Loading...
HomeMy WebLinkAbout20170998 Ver 1_401 Application_20170810OF WAtF9 oma, pG Office Use Only: TCorps action ID no. S13 . O < DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification (PCN) Form A. 1. Applicant Information 2 Processing Q 1 a. Type(s) of approval sought from the Corps: X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 27 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes X No For the record only ❑ Yes for Corps Permit: X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No 2. Project Information 2a. Name of project: Eric Green Stream Restoration 2b. County: Watauga 2c. Nearest municipality / town: Boone 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Eric Neal Greene 3b. Deed Book and Page No. 721/583 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 3112 Colby Chase Dr 3e. City, state, zip: Apex, NC 28539 3f. Telephone no.: 3g. Fax no.: N/A 3h. Email address: N/A Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: X Agent ❑ Other, specify: 4b. Name: Derek Goddard 4c. Business name (if applicable): BREC, PA 4d. Street address: 126 Executive Drive 4e. City, state, zip: Wilkesboro, NC 28697 4f. Telephone no.: 336-844-4088 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Derek Goddard 5b. Business name (if applicable): Blue Ridge Environmental Consultants, P.A. 5c. Street address: 126 Executive Drive 5d. City, state, zip: Wilkesboro, NC 28697 5e. Telephone no.: 336-844-4088 5f. Fax no.: 336-609-7726 5g. Email address: Derek@brec.biz Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 2960-75-9567-000 1 b. Site coordinates (in decimal degrees): Latitude: 36.212575 Longitude: - 81.481804 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 98.01 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Stoney Fork proposed project: 2b. Water Quality Classification of nearest receiving water: C;Tr 2c. River basin: Yadkin Pee-Dee 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Agricultural and Residential 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1500 Perennial 3d. Explain the purpose of the proposed project: To improve water quality, prevent bank erosion, exclude livestock, improve habitat, and improve overall functional of the stream. 3e. Describe the overall project in detail, including the type of equipment to be used: The project restore 1235 linear feet of the stream based on the attached detailed plans using a track excavator and natural channel design techniques. Because of the large CFS in this stream we ask that the. requirement to work in the, dry be waived. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / El Yes No El Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type El Preliminary Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Unknown Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes X No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): Wetlands X Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T ❑ Yes Corps W1 P T Fill No ❑ DWQ ❑ Yes ❑ Corps W2 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W4 []PMT ❑ No ❑ DWQ ❑ Yes ❑ Corps W5 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W6 ❑ P ❑ T ❑ No ❑ DWQ 2g. Total wetland impacts .30. 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 X P ❑ T Restoration Stoney Fork ❑X PER I NTS2 X,Corrp\ss 4 1235 P ❑ T PER ❑ INT Corps DWQ ❑ PER ❑ Corps S3 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S4 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S6 ❑ P ❑ T ❑ INT 1 ❑ DWQ 3h. Total stream and tributary impacts 1235 3i. Comments: Page 4 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑ PEI T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 0. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Tota I 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes,•permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse E] Tar -Pamlico E] Other: Project is in which protected basin? NA ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required. El Yes B1 ❑P❑T ❑ No ❑ Yes B2 ❑ P ❑ T ❑ No El Yes B3 ❑P❑T ❑ No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. This impact is the only practical alternative to repair the stream from bad erosion problems and improve water quality. Erosion control will be adhered to for sensitive watersheds. At the end of each day the work will be stabilized. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Stringent erosion control standards for sensitive water sheds will be adhered too.. At the end of each day the work will be stabilized. All work will be conducted from the banks whenever feasible. Limited contact with live water will occur. All machinery is late model and in good working order. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool []cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes X No within one of the NC Riparian Buffer Protection Rules? - 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ❑ Yes it No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply,(check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval El Yes No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): . 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version 6. