1 RCP \ \ �I \ \\ v T OW - - \- \(�5' �U�LaC �Nv =�60 \ \ \ \ BYPASS L \ \\ \� \ \ �// �1�30� E .130' ffUKE ENERGY \ \ I \ \ ( I I I INV 602.2 SHALLOW CONC:A\ v � T =� . MINS - � � � DB 2311PPG 171 \ � �B�30,PG1s �FLOW co o \ \ \ -DET 2SgETL=766' \TC=5.7 MINS O A5 100'DRAINA E AREA B QW CON --FLOW, - j- 0TP-13.5 MINS 1003' TC= .O-MINS r , \-A-I - \\\\'_------ \ V A I I I I1 v I \ 1 I 1 \ I ! -_-� // / / A \ \�v `' -�`� -� /� v v�� _ �� I// I/ I I I I I A\ ------ -- LEGEND BYPASS AREA DETENTION POND 1 DETENTION POND 3 DIRECT RELEASE AREA DETENTION POND 2 DETENTION POND 4 0 75 150 300 1 INCH =150 FEET o C5 L 0 LL N Lu Iz: 00 � � � o 0 N . N> z o -c U) J J 0 =)0 - 0 W0LL W o zoo Y z , 0=LCN J � p -J Q o O ~ o Q J U �Q� U F-� CO Lu >4 O Q Z J � W0 Or- < U Q � 0 � Z F m z ::D O ~ C/) Z 0 0 W of Z Q U Z U w Q 0 fooO~ O���rr�� Q v II_- V W z J w 0 C!1 0 0 Uj Q Lu 0- Q U m z Lu 0 U Lu Y M a w 0 o_ 0 z Lu 0 0 a ti Lu o N t 0 ol 0'0 N C ARo�•97/27/2017 X00.-,7•Ess/o* SEAL 9%*7 ' ' 033448 = ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 107/27/2017 DRAWN I HK DESIGNED I JW CHECKED I RC PROJECT # I CALATL1603 SHEET TITLE POST STORMWATER TRIBUTARY MAP (WS1) SHEET NUMBER 2/5 0 ( a Jul DET 4 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA P 14.06 AREA O 1.85 TOTAL 14.06 68.00 11.70 BYPASS 3 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA R 113.70 AREA O 1.85 AREA S 4.92 8.16 68 TOTAL 118.62 64.00 57.80 DIRECT RELEASE 3 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN AREA O 6.32 Q100 (cfs) AREA O 1.85 c�� o 0 � N TOTAL 8.16 68 COMPARISON PRE TO POST DEVELOPMENT CONCENTRATION Q25 (cfs) Q100 (cfs) CONCENTRATION Q25 (cfs) Q100 (cfs) POINT (WS) � c�� o 0 � N POINT (WS) � C�1 N > Z o U) XCP1 202.92 312.43 CP1 197.72 309.74 XCP2 161.70 259.65 CP2 163.56 254.79 O Q J U OR N/A N/A CP3 (CULVERT ONLY) 178.06 280.14 TOTAL RUNOFF Lu TOTAL RUNOFF T (XCP1+XCP2) 364.62 572.08 (CP1+CP2) 361.28 564.53 - \\\\ \ z,/// / / / /� \\ \ \ c, LQ,oys LD/ 640 FLOODWAIk\ DRAINAGE � / / / \ DRAINAGE ARE / \ AREA Q YEAR IFEI �Oo IN RCP INV 608.35 -1-DET4 S CHURCH RDS 13 6 /---` AA WCONC H OW v v \ o FLOW 3 // - - - ----- 21 DRAINAGE AREA R - - - R \\ FL\OW7 _MINS -"24 /_ff � \ / \ V A / \ \ ET FLOW i ----- - / / / /-- _-----_ - - \ - 0' \ _PD /� �\ t AG APIZ- -V l / / 7 \ A,iV / --7- -_SAAA - v BYPASS 3 _ SHALLOW CONC CFiANNEL-FLOW - \ ��\w - - I v� 6$ 0 SaY_ \ - --0y / D (UNPAVED�vAA TC=4_.5-MINS \ A \ TC=19.7 MINS- , A 7- B S 3 CHANNEL NAGE VAAI v \ 1 FLOW (2) 1 71 All VA 150 KEENEf� fl \ \ v v BYPASS3 \ 1 I J / / I I V // / / I I �- \ 1 o I I o ( DB23oP1 SHALLOW CONC v\\VA vv v --- \ FLOW (PAVED) I / � / / / \ / // // � / ✓ \ v / -- � -- I I / - � A� � � �/\ V v �-� � v � - � v // \_ �/ TC=49MINS / / / ��/ / / - \v\� - �\ 1 I / / / I I ��� - / / v v v \ _ v� r� ���v v_ CP2 63.6/254.8 \QIAGE- A PRICE MILL DE 3 v REEK �\ SHA LOW CONC W \ VA \ EET FL W (PAV < X D T 3 11 o \ = 118' L = 96' \ I/ I / TC=7.2 MINS T I E CHAN DIRECT I O RELEA 2 / r�� v V v v / �/� ��° --/ � \ DET 3 bpi \�I/ !A SHALL w coNc DRAIN, \ 1 A A i DRAINAGE AREA Y FLOW AREA / v---- PAV_lV[EETtD BYPASS 2 - (DET3i) 19 7.7/3 9.7 11111111111111111111000000 CHANNELFLOW L L=2174' ------------------- TC- r1 -MINS DRAINAGE 1 AREA KTC=42 MINIS BYPASS SHEETFLOW BYPASS 1 CHANNEL FLOW (1) LL=232' - / Iv v v \ PP�A� 3�MINS CP3 TC=26.5 MINS A I�ERMITTN SUM �l bR\AINAGE AREA A \ / v \ 'DJill \ I-BYPASS�L / I I I / �_� ��/�_ / - / �/ _� - \ -_ _ \ DRAINAGE \\ \ \\ \ \ \ \\ \ \\\ A A \ I I I S�IALLOW CONC./ / / I � � -=/�� - � � � � - � _ _� _ _ BY�A��i - -- FLOW / / / / / / / /�� - _v A� _ - -- �--AREA H �F#ANNEL F OW --- L = 1162' --L=1162' XC=�1 MI -NS -D LOE-=-1,965' 1 ' / �/ - _ SH tVif > r, - r`DRAINAGE NCFLO \\ DET / /� TC=3.8MINSAREA G (U1IPAVEQ�_\ _ lg�HRRfNFI 11 All, I i / LEGEND BYPASS AREA DETENTION POND 1 DETENTION POND 3 DIRECT RELEASE AREA DETENTION POND 2 DETENTION POND 4 0 75 150 300 1 INCH =150 FEET o C5 L 0 N Lu iz: CO � c�� o 0 � N C co � C�1 N > Z o U) J J 0. -D 0 O W0LL LL1 Io Z O Q� Z , O=LCN J � p 0 o O Q J U OR Lu >4 :� T N J O W Of Q U Q � 0 � Z F C� ZD z m z o C! U (n) C/) ' z or- p O W of Q U Z U w O 0Loo O Q v ���rr�� F V W z J w O 0 Q w 01 Q U m z Lu 0 U Lu Y M 0 Lu 0 O C' 0 Z w U) o a ti Lu o N L0 0 \ N CAR ""97/27/2017 ....... �o , of Es � s/o�•• SEAL 17 033448 = �C ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 107/27/2017 DRAWN I HK DESIGNED I JW CHECKED IRC PROJECT # CALATL1603 SHEET TITLE POST STORMWATER TRIBUTARY MAP (WS2) SHEET NUMBER 3/5 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Catawba River basin. 4. Total Property Area: 103.66 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:103.66 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 11 % 9. How many drainage areas does the project have? (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Receiving Stream Name Price Mill Creek Price Mill Creek Price Mill Creek Price Mill Creek Stream Class * C C C C Stream Index Number * 11-138-2-2 11-138-2-2 11-138-2-2 11-138-2-2 Total Drainage Area (sf) 176,424 495,548 228,009 612,612 On-site Drainage Area (so 176,424 495,548 228,009 612,612 Off-site Drainage Area (so Proposed Impervious Area** (sf) 35,995 101,090 46,470 124,900 % Impervious Area** total 20% 20% 20% 20% Impervious' Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 On-site Buildings/Lots (so 18,100 52,657 24,185 64,827 On-site Streets (sf) 13,225 35,792 16,469 44,394 On-site Parking (sf) On-site Sidewalks (so 4,670 12,641 5,816 15,679 Other on-site (sf) Future (sf) Off-site (so Existing BUA*** (sf) 0 0 0 1 0 Total (so: 35,995 101,090 46,470 1 124,900 * Stream Class and Index Number can be determined at: http.aortal.ncdenr.orglweblwq&slcsulclassiflcations Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 TO NCDEQ Attn: Robert D. Patterson, PE 1612 Mail Service Center Raleigh, NC 27699 Cardno Shaping the Future 9800 Southern Pine Blvd, Suite I Charlotte, NC 28273 (704) 927-9700 FAX (704) 529-3272 TRANSMITTAL DATE: 08/15/17 1PROJECT: CALATL1603 ATTENTION: Robert Patterson RE: Addington Crossing Construction Documents 07/27/2017 Addington Crossing Revised sheets C-509 to C-512 WE ARE SENDING YOU ® Attached Via ® 1st Class Mail/FedEx ❑ Overnight ❑ Courier ❑ Prints ❑ Shop Drawings ❑ Change Order * Plans ❑ Samples ❑ Specifications ❑ Sketches ❑ Letter ❑ CD/Diskettes ❑ Agreement ® Report ❑ Permits ❑ Pick-up the following items: ❑ Mylars ❑ Scope of Services COPIES DATE DESCRIPTION 2 07/27/2017 Addington Crossing Revised sheets C-509 to C-512 1 07/27/2017 Post Stormwater Tributary Map (WS1 & WS2) Sheets 2/5 & 3/5 1 08/11/2017 Comment Response Letter 1 08/11/2017 O&M Form signed sheet 1 08/11/2017 SSW-SWU-1 01 -Application with revised DAs 1 08/15/2017 Revised HydroCAD reports THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ For your information ❑ No exception taken ❑ For your use ❑ Submit copies for distribution ❑ Revise and resubmit ❑ As requested ❑ Return corrected ❑ Rejected ® For review and comment ❑ REMARKS: COPY TO: file SIGNED: If enclosures are not as noted, please notify us at once. W:\CalAtlan6cTotter Road\Communication\Transmittals\Transmittal_NCDEQ_RP_2017-08-11.docx Revised: December 2016 ATLANTIC COAST PIPELINE PROJECT CONTRACTOR YARDS - FAYETTEVILLE REGION CUMBERLAND COUNTY, NORTH CAROLINA EROSION & SEDIMENT CONTROL PLAN PROJECT CONTACTS 00" , i Dominion Energy CR) OWNER/APPLICANT DOMINION ENERGY TRANSMISSION, INC. 5000 DOMINION BOULEVARD GLEN ALLEN, VA 23060 PHONE: 804-335-4923 ERM NC, INC. CONSULTANT ERM NC, INC. LICENSE #F-1223 15720 BRIZHAM HILL AVENUE, SUITE 120 CHARLOTTE, NORTH CAROLINA 28277 SCOTT ROBINSON, PE 704-541-8345 scott.robinson@erm.com EXISTING INFORMATION SOURCES CONTOURS AND BASE MAP PROVIDED BY 13 CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON 24"X36" SHEETS FOR REDUCTIONS, REFER TO GRAPHIC SCALE. THE PLANS HAVE BEEN CREATED FOR FULL COLOR PLOTTING, AND SET OF THE PLANS THAT IS NOT PLOTTED IN FULL COLOR SHALL NOT BE CONSIDERED ADEQUATE FOR CONSTRUCTION PURPOSES. ***WARNING"** INFORMATION MAY BE LOST IN COPYING AND/OR GRAY SCALE PLOTTING. NORTH CAROLINA SHEET INDEX 0 1 08/04/2017 SHEET 1 - COVER SHEET 1*- 1 08/04/2017 SHEET 2 -FAYETTEVILLE (SP10_CY SPR10-A) AERIAL OVERVIEW *1 1 08/04/2017 SHEET 3 - FAYETTEVILLE (SP10_CY SPR10-A) ESCP 0 1 08/04/2017 SHEET 4 - ESCP NOTES 0. 1 08/04/2017 SHEET 5 - ESCP DETAILS 0 1 08/04/2017 SHEET 6 - ESCP DETAILS 1 08/04/2017 SHEET 7 - ESCP DETAILS DRAWING INDEX LEGEND F FILLED CIRCLE INDICATES DRAWING INCLUDED WITHIN THIS ISSUE MOST RECENT REVISION NUMBER F MOST RECENT ISSUE OR REVISION DATE 6 - X/XX/201X SHEET X - SHEET TITLE LOCATION MAP • f •" 4 1 _ t4�•�_- f 0410 f �'� _ S"� se :}��. °C iS ' rr .4 ` I{I - W • r i • r • « - � T ,_ ; -• Yt, r rr �- y • - � avi Irm,.. 66 � t � '± I1 { � � # � � r1� •� a ; . y Fr.r• rye` .i .war.. r r i r .... �� � • s r S}• fM�• f ♦ x�+.{ y + i +..*����'♦r� it ! �! - �� yti M • h,•,r�ar i� f'R' —1 ��� f �� S • !r i• �T VVV w r � � _� _ . � 't i _� .. .7 fes " ,A4 t• Q a _ 4�,? iyr .4, 14 •fir «r � r, j jr f7p .. I{ r • j • r h -�! ♦.. ••ais r •R: u• •*.r-•- +. ; I - ._r_�S1r- •� 4 i#• SHEETS all 9 r{ y? - - , - " !( r • t1. r�'„r' '+•?' rte• \ ` , -46V 16 T iw : •+ ^''♦ate," y - "�''' -►� ,ti Lr. a _. -' % - •�.. a�iI '� s'`�'••- � �• a r �• • . � 1 i '; .. r � r r fir • ..rte+ •. - . r .w- fir.. ♦. ;I. :. + •`' .�' r+ aM* � �fc • � �; � �� kl }� • +rte+� �.^ •• I ' i##iGd�. JF��'11F.��erl� 1.x_4 `� ~ - � *� i I �� f F • t }�+ 5^71 + i 1 pe Aw { i■ c x �f • x �� "••� ter, y� -3om - ;ell Jb --�� +++ tm . �!i�' y :� • +. 'fir ;�'-- cern I of AN varm � / `'KiT1T�'9�[�t� �r ■ � • -rte �i�} - .� r 1 •�• f Locki Creek ' a _ ,i=ce ` I♦ ��• - ch •f�t L C r _ 4 • •� k . = 1; = 2,000 FEET c- WHEN PRINTED FULL SIZE • r # ,- 1 4,004570ode h 1 _ i \ G. OSTS TRAILERS 11 1 - 1 1 3� 11 TRUE NORTH �A E POSTS S i t LAT35"02'8 327" — N * \\\ LON 78.4920r ZONE X 200 0 100 200 Ali I � ►� -�- IIII�IIII � i I / 1 E Q U I P M E N T L E G E N D LIMITS OF CONSTRUCTION $ UTILITY POLE \\ \ \GA / // // LIMITS OF DISTURBANCE E GUY ANCHOR GP # TI O GUY POLE CONTRACTOR YARD LIMITS M E OVERHEAD ELECTRIC LINE ® UTILITY VALVE t ■ � UNDERGROUND GAS LINE 0 LM LINE MARKER � I FENCE POST - - TS DITCH TEST STAND A 1 _ ft STREAM -TBM TEMPORARY BENCH MARK Ap # _ FLOW ARROW __--1000 ------ CONTOUR 4b • * Ew.. 0 11e WETLAND i ® FUEL TANK AREA (25'x 250') TRAILER (24'x 60') STORAGE UNITS TOP SOIL SEGREGATION AREA t .. GRAVEL AREA. GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. A FlLtrr��� , 1. CONTOURS AND BASE MAP PROVIDED BY 13 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. O ERM NC, INC. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 03/10/17 NJB ISSUED FOR REVIEW ti� �Q` ,. � 5�' f r License xham 3 Atlantic Coast Pipeline LLC 15720 Brixham Hill Ave, Suite 120 2. DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. A 08/04/17 WTS ISSUED FOR REVIEWIC - ERM Charlotte, NC 28277 (704) 541-8345 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 3. NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO - RAWN: NJB 08/04/17 PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. = TITLE: 4. DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO 0 � � W CHECKED: _ - ATLANTIC COAST PIPELINE CONTROL MEASURES ARE SPECIFIED. , ,•�� 4 APP. FORBID: FAYETTEVI LLE CONTRACTOR YARD AERIAL OVERVIEW APP. FOR CONST.: DISTRICT. - COUNTY: STATE: GROUP DWG. NO. REV. CUMBERLAND NC rf A . � B� +�`� SCALE: AS NOTED DIWFILE: ACP\North Carolina\ — 2 O F 7 EX. 18" CULVERT 6' 08 COSTS � Q � I i i i i i i i i ROCK CONSTRUCTION ENTRANCE (REF. SHEET 5) e GA TOPSOIL SEGREGATION (1.6 ACRES) SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) TS NC ST ATE $I GltWA Y 24 TRAILERS GA C W > GRAVEL PARKING LOT W (11.3 ACRES) DIVERSION SWALE (REF. SHEET 6) �v o DIVERSION SWALE C ' (REF. SHEET 6) ,'' PROP. 18" CULVERT & OUTLET PROTECTION \S Jy GATE POSTS ��'/ / s S�0 \(� \ LAT:35°02'38.27" \ l I LON:78°49'20.7146" y GRAVEL PARKING LOT (6.7 ACRES) y DIVERSION SWALE ♦ ! '' (REF. SHEET 6) ' y 'F' PROP. (2) 18" CULVE ♦ & OUTLET PROTECTI >J low ,,' (REF. SHEET 6) --G - E Q U I P M E N T y I I II wcuc 051e I I I I I I ;I I I ,I I OUTLET PROTECTION (REF. SHEET 6) e / \ \/ TOPSOIL SEGREGATION (2.0 ACRES) / SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) UNNAMED TRIBUTARY EK LOCKS CRE T NIA SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) y y y TRUE NORTH -I V- 100 0 50 100 I I I I I I I I I L EG E N D LIMITS OF CONSTRUCTION (40.8 ACRES) $ UTILITY POLE C LIMITS OF DISTURBANCE GAE GUY ANCHOR (39.4 ACRES) — — — — CONTRACTOR YARD LIMITS 0 GUY POLE E OVERHEAD ELECTRIC LINE ® UTILITY VALVE UNDERGROUND GAS LINE • LM LINE MARKER FENCE o POST TS DITCH TEST STAND -TBM TEMPORARY BENCH MARK STREAM —__--1000------ CONTOUR FLOW ARROW wcuc 051e WETLAND ROCK CONSTRUCTION ENTRANCE (OR APPROVED ALT.) ® FUEL TANK AREA (25'x 250') OUTLET PROTECTION TRAILER (24'x 60') I PROPOSED DIVERSION SWALE ® JI TOP SOIL SEGREGATION AREA ��•Q�T� GRAVEL AREA. PROPOSED COMPOST FILTER SOCK OR SILT FENCE GA TOPSOIL SEGREGATION (1.6 ACRES) SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) TS NC ST ATE $I GltWA Y 24 TRAILERS GA C W > GRAVEL PARKING LOT W (11.3 ACRES) DIVERSION SWALE (REF. SHEET 6) �v o DIVERSION SWALE C ' (REF. SHEET 6) ,'' PROP. 18" CULVERT & OUTLET PROTECTION \S Jy GATE POSTS ��'/ / s S�0 \(� \ LAT:35°02'38.27" \ l I LON:78°49'20.7146" y GRAVEL PARKING LOT (6.7 ACRES) y DIVERSION SWALE ♦ ! '' (REF. SHEET 6) ' y 'F' PROP. (2) 18" CULVE ♦ & OUTLET PROTECTI >J low ,,' (REF. SHEET 6) --G - E Q U I P M E N T y I I II wcuc 051e I I I I I I ;I I I ,I I OUTLET PROTECTION (REF. SHEET 6) e / \ \/ TOPSOIL SEGREGATION (2.0 ACRES) / SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) UNNAMED TRIBUTARY EK LOCKS CRE T NIA SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) y y y TRUE NORTH -I V- 100 0 50 100 I I I I I I I I I L EG E N D GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. * ��t� ; "S faE 11 i�r , 1. CONTOURS AND BASE MAP PROVIDED BY 13 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. �� \A CARO ' r ERM NC, INC. Atlantic Coast Pipeline LLC THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. �0 03/10/17 NJB ISSUED FOR REVIEW �ti .''' r License #F-1223 15720 Brixham Hill Ave, Suite 120 2. DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. A 08/04/17 WTS ISSUED FOR REVIEW Vit. ' = ERM Charlotte, NC 28277 (704) 541-8345 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 3. NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO f RAWN: NJB 08/04/17 PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. - 4. DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO Q w CHECKED: _ _ TITLE: ATLANTIC COAST PIPELINE CONTROL MEASURES ARE SPECIFIED. �',, APP. FORBID: FAYETTEVI LLE CONTRACTOR YARD ESCP CUMBERLAND NC GROUP DWG. NO. REV. \ ,\� APP. FOR CONST.: DISTRICT: - COUNTY: STATE: SCALE: DIR/FILE: ACP�NOrtil Car011nB� — 3 O F 7 AS NOTED LIMITS OF CONSTRUCTION (40.8 ACRES) $ UTILITY POLE C LIMITS OF DISTURBANCE GAE GUY ANCHOR (39.4 ACRES) — — — — CONTRACTOR YARD LIMITS 0 GUY POLE E OVERHEAD ELECTRIC LINE ® UTILITY VALVE UNDERGROUND GAS LINE • LM LINE MARKER FENCE o POST TS DITCH TEST STAND -TBM TEMPORARY BENCH MARK STREAM —__--1000------ CONTOUR FLOW ARROW wcuc 051e WETLAND ROCK CONSTRUCTION ENTRANCE (OR APPROVED ALT.) ® FUEL TANK AREA (25'x 250') OUTLET PROTECTION TRAILER (24'x 60') PROPOSED CULVERT PROPOSED DIVERSION SWALE ® STORAGE UNITS TOP SOIL SEGREGATION AREA ��•Q�T� GRAVEL AREA. PROPOSED COMPOST FILTER SOCK OR SILT FENCE GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. * ��t� ; "S faE 11 i�r , 1. CONTOURS AND BASE MAP PROVIDED BY 13 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. �� \A CARO ' r ERM NC, INC. Atlantic Coast Pipeline LLC THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. �0 03/10/17 NJB ISSUED FOR REVIEW �ti .''' r License #F-1223 15720 Brixham Hill Ave, Suite 120 2. DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. A 08/04/17 WTS ISSUED FOR REVIEW Vit. ' = ERM Charlotte, NC 28277 (704) 541-8345 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 3. NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO f RAWN: NJB 08/04/17 PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. - 4. DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO Q w CHECKED: _ _ TITLE: ATLANTIC COAST PIPELINE CONTROL MEASURES ARE SPECIFIED. �',, APP. FORBID: FAYETTEVI LLE CONTRACTOR YARD ESCP CUMBERLAND NC GROUP DWG. NO. REV. \ ,\� APP. FOR CONST.: DISTRICT: - COUNTY: STATE: SCALE: DIR/FILE: ACP�NOrtil Car011nB� — 3 O F 7 AS NOTED EROSION AND SEDIMENT CONTROL PLAN NARRATIVE THE EROSION AND SEDIMENT (E&S) CONTROL MEASURES FOR THE PIPELINE CONSTRUCTION ACTIVITIES PRIMARILY CONSIST OF BUT ARE NOT LIMITED TO COMPOST FILTER SOCK, BELTED SILT RETENTION FENCE, SUPER SILT FENCE, SLOPE BREAKERS, AND TEMPORARY AND PERMANENT SEEDING AND MULCHING. BEST MANAGEMENT PRACTICES (BMP) SPECIFICATIONS FOR THE E&S CONTROL PLAN (E&SCP) ARE TO BE UTILIZED BY THE CONSTRUCTION CONTRACTOR ACCORDING TO THE PROVIDED PLAN. GENERAL CONSTRUCTION NOTES: 1. DISCHARGING SEDIMENT LADEN WATER WHICH WILL CAUSE OR CONTRIBUTE TO THE DEGRADATION OF A BENEFICIAL USE OF A WATER OF THE STATE FROM THE CONSTRUCTION SITE, A DEWATERING SITE, OR SEDIMENT BASINTRAP INTO ANY SURFACE WATER WITHOUT FILTRATION OR EQUIVALENT TREATMENT IS PROHIBITED. 2. THE DISCHARGER SHALL AMEND THE EROSION & SEDIMENT CONTROL PLAN WHENEVER THERE IS A CHANGE IN THE CONSTRUCTION OR OPERATIONS, WHICH MAY EFFECT THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER. 3. DISCHARGES ORIGINATING FROM OFF-SITE SOURCES, WHICH FLOW THROUGH OR ACROSS THE AREAS DISTURBED BY CONSTRUCTION, MAY BE DIVERTED AROUND THE ACTIVE CONSTRUCTION AREA WHENEVER POSSIBLE. 4. PERFORM PERMANENT OR TEMPORARY SOIL STABILIZATION WITHIN 7 DAYS WHEN SITE IS AT FINAL GRADE AND ON SITES THAT ARE NOT AT FINAL GRADE, BUT WILL REMAIN DORMANT FOR MORE THAN 14 DAYS. 5. DUE TO VARYING SITE CONDITIONS, ADDITIONAL SEDIMENT CONTROL BMPS MAY BE NECESSARY BEYOND THE MEASURES SHOWN ON THE E&S CONTROL PLAN. 6. STAGING AREAS, ASSEMBLY AREAS, TEMPORARY EQUIPMENT AND NON -HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATED OUTSIDE 100 -YR FLOOD ZONES. HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATED AT LEAST 100 FEET BACK FROM SURFACE WATER BODIES. 7. EQUIPMENT STORAGE IN CONSTRUCTION STAGING AREAS SHALL BE LOCATED A MINIMUM OF 100 FEET AWAY FROM WETLAND EDGE. 8. AT MINIMUM, ALL BMPS ARE TO BE INSPECTED ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 -INCH PER 24-HOUR PERIOD DURING THE ENTIRE PROJECT. A WRITTEN REPORT MUST ALSO BE COMPLETED, DOCUMENTING EACH INSPECTION AND, IF NECESSARY, ANY REPAIR, REPLACEMENT OR MAINTENANCE ACTIVITY. 9. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING FACILITY SHOWN ON THE DRAWINGS, AND ANY OTHER WHICH IS NOT ON RECORD OR NOT SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL POTHOLE EXISTING UTILITIES AT THE POINTS OF CONNECTION AND ALL UTILITY CROSSINGS TO DETERMINE EXACT LOCATIONS PRIOR TO THE START OF WORK. ANY DISCREPANCIES BETWEEN THESE DRAWINGS AND EXISTING CONDITIONS SHALL BE REPORTED TO THE ENGINEER OF RECORD IMMEDIATELY. 10. ALL WORK WITHIN A PUBLIC RIGHT-OF-WAY SHALL BE COORDINATED WITH THE AGENCY HAVING JURISDICTION. 11. ALL REQUIRED PERMITS MUST BE OBTAINED PRIOR TO STARTING WORK. 12. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION, STABILIZATION AND MAINTENANCE OF ALL EXISTING AND PROPOSED SITE EROSION & SEDIMENTATION CONTROL DEVICES AND FACILITIES. 13. THE CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING EROSION & SEDIMENTATION DEVICES AND SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD THE ENGINEER OF RECORD HARMLESS OF ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ENGINEER OF RECORD. 14. AS SITE SPECIFIC CONDITIONS MAY WARRANT, THE E&SC PLAN MAY REQUIRE MINOR MODIFICATIONS TO ENSURE PROPER PROTECTION OF RECEIVING WATERS. THE RESPECTIVE PROJECT ENVIRONMENTAL INSPECTOR (EI) WILL IDENTIFY SITE SPECIFIC AREAS WHERE A CERTAIN BMP MODIFICATION(S) IS NECESSARY TO EITHER OMIT OR ENHANCE BMPS IN SUCH AREAS. THIS PROCESS ENTAILS THE EI TO IDENTIFY LOCATIONS WHERE BMPS WILL NEED TO BE ALTERED, SUBSTITUTED OR OMITTED AND CONTACT THE DOMINION GAS COMPLIANCE SPECIALIST TO REVIEW PROPOSED CHANGES. UPON REVIEW AND APPROVAL BY THE DOMINION COMPLIANCE SPECIALIST, THE EI WILL REDLINE, DATE, AND SIGN THE E&SCP DRAWING(S) DEPICTING THE REDLINE CHANGE(S). ONCE THIS PROCESS IS COMPLETED, THE EI WILL NOTIFY NCDEQ OF SUCH MINOR MODIFICATION REDLINE AMENDMENTS AS REQUIRED BY THE GENERAL PERMIT. BMP INSTALLATION AND REMOVAL SEQUENCE SEQUENCE OF CONSTRUCTION EROSION AND SEDIMENTATION. THE CONTRACTOR MAY DEVIATE SLIGHTLY FROM THE STAGING OF PERMANENT SITE STABILIZATION TIMEFRAMES 1. A PRE -CONSTRUCTION MEETING SHOULD TAKE PLACE PRIOR TO START OF CONSTRUCTION ACTIVITIES. PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS 2. BEGIN CLEARING AND GRUBBING SITE. CLEAR AND GRUB ONLY THOSE AREAS NECESSARY FOR INSTALLATION OF THE HIGH QUALITY WATER (HQW) ZONES 7 DAYS EROSION CONTROL MEASURES. SLOPES STEEPER THAN 3:1 7 DAYS 3. INSTALL SILT FENCE AS SHOWN ON THE PLANS. SLOPES 3:1 OR FLATTER 14 DAYS 4. ONCE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND PRIOR TO SEDIMENT REMOVAL ACTIVITIES, THE SITE IS TO ALL OTHER AREAS (SLOPES FLATTER THAN 4:1) 14 DAYS BE INSPECTED BY NCDENR - LAND QUALITY. ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 21 DAYS AFTER THE CONSTRUCTION 5. GRADE SITE ACCORDING TO CONTRACT DOCUMENTS. MAINTAIN EROSION CONTROL DEVICES AS NEEDED. ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED. 6. INSTALL STORM DRAINAGE AS INDICATED ON PLANS. 4. WHERE THE INITIATION OF STABILIZATION MEASURES WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY TEMPORARILY OR 7. GRASS OR OTHERWISE STABILIZE ALL AREAS AS THEY ARE BROUGHT TO FINAL GRADES. PERMANENTLY CEASES IS PRECLUDED BY SNOW COVER, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS 8. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO CONDITIONS ALLOW. MINIMIZE EROSION. INSPECT AND REPAIR MEASURES AFTER EACH RAINFALL AND AS NEEDED THROUGHOUT THE PROJECT. 5. WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE WITHIN 21 DAYS FROM WHEN ACTIVITIES CEASED 9. CONTRACTOR TO LEAVE ALL EROSION CONTROL DEVICES IN PLACE AT THE CONCLUSION OF THIS CONTRACT. CONTRACTOR IS (E.G., THE TOTAL TIME PERIOD THAT CONSTRUCTION ACTIVITY IS TEMPORARILY HALTED IS LESS THAN 21 DAYS), THEN TO CLEAN-OUT, REPAIR AND GRASS STABILIZE ALL DENUDED AREAS. ALL AREAS WILL BE RETURNED TO THE STATE OF STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE BY THE SEVENTH DAY AFTER EXISTING CONDITIONS PRIOR TO CONTRACT AS A MINIMUM. CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED. 10. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTAIN SEDIMENT ONSITE. ADDITIONAL EROSION CONTROL MEASURES MAY BE 6. AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY (UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY REQUIRED BY THE ENGINEER. OF 70%) WITHIN 30 DAYS, SEEDING AND MULCHING MUST BE RE -SEEDED IMMEDIATELY, OR AS SOON AS WEATHER PERMITS. 11. ALL EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN REQUIREMENTS AND LAND DEVELOPMENT STANDARDS. POLLUTANT CONTROLS MAINTENANCE SCHEDULE AFTER FULL REVEGETATION HAS BEEN ACHIEVED, ALL BMPS WILL BE REMOVED AND ANY LAND DISTURBED BY REMOVAL WILL BE PERMANENTLY STABILIZED. UNLESS OTHERWISE SPECIFIED, ALL MAINTENANCE MUST BE COMPLETED IMMEDIATELY AFTER AN INSPECTION IDENTIFIES THAT A BMP IS NOT FUNCTIONING AS REQUIRED. THE ROW AND ESC DEVICES WILL BE INSPECTED DAILY AT THE ACTIVE CONSTRUCTION SITE AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS FOR ACTIVELY DISTURBED AREAS, 14 CALENDAR DAYS FOR RESTORED AREAS, AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN ONE -HALF-INCH PER 24-HOUR PERIOD. SEDIMENT MUST BE REMOVED WHERE ACCUMULATION REACHES ONE-HALF THE ABOVE GROUND HEIGHT OF THE CONTROL MEASURE. EROSION CONTROL MEASURES, WHICH HAVE BEEN UNDERMINED OR TOPPED, SHALL BE REPAIRED IMMEDIATELY. • OTHER REQUIRED REPAIRS OR MAINTENANCE SHALL BE MADE IMMEDIATELY. TEMPORARY AND PERMANENT E&S CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. MATERIAL WASTE HANDLING AND RECYCLING 1. SOLID WASTE DISPOSAL SHALL BE HANDLED THROUGH ONE OF THE LOCAL LICENSED WASTE MANAGEMENT PROVIDERS AND PERMITTED DISPOSAL FACILITIES. THE CONTRACTOR WILL PROVIDE MOBILE AND COVERED WASTE RECEPTACLES AS NEEDED ALONG THE PROJECT LIMITS. CONTRACTOR SHALL ALSO PROVIDE A COVERED DUMPSTER FOR CONSOLIDATION OF WASTE FOR PICK UP AND DISPOSAL FOR THE DURATION OF THE PROJECT. ALL SOLID WASTE SHALL BE DISPOSED OF AT A LICENSED PERMITTED MUNICIPAL LANDFILL. 2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY PERMITS AN DOR DISPOSAL FEES. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO ASSURE THAT ALL MATERIALS AREA HANDLED AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS, RULES, AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THOSE ISSUED BY THE ENVIRONMENTAL PROTECTION AGENCY, NCDEQ, AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION. 3. CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING FOR THE DURATION OF THE PROJECT INCLUDING THE ROUTINE REMOVAL AND DISPOSAL OF SOLID WASTE. 4. CONTRACTOR SHALL KEEP RECORDS OF PROPER SOLID WASTE DISPOSAL AND PROVIDE COPIES TO THE EI. SEEDING AND MULCHING CONSTRUCTION MUST BE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. THIS SEQUENCE IS DESIGNED TO MINIMIZE SOIL EROSION AND SEDIMENTATION. THE CONTRACTOR MAY DEVIATE SLIGHTLY FROM THE STAGING OF PERMANENT SITE SEE SEED MIXES, SOIL AMENDMENTS, AND MULCH SPECIFICATIONS SPECIFIED IN THE ACP RESTORATION AND REHABILITATION IMPROVEMENTS, BUT NO DEVIATION FROM THE RELATIVE ORDER OF EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE PLAN. ALLOWED. 1. SEEDBED PREPARATION: AREAS TO BE SEEDED SHALL BE DISKED TO A DEPTH OF 4 -IN TO 6 -IN WHENEVER FEASIBLE, AND SMOOTHLY GRADED. THE STAGING OF EARTHMOVING ACTIVITIES FOR THIS PROJECT IS A GENERAL DESCRIPTION OF THE WORK REQUIRED. ALL WORK 2. IN TOPSOILED AREAS, SOIL TO BE REDISTRIBUTED EVENLY AND STABILIZED PRIOR TO SEEDING. SHALL BE COMPLETED IN ACCORDANCE WITH COMPANY STANDARDS, THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL 3. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION QUALITY REGULATIONS AND ALL OTHER APPLICABLE FEDERAL, STATE OR LOCAL REQUIREMENTS. ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 21 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED. THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN INCLUDING THE SOIL EROSION CONTROL DRAWINGS AND NARRATIVE 4. WHERE THE INITIATION OF STABILIZATION MEASURES WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY TEMPORARILY OR SHALL BE AVAILABLE ON SITE AT ALL TIMES DURING EARTH DISTURBANCE. PERMANENTLY CEASES IS PRECLUDED BY SNOW COVER, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS CONDITIONS ALLOW. 1. STAKE AND/OR FLAG ALL LIMITS OF DISTURBANCE FOR CONSTRUCTION ACTIVITIES, CLEARLY IDENTIFYING WETLAND AND 5. WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE WITHIN 21 DAYS FROM WHEN ACTIVITIES CEASED STREAM EDGES. INSTALL SIGNS TO DESIGNATE THE AREA TO IDENTIFY IMPORTANT PROJECT ATTRIBUTES SUCH AS (E.G., THE TOTAL TIME PERIOD THAT CONSTRUCTION ACTIVITY IS TEMPORARILY HALTED IS LESS THAN 21 DAYS), THEN WETLANDSTREAM BOUNDS, EXCLUSION AREAS ETC. STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE BY THE SEVENTH DAY AFTER 2. INSTALL ROCK CONSTRUCTION ENTRANCES IMMEDIATELY BEFORE INITIAL DISTURBANCES. THE ROCK CONSTRUCTION CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED. ENTRANCES TO BE UNDERLAIN BY FILTER FABRIC. ALL CONSTRUCTION TRAFFIC SHOULD USE ONLY ROCK CONSTRUCTION 6. AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY (UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY ENTRANCE FOR INGRESS AND EGRESS. ALL MUD OR SEDIMENT TRACKED ONTO THE EXISTING ROADWAY SHALL BE REMOVED OF 70%) WITHIN 30 DAYS, SEEDING AND MULCHING MUST BE RE -SEEDED IMMEDIATELY, OR AS SOON AS WEATHER PERMITS. BY THE CONTRACTOR AS NECESSARY. 3. INSTALL SILT FENCE AND COMPOST FILTER SOCKS AS NECESSARY ALONG THE ACCESS ROADS TO PREVENT SEDIMENT LADEN POLLUTANT CONTROLS RUNOFF FROM ENTERING DOWNSTREAM WATER BODIES. MAINTAIN THE ACCESS ROADS AS REQUIRED, ASSOCIATED DITCHES, AND NECESSARY OUTLET PROTECTION. REPORTABLE SPILLS OCCURRING DURING CONSTRUCTION, OPERATION AND MAINTENANCE ARE TO BE REPORTED 4. PRIOR TO AND SIMULTANEOUS WITH GRADING AND EXCAVATION, INSTALL REMAINING EROSION CONTROL DEVICES (ECD) IMMEDIATELY TO THE MONITORING CENTER IN ACCORDANCE WITH DOMINION POLICIES, PLANS AND PROCEDURES. SHOWN ON THE PLANS. DOMINION'S ENVIRONMENTAL HEALTH AND SAFETY DEPARTMENT WILL BE RESPONSIBLE FOR CONTACTING THE APPROPRIATE 5. COMMENCE GRADING AND ASSOCIATED CUT AND FILL SLOPES. THE EARTH MOVING ACTIVITY SHALL BEGIN IN AREA OF CUT SO AGENCIES, EXCEPT AS PROVIDED FOR BELOW. THAT THE CUTS CAN BE PLACED IN AREAS OF FILL. REMOVE TOPSOIL FROM AREAS TO RECEIVE FILL PRIOR TO FILLING. ANY FACILITY OWNER/OPERATOR WHO IS SUBJECT TO THE SPCC RULE MUST COMPLY WITH THE REPORTING REQUIREMENTS 6. FINALIZE UTILITY INSTALLATION AND ROADWAY GRADES AND PLACE TOPSOIL ON THE CUT AND FILL AREAS. STABILIZE CUT AND FOUND IN 40 CFR 112.4. A DISCHARGE MUST BE REPORTED TO THE EPA REGIONAL ADMINISTRATOR (RA) WHEN THERE IS A FILL SLOPES, AFTER PLACEMENT OF STOCKPILED TOPSOIL ON EXCAVATED SLOPES, AND AS DIRECTED. DISCHARGE OF: 7. RE -DISTRIBUTION OF WET SEDIMENT FROM DEVICES AND FACILITIES SHALL ONLY BE PERMITTED UPHILL OF AN EFFECTIVE •• MORE THAN 1,000 GALLONS OF OIL IN A SINGLE DISCHARGE TO NAVIGABLE WATERS OR ADJOINING SHORELINES, SEDIMENT CONTROL DEVICE OR FACILITY. SEDIMENT LADEN RUNOFF SHALL NOT BE ALLOWED TO FLOW DIRECTLY INTO •• MORE THAN 42 GALLONS OF OIL IN EACH OF TWO DISCHARGES TO NAVIGABLE WATERS OR ADJOINING SHORELINES WATER BODIES. OCCURRING WITHIN ANY TWELVE-MONTH PERIOD. 8. ANY EXPOSED TOPSOIL PILES SHOULD BE STABILIZED & SEEDED PER THE PERMIT REGULATIONS, AND BY TABLES SHOWN ON IF A DOMINION REPRESENTATIVE CANNOT BE PROMPTLY CONTACTED AND THE SPILL HAS IMPACTED WATER, THE PERSON THE APPROVED EROSION CONTROL PLANS AND MULCHED WITH STRAW AS SPECIFIED BY THE PROJECT OWNER. DISCOVERING THE SPILL OR RELEASE WILL CONTACT THE NATIONAL RESPONSE CENTER AT 1-800-424-8802 AND REPORT THE 9. UPON MINIMUM 70% UNIFORM PERENNIAL VEGETATIVE GROWTH, REMOVE TEMPORARY SEDIMENT CONTROLS. REMOVE RELEASE. THAT PERSON WILL CONTINUE CALLING DOMINION UNTIL A REPRESENTATIVE IS REACHED. ACCUMULATED SEDIMENTS WITHIN THE TRAPS, RE -GRADE TRAPS TO FINAL CONTOURS. STABILIZE SITE PER THE PLANS. GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. 1 ��L� {�A��O '�� �_ ; ��j,�.f� ; ,,, '(� ERM NC, INC. License #F-1223 Atlantic Coast Pipeline, LLC o 0 03/10/17 NJB ISSUED FOR REVIEW �.' C� ♦ {f 08/04/17 WTS ISSUED FOR REVIEW ! O = 15720 Brixham Hill Ave, Suite 120 F, R Nf Charlotte, NC 28277 (704) 541-8345 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 DRAWN: NJB 08/04/17 - TITLE: ATLANTIC COAST PIPELINE -•� o CHECKED: _ _ �/-! EROSION AND SEDIMENT CONTROL PLAN NOTES APP. FOR BID: ♦ 'G� G GROUP DWG. NO. REV. f�Q ? 0�*�% � APP. FOR CONST.: DISTRICT. - COUNTY. - STATE: NC 'rA Fka �)%' !!/!I{11h�1 DIRiFILE: ACP\North Carolina\ - 4 OF 7 1 SCALE: AS NOTED 100' MIN. PUBLIC STREET 00 pC� O 00 0 000p 0 U 000001 pp a 6" MIN. THICKNESS FILTER FABRIC UNDER STONE EXISTING GROUND 100' MIN. GENERAL NOTES: 1. A STABILIZED PAD OF WASHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM A PUBLIC STREET. 2. STONE TO BE SURGE STONE OR 2"-3" RAILROAD BALLAST 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN NECESSARY, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUIVALENT. (N. C. STD. N0. 6.06 TEMPORARY CONSTRUCTION ENTRANCE DETAIL A CREEK BANK AOOR£OATE OR SAHD&WS 1' FLUME PW CREEK BIOTTOY ~ QCiYAflD TQM PROPOSED PIPELAK SECTION d'A -A" DIRT PLUG ` EXCAVATED TRENCH _ 8 1 I I PROPOSED UTILITY I I I.L. 1, 1. 1._1.1.1 EROSION CON"M MEASURES TO K __ LOCATED BELOW APPROACH AREAS AC4114fOATE OR CREE-K BANK SANDBAGS FLUME PIPE PROPOSED PIPEUNE SECTIO.N" "B-- B" NOT TO SCALE NOTES: 1. GRUBBING SHALL NOT TAKE PLACE WITHIN 50 FT OF TOP OF BANK UNTIL ALL MATERIALS REQUIRED TO COMPLETE THE CROSSINGS ARE ON SITE AND PIPE IS READY FOR INSTALLATION. 2. PIPE CULVERT FOR FLUME AND ACCESS ROAD MAY BE ONE CONTINUOUS PIPE. 3. WATER ACCUMULATING WITHIN THE WORK AREA SHALL BE PUMPED TO A PUMPED WATER FILTER BAG PRIOR TO DISCHARGING INTO SURFACE WATER. 4. ALL EXCESS MATERIAL SHALL BE IMMEDIATELY REMOVED FROM THE STREAM CROSSING AREA. 5. ALL DISTURBED AREAS WITHIN 50 FEET OF TOP OF BANK SHALL BE BLANKETED OR MATTED WITHIN 24 HOURS OF INITIAL DISTURBANCE FOR MINOR STREAMS OR 48 HOURS OF INITIAL DISTURBANCE FOR MAJOR STREAMS, UNLESS OTHERWISE AUTHORIZED. STREAM CROSSING RESTORATION: 1. ONCE THE SOIL EROSION AND SEDIMENT CONTROL MEASURES AND THE REQUIRED WATER FLOW CONTROL MEASURES ARE IN PLACE, CONTRACTOR CAN PROCEED WITH TRENCH EXCAVATION. 2. ALL EXCAVATED MATERIALS THAT WILL BE USED AS BACKFILL SHALL BE PLACED IN A TEMPORARY STOCKPILE LOCATED OUTSIDE THE CHANNEL. CHANNEL BED MATERIAL SHALL BE SEGREGATED FOR LATER USE. A SEDIMENT BARRIER SHALL BE INSTALLED BETWEEN THE STOCKPILE AND STREAM CHANNEL. 3. COMPLETE TRENCH EXCAVATION FOR PIPELINE CONSTRUCTION, PLACE PIPELINE AND BACKFILL. 4. STREAM BANKS SHALL BE RESTORED TO PRE -CONSTRUCTION CONFIGURATIONS, AS MUCH AS POSSIBLE, AND STABILIZED. 5. RE -SEED RESTORED STREAM BANKS USING SEED MIXTURES AS SPECIFIED HEREIN. 6. RESTORED STREAM BANKS AND ADJACENT DISTURBED AREAS TO BE STABILIZED WITH APPROVED EROSION CONTROL BLANKET USING MANUFACTURER RECOMMENDED STAPLES AND PATTERNS. 7. PLACE SALVAGED BED MATERIAL ON THE CHANNEL BED IN THE DISTURBED AREA. DRY DITCH CROSSING 1: FLUME CROSSING DETAIL NOT TO SCALE 24" DEPTH OF TRENCH SECTION VIEW ti TRENCH PLUG SPACING jl I STACKED CLAY, BENTONITE OR CONCRETE -FILLED SACKS PIPE BEDDING ELEVATION PIPE INVERT CONSTRUCTION NOTES: 1. TRENCH PLUGS ARE REQUIRED AT ALL STREAM, RIVER, WETLAND, OR OTHER WATER BODY CROSSINGS REGARDLESS OF TRENCH SLOPE. 2. TOPSOIL MAY NOT BE USED TO FILL SACKS. 3. TRENCH PLUG LOCATION AND SPACING SHALL BE IN ACCORDANCE WITH CONSTRUCTION ALIGNMENT SHEETS, OR AS OTHERWISE DIRECTED BY THE EI. TRENCH PLUG DETAIL NOT TO SCALE TRENCH S�Oey WELL VEGETATED AREA SPACING OF WATERBARS (IN ACCORDANCE WITH CONSTRUCTION ALIGNMENT SHEETS) PIPELINE TRENCH \ TRENCH SPOILS (TYP.) `SLOPE BREAKER (TYP.) A A' SOIL DIVERSION BERM OR COMPOST FILTER SOCK FOR TEMPORARY WATERBAR (SEE SOIL 18" MIN. AFTER DIVERSION BERM AND COMPOST FILTER SOCK COMPACTIO DETAILS, THIS SHEET), SOIL DIVERSION BERM FOR PERMANENT WATERBAR. U MIN. AFTER COMPACTION FINAL GRADE SECTION A - A' TYPICAL LOCATION OF SEDIMENT PROPOSED BARRIER (IF REQUIRED, SEE NOTE 5) R.O.W. NOTES: 1. TEMPORARY SLOPE BREAKERS SHALL BE INSTALLED UPON INITIAL DISTRUBANCE OF THE SOIL. PERMANENT WATERBARS SHALL BE INSTALLED AFTER THE TRENCH HAS BEEN BACKFILLED. 2. WATERBARS SHALL NOT DISCHARGE TO THE OPEN TRENCH AND SHOULD BE ALIGNED SO THAT DISCHARGES DO NOT FLOW BACK ONTO THE RIGHT-OF-WAY. RUNOFF SHALL BE DIRECTED TO THE DOWNSLOPE SIDE OF THE DISTURBED AREA. 3. SLOPES GREATER THAN 30% MAY REQUIRE THE INSTALLATION OF A PARALLEL COLLECTION DITCH AND SEDIMENT TRAP AT THE BOTTOM OF THE SLOPE IN PLACE OF WATERBARS. 4. WATERBARS MUST BE INSTALLED AT ALL PUBLIC ROADWAY AND RAILROAD CUT SLOPES. 5. IF A SUITABLE VEGETATIVE FILTER STRIP DOES NOT EXIST AT THE POINT OF DISCHARGE FOR ANY WATERBAR, A SEDIMENT BARRIER SHALL BE PROVIDED (E.G., FILTER SOCK, SILT FENCE, OR SOIL DIVERSION BERM, SEE DETAILS, THIS SHEET) MAINTENANCE NOTES: 1. PERIODICALLY INSPECT RIGHT-OF-WAY DIVERSIONS FOR WEAR AND AFTER EVERY HEAVY RAINFALL FOR EROSION DAMAGE. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA, AND REPAIR THE DIKE. CHECK OUTLET AREAS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN PERMANENT ROAD DRAINAGE IS ESTABLISHED AND THE AREA ABOVE THE TEMPORARY RIGHT-OF-WAY DIVERSIONS IS PERMANENTLY STABILIZED, REMOVE THE DIKE, FILL THE CHANNEL TO BLEND WITH THE NATURAL GROUND, AND APPROPRIATELY STABILIZE THE DISTURBED AREA. TYPCIAL WATERBAR AND TEMPORARY SLOPE BREAKER DETAIL TRENCH PLUG AND FILTER SOCK TOP SPOIL PILE SOIL BELTED SILT RETENTION 0 FENCE (TYP.) TOPSOIL \ \ o LU BUFFER ZONE IS NOT TO HAVE 0 VEGETATION REMOVED (EXCEPT O TRENCH LINE). TREES ARE TO BE CUT STANDBY PUMP \\\\ w z \ \\ j�\\ 0- FLUSH TO GRADE. REMOVE STUMP 2 \/\\/ ONLY IF SAFETY BECOMES A FACTO[ PUMP AND FUEL CAN PLACED FS 50' 5 � 50 _//// (BOTH SIDES OF STREAM) IN FLUID CONTAINMENT BOX 0 LU DI F BACKHOE �� o 25' MIN. TIMBERMAT TOP OF BANK _tuuj HOSE UU STREAM FLOW 7 TRENCH ENERGY DISSIPATOR SCREENED INLET PLUG (E.G., FILTER BAG) TOP OF BANK BACKHOE / 0 25' MIN. DOWNSTREAM SANDBAG UPSTREAM SANDBAG / COFFERDAM COFFERDAM \ FBA-� 50' LU \\j\ Q w 00 Q TOP CLp TOP SOIL � SOIL SPOIL PILE PIPE WELDED, CONIC. COATED OR WEIGHTED TRENCH PLUG AND BELTED SILT RETENTION FENCE NOTES: 1. USE DAM AND PUMP METHOD ON NARROW WATERCOURSES WITH LIMITED STREAM FLOW TO PREVENT SEDIMENTATION AND INTERRUPTION OF STREAM FLOW DURING CROSSING CONSTRUCTION. IF FISH PASSAGE IS A CONCERN THIS METHOD IS NOT APPROPRIATE. 2. SCHEDULE CONSTRUCTION DURING PERIOD OF LOW STREAM FLOW. 3. SET UP PUMP AND HOSE AS SHOWN, OR USE OTHER PRACTICAL ALTERNATIVES. PUMP SHOULD HAVE TWICE THE PUMPING CAPACITY OF ANTICIPATED FLOW. HAVE STANDBY PUMP ON SITE. 4. INSTALL UPSTREAM DAM COMPOSED OF SANDBAGS OR CLEAN GRAVEL WITH PLASTIC UNDERLINING. INSTALL DOWNSTREAM DAM IF REQUIRED TO KEEP STREAMBED DRY. 5. EXCAVATE TRENCH AND INSTALL PIPE BY LOWERING IN UNDER HOSE. MOVE HOSE AS REQUIRED OR DISCONNECT IF TEMPORARY FLOW BLOCKAGE IS ACCEPTABLE. BACKFILL TRENCH. 6. DISMANTLE DOWNSTREAM DAM, THEN UPSTREAM DAM. KEEP PUMP RUNNING TO MAINTAIN FLOW. 7. MONITOR DAM AND PUMP FOR PROPER OPERATION THROUGHOUT THE CROSSING INSTALLATION. 8. IN HIGH QUALITY (HQ) OR EXCEPTIONAL VALUE (EV) STREAMS, USE 12" FILTER SOCK IN PLACE OF SILT FENCE. 9. ENSURE DISTURBED AREAS ARE SEEDED AND MULCHED USING SEED MIXTURES AS SPECIFIED IN THE INCLUDED TABLE. STREAM CROSSING RESTORATION: 1. ONCE THE SOIL EROSION AND SEDIMENT CONTROL MEASURES AND THE REQUIRED WATER FLOW CONTROL MEASURES ARE IN PLACE, CONTRACTOR CAN PROCEED WITH TRENCH EXCAVATION. 2. ALL EXCAVATED MATERIALS THAT WILL BE USED AS BACKFILL SHALL BE PLACED IN A TEMPORARY STOCKPILE LOCATED OUTSIDE THE CHANNEL. CHANNEL BED MATERIAL SHALL BE SEGREGATED FOR LATER USE. A SEDIMENT BARRIER SHALL BE INSTALLED BETWEEN THE STOCKPILE AND STREAM CHANNEL. 3. COMPLETE TRENCH EXCAVATION FOR PIPELINE CONSTRUCTION, PLACE PIPELINE AND BACKFILL. 4. STREAM BANKS SHALL BE RESTORED TO PRE -CONSTRUCTION CONFIGURATIONS, AS MUCH AS POSSIBLE, AND STABILIZED. 5. RE -SEED RESTORED STREAM BANKS AT THE RATE OF 15 LBS./ACRE WITH 'RIPARIAN BUFFER MIX' BY ERNST CONSERVATION SEEDS (MIX ERNMIX-178) OR APPROVED EQUAL. 6. RESTORED STREAM BANKS AND ADJACENT DISTURBED AREAS TO BE STABILIZED WITH APPROVED EROSION CONTROL BLANKET USING MANUFACTURER RECOMMENDED STAPLES AND PATTERNS. 7. PLACE SALVAGED BED MATERIAL ON THE CHANNEL BED IN THE DISTURBED AREA. DRY DITCH CROSSING 2: DAM AND PUMP DETAIL NOT TO SCALE TOP OF SILT MUST BE AT ABOVE THE l THE WASHED NOTES. I. REMOVE SEDIMENT *HEN HALF OF STONE OJTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO E4S.1RE DENATERING_ NOT TO SCALE MAINTENANCE NOTES: 1. INSPECT SILT FENCE OUTLETS AT LEAST ONCE PER WEEK AND AFTER EACH SIGNIFICANT (0.5 -INCH OR MORE) RAINFALL EVENT. MAKE REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR NEXT RAIN EVENT AND RELIEVE PRESSURE ON SILT FENCE. TAKE CARE NOT TO UNDERMINE FENCING DURING CLEANING. 3. REMOVE ALL SILT FENCE OUTLET MATERIALS AND UNSTABLE SEDIMENTS AND BRING THE AREA TO SURROUNDING GRADE AND STABILIZE ONCE UPSTREAM AREAS HAVE BEEN PROPERLY STABILIZED. STEEL POST WOVEN WIRE FABRIC HARDWARE CLOTH -- FILTER OF •57 WASHED STONE 'LI" Y INTO SDLP GRDU�O SECTION VIEW lo'IAI 3' FILTER FABRIC APRON ON GROUND 6'-- I I a RY 6 UPP R E E]^E OF II BURY WIRE FENCE AND �� FILTER FABRIC AKRON IN TRENCH HARDWARE CLOTH II U SILT FENCE OUTLET DETAIL NOT TO SCALE WELL VEGETATED, GRASSY AREA MAP FILTER BAG PLAN VIEW FILTER BAG WELL VEGETATED, GRASSY AREA ELEVATION VIEW DISCHARGE HOSE -- PUMP INTAKE HOSE CLAMPS DISCHARGE HOSE PUMP CLAMPS INTAKE HOSE CONSTRUCTION NOTES: 1. FILTER BAGS MAY BE USED TO FILTER WATER PUMPED FROM DISTURBED AREAS PRIOR TO DISCHARGING TO WATERS OF THE COMMONWEALTH. THEY MAY ALSO BE USED TO FILTER WATER PUMPED FROM THE SEDIMENT STORAGE AREAS OF SEDIMENT BASINS. 2. THE PUMPING RATE SHOULD BE DETERMINED BY THE CONTRACTOR BASED UPON THE ACTUAL AMOUNT OF GROUNDWATER ENCOUNTERED DURING CONSTRUCTION. PUMPING RATES WILL VARY DEPENDING ON THE SIZE OF THE FILTER BAG AND THE TYPE AND AMOUNT OF SEDIMENT DISCHARGED TO THE BAG. 3. FILTER BAGS SHALL BE MADE FROM NON -WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. 4. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES MUST BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. 5. BAGS SHALL BE LOCATED IN WELL -VEGETATED (GRASSY) AREAS AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE FLOW PATH SHALL BE PROVIDED. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. 6. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. 7. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHOULD BE FLOATING AND SCREENED. FILTER BAGS DETAIL NOT TO SCALE 8 X 8 X18 ROUGH OAK TIMBER TYPICAL 4' STEEL CABLE WETLAND TIMBER MATTING DETAIL NOT TO SCALE DIVERSION 4 - RIDGE 6" - COMPACTED EARTH OR STONE ENTRANCE PADS TO BE MADE OF COURSE AGGREGATE (AASHTO NO. 1) OR TIMBER SLAB WOOD (TYP.). TIMBERMATS 4' DIVERSION RIDGE 611 COMPACTED EARTH OR STONE APPLY ONE LAYER (TWO LAYERS IN WET J AREAS) GEATEXTILE UNDER ENTRANCE PADS (TYP.). NOTES: 1. ONLY CLEARING Q NECESSARY FOR INSTALLATION OF EQUIPMENT AND EQUIPMENT E EQUIPMENT BRIDGES MAY CROSS WATER BODIES PRIOR Q Q TO BRIDGE INSTALLATION. LIMIT THE CROSSING OF EACH WATERBODY TO ONE PIECE OF CLEARING EQUIPMENT. 2. INSTALL BELTED SILT RETENTION FENCE ACROSS THE DISTURBED AREA OF THE RIGHT OF WAY. 3. APPLY GEOTEXTILE UNDER ENTRANCE PADS. 4. EXCESS MUD IS TO BE REMOVED FROM THE ENTRANCE PADS AND MATS DURING CONSTRUCTION. 5. DURING FINAL CLEAN UP WHEN MATS, CULVERTS, CLEAN ROCK FILL, ETC. ARE REMOVED, INSTALL BELTED SILT RETENTION FENCE ACROSS THE ENTIRE RIGHT OF WAY ON BOTH SIDES OF STREAM. TEMPORARY BRIDGE CROSSING NOT TO SCALE GENERAL NOTES AND COMMENTS: SYM. r 0 BY A � SANDBAGS, y 1s,{t till ;�R$�a�A�Y , ; � ` \ C' ���,�0 `7 � � � , . • " � • �� � � ,Z ' r � � (• � ;�, �_ � �'� o - .� � .fes''',. ���f 1��.,,���y� � f�0�.� Y �� :y G ����ti 1 �`rAl,� � I �� ���� ERM NC, INC. License #F-1223 15720 Brixham Hill Ave, Suite 120 ERM Charlotte, NC 28277 (704) 541-8345 JERSEY BARRIERS, �0 03/10/17 08/04/17 ROAD PLATES, SAtIIOBAGS ETC. - DIRT Kw DRAWN: NJB 08/04/17 TITLE: ATLANTIC COAST PIPELINE EROSION AND SEDIMENT CONTROL PLAN DETAILS c CHECKED: _ _ APP. FORBID: EXCAVATED TRENCH B I , APP. FOR CONST.: DISTRICT: - COUNTY: - STATE: jsl C D►RiFaE: ACP\North Carolina\ l I REV. --T I I , a I I G1 I EROSION COWTROL i ._MEASURES TO BE 1 "KATED BELAW APPROACH AREAS SANDBAGS PLAN VIE W A CREEK BANK AOOR£OATE OR SAHD&WS 1' FLUME PW CREEK BIOTTOY ~ QCiYAflD TQM PROPOSED PIPELAK SECTION d'A -A" DIRT PLUG ` EXCAVATED TRENCH _ 8 1 I I PROPOSED UTILITY I I I.L. 1, 1. 1._1.1.1 EROSION CON"M MEASURES TO K __ LOCATED BELOW APPROACH AREAS AC4114fOATE OR CREE-K BANK SANDBAGS FLUME PIPE PROPOSED PIPEUNE SECTIO.N" "B-- B" NOT TO SCALE NOTES: 1. GRUBBING SHALL NOT TAKE PLACE WITHIN 50 FT OF TOP OF BANK UNTIL ALL MATERIALS REQUIRED TO COMPLETE THE CROSSINGS ARE ON SITE AND PIPE IS READY FOR INSTALLATION. 2. PIPE CULVERT FOR FLUME AND ACCESS ROAD MAY BE ONE CONTINUOUS PIPE. 3. WATER ACCUMULATING WITHIN THE WORK AREA SHALL BE PUMPED TO A PUMPED WATER FILTER BAG PRIOR TO DISCHARGING INTO SURFACE WATER. 4. ALL EXCESS MATERIAL SHALL BE IMMEDIATELY REMOVED FROM THE STREAM CROSSING AREA. 5. ALL DISTURBED AREAS WITHIN 50 FEET OF TOP OF BANK SHALL BE BLANKETED OR MATTED WITHIN 24 HOURS OF INITIAL DISTURBANCE FOR MINOR STREAMS OR 48 HOURS OF INITIAL DISTURBANCE FOR MAJOR STREAMS, UNLESS OTHERWISE AUTHORIZED. STREAM CROSSING RESTORATION: 1. ONCE THE SOIL EROSION AND SEDIMENT CONTROL MEASURES AND THE REQUIRED WATER FLOW CONTROL MEASURES ARE IN PLACE, CONTRACTOR CAN PROCEED WITH TRENCH EXCAVATION. 2. ALL EXCAVATED MATERIALS THAT WILL BE USED AS BACKFILL SHALL BE PLACED IN A TEMPORARY STOCKPILE LOCATED OUTSIDE THE CHANNEL. CHANNEL BED MATERIAL SHALL BE SEGREGATED FOR LATER USE. A SEDIMENT BARRIER SHALL BE INSTALLED BETWEEN THE STOCKPILE AND STREAM CHANNEL. 3. COMPLETE TRENCH EXCAVATION FOR PIPELINE CONSTRUCTION, PLACE PIPELINE AND BACKFILL. 4. STREAM BANKS SHALL BE RESTORED TO PRE -CONSTRUCTION CONFIGURATIONS, AS MUCH AS POSSIBLE, AND STABILIZED. 5. RE -SEED RESTORED STREAM BANKS USING SEED MIXTURES AS SPECIFIED HEREIN. 6. RESTORED STREAM BANKS AND ADJACENT DISTURBED AREAS TO BE STABILIZED WITH APPROVED EROSION CONTROL BLANKET USING MANUFACTURER RECOMMENDED STAPLES AND PATTERNS. 7. PLACE SALVAGED BED MATERIAL ON THE CHANNEL BED IN THE DISTURBED AREA. DRY DITCH CROSSING 1: FLUME CROSSING DETAIL NOT TO SCALE 24" DEPTH OF TRENCH SECTION VIEW ti TRENCH PLUG SPACING jl I STACKED CLAY, BENTONITE OR CONCRETE -FILLED SACKS PIPE BEDDING ELEVATION PIPE INVERT CONSTRUCTION NOTES: 1. TRENCH PLUGS ARE REQUIRED AT ALL STREAM, RIVER, WETLAND, OR OTHER WATER BODY CROSSINGS REGARDLESS OF TRENCH SLOPE. 2. TOPSOIL MAY NOT BE USED TO FILL SACKS. 3. TRENCH PLUG LOCATION AND SPACING SHALL BE IN ACCORDANCE WITH CONSTRUCTION ALIGNMENT SHEETS, OR AS OTHERWISE DIRECTED BY THE EI. TRENCH PLUG DETAIL NOT TO SCALE TRENCH S�Oey WELL VEGETATED AREA SPACING OF WATERBARS (IN ACCORDANCE WITH CONSTRUCTION ALIGNMENT SHEETS) PIPELINE TRENCH \ TRENCH SPOILS (TYP.) `SLOPE BREAKER (TYP.) A A' SOIL DIVERSION BERM OR COMPOST FILTER SOCK FOR TEMPORARY WATERBAR (SEE SOIL 18" MIN. AFTER DIVERSION BERM AND COMPOST FILTER SOCK COMPACTIO DETAILS, THIS SHEET), SOIL DIVERSION BERM FOR PERMANENT WATERBAR. U MIN. AFTER COMPACTION FINAL GRADE SECTION A - A' TYPICAL LOCATION OF SEDIMENT PROPOSED BARRIER (IF REQUIRED, SEE NOTE 5) R.O.W. NOTES: 1. TEMPORARY SLOPE BREAKERS SHALL BE INSTALLED UPON INITIAL DISTRUBANCE OF THE SOIL. PERMANENT WATERBARS SHALL BE INSTALLED AFTER THE TRENCH HAS BEEN BACKFILLED. 2. WATERBARS SHALL NOT DISCHARGE TO THE OPEN TRENCH AND SHOULD BE ALIGNED SO THAT DISCHARGES DO NOT FLOW BACK ONTO THE RIGHT-OF-WAY. RUNOFF SHALL BE DIRECTED TO THE DOWNSLOPE SIDE OF THE DISTURBED AREA. 3. SLOPES GREATER THAN 30% MAY REQUIRE THE INSTALLATION OF A PARALLEL COLLECTION DITCH AND SEDIMENT TRAP AT THE BOTTOM OF THE SLOPE IN PLACE OF WATERBARS. 4. WATERBARS MUST BE INSTALLED AT ALL PUBLIC ROADWAY AND RAILROAD CUT SLOPES. 5. IF A SUITABLE VEGETATIVE FILTER STRIP DOES NOT EXIST AT THE POINT OF DISCHARGE FOR ANY WATERBAR, A SEDIMENT BARRIER SHALL BE PROVIDED (E.G., FILTER SOCK, SILT FENCE, OR SOIL DIVERSION BERM, SEE DETAILS, THIS SHEET) MAINTENANCE NOTES: 1. PERIODICALLY INSPECT RIGHT-OF-WAY DIVERSIONS FOR WEAR AND AFTER EVERY HEAVY RAINFALL FOR EROSION DAMAGE. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA, AND REPAIR THE DIKE. CHECK OUTLET AREAS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN PERMANENT ROAD DRAINAGE IS ESTABLISHED AND THE AREA ABOVE THE TEMPORARY RIGHT-OF-WAY DIVERSIONS IS PERMANENTLY STABILIZED, REMOVE THE DIKE, FILL THE CHANNEL TO BLEND WITH THE NATURAL GROUND, AND APPROPRIATELY STABILIZE THE DISTURBED AREA. TYPCIAL WATERBAR AND TEMPORARY SLOPE BREAKER DETAIL TRENCH PLUG AND FILTER SOCK TOP SPOIL PILE SOIL BELTED SILT RETENTION 0 FENCE (TYP.) TOPSOIL \ \ o LU BUFFER ZONE IS NOT TO HAVE 0 VEGETATION REMOVED (EXCEPT O TRENCH LINE). TREES ARE TO BE CUT STANDBY PUMP \\\\ w z \ \\ j�\\ 0- FLUSH TO GRADE. REMOVE STUMP 2 \/\\/ ONLY IF SAFETY BECOMES A FACTO[ PUMP AND FUEL CAN PLACED FS 50' 5 � 50 _//// (BOTH SIDES OF STREAM) IN FLUID CONTAINMENT BOX 0 LU DI F BACKHOE �� o 25' MIN. TIMBERMAT TOP OF BANK _tuuj HOSE UU STREAM FLOW 7 TRENCH ENERGY DISSIPATOR SCREENED INLET PLUG (E.G., FILTER BAG) TOP OF BANK BACKHOE / 0 25' MIN. DOWNSTREAM SANDBAG UPSTREAM SANDBAG / COFFERDAM COFFERDAM \ FBA-� 50' LU \\j\ Q w 00 Q TOP CLp TOP SOIL � SOIL SPOIL PILE PIPE WELDED, CONIC. COATED OR WEIGHTED TRENCH PLUG AND BELTED SILT RETENTION FENCE NOTES: 1. USE DAM AND PUMP METHOD ON NARROW WATERCOURSES WITH LIMITED STREAM FLOW TO PREVENT SEDIMENTATION AND INTERRUPTION OF STREAM FLOW DURING CROSSING CONSTRUCTION. IF FISH PASSAGE IS A CONCERN THIS METHOD IS NOT APPROPRIATE. 2. SCHEDULE CONSTRUCTION DURING PERIOD OF LOW STREAM FLOW. 3. SET UP PUMP AND HOSE AS SHOWN, OR USE OTHER PRACTICAL ALTERNATIVES. PUMP SHOULD HAVE TWICE THE PUMPING CAPACITY OF ANTICIPATED FLOW. HAVE STANDBY PUMP ON SITE. 4. INSTALL UPSTREAM DAM COMPOSED OF SANDBAGS OR CLEAN GRAVEL WITH PLASTIC UNDERLINING. INSTALL DOWNSTREAM DAM IF REQUIRED TO KEEP STREAMBED DRY. 5. EXCAVATE TRENCH AND INSTALL PIPE BY LOWERING IN UNDER HOSE. MOVE HOSE AS REQUIRED OR DISCONNECT IF TEMPORARY FLOW BLOCKAGE IS ACCEPTABLE. BACKFILL TRENCH. 6. DISMANTLE DOWNSTREAM DAM, THEN UPSTREAM DAM. KEEP PUMP RUNNING TO MAINTAIN FLOW. 7. MONITOR DAM AND PUMP FOR PROPER OPERATION THROUGHOUT THE CROSSING INSTALLATION. 8. IN HIGH QUALITY (HQ) OR EXCEPTIONAL VALUE (EV) STREAMS, USE 12" FILTER SOCK IN PLACE OF SILT FENCE. 9. ENSURE DISTURBED AREAS ARE SEEDED AND MULCHED USING SEED MIXTURES AS SPECIFIED IN THE INCLUDED TABLE. STREAM CROSSING RESTORATION: 1. ONCE THE SOIL EROSION AND SEDIMENT CONTROL MEASURES AND THE REQUIRED WATER FLOW CONTROL MEASURES ARE IN PLACE, CONTRACTOR CAN PROCEED WITH TRENCH EXCAVATION. 2. ALL EXCAVATED MATERIALS THAT WILL BE USED AS BACKFILL SHALL BE PLACED IN A TEMPORARY STOCKPILE LOCATED OUTSIDE THE CHANNEL. CHANNEL BED MATERIAL SHALL BE SEGREGATED FOR LATER USE. A SEDIMENT BARRIER SHALL BE INSTALLED BETWEEN THE STOCKPILE AND STREAM CHANNEL. 3. COMPLETE TRENCH EXCAVATION FOR PIPELINE CONSTRUCTION, PLACE PIPELINE AND BACKFILL. 4. STREAM BANKS SHALL BE RESTORED TO PRE -CONSTRUCTION CONFIGURATIONS, AS MUCH AS POSSIBLE, AND STABILIZED. 5. RE -SEED RESTORED STREAM BANKS AT THE RATE OF 15 LBS./ACRE WITH 'RIPARIAN BUFFER MIX' BY ERNST CONSERVATION SEEDS (MIX ERNMIX-178) OR APPROVED EQUAL. 6. RESTORED STREAM BANKS AND ADJACENT DISTURBED AREAS TO BE STABILIZED WITH APPROVED EROSION CONTROL BLANKET USING MANUFACTURER RECOMMENDED STAPLES AND PATTERNS. 7. PLACE SALVAGED BED MATERIAL ON THE CHANNEL BED IN THE DISTURBED AREA. DRY DITCH CROSSING 2: DAM AND PUMP DETAIL NOT TO SCALE TOP OF SILT MUST BE AT ABOVE THE l THE WASHED NOTES. I. REMOVE SEDIMENT *HEN HALF OF STONE OJTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO E4S.1RE DENATERING_ NOT TO SCALE MAINTENANCE NOTES: 1. INSPECT SILT FENCE OUTLETS AT LEAST ONCE PER WEEK AND AFTER EACH SIGNIFICANT (0.5 -INCH OR MORE) RAINFALL EVENT. MAKE REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR NEXT RAIN EVENT AND RELIEVE PRESSURE ON SILT FENCE. TAKE CARE NOT TO UNDERMINE FENCING DURING CLEANING. 3. REMOVE ALL SILT FENCE OUTLET MATERIALS AND UNSTABLE SEDIMENTS AND BRING THE AREA TO SURROUNDING GRADE AND STABILIZE ONCE UPSTREAM AREAS HAVE BEEN PROPERLY STABILIZED. STEEL POST WOVEN WIRE FABRIC HARDWARE CLOTH -- FILTER OF •57 WASHED STONE 'LI" Y INTO SDLP GRDU�O SECTION VIEW lo'IAI 3' FILTER FABRIC APRON ON GROUND 6'-- I I a RY 6 UPP R E E]^E OF II BURY WIRE FENCE AND �� FILTER FABRIC AKRON IN TRENCH HARDWARE CLOTH II U SILT FENCE OUTLET DETAIL NOT TO SCALE WELL VEGETATED, GRASSY AREA MAP FILTER BAG PLAN VIEW FILTER BAG WELL VEGETATED, GRASSY AREA ELEVATION VIEW DISCHARGE HOSE -- PUMP INTAKE HOSE CLAMPS DISCHARGE HOSE PUMP CLAMPS INTAKE HOSE CONSTRUCTION NOTES: 1. FILTER BAGS MAY BE USED TO FILTER WATER PUMPED FROM DISTURBED AREAS PRIOR TO DISCHARGING TO WATERS OF THE COMMONWEALTH. THEY MAY ALSO BE USED TO FILTER WATER PUMPED FROM THE SEDIMENT STORAGE AREAS OF SEDIMENT BASINS. 2. THE PUMPING RATE SHOULD BE DETERMINED BY THE CONTRACTOR BASED UPON THE ACTUAL AMOUNT OF GROUNDWATER ENCOUNTERED DURING CONSTRUCTION. PUMPING RATES WILL VARY DEPENDING ON THE SIZE OF THE FILTER BAG AND THE TYPE AND AMOUNT OF SEDIMENT DISCHARGED TO THE BAG. 3. FILTER BAGS SHALL BE MADE FROM NON -WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. 4. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES MUST BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. 5. BAGS SHALL BE LOCATED IN WELL -VEGETATED (GRASSY) AREAS AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE FLOW PATH SHALL BE PROVIDED. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. 6. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. 7. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHOULD BE FLOATING AND SCREENED. FILTER BAGS DETAIL NOT TO SCALE 8 X 8 X18 ROUGH OAK TIMBER TYPICAL 4' STEEL CABLE WETLAND TIMBER MATTING DETAIL NOT TO SCALE DIVERSION 4 - RIDGE 6" - COMPACTED EARTH OR STONE ENTRANCE PADS TO BE MADE OF COURSE AGGREGATE (AASHTO NO. 1) OR TIMBER SLAB WOOD (TYP.). TIMBERMATS 4' DIVERSION RIDGE 611 COMPACTED EARTH OR STONE APPLY ONE LAYER (TWO LAYERS IN WET J AREAS) GEATEXTILE UNDER ENTRANCE PADS (TYP.). NOTES: 1. ONLY CLEARING Q NECESSARY FOR INSTALLATION OF EQUIPMENT AND EQUIPMENT E EQUIPMENT BRIDGES MAY CROSS WATER BODIES PRIOR Q Q TO BRIDGE INSTALLATION. LIMIT THE CROSSING OF EACH WATERBODY TO ONE PIECE OF CLEARING EQUIPMENT. 2. INSTALL BELTED SILT RETENTION FENCE ACROSS THE DISTURBED AREA OF THE RIGHT OF WAY. 3. APPLY GEOTEXTILE UNDER ENTRANCE PADS. 4. EXCESS MUD IS TO BE REMOVED FROM THE ENTRANCE PADS AND MATS DURING CONSTRUCTION. 5. DURING FINAL CLEAN UP WHEN MATS, CULVERTS, CLEAN ROCK FILL, ETC. ARE REMOVED, INSTALL BELTED SILT RETENTION FENCE ACROSS THE ENTIRE RIGHT OF WAY ON BOTH SIDES OF STREAM. TEMPORARY BRIDGE CROSSING NOT TO SCALE GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. y 1s,{t till ;�R$�a�A�Y , ; � ` \ C' ���,�0 `7 � � � , . • " � • �� � � ,Z ' r � � (• � ;�, �_ � �'� o - .� � .fes''',. ���f 1��.,,���y� � f�0�.� Y �� :y G ����ti 1 �`rAl,� � I �� ���� ERM NC, INC. License #F-1223 15720 Brixham Hill Ave, Suite 120 ERM Charlotte, NC 28277 (704) 541-8345 1 Atlantic Coast �1 eline LLC �0 03/10/17 08/04/17 NJB WTS ISSUED FOR REVIEW ISSUED FOR REVIEW - - 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 DRAWN: NJB 08/04/17 TITLE: ATLANTIC COAST PIPELINE EROSION AND SEDIMENT CONTROL PLAN DETAILS CHECKED: _ _ APP. FORBID: APP. FOR CONST.: DISTRICT: - COUNTY: - STATE: jsl C D►RiFaE: ACP\North Carolina\ GROUP - DWG. NO. 5 O F 7 REV. scALE: AS NOTED Operation & Maintenance Agreement Project Name: Project Location: Addington Crossing 5416 Hudson Church Road Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & corresponding O& Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level Spreader/VFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present User Defined BMP Present: :WN, 4 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party Title & Organization, Street address. City, state, zip: Phone number(s): Email: Signature: I Date: Z 7, /Y/OA) ,aNotary Public for the State o�ff � Na2i�ii C/"OIIu1,4 County of J�fif p!—k i io y/o Cc'f (/ , do hearby certify that (yLl 41t)J d A V S 0,4) personally appeared before me this 97 day of �(ANt .2o! i and acknowledge the due execution of they Op�errgons and Ma/i9tenance Aciregi nt. Witness m iaW and official seal, —/� �YAYY6iae. b ' 01 P, 2 s pOMMIS9�Ee PIPES z. PU500 J? FNBLj \� My commission expires STORM -EZ 6/2612017 Version 1.4 O&M Manual Page 1 of 3 ENVIRONMENTAL• GEOTECHNICAL BUILDING SCIENCES • MATERIALS TESTING July 21, 2017 Mr. Robert Cash, P.E. Cardno 9800 Southern Pines Blvd. Suite I Charlotte, INC 28273 7606 Whitehall Executive Center Drive, Suite 800 Charlotte, NC 28273 +1 704 529 3200 www.atcgroupservices.com RE: Report of Seasonal High Water Table Evaluation Potter Road Site Wesley Chapel, North Carolina Dear Mr. Cash: Based on ATC's review of the Preliminary Geotechnical Report prepared by others and dated February 10, 2016, our review of the area topographical map, and our experience in the Piedmont area of North Carolina, we provide the below Estimated Seasonal Water Table Elevations for the proposed Detention Ponds planned for the site. Detention Pond Location Estimated Seasonal High Groundwater Elevation, ft. Bio -retention Basin #1 (TP -4) 608 Blo-retention Basin #2 (TP -3) 585 Bio -retention Basin #3 (TP -2) 580 Bio -retention Basin #4 (TP -1) 580 If a "Final Geotechnical Report' is prepared for the site, we recommend the installation of temporary monitoring wells in the area of the proposed detention ponds in order to verify the elevations provided herein. Respectfully Submitted, ATC Associates of N.C., P.C. Joseph G.Schold, P.E. Principal Geotechnical Engineer Reg. NC No. 21736 Joe.schold@atcassociates.com W Q d w W O U O LL N W F - Z CW G W J a a r`L o m -x m 1 Jmdd9 <C 0 EE0 F- m c LM -E a , U a m El EL mmm3co>a rn day0 5 o m o nUL> .LY.E�N mmo $aOm-m mw oULo "aol1gmmmmt„ mo HtraScvOao-Emt 1L'0 '1l .',E .dP •Nd t m c m r rn m U 0 O L U U � N�6U�NmNZ�NUomNNLm NaOorn�0CrncEmc. cUcymaNmmOOE O o o Z m T c m OmN U) O�UQ� U N O o a E N w N m o OI l0 E c :Si 42 L C '� a N Z O L O N N a S W ar m m aw o £ a Q N c'm o a y c ma e m E n R N G E O N m O N a T Z 3 m e—j 0 E E D U F Li E N O O m ` O` V Z'+ r oc aoE a aV T••U Qu'ova.yNga`rn. mmd�'�mnCNcm JdoUC LCary0aNvOd0M�mO3N0cmcmn LO� a�3cvEo cNmmNmf aa� C m'�Tc rn day0 5 o m o nUL> .LY.E�N mmo $aOm-m mw oULo "aol1gmmmmt„ mo HtraScvOao-Emt 1L'0 '1l .',E .dP •Nd t U 0 O U U N�6U�NmNZ�NUomNNLm NaOorn�0CrncEmc. cUcymaNmmOOE Z _waU'mEUVmC OmN U) O�UQ� U Q7 O Z OmN U) O�UQ� J H Lu 0 z m m rn 0 0 o C EL Li \rcjo,_ \\ ` 660971 6 / A5 611 62I--------� \ I\ I613 I � / \ I I I 614 ---------- \ 615 / Z/ //// 620// I -- ____� 616 617 _ f OUTLET STRUCTURE I \ (SEE DETAIL THIS SHEET— I rC�EA�OUT/r / __---- Ir� 1 II 3.- I I I I I �� I I I I I I I I I iN I I l I i Il l lI/I/ iI rr r// II i i 1 1 I I I I I III I 111111 II �� I—I � r4P(w r r /Yo �it j � BIORETENTION r— // POND #1 52' 10, INiENA i ROC4 FORE6AY / % ASEWN / / / / /' / 4 / 3:1 RIP RAP APRON Lu of 2� y�` / HW 100 H 100A 6/6 N �61p'_ I I I 1 DRY DETENTION BASIN #1 FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES * CONTRACTOR TO ENSURE MIX HAS A P -INDEX BETWEEN 10 AND 30. * CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE). RIP RAP BERM BOTTOM ELEVATION d50=6", CLASS B 3, OF PRETREATMENT ELEV. 616.00 FOREBAY CLEAN OUT PIPE TO --- ---- BE CAPPED ---------- 100 YR. STORM ELEVATION: 616.33 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — __________ _______________ __ ___ ___________------- 50 YR. ST ORMELEVATION:616.20_________ _ _ _ 25 YR. ORM ELEVATION: 616.04 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _y — — — — — — — — — — — — — — — — — ----------------------- ----- — 10 YR. STORM ELEVATION_ 615.76 - - — — — — — — — — — — — — — — — — — — — -----------4--------------- — — — — —WATERQUALITYDETENTIONELEVATION:614.93 — — — — i _ SURFACE ELEVATION: 614.00 ------------ SHWT ELEVATION: 608 4" PERFORATED UNDERDRAIN @ 0.50%� AASHTO M288 CLASS 2 NON -WOVEN GEOTEXTILE FILTER FABRIC 8" OF WASHED STONE UNDERDRAIN OUTLET TO CONNECT INTO STRUCTURE' INV = 610.83 BIORETENTION POND #1 CROSS SECTION NOT TO SCALE WEIR EL.= 614.93 r- D• D '• t01:'8F PIPIE „ _ D ► ELEV = 612.50 • D ► • 2�'• i TOP OF BOX ELEV. 617.20 TOP OF BERM ELEV = 617.00 TOP OF EMERGENCY SPILLWAY ELEV = 616.00 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL \ STRUCTURE SEE DETAIL THIS SHEET - WEIR ON ALL FOUR (4) SIDES KEY RIP RAP MINIMUM DEPTH OF 2' '1 0 4" PVC INV. IN=610.83 UNDERDRAIN TIE-IN 4.0' 4.0' O� OP \ IANDLE MANHOLEFRAME AND LID TO BE PLACED DIRECTLY OVER STAIRS o ELEVATED TOP P -� 614.93 / 1\0 oQ Op'P\ NOTE: 1. CORE OPENINGS TO ACCOMMODATE PROPOSED PIPES. (REFER TO PLAN SHEET FOR SIZE AND LOCATION OF PIPE) TYPICAL CONCRETE OPEN THROAT DETAIL INV = 610.83 NOTES 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. NOT TO SCALE 617.20 SEEPAGE COLLAR 24" RCP INV. OUT=610.58 LEGEND ium PROPERTY LINE m CO rn RIGHT-OF-WAY (ROW) — — — — — — — SETBACK O m U PARCEL LINE 1:811.01 CONCRETE SIDEWALK J � OJ BACK OF CURB (FC) O Q J U �0� EDGE OF PAVEMENT (EP) — CENTER LINE OF PAVEMENT a W DRAINAGE EASEMENT o SANITARY SEWER EASEMENT FEMA 100 YEAR FLOODPLAIN Q CREEK — POND — WETLANDS - - - STREAM BUFFER — CENTERLINE OF SWALE O ROCK FOREBAY ROCK FOREBAY HATCH z MAJOR CONTOUR O MINOR CONTOUR v ) z MAJOR CONTOUR Of z MINOR CONTOUR 0627.00 SPOT ELEVATION Olt ium U-+ � w m CO rn o 0 00 CV Carolina > z & J J m W D 0 O m U Www.n 1:811.01 - ' 0 10 20 40 1 INCH = 20 FEET 0 o d N U-+ � w m CO rn o 0 00 CV . cq Q > z & J J m W D 0 O m U W � o Z O rn 10� Z , uJ I- O =Lp\j J � OJ Q W ()f O Q J U �0� H a W o � Q Z J O Q U LL O Z C� z Z ::D O V J v ) z 0 o Of z U ::D J Z U w O ~ W U' U J Z � Z Q Lu J U)J U) Q Q Lu m Q U m U) H z Lu O 0 Lu 0 Lu 0 Z O C) F_ �w U U U) 0 0 Q W Q o CD LO 0 4t .0 C A "--97/27/2017 �O : 'FESS/o •. � '; • O % = SEAL t 033448 • �'►NCINE`:•' ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 107/27/2017 DRAWN I HK DESIGNED JW CHECKED RC PROJECT # CALATL1603 SHEET TITLE BASIN 1 DETAIL SHEET NUMBER C-509 I— W W 2 U) J H W 0 z CO Q CID 0 L9 U co I_ o C EL Li LEGEND // \\�\ - /g9� / / // / / / // / / /r i R•PROPERTY LINE RIGHT-OF-WAY (ROW) — — — — — — — SETBACK PARCEL LINE CONCRETE SIDEWALK / / / I BACK OF CURB (FC) � �c'QpS� �/l I � / EDGE OF PAVEMENT (EP) r0000 CENTER LINE OF PAVEMENT — 1 ✓ J / / // j / 9e� / \ \ \ \ \ \ ( / / /�� I / DRAINAGE EASEMENT li SANITARY SEWER EASEMENT FEMA 100 YEAR FLOODPLAIN CREEK J / / / CENTERLINE / / / OF STREAM / \ \ \ \ \ \ \ / / / POND WETLANDS \ J / i/ / _yI— — / I \ \ \ \ \\ \\ \ / I \ f / - - - STREAM BUFFER o I \ \ I / / / CENTERLINE OF SWALE _—__—_--—/— � j --_r-- -- — ��— �/—/ --\— ��— � \�--—���v'�— ✓`j� _L_ \ �c_/—/_/�//� �__\i/_ i��\� /_�� \ �_ �/\ /�_\=i\��A�/� �i_�\ __�\'\ / �� \���j\V ����`/�IIIILIIIIII� � /\/—�/� i // �— \//_ \'/ /— �i�/ / �/// /--"\//� /= �aIIIII� _//�\/, ///%\/ '_— i-- — --__�I�—I I— A—�S�- — 'T�—E=6o/ oM— y \— _E -- — Ni ;--/— — —/i--- — , —\_�\— \— \ — ,\—t° � — \_ -A—�\'�, \_ \ �\ 0 —v4 \ \ /I I I/ I o1 Io / II / I I�I I/ �I I�I I ) I 10 '0 � �QQ� � , tIHI �1p J J ROCK FOREBAY ROCK FOREBAY H ATCH MAJOR CONTOUR MINOR CONTOUR 59 594 MAJOR CONTOUR 595596 MINOR CONTOUR 0627.00 SPOT ELEVATION 597 O z 598 U) 00- �zD�1598 --- . 57596 \ 595 OUTLET 599 STRUCTURE 53 (SEE DETAIL CLEANOUT THIS SHEET) M ST BIORETENTION i 3:1 cn \6" PVC ww POND #2 3:1 � INTENANC m\ m r. RE INTENA�T EASEME 4.0' SEEPAGE COLLAR \ROCKFOREBAY 593 1 4.0' 594 AOP N 596 f59 .27 IDLE 597 5g7 \ MANHOLEFRAME 598 598AND LID TO BE `b PLACED DIRECTLY CENTERLINE oOVER STAIRS OF110 RIP RAP APRON 7 @ 2.00% ELEVATED TOP 599 1 5 600 �8 605 597.03 o -5I ( CB 201 CB 214 P599600 HW 2000 6o2 660,5' 36" RCP 06 INV. OUT=589.33 607 608 9 594.03 \�6�594.03 6 \\ 614--- I I——--�--�-- I -�— —L— /--— 615 I I ---I - \0 16 616 V I I I / / / / / / / / // // 617 I I / / / / / / 4" PVC 618 \ \ I A I / / / / / / / / / / / I / / / / UNDEINV. IN=589.8 RDRAIN TIE -$N FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. RIP RAP BERM d50=6" CLASS B SC250 LINER 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES * CONTRACTOR TO ENSURE MIX HAS A P -INDEX BETWEEN 10 AND 30. * CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE). BOTTOM ELEVATION ELEV. 595.00 3' OF PRETREATMENT FOREBAY CLEAN OUT PIPE TO ELEV. 593.00 BE CAPPED 100 YR. STORM ELEVATION: 595.62 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 5 — — — — — — — — — — — — — — — — — — — _______________ _ 50YR.STORMELEVATION:595.44 ���----------------------- --- --------------------- 25 YR. STORM ELEVATION: 595.26--------- ______ —_7_b4_R._�'ai�1Gf�CE4_A7fOf�_535.bf—_—_—_—_—_---- RO WATER QUALITY DETENTION ELEVATION: 594.03 %4110y Cti---- — SURFACE ELEVATION: 593.00 — — — — — — — WEIR EL.= 594.03 r- D• D '• fOT:'OF PIPt ,• _ D ► ELEV = 691.50 • D ► • 36R' • i TOP OF BOX ELEV. 597.03 TOP OF BERM ELEV = 598.00 TOP OF EMERGENCY SPILLWAY ELEV = 597.00 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET - WEIR ON ALL FOUR (4) SIDES KEY RIP RAP MINIMUM DEPTH OF 2' NOTE: 1. CORE OPENINGS TO ACCOMMODATE PROPOSED PIPES. (REFER TO PLAN SHEET FOR SIZE AND LOCATION OF PIPE) TYPICAL CONCRETE OPEN THROAT DETAIL NOT TO SCALE N . LEE a> Carolina www.nc811.or9 W - ' — — — — — — — — — — — — — -- \ \ FITT ELEVATION: 8" OF WASHED STONE INV = 589.83 NOTES 4' PERFORATED UNDERDRAIN @ 0.50% UNDERDRAIN OUTLET 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY AASHTO M288 CLASS 2 NON -WOVEN TO CONNECT COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. GEOTEXTILE FILTER FABRIC INTO STRUCTURE 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INV = 589.83 INFILTRATION RATE IS AT LEAST 1 IN/R. BIORETENTION POND #2 CROSS SECTION 0 10 20 40 NOT TO SCALE 1 INCH = 20 FEET o d 0 a> U-+ LL W �-+ H m CO 0 o 0 00 CV . cq > z W E ? O - O 0oUu- W of o O O=Lc\I �Z Z , uJ J � Q _j � � J O QLu H W o � Q z J 'O Q U O Z v z Z O UJ Cn z 0 o 01. z U J Z U w W O F_ Q ~Q � U' U J Z Q J � /� VJ vJ 0 Q Lu m Q U m U) H z W O 0 W Y 0 Of W 0- 0 Ln Z O O z F_ W U U) U) 0 0 0 Q W Q o in LID0 4t -'97/27/2017 :�O :•F ESS�o•. • O % = SEAL t 033448 •••:GINE:•' .T i ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 107/27/2017 DRAWN I HK DESIGNED JW CHECKED RC PROJECT # CALATL1603 SHEET TITLE BASIN 2 DETAIL SHEET NUMBER C-51 0 H W W U) J H W 0 M z CO Q m L9 U co I_ \ \ RET WALL \\\ \ W/ALUMlN ENCE V (SEE DETAIL v \ v \ \SHE ET C-707) 1 � _ 40,2�F \\ \\ \\ \\ \ LLLL / I m / II QLu �J— \ Lu L0 :p :pL0 Ctl \ OUTLET � M \ STRUCTURE (SEE DETAIL THIS SHEET) BIORETENTION ST �IP RAP POND #3 APRON % WLS I I 1I wis W1S 313.01' F 0" R P I I I I I FEMA 100 YR I \ \ h STM / svs �M' I FLO�yDPLAIN r / "� I I I I 1 I STM 4 o`O WLS I I I I I I I I I II \II I I I o S I� I I I \ w \ 3•� �/ 4 PVC h� �cbcbc� ROCK FOREBAYANOUT ^� i I 1 5 586 / / / / I I 1 1 1co 587 � �/� W 588.., /< W owe // \ zQ //// /// j/ __/ / / / I I / /7 if --> �� // / �/_ / /C --J �_�JT� // �✓ ------ / Oct` 15 ZD , FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. 3' RIP RAP BERM BOTTOM ELEVATION d50=6", CLASS B ELEV. 587.00 OF PRETREATMENT FOREBAY ELEV. 585.00 M — — — — — — — — — — — — — — — — — — �E -------------- \�\ SHWT ELEVATION: 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES • CONTRACTOR TO ENSURE MIX HAS A P -INDEX BETWEEN 10 AND 30. • CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE). / CLEAN OUT PIPE TO ' • t ' '• BE CAPPED 100 YR. STORM ELEVATION: 586.96 — — — — — — — — — — — — — — — — — — — — — — TO — — — — — — 701`75T6 — — — — — — — — — — — — — — — — — •. _YR.STORMELEVAT85 _______ , 25 7R. -TT ORM ELEVATION: 586.73_ 10 YR. STORM ELEVATION: 586.55 _ -------------- -------------------------- �n/EfFfEL.==5$575 •: — — — — WATER QUALITY DETENTION ELEVATION: 585.63 • 11 �• P SURFACE ELEVATION: 585.00 ► ► aw' '• TOF'OF PIPt . ELEV = 683.5(1 2.50'. ' ; n 1 �. : • 3�'• • i FPER'FORA 8" OFWASHED STONETED UNDERDRAIN @ 0.50% UNDERDRAIN OUTLET — AASHTO M288 CLASS 2 NON -WOVEN TO CONNECT GEOTEXTILE FILTER FABRIC INTO STRUCTURE INV. = 581.83 BIORETENTION POND #3 CROSS SECTION NOT TO SCALE TOP OF BOX ELEV. 588.75 TOP OF BERM ELEV = 588.00 TOP OF EMERGENCY SPILLWAY ELEV = 587.00 INV = 581.83 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET - WEIR ON ALL FOUR (4) SIDES KEY RIP RAP MINIMUM DEPTH OF 2' NOTES 1� r 1.0 . / 5.75 1 0 585.75 4" PVC INV. IN=581.83 tOP kz ANDLE MANHOLE FRAME AND LID TO BE PLACED DIRECTLY OVER STAIRS o ELEVATED TOP VOQ \� NOTE: 1. CORE OPENINGS TO ACCOMMODATE PROPOSED PIPES. (REFER TO PLAN SHEET FOR SIZE AND LOCATION OF PIPE) TYPICAL CONCRETE OPEN THROAT DETAIL NOT TO SCALE 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. 588.75 LEGEND LEE PROPERTY LINE — — RIGHT-OF-WAY (ROW) — — — — — — — SETBACK O M U PARCEL LINE W of o Z O cn CONCRETE SIDEWALK J � Z 0 CD BACK OF CURB (FC) DQ O J ujH EDGE OF PAVEMENT (EP) — CENTER LINE OF PAVEMENT W a W DRAINAGE EASEMENT o SANITARY SEWER EASEMENT FEMA 100 YEAR FLOODPLAIN Q CREEK — POND — WETLANDS - - - STREAM BUFFER — CENTERLINE OF SWALE O ROCK FOREBAY ROCK FOREBAY HATCH V Z MAJOR CONTOUR O MINOR CONTOUR Cn Z MAJOR CONTOUR Z MINOR CONTOUR 0627.00 SPOT ELEVATION SEEPAGE COLLAR 30" RCP INV. OUT=581.58 Na. LEE Carolina m CO rn o 0 0 CV . Q >z00 www.nc811.or9 O M U - ' 0 10 20 40 1 INCH = 20 FEET 0 o d N U-+ � W m CO rn o 0 0 CV . Q >z00 (U ? 0 O M U ui W of o Z O cn , Of ZuJ O=Lc\I J � Z 0 CD Q � � DQ O J ujH W a W o � V Q Z J o L.L Q U N� L.L O Z V Z Z O UJ Cn Z O o Z U J Z U w O Q W Z Q U' U J Z Q uj VJ _j W 0 Q Q w m Q U m 07 H z W O 0 W `S 0 Of W 0- 0 Z O C.) z W U U cn 0 0 0 Q W Q o in LO O ♦♦♦�� - --97/27/2017 �O : 'F E S Sid•. � '; • O % 9 ; = SEAL t 033448 ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 07/27/2017 DRAWN I HK DESIGNED JW CHECKED RC PROJECT # CALATL1603 SHEET TITLE BASIN 3 DETAIL SHEET NUMBER C-51 1 H W W U) J H W 0 Z CO Q m N L9 U co I_ o C EL Li FEMA 100 YR � FLOODPLAIN / \\ 86 A \\ \ \ � \ OUTLET 588 STRUCTURE 689 (SEE DETAIL 1�G z / THIS / i v \ 5 \ /L 5� BIORETENTION\" 5 POND #4 CLEANOUT 4" PVC 405 \RROP. L� Q �,y5 - ---- Us -- s`9� SEEPAGE COLLAR 4.0' \ HW 500 RIP RAP \ �gp \ \ IOPANDLE Q�RON O� MANHOLE FRAME ���\ / \ AND LID TO BE - O / \ PLACED DIRECTLY \G'L s HW 400 5), \ OVER STAIRS 5 v 9/� 0 �S' \ \ / I* - �� \ \ \ \ \ \ \ ELEVATED TOP % ! s8 \ o "[� 6 RIP RAP\ 1a S8j APRON / \ \ I 589.15 \ DCB 501 '\pQ C70 \ � 590 — \ � � .. • • \\ \ 591 O� .. CB 502 F� .; • -c J// 36" RCP INV.OUT=580.95 592 � �1 V � 595 _ � � � � � \ 585.98 585.98 \ sIQ - J \ 11119` 5g3 - - v 4" PVC INV. IN=581.8 99 UNDERDRAIN TIE-IN 6'00 \ — y94 \ 61 - �C .001CB 4 \ e0 CB 505 0' ` _ \ \ NOTE: 1 CORE (REFER TO PIIAN SHGS O ET FOR IZE AND TE PROPOSED LOCATION OF PIPE) TYPICAL CONCRETE OPEN THROAT DETAIL 7.sVWT ELEVATION: 580. 8" OF WASHED STONE 4" PERFORATED UNDERDRAIN @ 0.50% 7UNDERDRAIN OUTLET AASHTO M288 CLASS 2 NON -WOVEN TO CONNECT GEOTEXTILE FILTER FABRIC INTO STRUCTURE INV. = 581.83 BIORETENTION POND #4 CROSS SECTION NOT TO SCALE TOP OF BOX ELEV. 589.15 TOP OF BERM ELEV = 589.00 TOP OF EMERGENCY SPILLWAY ELEV = 588.00 INV = 581.83 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET KEY RIP RAP MINIMUM DEPTH OF 2' NOTES 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. NOT TO SCALE LEGEND 2' OF FILL SOIL MEDIA MIX*: 75-85% MEDIUM TO COARSE WASHED SAND FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RIGHT-OF-WAY (ROW) RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED 8-10% FINES (SILT AND CLAY) FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND * CONTRACTOR TO ENSURE MIX HAS A P -INDEX RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL BETWEEN 10 AND 30. * INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY — MEDIA ALTERNATIVES (SUCH AS CAROLINA STALITE). BOTTOM ELEVATION RIP RAP BERM DRAINAGE EASEMENT OF PRETREATMENT d50=6", CLASS B 3 SANITARY SEWER EASEMENT FOREBAY ELEV. 587.00 CLEAN OUT PIPE TO FEMA 100 YEAR FLOODPLAIN ELEV. 585.00 BE CAPPED CREEK — 100 YR. STORM ELEVATION: 587.69 ------------------------- --- --------------------- — — — — — — — — — — — — — — — — — — — — — — — — — — — - — — — -------------------- — — — 50 YR. STORM ELEVATION: L---------7.38 , . •, — — — SL— — — — — — - - - YR. STORM ELEVATION: 587.19 ,— L -----------— — — — — — — — — — — — — — — -------------- ----- — — — — — — — — — — — — — — — — — — — — — — 9 — — — — — — — — — — — — — — - — — —25 --------- — - — — 10 YR. STORM ELEVAL.------ON: 586.94 ' — — — — — — — — — — — — — — — — — — — — ^ WATER QUALITY DETENTION ELEVATION: 585.98 WEIR EL.= 585.98 — — — — — — — — — — — — — — — — — — — r7` — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — v Z • ► �• ►• • P • O SURFACE ELEVATION: 585.00 ► ► — — • . '• ►. TOROF BERM 01. z ► ELEV = 83.55 250' ; n Lu Z Q Q U' U J Z Q a•o•aaoaa•aaaa•o .�� ►••: Q Q Lu v A. ► 7.sVWT ELEVATION: 580. 8" OF WASHED STONE 4" PERFORATED UNDERDRAIN @ 0.50% 7UNDERDRAIN OUTLET AASHTO M288 CLASS 2 NON -WOVEN TO CONNECT GEOTEXTILE FILTER FABRIC INTO STRUCTURE INV. = 581.83 BIORETENTION POND #4 CROSS SECTION NOT TO SCALE TOP OF BOX ELEV. 589.15 TOP OF BERM ELEV = 589.00 TOP OF EMERGENCY SPILLWAY ELEV = 588.00 INV = 581.83 31 RIP RAP d50=6", CLASS B OPEN THROAT CONTROL STRUCTURE SEE DETAIL THIS SHEET KEY RIP RAP MINIMUM DEPTH OF 2' NOTES 1. NO MECHANICAL COMPACTION: DO NOT MECHANICALLY COMPACT THE MEDIA. WATER OR WALK ON IT AS IT IS PLACED. 2. MEDIA MAINTENANCE: MAINTAIN MEDIA SUCH THAT INFILTRATION RATE IS AT LEAST 1 IN/R. NOT TO SCALE LEGEND LEE PROPERTY LINE — — RIGHT-OF-WAY (ROW) — — — — — — — SETBACK — ah,' PARCEL LINE W o Z O CONCRETE SIDEWALK J O OJ BACK OF CURB (FC) O Q J U Cum EDGE OF PAVEMENT (EP) — CENTER LINE OF PAVEMENT a W DRAINAGE EASEMENT o SANITARY SEWER EASEMENT FEMA 100 YEAR FLOODPLAIN Q CREEK — POND — WETLANDS - - - STREAM BUFFER — CENTERLINE OF SWALE O ROCK FOREBAY ROCK FOREBAY HATCH v Z MAJOR CONTOUR O MINOR CONTOUR — — MAJOR CONTOUR 01. z MINOR CONTOUR 0627.00 SPOT ELEVATION Na. LEE Carolina m � o 0 4 I 00 04 Www.0011.or9 cu W ? O — ah,' 0 10 20 40 1 INCH = 20 FEET 0 O E N L- LL W m � o 0 4 I 00 04 N N . > Z o cu W ? O O 0oULL Lu W o Z O , Of ZLLI O=�� J O OJ P_ Q W ()f O Q J U Cum H a W o � U Q z J O L.L Q U O Z v Z Z O UJ Cn z 0 o 01. z U J Z U w O 0 - Q Lu Z Q Q U' U J Z Q �J U I J �\j v / M Q Q Lu m Q U m U) z W O U W Y 0 Of W 0- 0 Z O_ U z Of W U U U) 0 0 0 Q LU Q o 0 0 -'97/27/2017 �\ .•F E S S�� ••• % • ,•�� 033448 • •'•;�GINE;•' .T i ROBERT L. CASH, P.E. INC LICENSE No. 033448 DATE 07/27/2017 DRAWN I HK DESIGNED JW CHECKED RC PROJECT # CALATL1603 SHEET TITLE BASIN 4 DETAIL SHEET NUMBER C-512 Ex -1 Ex -2 Ex WS Ex -2 Ex -HH Ex HH XCP1 Ex -PR XCPI (new Subcat) Subcat Reach on Link BP -1 DR -1 DET1 (BP 2) et 7 DET2 Det -2 P-1 �7�.IPond 2 CP3 DR -2 Culvert\\\\2J DR -2 CP1 CPI DET3 / Det 3 P-3 LLLCCC Det Pond 3 BP -4 Basin T USI Revision WS1 Detention R Prepared by Cardno HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Printed 8/15/2017 Page 2 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 BP -1 0.00 0.00 492.0 0.0103 0.013 36.0 0.0 0.0 2 DET1 0.00 0.00 138.0 0.0057 0.013 24.0 0.0 0.0 3 DET2 0.00 0.00 944.0 0.0200 0.013 24.0 0.0 0.0 4 DET3 0.00 0.00 586.0 0.0100 0.013 24.0 0.0 0.0 5 P-1 610.83 610.58 45.2 0.0055 0.013 24.0 0.0 0.0 6 P-2 589.83 589.33 43.8 0.0114 0.013 36.0 0.0 0.0 7 P-3 581.83 581.58 33.0 0.0076 0.013 30.0 0.0 0.0 USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment BP -1: BP -1 Runoff = 26.58 cfs @ 12.27 hrs, Volume= 115,438 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non -grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41 % Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 4 Subcatchment BP -1: BP -1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph 26:/ 26.58 cfs _� � �e 124�hr y� ❑Runoff -I 24 I I I 1 "- e4 Rei nfal L:5.20" 22 + --R nq" _I_= 5.71 $-�ac 20 18 J —1 1 L L q =X15.438-cf -Ru -o - -I - u 16 c 14 t t e;h=2.02" Olov� Lin -ih-=-' ,6t4' LL 12 L L L -Tc-30-01 nein 10 8:/ —-rl rt rt l l l rt 6:/ t- 4 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment BP -2: BP -2 Runoff = 66.42 cfs @ 12.20 hrs, Volume= 267,721 cf, Depth= 1.64" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non -grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment BP -2: BP -2 Hydrograph I 70-//66.42 cfs 65 ype 11 24 r 60 1"- ea% Riinfa11:�5.2F�" 55 - --�unof -�L a=451153-�ac 50 45 1 —Rr�ff-Volt me=2�7, 21 c N -Run-o"e t2.�4" 40 -I1" Lin ih �,4tW 0 35 LL 30 L L 1 -Tc-52503 Min 25 20 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment BP -4: Basin T Runoff = 3.29 cfs @ 12.14 hrs, Volume= 11,732 cf, Depth= 1.28" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 109,957 58 Meadow, non -grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unsaved Kv= 16.1 fas 18.9 1,153 Total N 3 0 LL 0 Subcatchment BP -4: Basin T Hydrograph 3.29 cfs Type II 24 -hr 10 -Year Rainfall=5.20" Runoff Area=109,957 sf Runoff Volume=11,732 cf Runoff Depth=1.28" Flow Length=1,153' Tc=18.9 min CN=58 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment DET1: Det 1 Runoff = 14.39 cfs @ 11.98 hrs, Volume= 29,745 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet 15 14 Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow 1lyp 1+24 -hr 13d�aK Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Rnf�11�5.2�0" 11 Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 10 1 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' R�nc ff Yolk mp =�9,745�qf � n= 0.013 6.5 488 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET1: Det 1 Hydrograph 16 15 14 14.39 cfs 1lyp 1+24 -hr 13d�aK Rnf�11�5.2�0" 11 rt t Ru1.".I. Asea` =176,424-�sf r 10 1 R�nc ff Yolk mp =�9,745�qf � 9 — — Runoff-Depth=-2.02" LL $ - Flo�v��en�gthl=488' 6 1 rt rt fit- l - - IT6=6-.