Loading...
HomeMy WebLinkAbout20171018 Ver 1_Build Maps_20170815 (2)� � � M O N • � ee heet � or Index o heets ,� �, , �� � � ,o ,� , , TO BURLINGTON BEGIN CONSTRUCTION —Yl— STA. 10 + 85.00 , ,� ,� � ,, � � \ � �\ � �� �� � � ��� � � ��� �� ��� � � ���� �� LOCA TI01�1: BRIDGE 1�0.126 O VER MILL RA CE � 1�0. ll9 O VER HA W RI VER 01� 1�C 87 TYPE OF WORI�: GRADI1�lG, PA T�I1�G, DRAI1�lAGE A1�lD STR UCTURES —L— NC 87 BEGIN —L— ST. BEGIN TIP PROJECT —L— STA. 10 + 00.00 BRIDGE , 14 + 92.00 HAW BEGIN BRIDGE —L— STA. 18 + 68.3 �,s_r... ,5, \ '� � / ,5 RIVER : / � � / �S � � �BRIDGE NO. 11 ,______ ______ ____ ______r_____ —�---�---�------ ---�---�---y--�--- THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. END TIP PROJECT —L— STA. 24 + 85.00 BEGIN CONSTRUCTION —Y3— STA. 10 + 15.00 MILL RACE � � �. � I ` �. � ,I y � ,--. , �N � �, —Y3— � �RI D'G E ' � O. 12 l __ END BRIDGE —L— STA. 19 + 41.00 . \ � �, —TEMP DRV— . ___ i � —L— NC 87 � T � � �� �� _ —LDET— � � ��'� � � � O , � -�,� , ,� . - \ � � < a, ' � > � / �'�i � �v� i /f � �� �r �\ � ✓S� � END BRID�E � \'SfI 11 /� 4 —L— STA. 17 + 77.00 � / � � � � RIVER /,y � I I gO I �- � �'S/ MILL RACE I l � 2� I � � / �' �J � 5�...� � N l 'S\ o � ��� ��S I � _ �� END CONSTRUCTION �� —Y2— STA. 11 + 36.00 � Q N � �Q __— � i'� �'���^` M1 N � AD NSRS 8� _ 200� TO ALTAMAHAW DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIG11t DATA PROJECT LEI�GTH Prepared In tl� Offlce of: HYDRAULICS E1VGIIVEER ADT 2 Ol 7= 7150 DI VISI01� OF HIGHWA YS 50 2s o so �oo ADT 2035 = 8500 LENGTH ROADWAY TIP PROJECT B-5239 = 0.213 MILES 1000 Birch Ridge Dr., Raleigh Nc, 27610 0� �oa�� K 0 /o �� �� o D= 60 % LENGTH STRUCTURES TIP PROJECT B-5239 = 0.068 MILES 2012 STANDARD SPECIFICATIONS �Q °�oQo PLANS� � T= 6%* TOTAL LENGTH TIP PROJECT 6-5239 = 0.281 MILES SIGNATURE: P.E. � �, 50 25 0 50 l00 V= 50 MPH RIGHT OF WAY DATE: JAMES A. SPEER, PE a � V — 4O MPH DECEMBER 16 2016 I'ROJECT ENGINEER ROADWAY DESIG11t � �� PROFILE (HORIZONTAL) * TTST — 2% DUAL = 4% � E11tGI11tEER ���� oo��Q FUNC CLASS = LETTI11lG DATE: DANIEL W GARDNER, JRt PE �� `� G°3 p��'Q 10 5 0 10 20 PRINCIPAL ARTERIAL DECEMBER 19, 2017 I'ROJECT DESIGN ENGINEER PROFILE (VERTICAL) "STATEWIDE TIER" P�E� SIGNATURE: BOUNDARIES AND PROPERTY.• State Line ----- County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Parcel/Sequence Number Existing Fence Line -X Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence � -� a ECM 123 -X X- Existing Wetland Boundary - - - -W�B- - - - Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary Existing Historic Property Boundary Known Contamination Area: Soil - •� Potential Contamination Area: Soil - � Known Contamination Area: Water '� Potential Contamination Area: Water � Contaminated Site: Known or Potential BUILDINGS A1�D OTHER CULTURE: Gas Pump Vent or U/G Tank Cap Sign Well Small Mine Foundation Area Outline Cemetery Building $CilOOI Church Dam HYDROLOGY.