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http://www.ncnhp.org - hftp://www.saw.usace.army.miIMETLAND/esa - http://www.fws.gov/nc-es/es/es.html 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? hftp://ocean.floridamarine.org/efh—coral/ims/viewer.htm 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? hftp://www.hpo.ncd'cr.gov 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: No rise to the flood way will occur. 8c. What source(s) did you use to make the floodplain determination? http://www.ncfloodmaps.com Derek Goddard A, A � 08/9/2017 Applicant/Agent's Printed Name Applican Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION PIN: 2960759567000 Stoney Fork Watauga County NC STREET ADDRESS: Pin — 2960759567000 — Stoney Fork Road, Deep Gap, NC Property Owner: Eric Neal Greene The undersigned, registered property owners of the above noted property, do hereby authorize Agent of BREC, PA to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and all standard and special conditions attached. Further I authorize the USDA —NRCS to give BREC, PA employees access to my Equip Application File & All Files at USDA. Property Owner's Address (if different than property above): Eric Neal Greene 3112 Colby Chase Drive Apex NC 27539 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized ignature Date: J y4 _ 2(::;,/ 19, If- &*..I 6/rte-,4, Print — Name, Title t - •,�i'" � ``ba —h l ,'�_ 7 ,(apaN �' � /a� /�: � �i`;,-1 �"" /� � �� ���,�. � � �� aI \``! ,i, i I --y' ( \ �l - \':,�.�� ��;:✓ y..� �" i� 7..�;;R\ ` �n "b -s 4{r�, r ,�.9 1•��.\ 900'" �.. 7 ). �"'= F 7..; ti (_.. •� ! t -i ) ''/ �"' 1�. - `t ' i f0°' " � r t � i ! ' r, ✓ ',Uve (( WV3i11S3N332iJ � ���I r :��� ��• �; r/l f �;I V (- �,.: j 1. -� a ..� 1. h. "� - `+�� J`�;i .�:`-'.� i..OE.ZI i " e 1 80. q.)4 abpiy -dSl _ r c j (�aSP7N 7u!Ltl del �� V 'Ai t ro - asplg svuAed ,.• s � o ulojunw 061 OL. It rorr m. r A, i d0 aSPIN wosnu Y �\ �x iw - - st.9E - - i3�000 oee� -i - - - � -t--LS. _ _ 3�wooHSr .8E 99, 59. 49r Eq, L9, l9, 09: BS. 5l .OE.ZZ. LB .SZ +OE•LZ •OE.lB S3lH35 31nNIW-S'L O,UJ O C.oM`e^°,teyOv VNr101M IRIMONI j SI I -;.- .S7AlInS 7tlOI'J0703`J 'S'R V V V 919N"avn°° a SONIHds M"M &W 7""°"'y' IdOMR M 9H.LAO JMIM "dan Cn'a -s• 36° 13 1"N 36° 12' 30'N 3 Soil Map—Watauga County, North Carolina (GREENE SOILS MAP) 456000 456100 456200 456300 456400 456500 456600 456700 456800 3 Map Scale: 1:6,740 if printed on A landscape (11" x 8.5") sheet m Meters N 0 50 100 200 300 A` 0 300 600 1200 1800 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 3 N 457400 g 36° 13' 1"N F ffi g F 36° 2'3(r N 4�b;1)C 4570DO 457100 457200 457300 457400 3 m m 6/6/2016 Page 1 of 3 MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons / OF Soil Map Unit Lines 13 Soil Map Unit Points Special Point Features (o, Blowout 0 Borrow Pit X Clay Spot Enlargement of maps beyond the scale of mapping can cause Closed Depression Wet Spot Gravel Pit misunderstanding of the detail of mapping and accuracy of soil line Gravelly Spot Landfill ` Lava Flow Other Marsh or swamp a Mine or Quarry 0 Miscellaneous Water 0 Perennial Water V Rock Outcrop + Saline Spot Sandy Spot 4Rt, Severely Eroded Spot Sinkhole lr Slide or Slip +44 Sodic Spot Soil Map—Watauga County, North Carolina (GREENE SOILS MAP) MAP INFORMATION The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 6/6/2016 1011111 Conservation Service National Cooperative Soil Survey Page 2 of 3 Spoil Area The soil surveys that comprise your AOI were mapped at 1:12,000. Stony Spot Warning: Soil Map may not be valid at this scale. Very Stony Spot Enlargement of maps beyond the scale of mapping can cause Wet Spot misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting p Other soils that could have been shown at a more detailed scale. .� Special Line Features – _ - Please rely on the bar scale on each map sheet for map Water Features measurements. Streams and Canals Source of Map: Natural Resources Conservation Service Transportation Web Soil Survey URL: http://websoilsurvey.nres.usda.gov +44 Rails Coordinate System: Web Mercator (EPSG:3857) ry Interstate Highways Maps from the Web Soil Survey are based on the Web Mercator US Routes projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Major Roads Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. Local Roads This product is generated from the USDA-NRCS certified data as of Background the version date(s) listed below. Aerial Photography Soil Survey Area: Watauga County, North Carolina Survey Area Data: Version 14, Sep 16, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 22, 2010—Mar 17, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 6/6/2016 1011111 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Watauga County, North Carolina Map Unit Legend GREENE SOILS MAP Watauga County, North Carolina (NC189) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CSC Cullasaja very cobbly loam, 8 to 2.8 1.6% 15 percent slopes, very stony DeB Dellwood cobbly sandy loam, 1 10.8 6.2% to 5 percent slopes, occasionally flooded EvD Evard-Cowee complex, 54.0 30.9% escarpment, 15 to 30 percent slopes, stony EvE Evard-Cowee complex, 80.0 