Loading...
HomeMy WebLinkAboutNCG140455 - Stevenson-Weir Charlotte�t1 •VV* ' RCDENR No- CA um DEPARTMENT OF ENVIRONMENT AND NRU RESOURCE; Division of Energy, Mineral and Land Resources Land Quality Section National Pollutant Discharge Elimination System FOR AGENCY USE ONLY Date Received Year Month Day Certificate of Coveracie— N Check# o t Perms Asst ed to -r-rr NCG140000 gpfA NOTICE OF INTENT I V EFP ` National Pollutant Discharge Elimination System application for cove rag de�(t� neral Permit T NCG140000: SrDRN R-LgjVp Q�ALIN � STORMWATER AND PROCESS WASTEWATER DISCHARGES associa%dkitl' gphN h� y classified as: SIC (Standard Irbd�E_t' :rl �'lasr :ca: fir! r'o;.'=r. �27a �ars..:.' ;. ter:" -=r cam'' mow' C:�: This NOI may be an application to discharge process wastewater. NCG140000 contains effluent limitations for process wastewater discharges. Wastewater discharges must meet the requirements of these effluent limitations. An exceedance of any of these limitations will result in a violation of the permit nJi` For questions, please contact the DEMLR Central Office or Regional Office in your area. (See page 6) (Please print or type) 1) Mailing address of owner/operator (official address to which all permit correspondence will be mailed): (Please print or type all entries in this application form.) Legal Owner Name Stevenson -Weir Company. (Please attach the most recent Annual Report to the NC Secretary of State showing the current legal name. Alternatively this permit can be givc . to an Signee's Name (as signed for in question 29 below) Stuart Stevenson Street Address 1523 South Anderson Road city Rockhill State SC ZIP Code 29730 _ Telephone No. (803) 371-0117 Email _ stuar O-stevenson-weir.com :Ivarnate C;.l,tact ar .2 Stuart Stevenson Email (if different) Alternate Contact Telephone (if different) 2) Location of facility producing discharge: Facility Name Stevenson -Weir Charlotte Facility Contact Stuart Stevenson Street Address 3725 Westinghouse Blvd city Charlotte State NC ZIP Code 28273 County Mecklenburg County Telephone No. (803) 371-0117 Fax: (803) 371-5822 �/ ; INyso�:al ���a.o:;;i ��oformafion: Please provide narrative directions to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). Steele Creek Road to the intersection of Steele Creek Road and '_?lestinnhouse Blvd. proceed South -East 0.04 miles to the Site. (A copy of a county map or USGS q lhcet w;t; fa; '°`j 4) Latitude 35.132149 Longitude -80.969109 (deg, min, sec) 5) This NPDES Permit Application applies to the following (check all that apply): X New or Proposed Facility Date operation is to begin 09/15/17 Page 1 of 7 SMAJ-2.29-11032011 I yst revised 7/2/14 i► NCG140000 N.O.I. ❑ Existing Facility Permit # Page 2 of 7 SWU-229-07122011 Last revised 7/2/14 NCG140000 N.O.I. 6) Consultant's application information: Consultant: Dwight Kurtz Consulting Firm: DePaul Engineering Inc. Mailing Address: 3693 Buffalo West Springs Highway City: Buffalo State: SC Zip Code: 29321 Phone: (864) 427-5407 Fax: ( N/A Email: dwightkurtzC�depaul-engineering.com (Optional) Staple Business Card Here: 7) Provide me 4 -digit Siandartl •in-dusual Classi,icallon Code (SIC Code) that describes the primary industrial activity at this facility: SIC Code: 3 2 7 3- 8) Provide a brief description of the types of industrial activities and products produced at this facility: (Attach a site diagrarrn sho-% ing Esta prace:s avec s p=eLen_ a_ _h€ -_1d--- 5i'my.; Produce ready mix concrete for the building on this site The ready mix concrete plant will be removed from this site when the building is complete. Construction is scheduled to last 6 to 8 months Stormwater Discharge Wastewater Treatment & ®ig^hart7^ an �er.nittBn%s !-,€^r rz�tenn 9) Discharge paints / Receiving waters: Number of discharge points (ditches, pipes, channels, etc.) that convey stormwater and/or wastewater from the property: Stormwater-only: Wastewater -only. Wastewater Commingled with Stormwater.• _ X For new facilities: Expected date of commencement of discharge: 08/15/17 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or viaste.vater discharges and up in? Steele Creek Receiving water classification (s), if known: C If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). City of Charlotte Will this facility discharge wastewater to SA (Shellfishing) waters? ❑ Yes ❑ No Note: Discharge of process wastewater to receiving waters classified as WS -II to WS -V or SA must be approved by the N.C. Division of Water Resources, Public Water Supply Section. If DWR does not approve, coverage under NCG140000 cannot be granted. No new discharges of —C� Q, D.