Pre -Construction Notification (PCN) Form
A.
Applicant Information 2 0
1 7 1 0 0
1.
Processing
1 a. Type(s) of approval sought from the
Corps:
®Section 404 Permit El Section 10 Permit
1 b.
Specify Nationwide Permit (NWP) number: 13 & 27 , or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps?
❑ Yes
® No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
❑ Yes ® No
For the record only for Corps Permit:
❑ Yes ® No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
❑ Yes
® No
1g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below.
❑ Yes
® No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2.
Project Information
2a. Name; of project:
Phillips Project
2b,
County:
Watauga
2c.
Nearest municipality / town:
Boone O y
2d. Subdivision name:
River Ridge (Phase 5) Plat Book 13, page 20
2e.
NCDOT only, T.I.P. or state
project no:
h 9�
N/A k
O
3.`'
Owner Information
3a.
Name(s) on Recorded'' Deed:
Joseph & Sarah Phillips,
3b.
Deed Book and Page No.
Deed Book 1901 Page 116 G�
3c
Responsible Party (for LLC if
applicable):
Joseph & Sarah Phillips
3d.
Street address:
253 Wild Turkey Road
3e.
City, state, zip:
Boone, NC, 28608
3f.
"Telephone no.:
919-931-9886
3g.
Fax no.:
919-821-7703
3h.
Email address:
SPhillipsghsfh.com
Page 1 of 11
PCN Form —Version 1.3 December 10, 2008 Version
4.
Applicant_ Information (if different from owner)
4a.
Applicant is:
®`Agent ❑ Other,specify:
4b. Name:
Glen Sullivan
4c.
Business name
(if applicable):
Foggy Mountain Nursery
4d.
Street address:
2251 Ed Little Road
4e.,
City, state, zip:
Creston NC 28615
4f.
Telephone no.:
336-384-5323
4g.
Fax no.:
336-384-3764
4h.
Email address:
foggymtn @skybest.com
5.
Agent/Consultant Information (if applicable)
5a.
Name:
5b.
Business name
(if applicable):
5c.
Street address:
5d.
City, state, zip:
5e.
Telephone no.:
5f.
Fax no.:
5g.
Email address:
Page 2 of 11
B. ,
Project Information and Prior Project History
1.
Property Identification
1a.
Property identification no. (tax PIN or parcel ID):
293 275 1215 000
1b.
Site coordinates (in decimal degrees):
`
Latitude Longitude:(36.2655)
(-81.5877)
1 c:
Property size:
1.415 acres
2.
Surface Waters
2a.
Name of nearest body of water (stream,, river, etc.) to
South Fork New River
proposed project:
2b.
Water Quality Classification of nearest receiving water:
WS -IV:+
2c.
River basin: map is available at
New
http://h2o.enr.state.ne.us/admin/maps/
3.
Project Description
3a.
Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The project site is located on the South Fork of the New River in Bald Mountain Township near Boone, NC. Landcover in
the area consists of mixed hardwood conifer, managed herbaceous cover, and mixed upland hardwoods. The property is
used as the primary residents for the land owner. Surrounding land use is primarily residential suburban with some
agricultural/rural use. The riverbank at the property is moderately to severely eroded due to storm water runoff and lack of
vegetative buffer along stream.
3b._
List the total estimated acreage of all existing wetlands on the property:
0
3c.
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
126 LF
3d.
Explain the purpose of the proposed project:
To repair and stabilize eroding bank by reestablishing proper bank profiles and to improve water quality and habitat for
aquatic fauna as well as riparian habitat on site. This will be achieved through bank reshaping, and with 1 in -stream
structure, along with adding large toe rock to the downstream side of the structure and planting of native woody
vegetation and grasses.
3e.'
Describe the overall project in detail, including the type of equipment to be used:
Eroding banks will be reshaped to approximately 2:1, or flatter and planted with native vegetation. One (1) rock vane will
be constructed to divert the thalweg back to the center of the stream. Large toe rock will be placed from station 0+57 to
1+26 on the downstream bank from the rock vane. During construction a track hoe will do the work from the bank unless
access to the river is necessary for proper structure placement. After construction the bank will be seeded with native
grass seed and sloped bank will be covered with erosion control matting and anchored with live stakes and landscape
staples. Flat areas will be seeded and mulched with straw. All areas will be planted with live stakes (Silky Willow, Salix
Sericea) (Silky Dogwood, Cornus amomum) (Elderberry, Sambucus canadensis) along with native rhododendron,
mountain laurel and river birch.