• Stream or Body of Water - Hydro, Pool or Reservoir � Jurisdictional Stream �S_ Buffer Zone 1 BufFer Zone 2 F I ow Arrow � --- Disappearing Stream �--- WLB EAB EPB HPB BZ 1 BZ 2 � Spring �--~�_ --� Wetland � Proposed Lateral, Tail, Head Ditch � FLOW False Sump � ��1�.,��1�1':� ��)1"� ���)'l���I�1 1 ( �.,=� 1����)1.,1 � .,=�:,, 1�)-1 ��1�1��)'\ ��1"� 1 1 i 1�1 1 ���.,'�, ��� � � � � � i � � - � � � , , , , , „ . - RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled RIGHT OF WAY.• Baseline Control Point Existing Right of Way Marker Existing Right of Way Line Proposed Right of Way Line Proposed Right of Way Line with Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite R1W Marker Proposed Control of Access Line with Concrete C/A Marker Existing Control of Access Proposed Control of Access Existing Easement Line Proposed Temporary Construction Easement - Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Drainage / Utility Easement Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Aerial Utility Easement CSX TRANSPORTATION O MILEPOST 35 0 SWITCH --� -� � -,- Proposed Permanent Easement with Iron Pin and Cap Marker ROADS AND RELATED FEATURES: Existing Edge of Pavement — Existing Curb — O 0 0' W . W /\ W7 — in� � '"' �� /C� �~A� E -E- TDE PDE DUE PUE TUE AUE � Orchard Vi neya rd EXISTING STRUCTURES.• MAJ O R: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES.• POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H-Frame Pole U/G Power Line LOS 6(S.U.E.*) U/G Power Line LOS C(S.U.E.*) U/G Power Line LOS D(S.U.E.*) — TELEPHONE: Proposed Slope Stakes Cut --- C--- Proposed Slope Stakes Fill --- F--- Proposed Curb Ramp cR Existing Metal Guardrail — Proposed Guardrail = Existing Cable Guiderail — Proposed Cable Guiderail — Equality symbol Pavement Removal T�EGETATION.• Single Tree Single Shrub Hedge '�' Woods Line � ti ����������I � � Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Pedestal Telephone Cell Tower U/G Telephone Cable Hand Hole U/G Telephone Cable LOS B(S.U.E.*) - U/G Telephone Cable LOS C(S.U.E.*) - U/G Telephone Cable LOS D(S.U.E.*) - U/G Telephone Conduit LOS 6(S.U.E.*) U/G Telephone Conduit LOS C(S.U.E.*) U/G Telephone Conduit LOS D(S.U.E.*) U/G Fiber Optics Cable LOS B(S.U.E.*) U/G Fiber Optics Cable LOS C(S.U.E.*) U/G Fiber Optics Cable LOS D(S.U.E.*) � � � � Vineyard CONC � ��N� WW I ` WATER: Water Manhole Water Meter Water Valve Water Hydrant U/G Water Line LOS B(S.U.E*) U/G Water Line LOS C(S.U.E*) U/G Water Line LOS D(S.U.E*) Above Ground Water Line �. �oN� HW TV Pedestal TV Towe r }----------< U/G TV Cable Hand Hole ��B U/G TV Cable LOS B(S.U.E.*) U/G TV Cable LOS C(S.U.E.*) 0 U/G TV Cable LOS D(S.U.E.*) U/G Fiber Optic Cable LOS B(S.U.E.*) s U/G Fiber Optic Cable LOS C(S.U.E.*) U/G Fiber Optic Cable LOS D(S.U.E.*) � � O ❑T � HH - - - -T- - - - - - T - - T - - - -TC- - - - - -TC- - T� - - - -T FO- - - - -T FO- - T FO GAS : Gas Valve Gas Meter U/G Gas Line LOS B(S.U.E.*) U/G Gas Line LOS C(S.U.E.*) U/G Gas Line LOS D(S.U.E.*) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer SS Forced Main Line LOS B(S.U.E.*) SS Forced Main Line LOS C(S.U.E.*) S S Force d Main Line L O S D( S. U.E.*) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line LOS 6(S.U.E.*) U/G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. - A�G Tank; Water, Gas, Oil Geoenvironmental Boring U/G Test Hole LOS A(S.U.E.*) Abandoned According to Utility Records - End of Information W A/G Water c❑ � HH - - - -TV- - - - - -TV- - TV - - - -TV FO- - - - -TV FO- TV FO �- A/G Gas � O 55 A/G Sanitary Sewer - - - -FSS- - - - - - FSS - - FSS • a � s❑ 7UTL 0 UST 0 � m AATU R E.O.I. N Z O > w � IF BEGIN APPROACH SLAB -L- STA. 14 + 67.83 \ _ TYPE III PS � c � PS 2-BAR METAL RAI L Bridae #119 c BEGIN APPROACH SLAB -L- STA. 18 + 36.74 END BRIDGE 8' CONC. PS -L- STA. 17 + 77.00 TYPE IIL _� TYPE III TYPE III � �NTS� END APPROACH SLAB BEGIN BRIDGE -L- STA. 18+01.17 -L- STA. �4+92.0o PS - PAVED SHOULDER SBG - SHOULDER BERM GUTTER SKETCH OF BRIDGE AND PAVEMENT RELATIONSHIP D ETAI L 4-1 SPECIAL LATERAL BASE DITCH ( Not to Scale) Natural � o� Fill Ground .?.� p 3���a,��e� Slope F � Min. D=1.0 Ft. 6- 2.0 Ft. A STA. 12 + 50 -L- RT TO STA. 14 + 00 -L- R D ETAI L 4-7 STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground �',•� n�•.� Ground d � Geotextile B Min. D= 1 Ft. Max. d = 0.5 Ft. *When B is < 6.0' 6= 3 Ft. Type of Liner= Class B Rip-Rap 0 D ETAI L 4-2 LATERAL BASE DITCH ( Not to Scale) Natural �� Ground 3•� p 3•� 1'�Ft. Fill Slope � o � Min. D= 1.0 Ft. I.• �'� B = 2 Ft. b = 5 Ft. D ETAI L 4-3 SPECIAL CUT DITCH ( Not to Scale) Front t Ditch Grou d 2.�� ��p'C�e� Slope Min. D= 1.0 Ft. � FROM STA 20 + bl -L- LT TO STA 23 + 00 -L- LT 2-BAR METAL RAI L END BRIDGE -L- STA. 19 + 41. C 00 TYPE III TYPE III � �%//�i � ����i ■ �% � � �� � 1 ■ �.\� : . . - • . �;?Ye� : �• � � .. . .. � . . , . . . . .. . � ,...�. .� . � • . :•� - �- DETAIL 4-4 LATERAL 'V' DITCH ( Not to Scale) Natural I �- ' Fill Ground 3•� � n�•:� 1'�Ft. Slope D Min. D= 1.0 Ft. b = 5.0 Ft. FROM STA. 14 + 00 -L- RT TO STA. 14 + 50 -L- RT FROM STA. 19 + 57 -L- RT TO STA. 20 + 50 -L- RT D ETAI L 4-5 RIP RAP AT EMBANKMENT ( Not to Scale) 10'min.-► Ditch �,0'mi� Grade �'� GEOTEXTILE � Type of Liner= 22 TONS,CL B Rip-Rap Geotextile= 48 sy -Y3 - Pl Sto 10+76.43 Pl Sto 10+32.44 p= 42° 20' 16.3" fLTI p= 45° 2/' 39.1" fRTJ D= 229° l0' S9.2" D= 229° l0' S9.2" L = 18.47' L = 19.79' T = 9.68' T = 10.45' R = 25.00' R = 25.00' DETAIL 4-6 DECK DRAIN DISSIPATOR PAD ( Not to Scale) . � DISSIPATOR P� AN vIEW � PAD o *NOTE: CENTER PAD DIRECTLY BELOW DECK DRAINS GROUND DDE = 44 CY DDE - 41 CY �- ^-� FROM STA. 15 + 30 -L- RT TO STA. 15 + 54 -L- RT �\ \ \ \ / i \� N� // �O N \ � - 1��"l \y �'�,, v � � � �f w000s \ �T � �� � �/�`' o �6. -� -f-a� � �o �\\� � � +so.00 -Y�- `�f 90� N\��9�-- 1 30.00' (RT.) ��� � \ � \ �'y � ��� ��� HAVOLINE T. GILLIAM � `��"� \ � � � APPROX, LOCATION J. WESLEY GILLIAM oF DRAIN PiPE DB 2263 PG 554 �'y \�'I�S � C ACCORDING TO 9 PROPERTY OWNER + 50.00 -L- \\ 50.00 (LT.) � � LT & R1 `� \ FEs � 50' TAPEI E� EXISTING\ R/W \ � i � � i �� � + 00.00 -L- + 24.86 -L- ' 63.00' (LT.) 60.00' (LT.) `,,� B� � � E �' E �} - - - C � _ _ _ _ � � C � +,�� � 1 �i , \ � o .