Loading...
HomeMy WebLinkAboutMcCarthy Improvement Warren Co_Narrative REVISED FINAL_6-19-17Erosion and Sedimentation Control Plan Technical Report For McCarthy Improvement Warren County Concrete Plant 1224 Ridgeway Drewry road Manson, NC 27553 Operator McCarthy Improvement Company 590 Means Street NW, Suite 100 Atlanta, GA 30318 Revisions June 19, 2017 Prepared by: Terra Consulting, LLC P.O. Box 1738 Carrollton, GA 30112 McCarthy Improvement Company Table of Contents Warren County Plant Site 1.0 Project Description.................................................................................. 2 2.0 Site Description...................................................................................... 2 2.1 Pre -development Conditions.............................................................. 2 2.2 Receiving Waters........................................................................... 3 2.3 Wetlands..................................................................................... 3 2.4 Flood Zone.................................................................................. 3 2.5 Soil Types.................................................................................... 3 2.6 Development Plan.......................................................................... 3 3.0 Hydrologic Analysis................................................................................. 4 4.0 Construction Sequence/Schedule.................................................................. 5 5.0 Vegetative Plan...................................................................................... 6 6.0 Storm Water Discharge Data....................................................................... 8 7.0 Temporary Diversion/Swale Velocity & Shear Stress .......................................... 10 Appendices Appendix A Financial Responsibility / Ownership Form Lease Agreement / Property Owners Consent Property Deed Appendix B Supporting Calculations: Drainage Area 1: NCDEQ Selection of Sediment Control Measure Spreadsheet NCDEQ Skimmer Basin Sizing Spreadsheet Drainage Basin 2: NCDEQ Selection of Sediment Control Measure Spreadsheet Appendix C NRCS Soil Survey Map Appendix D Erosion and Sedimentation Control Plan Preliminary Review Checklist Appendix E Hydrological Analysis Drainage Area 1 Predevelopment Drainage Area 1 Post -development Drainage Area 2 Predevelopment Drainage Area 2 Post -development Culvert Pipe Hydrology Appendix F Temporary Diversion Hydrology 1 McCarthy Improvement Company 1.0 Project Description Warren County Plant Site The purpose of this project in to install a portable concrete batch plant on leased property located at 1224 Ridgeway Drewry Road, Manson, in Warren County. The completed site will be occupied by the concrete batch plant, one aggregate stockpile, one sand stockpile, three (3) cement storage trailers, two (2) fly ash storage trailers, a control trailer, and a truck bed washout area with three settling pits to contain the wash water. The concrete batch plant is being installed to provide concrete for a repaving project on Interstate Highway 85 (I-85). The batch plant is expected to operate at this site through 2018. Once the project is completed the plant and all equipment will be removed. The aggregate base will be removed and the site will be regraded to ensure proper drainage. The site will be vegetated with a permanent grass suitable for the area and season. 2.0 Site Description Coordinates at site entrance: 36.456186° N 78.268450 W 2.1 Predevelopment Conditions McCarthy Improvement Company will lease the entire 4.39 acre parcel. The parcel is currently undeveloped mature pasture land except for approximately 0.6 acre on the north side of the parcel. This area was inadvertently graded and used to stock pile soil by S.T. Wooten Construction Corporation. Wooten is leasing the adjacent parcel to the north to be used as a waste site for excess soil from the I-85 construction project. Erosion and sediment control BMPs including a skimmer basin have been install on the adjacent parcel by Wooten. Runoff from the 3.01 acres designated as Drainage Area 1 currently flows to the east and flows into a roadside drainage ditch at the northwest side of the I-85 off -ramp to Ridgeway Drewry. Runoff from the remaining 1.4 acres designated as Drainage Area 2 flows to the southwest into a roadside drainage ditch on the north side of Ridgeway Drewry Road. The subject parcel and all adjacent parcels are located in an unincorporated area of Warren County. This area is not a Phase II stormwater area and the category is No Stormwater Program. The parcel immediately to the south of the site is occupied by an abandoned gas station and store. The parcels to the north is being used as a waste soil storage area by Wooten. The parcel to the west is undeveloped pasture and woodlands. The east side of the site is bounded by the south bound exit ramp from I-85 and the south side of the site is bounded by Ridgeway Drewry Road. 2 McCarthy Improvement Company 2.2 Receiving Waters Warren County Plant Site The receiving waters for the runoff from this site are the waters of Smith Creek. Smith Creek is located approximately 600 feet east of the eastern site boundary on the opposite side of I-85. Smith Creek is located within the Roanoke River Basin and has a classification of "C". The Stream Index is 23-10 and the segment is described as from source to North Carolina -Virginia State Line. The proposed site is not located within a High Water Quality Zone. The 303(d) listing for Smith Creek are the following: IR Category: ACS: Parameter of Interest: 5 EC Fish Community Fair (Nar, AL, FW) 5 EC Benthos Fair (Nar, AL, FW) 2.3 Wetlands There are no wetlands located on the proposed site. However, there are designated wetland located along Smith Creek to the north and east of the site. Discharges from this site will not impact these wetlands. 2.4 Flood Zone This site is not located within a Flood Hazard Zone as Identified by the FEMA Flood Insurance Rate Map No. 3720290800J, Panel 2908. 2.5 Soil Types Soil types located on the site have been identified by the NRCS Web Soil Survey. All soils on the site have been identified as Pacolet sandy clay loam, 2 to 8 percent slope, moderately eroded. A copy of the Soils Map is located in Appendix C of this Narrative. Soil type is shown on the Sheet C. 001 - Existing Conditions of the Erosion and Sediment Control Plan. 2.6 Development Plan Drainage Area 1 Development of the site will include grading to direct runoff from the largest portion of the disturbed area to the skimmer basin located at the eastern edge of the site. The result of the grading will be that the divide between Drainage Area 1 and Drainage Area 2 will be moved to the west enlarging Drainage Area A. The skimmer basin will be installed as detailed in the Erosion and Sedimentation Control Plan also submitted. Sediment fencing (silt fence) will be installed at the perimeter of the disturbed area. After grading, most of Drainage Area 1 will be covered with four to six inches of graded aggregate base (GAB) to support the concrete plant and auxiliary equipment. A 16 ft. by 60 ft. concrete slab will be installed as a foundation for 3 McCarthy Improvement Company Warren County Plant Site the plant and all remaining disturbed areas will be stabilized with a four to six inch layer of aggregate or permanent vegetation. Discharge from the skimmer and spillway will flow to the northeast along the tree line and enter the skimmer basin on the adjacent property to the north. Ultimately the discharge will enter the road -side ditch along the south -bound exit ramp from I-85. Skimmer Basin Sizing Requirements Permit Requirement Permit Minimum Requirement Actual Data Minimum Surface Area (325 ft2 per Qio 5,967 ft2 8,303 ft2 inflow) Minimum Volume (1800 ft3 per disturbed area) 5,040 ft' 24,571 ft' Maximum elevation over spillway at Qio 334.0 ft. 333.96 ft. Drainage Area 2 Grading the site will reduce the area of Drainage Area 2 by 0.58 acres. An off-site area located to the west of the property flows onto the site along the western property boundary. This portion of the drainage basin is covered by woods with dense undergrowth or mature pasture land and flow onto the site as sheet flow. Soil disturbance on this drainage basin will be limited to grading to install an access drive to the plant site, an area where the laboratory trailers will be parked, and two culvert pipes. The disturbed area will be 0.51 acres and will be covered by graded aggregate base. The remaining 0.29 acres will remain undisturbed pasture. A double row of sediment fencing (silt fence) will be installed on the down-slope side of the disturbed area. The disturbed area will be stabilized with graded aggregate base or permanent seeding. Runoff from this drainage area will flow to the south corner of the site and now into the road- side drainage ditch on the north side of Ridgeway Drewry Road. 3.0 Hydrologic Analysis The predevelopment and post -development drainage basins and receiving waters were determined using the survey prepared at one foot intervals by Pennoni Associates, Inc. of Chapel Hill, North Carolina on March 31, 2017. Runoff hydrographs for 2 and 10 year 24-hour type II storm events were developed using the SCS Method using HydroCAD Version 10.00-18 modeling software. Pre -development and post -development reports are located in Appendix C. 2 McCarthy Improvement Company Warren County Plant Site 4.0 Construction Sequence/Schedule 1. Obtain E&SC Plan approval 2. Flag work limits 3. Contact NC DEMLR at least 48 hours before beginning land disturbing activities 4. Install perimeter control (silt fence) 5. Install construction entrance and 2 culverts with inlet and outlet protection 6. Install sediment basin as first construction activity 7. Install Surface Skimmer and outlet 8. Construct temporary diversions and install turf reinforcement mats and liners 9. Grade site within disturbed area limits 10. Install concrete washout structure and establish staging areas 11. Within 7 days install aggregate cover on all surfaces delineated as requiring stabilization within 7 days. 12. Within 7 days install temporary and/or permanent vegetation on all surfaces not covered with aggregate and delineated as requiring stabilization within 7 days. 13. All erosion and sediment control practices will be inspected weekly and after rainfall events 14. All erosion and sediment control practices will be maintained for the duration of the project 15. At the conclusion of the paving project remove concrete plant and all plant -related equipment 16. Remove graded aggregate base from plant area, access road, and other parts of the site 17. Regrade site — remove diversions, berms, & swales, skimmer basin, and Culvert 1 18. Immediately following regrading, install RECP/liner in area formerly occupied by Culvert 1 19. Immediately following regrading, seed all disturbed areas with permanent vegetation 20. Once permanent vegetation is established, remove silt fence, construction entrance, and culvert 2 21. Install RECP/liner in area formerly occupied by Culvert 2 5 McCarthy Improvement Company 5.0 Vegetative Plan Temporary Vegetation Warren County Plant Site Temporary vegetation will be seeded on all disturbed areas of the site not stabilized with aggregate (GAB) or riprap. Seedbed Preparation: Seedbed should be well -pulverized, loose, and uniform. If hydraulic seeder is used the surface may be left with a more irregular surface of large clodes and stones. Lime: Apply ground agricultural limestone at the rate listed below. Apply uniformly and incorporate into the top 4 to 6 inches of soil. Fertilizer: Apply fertilizer at the rate listed below. Fertilizer should be incorporated into the top 4 to 6 inches of soil. If hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Seeding Method: Use hydraulic seeding equipment to apply seed, fertilizer, wood fiber mulch at 45 lbs/1,000 ft', and a mulch tackifer. Temporary Seeding Mixture: Mulch: Apply wood fiber mulch from hydraulic seeder at the rate of 45 pounds per 1,000 ft2 except in diversion swales where RECP liners and turf reinforcement mats are required. See Sheet C- 101. Maintenance: 2 Fertilizer Seeding dates Species Seeding rate Lime rate (10-10-10) rate January 1 to May 1 Rye (grain) 120 lb./acre 2,000 lb./acre 750 lb./acre Kobe Lespedeza 501b./acre May 1 to August 15 German Millet 401b./acre 2,000 lb./acre 7501b./acre August 15 to December 30 Rye (grain) 120 lb./acre 2,000 lb./acre 1,000 lb./acre Mulch: Apply wood fiber mulch from hydraulic seeder at the rate of 45 pounds per 1,000 ft2 except in diversion swales where RECP liners and turf reinforcement mats are required. See Sheet C- 101. Maintenance: 2 McCarthy Improvement Company Warren County Plant Site Reseed, fertilize and mulch areas immediately following erosion or damage. Re -fertilized where growth is not fully adequate. Do not mow. Protect from traffic as much as possible. Topdress Rye with 50 lb. /acre of nitrogen in March. Permanent Vegetation Permanent vegetation will be seeded on all disturbed areas of the site not stabilized with aggregate (GAB) or riprap. Disturbed area of the site that will be permanently vegetated is 1.46 A. Seedbed Preparation: 1. All areas will be seeded with a hydraulic seeder. 