� nihn r 5 I i -4 4 4 3 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment DET2: Det -2 Runoff = 36.26 cfs @ 12.02 hrs, Volume= 83,550 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 40 Sheet Flow, Sheet +-r t t Runoff Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale 32 _ 1 -1 -T 7 T Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 I Shallow Concentrated Flow, Gutter � I_ Ru ti -off Are�4�5, 48L f 26 Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 1 Runoff -Depth= -2.02' 0 201�Ow 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale 14 12 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total Subcatchment DET2: Det -2 Hydrograph 40 +-r t t Runoff 38 36.26 cfs 36 - I - rt rt -r fi - - - - II -24 -hr 32 _ 1 -1 -T 7 T � yp A(j Y��IRainfalls .216" 30 - 28 1 Z I L � I_ Ru ti -off Are�4�5, 48L f 26 Runoff olu 3 "f 24 22 1 Runoff -Depth= -2.02' 0 201�Ow LL 18 16 - -1 - �Tc�:9� rritn 14 12 10 8- 6 4 I 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment DET3: Det 3 Runoff = 23.46 cfs @ 12.02 hrs, Volume= 56,519 cf, Depth= 2.97" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow cfs - - - Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow - Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 20 19 18 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' -T -7 T7 T7 n= 0.013 10.5 936 Total ■Runoff Subcatchment DET3: Det 3 Hydrograph 26 2a 23 23.46 cfs - - - - – - — —IY 1124 r 2; - I— -16 -furl Rahn6l l�5.26" 20 19 18 1 7 -T -7 T7 T7 RuOD#Areap=48,""f ;6 - t I� �6, f w 15 6Y°�� Run-off-Depo- h Q.97" 0 12 _ i=1a�ven�gth96' 11 10 - -4 J- fc=-A 0.6 r>i+n 8 7 _ t 5 I -44 ;I 4 4- 1 0 0 5 10 15 20 25 30 35 40 45 Time 50 55 (hours) 60 65 70 75 80 85 90 95 ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment DR -1: DR -1 Runoff = 31.35 cfs @ 11.96 hrs, Volume= 62,093 cf, Depth= 2.97" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -1: DR -1 Hydrograph ❑Runoff 325 cfs iy 30 28 -L L L r p� 1124hr L26 ali�n#11��5.2��• tI t- r- fj• u Are- �2.50,4"Qq�f 24 22 ,8 Runoff -Depth 2.97' �II STC --5.6 rrin 16 LL 14 + d1=�9 12 10 1 :11L 8 4 All t 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment DR -2: DR -2 Runoff = 20.30 cfs @ 11.96 hrs, Volume= 40,204 cf, Depth= 2.97" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -2: DR -2 Hydrograph ❑Runoff 2120.30 cfs - - - - 1 20 Y I F24� r 19 18 -1 I I :EE E 146-Y�a-I "nfi11�526 17 16 — —1 4 4 k- RUArea�='I-$2J92-Sf 14 I t t � 1�r4 �� - O, J4�cf X 12 Runoff-De�h=2.97•• 3 11 - 1 I �T-5� rWM LL 10 9 4 --t4 C N=ft9 8 7 l - - - t-- l l l -1- fi 6 - - - 5 4 -I ::11 1 LE: [I I I I A a 11: 3 2 4 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment Ex -1: Ex WS #1 Runoff = 106.30 cfs @ 12.20 hrs, Volume= 424,141 cf, Depth= 1.71" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN DescriDtion 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non -grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet -1 1 - + Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc - = - - - Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel - t 4+- I Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total I w 0 LL Subcatchment Ex -1: Ex WS #1 Hydrograph 106.30 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff -tya-- 11 1% 1 -1 1 -4 - 1 1 -410-Yea# "nfall=54!' -1 1 - + I �u-goff-j"a=?,9T3,Q921-s# ��nolff�oi� 1-cf gunoff e4 - = - - - I I TIlovy Lein glih=;466' - - - - I I - I -1 :I Ic�25.11"Odn - t 4+- I I 1--- 7 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment Ex -2: Ex -2 Runoff = 19.08 cfs @ 12.26 hrs, Volume= 82,757 cf, Depth= 2.19" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Shallow 20 19 19.08 Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 1 Shallow Concentrated Flow, Shallow 18 17 Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow j Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' 1 "`.I' ea` = 7 13 n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, �AT ��Sf w 12 0 19 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment Ex -2: Ex -2 Hydrograph 20 19 19.08 cfs —1 -T --r -r 1 4yp� II 2 4 --hr 18 17 -46- I 6nII�J.2n 16 15 j 1 "`.I' ea` = 7 13 �AT ��Sf w 12 0 19 fi RunoffMeoh=2.19" I_ _IbV1Fl Le�ngh,43' 7 / 6 ��1-L r ia 5 4 4 4- 3 2 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment Ex -HH: Ex HH Runoff = 17.77 cfs @ 12.26 hrs, Volume= 77,837 cf, Depth= 2.19" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet 19 18 17.77 cfs Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex -HH: Ex HH 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph I —4 ■Runoff 19 18 17.77 cfs —I iyp� 1124--thr 17 1615 I— Ind-�F�a�IRinfll.2�'• 14 I— RuArea�:4Z7X4�sf 13 12 Y_ I /�f w 11 Runoff-Depfh=2.19" 10-r 0 I W Uel - EE -i 2V8 LL 7 7 - 1 1 --4- 5 5 4 1 -4 4- 11 1 I --4 4 3 2 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment Ex -PR: (new Subcat) Runoff = 7.61 cfs @ 11.90 hrs, Volume= 12,735 cf, Depth= 1.28" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 119,354 58 Meadow, non -grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex -PR: (new Subcat) Hydrograph 8 7.61 cfs Typ� 1124 hr 1 1 d-Y�ar IRainf�11=15.210" 6 1 I Runoff Areap119,15+sf 5 rF F -R4Y°[#"1e-2'5f Runoff Depth=1.28" 0 4 Tc-O.rrn U- CN=%8 3 -1 A I L L 2 0 Time (hours) ■ Runoff USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 16 Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 2.02" for 10 -Year event Inflow = 14.39 cfs @ 11.98 hrs, Volume= 29,745 cf Outflow = 9.83 cfs @ 12.05 hrs, Volume= 25,995 cf, Atten= 32%, Lag= 3.9 min Primary = 9.83 cfs @ 12.05 hrs, Volume= 25,995 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 615.76' @ 12.05 hrs Surf.Area= 5,478 sf Storage= 7,874 cf Plug -Flow detention time= 97.4 min calculated for 25,995 cf (87% of inflow) Center -of -Mass det. time= 35.7 min ( 883.4 - 847.7 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=9.82 cfs @ 12.05 hrs HW=615.76' (Free Discharge) L1=Culvert (Passes 9.82 cfs of 29.97 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 9.82 cfs @ 2.98 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=614.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 17 Pond P-1: Det Pond 1 Hydrograph T T 1— _J 14.39 cfs ■ Inflow outflow _ Incl" 4re�=i 76i 44t4�f IN Primary 16 / f ■ Secondary 15 / I —Pe-Ok 11-I0"64 5.716' 14 / 13 Storagin=7,$74 f / 12 11 / 9.83 cfs _ 4 11 10 / 9 -4 -k 1 - 1 1-1 A 4- .44 / LL / X 4- 1 1 I 7 / 6 / L L 5 - — — 3 / 2 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 18 Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 2.02" for 10 -Year event Inflow = 36.26 cfs @ 12.02 hrs, Volume= 83,550 cf Outflow = 31.97 cfs @ 12.06 hrs, Volume= 77,724 cf, Atten= 12%, Lag= 2.6 min Primary = 31.97 cfs @ 12.06 hrs, Volume= 77,724 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.01' @ 12.06 hrs Surf.Area= 9,300 sf Storage= 13,406 cf Plug -Flow detention time= 56.6 min calculated for 77,716 cf (93% of inflow) Center -of -Mass det. time= 19.1 min ( 869.4 - 850.3 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=31.94 cfs @ 12.06 hrs HW=595.01' (Free Discharge) LrCulvert (Passes 31.94 cfs of 65.32 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 31.94 cfs @ 3.25 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 19 Pond P-2: Det Pond 2 Hydrograph fi l -F I-� t t- l I n t 36.26 cfs 40 ; Inflow Are6=496,548 4 38/ 36 31.97 cfs f - Peak Elev=595.01' { 32 / _Storage=13,4o6f 28 i 11� + 4- 11 - 1 26 / y 24 v 2220 / / fi fi i LL18 / 1 16 14 / / 111 4-- 11--1 4- 11 - 1 12 / 10II rt rt lI rt 1 i ,ice%ziiiiiiiiM,00iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM.WN=11MMMI, LInflow ary USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 20 Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 2.97" for 10 -Year event Inflow = 23.46 cfs @ 12.02 hrs, Volume= 56,519 cf Outflow = 18.88 cfs @ 12.08 hrs, Volume= 50,081 cf, Atten= 20%, Lag= 3.7 min Primary = 18.88 cfs @ 12.08 hrs, Volume= 50,081 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.55' @ 12.08 hrs Surf.Area= 10,463 sf Storage= 14,314 cf Plug -Flow detention time= 91.6 min calculated for 50,076 cf (89% of inflow) Center -of -Mass det. time= 35.2 min ( 859.0 - 823.8 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=18.86 cfs @ 12.08 hrs HW=586.55' (Free Discharge) L1=Culvert (Passes 18.86 cfs of 44.05 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 18.86 cfs @ 2.94 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 21 EMI LInflow ary Pond P-3: Det Pond 3 Hydrograph T7 T T T T / 23.46 cfs Inflow Area=228,069 sf 26 24/ T T Peak Elev=586.55' 22 / 18.88 cfs Storage 14,314 cf 20 — 18 / T T I T T T 1-1 T T / H T 1-1-1 4--1 1 X14 / 1 1 1 1 1 1 1 1 1I _012 LL 10 / 8:/ 6/ 1 1 1 1 1 1 1 1 1 EMI LInflow ary USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 22 Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 1.94" for 10 -Year event Inflow = 140.15 cfs @ 12.11 hrs, Volume= 639,256 cf Primary = 140.15 cfs @ 12.11 hrs, Volume= 639,256 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 23 Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 1.85" for 10 -Year event Inflow = 119.25 cfs @ 12.15 hrs, Volume= 548,970 cf Primary = 119.25 cfs @ 12.15 hrs, Volume= 548,970 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 24 Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 1.82" for 10 -Year event Inflow = 142.07 cfs @ 12.22 hrs, Volume= 584,735 cf Primary = 142.07 cfs @ 12.22 hrs, Volume= 584,735 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment BP -1: BP -1 Runoff = 37.11 cfs @ 12.25 hrs, Volume= 158,349 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non -grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41 % Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 26 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Subcatchment BP -1: BP -1 Hydrograph 1 -4 --k Z- 4 + ❑Runoff s$ 37.11 cfs 1 -4-4- 11 1 1 �Y� �4-hr + +-2 - i eaf �lnfall�.10n 32 30-1 1 t t t I— 1 -4�unP"r�a=�5.17�1 8�ac 26 N 24 - 1 rt rt fi n oT m 8 4�cf 1 -Rum f wh�-2.�i'• 0 20 1 1 L L C 1 141" L-4ng-- h--�,6�4' LL18CWin 16 12 4- — 1 1 1 I --t 10 8 — — 6 4 - 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment BP -2: BP -2 Runoff = 97.28 cfs @ 12.20 hrs, Volume= 378,973 cf, Depth= 2.32" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non -grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc + — 1 1 4 � I Ype ii -24 --by 97.28 cfs Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel t �J5= e R iinfi�all 6.��" s0-1 75 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total ■Runoff Subcatchment BP -2: BP -2 Hydrograph 105 100-/// 95 1 —t 4 + — 1 1 4 � I Ype ii -24 --by 97.28 cfs 90 85 -I -tt t �J5= e R iinfi�all 6.��" s0-1 75 Z I Z �Mrrqff�4re�al=5.�s3 laic 65 4 1� ��ff�o�I,r3�f 3 Bunof 60 0 50 = 1 -4 + apfh2.32' Tiova L�n �h=%466' LL 45 t l I I D jc=�2513-Min 40V- 25 20-//I— -I 1 -4 -� 4- 15-/// 10 — — — 5- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment BP -4: Basin T Runoff = 5.12 cfs @ 12.12 hrs, Volume= 17,251 cf, Depth= 1.88" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 109,957 58 Meadow, non -grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unsaved Kv= 16.1 fas 18.9 1,153 Total Subcatchment BP -4: Basin T Hydrograph ■ Runoff 5.12 cfs 5- Type II 24 -hr 25 -Year Rainfall=6.20" 4 Runoff Area=109,957 sf Runoff Volume=17,251 cf 3 Runoff Depth=1.88" Flow Length=1,153' LL Tc=18.9 min 21 1 CN=58 1A I M 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment DET1: Det 1 Runoff = 19.78 cfs @ 11.98 hrs, Volume= 40,803 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet -T T 1 Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow I C�24 r Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow +- I— 1-26 -furl "n6l l�6.20" } 17 16 Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer t --l RuA�"�'T6,424�sf14 f 155 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' ::1a I I:E n= 0.013 6.5 488 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET1: Det 1 Hydrograph 22 -T T 1 20 19 19.78 cfsyp I C�24 r 18 - 4 + +- I— 1-26 -furl "n6l l�6.20" } 17 16 —1rt t t t --l RuA�"�'T6,424�sf14 f 155 ::1a I I:E YW� T"Olrlicf i 13 12 -1 — — — — Wunoff-Depth= LL 1a i=��vl4en6tri=488' 9 - +- I— 1 1-1 -ITc:6� rain f 8 7rt 6 rt — t- -1 -1 rt - - 5 4 - -T T T 17 -T T Z 3 2 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment DET2: Det -2 Runoff = 49.97 cfs @ 12.01 hrs, Volume= 114,609 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total 0 0 49.97 cfs 1 VA Subcatchment DET2: Det -2 Hydrograph L L I -T -T T 7- I �ype IT24- r 1 25 -Yea% Riinfa11:�6.20" Rynoff area=4P5,g481 sf -R�nc ff Vol�me=114, Ovcf -Ru Yof -Depths . I8" 41" L4nc�h -4,548' I- -I -i T-p=9�3 m i n TN 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment DET3: Det 3 Runoff = 30.21 cfs @ 12.02 hrs, Volume= 73,319 cf, Depth= 3.86" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 10.5 936 Total Subcatchment DET3: Det 3 Hydrograph I 32 30.21 cfs 30-x 0 - 4yp I11--24fi r 28-/ -26 -furl Rai nW W66.2b" 266 24 ' — fZu 0o Are�2Z8,909�f 20 22-Rr�ffyol�mp -73,19-111 18 — — — — Runoff -Depth= -3.86" 0 16 = T T 1 �lawea�gt 936' ,4 TTI -fc=h0-.6 rrtin 12 8 6 I- T T T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment DR -1: DR -1 Runoff = 40.22 cfs @ 11.96 hrs, Volume= 80,549 cf, Depth= 3.86" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -1: DR -1 Hydrogrraaph - 40.22 42 40 cfs■Runoff 4y p� I F�24-�h r 38 36 - — - 7 -T -T -F F:��-�F�a�IR inf ll�6.2 • 34 32 -t + RU00# Areap2�0,493td 26 rt fi t- IR�n9ff-Y°l�� �04�4"! N V 24 �inOffeh.� 0 22 TC -5-.6r i n LL 20 — 18 - 1 -+ I -I 1 1 --4 -+ CIN --t9 16 14 1 rt rt 1 1 1 -t rt t r-12 10 8 - 6 4 1+ +- i 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment DR -2: DR -2 Runoff = 26.04 cfs @ 11.96 hrs, Volume= 52,155 cf, Depth= 3.86" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -2: DR -2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph 28 26 26.04 cfs - �— I y IL24 r ❑Runoff 24 I � � � � I I ��-�F�a�I R�inf�11�6.2��• 22 20-/ - T F F Run� Are�'�,'��f 18 _ 9"�u2,55f 16 c 14 rt Runoff De th=3.86" �T LL 12 + 5J6 r�n 10 g (149 IT 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment Ex -1: Ex WS #1 Runoff = 153.99 cfs @ 12.20 hrs, Volume= 596,369 cf, Depth= 2.41" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN DescriDtion 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non -grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc 4 + 4 � � 1 ype II 24 -hr Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel --2"ear Rainfl 114.20!' 130 120 � Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total ■Runoff Subcatchment Ex -1: Ex WS #1 Hydrograph 170 153.99 160 150 cfs F 1 -4 4 + 4 � � 1 ype II 24 -hr 140 --2"ear Rainfl 114.20!' 130 120 � 1 1 1 1 F1tu�r of IA a=2,973,P9213`f _ 10o -I Bu nIf f Vol1� j — _ 69J d I Runoff-0epth- 4� N 0 80-90- . TIlovy Le�ngih=�4"' 60 50 _ _ -I I��1LI _ I I����I I 40 30 20 10 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment Ex -2: Ex -2 Runoff = 26.28 cfs @ 12.24 hrs, Volume= 112,247 cf, Depth= 2.96" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) L 20.7 150 0.0430 0.12 Sheet Flow, Shallow -2gnp"r"=4�4�31i sf 18 Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 16 0 14 Shallow Concentrated Flow, Shallow fi -rF�lov�r o Ling h 3,43' Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow 10 8 T -F Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' 1 1 1-1-T �N_-�0 n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, + T T- Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total Subcatchment Ex -2: Ex -2 Hydrograph 28 26 26.28 cfs fi ype 11 24 -hr 24 L L L 45 -Ty ea% RiinfaI1;�610" 22 20 -2gnp"r"=4�4�31i sf 18 L L I��"o-�[ fu n th 4 96 f 16 0 14 fi -rF�lov�r o Ling h 3,43' LL 12 -Tc=�305 nen 10 8 T -F F 1 1 1-1-T �N_-�0 4 A + T T- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment Ex -HH: Ex HH Runoff = 24.45 cfs @ 12.26 hrs, Volume= 105,575 cf, Depth= 2.96" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex -HH: Ex HH Hydrograph I L 26 24.45 cfs 24-/ - —I ype 11 24r 22 25 -Yea% Riinfa11:�6.20" 20 Rgngff �r"=4?7,�2Ai of 18 N 16 �� 5,�47c-itf w -Rind epth=2. 6 3 14 L L -0I" Length=4,2�8' 0 LL 12 Tc731A rein 10 -170 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment Ex -PR: (new Subcat) Runoff = 11.40 cfs @ 11.90 hrs, Volume= 18,725 cf, Depth= 1.88" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 119,354 58 Meadow, non -grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex -PR: (new Subcat) Hydrograph ■ Runoff 12 11.40 cfs — iy p� 1f 24--4h r 10 fi t- 1-26 Year RaMM114.210" 9 1 11 1 Fuooff Areap:l19,1541sf 8 —RffYOIi p =8, 25�f 7 Runoff Depth=1.88" 0 6 fi I— �Tc�-0- rr�n LL 1 1 1 1 1 1 1 1 1 (dN=t8 5 4 A -i I L 3 2 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 38 Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 2.78" for 25 -Year event Inflow = 19.78 cfs @ 11.98 hrs, Volume= 40,803 cf Outflow = 15.45 cfs @ 12.03 hrs, Volume= 37,052 cf, Atten= 22%, Lag= 3.2 min Primary = 15.26 cfs @ 12.03 hrs, Volume= 37,029 cf Secondary = 0.19 cfs @ 12.03 hrs, Volume= 24 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.04' @ 12.03 hrs Surf.Area= 5,806 sf Storage= 9,462 cf Plug -Flow detention time= 76.0 min calculated for 37,052 cf (91 % of inflow) Center -of -Mass det. time= 28.2 min ( 866.7 - 838.5 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=15.24 cfs @ 12.03 hrs HW=616.04' (Free Discharge) L1=Culvert (Passes 15.24 cfs of 31.02 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 15.24 cfs @ 3.44 fps) Secondary OutFlow Max=0.17 cfs @ 12.03 hrs HW=616.04' (Free Discharge) L3= Broad -Crested Rectangular Weir (Weir Controls 0.17 cfs @ 0.48 fps) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 39 ■ Inflow E Outflow 0 Primary ❑ Secondary '• • Det '• • ..... • i i •76,42'44f- 22 4— ' • • J. i • • • • • - 1 I oo ■ Inflow E Outflow 0 Primary ❑ Secondary USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 40 Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 2.78" for 25 -Year event Inflow = 49.97 cfs @ 12.01 hrs, Volume= 114,609 cf Outflow = 45.34 cfs @ 12.05 hrs, Volume= 108,782 cf, Atten= 9%, Lag= 2.3 min Primary = 45.34 cfs @ 12.05 hrs, Volume= 108,782 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.26' @ 12.05 hrs Surf.Area= 9,587 sf Storage= 15,719 cf Plug -Flow detention time= 44.2 min calculated for 108,782 cf (95% of inflow) Center -of -Mass det. time= 15.8 min ( 856.8 - 841.1 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=45.31 cfs @ 12.05 hrs HW=595.26' (Free Discharge) LrCulvert (Passes 45.31 cfs of 67.46 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 45.31 cfs @ 3.56 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 41 Pond P-2: Det Pond 2 Hydrograph T t I + 49.97 cfs 55 51 �I I� T T T T T 3!i LL 20 I% ill T T T ■ Inflow Outflow Inflow Are6=496,548 4 lS Se onda rY Peak Elev=595.26' Storage=15,719 cf ����%//////////////////////////////////////////////////////. �I I� T T T T T ����%//////////////////////////////////////////////////////. USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 42 Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 3.86" for 25 -Year event Inflow = 30.21 cfs @ 12.02 hrs, Volume= 73,319 cf Outflow = 25.33 cfs @ 12.08 hrs, Volume= 66,881 cf, Atten= 16%, Lag= 3.4 min Primary = 25.33 cfs @ 12.08 hrs, Volume= 66,881 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.73' @ 12.08 hrs Surf.Area= 10,753 sf Storage= 16,160 cf Plug -Flow detention time= 77.4 min calculated for 66,881 cf (91 % of inflow) Center -of -Mass det. time= 31.3 min ( 847.7 - 816.4 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=25.31 cfs @ 12.08 hrs HW=586.73' (Free Discharge) L1=Culvert (Passes 25.31 cfs of 45.14 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 25.31 cfs @ 3.24 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 43 1 1 i i Pond P-3: Det Pond 3 Hydrograph — i --] T L 30.21 cfs — 1lnile m JLre�=�2 fth f 1 25.33 cfs h i ■ Inflow ■ Outflow ■ Primary ■ Secondary 1 1 1 f �1 L ::POk lEI$v05U.7' 1 L L I I 1 L I I __jSl°rape� ,Ij6"f T L 1-1-1 Z L F T T T F I S T T L III Z L ITIS T Z ITI —T T C L 111 1 L 11 T L I1 1 T T T 111 T TAT T T II T T ■ Inflow ■ Outflow ■ Primary ■ Secondary 1 1 1 USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 44 Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 2.68" for 25 -Year event Inflow = 199.15 cfs @ 12.09 hrs, Volume= 882,742 cf Primary = 199.15 cfs @ 12.09 hrs, Volume= 882,742 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Hydrograph 220 Go ir,I _ ❑Inflow ❑ Primary 210 199.15 cfs - - - - 1 __I __ JJ__� --I 4loTV �e"= i1 200 ,51-0 190-------- 1- 180 170----I-1--1E:EI-1-1- 160 150 140 Imo+ k-1 1 I�+-1 1-1 I-+ 130 N V 120 1--- - rt 3 110 - - 0 100 " 90 T 1 I I 80 — 70 I I + +-I 1 - 60 50 40 30 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 45 Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 2.57" for 25 -Year event Inflow = 170.78 cfs @ 12.14 hrs, Volume= 763,706 cf Primary = 170.78 cfs @ 12.14 hrs, Volume= 763,706 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph L L 190 ❑Inflow ❑ Primary 180 170.78 cfs L L C I I_ Inflow Area=3,569,650 sf 170 160 ILLLCIILLIIL _ 150 140 L L L LI L L L LI L 130 120 ILLLLIIILLLIIIIL N 110- 100 L L 0 90 "80 LSII��LIII� 70.. 60 ' - 50 40 30 20 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 46 Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 2.53" for 25 -Year event Inflow = 202.92 cfs @ 12.21 hrs, Volume= 814,192 cf Primary = 202.92 cfs @ 12.21 hrs, Volume= 814,192 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Hydrograph F11-1 nflow 210r2C2.92 cfs Inflow Area=3,854,747 sf ❑ Primary 200 190 180- 170- 1rt t t� 1 I t t l I 160— 150 " T F 7 -1 T 7 -T 140 N 130 2, 1201 + + -+ 3 110— "71 T" 90 80 70 + 1-1 + 1 1-1 I-+ 60 "" 50 40 30 20 " 10 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment BP -1: BP -1 Runoff = 46.12 cfs @ 12.24 hrs, Volume= 195,033 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non -grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41 % Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 48 Subcatchment BP -1: BP -1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph ❑Runoff 48 46 46.12 cfsl 7 -T T � E e r 44 - - - -+- - - —HT2 — y L — �V� if�nfia �7.n 40 36 1 4 I— — nqf :�LNa =:T5.TI8:Fac N 3o _ E�r�"—O--�:t=:;5 IRLffbhf 28 0 24.42 - I t -+ t I— JI" Cen ih �,6t4' LL 22 20 - -T�" 18 t L C I I I 14 12 1$ _ -�t --L78 4 -I - 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 49 Summary for Subcatchment BP -2: BP -2 Runoff = 123.94 cfs @ 12.20 hrs, Volume= 475,634 cf, Depth= 2.91" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non -grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total 13 12 11 10 80 80 3 70 0 LL 60 40 30 20 10 ' 0 0 Subcatchment BP -2: BP -2 Hydrograph 123.94 cfs ype 1124! hr 60-lfie-f Riin6114-41" R1u n gff_,4rep=45.11531ac Runoff VI o fum 4T5,%?4-I dRunoff ept .91' *Il" Length=�,4"' Tc=25 i3-nein �N-I63 1 -4 4 4- 7 -T F- 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) _ rt r ype 1124! hr 60-lfie-f Riin6114-41" R1u n gff_,4rep=45.11531ac Runoff VI o fum 4T5,%?4-I dRunoff ept .91' *Il" Length=�,4"' Tc=25 i3-nein �N-I63 1 -4 4 4- 7 -T F- 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment BP -4: Basin T Runoff = 6.74 cfs @ 12.12 hrs, Volume= 22,138 cf, Depth= 2.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 109,957 58 Meadow, non -grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unsaved Kv= 16.1 fas 18.9 1,153 Total Subcatchment BP -4: Basin T Hydrograph 6.74 cfs Type II 24 -hr 6 50 -Year Rainfall=7.01" Runoff Area=109,957 sf 5 -Runoff Volume=22,138 cf 4 Runoff Depth=2.42" Flow Length=1,153' LL 3 Tc=18.9 min CN=58 0 1'6 25 30 35 80 85 90 95 0 40 45 50 55 60 65 70 75 Time (hours) ❑ Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 51 Summary for Subcatchment DET1: Det 1 Runoff = 24.31 cfs @ 11.98 hrs, Volume= 50,255 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet 20 RuqoffArea�=tT642440 Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow Runoff-Depth=3.42 - Flow thl=488' ,0 12 Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow PN=08 Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 6.5 488 Total Subcatchment DET1: Det 1 Hydrograph 26 24 24.31 cfs 11t2-4 hr 22 _yp -50-YearAalinfa11=7.011" 20 RuqoffArea�=tT642440 18 T T -R" ff-yol�ur�e-�0,�55Tcf 16 w 14 Runoff-Depth=3.42 - Flow thl=488' ,0 12 e;� -�Tc=6-.� rain 10 PN=08 4 it 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 52 Summary for Subcatchment DET2: Det -2 Runoff = 61.54 cfs @ 12.01 hrs, Volume= 141,159 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total Subcatchment DET2: Det -2 Hydrograph 65 61.54 cfs 60 -� - -I ype 11 24 -hr 55 �I 60 -Yea% Riinfall:7.61" 50 Ry ngff fir" =A 15,;48�Sf 45 w 40 �_ 1-Rr� l `�Qxn'�"'°-e=141�59 II cf uof-Delath�.42 0 35-///I- - -01" Lengih--1,548' il: 30 Tcq--" min 25 20 "=168 15 4- 4 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 53 Summary for Subcatchment DET3: Det 3 Runoff = 35.73 cfs @ 12.02 hrs, Volume= 87,280 cf, Depth= 4.59" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet 38 36 Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow 35.73 34 32 /-1 Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow 2$ - Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer - 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' I��Y°t� m�re7,80 f w 22 n= 0.013 10.5 936 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET3: Det 3 Hydrograph 40 38 36 cfs -Type 11 24 --hr' 35.73 34 32 /-1 1 --j -L -L 13d-Y�arIRAn6114.61 2$ - fZu 0of� Ar ae =-Z8,"9�sf I 24 - I��Y°t� m�re7,80 f w 22 Runoff -Depth -4.59" 20 i= lo�ven- th= 96• I LL 18 16 -fc=A 0-.6 niln I 14 12 -1 4 4 L L --1 4 `_fr` -79 10 8 - 4 4 I 4 I 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 54 Summary for Subcatchment DR -1: DR -1 Runoff = 47.46 cfs @ 11.96 hrs, Volume= 95,887 cf, Depth= 4.59" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -1: DR -1 Hydrograph ❑ Runoff 50 47.46 cfs iyp� 1h`24 -hr 45 56 -Year -I RArII6114.01" 40 Runoff Area=250,4934sf 35 R n ff Yo1unj5,Q"7+cf 30 Runoff Depth=4.59" 0 25�TC�-5 rrn LL20 T -r r bN-=- 9 15 7 T 7- 101 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment DR -2: DR -2 Runoff = 30.73 cfs @ 11.96 hrs, Volume= 62,086 cf, Depth= 4.59" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -2: DR -2 Hydrograph 32 301 28 30.73 cfs { – — — — yp II 24 -hr IJy(j-�F�IRinf117.0.. 26- 24Z J I L Lu p o' I' Area�--Tq2,TWL f 20 rt rt -r 1 � ��� 2'7 f y 18 0 -f t =4.5� Runoff -Depth --4.5-9" � 16 FL 14 T 5. rr�in N C=9 12 10 A I L L I I I A -L I L 8 6t —1 T T F I— 1 —1 7 7 7 T T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 56 Summary for Subcatchment Ex -1: Ex WS #1 Runoff = 195.05 cfs @ 12.20 hrs, Volume= 745,495 cf, Depth= 3.01" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN DescriDtion 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non -grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc cfs I -4 4 - + Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total ■Runoff Subcatchment Ex -1: Ex WS #1 Hydrograph 210 210 4- 195.05 200 190 cfs I -4 4 - + — 4� I ype 1124 �,- fi l AO�e� Reiinf�114.6 r' 180 160 � 1: :EF u jofflA-a=2,9'73,"21-sf 150 140 1301/ - -Ru7o me=745,495 -ef Runoff De���+{{.,�.�fi' 120 - v / 0 100 = -I -4TIlov� Ldngih= 466' LL go-, - jc=2513-M n 80 60 - I�1 1 E E I I ISI :E 40 - 4- 30-/// 20 — — — 10- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 57 Summary for Subcatchment Ex -2: Ex -2 Runoff = 32.36 cfs @ 12.24 hrs, Volume= 137,310 cf, Depth= 3.63" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 28 26 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 � Shallow Concentrated Flow, Shallow � I�I� Rff Iu doff De ' th=3.��f 3 zo 18-I— o Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow -L Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' 12 10O n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, — — —1 — —4 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total Subcatchment Ex -2: Ex -2 Hydrograph 34 32 32.36 cfs -t - t t 1 fi fi y{1e W24 ---hr 30 66=1%f ea�% Ri i n#fa 11:4.'F �$•' 28 26 fr=44,3�'f By°�I_I_ T `T 24 w 22- _ � � � � � � � I�I� Rff Iu doff De ' th=3.��f 3 zo 18-I— o — –0I" L4ngih=�,4A 33 LL 16 14 -L — — — AZ r#—In 12 10O _ _ _ _ 8 6 — — —1 — —4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 58 Summary for Subcatchment Ex -HH: Ex HH Runoff = 30.09 cfs @ 12.26 hrs, Volume= 129,148 cf, Depth= 3.63" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex -HH: Ex HH Hydrograph I L - ❑Runoff 32 30.09 cfs 30Typle "4� r 28T- 68=1%eai' Rainfall:7.61" 26 24 'I 4 4- Rgngff �►r"=4?7,�24isf 22-////l w 20 -Ru-no ep#h=3.6� 0 16 _i rt rt fi — F�1" Lin -h -4,2t- u 14 T T c I3" no 12 8 6 4 t t 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment Ex -PR: (new Subcat) Runoff = 14.69 cfs @ 11.90 hrs, Volume= 24,030 cf, Depth= 2.