\ �� � � - FROM STA. 15 + 54 TO STA. 15 + 75 -L- RT ,� DISCHARGE OUT�ET IN FROM STA. 19+50 TO STA. 19+60 -L- RT FACE OF DAM GEOTEXTILE o PROFlLE VIEW 3a5' HIGH x 4' WIDE � INV=586,08' L= 4.0' Type of Liner= 15 TONS CL B Rip-Rap (9 Pads LT/RT) Geotextile= 32sy STONE DAM FROM STA.16+69 TO STA.17+75 LTiRT � r-- - - - - - -- _STONE DAM C�-EOCK ROCK �- � -� -�-- _ _- - -�` �-��-�- ��� �OCK �S � �- - � STONE DAM � � 5��� ��� -_--� -Yl- P T t l +0 �RocK O S CI. O 0.00 DO NOT DISTURB �� WOOD STEPS 2 ��I >5 BM I �`� ELEV=598o15' SEAN WESLEY GILLIAM ��`� I °�- sEE sHEET ic-i �' N BEGIN CONST. -Y3- STA. 10+15.00 KELLY CROWDER GILLIAM / �QQ� � ���P z z SEE INSET 'A' FOR -Y3- STATIONING DB 2846 PG 82 ��_� ��,�� 4 � �� �� / " � � `�'- +68.00 -L- S 74°52'09" E m�� � �c� � `° ` ➢' , �W , v 18,74� �� � o GLEN RAVEN MILLS. INC. -+� �� o' , N � 50.00 (LT.) BEGIN CONST. � o Q`�Q �° -� �, 0 92.00' (LT.) -Yl- STA. 10 -� $5.00 � � � � / �SQo�o DB 38 PG 562 0� � o � �, �- 1 \/ 25e29� T ��` p� DESTRIAN ISBRI GE +85.00 -Yl- o� '� Q N 85°36'35" E �r so.00' (LT.) DO NOT DISTURB GATE om ��,- �_� J cAZEBo e cz � z + oo.00 -v�- � �, � ��, �, � 40.00' (LT.) +30.00 -Yl- _� � � I o� +23.00 L-BM I �,o �, ��, REMOVE WOODS 30.00' (LT.) ,, � �' m� � � 90.00' (LT.) zr z � ° �� EXISTING GOOD ,� � �' � � � T DI TU � SIGN � � �,� � � BRIDGE +so.00 `� CONDITION � � o � �, `� � � +10.00 -L- 36�� W� RAi� o �, � \�;, �' +bo.00 -�- REMOVE & 95.00' ( +85.00 -L Q Q �,� � � � ' � 50.00' (LT.) MTL GATE � �P � woo�s , o o �,o �, � �, , � 50.00' (LT.) RESET GATE %i � +51.61 -Yl- 65.00 (LT t a, U, I� N� 70.00 (LT.) �8" W wALL C� 40.00' (LT.) +60.00 -L- � � ��� � w�- � 58.00' (LT.) . • �nj� +50. 0 -L- WD STEPS 50.00' (LT.) � � � z gG CLASS 'B' RIP RAP f� 4°47�3" E � 50.0 '(LT.) � � a' � rn r-36'_W AIL z ►� ►� i k, Q, __ L- STA 19 + 58 LT EST. 2 TONS 26,�5' ��.+20.00 -L- N 88°3��g4" E �v +75.00 -L- n, ' � N TO i' 19+68 LT E � EST. 7 SY GEOTEXTILE �" �j 0.00' (LT.) �25 q ^� �" 65.00' (LT.) SI N ' �� � +00.00 -L- 2°0 '30° E 5.00' (LT.) FRO L- ST� 18+02 LTiRT �G � F � 2'j.99 �`NI ,4 5'3 ' `-�,� 6" S �50.00' (LT.) 24, 4' � `� N 72 9'41" E R SPECIAL DITCH -� T -L- LTiRT REMOVE � � � � � - - +49e23 N 76° 4'33" ��� - _ P� � � i i� +75.43 18,18 � g , �� STEEL � \ SI �4��- � � NC SL PE 5,70' -�Q� � � 50,50' RA PING P P REMOVE � � ` xiSTiNG � P ON :.:, 51057' N �_ '� IN F F__ F F ��� � CONC SLOPE AT-1 0 �YP. Pg - � � 'EMO �- _ - - - � PROTECTION � � F . � g:1 G�UFUpU�LE� DRA / - •j� � m CONC HANDRAIL G� 6" HDP ' STL t- � �_ - � J3 " o �� - - ----- - -- --- ---- - - 4 - - - /�b1�E � 6"�ST o N o � �'A� � o # ' o W � i BRID E 119� � i BRID E�12 �� o N 0409 0410 N o �� � REMOVE � � N I��42� 'JrO.O" W �- B L � o � o � --� ---- - -- � - -------- - _ L 2" PL 8: � ROCK NC HAND AIL 8'� , GRAU 350 �� � 2�i � HAN A��2�i �Ra,.� �5� � oa>> .