2. Leave the last 4 to 6 inches of fill loose and uncompacted. Allow rocks, roots, large clods and other debris to remain. 3. Roughen slope surfaces by making grooves 2 to 3 inches deep, perpendicular to the slope. 4. Spread lime evenly over the area as recommended by soil test. Seeding Method: Use hydraulic seeding equipment to apply seed, fertilizer, wood fiber mulch at 45 lbs/1,000 ft2, and a mulch tackifer. Permanent Seeding Mixture: Maintenance: Refertilize in late winter or early spring the following year. Mow as desired. Long term maintenance to be provided by land owner. 7 Fertilizer Species Seeding rate Lime rate (10-20-20) rate Virginia Wild Rye 6 lb./acre 2,000 lb./acre 40 lb./acre Eastern Bottlebrush Grass 2.5 lb./acre Fox Sedge 2.5 1b./acre Maintenance: Refertilize in late winter or early spring the following year. Mow as desired. Long term maintenance to be provided by land owner. 7 McCarthy Improvement Company 6.0 Storm Water Discharge Data Warren County Plant Site Total Parcel Area 4.39 Drainage Area 1 Pre -development drainage area on parcel 3.01 A Total Predevelopment drainage area 3.01 A Predevelopment Qio 9.74 cfs Post -development drainage area on parcel 3.59 A Post -development drainage area 2.71 A Post -development disturbed area 3.43 A Peak Flow Into Skimmer Basin 18.36 cfs Basin discharge - skimmer Qio (flow) 0.02 cfs Basin discharge - spillway Qio (flow) 8.72 cfs Basin discharge - skimmer Qio (velocity) 0.49 fps Basin discharge - spillway Qio (velocity) 1.72 fps Basin length at spillway 130 ft. Basin width at spillway 64 ft. Basin depth at spillway 3.5 ft. Basin inside side slope ratio 2:1 Spillway elevation 333.5 ft. Spillway width 8 ft. Spillway length (horizontal portion) 11 ft. Spillway length (slope portion of berm) 16 ft Spillway depth 1.5 ft. Spillway slope discharge side 3:1 Max depth of flow over spillway (Qio) 0.46 ft. Skimmer size 1.5 in. Skimmer orifice 1.5 in. Dewatering time for required volume 3.36 days Post -development area of by-pass 0.88 A By-pass area Qio 3.92 cfs Drainage Area 2 Predevelopment drainage area on parcel 1.38 A Total Predevelopment drainage area 2.54 A Predevelopment Qio 2.38 cfs Post -development drainage area on parcel 0.80 A Total Post -development drainage area 2.07 A Post -development disturbed area 0.51 A Post -development Qio 3.75 cfs 7.0 Temporary Diversion/Swale Velocity & Shear Stress Velocity and shear stress was determined for four sections of the diversion located at the south and west sides of Drainage Area 1. This diversion is identified as the SW Diversion and the sections area identified as the Upper, Upper -Middle, Lower -Middle, and Lower Section of SW Diversion. The diversion located on the northeast side of Drainage Area 1 was evaluated as one section. This section is identified as the NE Diversion. The Upper Section of the SW Diversion includes the swale at the northwest edge of the site as well as the swale that crosses the access drive to the site. The upper -middle section is top half of the swale that conveys runoff along the southwest edge of Drainage Area 1 where the slope is less steep. The Lower -Middle section is the bottom half of the swale along the SW edge of Drainage Area 1 and is much steeper than the upper half. The Lower Section of the SW Diversion conveys stormwater from the south corner of Drainage Area 1 to the inlet to the skimmer basin. The NE Diversion conveys runoff from the north edge of Drainage Area 1 to the inlet to the skimmer basin. Velocity and depth of flow of runoff from a 10 -year storm event in each of the diversion sections was determined using HydroCAD Version 10.00-18 modeling software. Printed reports from this modeling are located in Appendix F. Velocity of flow in all diversion sections exceeds 2 fps, therefore Rolled Erosion Control Product (RECP) is required in all surfaces within the diversions except the area covered by aggregate (GAB). Based on the velocity of the flow in the different diversions, the SW Diversion Lower -Middle Section and the NE Diversion require turf reinforcement mats and all other diversion sections require RECP liners. Width Depth of Section Depth of Velocity Section (ft) channel Length (ft.) Slope Flow (ft.) (fps) SW Diversion Upper Section 10 1 271 0.006 0.23 3.92 SW Diversion Upper -Middle 10 1 125 0.008 0.23 4.53 Section SW Diversion Lower -Middle 10 1 125 0.064 0.22 12.82 Section SW Diversion 10 1 262 0.011 0.22 5.31 Lower Section NE Diversion 10 1 171 0.023 0.23 7.68 Velocity of flow in all diversion sections exceeds 2 fps, therefore Rolled Erosion Control Product (RECP) is required in all surfaces within the diversions except the area covered by aggregate (GAB). Based on the velocity of the flow in the different diversions, the SW Diversion Lower -Middle Section and the NE Diversion require turf reinforcement mats and all other diversion sections require RECP liners. McCarthy Improvement Company Shear Stress: Shear stress was calculated using the following formula: Where: i=YDS i = Shear Stress (In/ft') Y = Weight of Water (lb/ft) D = Average water depth (ft.) S = Channel slope (ft/ft) Density of water at 60°F = 62.37 lb/ft3 Warren County Plant Site The permissible shear stress of the RECP liners and turf reinforcement mats used must exceed the shear stress values listed below for each diversion section. Section Shear Stress (lb/ft2) SW Diversion Upper Section 0.09 SW Diversion Upper -Middle Section 0.09 SW Diversion Lower -Middle Section 0.38 SW Diversion Lower Section 0.15 NE Diversion 0.33 10 Appendix A Financial Responsibility / Ownership Form Lease Agreement / Property Owners Consent Property Deed FINANCIAL RESPONSIBILITY/OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT EXPRESS PERMITTING OPTION 08012007 No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if the question is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank.) Part A. 1. Project Name McCarthy Improvement Warren County Concrete Batch Plant 2. Location of land -disturbing activity: County Warren Highway/Street 1224,Ridgway- Drewry Rd Latitude City or Township N 36.45616 3. Approximate date land -disturbing activity will commence: July 1, 2017 Nutbush Longitude W 78.26807 4. Purpose of development (residential, commercial, industrial, institutional, etc.):_Industrial (temporary) 5. Total acreage disturbed or uncovered (including off-site borrow and waste areas): 3.94 acres 6. Amount of fee enclosed: $1,000.00 . The Express Permitting application fee is a dual charge. The normal fee of $65.00 per acre is assessed without a ceiling amount. In addition, the Express Permitting supplement is $250.00 per acre up to eight acres, after which the Express Permitting supplemental fee is a fixed $2,000.00 (Example: 9 acres total is $2,585). NOTE: Both fees are rounded up to the next whole acre and need to be paid by separate checks to NCDENR. 7. Has an erosion and sediment control plan been filed? Yes X No Enclosed 8. Person to contact should erosion and sediment control issues arise during land -disturbing activity: Name Kevin Crusa E-mail Address kcrusa .mccarthyimprovement.com Telephone 864-630-0314 Cell # 864-630-0314 Fax # 9. Landowner(s) of Record (attach accompanied page to list additional owners): D.H. Rowland 919-833-5900 NA Name Telephone Fax Number 4525 Inwood Road same Current Mailing Address Current Street Address Raleigh NC 27603 City State Zip City State Zip 10. Deed Book No. 337 Page No. 30 Provide a copy of the most current deed. Part B. 1. Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet): McCarthy Improvement Company info(cDmccarthyimprovement.com Name E-mail Address 590 Means Street NW, Suite 100 same Current Mailing Address Current Street Address Atlanta GA 30318 City State Zip City State Telephone 404-684-9064 Fax Number 404-761-4764 Zip 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name Current Mailing Address City State Telephon E-mail Address Current Street Address Zip City State Zip Fax Number (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: Corporation Service Company compliancemail(o)-cscglobal.com Name of Registered Agent E-mail Address 327 Hillsborouqh Street 327 Hillsborough Street Current Mailing Address Current Street Address Raleigh, NC 27603 Raleigh, NC 27603 City State Zip City State Zip Telephone 800-927-9801 Fax Number. 850-555-1515 (c) In order to facilitate Express Permitting, it is necessary to be able to contact the Engineer or other consultant who can assist in providing any necessary information regarding the plan and its preparation: Terra Consultinq, LLC Engineering Firm or other consultant Jacki Congleton Individual contact person (type or print) iacki(@-terraconsultingllc.com E-mail Address 770-573-3055 Telephone Fax Number The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attorney-in- fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there be any change in the information provided herein. Scott E. Hutter President Type or print name Title or Authority _6/12/17 Signature Date I, o�d err Sup rk�l� a Notary Public of the County of 5 f State of Iowa, hereby certify that 5e(S 0 �- /6'A -- appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my hand and notarial seal, thisday of 20 tary sIAd IA L. 5uNC15TED7 Commission Number 184813 My commission expires C5 My Commission Expires to'n MaY 22, 2020 Financial Responsibility/Ownership Form Sedimentation Pollution Control Act Express Permitting Option Attachment 1 Additional Landowner of Record: Ms. Cannaaday 149 Dianas Way Will Mitchener Road Franklinton, NC 27525 LEASE AGREEMENT This Lease Agreement ("the "Agreement'), effective May 1, 2017,, is entered into by McCarthy Improvement Company, ("Lessee") of 5401 Victoria Ave. Davenport, Iowa 52807 and between Dewey H. Roland/Diana Cannaday with Mr. Roland's address of 4525 Inwood Rd. Raleigh, NC 27603 and Ms. Cannaday address as 149 Dianas Way Will Mitchener Rd. Franklinton, NC 27525. In consideration of the terms and conditions below, the receipt and adequacy of which are hereby acknowledged, Lessor does hereby rent, demise and lease unto Lessee certain real property and improvements located thereon on 4.35 Acres recorded in Deed Book 337 Deed Page 30 section B4 18 Warren County, NC (the "Premises") and grants Lessee the right to place and operate a portable concrete batch plant located on the Premises. See Attached Drawing. Term. This Agreement shall be for a term of 16 (sixteen) months beginning May 1, 2017, renewable as provided hereunder. 