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 119,354 58 Meadow, non -grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex -PR: (new Subcat) Hydrograph 16 -f4�� ■Runoff 15 14.69 Cfs i � � � i I iyp� 14 13 -7 T T 1i24 -hr Ij-5�6-�Y{ a/�rlRAnffi1Q1 12 + LF QTTOFV � U O tire`. =�",`4-5"f 11 _ 10 n ff- Ot M =! 41 0 d 9Runoff - - TT - De h=2.42" �T 0$ O-.�rr�n v. 71� t t t- I --i -t (N =t8 6 4 3 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 60 Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 3.42" for 50 -Year event Inflow = 24.31 cfs @ 11.98 hrs, Volume= 50,255 cf Outflow = 20.81 cfs @ 12.02 hrs, Volume= 46,505 cf, Atten= 14%, Lag= 2.5 min Primary = 18.62 cfs @ 12.02 hrs, Volume= 45,875 cf Secondary = 2.19 cfs @ 12.02 hrs, Volume= 630 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.20' @ 12.02 hrs Surf.Area= 5,980 sf Storage= 10,395 cf Plug -Flow detention time= 65.0 min calculated for 46,505 cf (93% of inflow) Center -of -Mass det. time= 24.9 min ( 857.4 - 832.5 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=18.61 cfs @ 12.02 hrs HW=616.19' (Free Discharge) L1=Culvert (Passes 18.61 cfs of 31.60 cfs potential flow) L2=Custom Weir/Orifice (Orifice Controls 18.61 cfs @ 3.72 fps) Secondary OutFlow Max=2.17 cfs @ 12.02 hrs HW=616.19' (Free Discharge) L3= Broad -Crested Rectangular Weir (Weir Controls 2.17 cfs @ 1.12 fps) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 61 Pond P-1: Det Pond 1 Hydrograph + �— I � 4 - Inflow Inflow Area=X176,414 sf 26 / 20.81 cfs Peak Elev=616.20' 24- 22 18.62 cfs Storage=10,395 cf 20 18 X16 49cfs 14 2 12T T T 10 4—II-64 i 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) O Inflow O outflow ■ Primary ■ Secondary USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 62 Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 3.42" for 50 -Year event Inflow = 61.54 cfs @ 12.01 hrs, Volume= 141,159 cf Outflow = 56.55 cfs @ 12.05 hrs, Volume= 135,333 cf, Atten= 8%, Lag= 2.1 min Primary = 56.55 cfs @ 12.05 hrs, Volume= 135,333 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.44' @ 12.05 hrs Surf.Area= 9,799 sf Storage= 17,474 cf Plug -Flow detention time= 37.9 min calculated for 135,318 cf (96% of inflow) Center -of -Mass det. time= 14.4 min ( 849.4 - 835.1 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=56.48 cfs @ 12.05 hrs HW=595.44' (Free Discharge) LrCulvert (Passes 56.48 cfs of 68.99 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 56.48 cfs @ 3.79 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 63 ■ Inflow ■ Outflow ■Primary ■Secondary Inflow Are�i=496,6�48--s-f® • ■ -, i • i . I% //////////////////////////////------////////////////////////////////////// ■ Inflow ■ Outflow ■Primary ■Secondary USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 64 Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.85' @ 12.07 hrs Surf.Area= 10,957 sf Storage= 17,489 cf Plug -Flow detention time= 69.5 min calculated for 80,842 cf (93% of inflow) Center -of -Mass det. time= 29.4 min ( 840.9 - 811.4 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=30.62 cfs @ 12.07 hrs HW=586.85' (Free Discharge) L1=Culvert (Passes 30.62 cfs of 45.89 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 30.62 cfs @ 3.33 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 4.59" for 50 -Year event Inflow = 35.73 cfs @ 12.02 hrs, Volume= 87,280 cf Outflow = 30.65 cfs @ 12.07 hrs, Volume= 80,842 cf, Atten= 14%, Lag= 3.2 min Primary = 30.65 cfs @ 12.07 hrs, Volume= 80,842 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.85' @ 12.07 hrs Surf.Area= 10,957 sf Storage= 17,489 cf Plug -Flow detention time= 69.5 min calculated for 80,842 cf (93% of inflow) Center -of -Mass det. time= 29.4 min ( 840.9 - 811.4 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=30.62 cfs @ 12.07 hrs HW=586.85' (Free Discharge) L1=Culvert (Passes 30.62 cfs of 45.89 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 30.62 cfs @ 3.33 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 65 Pond P-3: Det Pond 3 Hydrograph II � II I—I 35.73 cfs — — 4- 1 1 � 40 1- rt 38 Peak Elev=586.85' l� 'In 36 34 30 Rr .65 cfs 32 30 I l rt fi l I-� -r t-- 1-1 -1 rt 28 26 � � IIS � � II � � 24 22 rt , 3 20 ; c 18 LL 16 14 12 10 4- 1 1 � 1 r flow Area=228,009 sf 1- rt fi Peak Elev=586.85' �Stwap--IT,AO"f fi l I l rt fi l I-� -r t-- 1-1 -1 rt III � � IIS � � II � � rt —I T ---------------- ■ Inflow ■ Outflow D Primary ❑ Secondary USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 66 Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 3.31" for 50 -Year event Inflow = 249.95 cfs @ 12.05 hrs, Volume= 1,091,320 cf Primary = 249.95 cfs @ 12.05 hrs, Volume= 1,091,320 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 67 Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 3.19" for 50 -Year event Inflow = 213.97 cfs @ 12.14 hrs, Volume= 948,391 cf Primary = 213.97 cfs @ 12.14 hrs, Volume= 948,391 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Hydrograph E 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) + - ❑Inflow 220213.97 cfs fi fi _ Inflow Area=3,569,650 sf ❑ Primary 210 200 III --T 4- 4 190 180 CIIIIII 170 160 150 I�+��I I�+��I I4 140 N V 130 1 L L I I 3 120 -1 0 110 LL 100 — II II 90 70 60 50 fi fifi 40 30 E 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 68 Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 3.15" for 50 -Year event Inflow = 255.38 cfs @ 12.20 hrs, Volume= 1,011,954 cf Primary = 255.38 cfs @ 12.20 hrs, Volume= 1,011,954 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 69 Summary for Subcatchment BP -1: BP -1 Runoff = 55.85 cfs @ 12.24 hrs, Volume= 234,956 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non -grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41 % Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 70 Subcatchment BP -1: BP -1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph I � � � � � � + + ❑Runoff 60 55 55.85 cfs fi ype 11 24-h r 50 1d0 -Yea% Rainfan4.66" 45 J L L L F unOff �Ar�a 15.7T18Lc 40 �R�nc ff Volum=234,,9!6�cf Runoff�epth=4.12 35 0 30 F�lov�► Lin h--'i,6t4' " 25 I I I I I I I I I jTc�30�1 nfiin I 20 - — - — �N�68 15 t t t 10 5 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 71 Summary for Subcatchment BP -2: BP -2 Runoff = 153.13 cfs @ 12.20 hrs, Volume= 582,036 cf, Depth= 3.56" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non -grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel 4 -kx-010-Yeas Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total E 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment BP -2: BP -2 Hydrograph 170- 153.13 160 150-//_ cfs —I Type 114! hr pe 140 -4 4 -kx-010-Yeas 130 120 _ -1 1 L �Nnpff�mr=�g5�.�531ac 110 �, 100 / -t -F T T- I B� � If ff�e =_ �fr„ 90 3 80 TIlovy L -�h==�4�' ng o LL 70 60 - - -4 4 -k D jc�254 MM —l�=63 40 30 T E 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 72 Summary for Subcatchment BP -4: Basin T Runoff = 8.53 cfs @ 12.12 hrs, Volume= 27,591 cf, Depth= 3.01" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 109,957 58 Meadow, non -grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 18.9 1,153 Total Subcatchment BP -4: Basin T Hydrograph 9 8.53 c01 fs 8 �yp� I 4-frr 1I46 -Y6ar Ralin&IkT8� 7 Runoff Area=109,9571sf 6 Runoff Volume=7,591 Icf 5 Run-off Depth --3.0-V' FtwwILengt]�,=�-16 a 4 Tc=18.0 rr in 3 1 1 1 1 1 1 CIN=58 2-/ 1 I I I i i 1 I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 73 Summary for Subcatchment DET1: Det 1 Runoff = 29.18 cfs @ 11.98 hrs, Volume= 60,542 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' I— Ru qo{. Area --'I76,424�sf r 22 20 n= 0.013 6.5 488 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET1: Det 1 Hydrograph 32 30 29.18 cfs iyp� 28 26 lto�Y��rR�infll7.8" 1124-- it 24 I— Ru qo{. Area --'I76,424�sf r 22 20 I�nn1 fY�0,4 Cf 18 Runoff -Depth= -4.12" 16 _ i Iol Nie; thl=488' LL 14 12 fi t f- -JTc=6-.� rain 10 1 1 1 PN =-15-8 � 8 6 1 1 1 1 4-// + + 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 74 Summary for Subcatchment DET2: Det -2 Runoff = 74.00 cfs @ 12.01 hrs, Volume= 170,054 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet I , 4 4 80 75 7 4.00 cfs Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale 701zrt 65 Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter 4 Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer -1 1 L L 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' 45 n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale - -T Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET2: Det -2 Hydrograph -+t- I , 4 4 80 75 7 4.00 cfs -L I -L L HL241h r 701zrt 65 rt fi I-40 "- ea% Riin&04.8t" 4 -Ryno"r"=AM ;;A Sf 55 50 -1 1 L L I�t7nc "O'u'=��70 .54- cf -Oepth=4. " 45 unof 0 4o - -T T - 41"T �lLnh T,58' LL 35 - T- 25 20 15 10 " 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 75 Summary for Subcatchment DET3: Det 3 Runoff = 41.54 cfs @ 12.02 hrs, Volume= 102,180 cf, Depth= 5.38" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet + _ — Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow � y eH124-hr Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow 1— 1-fi6O=l�re4 RWAM14.96" 338 6 32 Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer E E7 1 ��"���I/ `r � 8�— f w 26 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' 1 - n= 0.013 10.5 936 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET3: Det 3 Hydrograph 46 + _ — 41.54 44 442 cfs 4 � � y eH124-hr 0 1— 1-fi6O=l�re4 RWAM14.96" 338 6 32 � I � E E7 1 ��"���I/ `r � 8�— f w 26 1 - I��luh 5f 3 22 0 -1 rt t fi F v� en# tl ----936' 9 LL20I�����I—I 18 I I�c=ll0 16, 149 12 ,$ _I 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 76 Summary for Subcatchment DR -1: DR -1 Runoff = 55.08 cfs @ 11.96 hrs, Volume= 112,256 cf, Depth= 5.38" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -1: DR -1 Hydrograph ❑ Runoff 55 55.08 cfs � i wry e 124 r 50 1 100 -Yea% Riinfa11=�7.96" 45 1— Rgngff fir"=Z O,93isf 40 1 Rrnc ff Yol�mn 11256 d F 35 Runoff epth=5.38" 0 30 T Tc�=" din LL 25 Y (;N=179 15 10 T T T T T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 77 Summary for Subcatchment DR -2: DR -2 Runoff = 35.66 cfs @ 11.96 hrs, Volume= 72,685 cf, Depth= 5.38" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR -2: DR -2 Hydrograph J � � � � ■Runoff 35.66 cfs — — — — — — — — - I 36 —I _ I-typ W24 --hr 34 32 1 h 0646ar- R,a� nf- 114.66" 30 28 24 - 1 -4 7--- --22 2 2 Runoff-Depth=5.36" Tc -5 in LL 18 16 _ 1 4 1- --t 4 cN=tg 14 10 8 —1 4 + 4 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 78 Summary for Subcatchment Ex -1: Ex WS #1 Runoff = 239.75 cfs @ 12.19 hrs, Volume= 909,251 cf, Depth= 3.67" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN DescriDtion 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non -grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total 1 1 U, 1 3 0 1 LL 1 Subcatchment Ex -1: Ex WS #1 Hydrograph 239.75 cfs I fi -r- 1 -jype 1124! hr L I 160 --Year RainfaII47AV �unlo#IA"a=?,93,Q921-s# -R n7ffVo�llme=9�9,�51__II�f flunoff-bepth=3.6r *Iov� Lengih= 466' Tc=�25 ]3- n) n -I64 1 4 4 7 -T 0 5 10 15 0 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 79 Summary for Subcatchment Ex -2: Ex -2 Runoff = 38.91 cfs @ 12.24 hrs, Volume= 164,476 cf, Depth= 4.34" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 38.91 cfs 20.7 150 0.0430 0.12 Y4 r36} Sheet Flow, Shallow — fi t t---460--Ye4 Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 L Shallow Concentrated Flow, Shallow I 26 --kI��476�f Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow -Runoffel2th 41ov� tin ih=3,4�3' I 20 LL '$ Bot.W=1.00' D=1.00' Z= 3.07' Top.W=7.00' t� -I -T�3" o f 16 1214 n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment Ex -2: Ex -2 Hydrograph 40 38 38.91 cfs Y4 r36} 34 — fi t t---460--Ye4 Riin-fa11*7.96" f 3a Z Z L I 26 --kI��476�f Vlff�j`re�=4i43'ILsf 24 3: 22 0 + -Runoffel2th 41ov� tin ih=3,4�3' I 20 LL '$ 1t t� -I -T�3" o f 16 1214 C 1 0 I 18 I 6 A 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 80 Summary for Subcatchment Ex -HH: Ex HH Runoff = 36.16 cfs @ 12.26 hrs, Volume= 154,699 cf, Depth= 4.34" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet - ype FF24! -h r Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc L Adutea% Rlin-fan47- r 28 Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel 44 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff Subcatchment Ex -HH: Ex HH Hydrograph 40 38 36 36.16 cfs 1 - ype FF24! -h r 34 � 32 L Adutea% Rlin-fan47- r 28 LLL L L L 4�_R"r"=4?7,j24Tsf 44 L L L I� —Riin o�;t=!�,�� flu noe th4 3� f 22 3 20 - -*laver Lin ih k,268' LL 18 14 12O 10 6 T48 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 81 Summary for Subcatchment Ex -PR: (new Subcat) Runoff = 18.32 cfs @ 11.90 hrs, Volume= 29,948 cf, Depth= 3.01" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 119,354 58 Meadow, non -grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex -PR: (new Subcat) 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph —� - - Runoff 19 18 18.32 cfs y I I-24- h r 17 16 fit t- Ind Y6 — R A n6I W7.86" 15 14 - —1-rr— Kul o Ar a p= ' 1 ", j54�Sf 12 1 1 1� E �r9f f- � 9' f 11 -I 11�E Runoff Dep�#h= " AT 010 8 O. 7 6 I 5 4 3 2 1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 82 Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.33' @ 12.02 hrs Surf.Area= 6,129 sf Storage= 11,218 cf Plug -Flow detention time= 57.0 min calculated for 56,792 cf (94% of inflow) Center -of -Mass det. time= 22.8 min ( 849.9 - 827.1 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=20.94 cfs @ 12.02 hrs HW=616.33' (Free Discharge) L1=Culvert (Passes 20.94 cfs of 32.09 cfs potential flow) L2=Custom Weir/Orifice (Orifice Controls 20.94 cfs @ 4.19 fps) Secondary OutFlow Max=4.88 cfs @ 12.02 hrs HW=616.33' (Free Discharge) L3= Broad -Crested Rectangular Weir (Weir Controls 4.88 cfs @ 1.48 fps) Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 4.12" for 100 -Year event Inflow = 29.18 cfs @ 11.98 hrs, Volume= 60,542 cf Outflow = 25.87 cfs @ 12.02 hrs, Volume= 56,792 cf, Atten= 11 %, Lag= 2.2 min Primary = 20.96 cfs @ 12.02 hrs, Volume= 54,964 cf Secondary = 4.91 cfs @ 12.02 hrs, Volume= 1,828 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.33' @ 12.02 hrs Surf.Area= 6,129 sf Storage= 11,218 cf Plug -Flow detention time= 57.0 min calculated for 56,792 cf (94% of inflow) Center -of -Mass det. time= 22.8 min ( 849.9 - 827.1 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83' 24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 610.83'/ 610.58' S=0.0055'/' Cc= 0.900 n=0.013, Flow Area= 3.14 sf #2 Device 1 614.93' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=20.94 cfs @ 12.02 hrs HW=616.33' (Free Discharge) L1=Culvert (Passes 20.94 cfs of 32.09 cfs potential flow) L2=Custom Weir/Orifice (Orifice Controls 20.94 cfs @ 4.19 fps) Secondary OutFlow Max=4.88 cfs @ 12.02 hrs HW=616.33' (Free Discharge) L3= Broad -Crested Rectangular Weir (Weir Controls 4.88 cfs @ 1.48 fps) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 83 Pond P-1: Det Pond 1 Hydrograph LInflow29.18 cfs wi Idol Are '1 / 6���f Pnma dary 32 — – — 3o j 25.87 cfs — 4-- I I —PeOk F-10" .33' 28 i - �5fo—ra—ae r -M 18 -CC -f 26 24 22 20.96 cfs -I I � I I ! I - y 20 / v18 16 0 I-1 L I I-1 T L I I A T LL 14 / 12 I -TSI IST 10 -I-I1LI a 4.91 cfsL I T =F ITT T I T T 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 84 Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.62' @ 12.04 hrs Surf.Area= 10,009 sf Storage= 19,253 cf Plug -Flow detention time= 33.3 min calculated for 164,228 cf (97% of inflow) Center -of -Mass det. time= 13.4 min ( 843.1 - 829.7 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=68.51 cfs @ 12.04 hrs HW=595.62' (Free Discharge) LrCulvert (Passes 68.51 cfs of 70.48 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 68.51 cfs @ 4.02 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 4.12" for 100 -Year event Inflow = 74.00 cfs @ 12.01 hrs, Volume= 170,054 cf Outflow = 68.61 cfs @ 12.04 hrs, Volume= 164,228 cf, Atten= 7%, Lag= 2.0 min Primary = 68.61 cfs @ 12.04 hrs, Volume= 164,228 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.62' @ 12.04 hrs Surf.Area= 10,009 sf Storage= 19,253 cf Plug -Flow detention time= 33.3 min calculated for 164,228 cf (97% of inflow) Center -of -Mass det. time= 13.4 min ( 843.1 - 829.7 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83' 36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 589.83'/ 589.33' S=0.0114'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=68.51 cfs @ 12.04 hrs HW=595.62' (Free Discharge) LrCulvert (Passes 68.51 cfs of 70.48 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 68.51 cfs @ 4.02 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1—Detention R Type // 24 -hr 100- Year Rainfall= 7.86 " Prepared • • • Printed8/15/2017 HydroCADO 10.00-19 s/n 08568 @ 2016 HydroCAD Software Solutions LLC Page 85 • 11 ' •, _ . • . .. • y i 1 �1 I I 1 1 1 1 �1 1 •1 1 :1 •1 USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 86 Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 5.38" for 100 -Year event Inflow = 41.54 cfs @ 12.02 hrs, Volume= 102,180 cf Outflow = 36.36 cfs @ 12.07 hrs, Volume= 95,742 cf, Atten= 12%, Lag= 3.0 min Primary = 36.36 cfs @ 12.07 hrs, Volume= 95,742 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.96' @ 12.07 hrs Surf.Area= 11,146 sf Storage= 18,749 cf Plug -Flow detention time= 63.2 min calculated for 95,742 cf (94% of inflow) Center -of -Mass det. time= 28.0 min ( 834.9 - 807.0 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83' 30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 581.58' S=0.0076'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=36.33 cfs @ 12.07 hrs HW=586.96' (Free Discharge) L1=Culvert (Passes 36.33 cfs of 46.58 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 36.33 cfs @ 3.44 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 87 ■ Inflow E Outflow 0 Primary ❑ Secondary Vnho'wi • Peak • • • • • • i • jr %i - I j% ///////////////////////////------//////////////////////////////------ ■ Inflow E Outflow 0 Primary ❑ Secondary USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 88 Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 4.00" for 100 -Year event Inflow = 305.36 cfs @ 12.05 hrs, Volume= 1,318,695 cf Primary = 305.36 cfs @ 12.05 hrs, Volume= 1,318,695 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 89 Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 3.87" for 100 -Year event Inflow = 260.68 cfs @ 12.14 hrs, Volume= 1,150,268 cf Primary = 260.68 cfs @ 12.14 hrs, Volume= 1,150,268 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS1_Detention R Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 90 Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 3.82" for 100 -Year event Inflow = 312.43 cfs @ 12.20 hrs, Volume= 1,228,426 cf Primary = 312.43 cfs @ 12.20 hrs, Volume= 1,228,426 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph ❑ Inflow Primary 340EI 312.43 cfs —� — 320 Inflow Area=3,854,747 sf 300 1- 280 -I 260 AT -L1: TT 240 220 T T T T I 7 T T T I in 200 X180 T T F1 T T T F1 T 0 160 140 TTT I ITTTI I I IT 120 Tt�I I I�Tt- I I I IA 100 0 - -4T - 6 60 4n 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Ex -3 Ex W #3 Ex -4 Ex -4 XCP2 XCP2 Subcat Reach on Link ODR -3 DET -4 BP -3 O D -3 Det 4 P-4 Det Pond 4 ZCP CP2 USI Revision WS2-Detention Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 2 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 DET -4 0.00 0.00 333.0 0.0100 0.013 24.0 0.0 0.0 2 P-4 581.83 580.95 58.8 0.0150 0.013 36.0 0.0 0.0 USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment BP -3: Runoff = 102.87 cfs @ 12.65 hrs, Volume= 737,137 cf, Depth= 1.71" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN DescriDtion 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non -grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet - Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 - Shallow Concentrated Flow, Shallow Conc L2 Ype I41 -r 90 - Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Runoffot -77 _37 cf Iv w 65 0 601 0 55 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 4 1 1 I Ic7 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total ■Runoff Subcatchment BP -3: Hydrograph 115 - 110 105 100 102.87 cfs -- - - L2 Ype I41 -r 90 - fi t 1- 1 �IIU= 4�e I� Inflall .2� ' 80-Fur�o#IAra--,17,71�f 75 70 1 Runoffot -77 _37 cf Iv w 65 0 601 0 55 Runoff epth-4. Ti"Ling-fh=�2�2' LL 50 45 4 1 1 I Ic7 30 20 15 10 - - - 5 / 0 0 5 10 15 20 25 30 35 40 45 50 Time (hours) 55 60 65 70 75 80 85 90 95 ■Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment DET -4: Det 4 Runoff = 40.89 cfs @ 12.04 hrs, Volume= 103,287 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet 4 4- -k- 44 40 cfs Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow 01 36 _ Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow - Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer fi 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' 24 0 22 —1 ::1 J n= 0.013 11.7 827 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET -4: Det 4 Hydrograph 4 4- -k- 44 40 cfs — T Yr 0.89 01 36 _ 'W2r4- —�l - e$f �l�ll�5.20n 3� - Iqngffj►re=61212sf 30 28 w 26 fi I�� 1 °=9�387�cf -Ru -no 2.�" 24 0 22 —1 ::1 J I L� Wftz E F�w�e�gtY�-8iT 18 14 --1- - - t--_ 711Q 12 10 _ 6 4 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment DR -3: DR -3 Runoff = 30.75 cfs @ 11.97 hrs, Volume= 59,943 cf, Depth= 2.02" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff Subcatchment DR -3: DR -3 Hydrograph 34 32 30.75 30 cfs { — -Yyp� II 24 -hr _ 28d-aF�a� Rinf115.2�• 26 24 -1 1 L L L goOpff Area�=�5,POLf 1 1Rrq�Yo1 �"9,"f 222 0 18 R �ff�T� .ir�in 0 16 5� LL 14 C�N=68 12 10 11 A-1 1 L L LI I I A -L I L 6' I-1 -1 T 1-1-1 7 7 7 T T - 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment Ex -3: Ex WS #3 Runoff = 96.35 cfs @ 12.65 hrs, Volume= 703,872 cf, Depth= 1.64" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non -grazed, HSG C 118.450 63 Weighted Average 118.450 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 100 95 Sheet Flow, Sheet - hype 11'24 -hr Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 E I Shallow Concentrated Flow, Shallow Conc 85 Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow -R f o me=703, 2_I-ef Runoff Lt.6e F 55 o - - -t Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 -rt- l l l l I je�8 J- � 40 30 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 - Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total ■ Runoff Subcatchment Ex -3: Ex WS #3 Hydrograph 105 100 95 96.35 cfs - hype 11'24 -hr 90 85 -1 -T T E I I :AIO-.Yea-f "nf6ll:i�&&' 85 Iu1n f . rem -1' 8 0 70 66 -R f o me=703, 2_I-ef Runoff Lt.6e F 55 o - - -t -+ + -Depth Tlovy Lein glfh=�;2k' 50 LL 45 / - -trt -rt- l l l l I je�8 J- � 40 30 ::1 Z I� I 11�� T IS I 25 20-//- 0 - - 15 1 10 - 4 5- 0-, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment Ex -4: Ex -4 Runoff = 14.43 cfs @ 12.41 hrs, Volume= 91,449 cf, Depth= 1.08" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.20" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, Bot.W=5.00' D=2.00' Z= 6.07' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex -4: Ex -4 Hydrograph 16- 15-/ 615 14.43 cfs 144yI24 r 13 10 Y�arIRiinfill 5l& 12 -r t —Runoff- krep=1,014,""f 11 10 R7nc�f�/ol�ue--�91,49f w 9 - Runoff -Depth= -1.08" U 3 8 f W Le --4,7 il LL 7 6 -tc �9� mein 5 �PN=-�5 4 3 F 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 8 Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 2.02" for 10 -Year event Inflow = 40.89 cfs @ 12.04 hrs, Volume= 103,287 cf Outflow = 36.74 cfs @ 12.09 hrs, Volume= 95,642 cf, Atten= 10%, Lag= 2.7 min Primary = 36.74 cfs @ 12.09 hrs, Volume= 95,642 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.94' @ 12.09 hrs Surf.Area= 10,274 sf Storage= 16,625 cf Plug -Flow detention time= 60.3 min calculated for 95,642 cf (93% of inflow) Center -of -Mass det. time= 20.7 min ( 873.3 - 852.6 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83' 36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 580.95' S=0.0150'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=36.69 cfs @ 12.09 hrs HW=586.94' (Free Discharge) L1=Culvert (Passes 36.69 cfs of 64.62 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 36.69 cfs @ 3.20 fps) te3 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cal Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 9 ■ Inflow ■ Outflow ■ Primary ■ Secondary '• • Det '• • ..... 40.89 cfs 4- • 42 1- 1 -Pe-OkIE10"50.94 40 • n • 36 34 32 30 28 24 o 18 16 12 x /////////////////////////////////////////// ////////////////////////////////////////////////////////////////////////////// ■ Inflow ■ Outflow ■ Primary ■ Secondary USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 10 Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 1.75" for 10 -Year event Inflow = 110.30 cfs @ 12.65 hrs, Volume= 892,722 cf Primary = 110.30 cfs @ 12.65 hrs, Volume= 892,722 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph 1 1 -4 - ❑ Inflow EIPrimary 110.30 120- 115 cfs —I Inflow Area=6,135,229 sf 110 - — 105 -1t t� I I l t l l 100 95 90 1 + 1-1 -4+ 1 1-1 85 I LI I TSI I I I� 780 5 3 60 55 50 -1-4+ 1 1 I���I I I� 45 40 35 30 - - - - - -VIII- 20 _ 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 10 -Year Rainfall=5.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 11 Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 1.55" for 10 -Year event Inflow = 108.18 cfs @ 12.59 hrs, Volume= 795,321 cf Primary = 108.18 cfs @ 12.59 hrs, Volume= 795,321 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph I L L— I I - F11-1 nflow ❑ Primary 1os.1s cfs „0 _ Inflow Area=6,174,630 sf 105 I�T��11I��� 100 95 85 80 75 n 70 65 3 60 ° 55 LL50—t+��I I—f I� 45 40 II 35I 30 - - - - II- 20 _ 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment BP -3: Runoff = 149.78 cfs @ 12.65 hrs, Volume= 1,036,461 cf, Depth= 2.41" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN DescriDtion 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non -grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 - Sheet Flow, Sheet T I 125--1Ye* RiainfaI14.2V' _4 4 Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 L Shallow Concentrated Flow, Shallow Conc Runoff Voiume 1,036,461- f I I -Runoff- IDe�h�2.�V - T T Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 7. &nji n Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total 16 15 14 13 12 11 10 w v 9 0 8 LL Subcatchment BP -3: Hydrograph -f -F -y T T ISI 111"24 -hr - T I 125--1Ye* RiainfaI14.2V' _4 4 1_ I Ru�of Ar a775,1167,W Sf -1 L L L Runoff Voiume 1,036,461- f I I -Runoff- IDe�h�2.