45.7% escarpment, 30 to 50 percent slopes, stony NkA Nikwasi loam, 0 to 3 percent 4.0 2.3% slopes, frequently flooded SnB Saunook loam, 2 to 8 percent 8.1 4.7% slopes SnC Saunook loam, 8 to 15 percent 11.4 6.5% slopes SnD Saunook loam, 15 to 30 percent 3.8 2.2% slopes Totals for Area of Interest 174.9 100.0% USDA Natural Resources Web Soil Survey 6/6/2016 Conservation Service National Cooperative Soil Survey Page 3 of 3 ERIC GREENE STREAM RESTORATION O 1O O� F US h�iy� 2) SITE 70W�O 2 0 N STONEY FORK ROAD VICINITY MAP (NTS) PROPERTY OWNER: ERIC N. GREENE 3112 COLBY CHASE DRIVE APEX, NC 27539 PROPERTY ADDRESS: 605 STONEY FORK ROAD PARCEL ID: 2960759567000 DEED BOOK/PAGE: 721 /583 x ERIC N2EAL GREENE 3 RESTORATSON SITE Tk< ST USGS MAP (NTS) 1:24,000 (MAPLE SPRINGS QUAD) TOPOGRAPHIC SURVEY: BLUE RIDGE GEOMATICS, PA 126 EXECUTIVE DRIVE - SUITE 220 WILKESBORO, NC 28697 LICENSE: C-3576 ENGINEER: BREC, PA 126 EXECUTIVE DRIVE - SUITE 220 WILKESBORO, NC 28697 LICENSE # C-3448 RESTORATION NATIONWIDE #27 IMPACTS: STONY FORK CREEK 1235' USDA - NRCS CONTRACT NUMBER EQIP 2014 7445321611V NORTH CAROLINA COUNTY MAP (WATAUGA COUNTY) SHEETINDEX C000 COVER SHEET C100 OVERALL PLAN C101 PLAN & PROFILE C102 PLAN & PROFILE C103 PLAN & PROFILE C104 PLAN & PROFILE C105 STRUCTURE TABLE C900 DETAILS C901 DETAILS C902 DETAILS JUSTIN C. CHURCH, PE TSP 11-7806 CITY/TOWN: DEEP GAP, NC SITE COORDINATES: LATITUDE = 36.212575° N LONGITUDE = -81.481804° W COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, PA.. ALL RIGHTS RESERVED. THIS PLAN MAY NCT BE RE -USED. SOLD. LOANED. OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PI AN WITHOUT THF WRITTEN CnNAFNT nF RI uF RInGE ENVIRONMENTAL CONSULTANTS. P A IS PROHIRIT n ANn K A Vlnl -- 11 1-1— rno--T I L— P1IM—Al F FY FWFS UP Tn Sinn nnn PPR nPFP"P Lu Lu w uj w J d pL 0 U U) tans sauTH couEGUTE DRIVE Q WIJ(ESBORO. NL 2863] Q 336.81410!6 60p;'o•e:.C2 w W (N C;AR,t4� W oaweaoiT cr Z G�a'voiyr�• LL Q cr z �g 0 Tn Z LU Q Z � a W 0 w W I- w � U) 0 Lu 0 w wLu Lu U) Q Lu 0 w W � o J o w � U Q m W 0 O U v"i z Q i O z J U ry Jf Q w o U) r1•x1r U) w LL. .�r. nuMea 2D60012015 «n6r J.EDWARDS orcer w .CHURCH 0 SCALE: cf) NTS (H) w v) m SHEET. � 0000 0 o Q w z z �g 0 Tn Z LU Q Z � a W 0 w W I- w � U) 0 Lu 0 w wLu Lu U) Q Lu 0 w W � o J o w � U Q m W 0 O U v"i z Q i O z J U ry Jf Q w o U) r1•x1r U) w LL. .�r. nuMea 2D60012015 «n6r J.EDWARDS orcer w .CHURCH 0 SCALE: cf) NTS (H) w v) m SHEET. � 0000 0 A-1 710- C COPYRIGHT 2071 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, PA, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENVIRONMENTAL CONSULTANTS, PA IS PROHIBITED AND IS A 1M So calx Tk DAM Y ESBM, N 2W7 us WA OU tftj. d LL LL QF E95 CY LL 1-- LLI LLJ 2 C/) Z :5 Lu U) Lu 0+00 233 232 231 230 m 229 r 228 O Z 227 226 225 224 223 CENTERLINE PROFILE STATION 1+100 2+100 LEGEND LOG J -HOOK ROCK CROSS VANE SEE DET. 1/C900 SEE DET. 2/C900 3+00 3+89 0+00 +00 2330 2320 2310 2300 2290 2280 2270 2260 2250 2240 2230 1+00 2+00 3+00 3+89 r USDA-NRCS STREAM CROSSING STD. 578 - t + 0) \ LIVESTOCK \ EXCLUSION _ - FENCE \ \ 6 COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS. P A. ALL RIGHTS RFSERVEO. TMS PLAN MAY NOT BE REA)SED. SOLD. LOANED. OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN \ WRITTEN CONSENT OF BLUE RIDGE ENVIRONMENTAL CONSULTANTS, PA. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, HI / \ 30 15 30 60 L ABLE BY FINES UP TO 3100,000 PER OFFENSE V' Q LLJ U) LL 2 H LL- L J LLJ m Z Q r--c----� L� 2060072015 n - B7 } J.EDWARDS L1_ J.CHURCH 0 JKALECn 1' = 30 (H) LL 1' = 30' M LLJm 11HEET:H C101 � HEAD C F RIFFLE 2303.50 HEAD F RIFFLE HEAD OF POOL 2303.16 HU OF RIFFLE H5 D OF RIFFLE 2304.10 ___ 2300.33 2298.58 _ HEAD OF RIFFLE_ HEA6 RIFFLE 2296.79 229545 HEAD OF RIFFLE 2292.64 HEAD OF OOL HEAD OF OOL HE OF POOL H D OF POOL tOFFOOL 2 66 2 1.33 2299.08 2297.29 HEAD OF OOL HEAD POOL _ HEAD POOL 2 5.95HEAD 294.47' OF OOL 2300.83 z 91.81 l E 0+00 +00 2330 2320 2310 2300 2290 2280 2270 2260 2250 2240 2230 1+00 2+00 3+00 3+89 r USDA-NRCS STREAM CROSSING STD. 578 - t + 0) \ LIVESTOCK \ EXCLUSION _ - FENCE \ \ 6 COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS. P A. ALL RIGHTS RFSERVEO. TMS PLAN MAY NOT BE REA)SED. SOLD. LOANED. OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN \ WRITTEN CONSENT OF BLUE RIDGE ENVIRONMENTAL CONSULTANTS, PA. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, HI / \ 30 15 30 60 L ABLE BY FINES UP TO 3100,000 PER OFFENSE V' Q LLJ U) LL 2 H LL- L J LLJ m Z Q r--c----� L� 2060072015 n - B7 } J.EDWARDS L1_ J.CHURCH 0 JKALECn 1' = 30 (H) LL 1' = 30' M LLJm 11HEET:H C101 � 3+89 4+00 233 232 231 230 m 229 r m 228 O Z 227 226 225 224 223 r�nn CENTERLINE PROFILE STATION A+nn LEGEND LOG J -HOOK ROCK CROSS VANE SEE DET.11C900 SEE DET. 2/C900 7+00 7+78 3+89 4+00 2330 2320 2310 2300 2290 2280 2270 2260 2250 2240 2230 5+00 6+00 7+00 7+ 8 er rw IAT MIA RY RI IIF RInr,F FNVIRnNIFNTAI rfW;IIl TAMS P A AI I RR:NTA RFRFRUFD TNI[ PI M YAY TWIT RF RFAIRFn R[II n I OANFD nR r4WN Tn OTHFRR RFPR / / / 00 W m In O c�, / Z- LIVESTOCK , `\ EXCLUSION FENCE \ / 30 15 0 30 60 TW R PI AN WRHOI Tf THF WRRTFN r"DNRFNT OF M I IF RIDGE ENVIRONMENTAL CONSULTANTS. PA IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS. PUNISHABLE BY FINES UP TO 5100.000 PER OFFENSE c— cn LL W J W m O Z Q � I HEAD OF L 2291.31 HEAD OF RIFFLE HEAD- RIFFLE_---. 