2. Rental: Lessee shall pay Eighteen Hundred and 00/100 ($1,800.00) Dollars per month to Lessors as rent. Payment shall be made to each Lessor at $900.00 each. Said rental payment shall be paid by on or before the 5h day of each month. 3. Use: Lessee shall use the Premises only for the conduct of its construction business. including but not limited to the operation of a concrete plant and stockpiling of the material located on the Premises. 4. Right -of -Way: Lessor shall permit Lessee to use whatever land is necessary for a convenient right-of-way for the ingress and egress of Lessee for the operation of its construction business. 5. Return of the Leased Premises: Within thirty (30) days after the expiration of this Agreement, Lessee shall remove all personal property, movable improvements and facilities then belonging to Lessee from and give peaceful possession of the Premises to Lessor. Lessee will grade to reasonable conformity to original grade and property will have proper drainage as before and a stand of grass on the Premises. 6. Warranties: Lessor warrants that during the Term of this Agreement and any renewal thereof, that it owns the Premises in fee, has full authority to enter into this Agreement and that it will not lease the Premises to any other person or entity. Lessor also warrants the terms and conditions of this Agreement shall remain effective until expiration of the Term and any renewal thereof if the Premises are sold to a third party. Lessor further warrants that the Premises are free of any contaminant or substance which is prohibited or regulated by any state, federal or local law or regulation. 7. Return of the Leased Premises: At the expiration of this Agreement, Lessee shall remove all personal property, materials, and facilities belonging to Lessee and give peaceful possession of the Premises to Lessor. Lessee shall return the premises to the Lessor in the same condition as originally found, excepting ordinary wear and tear. Once the Lessee returns possession of the Premises to the Lessor, the Lessor shall sign any and all release forms required by the Department of Transportation or other entity in order to release Lessee from any further liabilities under its contract with said entities. S. Real Estate Taxes: Lessor shall pay all real estate taxes and assessments levied against the Premises. 9. Renewal: Upon notice at least fifteen (15) days before the expiration of the Term of this Agreement, Lessee shall have the option to renew the Term for 3 consecutive months pursuant to the same terms and conditions herein. 10. Heirs and Assigns: This Agreement shall inure to the benefit of the heirs, successors and assigns of either party. 11. No Presum tion Against Drafter: Lessor and Lessee understand, agree, and acknowledge that this Lease has been freely negotiated by both parties, and that in any controversy, dispute, or contest over the meaning, interpretation, validity, or enforceability of this Lease or any of its terms or conditions, there shall be no inference, presumption or conclusion drawn whatsoever against either party by virtue of that party having drafted the Lease or any portion thereof. 12. MANDATORY BINDING ARBITATION. The American Arbitration Association ("AAA") shall conduct the arbitration unless the parties mutually agree to use an alternative arbitration service. The costs of the arbitration, including reasonable attorney fees and expenses, shall be borne equally by the parties. As part of any award, the arbitrator shall have the authority to award the costs of the arbitration, including reasonable attorney fees and expenses, to the either party. When awarding said costs, the arbitrator shall consider the amount demanded, the amount offered, if any, the date of any demand or offer, and the amount of the award. All arbitration matters or hearings by the arbitrator shall be conducted in accordance with the Complex Case Procedures of the AAA. Any matter not addressed by said rules shall be determined in accordance with the Georgia Rules of Civil Procedure and Evidence. Judgment upon any award made by the arbitrator may be entered in any court having jurisdiction thereof, if necessary. IN WITNESS WHEREOF, the parties have executed this Lease Agreement as of the day and year first above -written. WITNESSES LESSORS By: Title: Airs,, By: Title: Gz L LESSEE By:�� Title: �' Warren County, NC B4 22S 44A B4 13 B4 12 39A 4.4A B4 la B417 4. .3 5 A 19.266 B-4 33 B .; B4 20 B4 33 E34 33A 6.8A 29.25A 222 RECN SUBNO NEWPIN MAPN DESCRIPTION PLAT—REFERENCE NAME1 NAME2 ADDR CITY—STATE ZIP TOWNSHIP FIRE—DISTRICT—CODE FLAG NEIGHBORHOOD_CODE IMPROVEMENT—CODE SITUS ADDRESS TOTAL—ASSESSED—VALUE LAND_VALUE BUILDING_VALUE OTHER VALUE SALE—PRICE HEATED—AREA 2255 -949 2918557902 B4 18 EDDINS FILE CANNADY N A & D H ROWLAND 4525 INWOOD RD RALEIGH NC 27603 105 30 500 V 1224 SR 16321 16321 0 0 3500 0 0337 0030 nRAFTYn eV SANZET. BANZET 9 THOWpsoi't WARRENTON. N.C. Book 337 - Page 30". NORTH CAROLINA, WARREN COUNTY THIS DEED made this the Slat day of March, 1980, by R. L. Eddins and wife, Novia Eddins, of Baker County. Florida, parties of the first part, to Nathaniel A. Cannady of Franklin County, North Carolina, and Dewey H, .Rowland of Wake County, North Carolina, parties of the second part: WITNESSETH: THAT. for and in consideration of the sum of TEN DOLLARS, ($10.00) and other valpable considerations paid by the parties of the second part to the parties of the first part, the receipt of which ig hereby acknowledged, the parties of the first part have bargained, granted, sold and conveyed and by these presents do hereby bargain, grant, sell and convey to and unto the parties of the second part, as tenants in common, their heirs and assigns. that certain parcel or tract of land in Nutbush Township. Warren County, North Carolina, described as follows: BEGINNING at an iron pipe on the Northeast side of the Ridgeway Road, Southwest corner for the .85 acre tract conveyed to Humble Oil and Refining Company by R. L. Eddins, et ux, Book 227, page 133, thence along the line of Humble Oil and Refining Company North 47" 421 East 175 feet to an 'iron pipe, thane South 50° 391 East 258 feet to an iron, which iron is located on the Western edge of Interstate 85, thance along the right of way of Interstate 85 North 561151 East 361.3 feet to a right of way marker for Interstate 85, thence continuing along the right of way of Interstate 85 North 56° East 226.25 feet to a stake in Interstate 85 right of way, a common corner for 1.85 and lands now or formerly owned by Adam Seaman. thence along the line of now or formerly Adam Seaman North 84• West 643 feet to a stake in the center of a farm road, thence along the center line of said farm road South 47, 301 West 428,25 feet to the Nortt eastern edge of the Ridgeway Road, the ace along said road South 680 51 Fast 100 feet and South 611 151 East 50 feet to the place of beginning, containing 4. 35 acres according to survey and plat of W. Sturges Collins, 11. L. S. , March 18, 1980, and being a part of the land conveyed by Adam Seaman to R. L, Eddins by deed recorded in the office of the Register of Deeds of Warren County in Book 224, page 402. TO HAVE AND TO HOLD the above described land and premises, to- gether with all privileges and appurtenances thereto belonging, to and unto Appendix B Supporting Calculations Drainage Area 1: NCDEQ Selection of Sediment Control Measure Spreadsheet NCDEQ Skimmer Basin Sizing Spreadsheet Drainage Basin 2: NCDEQ Selection of Sediment Control Measure Spreadsheet North Carolina DEMLR Drainage Area 1 Selection of Sediment Control Measure 2.71 Total Drainage Area User entry Do Not Use Temporary Sediment Trap Calculated Value Okay Skimmer Sediment Basin Okay Temporary Sediment Basin 3.43 Disturbed Area (Acres) 18.36 Peak Flow from 10 -year Storm (cfs) Updated to comply with NPDES Permit Conditions TGH and BRB 07/03/2012 North Carolina DEMLR Drainage Area 1 Skimmer Basin Okay 3.43 Disturbed Area (Acres) 18.36 Peak Flow from 10 -year Storm (cfs) 6174 Required Volume ft3 5967 Required Surface Area ft2 54.6 Suggested Width ft 109.2 Suggested Length ft 64 Trial Top Width at Spillway Invert ft 130 Trial Top Length at Spillway Invert ft 2 Trial Side Slope Ratio Z:1 3.5 Trial Depth ft (2 to 3.5 feet above grade) 50 Bottom Width ft 116 Bottom Length ft 5800 Bottom Area ft2 24596 Actual Volume ft3 Okay 8320 Actual Surface Area ft2 Okay 11 Trial Weir Length ft 1.5 Trial Depth of Flow ft 60.6 Spillway Capacity cfs Okay 1.5 Skimmer Size (inches) Skimmer Size 0.125 Head on Skimmer (feet) (Inches) 1.5 Orifice Size (1/4 inch increments) 1.5 3.36 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 North Carolina DEMLR Drainage Area 2 Selection of Sediment Control Measure 0.8 Total Drainage Area User entry Okay Temporary Sediment Trap Calculated Value Okay Skimmer Sediment Basin Okay Temporary Sediment Basin 0.51 Disturbed Area (Acres) 3.75 Peak Flow from 10 -year Storm (cfs) Updated to comply with NPDES Permit Conditions TGH and BRB 07/03/2012 Appendix C NRCS Soil Survey Map m 744780 36° 2728" N � Soil Map—Warren County, North Carolina (Warren county Site) 744820 744860 744900 744940 744980 { d� rr ° Soil Map may not be valid at this seFal 36° 27'19'N 744780 744820 744860 744900 744940 744980 3 Map Scale: 1:1,770 if printed on A landscape (11" x 8.5") sheet. N Meters 0 25 50100 150 Feet 0 50 100 200 300 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UfM Zone 17N WGS84 usDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 74WM 745060 745100 I 1 1 745020 745060 745100 745140 36° 27'29'N R a 36° 2719" N 745140 3 5/11/2017 Page 1 of 3 MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Spoil Area The soil surveys that comprise your AOI were mapped at Soil Map Unit Polygons IC �. Soil Map Unit Lines 0 Soil Map Unit Points Special Point Features Very Stony Spot Blowout Warning: Soil Map may not be valid at this scale. Borrow Pit Wet Spot Clay Spot Enlargement of maps beyond the scale of mapping can cause Closed Depression Gravel Pit „ Gravelly Spot Other Landfill line placement. The maps do not show the small areas of Lava Flow Special Line Features Marsh or swamp contrasting soils that could have been shown at a more detailed Mine or Quarry Miscellaneous Water scale. Perennial Water IV Rock Outcrop Saline Spot Please rely on the bar scale on each map sheet for map Sandy Spot # Severely Eroded Spot Transportation Sinkhole Slide or Slip oa Sodic Spot Soil Map—Warren County, North Carolina (Warren county Site) MAP INFORMATION USDA Natural Resources Web Soil Survey 5/11/2017 �iiiill Conservation Service National Cooperative Soil Survey Page 2 of 3 Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. ( Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Other line placement. The maps do not show the small areas of Special Line Features contrasting soils that could have been shown at a more detailed scale. Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. Transportation Rails Source of Map: Natural Resources Conservation Service Web Soil Survey URL: �..r Interstate Highways Coordinate System: Web Mercator (EPSG:3857) US Routes Maps from the Web Soil Survey are based on the Web Mercator Major Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Local Roads Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. Background Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Warren County, North Carolina Survey Area Data: Version 13, Sep 20, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: May 10, 2010—Apr 4, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 5/11/2017 �iiiill Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Warren County, North Carolina Map Unit Legend Warren county Site Warren County, North Carolina (NC185) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI PpB2 Pacolet sandy clay loam, 2 to 8 percent slopes, moderately eroded 4.9 100.0% Totals for Area of Interest 4.9 100.0% USDA Natural Resources Web Soil Survey 5/11/2017 Conservation Service National Cooperative Soil Survey Page 3 of 3 Appendix D Erosion and Sedimentation Control Plan Preliminary Review Checklist EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST The following items shall be incorporated with respect to specific site conditions, in an erosion & sedimentation control plan: NPDES Construction Stormwater General Permit NCG010000 _X_ Designation on the plans where the 7 or 14 day ground stabilization requirements apply per Section II.6.2 of the permit. X Design of basins with one acre or more of drainage area for surface withdrawal as per Section II.6.4 of the permit. LOCATION INFORMATION X_ Project location & labeled vicinity map (roads, streets, landmarks) X North arrow and scale _X_ Identify River Basin. _X_ Provide a copy of site located on applicable USGS quadrangle and NRCS Soils maps if it is in a River Basin with Riparian Buffer requirements. GENERAL SITE FEATURES (Plan elements) X Property lines & ownership ID for adjoining properties X_ Existing contours (topographic lines) _X_ Proposed contours _X_ Limits of disturbed area (provide acreage total, delineate limits, and label). Be sure to include all access to measures, lots that will be disturbed, and utilities that may extend offsite. X Planned and existing building locations and elevations X Planned & existing road locations & elevations, including temporary access roads _X_ Lot and/or building numbers Hydrogeologic features: rock outcrops, seeps, springs, wetland and their limits, streams, lakes, ponds, dams, etc. (include all required local or state buffer zones and any DWQ Riparian Buffer determinations) _NA_ Easements and drainageways, particularly required for offsite affected areas. Include copies of any recorded easements and/or agreements with adjoining property owners. X Profiles of streets, utilities, ditch lines, etc. _XStockpiled topsoil or subsoil locations _NA__ If the same person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. _NA_ Location and details associated with any onsite stone crushing or other processing of material excavated. If the affected area associated with excavation, processing, stockpiles and transport of such materials will comprise 1 or more acres, and materials will be leaving the development tract, a mining permit will be required. _NA_ Required Army Corps 404 permit and Water Quality 401 certification (e.g. stream disturbances over 150 linear feet) EROSION & SEDIMENT CONTROL MEASURES (on plan) _X_ Legend (provide appropriate symbols for all measures and reference them to the construction details) X_ Location of temporary measures _X_ Location of permanent measures _X_ Construction drawings and details for temporary and permanent measures. Show measures to scale on plan and include proposed contours where necessary. Ensure design storage requirements are maintained through all phases of construction. _X_ Maintenance requirements for measures _X_ Contact person responsible for maintenance SITE DRAINAGE FEATURES _X_ Existing and planned drainage patterns (include off-site areas that drain through project and address temporary and permanent conveyance of stormwater over graded slopes) _X_ Method used to determine acreage of land being disturbed and drainage areas to all proposed measures (e.g. delineation map) X Size, pipe material and location of culverts and sewers X_ Soil information: type, special characteristics X Soil information below culvert storm outlets _X_ Name and classification of receiving water course or name of municipal operator (only where stormwater discharges are to occur) Acreage STORMWATER CALCULATIONS X Pre -construction runoff calculations for each outlet from the site (at peak discharge points). Be sure to provide all supporting data for the computation methods used (rainfall data for required storm events, time of concentration/storm duration, and runoff coefficients). X Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients for the site) X Design calcs for culverts and storm sewers (include HW, TW and outlet velocities) X Discharge and velocity calculations for open channel and ditch flows (easement & rights-of-way) _NA_ Design calcs for cross sections and method of stabilization for existing and planned channels (include temporary linings). Include appropriate permissible velocity and/or shear stress data. _X_ Design calcs and construction details for energy dissipaters below culvert and storm sewer outlets (include stone/material specs & apron dimensions). Avoid discharges on fill slopes. _X_ Design calcs and dimension of sediment basins (note current surface area and dewatering standards as well as diversion of runoff to the basins). Be sure that all surface drains, including ditches and berms, will have positive drainage to the basins. VEGETATIVE STABILIZATION X Area & acreage to be stabilized with vegetation X Method of soil preparation X Seed type & rates (temporary & permanent) _X_ Fertilizer type and rates _X Mulch type and rates (include mulch anchoring methods to be used) NOTE: Plan should include provisions for groundcover in accordance with NPDES Construction Stormwater General Permit NCG010000 and permanent groundcover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. FINANCIAL RESPONSIBILITY/OWNERSHIP FORM _X_ Completed, signed & notarized FR/O Form _X Accurate application fee payable to NCDENR ($65.00 per acre rounded up the next acre with no ceiling amount) NA_ Certificate of assumed name, if the owner is a partnership _X Name of Registered Agent (if applicable) _X Copy of the most current Deed for the site. Please make sure the deed(s) and ownership information are consistent between the plan sheets, local records and this form. X Provide latitude & longitude (in decimal degrees) at the project entrance. NOTE: For the Express Permitting Option, inquire at the local Regional Office for availability. NARRATIVE AND CONSTRUCTION SEQUENCE X Narrative describing the nature & purpose of the construction activity _X_ Construction sequence related to erosion and sediment control (including installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized). Address all phases of construction and necessary practices associated with temporary stream bypasses and/or crossings. _NA_ Bid specifications related only to erosion control rev. 12182012 Appendix E Hydrological Analysis Drainage Area 1 Predevelopment Drainage Area 1 Post -development Drainage Area 2 Predevelopment Drainage Area 2 Post -development Culvert Pipe Hydrology Drainage Area 1 Predevelopment Post -Development Drainage Basin 1 Subcat Reach on Link Basin 1 Predevelopment Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Drainage Basin 1 Runoff = 3.22 cfs @ 12.04 hrs, Volume= 0.201 af, Depth= 0.80" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 yr 24 hr Rainfall=3.50" Area (sf) CN Description 106,850 61 >75% Grass cover, Good, HSG B 24,136 86 Fallow, bare soil, HSG B 130,986 66 Weighted Average 130,986 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 100 0.0280 0.23 Sheet Flow, Sheet flow Range n=0.130 P2=3.50" 3.6 250 0.0280 1.17 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fos 10.9 350 Total Subcatchment 1S: Drainage Basin 1 Hydrograph i 1 I l l i i I l l i l i i I i i I I I I I I I I I I I I I I I I I I I I I I I I I i I I I I I I I I ❑Runoff 322 cfs + + i- I- I- 1- 1- I- 1- 1 -Type -H 24-h r 3 1 1 � Irl �41Ilr RlaJnf III'—J 5 I I I I I 1 1 1 1 1 1 1 1 1 1 1 1 11tv1 1 1l1a �� 1 1 1 1 1 1 1 I I 1 1 1 I Runoff Are1a="1301986 tf 1 1 1 1 1 1 I 1 1 1 I`, I 1 1 1 1 1 1 1 1 Vfollurm 1 1 1 1 Runoffs e=0.201 of N 2 �I I I I I 1 1 1 1 1 1 ------------------ � � I I I -- I I 1 I r Run' loff 1 1 ae�hIl_b. + 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Rlbw I L6 hgth-3510 I 1 11 1 11 11 1 1 1 I 1 1 I Imo�++ l i l l l l l I I I I I I I I I 1 1 1 1 1 1 Slope=0.0280IT 1 -1 T T 7 7 7 T T T T 1- F F I- I- 1 -1 -1` n-7 1 1 1 M=66 I I I I I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Basin 1 Predevelopment Type 11 24 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pace 3 Hydrograph for Subcatchment 1S: Drainage Basin 1 Time Precip. Excess Runoff lours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.08 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.17 0.00 0.00 5.00 0.22 0.00 0.00 6.00 0.28 0.00 0.00 7.00 0.35 0.00 0.00 8.00 0.42 0.00 0.00 9.00 0.51 0.00 0.00 10.00 0.63 0.00 0.00 11.00 0.82 0.00 0.00 12.00 2.32 0.26 2.88 13.00 2.70 0.41 0.31 14.00 2.87 0.48 0.19 15.00 2.99 0.54 0.16 16.00 3.08 0.58 0.12 17.00 3.16 0.62 0.11 18.00 3.22 0.65 0.10 19.00 3.28 0.68 0.09 20.00 3.33 0.71 0.07 21.00 3.38 0.73 0.07 22.00 3.42 0.76 0.07 23.00 3.46 0.78 0.07 24.00 3.50 0.80 0.06 25.00 3.50 0.80 0.00 26.00 3.50 0.80 0.00 27.00 3.50 0.80 0.00 28.00 3.50 0.80 0.00 29.00 3.50 0.80 0.00 30.00 3.50 0.80 0.00 31.00 3.50 0.80 0.00 32.00 3.50 0.80 0.00 33.00 3.50 0.80 0.00 34.00 3.50 0.80 0.00 35.00 3.50 0.80 0.00 36.00 3.50 0.80 0.00 37.00 3.50 0.80 0.00 38.00 3.50 0.80 0.00 39.00 3.50 0.80 0.00 40.00 3.50 0.80 0.00 41.00 3.50 0.80 0.00 42.00 3.50 0.80 0.00 43.00 3.50 0.80 0.00 44.00 3.50 0.80 0.00 45.00 3.50 0.80 0.00 46.00 3.50 0.80 0.00 47.00 3.50 0.80 0.00 48.00 3.50 0.80 0.00 49.00 3.50 0.80 0.00 50.00 3.50 0.80 0.00 51.00 3.50 0.80 0.00 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 52.00 3.50 0.80 0.00 53.00 3.50 0.80 0.00 54.00 3.50 0.80 0.00 55.00 3.50 0.80 0.00 56.00 3.50 0.80 0.00 57.00 3.50 0.80 0.00 58.00 3.50 0.80 0.00 59.00 3.50 0.80 0.00 60.00 3.50 0.80 0.00 61.00 3.50 0.80 0.00 62.00 3.50 0.80 0.00 63.00 3.50 0.80 0.00 64.00 3.50 0.80 0.00 65.00 3.50 0.80 0.00 66.00 3.50 0.80 0.00 67.00 3.50 0.80 0.00 68.00 3.50 0.80 0.00 69.00 3.50 0.80 0.00 70.00 3.50 0.80 0.00 71.00 3.50 0.80 0.00 72.00 3.50 0.80 0.00 Basin 1 Predevelopment Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Pa ece44 Summary for Subcatchment 1S: Drainage Basin 1 Runoff = 9.74 cfs @ 12.03 hrs, Volume= 0.556 af, Depth= 2.22" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 106,850 61 >75% Grass cover, Good, HSG B 24,136 86 Fallow, bare soil, HSG B 130,986 66 Weighted Average 130,986 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 100 0.0280 0.23 Sheet Flow, Sheet flow Range n=0.130 P2=3.50" 3.6 250 0.0280 1.17 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fos 10.9 350 Total Subcatchment 1S: Drainage Basin 1 Hydrograph I III_ _I I I I I I i 1 1 1 1 1 1 1 1 IIIIIIII ii II I ■Runoff 10 9.74 ds Ty1pe-11-12-4-hr - - d-�ir'12� if1J� i rr�lf ��1yy� -41- 7 - 8 I Runoff, Aam=1 30,986 Sf f I --------------------- 7-'I 1 1 1 1 1 1 1 1 1kulno # Volume=0' ' I If 6 _� _� _ 1 1 ;Runoff Deiptl=2'22' 0 5- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 