Page 3 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4.
Jurisdictional Determinations
4a.
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property
El Yes " ®No ❑Unknown
project (including all prior phases) in the past?
Comments:
4b.
If the Corps made the jurisdictional determination, what type
❑ Preliminary ❑ Final
of determination was made?
4c.
If yes, who delineated the jurisdictional areas?
Agency/Consultant Company:
Name (if known):j
Other:
4d.
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5.
Project History
5a.
Have permits or certifications been requested or obtained for
❑ Yes ® No ❑ Unknown
this project (including all prior phases) in the past?
5b.
If yes, explain in detail according to "help file" instructions.
6.
Future Project Plans
6a.
Is this a phased project?
❑ Yes ❑ No
6b.
If yes, explain.
Page 4 of 11
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your, project (check all that apply):
❑ Wetlands ® Streams`- tributaries ❑ Buffers
❑ Open Waters El Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d
2e.
2f
Wetland impact
Type of jurisdiction
number `=
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404, other)
(acres)
Temporary
W1 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
0
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number-
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ - non -404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ®P ❑ T
Stabilization:
South Fork New
® PER
® Corps
80
47
River
❑ INT
❑ DWQ
S2 ® P ❑ T
Rock Vane
South Fork New
® PER
® Corps
80
10
River
❑ INT
❑ DWQ
S3 ®P ❑ T
Toe Rock
South Fork New
® PER
® Corps
80
69
River
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
126
3i. Comments: From station 1+32 to 2+10 will be planted only.
Page 5 of 11
4.'`` Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries,tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then indivi ually list all open water impacts below.
4a.
4b.
4c.
4d.
4e.
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary T
01 ❑P❑T
02 ❑PEI T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts
0
4g. Comments:
5. < Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
5b.
5c.
5d.
5e.
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose
(acres)
number
of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
0
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ®No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b.
6c.
6d.
6e.
6f.
6g.
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary T
impact
required.
B1 ❑P❑T
El Yes
❑ No
B2 ❑P❑T
F1 Yes
❑ No
B3❑P❑T
_7❑
F1 Yes
No
6h. Total buffer impacts
0
6i. Comments:
Page 6 of 11
D.
Impact, Justification and Mitigation
1. `°'
Avoidance and Minimization
1a.
Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
This project will stabilize 126 LF of eroding stream bank, reduce stream bank erosion, reduce in -stream sediment loads
and improve in -stream aquatic habitats. Stream aesthetics will be improved with the establishment of a well vegetated
and functioning riparian zone
b.
Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques'.
During construction, equipment will only access the stream when absolutely necessary. For this project, it is anticipated
that most of the track hoe work can be accomplished from the top of the bank. However, equipment may need access the
stream during the construction when no other construction alternative exists. Soil disturbance will be limited to what can
seeded and stabilized in one day. Banks will be seeded and coir matting will be placed and anchored with wooden
stakes. Flat areas will be seeded and covered with straw.
2.
Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a.
Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
El Yes ® No
2b.
If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c.
If yes, which mitigation, option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee; Responsible Mitigation
3.
Complete if Using a Mitigation Bank
3a.
Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type
Quantity
3c. Comments:
4.
Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b.
Stream mitigation requested:
linear feet
4c.
If using stream mitigation, stream temperature:
❑ warm ❑ cool ❑cold
4d.
Buffer mitigation requested (DWQ only):
square feet
4e.
Riparian wetland mitigation requested:
acres
4f.
Non -riparian wetland mitigation requested:
acres
4g.
Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
Page 7 of 11
PCN Form —Version 1.3 December 10, 2008 Version
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? If yes, you will have to fill out this entire form — please
contact the State for more information.
❑ Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
0
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 8 of 11
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
%
2b. Does this project require a Stormwater Management Plan?
❑ Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Project does not require non -404
Jurisdictional General Permit, Is not subject to a General Certification 3704 or 3705, and impervious surface is less than
24%.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
❑ Phase II
3b. Which of the following locally -implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4. DWQ Stormwater Program Review
❑ Coastal counties
❑ HQW
4a. Which of the following state -implemented stormwater management programs apply
❑ ORW
(check all that apply):
❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 1.3 December 10, 2008 Version
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1 a.