2289.81 2287.80 HEAD OF RIFFLE HEAD OF RIFFLE 2285.47 2283.95 H OF RIFFLE H OF RIFFLE 2282.61 2280.77 H OF RIFFLE 2280.25 H OF POOL 2290.81 HEAD POOL HEAD OF POOL HEAD OF OOL HEA OF POOL 288.80 2288.30 22 HEAD POOL HEAD OF FOOL _ 2290.31 '97 2284.45 2 3.11 HEAD OF I 00t HEAD OF OL 2 1.77 22 6.47 H OF POOL HEAD 0 POOL HEAD OF L 2ze1.z7 279.75 'd 2215.97 li 3+89 4+00 2330 2320 2310 2300 2290 2280 2270 2260 2250 2240 2230 5+00 6+00 7+00 7+ 8 er rw IAT MIA RY RI IIF RInr,F FNVIRnNIFNTAI rfW;IIl TAMS P A AI I RR:NTA RFRFRUFD TNI[ PI M YAY TWIT RF RFAIRFn R[II n I OANFD nR r4WN Tn OTHFRR RFPR / / / 00 W m In O c�, / Z- LIVESTOCK , `\ EXCLUSION FENCE \ / 30 15 0 30 60 TW R PI AN WRHOI Tf THF WRRTFN r"DNRFNT OF M I IF RIDGE ENVIRONMENTAL CONSULTANTS. PA IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS. PUNISHABLE BY FINES UP TO 5100.000 PER OFFENSE c— cn LL W J W m O Z Q 7+78 8+00 233 232 231 230 m 229 228 O z 227 226 225 224 223 CENTERLINE PROFILE STATION 9+,00 10+,00 LEGEND LOG J -HOOK ROCK CROSS VANE SEE DET. VC900 SEE DET. 2/C900 11+00 11+67 7+ 8 8+00 10+00 11+00 2330 2320 2310 2300 2290 2280 2270 2260 2250 2240 2230 11+67 / )014 RY BLUE RIDGF FNVIRONkEWAI r"MlM TAMS P A AI I \ EXCLUSION \ FENCE RF.SFRVFO THIS PI AN BRAY NOT RF RF-SFD SOI 0 1 OANFD. OR OWEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PI AN WRHOIfT THE WRRTFN C.ONSFNT K RI I tF RIDGE ENVIRONMENTAL CONSULTANTS. PAIS PROMRITED ANO IS; UMUJJIIVV 01 U. of �R 30 15 0 ` 60 FFOFRAI COPYRIGHT LAWS. PUNISHARI F RY FlNFS UP TO 5100.000 PER OFFENSE Lu 0 ui U' g W w z X a U Z a w 0 N 11•x17• N W LL 0&092017 O sc, Bwn R 2060012015 a MM Bx } J.EDWAR0.5 � BY LL J.CHURCH O SCALE: (n 30. (H) W 30 M m w_ SHEET: C103 J OF RIFFLE HEAD RIFFLE HEAD C G H F RIFFLE 2277.91 2276.58 2275.25 HEAD OF RI FLE H OF RIFFLE 22 2.92 2^71.14 HEAD RIFFLE HEAD RIF FLE 2269.52 2267.90 HEAD RIFFLE HEAD C RIFFLE 2266.57 2265.24 HEAD Of POOL 2278.41 HEAD OF OOL HEAD OF HEAD OF FOOL 5.75 2 4.42 HEAD OF F O7 OL HEAD F POOL HEAD F POOL HEAD OF OOL HEAD OF FOOL 7.08 HEAD F POOL 22 2.14 HE kD OF POOL 2270.02 2268.40 Z 37.07 22 74 2273.92 2271.64 HEAD POOL 273.42.. 7+ 8 8+00 10+00 11+00 2330 2320 2310 2300 2290 2280 2270 2260 2250 2240 2230 11+67 / )014 RY BLUE RIDGF FNVIRONkEWAI r"MlM TAMS P A AI I \ EXCLUSION \ FENCE RF.SFRVFO THIS PI AN BRAY NOT RF RF-SFD SOI 0 1 OANFD. OR OWEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PI AN WRHOIfT THE WRRTFN C.ONSFNT K RI I tF RIDGE ENVIRONMENTAL CONSULTANTS. PAIS PROMRITED ANO IS; UMUJJIIVV 01 U. of �R 30 15 0 ` 60 FFOFRAI COPYRIGHT LAWS. PUNISHARI F RY FlNFS UP TO 5100.000 PER OFFENSE Lu 0 ui U' g W w z X a U Z a w 0 N 11•x17• N W LL 0&092017 O sc, Bwn R 2060012015 a MM Bx } J.EDWAR0.5 � BY LL J.CHURCH O SCALE: (n 30. (H) W 30 M m w_ SHEET: C103 m r m D O z CENTERLINE PROFILE STATION ---T MIA RV RI IIF RIMF FNVIR/YJIIFNTAI r' lII TANTO D A Al 1 01— 0-90— TNTC DI AN IAV I -T RF RFJ ICFh C n I nANFn OR fJVFN TOOTHFRC RFDR/tt11 EXCLUSION FENCE OR PHOTMOPYING OF THIS PLAN WITHOUT THF WRDTFN LEGEND LOG J -HOOK ROCK CROSS VANE SEE DET. VC900 SEE DET. 2/C900 I EXITING NCDOT CU6VERT & HEAbWALL RI UE RIDGE ENVIRONMENTAL CONSULTANTS, PA IS PROW&TED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS. PUNISHABLE BY FINES UP TO $100.000 PER OFFENSE 60 w J w m 0 z a € COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS.P.A_ ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED .SOLD ,LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGt tNVIKUry tN IAL UUNbULIAN IS, PA IS PROHIBITED AND 13 A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $11)0.000 PER OFFENSE w w Lu J d e° O U E 13065 1 CO G.TE MIA 4 Q .'.$B O, K 28697 Q 93fi.64.1066 Mojuec hz w Lu SN CARS LLJU Qo- w m h Tn rov c z Lu ;11CBELS.0-3.8. U U) F- gn+cARO` Z O 0 U) 0 Q 5 0 z Go Go U) U z w CIO J a. a Lu Lu LLJ z 2 O U) � z W W O w Lu cl) of cn w Lu U LL: � w W Lu m F- o U) Q w 0 w w c� 0 � J w o OZ U H Q a a O cn 11'X1)' Cn w oeroanolT O oxc ��wa�r, 2D6W72C15 d qUw By} J.EDWARDS opovED Br Li J.CHURCH O SCALE. fn 1'=30' (H) w 1'= 30' M m w SHEET_ 10570 STRUCTURE TABLE 7+84.09 8+04.09 HEAD OF POOL HEAD OF RIFFLE 2278.41 2277.91 STATION STRUCTURE ELEVATION 8+19.09 HEAD OF POOL 2277.08 RIFFLE CROSS SECTION PROFILE 0+41.28 HEAD OF POOL 2304,10 8+39.09 HEAD OF RIFFLE 2276.58 STATION 0+61.28 HEAD OF RIFFLE 2303.50 8+54.09 HEAD OF POOL 2275.75 0+20 0+00 0+ 0 2 20 0+76.36 HEAD OF POOL 2302.66 8+74.18 HEAD OF RIFFLE 2275.25 13.5' 0+96.37 HEAD OF RIFFLE 2302.16 8+89.09 HEAD OF POOL 2274.42 m 1 10 1+11.33 HEAD OF POOL 2301.33 9+08.87 HEAD OF POOL 2273.59 Z5 1+35.03 HEAD OF POOL 2300.83 9+28.92 HEAD OF POOL 2273.42 0 z _10____ 10 1+56.88 HEAD OF RIFFLE 2300.33 9+43.88 9+57.88 9+81.90 10+00.96 10+26.13 10+46.13 HEAD OF RIFFLE HEAD OF POOL HEAD OF POOL HEAD OF RIFFLE HEAD OF POOL HEAD OF RIFFLE 2272. 