� � � � - - �; - � � +41e89 CONC SLOPE . - ``� � �, � � C - - - - C - _ C _ _ _ � � / "F�'s 0 ECTION � 50.10' PROTECTION WO DS � � _ � ISTING R/W / EX TING R F TONE HW �%� ' SIGN �I Q SPECIAL BASE DITCH qT - � +20.00 -L- (/ � SEE DETAIL 4-1 F� 6° i F ASSUM � N 722 121I �r, ---l6-- l N�° '45' E � 6� +80.00 -L- F F C - �- - - - - - �i / �OCAT ON �, . � �� OODS � � R� F � REMO� .00' (RT.) DVE �DUE UE DUE TF� cB �� �� o � TB ,� g°�9� g E � . H /� +�5. 0-L���� , �� 09_ �°60 � +89.14� .c 50.00' (RT.) J� +50.00 -L- E WOODS � '�' �, ^� . �� � 17-�3' � / 50.0 (R� � 50 58 7° E � o� �➢ 9� < 60.00' RT. � �c c, �' W o `_`'� -�3 . -L- � - a40�00Y(RT.) � °06 �� � °9,_ " CLASS 'B' RIP RAP � \ � ) \ c _ \ � c� , +00.00 -L- +45.00 -L- E E ExPOP PE 6 CI y�� � w � � �� �a 50. 0; f�T.) k �/�� N 35�56° N EST. 7 S� GEOTEXTI 80.00' RT. 70.00' RT. + 75.00 -L- E � _ \ N � „�'�A� ( �T.) � � � E ` 3 , � � � � ) ( ) , z�y m. E i- Q -� � S 83°I '40" E �S„ 75.00 (RT.) �� z E � E �/ 22 72, °S � F p �� 3 LATERAL DITCH� � BEGIN GRADE +00.00 -L- �,�, � � c� ;e� _��,� � �, � / � � � �� ROpE 33 99 F SEE DETAIL 4-4 E +50.00 -L- +60.00 -L- � � `" � � RECONSTRUCT � 2 JEREMY D. TROXLER 100.00 (RT.) 50.00' (RT.) z� ,I � � -e� I BER/WDIKE o� e' �op TY NF �-'�I XS7 , 75.00' (RT.) W � � co � � '� ,-- " �F <i -� -L- STA. 10 -f- 50.00 NICOLE H. TROXLER 12+36.00 \ 70.00' (RT.) �� z i� � M�� �� z� .. pON� Fo� � �, � �I ,� -Yl - POT Sto. } y � °� °j � o J �� ° .o` ti e � �w = � 3 DB 3�20 PG �3� 13+45 99 ~ o � � �'�� ��� � �Q � � +20.49 -L-qNk s � I �' m PB 74 PG 45 -L - POT StO. . � � o � v � °' c� �" � �/ wa REMOVE �' �� ~ -� �`� �,� 90.00 (RT.) �� �, � w000s � o GLEN RAVEN MILLS. WC. � W o �� B E G I N P ROJ E CT T I P B-5 2 3 9 , � �, EXISTING ' 17 00� RT- DB 38 PG 562 Q o`` � 4 � ���, �//� LATERAL BASE DIT � BRIDGE � � �oe �c� �� �p o/ -L- STA. 1 O-F- OO.00 4 GLEN pBA38 PG I562' INC. �I� � � SEE DETAIL =2 � �� NS � 8�� RS 200� . PROJECT REFERENCE NO. B-52 39 RNV SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 4 HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED r�� � Z � � N� �� CL. II RIP RAP C II RIP RAP �,� CL. II RIP RAP � ';�II� �I I AND EXCAVATION A D EXCAVATION � ST . AY ITEM ,� �� � r STR. PAY ITEM , ST . PAY ITEM �� �S RIP RAP AT w '� _ ��I � EMBANKMENT �� �oo o� I STANDARD BASE DITCH �„ SEE DETAIL 4-5 � � SEE DETAIL 4-7 � � N SBG �/ o/ I EMBAN MPENT � �S�O -L STA 19 + 83 RT / � � � SEE DETAIL 4-5 �S \ \✓ � S� - �� � �� �OC�� . o� ���-� E N D PROJ ECT TI P B-52 -L- STA. 24 � 85.00 -Y2- POT Sto.10+00.00= 4 -L- POT Sto. 2/+47.79 GLEN RAVEN MILLS.INC. DB 38 PG 562 END GRADE -L- STA. 23 + 00.0 +00.00 -L- WOODS 65.00' (LT.) +50.00 -L- WOODS 60.00' (LT.) +90.00 -L- � 50.00' (LT.) � �� � �^ c _ - - - - - - _ _ C E ExisTiNG Riw TEL PED � O S I N ������� �����-,�� ��-,��,�����1-, ���, s < �.� r- r- �, r- r- �, r- r- r- r- r- r- r- r- r- �, �, �, ti o r NeC. HIGHWAY S7 25' BST o N p(V TO ALTAMAHAW o � T =� - - - `` . RT. � + 50' TAP �ST�N�� O Va TIE TO EXISTING ITCH N ?� PSRM 6.7 SY �~ 5• �0 _� +30.18 -L� ' 95.00' (RT) END GRADE -Y2- STA „' . 