F11ow L�ength>=350 LL _ gf� - -� —I —I —I —1 -1-1-t rt 7 T T r r r r- r- r I— I— Tc='1 V..7 I I 11n 3- 2- 0 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Basin 1 Predevelopment Type 11 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pace 5 Hydrograph for Subcatchment 1S: Drainage Basin 1 Time Precip. Excess Runoff lours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.27 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.56 0.00 0.00 8.00 0.68 0.00 0.00 9.00 0.84 0.00 0.00 10.00 1.03 0.00 0.00 11.00 1.34 0.02 0.10 12.00 3.78 0.96 9.24 13.00 4.40 1.33 0.76 14.00 4.67 1.51 0.46 15.00 4.86 1.64 0.36 16.00 5.02 1.74 0.28 17.00 5.14 1.82 0.25 18.00 5.25 1.90 0.22 19.00 5.35 1.97 0.19 20.00 5.43 2.02 0.16 21.00 5.50 2.08 0.15 22.00 5.57 2.13 0.15 23.00 5.64 2.17 0.14 24.00 5.70 2.22 0.14 25.00 5.70 2.22 0.00 26.00 5.70 2.22 0.00 27.00 5.70 2.22 0.00 28.00 5.70 2.22 0.00 29.00 5.70 2.22 0.00 30.00 5.70 2.22 0.00 31.00 5.70 2.22 0.00 32.00 5.70 2.22 0.00 33.00 5.70 2.22 0.00 34.00 5.70 2.22 0.00 35.00 5.70 2.22 0.00 36.00 5.70 2.22 0.00 37.00 5.70 2.22 0.00 38.00 5.70 2.22 0.00 39.00 5.70 2.22 0.00 40.00 5.70 2.22 0.00 41.00 5.70 2.22 0.00 42.00 5.70 2.22 0.00 43.00 5.70 2.22 0.00 44.00 5.70 2.22 0.00 45.00 5.70 2.22 0.00 46.00 5.70 2.22 0.00 47.00 5.70 2.22 0.00 48.00 5.70 2.22 0.00 49.00 5.70 2.22 0.00 50.00 5.70 2.22 0.00 51.00 5.70 2.22 0.00 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 52.00 5.70 2.22 0.00 53.00 5.70 2.22 0.00 54.00 5.70 2.22 0.00 55.00 5.70 2.22 0.00 56.00 5.70 2.22 0.00 57.00 5.70 2.22 0.00 58.00 5.70 2.22 0.00 59.00 5.70 2.22 0.00 60.00 5.70 2.22 0.00 61.00 5.70 2.22 0.00 62.00 5.70 2.22 0.00 63.00 5.70 2.22 0.00 64.00 5.70 2.22 0.00 65.00 5.70 2.22 0.00 66.00 5.70 2.22 0.00 67.00 5.70 2.22 0.00 68.00 5.70 2.22 0.00 69.00 5.70 2.22 0.00 70.00 5.70 2.22 0.00 71.00 5.70 2.22 0.00 72.00 5.70 2.22 0.00 Drainag Basin 1 A Skimmer Basin Subcat Reach on Link 2S Drainage Basin A By -Pass Basin 1 Post Development Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Drainage Basin 1 Runoff = 11.01 cfs @ 12.02 hrs, Volume= 0.686 af, Depth= 3.05" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 yr 24 hr Rainfall=3.50" Area (sf) CN Description 108,499 96 Gravel surface, HSG B 8,303 98 Water Surface, HSG B 960 100 Concrete slab foundation for plant 117,762 96 Weighted Average 108,499 92.13% Pervious Area 9,263 7.87% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.1 100 0.0300 0.23 Sheet Flow, Sheet flow Range n=0.130 P2=3.50" 3.7 772 0.0300 3.52 Shallow Concentrated Flow, Shallow Concentrated Flow Paved Kv= 20.3 fps 10.8 872 Total Subcatchment 1S: Drainage Basin 1 Hydrograph 12 l l l l l l 1 1 l l 1 1 I I_ I_ 1_ (Type II Q4 -hr 10 ' -1-1 -1 -1 -1 -1 + + + tri �41,-hlr_ ;Rap all -3.;50 , 9' I I M M I Rbadff Atea�=-1117 762 tI 8 ? I I I I I— 1 1 1 1-1-A-4 4 4 - RUrwff-V-OhjM=01686- of 7 11 11- 11 11 11 TTTT-r I T11 I 11"e h�- 110, ,i _0 6 I I I I I 1 1 II —FIDW IL1eh-0 16721 I�lope-0:0 0^-I'/1 4 3 -I-I-1--I-I-I-I-I-4-4-444+4-4-4-4-1-1-1-1-1-1-C-N-46 2- 1 - 1 1 -I -I I 1 1 7 T 1 1 1 F 1- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ Runoff Basin 1 Post Development Type 11 24 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pace 3 Hydrograph for Subcatchment 1S: Drainage Basin 1 Time Precip. Excess Runoff lours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.08 0.00 0.00 3.00 0.12 0.00 0.02 4.00 0.17 0.01 0.04 5.00 0.22 0.03 0.06 6.00 0.28 0.06 0.09 7.00 0.35 0.10 0.11 8.00 0.42 0.15 0.14 9.00 0.51 0.22 0.22 10.00 0.63 0.31 0.29 11.00 0.82 0.47 0.54 12.00 2.32 1.89 10.90 13.00 2.70 2.26 0.65 14.00 2.87 2.42 0.38 15.00 2.99 2.54 0.29 16.00 3.08 2.63 0.23 17.00 3.16 2.71 0.20 18.00 3.22 2.77 0.17 19.00 3.28 2.83 0.15 20.00 3.33 2.88 0.13 21.00 3.38 2.92 0.12 22.00 3.42 2.97 0.11 23.00 3.46 3.01 0.11 24.00 3.50 3.05 0.10 25.00 3.50 3.05 0.00 26.00 3.50 3.05 0.00 27.00 3.50 3.05 0.00 28.00 3.50 3.05 0.00 29.00 3.50 3.05 0.00 30.00 3.50 3.05 0.00 31.00 3.50 3.05 0.00 32.00 3.50 3.05 0.00 33.00 3.50 3.05 0.00 34.00 3.50 3.05 0.00 35.00 3.50 3.05 0.00 36.00 3.50 3.05 0.00 37.00 3.50 3.05 0.00 38.00 3.50 3.05 0.00 39.00 3.50 3.05 0.00 40.00 3.50 3.05 0.00 41.00 3.50 3.05 0.00 42.00 3.50 3.05 0.00 43.00 3.50 3.05 0.00 44.00 3.50 3.05 0.00 45.00 3.50 3.05 0.00 46.00 3.50 3.05 0.00 47.00 3.50 3.05 0.00 48.00 3.50 3.05 0.00 49.00 3.50 3.05 0.00 50.00 3.50 3.05 0.00 51.00 3.50 3.05 0.00 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 52.00 3.50 3.05 0.00 53.00 3.50 3.05 0.00 54.00 3.50 3.05 0.00 55.00 3.50 3.05 0.00 56.00 3.50 3.05 0.00 57.00 3.50 3.05 0.00 58.00 3.50 3.05 0.00 59.00 3.50 3.05 0.00 60.00 3.50 3.05 0.00 61.00 3.50 3.05 0.00 62.00 3.50 3.05 0.00 63.00 3.50 3.05 0.00 64.00 3.50 3.05 0.00 65.00 3.50 3.05 0.00 66.00 3.50 3.05 0.00 67.00 3.50 3.05 0.00 68.00 3.50 3.05 0.00 69.00 3.50 3.05 0.00 70.00 3.50 3.05 0.00 71.00 3.50 3.05 0.00 72.00 3.50 3.05 0.00 Basin 1 Post Development Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Pace 4 Summary for Subcatchment 2S: Drainage Basin A By -Pass Runoff = 1.93 cfs @ 12.11 hrs, Volume= 0.137 af, Depth= 1.86" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 yr 24 hr Rainfall=3.50" Area (sf) CN Description 19,288 96 Gravel surface, HSG B 19,288 69 50-75% Grass cover, Fair, HSG B 38,576 83 Weighted Average 38,576 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.0 100 0.0100 0.09 Sheet Flow, Sheet flow off the site Grass: Dense n= 0.240 P2= 3.50" Subcatchment 2S: Drainage Basin A By -Pass Hydrograph 1 1 1_ L L L L I_ I_ I_I_.I_.I _.I _.I J J J J. I 2 1.93 cfs I I I I I I I I I 1 (Type III 24 -hr 1 1 1 1 1 1 1 1 1 2 yr11 �411Ilr Rainllfall-3.5�'I 1 1 1 1 1 — Runoff Area=�38,576 sf V I I I I I I I I I I I I I I I I I I I I I I I I i i i I 1 1 I I I 1 Runoff l Volurne=0.137 of -i-L-L1 _L_LLLL "un' Ifaei4h' 1.00 0 1 1 1 1 1 1 1 1 1 1 1 1 FIOW'Lehg*h110107 LL 1 1 1 1 1 1 1 1 Slope=0.01'001'1 1 1 1 1 1 I I I I I I Tc' m�p I l l l l l l l l l l l l l l l l l l l l r 18.0 . I n 1 1 1 1 1 1 1 M=83 1 1 1 1 1 1 I I 1 1 1 1 I 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Basin 1 Post Development Type 11 24 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pace 5 Hydrograph for Subcatchment 2S: Drainage Basin A By -Pass Time Precip. Excess Runoff lours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.08 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.17 0.00 0.00 5.00 0.22 0.00 0.00 6.00 0.28 0.00 0.00 7.00 0.35 0.00 0.00 8.00 0.42 0.00 0.00 9.00 0.51 0.01 0.01 10.00 0.63 0.02 0.02 11.00 0.82 0.07 0.05 12.00 2.32 0.92 1.42 13.00 2.70 1.21 0.18 14.00 2.87 1.34 0.11 15.00 2.99 1.44 0.08 16.00 3.08 1.51 0.06 17.00 3.16 1.57 0.05 18.00 3.22 1.63 0.05 19.00 3.28 1.68 0.04 20.00 3.33 1.72 0.04 21.00 3.38 1.76 0.03 22.00 3.42 1.79 0.03 23.00 3.46 1.83 0.03 24.00 3.50 1.86 0.03 25.00 3.50 1.86 0.00 26.00 3.50 1.86 0.00 27.00 3.50 1.86 0.00 28.00 3.50 1.86 0.00 29.00 3.50 1.86 0.00 30.00 3.50 1.86 0.00 31.00 3.50 1.86 0.00 32.00 3.50 1.86 0.00 33.00 3.50 1.86 0.00 34.00 3.50 1.86 0.00 35.00 3.50 1.86 0.00 36.00 3.50 1.86 0.00 37.00 3.50 1.86 0.00 38.00 3.50 1.86 0.00 39.00 3.50 1.86 0.00 40.00 3.50 1.86 0.00 41.00 3.50 1.86 0.00 42.00 3.50 1.86 0.00 43.00 3.50 1.86 0.00 44.00 3.50 1.86 0.00 45.00 3.50 1.86 0.00 46.00 3.50 1.86 0.00 47.00 3.50 1.86 0.00 48.00 3.50 1.86 0.00 49.00 3.50 1.86 0.00 50.00 3.50 1.86 0.00 51.00 3.50 1.86 0.00 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 52.00 3.50 1.86 0.00 53.00 3.50 1.86 0.00 54.00 3.50 1.86 0.00 55.00 3.50 1.86 0.00 56.00 3.50 1.86 0.00 57.00 3.50 1.86 0.00 58.00 3.50 1.86 0.00 59.00 3.50 1.86 0.00 60.00 3.50 1.86 0.00 61.00 3.50 1.86 0.00 62.00 3.50 1.86 0.00 63.00 3.50 1.86 0.00 64.00 3.50 1.86 0.00 65.00 3.50 1.86 0.00 66.00 3.50 1.86 0.00 67.00 3.50 1.86 0.00 68.00 3.50 1.86 0.00 69.00 3.50 1.86 0.00 70.00 3.50 1.86 0.00 71.00 3.50 1.86 0.00 72.00 3.50 1.86 0.00 Basin 1 Post Development Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 6 Summary for Pond 1 P: Skimmer Basin Inflow Area = 2.703 ac, 7.87% Impervious, Inflow Depth = 3.05" for 2 yr 24 hr event Inflow = 11.01 cfs @ 12.02 hrs, Volume= 0.686 of Outflow = 0.22 cfs @ 16.09 hrs, Volume= 0.216 af, Atten= 98%, Lag= 244.4 min Primary = 0.02 cfs @ 11.85 hrs, Volume= 0.120 of Secondary = 0.20 cfs @ 16.09 hrs, Volume= 0.095 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 333.53' @ 16.09 hrs Surf -Area= 8,329 sf Storage= 24,846 cf Plug -Flow detention time= 1,283.4 min calculated for 0.216 of (31 % of inflow) Center -of -Mass det. time= 1,128.7 min ( 1,901.1 - 772.4 ) Volume Invert Avail.Storage Storage Description #1 330.00' 37,907 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 330.00 5,799 0 0 331.00 6,474 6,137 6,137 332.00 7,179 6,827 12,963 333.00 7,924 7,552 20,515 333.50 8,303 4,057 24,571 334.00 8,690 4,248 28,820 335.00 9,485 9,088 37,907 Device Routinq Invert Outlet Devices #1 Secondary 333.50' 11.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #2 Primary 330.50' 0.024 cfs Constant Flow/Skimmer Phase -In= 0.75' Primary OutFlow Max=0.02 cfs @ 11.85 hrs HW=331.32' (Free Discharge) L2=Constant Flow/Skimmer (Constant Controls 0.02 cfs) Secondary OutFlow Max=0.16 cfs @ 16.09 hrs HW=333.53' (Free Discharge) 't1=Broad-Crested Rectangular Weir (Weir Controls 0.16 cfs @ 0.44 fps) Basin 1 Post Development Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Pacie 7 Pond 1P: Skimmer Basin 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) 335 334 m 333 m c 0 w 332 331 330 0 Pond 1P: Skimmer Basin Stage -Discharge 5 10 15 20 25 30 Discharge (cfs) 35 40 45 50 Total ❑ Primary ❑ Secondary Hydrograph I -171LI 1 1L Li 1 1-41 1 11_�_LI 1 71 L I-1 1 fi.oi cfs I�filow E Primary El 12 � , 1-1-1 -4 4 1-1 -1 7 + (Area=I -J.01 IaCI I I IIIp�-' I�� � vI 11 - pp�I rI"I I" I' -7 i t 10- 1 1 7 1 T T T T 1-1 -1 7 T T_ I- IStorliceJ214� 846-6f, 1-1 -I-4 -1-4441-1-1-4 �1-1-1-144 -1-1-1_r I -1-I 9 'I ,', 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 8_/ -- m 7--/ -I -I rt I - I -I t 1- r__I-I -I rt t 1- I - I -I -1 rt 1- r__I-I -I rt t 1- I - I -I 1-17 1 1 1-11LL1 1 17 LL L 1 1-11LL1 1L 7L L1 1 1 6 _-I 0 o , 5 ,I 117 111 1 11-7 111 11-7 111 4 3 2 022 cfs 1 - 0.02 cfs. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) 335 334 m 333 m c 0 w 332 331 330 0 Pond 1P: Skimmer Basin Stage -Discharge 5 10 15 20 25 30 Discharge (cfs) 35 40 45 50 Total ❑ Primary ❑ Secondary Basin 1 Post Development Type 11 24 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 8 Pond 1 P: Skimmer Basin Stage -Area -Storage Surface/Horizontal/Wetted Area (sq -ft) 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Storage (cubic -feet) ❑ Surface ❑ Storage Basin 1 Post Development Type 11 24 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 9 Hydrograph for Pond 1 P: Skimmer Basin Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 330.00 0.00 0.00 0.00 2.50 0.00 2 330.00 0.00 0.00 0.00 5.00 0.06 295 330.05 0.00 0.00 0.00 7.50 0.13 1,148 330.20 0.00 0.00 0.00 10.00 0.29 2,895 330.49 0.00 0.00 0.00 12.50 1.18 20,195 332.96 0.02 0.02 0.00 15.00 0.29 24,427 333.48 0.02 0.02 0.00 17.50 0.19 24,808 333.53 0.19 0.02 0.17 20.00 0.13 24,726 333.52 0.14 0.02 0.11 22.50 0.11 24,696 333.51 0.11 0.02 0.09 25.00 0.00 24,550 333.50 0.02 0.02 0.00 27.50 0.00 24,334 333.47 0.02 0.02 0.00 30.00 0.00 24,118 333.45 0.02 0.02 0.00 32.50 0.00 23,902 333.42 0.02 0.02 0.00 35.00 0.00 23,686 333.39 0.02 0.02 0.00 37.50 0.00 23,470 333.37 0.02 0.02 0.00 40.00 0.00 23,254 333.34 0.02 0.02 0.00 42.50 0.00 23,038 333.31 0.02 0.02 0.00 45.00 0.00 22,822 333.29 0.02 0.02 0.00 47.50 0.00 22,606 333.26 0.02 0.02 0.00 50.00 0.00 22,390 333.23 0.02 0.02 0.00 52.50 0.00 22,174 333.21 0.02 0.02 0.00 55.00 0.00 21,958 333.18 0.02 0.02 0.00 57.50 0.00 21,742 333.15 0.02 0.02 0.00 60.00 0.00 21,526 333.13 0.02 0.02 0.00 62.50 0.00 21,310 333.10 0.02 0.02 0.00 65.00 0.00 21,094 333.07 0.02 0.02 0.00 67.50 0.00 20,878 333.05 0.02 0.02 0.00 70.00 0.00 20,662 333.02 0.02 0.02 0.00 Basin 1 Post Development Type 11 24 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 10 Stage -Discharge for Pond 1 P: Skimmer Basin Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 330.00 0.00 0.00 0.00 330.05 0.00 0.00 0.00 330.10 0.00 0.00 0.00 330.15 0.00 0.00 0.00 330.20 0.00 0.00 0.00 330.25 0.00 0.00 0.00 330.30 0.00 0.00 0.00 330.35 0.00 0.00 0.00 330.40 0.00 0.00 0.00 330.45 0.00 0.00 0.00 330.50 0.00 0.00 0.00 330.55 0.00 0.00 0.00 330.60 0.00 0.00 0.00 330.65 0.00 0.00 0.00 330.70 0.01 0.01 0.00 330.75 0.01 0.01 0.00 330.80 0.01 0.01 0.00 330.85 0.01 0.01 0.00 330.90 0.01 0.01 0.00 330.95 0.01 0.01 0.00 331.00 0.02 0.02 0.00 331.05 0.02 0.02 0.00 331.10 0.02 0.02 0.00 331.15 0.02 0.02 0.00 331.20 0.02 0.02 0.00 331.25 0.02 0.02 0.00 331.30 0.02 0.02 0.00 331.35 0.02 0.02 0.00 331.40 0.02 0.02 0.00 331.45 0.02 0.02 0.00 331.50 0.02 0.02 0.00 331.55 0.02 0.02 0.00 331.60 0.02 0.02 0.00 331.65 0.02 0.02 0.00 331.70 0.02 0.02 0.00 331.75 0.02 0.02 0.00 331.80 0.02 0.02 0.00 331.85 0.02 0.02 0.00 331.90 0.02 0.02 0.00 331.95 0.02 0.02 0.00 332.00 0.02 0.02 0.00 332.05 0.02 0.02 0.00 332.10 0.02 0.02 0.00 332.15 0.02 0.02 0.00 332.20 0.02 0.02 0.00 332.25 0.02 0.02 0.00 332.30 0.02 0.02 0.00 332.35 0.02 0.02 0.00 332.40 0.02 0.02 0.00 332.45 0.02 0.02 0.00 332.50 0.02 0.02 0.00 332.55 0.02 0.02 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 332.60 0.02 0.02 0.00 332.65 0.02 0.02 0.00 332.70 0.02 0.02 0.00 332.75 0.02 0.02 0.00 332.80 0.02 0.02 0.00 332.85 0.02 0.02 0.00 332.90 0.02 0.02 0.00 332.95 0.02 0.02 0.00 333.00 0.02 0.02 0.00 333.05 0.02 0.02 0.00 333.10 0.02 0.02 0.00 333.15 0.02 0.02 0.00 333.20 0.02 0.02 0.00 333.25 0.02 0.02 0.00 333.30 0.02 0.02 0.00 333.35 0.02 0.02 0.00 333.40 0.02 0.02 0.00 333.45 0.02 0.02 0.00 333.50 0.02 0.02 0.00 333.55 0.32 0.02 0.30 333.60 0.87 0.02 0.85 333.65 1.58 0.02 1.55 333.70 2.41 0.02 2.39 333.75 3.40 0.02 3.38 333.80 4.52 0.02 4.49 333.85 5.75 0.02 5.72 333.90 7.09 0.02 7.07 333.95 8.59 0.02 8.57 334.00 10.21 0.02 10.19 334.05 11.96 0.02 11.93 334.10 13.83 0.02 13.80 334.15 15.57 0.02 15.55 334.20 17.39 0.02 17.36 334.25 19.26 0.02 19.24 334.30 21.20 0.02 21.17 334.35 23.19 0.02 23.17 334.40 25.24 0.02 25.22 334.45 27.35 0.02 27.32 334.50 29.50 0.02 29.48 334.55 31.74 0.02 31.72 334.60 34.03 0.02 34.01 334.65 36.38 0.02 36.36 334.70 38.78 0.02 38.75 334.75 41.15 0.02 41.12 334.80 43.56 0.02 43.53 334.85 46.01 0.02 45.98 334.90 48.49 0.02 48.47 334.95 51.02 0.02 50.99 335.00 53.58 0.02 53.55 Basin 1 Post Development Type 11 24 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 11 Stage -Area -Storage for Pond 1 P: Skimmer Basin Elevation Surface Storage (feet) (sq -ft) (cubic -feet) 330.00 5,799 0 330.05 5,833 291 330.10 5,867 583 330.15 5,900 877 330.20 5,934 1,173 330.25 5,968 1,471 330.30 6,002 1,770 330.35 6,035 2,071 330.40 6,069 2,374 330.45 6,103 2,678 330.50 6,137 2,984 330.55 6,170 3,292 330.60 6,204 3,601 330.65 6,238 3,912 330.70 6,271 4,225 330.75 6,305 4,539 330.80 6,339 4,855 330.85 6,373 5,173 330.90 6,406 5,492 330.95 6,440 5,814 331.00 6,474 6,137 331.05 6,509 6,461 331.10 6,545 6,787 331.15 6,580 7,116 331.20 6,615 7,445 331.25 6,650 7,777 331.30 6,686 8,110 331.35 6,721 8,446 331.40 6,756 8,782 331.45 6,791 9,121 331.50 6,827 9,462 331.55 6,862 9,804 331.60 6,897 10,148 331.65 6,932 10,494 331.70 6,967 10,841 331.75 7,003 11,190 331.80 7,038 11,541 331.85 7,073 11,894 331.90 7,108 12,249 331.95 7,144 12,605 332.00 7,179 12,963 332.05 7,216 13,323 332.10 7,254 13,685 332.15 7,291 14,048 332.20 7,328 14,414 332.25 7,365 14,781 332.30 7,403 15,150 332.35 7,440 15,521 332.40 7,477 15,894 332.45 7,514 16,269 332.50 7,552 16,646 332.55 7,589 17,024 Elevation Surface Storage (feet) (sq -ft) (cubic -feet) 332.60 7,626 17,405 332.65 7,663 17,787 332.70 7,700 18,171 332.75 7,738 18,557 332.80 7,775 18,945 332.85 7,812 19,334 332.90 7,849 19,726 332.95 7,887 20,119 333.00 7,924 20,515 333.05 7,962 20,912 333.10 8,000 21,311 333.15 8,038 21,712 333.20 8,076 22,114 333.25 8,114 22,519 333.30 8,151 22,926 333.35 8,189 23,334 333.40 8,227 23,745 333.45 8,265 24,157 333.50 8,303 24,571 333.55 8,342 24,987 333.60 8,380 25,405 333.65 8,419 25,825 333.70 8,458 26,247 333.75 8,497 26,671 333.80 8,535 27,097 333.85 8,574 27,525 333.90 8,613 27,954 333.95 8,651 28,386 334.00 8,690 28,820 334.05 8,730 29,255 334.10 8,770 29,692 334.15 8,809 30,132 334.20 8,849 30,573 334.25 8,889 31,017 334.30 8,929 31,462 334.35 8,968 31,910 334.40 9,008 32,359 334.45 9,048 32,810 334.50 9,088 33,264 334.55 9,127 33,719 334.60 9,167 34,177 334.65 9,207 34,636 334.70 9,246 35,097 334.75 9,286 35,561 334.80 9,326 36,026 334.85 9,366 36,493 334.90 9,405 36,962 334.95 9,445 37,434 335.00 9,485 37,907 Basin 1 Post Development Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Paqe 12 Summary for Subcatchment 1S: Drainage Basin 1 Runoff = 18.36 cfs @ 12.02 hrs, Volume= 1.178 af, Depth= 5.23" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 108,499 96 Gravel surface, HSG B 8,303 98 Water Surface, HSG B 960 100 Concrete slab foundation for plant 117,762 96 Weighted Average 108,499 92.13% Pervious Area 9,263 7.87% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.1 100 0.0300 0.23 Sheet Flow, Sheet flow 17 16 Range n=0.130 P2=3.50" 3.7 772 0.0300 3.52 Shallow Concentrated Flow, Shallow Concentrated Flow 15 Paved Kv= 20.3 fps 10.8 872 Total Subcatchment 1S: Drainage Basin 1 Hydrograph LI_I_I_1_1_I_I_I_I_i _ L L 20 L I 11 1 1 1L-1-1ALLLLLLLLLLI I I I 1 1 1 1 1 1L ■Runoff 19I— 18:/ 8.36 cfs -1-4 -4 -4 4 4- 4-h Type -112 -4 --hr 17 16 1 1�-4444 t0l��rL4rrA016Wi17� t + - —- 15 -i -1 -1 + +fii- punoff1-Area=♦7,762-S# 14 13 - L - - rt rt rt 1 t r-rfi — 1 -I —1 -1-1-1 -r F urnOff �/ol�um� 1l.1l7 � - r 1- rt rt rt rt 1 12 11 ' F 1-11_ F 11 T T T R�adf�p�i-i.p11� ig __ _� 1 7 7 1 T T I FIIow Len h=872 io 8 I— I— I— —I —I —I —I r i 7 6 - - - - Ie'1= - - - - - - - - - - - - - - - - - - - - - - -— 1 - %].li d 1 1 1 TSl 5iL 1 1— 1_ 4 2' L 1_ 1_ 1-1 —1 —1 -1 -1 1 1 1 L L L L L L L I_ I_ I_I_1_1_1_1 _I —1 J 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Basin 1 Post Development Type 1124 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 13 Hydrograph for Subcatchment 1S: Drainage Basin 1 Time Precip. Excess Runoff lours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.02 3.00 0.20 0.02 0.07 4.00 0.27 0.06 0.11 5.00 0.36 0.11 0.15 6.00 0.46 0.18 0.19 7.00 0.56 0.26 0.24 8.00 0.68 0.35 0.28 9.00 0.84 0.49 0.41 10.00 1.03 0.66 0.52 11.00 1.34 0.94 0.95 12.00 3.78 3.32 18.18 13.00 4.40 3.94 1.07 14.00 4.67 4.21 0.62 15.00 4.86 4.40 0.48 16.00 5.02 4.55 0.37 17.00 5.14 4.67 0.32 18.00 5.25 4.78 0.28 19.00 5.35 4.88 0.25 20.00 5.43 4.96 0.21 21.00 5.50 5.03 0.19 22.00 5.57 5.10 0.19 23.00 5.64 5.16 0.18 24.00 5.70 5.23 0.17 25.00 5.70 5.23 0.00 26.00 5.70 5.23 0.00 27.00 5.70 5.23 0.00 28.00 5.70 5.23 0.00 29.00 5.70 5.23 0.00 30.00 5.70 5.23 0.00 31.00 5.70 5.23 0.00 32.00 5.70 5.23 0.00 33.00 5.70 5.23 0.00 34.00 5.70 5.23 0.00 35.00 5.70 5.23 0.00 36.00 5.70 5.23 0.00 37.00 5.70 5.23 0.00 38.00 5.70 5.23 0.00 39.00 5.70 5.23 0.00 40.00 5.70 5.23 0.00 41.00 5.70 5.23 0.00 42.00 5.70 5.23 0.00 43.00 5.70 5.23 0.00 44.00 5.70 5.23 0.00 45.00 5.70 5.23 0.00 46.00 5.70 5.23 0.00 47.00 5.70 5.23 0.00 48.00 5.70 5.23 0.00 49.00 5.70 5.23 0.00 50.00 5.70 5.23 0.00 51.00 5.70 5.23 0.00 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 52.00 5.70 5.23 0.00 53.00 5.70 5.23 0.00 54.00 5.70 5.23 0.00 55.00 5.70 5.23 0.00 56.00 5.70 5.23 0.00 57.00 5.70 5.23 0.00 58.00 5.70 5.23 0.00 59.00 5.70 5.23 0.00 60.00 5.70 5.23 0.00 61.00 5.70 5.23 0.00 62.00 5.70 5.23 0.00 63.00 5.70 5.23 0.00 64.00 5.70 5.23 0.00 65.00 5.70 5.23 0.00 66.00 5.70 5.23 0.00 67.00 5.70 5.23 0.00 68.00 5.70 5.23 0.00 69.00 5.70 5.23 0.00 70.00 5.70 5.23 0.00 71.00 5.70 5.23 0.00 72.00 5.70 5.23 0.00 Basin 1 Post Development Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Paqe 14 Summary for Subcatchment 2S: Drainage Basin A By -Pass Runoff = 3.92 cfs @ 12.10 hrs, Volume= 0.281 af, Depth= 3.81" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 19,288 96 Gravel surface, HSG B 19,288 69 50-75% Grass cover, Fair, HSG B 38,576 83 Weighted Average 38,576 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.0 100 0.0100 0.09 Sheet Flow, Sheet flow off the site Grass: Dense n= 0.240 P2= 3.50" Subcatchment 2S: Drainage Basin A By -Pass Hydrograph 4 i 3.9z cfs Type II 24 -hr 101 Yr �4 hr A inW1=5170,+ r -I --t -t -r I t t t Runoff Area=38,576-sf 3 RulnOff Volume:4.281 ;aj Runoff Ddpf H= 181 0 2 I- -I -I -I -I -I - I- (Flow leingth-100 $100e1 -0.01011Q 11�/i Tc=18.0 min 1 I � l7 -I 7 7 7 T T T T TF F 1 I I 1-1 I I I-1 -1 7 -7 I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Basin 1 Post Development Type 1124 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 15 Hydrograph for Subcatchment 2S: Drainage Basin A By -Pass Time Precip. Excess Runoff lours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.27 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.56 0.01 0.01 8.00 0.68 0.03 0.02 9.00 0.84 0.07 0.04 10.00 1.03 0.14 0.07 11.00 1.34 0.29 0.15 12.00 3.78 2.10 3.00 13.00 4.40 2.64 0.34 14.00 4.67 2.88 0.19 15.00 4.86 3.05 0.15 16.00 5.02 3.19 0.11 17.00 5.14 3.30 0.10 18.00 5.25 3.40 0.09 19.00 5.35 3.49 0.08 20.00 5.43 3.56 0.06 21.00 5.50 3.63 0.06 22.00 5.57 3.69 0.06 23.00 5.64 3.75 0.05 24.00 5.70 3.81 0.05 25.00 5.70 3.81 0.00 26.00 5.70 3.81 0.00 27.00 5.70 3.81 0.00 28.00 5.70 3.81 0.00 29.00 5.70 3.81 0.00 30.00 5.70 3.81 0.00 31.00 5.70 3.81 0.00 32.00 5.70 3.81 0.00 33.00 5.70 3.81 0.00 34.00 5.70 3.81 0.00 35.00 5.70 3.81 0.00 36.00 5.70 3.81 0.00 37.00 5.70 3.81 0.00 38.00 5.70 3.81 0.00 39.00 5.70 3.81 0.00 40.00 5.70 3.81 0.00 41.00 5.70 3.81 0.00 42.00 5.70 3.81 0.00 43.00 5.70 3.81 0.00 44.00 5.70 3.81 0.00 45.00 5.70 3.81 0.00 46.00 5.70 3.81 0.00 47.00 5.70 3.81 0.00 48.00 5.70 3.81 0.00 49.00 5.70 3.81 0.00 50.00 5.70 3.81 0.00 51.00 5.70 3.81 0.00 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 52.00 5.70 3.81 0.00 53.00 5.70 3.81 0.00 54.00 5.70 3.81 0.00 55.00 5.70 3.81 0.00 56.00 5.70 3.81 0.00 57.00 5.70 3.81 0.00 58.00 5.70 3.81 0.00 59.00 5.70 3.81 0.00 60.00 5.70 3.81 0.00 61.00 5.70 3.81 0.00 62.00 5.70 3.81 0.00 63.00 5.70 3.81 0.00 64.00 5.70 3.81 0.00 65.00 5.70 3.81 0.00 66.00 5.70 3.81 0.00 67.00 5.70 3.81 0.00 68.00 5.70 3.81 0.00 69.00 5.70 3.81 0.00 70.00 5.70 3.81 0.00 71.00 5.70 3.81 0.00 72.00 5.70 3.81 0.00 Basin 1 Post Development Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Paqe 16 Summary for Pond 1 P: Skimmer Basin Inflow Area = 2.703 ac, 7.87% Impervious, Inflow Depth = 5.23" for 10 yr 24 hr event Inflow = 18.36 cfs @ 12.02 hrs, Volume= 1.178 of Outflow = 8.74 cfs @ 12.16 hrs, Volume= 0.707 af, Atten= 52%, Lag= 8.9 min Primary = 0.02 cfs @ 10.80 hrs, Volume= 0.124 of Secondary = 8.72 cfs @ 12.16 hrs, Volume= 0.583 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 333.96' @ 12.16 hrs Surf.Area= 8,655 sf Storage= 28,430 cf Plug -Flow detention time= 503.4 min calculated for 0.707 of (60% of inflow) Center -of -Mass det. time= 397.2 min ( 1,157.1 - 760.0 ) Volume Invert Avail.Storage Storage Description #1 330.00' 37,907 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 330.00 5,799 0 0 331.00 6,474 6,137 6,137 332.00 7,179 6,827 12,963 333.00 7,924 7,552 20,515 333.50 8,303 4,057 24,571 334.00 8,690 4,248 28,820 335.00 9,485 9,088 37,907 Device Routinq Invert Outlet Devices #1 Secondary 333.50' 11.