92 2272.14 2271.64 2271.14 2270.02 2269.52 5 -2 20 -0+20 0+00 0+20 POOL CROSS SECTION PROFILE 1+78.39 HEAD OF POOL 2299.08 2+01.86 HEAD OF RIFFLE 2298.58 2+25.08 HEAD OF POOL 2297.29 2+57.76 HEAD OF RIFFLE 2296.79 2+72.76 HEAD OF POOL 2295.95 2+90.36 HEAD OF RIFFLE 2295.45 10+66.13 HEAD OF POOL 2268.40 STATION -0+20 0+00 0+ 0 3+07.96 HEAD OF POOL 2294.47 10+86.13 HEAD OF RIFFLE 2267.90 2 20 3+25.57 HEAD OF RIFFLE 2293.97 11+01.13 HEAD OF POOL 2267.07 m17' 1 - - 10 3+40.57 HEAD OF POOL 2293.14 11+21.13 HEAD OF RIFFLE 2266.57 m D 3 3+60.57 HEAD OF RIFFLE 2292.64 11+36.13 HEAD OF POOL 2265.74 0 __. _ 3+75.57 HEAD OF POOL 2291.81 11+56.13 11+71.13 HEAD OF RIFFLE HEAD OF POOL 2265.24 2264.40 z 1 - - 10 -2 20 3+98.13 HEAD OF POOL 2291.31 4+20.69 HEAD OF POOL 2290.81 11+91.13 12+06.13 12+26.13 12+41.13 HEAD OF RIFFLE HEAD OF POOL HEAD OF RIFFLE HEAD OF POOL 2263.90 2263.07 2262.57 2261.73 -0+20 0+00 0+20 4+43.42 HEAD OF POOL 2290.31 4+63.29 HEAD OF RIFFLE 2289.81 4+81.29 HEAD OF POOL 2288.80 5+15.55 HEAD OF POOL 2288.30 5+33.41 HEAD OF RIFFLE 2287.80 5+48.41 HEAD OF POOL 2286.97 5+65.74 HEAD OF POOL 2286.47 5+83.08 HEAD OF POOL 2285.97 6+00.49 HEAD OF RIFFLE 2285.47 6+18.83 HEAD OF POOL 2284.45 6+38.83 HEAD OF RIFFLE 2283.95 6+53.99 HEAD OF POOL 2283.11 6+73.99 HEAD OF RIFFLE 2282.61 6+88.99 HEAD OF POOL 2281.77 7+10.60 HEAD OF POOL 2281.27 7+30.64 HEAD OF RIFFLE 2280.77 7+49.09 HEAD OF POOL 2279.75 30 15 0 30 60 7+69.09 HEAD OF RIFFLE 2279.25 € COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS.P.A_ ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED .SOLD ,LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGt tNVIKUry tN IAL UUNbULIAN IS, PA IS PROHIBITED AND 13 A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $11)0.000 PER OFFENSE w w Lu J d e° O U E 13065 1 CO G.TE MIA 4 Q .'.$B O, K 28697 Q 93fi.64.1066 Mojuec hz w Lu SN CARS LLJU Qo- w m h Tn rov c z Lu ;11CBELS.0-3.8. U U) F- gn+cARO` Z O 0 U) 0 Q 5 0 z Go Go U) U z w CIO J a. a Lu Lu LLJ z 2 O U) � z W W O w Lu cl) of cn w Lu U LL: � w W Lu m F- o U) Q w 0 w w c� 0 � J w o OZ U H Q a a O cn 11'X1)' Cn w oeroanolT O oxc ��wa�r, 2D6W72C15 d qUw By} J.EDWARDS opovED Br Li J.CHURCH O SCALE. fn 1'=30' (H) w 1'= 30' M m w SHEET_ 10570 Q1 WATER FLOW C900 BANKFULL N' / LOG J -HOOK ROOTWAD COMBO GAP FEATHER 3x1186 OUT BAYA A2BACKFILL WITH ROCK SILL SELECT MATERIALFOOTERLOGHEADERROOT WADBOULDER ANCHOR BOULDER TIED INTO STREAM BANK PLAN VIEW GENERAL NOTES. 1. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE 114 DIAMETER FROM THE TOP OF THE LOG. THE NAILS SHALL BE ON 12 INCH CENTERS, FILTER FABRIC SHALL BE BURIED IN THE BOTTOM OF THE CHANNEL AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. 2. A TRENCH SHALL BE DUG IN SUCH A MANNER THAT THE FOOTER LOGS A MINIMUM OF 213 OF THE HEADER BOULDER IS BURIED BENEATH THE BED SURFACE ELEVATION. 3. A HYDRAULIC EXCAVATOR WITH A BUCKET THAT CONTAINS A HYDRAULIC THUMB SHALL BE USED TO PLACE BOULDERS AND LOGS WITH THE SUPERVISION OF THE ENGINEER. 4. SEE SPECIAL PROVISIONS FOR HEADER AND FOOTER DIMENSIONS. S. FOOTER LOG SHALL BE PLACED FIRST NTH HEADER LOG PLACED ON TOP PRIOR TO BACKFILLING THE TRENCH. 6. 113 OF THE WAY ACROSS THE CHANNEL FROM THE OUTSIDE BANK THE HEADER ROCK SHALL BE PLACED AT 0.2 FT ABOVE THE CHANNEL. 7. THERE SHALL BE GAPS BETWEEN THE HEADER ROCKS OF AT LEAST 3 TIMES THE D84 OF THE CHANNEL BED.. 8. HEADER LOGS SHALL SLOPE FROM THE BED ELEVATION, AT THE HEAD OF THE VANE, TO 1f2 BANKFULL ELEVATION AT A SLOPE OF 2%-5%. HEADER AND FOOTER LOGS SHALL BE TED SECURELY INTO THE BANK IN SUCH A WAY THAT IT ELIMINATES THE POSSIBIUTY OF STREAMFLOW DIVERTING AROUND THEM. 9. ANY SOIL DISTURBED DURING THE PLACEMENT OF .1 -HOOK VANES, SHALL BE SEEDED USING TEMPORARY AND PERMANENT SEEDING METHODS. 10.ROOTWAD, FOOTER, AND HEADER LOGS SHALL BE CABLED TOGETHER AT THE HORIZONTAL LOCATION OF BANKFULL 11. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE VANE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. SECTION A -A SECTION B -B FILTER 20 - BACKFILL' SELECT MATE SINGLE STEP ROCK CROSS VANE ' }OF PROPOSED ' BANKFULL WIDTH CFULL :E NOTE 7 }OF PROPOSED B 1 WIDTH WIDTH JI GROUND SURFACE BANKFULL ELEVATION l STREAMBANK BANKFULL BANKFULL WIDTH SLOPE OF VANE FROM CENTERLINE 2%-5% 112 BANKFULL ELEVATON BACKFILL PE EN ELEVATION 'S^•- SELECT MATERIAL Lu SECTION A -A BOULDERS U WILL BE PLACED INTO TOP OF CEN FOOTERLOGS FILTER FABRIC CROSS-SECTION A MINIMUM OF THE ROCK LONGITUDINAL PROFILE WILL BE PLACED INTO ROCK SILL THE EXISTING SUBTRATE HEADER LOG STREAM BED AND SHALL BE A MINIMUM STREAMBED FOOTER BOULDER FOOTER LOG ELEVATION OF THE 18' DIAMETER ELEVATION SECTION A -A SECTION B -B FILTER 20 - BACKFILL' SELECT MATE SINGLE STEP ROCK CROSS VANE ' }OF PROPOSED ' BANKFULL WIDTH CFULL :E NOTE 7 1�GEN RAL NO S: ARE TO BE STRUCTURE STONE 2. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH STRUCTURE STONE CLASS A AND SELECT MATERIAL OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTER FABRIC. 3. DIMENSIONS AND SLOPES MAY BE ADJUSTED TO FIT BY THE DESIGN ENGINEER. 4. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TIGHTLY. 5. FOOTER BOULDERS AND VANE BOULDERS SHALL BE NATIVE STONE OR SHOT ROCK, CUBICAL OR RECTANGULAR IN NATURE. 6. SLOPE OF VANE FROM CENTERLINE TO THE TOP OF THE VANE ARM SHALL BE 2.5%. 