'r ^^ �`-���__r-r ' WOODS END CONST. -Y2- STA. 11 + + 30.24 -L- 50.00' (RT) _B�-S- �. GLEN RAVEN MILLS.INC. DB 38 PG 562 �-- 4 -Y� - PnT St _ l� + 57_97 : • / � BM 2 � �EV=61qo20' E SHEET IC-I SEE SHEET 6 FOR -L- PROFILE SEE SHEET 7 FOR -Yl-, -Y2-, AND -Y3- PROFILES SEE SHEETS S-1 THRU S-?? FOR STRUCTURE PLANS N Z O � W � c � � � s N Q � � � I O� M N � O m O � L �� / � � N � I �, Va wo o� N � PS TEMP YPE . UI �N �' N N�_C TEMP TYPE III TEMP PS TYPE III -LDET- : f BEGIN BRIDGE -L- STA. ?? + ??.?? N TEMP PS TYPE I ����„�„ N N �' ' ' " " - - �` TEMP N� TEMP � � PS TEMP N� TYPE III TYPE III TYPE III BEGIN BRIDGE END BRIDGE -L- STA. ?? + ??.?? -L- STA. ?? + ??•?? �NTS� PS - PAVED SHOULDER SKETCH OF TEMP. BRIDGE AND PAVEMENT RELATIONSHIP BEGIN PROJECT TIP B-5239 -L- STA. 10 + 00.00 APPROXo LOCATION /OF DRAIN PIPE ACCORDING TO � ROPERTY OWNER -o \ � �� \\ E S �� E ISTING��R/W \\ � �� � TYPE III END BRIDGE -L- STA. ?? + ??. �ETAI L •F �ET•U R DISCHARGE OUTLET IN I FACE OF DAM 305' HIGH x 4' WIDE INV=586,08' STONE DAM � �-- - - - - - - _STONE DAM C��OCK ROCK ��-- --J�-�- - �� ROC� _- - S�$-�� C-- - � STONE DAM '*,� ^� 0 C KI � - - � � �S�\/ ��-� --� � - - �f- �ROCK \ YIDET POT Sto. l0 00.00 s� � � \ 2 /I \ \ >`� B M I �/ / SEAN WESLEY GILLIAM ��� I E�EV=598o15' N / z � SEE SHEET IC-I �' ` \ aN � KELLY CROWDER GILLIAM � �QQ� / �o�,P ` Z DB 2846 PG 82 =�� �, � z � � � _ � 4 �� \ c,cO`P� � WOODS � �' � � o � � � BEGIN CONST. �� �'� 9 \ s� S 74°52'09° E �o � -° �' 9�, � �� ���� -Yl DET- STA. 11 + 20.00 18�74' �, I � � � �`` GLEN RAVEN MILLS. INC. -+ � �� o' o ��„ � -� -A� � � �, � �o Q\ s� � � / �S�o�oQ DB 38 PG 562 � � � � � Se � < � �v \ Q 25a29' � _` +80.00 -Yl- `�f� 9�,0 \ N�\�+`p'�, 30 00 (LT.)1 z� o � j I\/ N 85°36'35" E � z '� 30.00 (RT.) � \ �- om � �, I z� I � GAZEBO B ��' c`n c� ��\ �\� < +00.00 -Yl- � � o° I ��o � +23.00 -L$M I � T' 40.00 (LT.) + 30.00 -Yl- c�,� '� o� � o HAVOLINE T. GILLIAM � �s � � 30.00' (LT.) _ � � � 90.00' (LT.) �o z � � �� � F � -YlD T - �S �S ll �.2/ � � �� J. WESLEY GILLIAM DB 2263 PG 554 ��'ti \ \� ���, � 85 00 L � � � \ `' ✓ � � °� � +10.00 -L- 36�� Wp RAi� °� + 00.00 -L- +50.00 -L- 63 00' (LT ) E E 9 + �`p� � WOODS + . - Q o � `� � � � °� 50.00' LT. � �� � , o I � � MTL GATE � � F` \ +51.61 -Yl- � � � �n , 70.00 LT. N " i- c \ � � 40.00' (LT.) + 60.0065L00 LT� � � � � � � � � � � ) 18" D� W EPS m r 3 50.00' LT. � W z + 50. -L- � +24.86 -L- p � ( ) N 4°47V3" E i N50.0 (LT.) � � �� '� 60.00' (LT.) W \ ' ,L \ 260 5' � �.+20.00 -L- N 88°3I'zt'4° E �' +75.00 -L- ti-, B � � s O� � '�\\ 0.00' (LT.) �25,4 65.00' (LT.) SI N �I , /�� I + 00.00 -L- � G -YIDET - PT Sto. 12+65.48 A / 7C° / O/ /1 G /l�i [ �. - � � � � . , . � - � �� , � � f \ _ • ► ,!w - � �- -`T ' � il� ' ! . � . �j�il . , . � • � �;� ''►' ' '� � � ,i. . �� ' i• � '1" ,� i�� �,:. � .� � i� .. _ I , . . �,•:>�1 -- - �� is is �; - , - � � � � � ' �� . ��•» EXISTING R/W E � / � � � + 80.00 -L- C, F 2� 0-L- PS -v �P. .00� ��.