�V - T T I I -f 16* Length 15,Z�T 7. &nji n ==$I, 1 51 1 1 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment DET -4: Det 4 Runoff = 56.52 cfs @ 12.04 hrs, Volume= 141,683 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET -4: Det 4 Hydrograph V 60 56.52 cfs 55 ype 11 24 -hr 50 25-Yeai• Riinall6." 45 Rgngff �j►re�=6�12,�121 sf 40 R n ff Yol mMpth-=2.787"141, 83 cf 35 F Rluno, 0 30 I- I— — —Flaw Length=827' "25 Tc711jMin 20 �N 68 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment DR -3: DR -3 Runoff = 42.17 cfs @ 11.96 hrs, Volume= 82,226 cf, Depth= 2.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR -3: DR -3 Hydrograph Runoff 42.17 44 42 cfs - I I I t L C I I I F�24-�h r 40 38 -y - 1 A 4 + 4 I— 1-26 -furl RaWf " 114.26 36 34 t t-�- RUAr"�=3�5,P"f 32 30 28 - 1 rgTyo-�"2,�26-f 24 Runoff-Depth=2.7$•• 22 - I 1 - - - - - 1 1 1 1 -T C56 n�M- _0 LL 20T:T7� 18 GTN�8 16 14 - 12 10 17 -T 7 L L 1 I71 a T -E 8 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment Ex -3: Ex WS #3 Runoff = 141.96 cfs @ 12.60 hrs, Volume= 996,367 cf, Depth= 2.32" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non -grazed, HSG C 118.450 63 Weighted Average 118.450 I I I I ype 1124 hr 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet I I I I ype 1124 hr 130 --4 Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 -1 Shallow Concentrated Flow, Shallow Conc T 7- f � RuInD rea�l 18. r mo' I 100 90 - Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 A Shallow Concentrated Flow, Shallow T L I I -FlI" L�ngih=�2�2' 70 U- 60 1 Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 4 - 4- �N 163 40 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 1 L 20 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total ■Runoff Subcatchment Ex -3: Ex WS #3 Hydrograph 150141.96 140 cfs I I I I ype 1124 hr 130 --4 -4- --2"ea# Rainfa114.20!' 120 110 � -1 7 T 7- f � RuInD rea�l 18. r mo' I 100 90 - T T -Rrnolff- o� 9916,�7--II d1 Runoff -Depth 2.32" w o $° ' -� A T T L I I -FlI" L�ngih=�2�2' 70 U- 60 1 T T T 1 1 Tc758.1tn" 1 50 4 - 4- �N 163 40 30 1 L 20 10 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment Ex -4: Ex -4 Runoff = 23.98 cfs @ 12.41 hrs, Volume= 138,207 cf, Depth= 1.63" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 25 -Year Rainfall=6.20" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, Bot.W=5.00' D=2.00' Z= 6.07' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex -4: Ex -4 Hydrograph 26 23.98 cfs 24-//// Type 124 -hr 22 -//25 -Yea% Rainfa11;i6.20" 20 Runoff Arpa=1,014 GA Sf 16 Runoff Volume=1� 8�O7�I cf 16 -Rutnoff-bepth=1.63" w - 14- - 4 -f I" Lengih x,74-1' 3 12 10 Tc=,3%x2 n#n l l "-5 6 1 12030 41 4 1 5 5 0 61 0 :1 90 95 ❑Runoff USI Revision WS2-Detention Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 17 Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 2.78" for 25 -Year event Inflow = 56.52 cfs @ 12.04 hrs, Volume= 141,683 cf Outflow = 52.07 cfs @ 12.08 hrs, Volume= 134,037 cf, Atten= 8%, Lag= 2.4 min Primary = 52.07 cfs @ 12.08 hrs, Volume= 134,037 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.19' @ 12.08 hrs Surf.Area= 10,620 sf Storage= 19,244 cf Plug -Flow detention time= 47.0 min calculated for 134,024 cf (95% of inflow) Center -of -Mass det. time= 17.0 min ( 860.3 - 843.3 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83' 36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 580.95' S=0.0150'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=52.04 cfs @ 12.08 hrs HW=587.19' (Free Discharge) L1=Culvert (Passes 52.04 cfs of 66.83 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 52.04 cfs @ 3.60 fps) te3 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS2-Detention Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 18 Pond P-4: Det Pond 4 Hydrograph L I L 56.52 cfS ■El Inflmow ' Inflow Area=612,6'12-sf E Outflow ❑ Se onda ry 60 52.07 cfs Peak Elev=587.19' 55 / — —I Storage=19,244 cf 50 45 40 X w 35 ° ° 30 / L L_ 11 LL 25:/ / -1 -J- t— I --t t 2():// ////////////////////////////////////// iiiii%////////////////////////////////////////////////////////////////////// USI Revision WS2-Detention Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 19 Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 2.45" for 25 -Year event Inflow = 159.65 cfs @ 12.59 hrs, Volume= 1,252,724 cf Primary = 159.65 cfs @ 12.59 hrs, Volume= 1,252,724 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph I- T L II ❑Inflow 170 159.65 cfs T T L Inflow Area=6,135,229 ❑ Primary 160 _ sf 150 ITTTTI 1 1 T - 140 130 ITTTT I ITTTT I IT 120 I�Tfi�I I�rt�l1 1 Irt 110 N 100 I�Tfi�III�T��III� 3900 80 " I T��I I�TI I I IA 70 70 60 50 40�- 30 gn 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type// 24 -hr 25 -Year Rainfall=6.20" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 20 Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 2.20" for 25 -Year event Inflow = 161.70 cfs @ 12.59 hrs, Volume= 1,134,573 cf Primary = 161.70 cfs @ 12.59 hrs, Volume= 1,134,573 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs N V 3 0 LL Link XCP2: XCP2 Hydrograph ii 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment BP -3: Runoff = 190.21 cfs @ 12.65 hrs, Volume= 1,295,633 cf, Depth= 3.01" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN DescriDtion 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non -grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc Length Slope (min) (feet) (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total Subcatchment BP -3: Hydrograph � + I t- I -� -� t t- 210 ■Runoff 20900 190.21 cfs I -T� y� I12 V 180 170-'/ - 1 15&--1Ye4r Rlainfall*7.OT' 50 - - 4 4 � ea 5,167, 87- 140 - Runoff Volme=11,2J5,I633-£# 130 k 1 w 120 unoff De h�.61" 100 -I - - - I Io* L n91th= 2 ' o - LL 90 80 l 1 rt T t- l 11 I I7 60 / J� I� I I I 1 1 -1 -L -L L- 50 40 -4 4- I 1 A 4 4- 30 20 - 4 - - 10 / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment DET -4: Det 4 Runoff = 69.73 cfs @ 12.04 hrs, Volume= 174,505 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet 75 70-, cfs Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow 65 Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow J T Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 1 t 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' R�nc�ff�C�ol�m=74,505 cf kr w 3 40 n= 0.013 11.7 827 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff Subcatchment DET -4: Det 4 Hydrograph 75 70-, cfs hype W24� r 69.73 65 60- eai• Rainfal[:4.61" � 60 55 J T T L nQ 50 N 45 1 t R�nc�ff�C�ol�m=74,505 cf kr w 3 40 u-off-bepth�3.�" - Flaw-Length=8�7' 35 30 1-1 TI T - n -I c=11 j Win 25 t// I� _ — 8 20 15 T T L 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment DR -3: DR -3 Runoff = 51.78 cfs @ 11.96 hrs, Volume= 101,274 cf, Depth= 3.42" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct N V 3 0 LL Subcatchment DR -3: DR -3 Hydrograph 51.78 cfs 10 W T _I I —i -�y4e U 244 --hr 60=Yea% Fain-falC2�7.61- F- T- -Rgngff Area=355,-�3�sf -Rr� �yoh 374J2 f ep# 4 I I Ti=S.IO n� in I A 4 X46$ T T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑Runoff USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment Ex -3: Ex WS #3 Runoff = 182.01 cfs @ 12.59 hrs, Volume= 1,250,502 cf, Depth= 2.91" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non -grazed, HSG C 118.450 63 Weighted Average 118.450 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 200 1990- 0 / Sheet Flow, Sheet _ � I y 11 24-�- Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 -I Shallow Concentrated Flow, Shallow � - ►r"=1� 8.�501ae 130 -:runoff Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Z I L: I I- --Run�off�De�h--L2.�t' 110 a 100 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total ■Runoff Subcatchment Ex -3: Ex WS #3 Hydrograph 1 200 1990- 0 / 182.01 cfs _ � I y 11 24-�- 160 15"=1Ye-a r Rfiainfa1W7.0V' 150 -t -I T � - ►r"=1� 8.�501ae 130 -:runoff Rlungff, Volume -1,250,502 120 Z I L: I I- --Run�off�De�h--L2.�t' 110 a 100 I -Flog Unglth 14,2 2' 80-/ Tc=58 mm, � I63 60 -4 4 4 4- 50 40 30 � 20 - 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment Ex -4: Ex -4 Runoff = 32.62 cfs @ 12.41 hrs, Volume= 180,171 cf, Depth= 2.13" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 50 -Year Rainfall=7.01" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet - Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Runoffs Arga=1,014,QA8�sf Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, - lour L�ngih=�,7�1' Bot.W=5.00' D=2.00' Z= 6.07' Top.W=29.00' —I T T T —To�� Win n= 0.035 Earth, dense weeds 39.2 3,721 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment Ex -4: Ex -4 Hydrograph 36 T 34-32.62 32 cfs T T ype 1L24 --hr - 1 -4 4 -60 --Yea% R i nfa I W7.61VI 28 26 Runoffs Arga=1,014,QA8�sf 24 22 Runoff -V f Runoffuepth=2.13" 20 0 18--I - lour L�ngih=�,7�1' 16 —I T T T —To�� Win 12 10 — T T T -' — T -T 8 6 TT T T T 4-// � — 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 50 -Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 26 Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 3.42" for 50 -Year event Inflow = 69.73 cfs @ 12.04 hrs, Volume= 174,505 cf Outflow = 64.80 cfs @ 12.08 hrs, Volume= 166,860 cf, Atten= 7%, Lag= 2.3 min Primary = 64.80 cfs @ 12.08 hrs, Volume= 166,860 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.38' @ 12.08 hrs Surf.Area= 10,852 sf Storage= 21,277 cf Plug -Flow detention time= 40.3 min calculated for 166,842 cf (96% of inflow) Center -of -Mass det. time= 15.4 min ( 852.7 - 837.3 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83' 36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 580.95' S=0.0150'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=64.73 cfs @ 12.08 hrs HW=587.37' (Free Discharge) L1=Culvert (Passes 64.73 cfs of 68.45 cfs potential flow) L2=Custom Weir/Orifice (Weir Controls 64.73 cfs @ 3.87 fps) te3 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS2-Detention Type 1124 -hr 50- Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 27 ■ Inflow ■ Outflow ■ Primary ■ Secondary '• • �- '• • _ 1 / 1 i 1 I% //////////////////////AO A--////////------ 1 1 1 1 1 1 .1 1 SI •1 ■ Inflow ■ Outflow ■ Primary ■ Secondary USI Revision WS2-Detention Type 1124 -hr 50 -Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 28 Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 3.06" for 50 -Year event Inflow = 202.45 cfs @ 12.59 hrs, Volume= 1,563,767 cf Primary = 202.45 cfs @ 12.59 hrs, Volume= 1,563,767 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 Hydrograph ❑ Inflow ❑Primary 220 210 202.45 cfs Inflow Area=6,135,229 sf 200 190 — 180 — 170 t t 160 150 140 -Z:7FI I -1T77FI I 7 -T N 130 120 -f + I I + I I -+3 110 i—°° 100 171 T T F- 71 T 7 E 90 80 70 �-I I I + I 1-1 I4 60 FOCII���� 450 0 30 iu 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 50 -Year Rainfall= 7. 01 " Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 29 Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 2.78" for 50 -Year event Inflow = 208.34 cfs @ 12.59 hrs, Volume= 1,430,673 cf Primary = 208.34 cfs @ 12.59 hrs, Volume= 1,430,673 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Hydrograph + ± _ ❑Inflow 230 220 208.34 cfs 1 Inflow Area= 6 174 630_sf ❑ Primary 210 i - 7 7 200 � tt- I I t I� 190 180 170 1-4 1 1 -- 4��I � I� 160 I t fiVI I t t- I I I Irt _1150 40 130 21 120 1 -4 -4 c 110 LL 100 - + - - - + - 90 80 I -4 -4 4- 60 + + 40 30 i 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment BP -3: Runoff = 234.32 cfs @ 12.64 hrs, Volume= 1,580,233 cf, Depth= 3.67" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN DescriDtion 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non -grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet - Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc -iy� I 41 p�. 220 Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 -44 Shallow Concentrated Flow, Shallow + I I-10O-Yeir Rainfall*.W' iso _ Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Runoff Vol urne:--1,S80,233-e# Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 w a 130 -4 4 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total ■Runoff Subcatchment BP -3: Hydrograph 260 - 250 230 230 234.32 cfs - -iy� I 41 p�. 220 210 - -44 + I I-10O-Yeir Rainfall*.W' iso _ 170 -!'''7'7 Runoff Vol urne:--1,S80,233-e# 160 150 50 fi �u� ff-tDe�th-".�' w a 130 -4 4 1- f log v Length -O -,2$T 0120 LL -57f& min : `T`7 1 00 90 60 50 - -t-++ f- 11 1-+ i I- 40- 20 - - - - / 10 0- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment DET -4: Det 4 Runoff = 83.96 cfs @ 12.04 hrs, Volume= 210,226 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet 90 85 cfs Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow 80 75 Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow _ Z Z Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer — 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' w 50 n= 0.013 11.7 827 Total 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff Subcatchment DET -4: Det 4 Hydrograph 90 85 cfs -�y�e ft�24 h r 83.96 80 75 -1 1 L L L- 1 -466 -Yea% Fiinfa11;17.9670- " 65 _ Z Z L �qrrarff�j►re�=6�1212�sf 60j/ 55 _ — _Y � O,� 6�cf 11 — -Rurroepth= w 50 .1-2 c 45 FJs�wengtY--837' LL 40 35 rt n* 30 p 25 20 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment DR -3: DR -3 Runoff = 62.10 cfs @ 11.96 hrs, Volume= 122,005 cf, Depth= 4.12" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR -3: DR -3 Hydrograph 65 60 62.10 I cfs - -�y4e U 24 -hr ❑Runoff 55 1100 -Yea% Resin-fa11�7.86" 503O�sf 45 y 40 - R n ff of m 1 2&05 d - I_ � of�eRth=4. " — -Ru 335 IT5I01 0 25 20 15 + 10 5 T T F T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment Ex -3: Ex WS #3 Runoff = 225.90 cfs @ 12.59 hrs, Volume= 1,530,246 cf, Depth= 3.56" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non -grazed, HSG C 118.450 63 Weighted Average 118.450 -1- 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 26.5 232 0.0200 0.15 Sheet Flow, Sheet Z -1- L _ i i -, -LL 220 Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc 200 - Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 - - Shallow Concentrated Flow, Shallow fi M� f r = 01C61 I Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Runoff Volume=1 X50 - 1 - 4 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total ■Runoff Subcatchment Ex -3: Ex WS #3 Hydrograph 250 Z -1- L _ i i -, -LL 220 225.90 cfs _ -t 4 + I -+ �y� 1 �4 � 200 - -10(PY"r R�airfall4.W' 190 180 - - - - fi M� f r = 01C61 I 17o - Runoff Volume=1 X50 - 1 - 4 4 1 �u`noff-Dep h=3.�F w 140 - 130 I L I I I --FlOr Lng 0 120 LL 110 100 -4 -L �C 4 � IS I 90 80 60 t t t- l 1 1 1 fi 1 450 0 30 20 - J -L 4- / 10 10 0 0--5' 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■Runoff USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall= 7.86 " Prepared by Cardno Printed 8/15/2017 HydroCADO 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment Ex -4: Ex -4 Runoff = 42.35 cfs @ 12.38 hrs, Volume= 227,418 cf, Depth= 2.69" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24 -hr 100 -Year Rainfall=7.86" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet I u9offII'A" ,014 r -r �8 Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow 24 0 22 41" L� gih �,7i1' Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, --4 -4� 12 10 Bot.W=5.00' D=2.00' Z= 6.07' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex -4: Ex -4 Hydrograph 46 � � � ■Runoff 44 42 42.35 cfs - fi ? IF24-hr 38 y� I -400-Yea% Rainfal14.86" 36 3432 I u9offII'A" ,014 r -r �8 I� �� � =2 7�1f w 26 —Rano th=2 24 0 22 41" L� gih �,7i1' ` 18 18 J2 -L L — — — — -JC r iirl 16 14 --4 -4� 12 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 35 Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.69' @ 12.09 hrs Surf.Area= 11,233 sf Storage= 24,710 cf Plug -Flow detention time= 35.5 min calculated for 202,581 cf (96% of inflow) Center -of -Mass det. time= 14.4 min ( 846.3 - 832.0 ) Volume Invert Avail.Storage Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 4.12" for 100 -Year event Inflow = 83.96 cfs @ 12.04 hrs, Volume= 210,226 cf Outflow = 71.04 cfs @ 12.09 hrs, Volume= 202,581 cf, Atten= 15%, Lag= 3.5 min Primary = 71.04 cfs @ 12.09 hrs, Volume= 202,581 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.69' @ 12.09 hrs Surf.Area= 11,233 sf Storage= 24,710 cf Plug -Flow detention time= 35.5 min calculated for 202,581 cf (96% of inflow) Center -of -Mass det. time= 14.4 min ( 846.3 - 832.0 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq -ft) (%) (cubic -feet) (cubic -feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83' 36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 581.83'/ 580.95' S=0.0150'/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00' 10.0' long x 11.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=71.03 cfs @ 12.09 hrs HW=587.69' (Free Discharge) L1=Culvert (Inlet Controls 71.03 cfs @ 10.05 fps) L2=Custom Weir/Orifice (Passes 71.03 cfs of 87.50 cfs potential flow) te3 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) USI Revision WS2-Detention Type 1124 -hr 100-YearRainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD@10.00-19 s/n08568 @2016 HydroCAD Software Solutions LLC Page 36 83 cfS — — — — — — — — — — - InhOwIAre�=&12,M2--S-f 71 IA-ciQj Peak Elev=587.69' Storage=24,7-1 O-cf 11 :E E I --I L I I I 4- 1-1 -4 t t t T T- 1-1 -1 T --------------- 2�! 101, %1 -i Ip" 01 $ 2�! 0110 ;01?� I u 5 - I.-' I ------------ -1 1111 USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 37 Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 3.73" for 100 -Year event Inflow = 249.22 cfs @ 12.59 hrs, Volume= 1,904,819 cf Primary = 249.22 cfs @ 12.59 hrs, Volume= 1,904,819 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary USI Revision WS2-Detention Type 1124 -hr 100 -Year Rainfall=7.86" Prepared by Cardno Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 @2016 HydroCAD Software Solutions LLC Page 38 Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 3.42" for 100 -Year event Inflow = 259.65 cfs @ 12.59 hrs, Volume= 1,757,664 cf Primary = 259.65 cfs @ 12.59 hrs, Volume= 1,757,664 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) F11-1 nflow ❑ Primary August 15, 2017 Mr. Robert D. Patterson, PE North Carolina Department of Environmental Quality Storm Water Permitting Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, INC 27699-1612 Re: Response to Comments —Addington Crossing Subdivision - Permit No. SW3170304 Mr. Patterson: carucina Shaping the Future Cardno is pleased to provide the attached Addendum No. 3 to the Storm Water Management Plan for Addington Crossing Subdivision. The addendum includes a response to comments provided by your office dated June 26, 2017. The comments from the above referenced letter have been reproduced below and addressed as follows: 1. Provide the missing signed and sealed cover page for the supplement form. An original copy of the signed supplement form has been provided as an attachment to this correspondence. 2. Provide the missing signed and notarized cover page for the O&M agreement to show the revision from the dry basins to bioretention cells. An original copy of the signed and notarized O&M agreement has been provided as an attachment to this correspondence. 3. Revise the DA sizes in part IV.10 on SWU-101 to be consistent with the calculations. The drainage area sizes have been revised. A copy of the revised SWU-101 form has been provided as an attachment to this correspondence. 4. Provide a soils report that shows the SHWT elevations at each SCM per bioretention M DC1. A copy of the original geotechnical letter detailing the SHWT levels have been included as an attachment to this correspondence. 5. Revise C-509-512 to specify "washed" stone for around the underdrains. The details have been revised as requested. 9800 Southern Pine Boulevard Suite I Charlotte, North Carolina 28273 Phone (704)927-9700 Fax (980) 422-0938 vmv.cardno.conn V�O Cardna Shaping the Fulure Page 2 August 15, 2017 In addition to the response to comments above, several items related to the SWMP have been revised. These revisions were based upon feedback from other review entities. These revisions include the following: • Minor revisions have been made to the proposed basin maps to adjust a couple of areas not being routed correctly. There were also a couple of revisions to the Tc values for several basins. The revisions are as follows: - Increased Basin A due to bypass Swale. - Decreased Basin E due to bypass Swale. - Adjusted the Tc of Basin E due to there no longer being channel flowjust before the basin and also due to the reduction in basin area. - Adjusted the Tc of Basin L due to there no longer being channel flow just before the basin. • Detention calculations have been revised to show the volume of the pond beginning at ground level and disregarding the media storage volume as well as the volume of the rock berm separating the forebay. The effects from exfiltration and underdrains have also been disregarded. • There have been several storm drain inlets that have been added to the project to help reduce several areas of high spread. • The twin 60 inch culvert crossing has been revised to reflect the change in hydrology mentioned above. If you have any questions or need any additional information pertaining to the response to comments, please do not hesitate to contact me. Since "ert Cash, PE Project Manager Cardno (NC) Inc. Enclosures 5 m J a L0 0 0 ( N 0- E c DET 1 AREA DATA WATERSHED (WS) WS AREA (AC) CN TC AREA E 4.05 68.00 1.17 TOTAL 4.05 68.00 6.50 DET 2 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA I 11.38 68.00 1.17 TOTAL 11.38 68.00 9.30 DET 3 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA L 5.23 68.00 1.17 TOTAL 5.23 79.00 10.50 BYPASS 1 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA B 10.42 68.00 1.17 AREA C 5.30 68.00 79.00 TOTAL 15.72 68.00 30.10 BYPASS 2 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA A 41.86 63.00 1.17 AREA K 3.19 63.00 79.00 TOTAL 45.05 63.00 25.30 DIRECT RELEASE 1 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN AREA D 1.42 79.00 AREA F 1.17 79.00 AREA G 0.74 79.00 AREA J 2.42 79.00 TOTAL 5.75 79.00 DIRECT RELEASE 2 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN AREA H 0.96 79.00 AREA M 0.79 79.00 AREA N 1.98 79.00 TOTAL 3.72 79.00 BYPASS 4 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA T 2.53 58.00 18.90 TOTAL 2.53 58.00 18.90 COMPARISON PRE TO POST DEVELOPMENT CONCENTRATION Q25 (CfS) Q100 (cfs) CONCENTRATION Q25 (Cfs) Q100 (cfs) POINT (WS) o 0 N POINT (WS) z o -c U) XCP1 202.92 312.43 CP1 197.72 309.74 XCP2 161.70 259.65 CP2 163.56 254.79 o Q J U �Q� N/A N/A CP3 (CULVERT ONLY) 178.06 280.14 TOTAL RUNOFF 364.62 572.08 TOTAL RUNOFF 361.28 564.53 (XCP1+XCP2) (CP1+CP2) TC=19.7 MINS-- j EX POND \ S3CHANNEL � NAGE ` - v \ 1 \ \ \ V \ \ \ V A 1 \ FLOW (2) �� X EN AR 7' 150 K OY -��U E R \ �`\ s_� - "'z \ - -- l �/ /l �% �✓ \ �l l 18 7 �v /Z- 2zp�tisso 3 / CP2 163.6/254.8 E -AR PRICE MIL DE 3 REEK �\ 1 �%� \_ SHA LOW CONC W G�( VA - - ET FL W (PAV \< A I� \\L� =118' L=96' D T3 TC=7.2 MINS T I I E CHAN DIRECT ( s / - 6' RELEA 2 1 I I I V I I I I I r�\ \ \ \ / /i V A � DET3 / -SHA W CONC PE DRAT bpi DRAINAGE AREA Y \ FLOW A y ' \ I I \ 1 I \I \ \ \ ( o BYPASS 2 /UNPAVED) L -A3 (DE 3) / \ 97.7/309.7 A1-74 \ -- A I \ I I I \ I I I I / A v �% CHANNEL FLOW I 1 I A/ \_� fit -MINS DRAINAGE BYPASS 3 TC=4.2 MINS \ AREA K \ BYPASS \ =-T SS 1 CHANNEL FLOW -IEET FLOW \ \ - - L-232 / l l �'V� 1 �� - - / �P�AINA - - I v ` , TC#.3 MINS P3 ,-26.5 MINS o / \ /\ / / \/ \ , \ \ /- - - r / / % Jf�TERMITTEN / --- ii/ - _ - DRAINAGE AREA A � ^ _ _ - - -- � ,� RISDIGTIO��i_- - \\ ---- i -moi \ - ,NAGE L v v v v v - N - -- ,- yyA'D DRAINAGE BYPASS 2 SHALLOW CONC. / / / / ` - \L - - - - - - _ BA1 - AREA H - / /�_ �\ - FLOW / -- - � � - � �HANPIEL --- L=1162/// / // / V / -V� _ �� TC= .1 MINS," / / �\ `� i'-0 SIVA-LL-O W- �> �i�- �L_=1.9)i5�� DRAINAGE �FtOW A � - -DET R N 1 � � TC=3.8 MINS AREAL ' \ \ PACED) � ` V P HANNECt 140' MIN TAN L \ -- \\ \ `�DET 1S� ET 7-_� v v v F OW v \ \ \= 50' \ D T 1) L - TC 4.1 MIN 1 I \\\ 1 I I MIN / EH BYPASS2 T2S \ V l \ \ I) / v NC F SHEET FLOW 1 PIPE v PAVED I \ \ I NPAVE ( ) I I \ / � I � B ASS \ \ ) � , I D IP 1 \ \ \ L= 150' \ \ I / 7 - I j \ I / CH�1NN L L = 154 I I TC=15 MINS / INS ARE 1 I I o M TC NEM I I I I I I I ( I NS BYPAss CHANN 1 V I I \ L = 199' � � � �RAINgGE BYP'A+ - -_ ET FL UV / ------/INV=sz76/�%� _ - -_T_ _ - _\---- _PO E - -- - - - - - - -- --- - I o I \ \ \ \ \ _ / \\_624s \ \ TT RRDSf� 1357 A I I v v \ v v v y TC=2O 7� MIN N ( I - \ \ V v (60 Pl1BLI R/w - - - - - - - -- / v v v �v B 4 v \ �O�"TER RD �R 35�T I EX.1 RCP \ \ �I \ \\ v T OW - - \- \(�5' �U�LaC �Nv =�60 \ \ \ \ BYPASS L \ \\ \� \ \ �// �1�30� E .130' ffUKE ENERGY \ \ I \ \ ( I I I INV 602.2 SHALLOW CONC:A\ v � T =� . MINS - � � � DB 2311PPG 171 \ � �B�30,PG1s �FLOW co o \ \ \ -DET 2SgETL=766' \TC=5.7 MINS O A5 100'DRAINA E AREA B QW CON --FLOW, - j- 0TP-13.5 MINS 1003' TC= .O-MINS r , \-A-I - \\\\'_------ \ V A I I I I1 v I \ 1 I 1 \ I ! -_-� // / / A \ \�v `' -�`� -� /� v v�� _ �� I// I/ I I I I I A\ ------ -- LEGEND BYPASS AREA DETENTION POND 1 DETENTION POND 3 DIRECT RELEASE AREA DETENTION POND 2 DETENTION POND 4 0 75 150 300 1 INCH =150 FEET o C5 L 0 LL N Lu Iz: 00 � � � o 0 N . N> z o -c U) J J 0 =)0 - 0 W0LL W o zoo Y z , 0=LCN J � p -J Q o O ~ o Q J U �Q� U F-� CO Lu >4 O Q Z J � W0 Or- < U Q � 0 � Z F m z ::D O ~ C/) Z 0 0 W of Z Q U Z U w Q 0 fooO~ O���rr�� Q v II_- V W z J w 0 C!1 0 0 Uj Q Lu 0- Q U m z Lu 0 U Lu Y M a w 0 o_ 0 z Lu 0 0 a ti Lu o N t 0 ol 0'0 N C ARo�•97/27/2017 X00.