7. ELEVATION CHANGE SHALL BE SPLIT EVENLY OVER TWO DROPS. 8. THERE SHALL BE NO DROP GREATER THAN 6INCHES. 9. THE ELEVATION OF EACH GRADE CONTROL STRUCTURE SHOULD BE EQUAL TO OR GREATER THAN THE ELEVATION OF THE TOP OF THE FOOTER ROCKS DIRECTLY UPSTREAM. 10. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. STREAMBANK BANKFULL ELEVATION 15%V'wFS[OpE }OF PROPOSED OF PROPOSED BANKFULL WIDT }OF PROPOSED BANKFULL WIDTH BANKFULL WIDTH SLOPE OF VANE FROM CENTERLINE NO GAPS BANKFULL PE EN ELEVATION BOULD NSTMREAMBEDFOOTER Lu SECTION A -A BOULDERS U WILL BE PLACED INTO TOP OF CEN THE EXISTING SUBSTRATE AT ELEV CROSS-SECTION A MINIMUM OF THE ROCK LONGITUDINAL PROFILE DIAMETER 1�GEN RAL NO S: ARE TO BE STRUCTURE STONE 2. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH STRUCTURE STONE CLASS A AND SELECT MATERIAL OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTER FABRIC. 3. DIMENSIONS AND SLOPES MAY BE ADJUSTED TO FIT BY THE DESIGN ENGINEER. 4. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TIGHTLY. 5. FOOTER BOULDERS AND VANE BOULDERS SHALL BE NATIVE STONE OR SHOT ROCK, CUBICAL OR RECTANGULAR IN NATURE. 6. SLOPE OF VANE FROM CENTERLINE TO THE TOP OF THE VANE ARM SHALL BE 2.5%. 7. ELEVATION CHANGE SHALL BE SPLIT EVENLY OVER TWO DROPS. 8. THERE SHALL BE NO DROP GREATER THAN 6INCHES. 9. THE ELEVATION OF EACH GRADE CONTROL STRUCTURE SHOULD BE EQUAL TO OR GREATER THAN THE ELEVATION OF THE TOP OF THE FOOTER ROCKS DIRECTLY UPSTREAM. 10. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. STREAMBANK BANKFULL ELEVATION 15%V'wFS[OpE .,rnow�r_ur -11— ni 11..— --.—Ad 1-111 T—Q o A m i —W— RPSFRVPII THIS PI AN MAY NnT RF RFIISFD. SOLD. LOANED. OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO 2100,000 PER OFFENSE LL Lu F— LL J Ll a � O U 0n 1] SOUTH COLL WM 0" Q WILNESBCRO. HC 3869] Q 3I6.BM d068 NP/becJiz ,,LIJ 0O0.P •, Q �NCBELS�-344E� _ Tn TM CAROV' 0 f- OfQ a p S Z ¢ Q F— Cn U Z LL J CoU J C1 CL Q FOOTER BOULDERS r Z WILL BE PLACED INTO O THE EXISTING SUBTRATE A MINIMUM STREAMBED SLOPE OF VANE FROM CENTERLINE OF THE BOULDER DIAMETER ELEVATION TOP BANKFULL SHALL BE 2-5% � FILTER FABRIC FLOW SECTION B -B AX OF 0.5' HEADER i STONE % /• POOL FOOTER `/ r/`� / STREAMBED STONE ELEV. FILTER FABRIC • / •STEP ROCK Lu SECTION A -A = .,rnow�r_ur -11— ni 11..— --.—Ad 1-111 T—Q o A m i —W— RPSFRVPII THIS PI AN MAY NnT RF RFIISFD. SOLD. LOANED. OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO 2100,000 PER OFFENSE LL Lu F— LL J Ll a � O U 0n 1] SOUTH COLL WM 0" Q WILNESBCRO. HC 3869] Q 3I6.BM d068 NP/becJiz ,,LIJ 0O0.P •, Q �NCBELS�-344E� _ Tn TM CAROV' 0 f- OfQ a p S Z ¢ Q F— Cn U Z LL J CoU J C1 CL Q LLI CD E O Lu �uu Lu � p J � N Z z� J Q a w n $ 0 u) H X,r U'i LL" o9roarzo+r O H BBQ a 206001201 10— By r J.EDWARDS LL JXHURCH O SCALE: Cn NTS (H) LL m M Lu 2 SHEET � C901 0 F --- LL) Z g O u) Lu Q Z a z � � uJ p LL �co Lu (� Wcr- = U w :�E LLJ w m C/) Q LLI CD E O Lu �uu Lu � p J � N Z z� J Q a w n $ 0 u) H X,r U'i LL" o9roarzo+r O H BBQ a 206001201 10— By r J.EDWARDS LL JXHURCH O SCALE: Cn NTS (H) LL m M Lu 2 SHEET � C901 0 1 LIVESTAKE/BAREROOT PLANTING C 901 DIBBLE PLANTING METHOD USING THE RBC PLANTING BAR PLANTING NOTES: (FOR FLOODPLAIN BUFFER PLANTING AND UPLAND BUFFER PLANTING BAG A PLAN NG) DURING PLANTING, SEEDLINGS SHALL BE KEPT IN A MOIST CANVAS BAG OR SIMILAR CONTAINER TO PREVENT THE STAKING MAY BE REQUIRED THROUGH ROOT SYSTEMS FROM DRYING. MATTING, ROCK OR COMPACTED SOILS KBC PLANTING BAR A STARTER HOLE MAY BE REQUIRED. PLANTING BAR SHALL HAVE A BLADE WITH 1, INSERT PLANTING 2. REMOVE PLANTING 3. INSERT PLANTING A TRIANGULAR CROSS SECTION, AND BAR AS SHOWN AND BAR AND PLACE BAR 21N. TOWARD SHALL BE 121N. LONG, 41N. WIDE AND 11N. PULL HANDLE SEEDLING AT PLANTER FROM THICK AT CENTER. LIVE STAKES TOWARDaPLANTER. CORRECT DEPTH. SEEDLING. ROOT PRUNING 1 ALL SEEDLINGS SHALL BE ROOT PRUNED, IF NECESSARY, SO THAT NO EXISTINGIPROPOSED ROOTS EXTEND MORE THAN 10 GROUND INCHES (101N.) BELOW THE ROOT EXISTING/PROPOSEDSTREAMBED COLLAR GENERAL NOTES: 1. LIVE STAKES SHALL BE EVENLY SPACED 1 PER 4. PULL HANDLE OF C6. LEAVE 5. PUSH HANDLE SQUARE CUT BAR TOWARD FORWARD FIRMING COMPACTION HOLE SQ.YD. PLANTER, FIRMING OPEN. WATER SOIL AT BOTTOM. BUDS (FACING UPWARD) 2. LIVE STAKES SHALL BE DRIVEN UNTIL SOIL AT TOP. THOROUGHLY. LIVE CUTTING (1/2' TO 1- DIAMETER) R ANGLE CUT 3OA45A LIVE STAKE 3 C901 APPROXIMATELY OF LIVE STAKE IS WITHIN GROUND. 3. IF STARTER HOLE IS NEEDED, MINIMIZE AIR POCKET. 4. UTILIZE ALL ON SITE TRANSPLANT MATERIALS MADE AVAILABLE BY THE OWNER. ONCE SOURCE OF TRANSPLANT MATERIAL HAS BEEN HARVESTED, THEN UTILIZE LIVE STAKING. BANK STABILIZATION WITH LIVE STAKES r1AH�Tp f 3V, .�—• V ~ -- GBOMD t / SMAM GENERAL NOTES: 1. TREE REFORESTATION SHALL BE PLANTED 6 TO 10' ON CENTER, RANDOM SPACING, AVERAGING B' ON CENTER, APPROXIMATELY 436.681 PLANTS PER ACRE. 2. OTHER PLANTING METHOD CAN BE USED WITH THE PERMISSION OF THE PLANTING SUPERVISOR Sucam Crossing Cross-Smtion Grading (Beam or Exon ditch) Lookma Dowmtream At each and of crcasv ig w paveo smfacc —IT Oom ctrunng the asairtg Botwm width:._— It. LM.A� hr,r f -t Lcn ramp: ._. A. lo10,4&_ .