Does the project involve an expenditure of public (federal/state/local) funds or the
❑ Yes
® No
use of public (federal/state) land?
1 b.
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c.
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
F1 Yes
El No
letter.)
Comments:
2.
Violations (DWQ Requirement)
2a.
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 26 .0200)?
2b.
Is this an after -the -fact permit application?
F1 Yes
® No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3.
Cumulative Impacts (DWQ Requirement)
3a.
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes
® No
additional development, which could impact nearby downstream water quality?
3b.
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4.
Sewage Disposal (DWQ Requirement)
4a.
Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 10 of 11
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
® Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ® No
impacts?
E] Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
US Fish and Wildlife Service website: Endangered and Threatened Species by County in North Carolina
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
http://www.habitat.noaa.gov/protection/efh/efhmapper/index.htmi
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
National Register of Historic Places at http://www.hpo.ncdcr.gov/nrlist.htm
8. Flood Zone Designation (Corps Requirement)
8a: Will this project occur in a FEMA -designated 100 -year floodplain?
® Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: The project will not impede flood waters.
8c. What source(s) did you use to make the floodplain determination? http://fris.nc.gov/fris/Home.aspx?ST=NC
Glen Sullivan
?
August 8, 2017
Applicant/Agent's Printed Name
v Applicant/Agent's Signature
Date
(Agent's signature is valid only if an authorization letter from the applicant
isprovided.)
Page 11 of 11
W
i, �,�, L-- _;* 11,
-S designate Glen Sullivan of Foggy Mountain
Nursery to act as my duly authorized agent concerning all US Army Corps of
Engineers and NC DENR permitting regarding the stream bank restoration project
on my property in WTwA4 County, NC.
Name
Address
Phone number Fax number
f 1,ps sa.rr-- . 6��'' j ,' �s t) c . cart
E-mail address
Date
Signature
e
l _
t '1
P
4A
o 0 _U ' � o I LL0 E{
w y
I
Al
I
o,f 1)
0
6
FIGURE 5. Typical bank reshaping and revegetation plan.
Cross-section view before work (existing condition)
__, Pasture grasses, little valve for bank
Q
Cross-section view after work
i be
Rooted trees, 2' to 6' tall. 10
Herbaceous vegetation.
Live stakes 18" to 24" in length. I
Erosion control blanket 4
- 8 ft wide, anchored with
wooden stakes/live stakes.
� r f� � r7►' M' ty1.�i'"
Water level
FIGURE 6. Typical rock vane structure showing plan and cross-section views. Photograph
shows a rock vane constructed in the South Fork New River at the Wagoner Road Access, New
River State Park.
PLAN VIEW
le
CROSS-SECTION VIEW
Ban
Vi) Footer rocks
Top rocks
Bankfull bench
0
VICINITY
MAP
2
Length (in ft) Impacted
78
b Insbeam SWdures
Length (in ft) of Sbeambank
126
Sbpin
LengM (in ft) of Live Stake
�a
LEGEND:
Mea Disturbed Dunng
J
"g
Bank resloping 0
yy
Planted Area
.r
Rack Vane
Toe Rock
so
®
Uth
Fork
o
NoW
River
o
_
o
v
Rock Vane
@ 0+42
Toe Rock
o
from 0+57 - 1+26
o
.c I
2:1 slope
SUMMARY TABLE
a
0
Q
�
m
ACTIVITY REACH
J
Reach Length 126 Feet
l
Q Parcel ID # 2932 75 1215'
Na. Instream Struct
Deed Book 1901
Page 116
P�
IX
W
F
Q
a
House
Q
SITE PLAN
Phillips Project
60
0 60
120
iso
!dO mountain ,O.,-- — 2r — NORM CAFWLW,
t ��
GRAPHIC
SCALE — FEET
Foggy Mountain Nursery
2251 m trtttE naa rAeM Ns 2l51S rat (335) x4-5323
ures
2
Length (in ft) Impacted
78
b Insbeam SWdures
Length (in ft) of Sbeambank
126
Sbpin
LengM (in ft) of Live Stake
� 26
Planting
Mea Disturbed Dunng
Constmction (Anes)
0.08
y
Station 0+00 — 0+75
Station 1+00
Station 1+26 — 0+00
Station 1+00 — 0+00