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #2 Primary 330.50' 0.024 cfs Constant Flow/Skimmer Phase -In= 0.75' Primary OutFlow Max=0.02 cfs @ 10.80 hrs HW=331.27' (Free Discharge) L2=Constant Flow/Skimmer (Constant Controls 0.02 cfs) Secondary OutFlow Max=8.44 cfs @ 12.16 hrs HW=333.95' (Free Discharge) 't1=Broad-Crested Rectangular Weir (Weir Controls 8.44 cfs @ 1.72 fps) Basin 1 Post Development Type 1124 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 17 m m c 0 .9 m W 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond 1 P: Skimmer Basin Stage -Discharge 0 5 10 15 20 25 30 35 40 45 50 Discharge (cfs) ® Inflow © Outflow EPrimary ❑ Secondary CI Total ❑ Primary ❑ Secondary Pond 1 P: Skimmer Basin Hydrograph 1 —1_t 1 l-1 1 1_J 1i 1 1-i 1 i I i11 1I 1 _t 11I I I / 1-1 --1 4 1 1 1-1 1 1 11 1 1 4 1 1 1 11 1 1 11 1 1 4 1 11 1 1 18.36 cis - -1 rt/� -I f16W / T I-1 I T hhi I/"F� �+F�+-�F�I� 10c1 20 19 / / , / /-I-I 1 1 1 1 ' 18 /, --I-I-I L -I -I - T - -1 17 /, / ' 1-1 -I - 1-1-1-4 4 4 1-1 -1 4 + ♦ 1-ISLV1" t 221&43011 16 ,-I-Irt --I�rt1 �I--Irttt--I�rtt'f---I�t-I-I 15 '// /I 1 1 I T I 1 1 I 1 1 1 T 1 1 14 / /, / - II III 13 /I -VIII -III 12 /,/j 1 1-874ofs 11 1111 1 1A LI 1 1 1-11 1 1A 1 11 1 11 // I-1 11 -1-1 _- i- -I-1-1 -1 I- + -I-I 0 10 8.72 cfs 1_1 7 r r- 1 I rt T r 1 1_1 _1 7_r r- 1 I rt rt r- l 1_1 E 9 ' /I 8 7 ,/ / _I I1 1 11 1-11 1 L 1 1 11 1 1 1 11 1 1 1 1 111 6 i , ' -I -- 1- 1-1 - -1 J- 1-1-1 - 4 1- 1-1 --� -4 1-1-1 5 1--I-I t t - I -I t fi- -I -I-I 4 3 2 0 1 m m c 0 .9 m W 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond 1 P: Skimmer Basin Stage -Discharge 0 5 10 15 20 25 30 35 40 45 50 Discharge (cfs) ® Inflow © Outflow EPrimary ❑ Secondary CI Total ❑ Primary ❑ Secondary Basin 1 Post Development Type 11 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 18 Pond 1 P: Skimmer Basin Stage -Area -Storage Surface/Horizontal/Wetted Area (sq -ft) 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Storage (cubic -feet) ❑ Surface ❑ Storage Basin 1 Post Development Type 1124 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 19 Hydrograph for Pond 1 P: Skimmer Basin Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 330.00 0.00 0.00 0.00 2.50 0.05 87 330.01 0.00 0.00 0.00 5.00 0.15 985 330.17 0.00 0.00 0.00 7.50 0.26 2,830 330.47 0.00 0.00 0.00 10.00 0.52 6,083 330.99 0.02 0.02 0.00 12.50 1.95 26,425 333.72 2.83 0.02 2.81 15.00 0.48 25,127 333.57 0.51 0.02 0.48 17.50 0.30 24,977 333.55 0.32 0.02 0.29 20.00 0.21 24,847 333.53 0.22 0.02 0.20 22.50 0.18 24,797 333.53 0.19 0.02 0.16 25.00 0.00 24,566 333.50 0.02 0.02 0.00 27.50 0.00 24,350 333.47 0.02 0.02 0.00 30.00 0.00 24,134 333.45 0.02 0.02 0.00 32.50 0.00 23,918 333.42 0.02 0.02 0.00 35.00 0.00 23,702 333.39 0.02 0.02 0.00 37.50 0.00 23,486 333.37 0.02 0.02 0.00 40.00 0.00 23,270 333.34 0.02 0.02 0.00 42.50 0.00 23,054 333.32 0.02 0.02 0.00 45.00 0.00 22,838 333.29 0.02 0.02 0.00 47.50 0.00 22,622 333.26 0.02 0.02 0.00 50.00 0.00 22,406 333.24 0.02 0.02 0.00 52.50 0.00 22,190 333.21 0.02 0.02 0.00 55.00 0.00 21,974 333.18 0.02 0.02 0.00 57.50 0.00 21,758 333.16 0.02 0.02 0.00 60.00 0.00 21,542 333.13 0.02 0.02 0.00 62.50 0.00 21,326 333.10 0.02 0.02 0.00 65.00 0.00 21,110 333.07 0.02 0.02 0.00 67.50 0.00 20,894 333.05 0.02 0.02 0.00 70.00 0.00 20,678 333.02 0.02 0.02 0.00 Basin 1 Post Development Type 11 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 20 Stage -Discharge for Pond 1 P: Skimmer Basin Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 330.00 0.00 0.00 0.00 330.05 0.00 0.00 0.00 330.10 0.00 0.00 0.00 330.15 0.00 0.00 0.00 330.20 0.00 0.00 0.00 330.25 0.00 0.00 0.00 330.30 0.00 0.00 0.00 330.35 0.00 0.00 0.00 330.40 0.00 0.00 0.00 330.45 0.00 0.00 0.00 330.50 0.00 0.00 0.00 330.55 0.00 0.00 0.00 330.60 0.00 0.00 0.00 330.65 0.00 0.00 0.00 330.70 0.01 0.01 0.00 330.75 0.01 0.01 0.00 330.80 0.01 0.01 0.00 330.85 0.01 0.01 0.00 330.90 0.01 0.01 0.00 330.95 0.01 0.01 0.00 331.00 0.02 0.02 0.00 331.05 0.02 0.02 0.00 331.10 0.02 0.02 0.00 331.15 0.02 0.02 0.00 331.20 0.02 0.02 0.00 331.25 0.02 0.02 0.00 331.30 0.02 0.02 0.00 331.35 0.02 0.02 0.00 331.40 0.02 0.02 0.00 331.45 0.02 0.02 0.00 331.50 0.02 0.02 0.00 331.55 0.02 0.02 0.00 331.60 0.02 0.02 0.00 331.65 0.02 0.02 0.00 331.70 0.02 0.02 0.00 331.75 0.02 0.02 0.00 331.80 0.02 0.02 0.00 331.85 0.02 0.02 0.00 331.90 0.02 0.02 0.00 331.95 0.02 0.02 0.00 332.00 0.02 0.02 0.00 332.05 0.02 0.02 0.00 332.10 0.02 0.02 0.00 332.15 0.02 0.02 0.00 332.20 0.02 0.02 0.00 332.25 0.02 0.02 0.00 332.30 0.02 0.02 0.00 332.35 0.02 0.02 0.00 332.40 0.02 0.02 0.00 332.45 0.02 0.02 0.00 332.50 0.02 0.02 0.00 332.55 0.02 0.02 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 332.60 0.02 0.02 0.00 332.65 0.02 0.02 0.00 332.70 0.02 0.02 0.00 332.75 0.02 0.02 0.00 332.80 0.02 0.02 0.00 332.85 0.02 0.02 0.00 332.90 0.02 0.02 0.00 332.95 0.02 0.02 0.00 333.00 0.02 0.02 0.00 333.05 0.02 0.02 0.00 333.10 0.02 0.02 0.00 333.15 0.02 0.02 0.00 333.20 0.02 0.02 0.00 333.25 0.02 0.02 0.00 333.30 0.02 0.02 0.00 333.35 0.02 0.02 0.00 333.40 0.02 0.02 0.00 333.45 0.02 0.02 0.00 333.50 0.02 0.02 0.00 333.55 0.32 0.02 0.30 333.60 0.87 0.02 0.85 333.65 1.58 0.02 1.55 333.70 2.41 0.02 2.39 333.75 3.40 0.02 3.38 333.80 4.52 0.02 4.49 333.85 5.75 0.02 5.72 333.90 7.09 0.02 7.07 333.95 8.59 0.02 8.57 334.00 10.21 0.02 10.19 334.05 11.96 0.02 11.93 334.10 13.83 0.02 13.80 334.15 15.57 0.02 15.55 334.20 17.39 0.02 17.36 334.25 19.26 0.02 19.24 334.30 21.20 0.02 21.17 334.35 23.19 0.02 23.17 334.40 25.24 0.02 25.22 334.45 27.35 0.02 27.32 334.50 29.50 0.02 29.48 334.55 31.74 0.02 31.72 334.60 34.03 0.02 34.01 334.65 36.38 0.02 36.36 334.70 38.78 0.02 38.75 334.75 41.15 0.02 41.12 334.80 43.56 0.02 43.53 334.85 46.01 0.02 45.98 334.90 48.49 0.02 48.47 334.95 51.02 0.02 50.99 335.00 53.58 0.02 53.55 Basin 1 Post Development Type 1124 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 21 Stage -Area -Storage for Pond 1 P: Skimmer Basin Elevation Surface Storage (feet) (sq -ft) (cubic -feet) 330.00 5,799 0 330.05 5,833 291 330.10 5,867 583 330.15 5,900 877 330.20 5,934 1,173 330.25 5,968 1,471 330.30 6,002 1,770 330.35 6,035 2,071 330.40 6,069 2,374 330.45 6,103 2,678 330.50 6,137 2,984 330.55 6,170 3,292 330.60 6,204 3,601 330.65 6,238 3,912 330.70 6,271 4,225 330.75 6,305 4,539 330.80 6,339 4,855 330.85 6,373 5,173 330.90 6,406 5,492 330.95 6,440 5,814 331.00 6,474 6,137 331.05 6,509 6,461 331.10 6,545 6,787 331.15 6,580 7,116 331.20 6,615 7,445 331.25 6,650 7,777 331.30 6,686 8,110 331.35 6,721 8,446 331.40 6,756 8,782 331.45 6,791 9,121 331.50 6,827 9,462 331.55 6,862 9,804 331.60 6,897 10,148 331.65 6,932 10,494 331.70 6,967 10,841 331.75 7,003 11,190 331.80 7,038 11,541 331.85 7,073 11,894 331.90 7,108 12,249 331.95 7,144 12,605 332.00 7,179 12,963 332.05 7,216 13,323 332.10 7,254 13,685 332.15 7,291 14,048 332.20 7,328 14,414 332.25 7,365 14,781 332.30 7,403 15,150 332.35 7,440 15,521 332.40 7,477 15,894 332.45 7,514 16,269 332.50 7,552 16,646 332.55 7,589 17,024 Elevation Surface Storage (feet) (sq -ft) (cubic -feet) 332.60 7,626 17,405 332.65 7,663 17,787 332.70 7,700 18,171 332.75 7,738 18,557 332.80 7,775 18,945 332.85 7,812 19,334 332.90 7,849 19,726 332.95 7,887 20,119 333.00 7,924 20,515 333.05 7,962 20,912 333.10 8,000 21,311 333.15 8,038 21,712 333.20 8,076 22,114 333.25 8,114 22,519 333.30 8,151 22,926 333.35 8,189 23,334 333.40 8,227 23,745 333.45 8,265 24,157 333.50 8,303 24,571 333.55 8,342 24,987 333.60 8,380 25,405 333.65 8,419 25,825 333.70 8,458 26,247 333.75 8,497 26,671 333.80 8,535 27,097 333.85 8,574 27,525 333.90 8,613 27,954 333.95 8,651 28,386 334.00 8,690 28,820 334.05 8,730 29,255 334.10 8,770 29,692 334.15 8,809 30,132 334.20 8,849 30,573 334.25 8,889 31,017 334.30 8,929 31,462 334.35 8,968 31,910 334.40 9,008 32,359 334.45 9,048 32,810 334.50 9,088 33,264 334.55 9,127 33,719 334.60 9,167 34,177 334.65 9,207 34,636 334.70 9,246 35,097 334.75 9,286 35,561 334.80 9,326 36,026 334.85 9,366 36,493 334.90 9,405 36,962 334.95 9,445 37,434 335.00 9,485 37,907 Drainage Area 2 Predevelopment Post -development Drainage Area 2 Predevelpment Subcat Reach on Link Basin 2 Predevelopment Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Drainage Area 2 - Predevelpment Runoff = 0.58 cfs @ 12.67 hrs, Volume= 0.102 af, Depth> 0.48" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 yr 24 hr Rainfall=3.50" Area (sf) CN Description 6,634 55 Woods, Good, HSG B 103,937 61 >75% Grass cover, Good, HSG B 110,571 61 Weighted Average 110,571 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 52.9 200 0.0300 0.06 Sheet Flow, Sheet Flow Woods: Dense underbrush n= 0.800 P2= 3.50" 2.1 321 0.0300 2.60 Shallow Concentrated Flow, Shallow concentrated Flow - Pasture Grassed Waterwav Kv= 15.0 fps 55.0 521 Total Subcatchment 1S: Drainage Area 2 - Predevelpment Hydrograph I i J _ 1 _ _ _ I— _ L _ _ _ _I _ _ _ _ _ _ J _ _ ❑Runoff 0.6 I I 1ots I 0.55 Type -11 -11 -24 --hr- - —1 - - 1 - 0.5 2 yr 2#-hrlRainf-ail-3-,"50"I 0.45 RUrvol Area -010-1,M Sf — —1 — — 1— — — 7 — 0.4 Runoff V©lume=0.102 Elf 0.35 Rl�noff- - ,PthL>0.48" - 0 0.3 LL Flow Lengthy521' 1 I I I i i 0.25 Shope=0.0300_'P 1 -I 0.2 T 1=55.0 mir>� 11- - i - 0.15 EN -61 L 0.1 0.05 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Basin 2 Predevelopment Type 11 24 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pace 3 Hydrograph for Subcatchment 1 S: Drainage Area 2 - Predevelpment Time Precip. Excess Runoff tours) (inches) (inches) (cfs) 5.00 0.22 0.00 0.00 5.25 0.23 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.26 0.00 0.00 6.00 0.28 0.00 0.00 6.25 0.30 0.00 0.00 6.50 0.31 0.00 0.00 6.75 0.33 0.00 0.00 7.00 0.35 0.00 0.00 7.25 0.36 0.00 0.00 7.50 0.38 0.00 0.00 7.75 0.40 0.00 0.00 8.00 0.42 0.00 0.00 8.25 0.44 0.00 0.00 8.50 0.46 0.00 0.00 8.75 0.49 0.00 0.00 9.00 0.51 0.00 0.00 9.25 0.54 0.00 0.00 9.50 0.57 0.00 0.00 9.75 0.60 0.00 0.00 10.00 0.63 0.00 0.00 10.25 0.67 0.00 0.00 10.50 0.71 0.00 0.00 10.75 0.76 0.00 0.00 11.00 0.82 0.00 0.00 11.25 0.90 0.00 0.00 11.50 0.99 0.00 0.00 11.75 1.35 0.00 0.00 12.00 2.32 0.15 0.02 12.25 2.47 0.19 0.21 12.50 2.57 0.22 0.51 12.75 2.64 0.24 0.57 13.00 2.70 0.26 0.45 13.25 2.75 0.28 0.34 13.50 2.80 0.29 0.27 13.75 2.84 0.30 0.22 14.00 2.87 0.32 0.19 14.25 2.90 0.33 0.16 14.50 2.93 0.34 0.15 14.75 2.96 0.35 0.13 15.00 2.99 0.36 0.12 15.25 3.01 0.37 0.11 15.50 3.04 0.38 0.11 15.75 3.06 0.39 0.10 16.00 3.08 0.40 0.10 16.25 3.10 0.40 0.09 16.50 3.12 0.41 0.09 16.75 3.14 0.42 0.08 17.00 3.16 0.43 0.08 17.25 3.17 0.43 0.08 17.50 3.19 0.44 0.08 17.75 3.21 0.45 0.07 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 18.00 3.22 0.45 0.07 18.25 3.24 0.46 0.07 18.50 3.25 0.47 0.07 18.75 3.27 0.47 0.07 19.00 3.28 0.48 0.07 19.25 3.30 0.48 0.06 19.50 3.31 0.49 0.06 19.75 3.32 0.49 0.06 20.00 3.33 0.50 0.06 Basin 2 Predevelopment Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Pa ece44 Summary for Subcatchment 1S: Drainage Area 2 - Predevelpment Runoff = 2.38 cfs @ 12.61 hrs, Volume= 0.336 af, Depth> 1.59" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 6,634 55 Woods, Good, HSG B 103,937 61 >75% Grass cover, Good, HSG B 110,571 61 Weighted Average 110,571 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 52.9 200 0.0300 0.06 Sheet Flow, Sheet Flow Woods: Dense underbrush n= 0.800 P2= 3.50" 2.1 321 0.0300 2.60 Shallow Concentrated Flow, Shallow concentrated Flow - Pasture Grassed Waterwav Kv= 15.0 fps 55.0 521 Total Subcatchment 1S: Drainage Area 2 - Predevelpment Hydrograph I f I I I I [ Type II 24�hr 10; yr 