-,7•Ess/o* SEAL 9%*7 ' ' 033448 = ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 107/27/2017 DRAWN I HK DESIGNED I JW CHECKED I RC PROJECT # I CALATL1603 SHEET TITLE POST STORMWATER TRIBUTARY MAP (WS1) SHEET NUMBER 2/5 0 ( a Jul DET 4 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA P 14.06 AREA O 1.85 TOTAL 14.06 68.00 11.70 BYPASS 3 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN TC AREA R 113.70 AREA O 1.85 AREA S 4.92 8.16 68 TOTAL 118.62 64.00 57.80 DIRECT RELEASE 3 AREA DATA WATERSHED (WS) WS TOTAL AREA (AC) CN AREA O 6.32 Q100 (cfs) AREA O 1.85 c�� o 0 � N TOTAL 8.16 68 COMPARISON PRE TO POST DEVELOPMENT CONCENTRATION Q25 (cfs) Q100 (cfs) CONCENTRATION Q25 (cfs) Q100 (cfs) POINT (WS) � c�� o 0 � N POINT (WS) � C�1 N > Z o U) XCP1 202.92 312.43 CP1 197.72 309.74 XCP2 161.70 259.65 CP2 163.56 254.79 O Q J U OR N/A N/A CP3 (CULVERT ONLY) 178.06 280.14 TOTAL RUNOFF Lu TOTAL RUNOFF T (XCP1+XCP2) 364.62 572.08 (CP1+CP2) 361.28 564.53 - \\\\ \ z,/// / / / /� \\ \ \ c, LQ,oys LD/ 640 FLOODWAIk\ DRAINAGE � / / / \ DRAINAGE ARE / \ AREA Q YEAR IFEI �Oo IN RCP INV 608.35 -1-DET4 S CHURCH RDS 13 6 /---` AA WCONC H OW v v \ o FLOW 3 // - - - ----- 21 DRAINAGE AREA R - - - R \\ FL\OW7 _MINS -"24 /_ff � \ / \ V A / \ \ ET FLOW i ----- - / / / /-- _-----_ - - \ - 0' \ _PD /� �\ t AG APIZ- -V l / / 7 \ A,iV / --7- -_SAAA - v BYPASS 3 _ SHALLOW CONC CFiANNEL-FLOW - \ ��\w - - I v� 6$ 0 SaY_ \ - --0y / D (UNPAVED�vAA TC=4_.5-MINS \ A \ TC=19.7 MINS- , A 7- B S 3 CHANNEL NAGE VAAI v \ 1 FLOW (2) 1 71 All VA 150 KEENEf� fl \ \ v v BYPASS3 \ 1 I J / / I I V // / / I I �- \ 1 o I I o ( DB23oP1 SHALLOW CONC v\\VA vv v --- \ FLOW (PAVED) I / � / / / \ / // // � / ✓ \ v / -- � -- I I / - � A� � � �/\ V v �-� � v � - � v // \_ �/ TC=49MINS / / / ��/ / / - \v\� - �\ 1 I / / / I I ��� - / / v v v \ _ v� r� ���v v_ CP2 63.6/254.8 \QIAGE- A PRICE MILL DE 3 v REEK �\ SHA LOW CONC W \ VA \ EET FL W (PAV < X D T 3 11 o \ = 118' L = 96' \ I/ I / TC=7.2 MINS T I E CHAN DIRECT I O RELEA 2 / r�� v V v v / �/� ��° --/ � \ DET 3 bpi \�I/ !A SHALL w coNc DRAIN, \ 1 A A i DRAINAGE AREA Y FLOW AREA / v---- PAV_lV[EETtD BYPASS 2 - (DET3i) 19 7.7/3 9.7 11111111111111111111000000 CHANNELFLOW L L=2174' ------------------- TC- r1 -MINS DRAINAGE 1 AREA KTC=42 MINIS BYPASS SHEETFLOW BYPASS 1 CHANNEL FLOW (1) LL=232' - / Iv v v \ PP�A� 3�MINS CP3 TC=26.5 MINS A I�ERMITTN SUM �l bR\AINAGE AREA A \ / v \ 'DJill \ I-BYPASS�L / I I I / �_� ��/�_ / - / �/ _� - \ -_ _ \ DRAINAGE \\ \ \\ \ \ \ \\ \ \\\ A A \ I I I S�IALLOW CONC./ / / I � � -=/�� - � � � � - � _ _� _ _ BY�A��i - -- FLOW / / / / / / / /�� - _v A� _ - -- �--AREA H �F#ANNEL F OW --- L = 1162' --L=1162' XC=�1 MI -NS -D LOE-=-1,965' 1 ' / �/ - _ SH tVif > r, - r`DRAINAGE NCFLO \\ DET / /� TC=3.8MINSAREA G (U1IPAVEQ�_\ _ lg�HRRfNFI 11 All, I i / LEGEND BYPASS AREA DETENTION POND 1 DETENTION POND 3 DIRECT RELEASE AREA DETENTION POND 2 DETENTION POND 4 0 75 150 300 1 INCH =150 FEET o C5 L 0 N Lu iz: CO � c�� o 0 � N C co � C�1 N > Z o U) J J 0. -D 0 O W0LL LL1 Io Z O Q� Z , O=LCN J � p 0 o O Q J U OR Lu >4 :� T N J O W Of Q U Q � 0 � Z F C� ZD z m z o C! U (n) C/) ' z or- p O W of Q U Z U w O 0Loo O Q v ���rr�� F V W z J w O 0 Q w 01 Q U m z Lu 0 U Lu Y M 0 Lu 0 O C' 0 Z w U) o a ti Lu o N L0 0 \ N CAR ""97/27/2017 ....... �o , of Es � s/o�•• SEAL 17 033448 = �C ROBERT L. CASH, P.E. NC LICENSE No. 033448 DATE 107/27/2017 DRAWN I HK DESIGNED I JW CHECKED IRC PROJECT # CALATL1603 SHEET TITLE POST STORMWATER TRIBUTARY MAP (WS2) SHEET NUMBER 3/5 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Catawba River basin. 4. Total Property Area: 103.66 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:103.66 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 11 % 9. How many drainage areas does the project have? (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Receiving Stream Name Price Mill Creek Price Mill Creek Price Mill Creek Price Mill Creek Stream Class * C C C C Stream Index Number * 11-138-2-2 11-138-2-2 11-138-2-2 11-138-2-2 Total Drainage Area (sf) 176,424 495,548 228,009 612,612 On-site Drainage Area (so 176,424 495,548 228,009 612,612 Off-site Drainage Area (so Proposed Impervious Area** (sf) 35,995 101,090 46,470 124,900 % Impervious Area** total 20% 20% 20% 20% Impervious' Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 On-site Buildings/Lots (so 18,100 52,657 24,185 64,827 On-site Streets (sf) 13,225 35,792 16,469 44,394 On-site Parking (sf) On-site Sidewalks (so 4,670 12,641 5,816 15,679 Other on-site (sf) Future (sf) Off-site (so Existing BUA*** (sf) 0 0 0 1 0 Total (so: 35,995 101,090 46,470 1 124,900 * Stream Class and Index Number can be determined at: http.aortal.ncdenr.orglweblwq&slcsulclassiflcations Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 TO NCDEQ Attn: Robert D. Patterson, PE 1612 Mail Service Center Raleigh, NC 27699 Cardno Shaping the Future 9800 Southern Pine Blvd, Suite I Charlotte, NC 28273 (704) 927-9700 FAX (704) 529-3272 TRANSMITTAL DATE: 08/15/17 1PROJECT: CALATL1603 ATTENTION: Robert Patterson RE: Addington Crossing Construction Documents 07/27/2017 Addington Crossing Revised sheets C-509 to C-512 WE ARE SENDING YOU ® Attached Via ® 1st Class Mail/FedEx ❑ Overnight ❑ Courier ❑ Prints ❑ Shop Drawings ❑ Change Order * Plans ❑ Samples ❑ Specifications ❑ Sketches ❑ Letter ❑ CD/Diskettes ❑ Agreement ® Report ❑ Permits ❑ Pick-up the following items: ❑ Mylars ❑ Scope of Services COPIES DATE DESCRIPTION 2 07/27/2017 Addington Crossing Revised sheets C-509 to C-512 1 07/27/2017 Post Stormwater Tributary Map (WS1 & WS2) Sheets 2/5 & 3/5 1 08/11/2017 Comment Response Letter 1 08/11/2017 O&M Form signed sheet 1 08/11/2017 SSW-SWU-1 01 -Application with revised DAs 1 08/15/2017 Revised HydroCAD reports THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ For your information ❑ No exception taken ❑ For your use ❑ Submit copies for distribution ❑ Revise and resubmit ❑ As requested ❑ Return corrected ❑ Rejected ® For review and comment ❑ REMARKS: COPY TO: file SIGNED: If enclosures are not as noted, please notify us at once. W:\CalAtlan6cTotter Road\Communication\Transmittals\Transmittal_NCDEQ_RP_2017-08-11.docx Revised: December 2016 ATLANTIC COAST PIPELINE PROJECT CONTRACTOR YARDS - FAYETTEVILLE REGION CUMBERLAND COUNTY, NORTH CAROLINA EROSION & SEDIMENT CONTROL PLAN PROJECT CONTACTS 00" , i Dominion Energy CR) OWNER/APPLICANT DOMINION ENERGY TRANSMISSION, INC. 5000 DOMINION BOULEVARD GLEN ALLEN, VA 23060 PHONE: 804-335-4923 ERM NC, INC. CONSULTANT ERM NC, INC. LICENSE #F-1223 15720 BRIZHAM HILL AVENUE, SUITE 120 CHARLOTTE, NORTH CAROLINA 28277 SCOTT ROBINSON, PE 704-541-8345 scott.robinson@erm.com EXISTING INFORMATION SOURCES CONTOURS AND BASE MAP PROVIDED BY 13 CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON 24"X36" SHEETS FOR REDUCTIONS, REFER TO GRAPHIC SCALE. THE PLANS HAVE BEEN CREATED FOR FULL COLOR PLOTTING, AND SET OF THE PLANS THAT IS NOT PLOTTED IN FULL COLOR SHALL NOT BE CONSIDERED ADEQUATE FOR CONSTRUCTION PURPOSES. ***WARNING"** INFORMATION MAY BE LOST IN COPYING AND/OR GRAY SCALE PLOTTING. NORTH CAROLINA SHEET INDEX 0 1 08/04/2017 SHEET 1 - COVER SHEET 1*- 1 08/04/2017 SHEET 2 -FAYETTEVILLE (SP10_CY SPR10-A) AERIAL OVERVIEW *1 1 08/04/2017 SHEET 3 - FAYETTEVILLE (SP10_CY SPR10-A) ESCP 0 1 08/04/2017 SHEET 4 - ESCP NOTES 0. 1 08/04/2017 SHEET 5 - ESCP DETAILS 0 1 08/04/2017 SHEET 6 - ESCP DETAILS 1 08/04/2017 SHEET 7 - ESCP DETAILS DRAWING INDEX LEGEND F FILLED CIRCLE INDICATES DRAWING INCLUDED WITHIN THIS ISSUE MOST RECENT REVISION NUMBER F MOST RECENT ISSUE OR REVISION DATE 6 - X/XX/201X SHEET X - SHEET TITLE LOCATION MAP • f •" 4 1 _ t4�•�_- f 0410 f �'� _ S"� se :}��. °C iS ' rr .4 ` I{I - W • r i • r • « - � T ,_ ; -• Yt, r rr �- y • - � avi Irm,.. 66 � t � '± I1 { � � # � � r1� •� a ; . y Fr.r• rye` .i .war.. r r i r .... �� � • s r S}• fM�• f ♦ x�+.{ y + i +..*����'♦r� it ! �! - �� yti M • h,•,r�ar i� f'R' —1 ��� f �� S • !r i• �T VVV w r � � _� _ . � 't i _� .. .7 fes " ,A4 t• Q a _ 4�,? iyr .4, 14 •fir «r � r, j jr f7p .. I{ r • j • r h -�! ♦.. ••ais r •R: u• •*.r-•- +. ; I - ._r_�S1r- •� 4 i#• SHEETS all 9 r{ y? - - , - " !( r • t1. r�'„r' '+•?' rte• \ ` , -46V 16 T iw : •+ ^''♦ate," y - "�''' -►� ,ti Lr. a _. -' % - •�.. a�iI '� s'`�'••- � �• a r �• • . � 1 i '; .. r � r r fir • ..rte+ •. - . r .w- fir.. ♦. ;I. :. + •`' .�' r+ aM* � �fc • � �; � �� kl }� • +rte+� �.^ •• I ' i##iGd�. JF��'11F.��erl� 1.x_4 `� ~ - � *� i I �� f F • t }�+ 5^71 + i 1 pe Aw { i■ c x �f • x �� "••� ter, y� -3om - ;ell Jb --�� +++ tm . �!i�' y :� • +. 'fir ;�'-- cern I of AN varm � / `'KiT1T�'9�[�t� �r ■ � • -rte �i�} - .� r 1 •�• f Locki Creek ' a _ ,i=ce ` I♦ ��• - ch •f�t L C r _ 4 • •� k . = 1; = 2,000 FEET c- WHEN PRINTED FULL SIZE • r # ,- 1 4,004570ode h 1 _ i \ G. OSTS TRAILERS 11 1 - 1 1 3� 11 TRUE NORTH �A E POSTS S i t LAT35"02'8 327" — N * \\\ LON 78.4920r ZONE X 200 0 100 200 Ali I � ►� -�- IIII�IIII � i I / 1 E Q U I P M E N T L E G E N D LIMITS OF CONSTRUCTION $ UTILITY POLE \\ \ \GA / // // LIMITS OF DISTURBANCE E GUY ANCHOR GP # TI O GUY POLE CONTRACTOR YARD LIMITS M E OVERHEAD ELECTRIC LINE ® UTILITY VALVE t ■ � UNDERGROUND GAS LINE 0 LM LINE MARKER � I FENCE POST - - TS DITCH TEST STAND A 1 _ ft STREAM -TBM TEMPORARY BENCH MARK Ap # _ FLOW ARROW __--1000 ------ CONTOUR 4b • * Ew.. 0 11e WETLAND i ® FUEL TANK AREA (25'x 250') TRAILER (24'x 60') STORAGE UNITS TOP SOIL SEGREGATION AREA t .. GRAVEL AREA. GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. A FlLtrr��� , 1. CONTOURS AND BASE MAP PROVIDED BY 13 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. O ERM NC, INC. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 03/10/17 NJB ISSUED FOR REVIEW ti� �Q` ,. � 5�' f r License xham 3 Atlantic Coast Pipeline LLC 15720 Brixham Hill Ave, Suite 120 2. DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. A 08/04/17 WTS ISSUED FOR REVIEWIC - ERM Charlotte, NC 28277 (704) 541-8345 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 3. NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO - RAWN: NJB 08/04/17 PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. = TITLE: 4. DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO 0 � � W CHECKED: _ - ATLANTIC COAST PIPELINE CONTROL MEASURES ARE SPECIFIED. , ,•�� 4 APP. FORBID: FAYETTEVI LLE CONTRACTOR YARD AERIAL OVERVIEW APP. FOR CONST.: DISTRICT. - COUNTY: STATE: GROUP DWG. NO. REV. CUMBERLAND NC rf A . � B� +�`� SCALE: AS NOTED DIWFILE: ACP\North Carolina\ — 2 O F 7 EX. 18" CULVERT 6' 08 COSTS � Q � I i i i i i i i i ROCK CONSTRUCTION ENTRANCE (REF. SHEET 5) e GA TOPSOIL SEGREGATION (1.6 ACRES) SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) TS NC ST ATE $I GltWA Y 24 TRAILERS GA C W > GRAVEL PARKING LOT W (11.3 ACRES) DIVERSION SWALE (REF. SHEET 6) �v o DIVERSION SWALE C ' (REF. SHEET 6) ,'' PROP. 18" CULVERT & OUTLET PROTECTION \S Jy GATE POSTS ��'/ / s S�0 \(� \ LAT:35°02'38.27" \ l I LON:78°49'20.7146" y GRAVEL PARKING LOT (6.7 ACRES) y DIVERSION SWALE ♦ ! '' (REF. SHEET 6) ' y 'F' PROP. (2) 18" CULVE ♦ & OUTLET PROTECTI >J low ,,' (REF. SHEET 6) --G - E Q U I P M E N T y I I II wcuc 051e I I I I I I ;I I I ,I I OUTLET PROTECTION (REF. SHEET 6) e / \ \/ TOPSOIL SEGREGATION (2.0 ACRES) / SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) UNNAMED TRIBUTARY EK LOCKS CRE T NIA SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) y y y TRUE NORTH -I V- 100 0 50 100 I I I I I I I I I L EG E N D LIMITS OF CONSTRUCTION (40.8 ACRES) $ UTILITY POLE C LIMITS OF DISTURBANCE GAE GUY ANCHOR (39.4 ACRES) — — — — CONTRACTOR YARD LIMITS 0 GUY POLE E OVERHEAD ELECTRIC LINE ® UTILITY VALVE UNDERGROUND GAS LINE • LM LINE MARKER FENCE o POST TS DITCH TEST STAND -TBM TEMPORARY BENCH MARK STREAM —__--1000------ CONTOUR FLOW ARROW wcuc 051e WETLAND ROCK CONSTRUCTION ENTRANCE (OR APPROVED ALT.) ® FUEL TANK AREA (25'x 250') OUTLET PROTECTION TRAILER (24'x 60') I PROPOSED DIVERSION SWALE ® JI TOP SOIL SEGREGATION AREA ��•Q�T� GRAVEL AREA. PROPOSED COMPOST FILTER SOCK OR SILT FENCE GA TOPSOIL SEGREGATION (1.6 ACRES) SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) TS NC ST ATE $I GltWA Y 24 TRAILERS GA C W > GRAVEL PARKING LOT W (11.3 ACRES) DIVERSION SWALE (REF. SHEET 6) �v o DIVERSION SWALE C ' (REF. SHEET 6) ,'' PROP. 18" CULVERT & OUTLET PROTECTION \S Jy GATE POSTS ��'/ / s S�0 \(� \ LAT:35°02'38.27" \ l I LON:78°49'20.7146" y GRAVEL PARKING LOT (6.7 ACRES) y DIVERSION SWALE ♦ ! '' (REF. SHEET 6) ' y 'F' PROP. (2) 18" CULVE ♦ & OUTLET PROTECTI >J low ,,' (REF. SHEET 6) --G - E Q U I P M E N T y I I II wcuc 051e I I I I I I ;I I I ,I I OUTLET PROTECTION (REF. SHEET 6) e / \ \/ TOPSOIL SEGREGATION (2.0 ACRES) / SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) UNNAMED TRIBUTARY EK LOCKS CRE T NIA SUPER SILT FENCE OR STACKED 18 -INCH CFS (REF. SHEET 7) y y y TRUE NORTH -I V- 100 0 50 100 I I I I I I I I I L EG E N D GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. * ��t� ; "S faE 11 i�r , 1. CONTOURS AND BASE MAP PROVIDED BY 13 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. �� \A CARO ' r ERM NC, INC. Atlantic Coast Pipeline LLC THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. �0 03/10/17 NJB ISSUED FOR REVIEW �ti .''' r License #F-1223 15720 Brixham Hill Ave, Suite 120 2. DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. A 08/04/17 WTS ISSUED FOR REVIEW Vit. ' = ERM Charlotte, NC 28277 (704) 541-8345 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 3. NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO f RAWN: NJB 08/04/17 PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. - 4. DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO Q w CHECKED: _ _ TITLE: ATLANTIC COAST PIPELINE CONTROL MEASURES ARE SPECIFIED. �',, APP. FORBID: FAYETTEVI LLE CONTRACTOR YARD ESCP CUMBERLAND NC GROUP DWG. NO. REV. \ ,\� APP. FOR CONST.: DISTRICT: - COUNTY: STATE: SCALE: DIR/FILE: ACP�NOrtil Car011nB� — 3 O F 7 AS NOTED LIMITS OF CONSTRUCTION (40.8 ACRES) $ UTILITY POLE C LIMITS OF DISTURBANCE GAE GUY ANCHOR (39.4 ACRES) — — — — CONTRACTOR YARD LIMITS 0 GUY POLE E OVERHEAD ELECTRIC LINE ® UTILITY VALVE UNDERGROUND GAS LINE • LM LINE MARKER FENCE o POST TS DITCH TEST STAND -TBM TEMPORARY BENCH MARK STREAM —__--1000------ CONTOUR FLOW ARROW wcuc 051e WETLAND ROCK CONSTRUCTION ENTRANCE (OR APPROVED ALT.) ® FUEL TANK AREA (25'x 250') OUTLET PROTECTION TRAILER (24'x 60') PROPOSED CULVERT PROPOSED DIVERSION SWALE ® STORAGE UNITS TOP SOIL SEGREGATION AREA ��•Q�T� GRAVEL AREA. PROPOSED COMPOST FILTER SOCK OR SILT FENCE GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. * ��t� ; "S faE 11 i�r , 1. CONTOURS AND BASE MAP PROVIDED BY 13 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. �� \A CARO ' r ERM NC, INC. Atlantic Coast Pipeline LLC THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. �0 03/10/17 NJB ISSUED FOR REVIEW �ti .''' r License #F-1223 15720 Brixham Hill Ave, Suite 120 2. DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. A 08/04/17 WTS ISSUED FOR REVIEW Vit. ' = ERM Charlotte, NC 28277 (704) 541-8345 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 3. NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO f RAWN: NJB 08/04/17 PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. - 4. DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO Q w CHECKED: _ _ TITLE: ATLANTIC COAST PIPELINE CONTROL MEASURES ARE SPECIFIED. �',, APP. FORBID: FAYETTEVI LLE CONTRACTOR YARD ESCP CUMBERLAND NC GROUP DWG. NO. REV. \ ,\� APP. FOR CONST.: DISTRICT: - COUNTY: STATE: SCALE: DIR/FILE: ACP�NOrtil Car011nB� — 3 O F 7 AS NOTED EROSION AND SEDIMENT CONTROL PLAN NARRATIVE THE EROSION AND SEDIMENT (E&S) CONTROL MEASURES FOR THE PIPELINE CONSTRUCTION ACTIVITIES PRIMARILY CONSIST OF BUT ARE NOT LIMITED TO COMPOST FILTER SOCK, BELTED SILT RETENTION FENCE, SUPER SILT FENCE, SLOPE BREAKERS, AND TEMPORARY AND PERMANENT SEEDING AND MULCHING. BEST MANAGEMENT PRACTICES (BMP) SPECIFICATIONS FOR THE E&S CONTROL PLAN (E&SCP) ARE TO BE UTILIZED BY THE CONSTRUCTION CONTRACTOR ACCORDING TO THE PROVIDED PLAN. GENERAL CONSTRUCTION NOTES: 1. DISCHARGING SEDIMENT LADEN WATER WHICH WILL CAUSE OR CONTRIBUTE TO THE DEGRADATION OF A BENEFICIAL USE OF A WATER OF THE STATE FROM THE CONSTRUCTION SITE, A DEWATERING SITE, OR SEDIMENT BASINTRAP INTO ANY SURFACE WATER WITHOUT FILTRATION OR EQUIVALENT TREATMENT IS PROHIBITED. 2. THE DISCHARGER SHALL AMEND THE EROSION & SEDIMENT CONTROL PLAN WHENEVER THERE IS A CHANGE IN THE CONSTRUCTION OR OPERATIONS, WHICH MAY EFFECT THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER. 3. DISCHARGES ORIGINATING FROM OFF-SITE SOURCES, WHICH FLOW THROUGH OR ACROSS THE AREAS DISTURBED BY CONSTRUCTION, MAY BE DIVERTED AROUND THE ACTIVE CONSTRUCTION AREA WHENEVER POSSIBLE. 4. PERFORM PERMANENT OR TEMPORARY SOIL STABILIZATION WITHIN 7 DAYS WHEN SITE IS AT FINAL GRADE AND ON SITES THAT ARE NOT AT FINAL GRADE, BUT WILL REMAIN DORMANT FOR MORE THAN 14 DAYS. 5. DUE TO VARYING SITE CONDITIONS, ADDITIONAL SEDIMENT CONTROL BMPS MAY BE NECESSARY BEYOND THE MEASURES SHOWN ON THE E&S CONTROL PLAN. 6. STAGING AREAS, ASSEMBLY AREAS, TEMPORARY EQUIPMENT AND NON -HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATED OUTSIDE 100 -YR FLOOD ZONES. HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATED AT LEAST 100 FEET BACK FROM SURFACE WATER BODIES. 7. EQUIPMENT STORAGE IN CONSTRUCTION STAGING AREAS SHALL BE LOCATED A MINIMUM OF 100 FEET AWAY FROM WETLAND EDGE. 8. AT MINIMUM, ALL BMPS ARE TO BE INSPECTED ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 -INCH PER 24-HOUR PERIOD DURING THE ENTIRE PROJECT. A WRITTEN REPORT MUST ALSO BE COMPLETED, DOCUMENTING EACH INSPECTION AND, IF NECESSARY, ANY REPAIR, REPLACEMENT OR MAINTENANCE ACTIVITY. 9. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING FACILITY SHOWN ON THE DRAWINGS, AND ANY OTHER WHICH IS NOT ON RECORD OR NOT SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL POTHOLE EXISTING UTILITIES AT THE POINTS OF CONNECTION AND ALL UTILITY CROSSINGS TO DETERMINE EXACT LOCATIONS PRIOR TO THE START OF WORK. ANY DISCREPANCIES BETWEEN THESE DRAWINGS AND EXISTING CONDITIONS SHALL BE REPORTED TO THE ENGINEER OF RECORD IMMEDIATELY. 10. ALL WORK WITHIN A PUBLIC RIGHT-OF-WAY SHALL BE COORDINATED WITH THE AGENCY HAVING JURISDICTION. 11. ALL REQUIRED PERMITS MUST BE OBTAINED PRIOR TO STARTING WORK. 12. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION, STABILIZATION AND MAINTENANCE OF ALL EXISTING AND PROPOSED SITE EROSION & SEDIMENTATION CONTROL DEVICES AND FACILITIES. 13. THE CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING EROSION & SEDIMENTATION DEVICES AND SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD THE ENGINEER OF RECORD HARMLESS OF ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ENGINEER OF RECORD. 14. AS SITE SPECIFIC CONDITIONS MAY WARRANT, THE E&SC PLAN MAY REQUIRE MINOR MODIFICATIONS TO ENSURE PROPER PROTECTION OF RECEIVING WATERS. THE RESPECTIVE PROJECT ENVIRONMENTAL INSPECTOR (EI) WILL IDENTIFY SITE SPECIFIC AREAS WHERE A CERTAIN BMP MODIFICATION(S) IS NECESSARY TO EITHER OMIT OR ENHANCE BMPS IN SUCH AREAS. THIS PROCESS ENTAILS THE EI TO IDENTIFY LOCATIONS WHERE BMPS WILL NEED TO BE ALTERED, SUBSTITUTED OR OMITTED AND CONTACT THE DOMINION GAS COMPLIANCE SPECIALIST TO REVIEW PROPOSED CHANGES. UPON REVIEW AND APPROVAL BY THE DOMINION COMPLIANCE SPECIALIST, THE EI WILL REDLINE, DATE, AND SIGN THE E&SCP DRAWING(S) DEPICTING THE REDLINE CHANGE(S). ONCE THIS PROCESS IS COMPLETED, THE EI WILL NOTIFY NCDEQ OF SUCH MINOR MODIFICATION REDLINE AMENDMENTS AS REQUIRED BY THE GENERAL PERMIT. BMP INSTALLATION AND REMOVAL SEQUENCE SEQUENCE OF CONSTRUCTION EROSION AND SEDIMENTATION. THE CONTRACTOR MAY DEVIATE SLIGHTLY FROM THE STAGING OF PERMANENT SITE STABILIZATION TIMEFRAMES 1. A PRE -CONSTRUCTION MEETING SHOULD TAKE PLACE PRIOR TO START OF CONSTRUCTION ACTIVITIES. PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS 2. BEGIN CLEARING AND GRUBBING SITE. CLEAR AND GRUB ONLY THOSE AREAS NECESSARY FOR INSTALLATION OF THE HIGH QUALITY WATER (HQW) ZONES 7 DAYS EROSION CONTROL MEASURES. SLOPES STEEPER THAN 3:1 7 DAYS 3. INSTALL SILT FENCE AS SHOWN ON THE PLANS. SLOPES 3:1 OR FLATTER 14 DAYS 4. ONCE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND PRIOR TO SEDIMENT REMOVAL ACTIVITIES, THE SITE IS TO ALL OTHER AREAS (SLOPES FLATTER THAN 4:1) 14 DAYS BE INSPECTED BY NCDENR - LAND QUALITY. ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 21 DAYS AFTER THE CONSTRUCTION 5. GRADE SITE ACCORDING TO CONTRACT DOCUMENTS. MAINTAIN EROSION CONTROL DEVICES AS NEEDED. ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED. 6. INSTALL STORM DRAINAGE AS INDICATED ON PLANS. 4. WHERE THE INITIATION OF STABILIZATION MEASURES WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY TEMPORARILY OR 7. GRASS OR OTHERWISE STABILIZE ALL AREAS AS THEY ARE BROUGHT TO FINAL GRADES. PERMANENTLY CEASES IS PRECLUDED BY SNOW COVER, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS 8. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO CONDITIONS ALLOW. MINIMIZE EROSION. INSPECT AND REPAIR MEASURES AFTER EACH RAINFALL AND AS NEEDED THROUGHOUT THE PROJECT. 5. WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE WITHIN 21 DAYS FROM WHEN ACTIVITIES CEASED 9. CONTRACTOR TO LEAVE ALL EROSION CONTROL DEVICES IN PLACE AT THE CONCLUSION OF THIS CONTRACT. CONTRACTOR IS (E.G., THE TOTAL TIME PERIOD THAT CONSTRUCTION ACTIVITY IS TEMPORARILY HALTED IS LESS THAN 21 DAYS), THEN TO CLEAN-OUT, REPAIR AND GRASS STABILIZE ALL DENUDED AREAS. ALL AREAS WILL BE RETURNED TO THE STATE OF STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE BY THE SEVENTH DAY AFTER EXISTING CONDITIONS PRIOR TO CONTRACT AS A MINIMUM. CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED. 10. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTAIN SEDIMENT ONSITE. ADDITIONAL EROSION CONTROL MEASURES MAY BE 6. AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY (UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY REQUIRED BY THE ENGINEER. OF 70%) WITHIN 30 DAYS, SEEDING AND MULCHING MUST BE RE -SEEDED IMMEDIATELY, OR AS SOON AS WEATHER PERMITS. 11. ALL EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN REQUIREMENTS AND LAND DEVELOPMENT STANDARDS. POLLUTANT CONTROLS MAINTENANCE SCHEDULE AFTER FULL REVEGETATION HAS BEEN ACHIEVED, ALL BMPS WILL BE REMOVED AND ANY LAND DISTURBED BY REMOVAL WILL BE PERMANENTLY STABILIZED. UNLESS OTHERWISE SPECIFIED, ALL MAINTENANCE MUST BE COMPLETED IMMEDIATELY AFTER AN INSPECTION IDENTIFIES THAT A BMP IS NOT FUNCTIONING AS REQUIRED. THE ROW AND ESC DEVICES WILL BE INSPECTED DAILY AT THE ACTIVE CONSTRUCTION SITE AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS FOR ACTIVELY DISTURBED AREAS, 14 CALENDAR DAYS FOR RESTORED AREAS, AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN ONE -HALF-INCH PER 24-HOUR PERIOD. SEDIMENT MUST BE REMOVED WHERE ACCUMULATION REACHES ONE-HALF THE ABOVE GROUND HEIGHT OF THE CONTROL MEASURE. EROSION CONTROL MEASURES, WHICH HAVE BEEN UNDERMINED OR TOPPED, SHALL BE REPAIRED IMMEDIATELY. • OTHER REQUIRED REPAIRS OR MAINTENANCE SHALL BE MADE IMMEDIATELY. TEMPORARY AND PERMANENT E&S CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. MATERIAL WASTE HANDLING AND RECYCLING 1. SOLID WASTE DISPOSAL SHALL BE HANDLED THROUGH ONE OF THE LOCAL LICENSED WASTE MANAGEMENT PROVIDERS AND PERMITTED DISPOSAL FACILITIES. THE CONTRACTOR WILL PROVIDE MOBILE AND COVERED WASTE RECEPTACLES AS NEEDED ALONG THE PROJECT LIMITS. CONTRACTOR SHALL ALSO PROVIDE A COVERED DUMPSTER FOR CONSOLIDATION OF WASTE FOR PICK UP AND DISPOSAL FOR THE DURATION OF THE PROJECT. ALL SOLID WASTE SHALL BE DISPOSED OF AT A LICENSED PERMITTED MUNICIPAL LANDFILL. 2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY PERMITS AN DOR DISPOSAL FEES. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO ASSURE THAT ALL MATERIALS AREA HANDLED AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS, RULES, AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THOSE ISSUED BY THE ENVIRONMENTAL PROTECTION AGENCY, NCDEQ, AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION. 3. CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING FOR THE DURATION OF THE PROJECT INCLUDING THE ROUTINE REMOVAL AND DISPOSAL OF SOLID WASTE. 4. CONTRACTOR SHALL KEEP RECORDS OF PROPER SOLID WASTE DISPOSAL AND PROVIDE COPIES TO THE EI. SEEDING AND MULCHING CONSTRUCTION MUST BE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. THIS SEQUENCE IS DESIGNED TO MINIMIZE SOIL EROSION AND SEDIMENTATION. THE CONTRACTOR MAY DEVIATE SLIGHTLY FROM THE STAGING OF PERMANENT SITE SEE SEED MIXES, SOIL AMENDMENTS, AND MULCH SPECIFICATIONS SPECIFIED IN THE ACP RESTORATION AND REHABILITATION IMPROVEMENTS, BUT NO DEVIATION FROM THE RELATIVE ORDER OF EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE PLAN. ALLOWED. 1. SEEDBED PREPARATION: AREAS TO BE SEEDED SHALL BE DISKED TO A DEPTH OF 4 -IN TO 6 -IN WHENEVER FEASIBLE, AND SMOOTHLY GRADED. THE STAGING OF EARTHMOVING ACTIVITIES FOR THIS PROJECT IS A GENERAL DESCRIPTION OF THE WORK REQUIRED. ALL WORK 2. IN TOPSOILED AREAS, SOIL TO BE REDISTRIBUTED EVENLY AND STABILIZED PRIOR TO SEEDING. SHALL BE COMPLETED IN ACCORDANCE WITH COMPANY STANDARDS, THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL 3. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION QUALITY REGULATIONS AND ALL OTHER APPLICABLE FEDERAL, STATE OR LOCAL REQUIREMENTS. ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 21 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED. THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN INCLUDING THE SOIL EROSION CONTROL DRAWINGS AND NARRATIVE 4. WHERE THE INITIATION OF STABILIZATION MEASURES WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY TEMPORARILY OR SHALL BE AVAILABLE ON SITE AT ALL TIMES DURING EARTH DISTURBANCE. PERMANENTLY CEASES IS PRECLUDED BY SNOW COVER, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS CONDITIONS ALLOW. 1. STAKE AND/OR FLAG ALL LIMITS OF DISTURBANCE FOR CONSTRUCTION ACTIVITIES, CLEARLY IDENTIFYING WETLAND AND 5. WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE WITHIN 21 DAYS FROM WHEN ACTIVITIES CEASED STREAM EDGES. INSTALL SIGNS TO DESIGNATE THE AREA TO IDENTIFY IMPORTANT PROJECT ATTRIBUTES SUCH AS (E.G., THE TOTAL TIME PERIOD THAT CONSTRUCTION ACTIVITY IS TEMPORARILY HALTED IS LESS THAN 21 DAYS), THEN WETLANDSTREAM BOUNDS, EXCLUSION AREAS ETC. STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE BY THE SEVENTH DAY AFTER 2. INSTALL ROCK CONSTRUCTION ENTRANCES IMMEDIATELY BEFORE INITIAL DISTURBANCES. THE ROCK CONSTRUCTION CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED. ENTRANCES TO BE UNDERLAIN BY FILTER FABRIC. ALL CONSTRUCTION TRAFFIC SHOULD USE ONLY ROCK CONSTRUCTION 6. AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY (UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY ENTRANCE FOR INGRESS AND EGRESS. ALL MUD OR SEDIMENT TRACKED ONTO THE EXISTING ROADWAY SHALL BE REMOVED OF 70%) WITHIN 30 DAYS, SEEDING AND MULCHING MUST BE RE -SEEDED IMMEDIATELY, OR AS SOON AS WEATHER PERMITS. BY THE CONTRACTOR AS NECESSARY. 