� pVE ' 50.00' (RT.) � � \ +50.00 -L- SPECIAL CUT DITCH E C C� 60.00' (RT.) SEE DETAIL DETI - � + 00.00 -L- + 45.00 -L- E 80.00' (RT.) 70.00' (RT.) + 75.00 -L- 75.00' (RT.) + 00.00 -L- JEREMY D. TROXLER �00.00' (RT.) BEGIN GRADE NICOLE H. TROXLER -LDET- STA. 11 + 11.74 � DBB3i70 PG 45 -LDET - PC Sto. 10+00.00= -LDET - PRC Sto. 11+60.63 -L - POT Sto.10+04.15 DETAIL DETI SPECIAL CUT DITCH ( Not to Scale) � Front 0 Ditch Natural `L�'� ,�e� Slope Ground ?7 p �\O d Geotextile Min. D= 1 Ft. Type of Liner= Class B Rip-Rap Max. d= 0.5 Ft FROM -LDET- STA. 11 + 50 TO 13 + 00 RT DETAIL DET2 SPECIAL CUT DITCH ( Not to $cale) Front �t Ditch Natural � �,'1 ,`,�gt Slope Ground ?• j D F��� Min. D= 1.0 Ft. FROM -LDET- STA. 13 + 00 TO 14 + 80 RT FROM -LDET- STA. 22+00 TO 24+55 RT DETAIL DET3 TOE PROTECTION ?•� ( Not to Scale) �,�cet or F\ Fd�s� p�etfer ,L.� �°`�S\oQe d � Geotextile d = 1 Ft. Type of Liner= Class B Rip-Rap FROM -LDET- STA. 14 + 00 TO 14 + 85 LT FROM -LDET- STA. 18 + 00 TO 19 + 10 RT FROM -LDET- STA. 22 + 00 TO 22 + 70 RT CLASS 'B' RIP RAP EST.2 TONS EST. 7 SY GEOTEXTILE � e� T � r���n,�Nc � T coNc s�oPE ��_ -r� ,� F� FUNNEL DRAIN ��� �-- � �� PROTECTION\� � � _��e Pi � �a - � _ ��v � -� � ONC NDRAIL -�-� � �'6 � � " o��� -L �� -I-��� - - -� - 1 � SAG�rA�+� vr���5- " ` I � P TE TI N W � � gRIDGE #119� � ��n� ��, SEE DETAIL DET3 I i i N l tl�Z� O.O�� �- B�- 4- I FUNNE� DRAIN � NA� 8� �S 2Q�7 � � -DRV - POT Sto. ll +45.70 �W +68.00 -L- N � 50.00� (LT.) END CONST. �, -, 0 92.00 (�T.) _DRV- STA. 11 + 40.00 �� -DRV - PT Sto. 10+72.97 o -� � -�. z m�' `4,� w000s � �� �� S l3° 42' S0.0" E �,`9 � o + 30.00 -L- = �' +60.00 -L- 95.00' (LT.) m 50.00' (LT.) 58.00' (LT.) �r-36" �AIL� '� \ / I J N 5 �� PROJECT REFERENCE NO. B-5239 WW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 5 HYDRAU LICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED END PROJECT TIP B-523 -L- STA. 24 � 85.00 4 GLEN RAVEN MILLS.INC. DB 38 PG 562 -�Rv- Pc st�_ m+�5_�5 . • ., ,� - ., � ' .� � � ��. � � � e �, - - . I ��o ' � � �- �u . _ �►� �� . �� ° � � . �' -.= �`_ _ I \_ � � �' � �3� K.m� . � . ► _. ' ' i� t- � . � � � � ' ��l� 1ti't :f�� _ . ►l ,., l.. .. .� i�i�q�" �F: K�Pi;i�l"KI�IA �` n�i�iili,- •• � . �j / ��. „� ��- �,.� ���jr5 � �,:j�� ' • N � � ` � //////0/��I�� � � � � ; � � I� . - � � - � � - - ,�, .� . ,,,, , � � �� � i� . . ii���u�y�� � . � �; ' �����yl�e :.. � �. . � � � _M;�`�'t=-�� -_ `d�:9l/lIC� ------ - ` �- ----- �11 a..�.. _ .r\ Y "r., _ 1 `- - - / �� A► ��� , � . � � .. �� _ ���. � i zna r. � ' � n �r . • � �`�dl�il��� � � '!� li%/�/�/iti� � - - � � i �►.. � . .: � . - ��,111�///1 �� � 1` � � ��►7,. ���.-�� . ��'�� ,,� ��� [�It � � v_ ._ � .ra� n�r.� i � � � %�►_'�� //�� � �a.'.� r:�ilr.�yi.���: �•Z► ► r�t�a�����iirae�iw����ic� '���,.�-,._,r�.�ca:srunw�r�� r ��•. �'•�t Q� ����v����,.n.c�:�7�•l�os•<.w':�i�-a ��.� ,, • \ • • i :::....n, ' � �► 1�1► ':�. � � `� I � • ■I�����r��l��'�`iif� :�, ►�����yy�I ► � .. �.:....�:• � �_��. �� ' : .. ' �� o • �� ��� �b.� ����.....,�� I:...:�,.:��\ �:i - •�--�-- - --- ------ ---- ----------- --- _ _ _ .. _ - -- ..- --- - .i� � � - � . � � � � �"�:..,.._,.-.. • e.�_ �'� ^ � ' ,l ' � 7 �I�� �l��'�,I � • � � � • %%�%%�%1111�i � . i �� � � ' i��i�� a��; '' '���1 � � .� � . , , r��e����, r �iiiii�e:�i • . � • ����'!: ':1 �'� . %ii%ihYyr � • � �������l�I� : p ' ������Ii;%` I':• . � . ^ -- _ ` �. 