—in.tted in receiving waters classified as WS -1 or freshwater ORW. 10) Each applicant shall provide the following Infonnauvn taunan aUU1L1Urrar sheets as necessary): Two (2) site plans depicting the facility or site with numbered outfalls which indicate stormwater and wastewater outfalls. The plans shall legibly show. at a minimum, (existing or proposed): o Outline of drainage areae y.iLh topograp hic.Ql lines and ICQLUIcs o Stormwater/wastewater treatment structures o Location of numbered stormwater/wastewater outfalls (corresponding to which drainage areas) o Runoff conveyance structures o Areas and acreage where materials are stored o Impervious area acreages o Location(s) of streams and/or wetlands the site is draining to, and any applicable buffers Page 3 of 7 SWU-229-07122011 Last revised 7/2114 NCG V10000 I.O.I. o Site property lines, North Arrow, and bar scale o If applicable, the 100 -year floodplain line o Acreage of each stormvi ater and wastewater topographical area o Each of the facilities' wastewater or stormwater source and discharge structures and each of its hazardous waste treatment, storage, or disposal facilities o Site location (insert) Ske Plans shall be 24" x 36" in size. • Line drawing and description: A line drawing of the water flow through the facility. A pictorial description of the nature and amount of any sources of water and any collection and treatment measures. • A narrative description and identification of each type of process, operation, or production area which contributes waste ate, to the efflue� �t for each ouuali, ariiu a uesi r iipLlor i of ti ie a esti llei it LI [U vVccst�VdateF receives (or will receive), including the ultimate disposal of any solid or fluid wastes other than by discharge. Processes, operations, or production areas may be described in general terms (e.g. "ash silo"). 11) Does the applicant have any unresolved Notice of Violations (NOVs)? X No ❑ Yes Wastewater. 12) What types of wastewater does your facility generate or discharge? Type Of Muf6iCiiiLE:Et Genera'_ D€�.:­=`L- SLz:L to ece" Treatment System Vehicle and equipment cleaning (VE) N N N Wetting of raw material stockpiles (RM) Y Y N Mixing drum cleaning (MD) Y N N Further explanation, if necessary: Wetting of raw material stockpiles drains to the on site storiilvrater wet detention pond. 13) Will your facility spray -down or actively wet aggregate piles? ❑ No X Yes 14) Does the facility use any of the following on site? NO ❑ Phosphorus -containing Detergents ❑ Non -Phosphorus -containing Detergents ❑ Brighteners ❑ Other Cleaning Agents ❑ Other: !g- �,lr�_.;...-A F.3.- t_e 1.�.�_-.-..11 /-. �_ / ft , rF o... r:! lam.._ 15) Are wasteE:ae6- t�v Eace E"cF-Eic ac.-:.E:ECs pt!Mn-Eisv in G-ic i n— EEFU_ �LrF€E: X No ❑ Yes 16) Does your facility use or plan to use a recycle system, or recycle components in your treatment system? ❑ Yes X No If yes, what size storm event is the system designed to hold before overflowing? (for example, 10 -yr, 24 -hr) year, 24 -hr rainfall event Page 4 of 7 SWU-229-07122011 Last revised 7/2/14 NCG140000 N.®.I. PIZ!17) Will your facility build a closed-loop recycle system that meets design requirements in 15A NCAC 02T 1 .1000 and hold your facilities' working volume'? 1r `— ❑ Yes X No Will your facility discharge was€evlra€er to surface waters? X Yes ❑ No If the facility's treatment system meets the design requirements of 15A NCACO2T .1000 (including iiviul�ig the 25 -year, 24-hour afvrtn plus one foot of freeboard), holds the working volume of your site, and does not discharge wastewater to surface waters, you may not be required to obtain an NPDES permit for wastewater discharges. If you believe this is the case, please contact DEMLR's Aquifer Protection Section Land Application Unit Central Office Supervisor or staff (1636 Mail Service Center, Raleigh, NC 27699-1636) for more information on obtaining the necessary permits or approvals. If you will discharge wastewater or stormwater to surface waters, please continue to apply for a permit to discharge associated with ready -mixed concrete or like operations under NCG140000. For further questions, please contact DEMLR's Stormwater Permitting Unit Staff. 18) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2) for any new or expanding water pollution control facility's discharge in North Carolina. You may attach additional sheets. a) What wastewaters were considered for this alternatives review? X VE X RM X MD b) Connection to a Municipal or Regional Sewer Collection System: i) Are there existing sewer lines within a one -mile radius? ..................................... X Yes ❑ No (1) If Yes, will the wastewater treatment plant (WWTP) accept the wastewater? .... ❑ Yes X No (a) If No, please attach a letter documenting that the WWTP will not accept the wastewater. (b) If Yes, is it feasible to connect to the WWTP? Why or why not?* The WWTP has not been contacted about accepting wastewater. All areas generating waste water are open to precipitation WWTPs require areas generating waste water to be covered to prevent rain water from entering their system c) Closed-loop Recycle System (must meet design requirements of 15A NCAC 2T.1000): i) Are you already proposing a closed-loop recycle system (CLRS)? ❑ Yes X No (1) If Yes, contact DEMLR's Aquifer Protection Section's Land Application Unit (2) If No, is this option technologically feasible (possible)? Why or why not?* A closed loop Recycle System is not feasible for this plant. Mixer drum cleaning waste water will be collected in a plastic lined pit that is grade isolated from stormwater flows. This is a lo -VA. vuiul t:,vnpgu ary giant that will opertate for 6 to 8 months (3) If No, is it feasible to build a CLRS on your site? Why or why not?* A closed loop Recycle System is not feasible for this plant. Mixer drum cleaning waste water will be collected in a plastic lined pit that is grade isolated from stormwater flows This is a lr;w vlilile'tir {i- rninorary plant that will opertate for 6 to 8 months (4) What is the feasibility of building a CLRS compared to direct surface water discharge?* This is a temporary plant for a single construction project. A drum washout pit will be constructed that is similar to what is required (see above) to what is required on all construction sites. The water w. a. tet., + +r. LL_ -- 11 Pr ill he 11.._:r;. nnv� :-:-:-:_:_ spray irrigation): i) Is a surface or subsurface disposal technologically feasible (possible)? .................... ❑ Yes X No 1 'Ge J ,4 don Land i1pi:lii ai;oii Unit's VabDi B Aiai;.cw Cdicuhiiioji Policy for more information, on DWQ LAU's website http,/Iportal.ncdenr.org/web/wq/aps/lau/policies for more information. Page 5 of 7 SWU-22,c)-071220i i Last re iFed 7/2/14 NCG140000 N.O.I. Why or Why not? This is a temporary plant for a single construction proiect. A drum washout pit will be constructed that is similar to what is required (see above) to what is required on all construction sites. The water will be allowed to evaporate and the solids used as backfill. ii) Is a surface or subsurface disposal system feasible to implement?* ........................... ❑ Yes X No Why or Why not? This is a temporary plant for a single construction project. A drum washout pit will be constructed that is similar to what is required (see above) to what is required on all construction sites. The water will be allowed to evaporate and the solids used as backfill. iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct discharge to surface waters?* It is not anticipated to have Drum Washout waste water discharge Aggregate wetting water will be performed with city water. This water will discharge to a wet pond designed for the construction site. This water will not contain soil or Cementous fin-. Ths water is filtered thru washed stone before it is discharged to the wet pond ASTM C93 requires that aggregates contain less than 5% fine material that passes a 200 sieve. This is less than the fines contained in the background soils that the wet detention pond is designed for. e) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound alternative of all reasonably cost-effective options of the wastewaters being considered?