3. INSTALL SILT FENCE AND COMPOST FILTER SOCKS AS NECESSARY ALONG THE ACCESS ROADS TO PREVENT SEDIMENT LADEN POLLUTANT CONTROLS RUNOFF FROM ENTERING DOWNSTREAM WATER BODIES. MAINTAIN THE ACCESS ROADS AS REQUIRED, ASSOCIATED DITCHES, AND NECESSARY OUTLET PROTECTION. REPORTABLE SPILLS OCCURRING DURING CONSTRUCTION, OPERATION AND MAINTENANCE ARE TO BE REPORTED 4. PRIOR TO AND SIMULTANEOUS WITH GRADING AND EXCAVATION, INSTALL REMAINING EROSION CONTROL DEVICES (ECD) IMMEDIATELY TO THE MONITORING CENTER IN ACCORDANCE WITH DOMINION POLICIES, PLANS AND PROCEDURES. SHOWN ON THE PLANS. DOMINION'S ENVIRONMENTAL HEALTH AND SAFETY DEPARTMENT WILL BE RESPONSIBLE FOR CONTACTING THE APPROPRIATE 5. COMMENCE GRADING AND ASSOCIATED CUT AND FILL SLOPES. THE EARTH MOVING ACTIVITY SHALL BEGIN IN AREA OF CUT SO AGENCIES, EXCEPT AS PROVIDED FOR BELOW. THAT THE CUTS CAN BE PLACED IN AREAS OF FILL. REMOVE TOPSOIL FROM AREAS TO RECEIVE FILL PRIOR TO FILLING. ANY FACILITY OWNER/OPERATOR WHO IS SUBJECT TO THE SPCC RULE MUST COMPLY WITH THE REPORTING REQUIREMENTS 6. FINALIZE UTILITY INSTALLATION AND ROADWAY GRADES AND PLACE TOPSOIL ON THE CUT AND FILL AREAS. STABILIZE CUT AND FOUND IN 40 CFR 112.4. A DISCHARGE MUST BE REPORTED TO THE EPA REGIONAL ADMINISTRATOR (RA) WHEN THERE IS A FILL SLOPES, AFTER PLACEMENT OF STOCKPILED TOPSOIL ON EXCAVATED SLOPES, AND AS DIRECTED. DISCHARGE OF: 7. RE -DISTRIBUTION OF WET SEDIMENT FROM DEVICES AND FACILITIES SHALL ONLY BE PERMITTED UPHILL OF AN EFFECTIVE •• MORE THAN 1,000 GALLONS OF OIL IN A SINGLE DISCHARGE TO NAVIGABLE WATERS OR ADJOINING SHORELINES, SEDIMENT CONTROL DEVICE OR FACILITY. SEDIMENT LADEN RUNOFF SHALL NOT BE ALLOWED TO FLOW DIRECTLY INTO •• MORE THAN 42 GALLONS OF OIL IN EACH OF TWO DISCHARGES TO NAVIGABLE WATERS OR ADJOINING SHORELINES WATER BODIES. OCCURRING WITHIN ANY TWELVE-MONTH PERIOD. 8. ANY EXPOSED TOPSOIL PILES SHOULD BE STABILIZED & SEEDED PER THE PERMIT REGULATIONS, AND BY TABLES SHOWN ON IF A DOMINION REPRESENTATIVE CANNOT BE PROMPTLY CONTACTED AND THE SPILL HAS IMPACTED WATER, THE PERSON THE APPROVED EROSION CONTROL PLANS AND MULCHED WITH STRAW AS SPECIFIED BY THE PROJECT OWNER. DISCOVERING THE SPILL OR RELEASE WILL CONTACT THE NATIONAL RESPONSE CENTER AT 1-800-424-8802 AND REPORT THE 9. UPON MINIMUM 70% UNIFORM PERENNIAL VEGETATIVE GROWTH, REMOVE TEMPORARY SEDIMENT CONTROLS. REMOVE RELEASE. THAT PERSON WILL CONTINUE CALLING DOMINION UNTIL A REPRESENTATIVE IS REACHED. ACCUMULATED SEDIMENTS WITHIN THE TRAPS, RE -GRADE TRAPS TO FINAL CONTOURS. STABILIZE SITE PER THE PLANS. GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. 1 ��L� {�A��O '�� �_ ; ��j,�.f� ; ,,, '(� ERM NC, INC. License #F-1223 Atlantic Coast Pipeline, LLC o 0 03/10/17 NJB ISSUED FOR REVIEW �.' C� ♦ {f 08/04/17 WTS ISSUED FOR REVIEW ! O = 15720 Brixham Hill Ave, Suite 120 F, R Nf Charlotte, NC 28277 (704) 541-8345 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 DRAWN: NJB 08/04/17 - TITLE: ATLANTIC COAST PIPELINE -•� o CHECKED: _ _ �/-! EROSION AND SEDIMENT CONTROL PLAN NOTES APP. FOR BID: ♦ 'G� G GROUP DWG. NO. REV. f�Q ? 0�*�% � APP. FOR CONST.: DISTRICT. - COUNTY. - STATE: NC 'rA Fka �)%' !!/!I{11h�1 DIRiFILE: ACP\North Carolina\ - 4 OF 7 1 SCALE: AS NOTED 100' MIN. PUBLIC STREET 00 pC� O 00 0 000p 0 U 000001 pp a 6" MIN. THICKNESS FILTER FABRIC UNDER STONE EXISTING GROUND 100' MIN. GENERAL NOTES: 1. A STABILIZED PAD OF WASHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM A PUBLIC STREET. 2. STONE TO BE SURGE STONE OR 2"-3" RAILROAD BALLAST 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN NECESSARY, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUIVALENT. (N. C. STD. N0. 6.06 TEMPORARY CONSTRUCTION ENTRANCE DETAIL A CREEK BANK AOOR£OATE OR SAHD&WS 1' FLUME PW CREEK BIOTTOY ~ QCiYAflD TQM PROPOSED PIPELAK SECTION d'A -A" DIRT PLUG ` EXCAVATED TRENCH _ 8 1 I I PROPOSED UTILITY I I I.L. 1, 1. 1._1.1.1 EROSION CON"M MEASURES TO K __ LOCATED BELOW APPROACH AREAS AC4114fOATE OR CREE-K BANK SANDBAGS FLUME PIPE PROPOSED PIPEUNE SECTIO.N" "B-- B" NOT TO SCALE NOTES: 1. GRUBBING SHALL NOT TAKE PLACE WITHIN 50 FT OF TOP OF BANK UNTIL ALL MATERIALS REQUIRED TO COMPLETE THE CROSSINGS ARE ON SITE AND PIPE IS READY FOR INSTALLATION. 2. PIPE CULVERT FOR FLUME AND ACCESS ROAD MAY BE ONE CONTINUOUS PIPE. 3. WATER ACCUMULATING WITHIN THE WORK AREA SHALL BE PUMPED TO A PUMPED WATER FILTER BAG PRIOR TO DISCHARGING INTO SURFACE WATER. 4. ALL EXCESS MATERIAL SHALL BE IMMEDIATELY REMOVED FROM THE STREAM CROSSING AREA. 5. ALL DISTURBED AREAS WITHIN 50 FEET OF TOP OF BANK SHALL BE BLANKETED OR MATTED WITHIN 24 HOURS OF INITIAL DISTURBANCE FOR MINOR STREAMS OR 48 HOURS OF INITIAL DISTURBANCE FOR MAJOR STREAMS, UNLESS OTHERWISE AUTHORIZED. STREAM CROSSING RESTORATION: 1. ONCE THE SOIL EROSION AND SEDIMENT CONTROL MEASURES AND THE REQUIRED WATER FLOW CONTROL MEASURES ARE IN PLACE, CONTRACTOR CAN PROCEED WITH TRENCH EXCAVATION. 2. ALL EXCAVATED MATERIALS THAT WILL BE USED AS BACKFILL SHALL BE PLACED IN A TEMPORARY STOCKPILE LOCATED OUTSIDE THE CHANNEL. CHANNEL BED MATERIAL SHALL BE SEGREGATED FOR LATER USE. A SEDIMENT BARRIER SHALL BE INSTALLED BETWEEN THE STOCKPILE AND STREAM CHANNEL. 3. COMPLETE TRENCH EXCAVATION FOR PIPELINE CONSTRUCTION, PLACE PIPELINE AND BACKFILL. 4. STREAM BANKS SHALL BE RESTORED TO PRE -CONSTRUCTION CONFIGURATIONS, AS MUCH AS POSSIBLE, AND STABILIZED. 5. RE -SEED RESTORED STREAM BANKS USING SEED MIXTURES AS SPECIFIED HEREIN. 6. RESTORED STREAM BANKS AND ADJACENT DISTURBED AREAS TO BE STABILIZED WITH APPROVED EROSION CONTROL BLANKET USING MANUFACTURER RECOMMENDED STAPLES AND PATTERNS. 7. PLACE SALVAGED BED MATERIAL ON THE CHANNEL BED IN THE DISTURBED AREA. DRY DITCH CROSSING 1: FLUME CROSSING DETAIL NOT TO SCALE 24" DEPTH OF TRENCH SECTION VIEW ti TRENCH PLUG SPACING jl I STACKED CLAY, BENTONITE OR CONCRETE -FILLED SACKS PIPE BEDDING ELEVATION PIPE INVERT CONSTRUCTION NOTES: 1. TRENCH PLUGS ARE REQUIRED AT ALL STREAM, RIVER, WETLAND, OR OTHER WATER BODY CROSSINGS REGARDLESS OF TRENCH SLOPE. 2. TOPSOIL MAY NOT BE USED TO FILL SACKS. 3. TRENCH PLUG LOCATION AND SPACING SHALL BE IN ACCORDANCE WITH CONSTRUCTION ALIGNMENT SHEETS, OR AS OTHERWISE DIRECTED BY THE EI. TRENCH PLUG DETAIL NOT TO SCALE TRENCH S�Oey WELL VEGETATED AREA SPACING OF WATERBARS (IN ACCORDANCE WITH CONSTRUCTION ALIGNMENT SHEETS) PIPELINE TRENCH \ TRENCH SPOILS (TYP.) `SLOPE BREAKER (TYP.) A A' SOIL DIVERSION BERM OR COMPOST FILTER SOCK FOR TEMPORARY WATERBAR (SEE SOIL 18" MIN. AFTER DIVERSION BERM AND COMPOST FILTER SOCK COMPACTIO DETAILS, THIS SHEET), SOIL DIVERSION BERM FOR PERMANENT WATERBAR. U MIN. AFTER COMPACTION FINAL GRADE SECTION A - A' TYPICAL LOCATION OF SEDIMENT PROPOSED BARRIER (IF REQUIRED, SEE NOTE 5) R.O.W. NOTES: 1. TEMPORARY SLOPE BREAKERS SHALL BE INSTALLED UPON INITIAL DISTRUBANCE OF THE SOIL. PERMANENT WATERBARS SHALL BE INSTALLED AFTER THE TRENCH HAS BEEN BACKFILLED. 2. WATERBARS SHALL NOT DISCHARGE TO THE OPEN TRENCH AND SHOULD BE ALIGNED SO THAT DISCHARGES DO NOT FLOW BACK ONTO THE RIGHT-OF-WAY. RUNOFF SHALL BE DIRECTED TO THE DOWNSLOPE SIDE OF THE DISTURBED AREA. 3. SLOPES GREATER THAN 30% MAY REQUIRE THE INSTALLATION OF A PARALLEL COLLECTION DITCH AND SEDIMENT TRAP AT THE BOTTOM OF THE SLOPE IN PLACE OF WATERBARS. 4. WATERBARS MUST BE INSTALLED AT ALL PUBLIC ROADWAY AND RAILROAD CUT SLOPES. 5. IF A SUITABLE VEGETATIVE FILTER STRIP DOES NOT EXIST AT THE POINT OF DISCHARGE FOR ANY WATERBAR, A SEDIMENT BARRIER SHALL BE PROVIDED (E.G., FILTER SOCK, SILT FENCE, OR SOIL DIVERSION BERM, SEE DETAILS, THIS SHEET) MAINTENANCE NOTES: 1. PERIODICALLY INSPECT RIGHT-OF-WAY DIVERSIONS FOR WEAR AND AFTER EVERY HEAVY RAINFALL FOR EROSION DAMAGE. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA, AND REPAIR THE DIKE. CHECK OUTLET AREAS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN PERMANENT ROAD DRAINAGE IS ESTABLISHED AND THE AREA ABOVE THE TEMPORARY RIGHT-OF-WAY DIVERSIONS IS PERMANENTLY STABILIZED, REMOVE THE DIKE, FILL THE CHANNEL TO BLEND WITH THE NATURAL GROUND, AND APPROPRIATELY STABILIZE THE DISTURBED AREA. TYPCIAL WATERBAR AND TEMPORARY SLOPE BREAKER DETAIL TRENCH PLUG AND FILTER SOCK TOP SPOIL PILE SOIL BELTED SILT RETENTION 0 FENCE (TYP.) TOPSOIL \ \ o LU BUFFER ZONE IS NOT TO HAVE 0 VEGETATION REMOVED (EXCEPT O TRENCH LINE). TREES ARE TO BE CUT STANDBY PUMP \\\\ w z \ \\ j�\\ 0- FLUSH TO GRADE. REMOVE STUMP 2 \/\\/ ONLY IF SAFETY BECOMES A FACTO[ PUMP AND FUEL CAN PLACED FS 50' 5 � 50 _//// (BOTH SIDES OF STREAM) IN FLUID CONTAINMENT BOX 0 LU DI F BACKHOE �� o 25' MIN. TIMBERMAT TOP OF BANK _tuuj HOSE UU STREAM FLOW 7 TRENCH ENERGY DISSIPATOR SCREENED INLET PLUG (E.G., FILTER BAG) TOP OF BANK BACKHOE / 0 25' MIN. DOWNSTREAM SANDBAG UPSTREAM SANDBAG / COFFERDAM COFFERDAM \ FBA-� 50' LU \\j\ Q w 00 Q TOP CLp TOP SOIL � SOIL SPOIL PILE PIPE WELDED, CONIC. COATED OR WEIGHTED TRENCH PLUG AND BELTED SILT RETENTION FENCE NOTES: 1. USE DAM AND PUMP METHOD ON NARROW WATERCOURSES WITH LIMITED STREAM FLOW TO PREVENT SEDIMENTATION AND INTERRUPTION OF STREAM FLOW DURING CROSSING CONSTRUCTION. IF FISH PASSAGE IS A CONCERN THIS METHOD IS NOT APPROPRIATE. 2. SCHEDULE CONSTRUCTION DURING PERIOD OF LOW STREAM FLOW. 3. SET UP PUMP AND HOSE AS SHOWN, OR USE OTHER PRACTICAL ALTERNATIVES. PUMP SHOULD HAVE TWICE THE PUMPING CAPACITY OF ANTICIPATED FLOW. HAVE STANDBY PUMP ON SITE. 4. INSTALL UPSTREAM DAM COMPOSED OF SANDBAGS OR CLEAN GRAVEL WITH PLASTIC UNDERLINING. INSTALL DOWNSTREAM DAM IF REQUIRED TO KEEP STREAMBED DRY. 5. EXCAVATE TRENCH AND INSTALL PIPE BY LOWERING IN UNDER HOSE. MOVE HOSE AS REQUIRED OR DISCONNECT IF TEMPORARY FLOW BLOCKAGE IS ACCEPTABLE. BACKFILL TRENCH. 6. DISMANTLE DOWNSTREAM DAM, THEN UPSTREAM DAM. KEEP PUMP RUNNING TO MAINTAIN FLOW. 7. MONITOR DAM AND PUMP FOR PROPER OPERATION THROUGHOUT THE CROSSING INSTALLATION. 8. IN HIGH QUALITY (HQ) OR EXCEPTIONAL VALUE (EV) STREAMS, USE 12" FILTER SOCK IN PLACE OF SILT FENCE. 9. ENSURE DISTURBED AREAS ARE SEEDED AND MULCHED USING SEED MIXTURES AS SPECIFIED IN THE INCLUDED TABLE. STREAM CROSSING RESTORATION: 1. ONCE THE SOIL EROSION AND SEDIMENT CONTROL MEASURES AND THE REQUIRED WATER FLOW CONTROL MEASURES ARE IN PLACE, CONTRACTOR CAN PROCEED WITH TRENCH EXCAVATION. 2. ALL EXCAVATED MATERIALS THAT WILL BE USED AS BACKFILL SHALL BE PLACED IN A TEMPORARY STOCKPILE LOCATED OUTSIDE THE CHANNEL. CHANNEL BED MATERIAL SHALL BE SEGREGATED FOR LATER USE. A SEDIMENT BARRIER SHALL BE INSTALLED BETWEEN THE STOCKPILE AND STREAM CHANNEL. 3. COMPLETE TRENCH EXCAVATION FOR PIPELINE CONSTRUCTION, PLACE PIPELINE AND BACKFILL. 4. STREAM BANKS SHALL BE RESTORED TO PRE -CONSTRUCTION CONFIGURATIONS, AS MUCH AS POSSIBLE, AND STABILIZED. 5. RE -SEED RESTORED STREAM BANKS AT THE RATE OF 15 LBS./ACRE WITH 'RIPARIAN BUFFER MIX' BY ERNST CONSERVATION SEEDS (MIX ERNMIX-178) OR APPROVED EQUAL. 6. RESTORED STREAM BANKS AND ADJACENT DISTURBED AREAS TO BE STABILIZED WITH APPROVED EROSION CONTROL BLANKET USING MANUFACTURER RECOMMENDED STAPLES AND PATTERNS. 7. PLACE SALVAGED BED MATERIAL ON THE CHANNEL BED IN THE DISTURBED AREA. DRY DITCH CROSSING 2: DAM AND PUMP DETAIL NOT TO SCALE TOP OF SILT MUST BE AT ABOVE THE l THE WASHED NOTES. I. REMOVE SEDIMENT *HEN HALF OF STONE OJTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO E4S.1RE DENATERING_ NOT TO SCALE MAINTENANCE NOTES: 1. INSPECT SILT FENCE OUTLETS AT LEAST ONCE PER WEEK AND AFTER EACH SIGNIFICANT (0.5 -INCH OR MORE) RAINFALL EVENT. MAKE REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR NEXT RAIN EVENT AND RELIEVE PRESSURE ON SILT FENCE. TAKE CARE NOT TO UNDERMINE FENCING DURING CLEANING. 3. REMOVE ALL SILT FENCE OUTLET MATERIALS AND UNSTABLE SEDIMENTS AND BRING THE AREA TO SURROUNDING GRADE AND STABILIZE ONCE UPSTREAM AREAS HAVE BEEN PROPERLY STABILIZED. STEEL POST WOVEN WIRE FABRIC HARDWARE CLOTH -- FILTER OF •57 WASHED STONE 'LI" Y INTO SDLP GRDU�O SECTION VIEW lo'IAI 3' FILTER FABRIC APRON ON GROUND 6'-- I I a RY 6 UPP R E E]^E OF II BURY WIRE FENCE AND �� FILTER FABRIC AKRON IN TRENCH HARDWARE CLOTH II U SILT FENCE OUTLET DETAIL NOT TO SCALE WELL VEGETATED, GRASSY AREA MAP FILTER BAG PLAN VIEW FILTER BAG WELL VEGETATED, GRASSY AREA ELEVATION VIEW DISCHARGE HOSE -- PUMP INTAKE HOSE CLAMPS DISCHARGE HOSE PUMP CLAMPS INTAKE HOSE CONSTRUCTION NOTES: 1. FILTER BAGS MAY BE USED TO FILTER WATER PUMPED FROM DISTURBED AREAS PRIOR TO DISCHARGING TO WATERS OF THE COMMONWEALTH. THEY MAY ALSO BE USED TO FILTER WATER PUMPED FROM THE SEDIMENT STORAGE AREAS OF SEDIMENT BASINS. 2. THE PUMPING RATE SHOULD BE DETERMINED BY THE CONTRACTOR BASED UPON THE ACTUAL AMOUNT OF GROUNDWATER ENCOUNTERED DURING CONSTRUCTION. PUMPING RATES WILL VARY DEPENDING ON THE SIZE OF THE FILTER BAG AND THE TYPE AND AMOUNT OF SEDIMENT DISCHARGED TO THE BAG. 3. FILTER BAGS SHALL BE MADE FROM NON -WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. 4. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES MUST BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. 5. BAGS SHALL BE LOCATED IN WELL -VEGETATED (GRASSY) AREAS AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE FLOW PATH SHALL BE PROVIDED. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. 6. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. 7. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHOULD BE FLOATING AND SCREENED. FILTER BAGS DETAIL NOT TO SCALE 8 X 8 X18 ROUGH OAK TIMBER TYPICAL 4' STEEL CABLE WETLAND TIMBER MATTING DETAIL NOT TO SCALE DIVERSION 4 - RIDGE 6" - COMPACTED EARTH OR STONE ENTRANCE PADS TO BE MADE OF COURSE AGGREGATE (AASHTO NO. 1) OR TIMBER SLAB WOOD (TYP.). TIMBERMATS 4' DIVERSION RIDGE 611 COMPACTED EARTH OR STONE APPLY ONE LAYER (TWO LAYERS IN WET J AREAS) GEATEXTILE UNDER ENTRANCE PADS (TYP.). NOTES: 1. ONLY CLEARING Q NECESSARY FOR INSTALLATION OF EQUIPMENT AND EQUIPMENT E EQUIPMENT BRIDGES MAY CROSS WATER BODIES PRIOR Q Q TO BRIDGE INSTALLATION. LIMIT THE CROSSING OF EACH WATERBODY TO ONE PIECE OF CLEARING EQUIPMENT. 2. INSTALL BELTED SILT RETENTION FENCE ACROSS THE DISTURBED AREA OF THE RIGHT OF WAY. 3. APPLY GEOTEXTILE UNDER ENTRANCE PADS. 4. EXCESS MUD IS TO BE REMOVED FROM THE ENTRANCE PADS AND MATS DURING CONSTRUCTION. 5. DURING FINAL CLEAN UP WHEN MATS, CULVERTS, CLEAN ROCK FILL, ETC. ARE REMOVED, INSTALL BELTED SILT RETENTION FENCE ACROSS THE ENTIRE RIGHT OF WAY ON BOTH SIDES OF STREAM. TEMPORARY BRIDGE CROSSING NOT TO SCALE GENERAL NOTES AND COMMENTS: SYM. r 0 BY A � SANDBAGS, y 1s,{t till ;�R$�a�A�Y , ; � ` \ C' ���,�0 `7 � � � , . • " � • �� � � ,Z ' r � � (• � ;�, �_ � �'� o - .� � .fes''',. ���f 1��.,,���y� � f�0�.� Y �� :y G ����ti 1 �`rAl,� � I �� ���� ERM NC, INC. License #F-1223 15720 Brixham Hill Ave, Suite 120 ERM Charlotte, NC 28277 (704) 541-8345 JERSEY BARRIERS, �0 03/10/17 08/04/17 ROAD PLATES, SAtIIOBAGS ETC. - DIRT Kw DRAWN: NJB 08/04/17 TITLE: ATLANTIC COAST PIPELINE EROSION AND SEDIMENT CONTROL PLAN DETAILS c CHECKED: _ _ APP. FORBID: EXCAVATED TRENCH B I , APP. FOR CONST.: DISTRICT: - COUNTY: - STATE: jsl C D►RiFaE: ACP\North Carolina\ l I REV. --T I I , a I I G1 I EROSION COWTROL i ._MEASURES TO BE 1 "KATED BELAW APPROACH AREAS SANDBAGS PLAN VIE W A CREEK BANK AOOR£OATE OR SAHD&WS 1' FLUME PW CREEK BIOTTOY ~ QCiYAflD TQM PROPOSED PIPELAK SECTION d'A -A" DIRT PLUG ` EXCAVATED TRENCH _ 8 1 I I PROPOSED UTILITY I I I.L. 1, 1. 1._1.1.1 EROSION CON"M MEASURES TO K __ LOCATED BELOW APPROACH AREAS AC4114fOATE OR CREE-K BANK SANDBAGS FLUME PIPE PROPOSED PIPEUNE SECTIO.N" "B-- B" NOT TO SCALE NOTES: 1. GRUBBING SHALL NOT TAKE PLACE WITHIN 50 FT OF TOP OF BANK UNTIL ALL MATERIALS REQUIRED TO COMPLETE THE CROSSINGS ARE ON SITE AND PIPE IS READY FOR INSTALLATION. 2. PIPE CULVERT FOR FLUME AND ACCESS ROAD MAY BE ONE CONTINUOUS PIPE. 3. WATER ACCUMULATING WITHIN THE WORK AREA SHALL BE PUMPED TO A PUMPED WATER FILTER BAG PRIOR TO DISCHARGING INTO SURFACE WATER. 4. ALL EXCESS MATERIAL SHALL BE IMMEDIATELY REMOVED FROM THE STREAM CROSSING AREA. 5. ALL DISTURBED AREAS WITHIN 50 FEET OF TOP OF BANK SHALL BE BLANKETED OR MATTED WITHIN 24 HOURS OF INITIAL DISTURBANCE FOR MINOR STREAMS OR 48 HOURS OF INITIAL DISTURBANCE FOR MAJOR STREAMS, UNLESS OTHERWISE AUTHORIZED. STREAM CROSSING RESTORATION: 1. ONCE THE SOIL EROSION AND SEDIMENT CONTROL MEASURES AND THE REQUIRED WATER FLOW CONTROL MEASURES ARE IN PLACE, CONTRACTOR CAN PROCEED WITH TRENCH EXCAVATION. 2. ALL EXCAVATED MATERIALS THAT WILL BE USED AS BACKFILL SHALL BE PLACED IN A TEMPORARY STOCKPILE LOCATED OUTSIDE THE CHANNEL. CHANNEL BED MATERIAL SHALL BE SEGREGATED FOR LATER USE. A SEDIMENT BARRIER SHALL BE INSTALLED BETWEEN THE STOCKPILE AND STREAM CHANNEL. 3. COMPLETE TRENCH EXCAVATION FOR PIPELINE CONSTRUCTION, PLACE PIPELINE AND BACKFILL. 4. STREAM BANKS SHALL BE RESTORED TO PRE -CONSTRUCTION CONFIGURATIONS, AS MUCH AS POSSIBLE, AND STABILIZED. 5. RE -SEED RESTORED STREAM BANKS USING SEED MIXTURES AS SPECIFIED HEREIN. 6. RESTORED STREAM BANKS AND ADJACENT DISTURBED AREAS TO BE STABILIZED WITH APPROVED EROSION CONTROL BLANKET USING MANUFACTURER RECOMMENDED STAPLES AND PATTERNS. 7. PLACE SALVAGED BED MATERIAL ON THE CHANNEL BED IN THE DISTURBED AREA. DRY DITCH CROSSING 1: FLUME CROSSING DETAIL NOT TO SCALE 24" DEPTH OF TRENCH SECTION VIEW ti TRENCH PLUG SPACING jl I STACKED CLAY, BENTONITE OR CONCRETE -FILLED SACKS PIPE BEDDING ELEVATION PIPE INVERT CONSTRUCTION NOTES: 1. TRENCH PLUGS ARE REQUIRED AT ALL STREAM, RIVER, WETLAND, OR OTHER WATER BODY CROSSINGS REGARDLESS OF TRENCH SLOPE. 2. TOPSOIL MAY NOT BE USED TO FILL SACKS. 3. TRENCH PLUG LOCATION AND SPACING SHALL BE IN ACCORDANCE WITH CONSTRUCTION ALIGNMENT SHEETS, OR AS OTHERWISE DIRECTED BY THE EI. TRENCH PLUG DETAIL NOT TO SCALE TRENCH S�Oey WELL VEGETATED AREA SPACING OF WATERBARS (IN ACCORDANCE WITH CONSTRUCTION ALIGNMENT SHEETS) PIPELINE TRENCH \ TRENCH SPOILS (TYP.) `SLOPE BREAKER (TYP.) A A' SOIL DIVERSION BERM OR COMPOST FILTER SOCK FOR TEMPORARY WATERBAR (SEE SOIL 18" MIN. AFTER DIVERSION BERM AND COMPOST FILTER SOCK COMPACTIO DETAILS, THIS SHEET), SOIL DIVERSION BERM FOR PERMANENT WATERBAR. U MIN. AFTER COMPACTION FINAL GRADE SECTION A - A' TYPICAL LOCATION OF SEDIMENT PROPOSED BARRIER (IF REQUIRED, SEE NOTE 5) R.O.W. NOTES: 1. TEMPORARY SLOPE BREAKERS SHALL BE INSTALLED UPON INITIAL DISTRUBANCE OF THE SOIL. PERMANENT WATERBARS SHALL BE INSTALLED AFTER THE TRENCH HAS BEEN BACKFILLED. 2. WATERBARS SHALL NOT DISCHARGE TO THE OPEN TRENCH AND SHOULD BE ALIGNED SO THAT DISCHARGES DO NOT FLOW BACK ONTO THE RIGHT-OF-WAY. RUNOFF SHALL BE DIRECTED TO THE DOWNSLOPE SIDE OF THE DISTURBED AREA. 3. SLOPES GREATER THAN 30% MAY REQUIRE THE INSTALLATION OF A PARALLEL COLLECTION DITCH AND SEDIMENT TRAP AT THE BOTTOM OF THE SLOPE IN PLACE OF WATERBARS. 4. WATERBARS MUST BE INSTALLED AT ALL PUBLIC ROADWAY AND RAILROAD CUT SLOPES. 5. IF A SUITABLE VEGETATIVE FILTER STRIP DOES NOT EXIST AT THE POINT OF DISCHARGE FOR ANY WATERBAR, A SEDIMENT BARRIER SHALL BE PROVIDED (E.G., FILTER SOCK, SILT FENCE, OR SOIL DIVERSION BERM, SEE DETAILS, THIS SHEET) MAINTENANCE NOTES: 1. PERIODICALLY INSPECT RIGHT-OF-WAY DIVERSIONS FOR WEAR AND AFTER EVERY HEAVY RAINFALL FOR EROSION DAMAGE. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA, AND REPAIR THE DIKE. CHECK OUTLET AREAS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN PERMANENT ROAD DRAINAGE IS ESTABLISHED AND THE AREA ABOVE THE TEMPORARY RIGHT-OF-WAY DIVERSIONS IS PERMANENTLY STABILIZED, REMOVE THE DIKE, FILL THE CHANNEL TO BLEND WITH THE NATURAL GROUND, AND APPROPRIATELY STABILIZE THE DISTURBED AREA. TYPCIAL WATERBAR AND TEMPORARY SLOPE BREAKER DETAIL TRENCH PLUG AND FILTER SOCK TOP SPOIL PILE SOIL BELTED SILT RETENTION 0 FENCE (TYP.) TOPSOIL \ \ o LU BUFFER ZONE IS NOT TO HAVE 0 VEGETATION REMOVED (EXCEPT O TRENCH LINE). TREES ARE TO BE CUT STANDBY PUMP \\\\ w z \ \\ j�\\ 0- FLUSH TO GRADE. REMOVE STUMP 2 \/\\/ ONLY IF SAFETY BECOMES A FACTO[ PUMP AND FUEL CAN PLACED FS 50' 5 � 50 _//// (BOTH SIDES OF STREAM) IN FLUID CONTAINMENT BOX 0 LU DI F BACKHOE �� o 25' MIN. TIMBERMAT TOP OF BANK _tuuj HOSE UU STREAM FLOW 7 TRENCH ENERGY DISSIPATOR SCREENED INLET PLUG (E.G., FILTER BAG) TOP OF BANK BACKHOE / 0 25' MIN. DOWNSTREAM SANDBAG UPSTREAM SANDBAG / COFFERDAM COFFERDAM \ FBA-� 50' LU \\j\ Q w 00 Q TOP CLp TOP SOIL � SOIL SPOIL PILE PIPE WELDED, CONIC. COATED OR WEIGHTED TRENCH PLUG AND BELTED SILT RETENTION FENCE NOTES: 1. USE DAM AND PUMP METHOD ON NARROW WATERCOURSES WITH LIMITED STREAM FLOW TO PREVENT SEDIMENTATION AND INTERRUPTION OF STREAM FLOW DURING CROSSING CONSTRUCTION. IF FISH PASSAGE IS A CONCERN THIS METHOD IS NOT APPROPRIATE. 2. SCHEDULE CONSTRUCTION DURING PERIOD OF LOW STREAM FLOW. 3. SET UP PUMP AND HOSE AS SHOWN, OR USE OTHER PRACTICAL ALTERNATIVES. PUMP SHOULD HAVE TWICE THE PUMPING CAPACITY OF ANTICIPATED FLOW. HAVE STANDBY PUMP ON SITE. 4. INSTALL UPSTREAM DAM COMPOSED OF SANDBAGS OR CLEAN GRAVEL WITH PLASTIC UNDERLINING. INSTALL DOWNSTREAM DAM IF REQUIRED TO KEEP STREAMBED DRY. 5. EXCAVATE TRENCH AND INSTALL PIPE BY LOWERING IN UNDER HOSE. MOVE HOSE AS REQUIRED OR DISCONNECT IF TEMPORARY FLOW BLOCKAGE IS ACCEPTABLE. BACKFILL TRENCH. 6. DISMANTLE DOWNSTREAM DAM, THEN UPSTREAM DAM. KEEP PUMP RUNNING TO MAINTAIN FLOW. 7. MONITOR DAM AND PUMP FOR PROPER OPERATION THROUGHOUT THE CROSSING INSTALLATION. 8. IN HIGH QUALITY (HQ) OR EXCEPTIONAL VALUE (EV) STREAMS, USE 12" FILTER SOCK IN PLACE OF SILT FENCE. 9. ENSURE DISTURBED AREAS ARE SEEDED AND MULCHED USING SEED MIXTURES AS SPECIFIED IN THE INCLUDED TABLE. STREAM CROSSING RESTORATION: 1. ONCE THE SOIL EROSION AND SEDIMENT CONTROL MEASURES AND THE REQUIRED WATER FLOW CONTROL MEASURES ARE IN PLACE, CONTRACTOR CAN PROCEED WITH TRENCH EXCAVATION. 2. ALL EXCAVATED MATERIALS THAT WILL BE USED AS BACKFILL SHALL BE PLACED IN A TEMPORARY STOCKPILE LOCATED OUTSIDE THE CHANNEL. CHANNEL BED MATERIAL SHALL BE SEGREGATED FOR LATER USE. A SEDIMENT BARRIER SHALL BE INSTALLED BETWEEN THE STOCKPILE AND STREAM CHANNEL. 3. COMPLETE TRENCH EXCAVATION FOR PIPELINE CONSTRUCTION, PLACE PIPELINE AND BACKFILL. 4. STREAM BANKS SHALL BE RESTORED TO PRE -CONSTRUCTION CONFIGURATIONS, AS MUCH AS POSSIBLE, AND STABILIZED. 5. RE -SEED RESTORED STREAM BANKS AT THE RATE OF 15 LBS./ACRE WITH 'RIPARIAN BUFFER MIX' BY ERNST CONSERVATION SEEDS (MIX ERNMIX-178) OR APPROVED EQUAL. 6. RESTORED STREAM BANKS AND ADJACENT DISTURBED AREAS TO BE STABILIZED WITH APPROVED EROSION CONTROL BLANKET USING MANUFACTURER RECOMMENDED STAPLES AND PATTERNS. 7. PLACE SALVAGED BED MATERIAL ON THE CHANNEL BED IN THE DISTURBED AREA. DRY DITCH CROSSING 2: DAM AND PUMP DETAIL NOT TO SCALE TOP OF SILT MUST BE AT ABOVE THE l THE WASHED NOTES. I. REMOVE SEDIMENT *HEN HALF OF STONE OJTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO E4S.1RE DENATERING_ NOT TO SCALE MAINTENANCE NOTES: 1. INSPECT SILT FENCE OUTLETS AT LEAST ONCE PER WEEK AND AFTER EACH SIGNIFICANT (0.5 -INCH OR MORE) RAINFALL EVENT. MAKE REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR NEXT RAIN EVENT AND RELIEVE PRESSURE ON SILT FENCE. TAKE CARE NOT TO UNDERMINE FENCING DURING CLEANING. 3. REMOVE ALL SILT FENCE OUTLET MATERIALS AND UNSTABLE SEDIMENTS AND BRING THE AREA TO SURROUNDING GRADE AND STABILIZE ONCE UPSTREAM AREAS HAVE BEEN PROPERLY STABILIZED. STEEL POST WOVEN WIRE FABRIC HARDWARE CLOTH -- FILTER OF •57 WASHED STONE 'LI" Y INTO SDLP GRDU�O SECTION VIEW lo'IAI 3' FILTER FABRIC APRON ON GROUND 6'-- I I a RY 6 UPP R E E]^E OF II BURY WIRE FENCE AND �� FILTER FABRIC AKRON IN TRENCH HARDWARE CLOTH II U SILT FENCE OUTLET DETAIL NOT TO SCALE WELL VEGETATED, GRASSY AREA MAP FILTER BAG PLAN VIEW FILTER BAG WELL VEGETATED, GRASSY AREA ELEVATION VIEW DISCHARGE HOSE -- PUMP INTAKE HOSE CLAMPS DISCHARGE HOSE PUMP CLAMPS INTAKE HOSE CONSTRUCTION NOTES: 1. FILTER BAGS MAY BE USED TO FILTER WATER PUMPED FROM DISTURBED AREAS PRIOR TO DISCHARGING TO WATERS OF THE COMMONWEALTH. THEY MAY ALSO BE USED TO FILTER WATER PUMPED FROM THE SEDIMENT STORAGE AREAS OF SEDIMENT BASINS. 2. THE PUMPING RATE SHOULD BE DETERMINED BY THE CONTRACTOR BASED UPON THE ACTUAL AMOUNT OF GROUNDWATER ENCOUNTERED DURING CONSTRUCTION. PUMPING RATES WILL VARY DEPENDING ON THE SIZE OF THE FILTER BAG AND THE TYPE AND AMOUNT OF SEDIMENT DISCHARGED TO THE BAG. 3. FILTER BAGS SHALL BE MADE FROM NON -WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. 4. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES MUST BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. 5. BAGS SHALL BE LOCATED IN WELL -VEGETATED (GRASSY) AREAS AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE FLOW PATH SHALL BE PROVIDED. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. 6. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. 7. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHOULD BE FLOATING AND SCREENED. FILTER BAGS DETAIL NOT TO SCALE 8 X 8 X18 ROUGH OAK TIMBER TYPICAL 4' STEEL CABLE WETLAND TIMBER MATTING DETAIL NOT TO SCALE DIVERSION 4 - RIDGE 6" - COMPACTED EARTH OR STONE ENTRANCE PADS TO BE MADE OF COURSE AGGREGATE (AASHTO NO. 1) OR TIMBER SLAB WOOD (TYP.). TIMBERMATS 4' DIVERSION RIDGE 611 COMPACTED EARTH OR STONE APPLY ONE LAYER (TWO LAYERS IN WET J AREAS) GEATEXTILE UNDER ENTRANCE PADS (TYP.). NOTES: 1. ONLY CLEARING Q NECESSARY FOR INSTALLATION OF EQUIPMENT AND EQUIPMENT E EQUIPMENT BRIDGES MAY CROSS WATER BODIES PRIOR Q Q TO BRIDGE INSTALLATION. LIMIT THE CROSSING OF EACH WATERBODY TO ONE PIECE OF CLEARING EQUIPMENT. 2. INSTALL BELTED SILT RETENTION FENCE ACROSS THE DISTURBED AREA OF THE RIGHT OF WAY. 3. APPLY GEOTEXTILE UNDER ENTRANCE PADS. 4. EXCESS MUD IS TO BE REMOVED FROM THE ENTRANCE PADS AND MATS DURING CONSTRUCTION. 5. DURING FINAL CLEAN UP WHEN MATS, CULVERTS, CLEAN ROCK FILL, ETC. ARE REMOVED, INSTALL BELTED SILT RETENTION FENCE ACROSS THE ENTIRE RIGHT OF WAY ON BOTH SIDES OF STREAM. TEMPORARY BRIDGE CROSSING NOT TO SCALE GENERAL NOTES AND COMMENTS: SYM. DATE BY REVISION INFORMATION PROJECT/TASK APP. y 1s,{t till ;�R$�a�A�Y , ; � ` \ C' ���,�0 `7 � � � , . • " � • �� � � ,Z ' r � � (• � ;�, �_ � �'� o - .� � .fes''',. ���f 1��.,,���y� � f�0�.� Y �� :y G ����ti 1 �`rAl,� � I �� ���� ERM NC, INC. License #F-1223 15720 Brixham Hill Ave, Suite 120 ERM Charlotte, NC 28277 (704) 541-8345 1 Atlantic Coast �1 eline LLC �0 03/10/17 08/04/17 NJB WTS ISSUED FOR REVIEW ISSUED FOR REVIEW - - 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 DRAWN: NJB 08/04/17 TITLE: ATLANTIC COAST PIPELINE EROSION AND SEDIMENT CONTROL PLAN DETAILS CHECKED: _ _ APP. FORBID: APP. FOR CONST.: DISTRICT: - COUNTY: - STATE: jsl C D►RiFaE: ACP\North Carolina\ GROUP - DWG. NO. 5 O F 7 REV. scALE: AS NOTED