1. % 'i7��[//� .,,' ��,�.• .1 11 ;������ . . . .�i��e �i � . • . . Y��7�vy� . - � � . � � �i. � � � 11 _� �'�%%Ii/'' ' if�l1� _ /�ii;ll/% • 1 1 I ' � •' :,.,�.;:�,.7; � _ .. �iA//y� +�i%i _ ��F� ♦ �S9 il ' )`� • I , , - � iii'rui • �.. �� �� 'tiin. � J . � , � . . � � • %�ee�j, � �� � �• / � 1 11 _.�����i'�_ti� ,•' � �' �. � • + • �II ���� ��ilfl� : 1 • , � � _ ����r ._�:,5-"'" - ' - „�,, � _ r - �l� • � � I .. � _ � .' ; , I I� � � �� � �,'. : � •• �` ; ..= � � � ,•'• �I�" • : �• � �� . i � � � ,. � � � � ► � •• I 1 11 •� 11 :�� � •� ., � ' , I• � ��' 1 �� � �� •. , � ., •. � � ' ' � � � •� y � � � �i�„ � .• •• •, • � •� � • � • ' . .� • • . • . � • � .� �� •�� . : : . -. . • � � : �� �: • . i � . � • I I i I• �� ,_ . . I '�(I i ' I I I � ., `• -LDE D ETAI L D ET4 STANDARD 'V' DITCH ( Not to Scale) Natural Natural Ground ?.� '� Ground D �' � d Geotextile Min. D= 1 Ft. Type of Liner= Class B Rip-Rap Max. d= 0.5 Ft FROM -LDET- STA. 17+28 TO 17+85 RT DETAIL DET5 RIP RAP AT EMBANKMENT ( Not to Scale) 10'min. Ditch �,0'min• � Grade �, 1'5 GEOTEXTILE � Type of Liner= 40 TONS,CL B Rip-Rap Geotextile= 56 sy FROM -LDET- STA. 15+42 TO 15+57 RT FROM -LDET- STA. 16 + 39 TO 16 + 58 RT v, 3 � o � � � �� j � � � �`^� ? �� Q II� `�' x � Q I �PT Sto. l3 +2/.26 � / w � � � r � � �S I , o �' I I / ° oi y N , � � � � ' / / � � �S� �✓S � , �' \ � \�S � \-- �>� � �� /o��� - , � R ac / +00.00 -L- WOODS 65.00' (LT.) +50.00 -L- WOODS 60.00' (LT.) +90.00 -L- 50.00' (LT.) E EXISTING R/W TEL PED �rr P �.��������� , C � � T � TOE PROTECTION N.Ce IGHwA 87 2� o SEE DETAIL DET3 TO � AW o • ♦ • ■ / � �� �""_- ���t `� �� I � . �'� � 50� r ' � �c F � � "� SPEC CUT DITCH � C � SEE D IL DET2 � � � � + 30.24 -L- � � _ � ,B, P 50.00' (RT) - E .2 Ns -B�-S- � SY GEOTEXTILE �� END GRADE �� -LD PRC StO. 23+24.56 -LDET- STA. 23 + 78.13 LDET - PC Sta. 2/+63.93 -LDET - PT Sto. 24+85.19= -L - POT Sto. 24 +80.07 + o.�s -� -Y2DET - POT Sto. 10+00.00= , � 95. 0 cRT) -LDET - POT Sto. 2/+38.16 M-� -DRV - POT Sto. 9+65.32 � B -��' �(�"�� ���� IP P OODS EXISTING WOODS DITCH y END CONST. �� �,� -Y2 DET- STA. 10 + 88.00 /� �, " ��. GLEN RAVEN MILLS. INC. � DB 38 PG 562 � x � - . �� , �4 �,�----� Vdet = 40 MPH � � -LDET - -YIDET - -DRV - Pl Sto l0 +80.90 Pl Sto l2 +4/.53 Pl Sto 22 +44.83 Pl Sto 24 +05.46 Pl Sta l2 +23.42 Pl Sto l0 +55.85 - �_ l6° 53' 12.3" fRT l 0= l6° 53' 12.3" lLT l �_ l6° 53` 12.3" lLT J �_ l6° 53' 12.3" fRT J p= 30° 53' 33.6" �RT l p= 90° 00' 00.0" lLT l ��,� ,.- D= l0° 30' 46.8" D= l0° 30' 46.8" D= l0° 30' 46.8" D= l0° 30' 46.8" D= 35° 48' 35.5" D= l90° 59' 09.4" ,S/ � L= 160.63' L= 160.63' L= 160.63' L= 160.63' L= 86.27' L= 47.12' � _ � _ � _ i _ � _ � � �,P T- 80.90 T 80.90 T 80.90 T 80.90 T- 44.2/ T= 30.00 - �� R= 545.00' R= 545.00' R= 545.00' R= 545.00' R= 160.00` R= 30.00' � / SE = SEE PLANS SE = SEE PLANS SE = SEE PLANS SE = SEE PLANS SE = SEE PLANS _ �'' �� � � � BM 2 ' � LEV=614o20' $ E SHEET IC-I SEE SHEET 7 FOR -DRV- PROFILE SEE SHEET 8 FOR -LDET-, -Y1DET-, AND -Y2DET- PROFILE