*... X Yes ❑ No i) If No, contact DEMLR's Land Application Unit to determine permitting requirements. f) If this review included all wastewater discharge types, would excluding some types (e.g. raw stockpile wetting) make any of the above non -discharge options feasible? .............. ❑ Yes X No * You may be asked to provide further information to support your answers to these questions after the initial review. Feasibility should take into account initial and recurring costs. Stormwater: 19) Does this facility employ any best management practices fvr Stor-mvJu:o COIttr4i r ❑ No X Yes If yes, please briefly describe: Drum washout is performed in designated areas only: Fine and Coarse Aggregates are contained within block walls: All stormwater is discharged through a wet detention pond. 20) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No X Yes If yes, when was it implemented? 21) Are vehicle maintenance activities (VMA) occurring or planned at this facility? X No ❑Yes If yes, does your VMA area discharge into your wastewater treatment device? ❑ No ❑ Yes Other/Permittima: 22) Does this facility have a Division of Land Resources Erosion & Sedimentation Control (E&SC) Permit? X No ❑Yes If yes, list the permit numbers for all current E&SC permits for this facility: City of Charlotte 23) Is your facility subject to Phase II Post -Construction Area? XYes No If yes, who is the permitting authority? City of Charlotte 24) Is your facility located in one of the 20 Coastal Counties? ❑ Yes X No Is your facility adding more than 10,000 ft2 of built -upon area or CAMA Major Permit? ❑ Yes X No Page 6 of 7 SWU-229-07122011 Last revised 7/2/14 NCG140000 N.O.I. 25) Is your facility discharging wastewater (treated or untreated) such as water from wetting of aggregate piles, drum rinse -out, or vehicle and equipment cleaning to a stormwater BMP? ❑ No X Yes If yes, please attach your approval from the permitting authority to do so. 26) Does this facility have any other NPDES permits? X No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: 27) Does this facility have any Non -Discharge permits (ex: recycle permits)? X No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 28) Hazardous Waste:? a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? X No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? X No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? X No ❑ Yes 29) Signatory Requirements (per 40 CFR 122.22) All applications, reports, or information submitted to the Director shall be signed and certified. a All notices of intent to be covered under this General Permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means. (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship. by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. Page 7 of 7 SWU-229-07122011 Last revised 7/2/14 d) Type(s) of waste: How is material stored: Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: Vendor address: Final Checklist This application will be returned as incomplete unless all of the following items have been included: ❑ Check for $100 made payable to NCDENR. ❑ This completed application and all supporting documentation. See Question 10. ❑ If an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR) or local designee: documentation verifying applicant has developed and submitted that Plan to the governing agency (required per 15A NCAC 02H .0138). ❑ Two (2) site plans depicting the site plan with numbered outfalls which indicate stormwater and wastewater outfalls. See Question 10. ❑ A county map or USGS quad sheet with location of facility clearly marked. 29) Signatory Requirements (per 40 CFR 122.22) All applications, reports, or information submitted to the Director shall be signed and certified. a All notices of intent to be covered under this General Permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means. (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship. by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. Page 7 of 7 SWU-229-07122011 Last revised 7/2/14 NCG140000 N.0.1. Certification: North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Stuart Stevenson Title: Owner of Applicant) (Date Si ned) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDENR Mail the entire package to: Stormwater Permitting Unit Program Division of Energy, Mineral and Land Resources 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DEMLR Regional Office for your area. DEMLR Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office .. (910) 433-3300 Mooresville Office .. (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ... (252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office ......... (919) 807-6300 Page 8 of 7 SWU-229-07122011 Last revised 7/2/14