___.bpe(%a H:V) Right nmp: fL long, slope (14 or H:V) Crowing RPf— —ft (P—Old to V—): _ R. Lwe pal ?,Lm. dia. 3 112" Surf— Mwcoal & Thick— Lcist g scam chanm:l }��J II m—may I— l ft wdth should — Sa Tae aratch stream hoaom w,dth Tr—b Detail t --- -- Fabtic Fitt. Clap o crosnag MRn men NR(—, Mamml Sr—. 597 Supiq - Sm F.1— Lappin Derail See Datil Tnodung D t d -, SITca1D Ceossmg Plan Vic Ort dap \ Sueam buaua F—Paet F'—g atast thea Brctat ANay wzu F— Coaaoteeaoa Sp o,;O foa Oectes—t—tall min d'tbd g—d kgv, ova fabm fitter cloth. Gmel sbaold becnnher — (mrtd bond) or trhsadballm smnc or a —s—tion efYatd 3:1 Top f bk 3:1/ Gyms -1- — _ StabiTm d cog dais -.See Toe _. .— r- Trench Detail nmp o crosnag R.& re.p _. See Fabric._ - Sm F.1— Lappin Derail Tnodung D t d callil E _ Caution 578 - Stream Crossing (Fad Type) 1 . * , ,,. USDA-NR(S North Carolina TYPICAL MATTING LOCATION DETAIL BANKFULL ROCK CONSTRUCTED RIFFLE - SECTION B -B' L/'BEO NSTAWTgN-APPROXIWTFLY app STARES PER ROLL Ir vv�rtl.n OR WIMM REOUMED WE BIANIQ:T SMONN 2' LONG 1' x 2' WOOD STAKES FIGURE A - BED INSTALLATION wl2' GALVANIZED ROOFING NAIL AT THE TOP TO HOLD MATTING 2' LONG 1" x 2' WOOD STAKES w/ 2' GALVANIZED ROOFING NAIL AT THE KANOn SECTION A -A 0 0 0 TOP TO HOLD MATTING �. MATTING FROM TOE OF CHANNEL TO 2 FT. BEYOND BANKFULL G-0 EVnaT -(A` AURiAQ ..0 .<,",- a • •••a'•, "%'x`.•:` MATTING STAKING VIEW NOTES: 1. USE WOOD STAKES 2'x2'x18' (NOT METAL) FOR MATTING INSTALLED IN PUMP AROUND OR IN THE WET. 2. USE OF METAL STAPLES IS ACCEPTABLE WHEN MATTING BLOWN STRAW CONSTRUCTING IN THE DRY AND VEGETATION IS e ESTABLISHED PRIOR TO DIVERTING WATER `_,.:,saEE.srAtuna-rnloraaYAosTAPIESPERRolilea.3. BLOWN STRAW AND SEED SHALL BE PLACED UNDER CROSS SECTION wonn�as�- MATTING TO AID SEED GERMINATION. FIGURE H - SLOPE INSTALLATION E !`MVRI(:HT ante RV RI IF PlnrFFMAPONMFNTAI MMn lII TANTO PA all—HTRaFRF—n THIRPI ANMAVNOTRFRFJIRPI R" r) IOANFO ORrJVFNTn OTHFRR RFPRnntl'TinNf1R nTnr.f)PVINrnFTMICPI ANWf Wn[MTM[WRITTFun ,eeuTn QIIFRInrFFNVIRONMFNTAI CnNCIIITANTC P A IC PP—RI—nNn lC etaN ATlrvinec—Al—D-1-1 ewe Pi iuieunoic Pv nuee iio Tn e�rvi mn Peo rt<eeuee RIPARIAN PLANTING PLAN BARE ROOTS WILL BE SELECTED FROM THE NATIVE VEGETATION SPECIES LISTED BELOW. TREES SHOULD BE PLANTED AT A DENSITY SUFFICIENT TO PROVIDE 320 TREES PER ACRE AT MATURITY. TO ACHIEVE THIS DENSITY, APPROXIMATELY 436 (IOk10' SPACING) TO 681 (8k8' SPACING) TREES PER ACRE SHOULD BE PLANTED INITIALLY. SHRUBS SHOULD BE PLANTED AT A DENSITY SUFFICIENT TO PROVIDE 1200 SHRUBS PER ACRE. NO MORE THAN 20% OF ANY SPECIES SHALL BE USED. PLUGS SHALL BE USED AT THE SLOPE TOES AS NEEDED FOR STABIUTY AND HABITAT. WOODY VEGETATION NATIVE TO WESTERN NORTH CAROLINA SHRUBS COMMON NAME SCIENTIFIC NAME 'BUTTONBUSH CEPHAIANTHUS OCCIDENTALIS AMERICAN WITCH HAZEL HAMAMELIS VIRGINIANA 'TAG ALDER ALNUS SERRULATA 'CAROLINA WILLOW SALIX CAROLINIANA 'ELDERBERRY SAMBUCUS CANADENSIS RED CHOKEBERRY ARONIA ARBUTIFOLIA' 'SILKY DOGWOOD CORNUS AMOMUIN 'SILKY WILLOW SAUX SERICEA WINTERBERRY ILEX VERTICILLATA 'NINE BARK PHYSOCARPUS EUPATORIUM FISTULOSUM (JOE PYE WEED) TREES "BLACK WALNUT JUGLANS NIGRA 'P'BLACK WILLOW SALIX NIGRA "BLACKGUM NYSSA SYLVATICA "GREEN ASH FRAXINUS PENNSYLVANICA -RED MAPLE ACER RUBRUM "RNER BIRCH BETULA NIGRA "SILVER MAPLE ACER SACCHARINUM "SWEETGUM UOUIDAMBAR STYRACIFLUA "SYCAMORE PLANTANUS OCCIDENTALIS "EASTERN HEMLOCK TSUGA CANADENSIS 'SPECIES TO USE FOR UVESTAKES "TREES TREES 6 SHRUBS PER PLANS /_ WATER SURFACE FLOODPLAIN BENCH LIVESTAKES 8 FLOODPLAIN PLUGS PER PLANS E&SC TEMPORARY SEEDING SCHEDULE ' DO NOT USE WITHIN 25RIPARIAN BUFFER SEE RIPARIAN SEEDING SCHEDULE FOR BUFFER SEEDING SPECS LATE WINTER 8 EARLY SPRING (FEB 15 -MAY 151 SPECIES RATE (LB/ACRE) RYE GRAIN 120 AND % COMPOSTIION KOREAN LESPEDEZA 50 SUMMER (MAY 15 -AUGUST 151 SPECIES RATE (LBIACRE) GERMAN MILLET 40 OR SORGHASTRUM NUTANS (INDIAN GRASS) TALL FESCUE 50 FALL (AUGUST 15 -DECEMBER 15) SPECIES RATE (LBIACRE) RYE GRAIN 120 SOIL PREPARATION: SOIL TEST: SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT (PHOSPHORUS, POTASSIUM, CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE NEEDED AMOUNTS OF FERTILIZER AND/OR LIME. CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE PLANTED. THIS INCLUDES ROCKS, BOTTLES, LARGE ROOTS AND OLD TREE TRUNKS. IF EXTENSIVE GRADING IS NEEDED, REMOVE THE TOPSOIL AND STOCKPILE IT FOR REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED. THE SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADING, ESPECIALLY IF THE GROUND IS WET. THIS COMPACTED LAYER MUST BE BROKEN UP. A SPRING -TOOTH HARROW WORKS WELL ON LIGHTLY COMPACTED SOILS; A SOIL AMENDMENTS SMALL ROTOTILLER MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. FOLLOW RECOMMENDATIONS OF SOIL TEST OR APPLY 2000 LBIACRE GROUND DEEP TILLAGE: ROTOTILLING LOOSENS COMPACTED SOIL AND IMPROVES THE AGRICULTURAL LIMESTONE AND 750 LBIACRE 10.10.10 FERTILIZER. INCREASE FERTILIZER SPEED AND DEPTH OF ROOTING. A TRACTOR -MOUNTED OR SELF-PROPELLED RATE TO 1000 LBIACRE IN THE FALL. TILLER WILL ADEQUATELY TILL THE SOIL TAKE CARE NOT TO DESTROY THE MULCH EXISTING TREES IN THE LAWN. CUTTING TOO MANY TREE ROOTS DURING SOIL APPLY 4000-5000 LBIACRE GRAIN STRAW OR EQUIVALENT COVER OR ANOTHER SUITABLE TILLAGE CAN SEVERELY DAMAGE OR KILL A TREE TREES CAN ALSO BE MULCHING MATERIAL. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SUFFOCATED BY DEEPLY COVERING THE ROOTS WITH SOIL IF ADDITIONAL SOIL IS ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A NECESSARY AT A TREE BASE, CONSTRUCT A"TREE WELL" MULCH ANCHORING TOOL. MAINTENANCE REPLACE THE TOPSOIL: ONCE THE SUBSURFACE IS ESTABLISHED, RETURN THE REFERTILIZE IF GROWTH IN NOT FULLY ADEQUATE RESEED, FERTILIZER, AND MULCH TOPSOIL AND SPREAD UNIFORMLY OVER THE ENTIRE AREA ALLOW FOR AT LEAST IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE, TOPDRESS WITH 50 LBIACRE OF 6 TO 8 INCHES OF DEPTH AFTER THE SOIL HAS SETTLED. THIS MEANS PLACING NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE ABOUT 8 TO 10 INCHES OF TOPSOIL OVER THE SUBSURFACE IMPROVE THE SOIL BY 15, OVERSEED WITH 50 LB/ACRE KOREAN LESPEDEZA IN LATE FEBRUARY OR EARLY ADDING ORGANIC MATTER. THIS IMPROVES WATER RETENTION IN SANDY SOILS MARCH. AND DRAINAGE IN CLAY SOILS AND REDUCES FERTILIZER LEACHING. RIPARIAN SEEDING SCHEDULE FOR USE WITHIN 25' RIPARIAN BUFFER. SEE EBSC SEEDING SCHEDULE FOR NON -BUFFER SEEDING SPECS. SEEDING MIXTURE SPECIES % COMPOSTIION PANICUM VIRGATUM (SWITCHGRASS 10 PANICUM CLANDESTINUM (DEER TONGUE) 10 JUNCUS EFFUSUS (SOFT RUSH) 10 CAREX VULPINOIDEA (FOX SEDGE) 10 SORGHASTRUM NUTANS (INDIAN GRASS) 10 CHASMANTHIUM LATIFOLIUM (RIVER OATS) 10 ELYMUS HYSTRIX (BOTTLEBRUSH GRASS) 10 VERNONIA GIGANTEA (GIANT IRONWEED) 5 RUBECKIA HIRTA (BLACK EYED SUSAN) 5 EUPATORIUM FISTULOSUM (JOE PYE WEED) 5 RHUS TYPHINA (STAGHORN SUMAC) 5 VERBENA RASTATA (BLUE VERVAIN) 5 PENSTEMON DIGITALIS (TALL WHITE BEARD TONGUE) 5 APPLICATION: APPLY AT A RATE OF 15LBSIACRE. SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4000 LBIACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LBIACRE 5.10-10 FERTILIZER. MAINTENANCE: REFERTILIZE THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. E&SC PERMANENT SEEDING SCHEDULE DO NOT USE WITHIN 25' RIPARIAN BUFFER. SEE RIPARIAN SEEDING SCHEDULE FOR BUFFER SEEDING SPECS SEEDING MIXTURE RATE (LB/ACRE) KENTUCKY BLUEGRASS 100 TALL FESCUE 20 REDTOP 10 SERICEA LESPEDEZA 5 KOREAN LESPEDEZA 5 SEEDING NOTE 1. AFTER AUGUST 15. USE UNSCARIFIED SERICEA LESPEDEZA SEED. 2. WHERE APPEARANCE IS A CONSIDERATION, OMIT SERCIA LESPEDEZA AND INCREASE KOREAN LESPEDEZA TO 40 LB/ACRE NURSE PLANTS BETWEEN MAY 1 AND AUGUST 15 ADD 10 LBIACRE GERMAN MILLET OR 15 LB/ACRE TALL FESCUS, PRIOR TO MAY 1 OR AFTER AUGUST 15, ADD 40 LB/ACRE RYE GRAIN. IT MAY BE BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER AND OVERSEED THE LESPEDEZA IN MARCH. SEEDING DATES BEST POSSIBLE BELOW 2500 FT: AUG 15 -SEP 1 JULY 25 -SEP 15 MAR 1 -APR 1 MAR 1- MAY 10 ABOVE 2500 FT: JULY 25- AUG 15 JULY 15 -AUG 30 MAR 20 - APR 20 MAR 5 -MAY 15 COMPLETE SEEDING EARLIER IN THE FALL, AND START LATER IN THE SPRING ON NORTH AND EAST FACING SLOPES. SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4000 LBIACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LBIACRE 5.10-10 FERTILIZER MULCH APPLY 4000.5000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE REFERTILIZE THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE MOW NO MORE THAN ONCE PER YEAR RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. SOIL PREPARATION: SOIL TEST: SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT (PHOSPHORUS, POTASSIUM, CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE NEEDED AMOUNTS OF FERTILIZER AND/OR LIME. CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE PLANTED. THIS INCLUDES ROCKS, BOTTLES, LARGE ROOTS AND OLD TREE TRUNKS. IF EXTENSIVE GRADING IS NEEDED, REMOVE THE TOPSOIL AND STOCKPILE IT FOR REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED. THE SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADING, ESPECIALLY IF THE GROUND IS WET. THIS COMPACTED LAYER MUST BE BROKEN UP. A SPRING -TOOTH HARROW WORKS WELL ON LIGHTLY COMPACTED SOILS; A SMALL ROTOTILLER MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. DEEP TILLAGE: ROTOTILLING LOOSENS COMPACTED SOIL AND IMPROVES THE SPEED AND DEPTH OF ROOTING. A TRACTOR -MOUNTED OR SELF-PROPELLED TILLER WILL ADEQUATELY TILL THE SOIL TAKE CARE NOT TO DESTROY THE EXISTING TREES IN THE LAWN. CUTTING TOO MANY TREE ROOTS DURING SOIL TILLAGE CAN SEVERELY DAMAGE OR KILL A TREE TREES CAN ALSO BE SUFFOCATED BY DEEPLY COVERING THE ROOTS WITH SOIL IF ADDITIONAL SOIL IS NECESSARY AT A TREE BASE, CONSTRUCT A "TREE WELL' REPLACE THE TOPSOIL: ONCE THE SUBSURFACE IS ESTABLISHED, RETURN THE TOPSOIL AND SPREAD UNIFORMLY OVER THE ENTIRE AREA ALLOW FOR AT LEAST 6 TO 6 INCHES OF DEPTH AFTER THE SOIL HAS SETTLED. THIS MEANS PLACING ABOUT 8 TO 10 INCHES OF TOPSOIL OVER THE SUBSURFACE IMPROVE THE SOIL BY ADDING ORGANIC MATTER THIS IMPROVES WATER RETENTION IN SANDY SOILS AND DRAINAGE IN CLAY SOILS AND REDUCES FERTILIZER LEACHING. 0 COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS. P.A.. ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENVIRONMENTAL CONSULTANTS, PA IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS. PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE NTS C902