24 h� Rainfa�1-5,170" 2 Runoff Area=110,571 sf Runoff Voljume=01,336, of Runoff Depth>1.59" Flow Length -521'1 I LL 1- Slope_0.0000 ; /' Tc=55.0 min CN -61 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff Basin 2 Predevelopment Type 11 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pace 5 Hydrograph for Subcatchment 1 S: Drainage Area 2 - Predevelpment Time Precip. Excess Runoff tours) (inches) (inches) (cfs) 5.00 0.36 0.00 0.00 5.25 0.38 0.00 0.00 5.50 0.41 0.00 0.00 5.75 0.43 0.00 0.00 6.00 0.46 0.00 0.00 6.25 0.48 0.00 0.00 6.50 0.51 0.00 0.00 6.75 0.54 0.00 0.00 7.00 0.56 0.00 0.00 7.25 0.59 0.00 0.00 7.50 0.62 0.00 0.00 7.75 0.65 0.00 0.00 8.00 0.68 0.00 0.00 8.25 0.72 0.00 0.00 8.50 0.75 0.00 0.00 8.75 0.79 0.00 0.00 9.00 0.84 0.00 0.00 9.25 0.88 0.00 0.00 9.50 0.93 0.00 0.00 9.75 0.98 0.00 0.00 10.00 1.03 0.00 0.00 10.25 1.09 0.00 0.00 10.50 1.16 0.00 0.00 10.75 1.24 0.00 0.00 11.00 1.34 0.00 0.00 11.25 1.46 0.00 0.00 11.50 1.61 0.02 0.01 11.75 2.21 0.12 0.04 12.00 3.78 0.70 0.27 12.25 4.02 0.83 1.25 12.50 4.19 0.91 2.29 12.75 4.30 0.97 2.23 13.00 4.40 1.02 1.59 13.25 4.48 1.07 1.13 13.50 4.55 1.11 0.84 13.75 4.62 1.15 0.66 14.00 4.67 1.18 0.53 14.25 4.73 1.21 0.45 14.50 4.77 1.24 0.39 14.75 4.82 1.26 0.35 15.00 4.86 1.29 0.32 15.25 4.91 1.31 0.30 15.50 4.95 1.34 0.28 15.75 4.98 1.36 0.26 16.00 5.02 1.38 0.25 16.25 5.05 1.40 0.24 16.50 5.08 1.42 0.22 16.75 5.11 1.44 0.21 17.00 5.14 1.45 0.20 17.25 5.17 1.47 0.20 17.50 5.20 1.49 0.19 17.75 5.22 1.51 0.19 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 18.00 5.25 1.52 0.18 18.25 5.27 1.54 0.17 18.50 5.30 1.55 0.17 18.75 5.32 1.57 0.16 19.00 5.35 1.58 0.16 19.25 5.37 1.59 0.15 19.50 5.39 1.61 0.15 19.75 5.41 1.62 0.14 20.00 5.43 1.63 0.14 Drainage Area 2 - Post -development Subcat Reach on Link Basin 2 Post -Development Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1 S: Drainage Area 2 - Post -development Runoff = 1.21 cfs @ 12.33 hrs, Volume= 0.129 af, Depth> 0.74" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 yr 24 hr Rainfall=3.50" Area (sf) CN Description 3,683 55 Woods, Good, HSG B 59,814 61 >75% Grass cover, Good, HSG B 16,062 96 Gravel surface, HSG B 10,784 61 >75% Grass cover, Good, HSG B 90,343 67 Weighted Average 90,343 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.4 100 0.0300 0.05 Sheet Flow, Sheet Flow - Woods Woods: Dense underbrush n= 0.800 P2= 3.50" 1.8 274 0.0300 2.60 Shallow Concentrated Flow, Shallow concentrate flow - pasture Grassed Waterway Kv= 15.0 fps 0.5 68 0.0100 2.36 1.85 Pipe Channel, Culvert under Access Drive 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.025 Corrugated metal 0.5 80 0.0300 2.60 Shallow Concentrated Flow, Shallow concentrated flow below pip Grassed Waterwav Kv= 15.0 fps 33.2 522 Total Basin 2 Post -Development Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 3 Subcatchment 1S: Drainage Area 2 - Post -development Hydrograph I I II i II I ❑Runoff I I I i.2i ods I I I I Type II 24 -hr 2 yr-24,lhr OainfaU 3.50" ' Runoff Area=909343 sf Runoff) Vollume=0.1129 of Runoff Depth>0.74" Flow Length=522' Tc=33.2 min CN=67 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Basin 2 Post -Development Type 11 24 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 4 Hydrograph for Subcatchment 1 S: Drainage Area 2 - Post -development Time Precip. Excess Runoff tours) (inches) (inches) (cfs) 5.00 0.22 0.00 0.00 5.25 0.23 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.26 0.00 0.00 6.00 0.28 0.00 0.00 6.25 0.30 0.00 0.00 6.50 0.31 0.00 0.00 6.75 0.33 0.00 0.00 7.00 0.35 0.00 0.00 7.25 0.36 0.00 0.00 7.50 0.38 0.00 0.00 7.75 0.40 0.00 0.00 8.00 0.42 0.00 0.00 8.25 0.44 0.00 0.00 8.50 0.46 0.00 0.00 8.75 0.49 0.00 0.00 9.00 0.51 0.00 0.00 9.25 0.54 0.00 0.00 9.50 0.57 0.00 0.00 9.75 0.60 0.00 0.00 10.00 0.63 0.00 0.00 10.25 0.67 0.00 0.00 10.50 0.71 0.00 0.00 10.75 0.76 0.00 0.00 11.00 0.82 0.00 0.00 11.25 0.90 0.00 0.00 11.50 0.99 0.00 0.00 11.75 1.35 0.03 0.01 12.00 2.32 0.28 0.25 12.25 2.47 0.34 1.14 12.50 2.57 0.39 0.97 12.75 2.64 0.42 0.56 13.00 2.70 0.44 0.37 13.25 2.75 0.47 0.27 13.50 2.80 0.49 0.22 13.75 2.84 0.51 0.19 14.00 2.87 0.52 0.16 14.25 2.90 0.54 0.15 14.50 2.93 0.55 0.13 14.75 2.96 0.57 0.13 15.00 2.99 0.58 0.12 15.25 3.01 0.59 0.11 15.50 3.04 0.60 0.11 15.75 3.06 0.61 0.10 16.00 3.08 0.63 0.10 16.25 3.10 0.64 0.09 16.50 3.12 0.65 0.09 16.75 3.14 0.65 0.08 17.00 3.16 0.66 0.08 17.25 3.17 0.67 0.08 17.50 3.19 0.68 0.08 17.75 3.21 0.69 0.08 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 18.00 3.22 0.70 0.07 18.25 3.24 0.71 0.07 18.50 3.25 0.72 0.07 18.75 3.27 0.72 0.07 19.00 3.28 0.73 0.07 19.25 3.30 0.74 0.06 19.50 3.31 0.74 0.06 19.75 3.32 0.75 0.06 20.00 3.33 0.76 0.06 Basin 2 Post -Development Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Pa ece55 Summary for Subcatchment 1 S: Drainage Area 2 - Post -development Runoff = 3.75 cfs @ 12.30 hrs, Volume= 0.359 af, Depth> 2.08" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 3,683 55 Woods, Good, HSG B 59,814 61 >75% Grass cover, Good, HSG B 16,062 96 Gravel surface, HSG B 10,784 61 >75% Grass cover, Good, HSG B 90,343 67 Weighted Average 90,343 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.4 100 0.0300 0.05 Sheet Flow, Sheet Flow - Woods Woods: Dense underbrush n= 0.800 P2= 3.50" 1.8 274 0.0300 2.60 Shallow Concentrated Flow, Shallow concentrate flow - pasture Grassed Waterway Kv= 15.0 fps 0.5 68 0.0100 2.36 1.85 Pipe Channel, Culvert under Access Drive 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.025 Corrugated metal 0.5 80 0.0300 2.60 Shallow Concentrated Flow, Shallow concentrated flow below pip Grassed Waterwav Kv= 15.0 fps 33.2 522 Total Basin 2 Post -Development Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 6 Subcatchment 1S: Drainage Area 2 - Post -development Hydrograph 4 ❑Runoff 3.75 cfs Type 11 24 -hr 10 yr 24 hrRainfall1_5.70" 3-/ Runoff Areal=90;343, sf Runoff Volume -00359, of Runoff Depth>2.08" LL 2-/ Flow Length -522' Tc -33.2 min A ,I 0 U CN=67 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Basin 2 Post -Development Type 1124 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pace 7 Hydrograph for Subcatchment 1 S: Drainage Area 2 - Post -development Time Precip. Excess Runoff tours) (inches) (inches) (cfs) 5.00 0.36 0.00 0.00 5.25 0.38 0.00 0.00 5.50 0.41 0.00 0.00 5.75 0.43 0.00 0.00 6.00 0.46 0.00 0.00 6.25 0.48 0.00 0.00 6.50 0.51 0.00 0.00 6.75 0.54 0.00 0.00 7.00 0.56 0.00 0.00 7.25 0.59 0.00 0.00 7.50 0.62 0.00 0.00 7.75 0.65 0.00 0.00 8.00 0.68 0.00 0.00 8.25 0.72 0.00 0.00 8.50 0.75 0.00 0.00 8.75 0.79 0.00 0.00 9.00 0.84 0.00 0.00 9.25 0.88 0.00 0.00 9.50 0.93 0.00 0.00 9.75 0.98 0.00 0.00 10.00 1.03 0.00 0.00 10.25 1.09 0.00 0.00 10.50 1.16 0.01 0.01 10.75 1.24 0.01 0.02 11.00 1.34 0.02 0.05 11.25 1.46 0.04 0.08 11.50 1.61 0.07 0.12 11.75 2.21 0.24 0.25 12.00 3.78 1.01 1.27 12.25 4.02 1.16 3.67 12.50 4.19 1.26 2.78 12.75 4.30 1.34 1.51 13.00 4.40 1.40 0.93 13.25 4.48 1.45 0.66 13.50 4.55 1.50 0.52 13.75 4.62 1.54 0.44 14.00 4.67 1.58 0.38 14.25 4.73 1.61 0.34 14.50 4.77 1.65 0.31 14.75 4.82 1.68 0.29 15.00 4.86 1.71 0.27 15.25 4.91 1.74 0.26 15.50 4.95 1.77 0.25 15.75 4.98 1.79 0.23 16.00 5.02 1.81 0.22 16.25 5.05 1.84 0.21 16.50 5.08 1.86 0.20 16.75 5.11 1.88 0.19 17.00 5.14 1.90 0.18 17.25 5.17 1.92 0.18 17.50 5.20 1.94 0.17 17.75 5.22 1.96 0.17 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 18.00 5.25 1.98 0.16 18.25 5.27 2.00 0.16 18.50 5.30 2.01 0.15 18.75 5.32 2.03 0.15 19.00 5.35 2.05 0.14 19.25 5.37 2.06 0.14 19.50 5.39 2.08 0.13 19.75 5.41 2.09 0.13 20.00 5.43 2.11 0.12 Culvert Pipe Hydrology Culvert 1 Drainage ce 1P Culvert 1 Area Subcat Reach Pon Link Culvert 2 Drainage CB 2P Culvert 2 Area Warren Co culverts Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1 S: Culvert 1 Drainage Area Runoff = 2.29 cfs @ 12.32 hrs, Volume= 0.228 af, Depth> 1.76" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 3,683 55 Woods, Good, HSG B 59,814 61 >75% Grass cover, Good, HSG B 4,303 96 Gravel surface, HSG B 67,800 63 Weighted Average 67,800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.4 100 0.0300 0.05 Sheet Flow, Sheet flow Woods: Dense underbrush n= 0.800 P2= 3.50" 3.8 274 0.0300 1.21 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 34.2 374 Total Subcatchment 1S: Culvert 1 Drainage Area Hydrograph I I I I I I ❑Runoff 2.29 cfs I I I I Type IJ 24 -hr 2 - TOyr 241 -hr Rainfa111-5.70" Runoff Area=671800 sf Runoff Volume -01228 of Runoff Depth,�1.76" IF_ low Length -3,74' 1 - Slope -0.0300 I Tc -34.2 m i n CN=63 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Warren Co culverts Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pace 3 Hydrograph for Subcatchment 1S: Culvert 1 Drainage Area Time Precip. Excess Runoff tours) (inches) (inches) (cfs) 5.00 0.36 0.00 0.00 5.25 0.38 0.00 0.00 5.50 0.41 0.00 0.00 5.75 0.43 0.00 0.00 6.00 0.46 0.00 0.00 6.25 0.48 0.00 0.00 6.50 0.51 0.00 0.00 6.75 0.54 0.00 0.00 7.00 0.56 0.00 0.00 7.25 0.59 0.00 0.00 7.50 0.62 0.00 0.00 7.75 0.65 0.00 0.00 8.00 0.68 0.00 0.00 8.25 0.72 0.00 0.00 8.50 0.75 0.00 0.00 8.75 0.79 0.00 0.00 9.00 0.84 0.00 0.00 9.25 0.88 0.00 0.00 9.50 0.93 0.00 0.00 9.75 0.98 0.00 0.00 10.00 1.03 0.00 0.00 10.25 1.09 0.00 0.00 10.50 1.16 0.00 0.00 10.75 1.24 0.00 0.00 11.00 1.34 0.00 0.00 11.25 1.46 0.01 0.02 11.50 1.61 0.03 0.04 11.75 2.21 0.15 0.10 12.00 3.78 0.80 0.67 12.25 4.02 0.93 2.19 12.50 4.19 1.02 1.81 12.75 4.30 1.09 1.01 13.00 4.40 1.14 0.63 13.25 4.48 1.19 0.45 13.50 4.55 1.23 0.36 13.75 4.62 1.27 0.30 14.00 4.67 1.31 0.26 14.25 4.73 1.34 0.23 14.50 4.77 1.37 0.21 14.75 4.82 1.40 0.20 15.00 4.86 1.42 0.19 15.25 4.91 1.45 0.18 15.50 4.95 1.47 0.17 15.75 4.98 1.50 0.16 16.00 5.02 1.52 0.15 16.25 5.05 1.54 0.14 16.50 5.08 1.56 0.13 16.75 5.11 1.58 0.13 17.00 5.14 1.60 0.13 17.25 5.17 1.62 0.12 17.50 5.20 1.63 0.12 17.75 5.22 1.65 0.12 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 18.00 5.25 1.67 0.11 18.25 5.27 1.69 0.11 18.50 5.30 1.70 0.11 18.75 5.32 1.72 0.10 19.00 5.35 1.73 0.10 19.25 5.37 1.75 0.10 19.50 5.39 1.76 0.09 19.75 5.41 1.77 0.09 20.00 5.43 1.79 0.08 Warren Co culverts Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Pa ece44 Summary for Subcatchment 2S: Culvert 2 Drainage Area Runoff = 4.41 cfs @ 11.98 hrs, Volume= 0.194 af, Depth> 1.94" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 7,923 89 Paved roads w/open ditches, 50% imp, HSG B 44,249 61 >75% Grass cover, Good, HSG B 52,172 65 Weighted Average 48,211 92.41 % Pervious Area 3,962 7.59% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 6.3 806 0.0200 2.12 Shallow Concentrated Flow, Shallow concentrated flow Grassed Waterway Kv= 15.0 fps Subcatchment 2S: Culvert 2 Drainage Area Hydrograph 4 I I 3 _ I _ m I I v I I I I _I _ _ I_ _ Tvpe 1111_24+hr 110 yr 24 hr 11Rai6fall11-5.�0" Runoff Area=52;172sf Runoff Volume -0.194 of Runoff DepthA .94" Flow Length -806' Slope -0.0200 '/' Tc -6.3 m i n - CN -65 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff Warren Co culverts Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pace 5 Hydrograph for Subcatchment 2S: Culvert 2 Drainage Area Time Precip. Excess Runoff tours) (inches) (inches) (cfs) 5.00 0.36 0.00 0.00 5.25 0.38 0.00 0.00 5.50 0.41 0.00 0.00 5.75 0.43 0.00 0.00 6.00 0.46 0.00 0.00 6.25 0.48 0.00 0.00 6.50 0.51 0.00 0.00 6.75 0.54 0.00 0.00 7.00 0.56 0.00 0.00 7.25 0.59 0.00 0.00 7.50 0.62 0.00 0.00 7.75 0.65 0.00 0.00 8.00 0.68 0.00 0.00 8.25 0.72 0.00 0.00 8.50 0.75 0.00 0.00 8.75 0.79 0.00 0.00 9.00 0.84 0.00 0.00 9.25 0.88 0.00 0.00 9.50 0.93 0.00 0.00 9.75 0.98 0.00 0.00 10.00 1.03 0.00 0.00 10.25 1.09 0.00 0.00 10.50 1.16 0.00 0.01 10.75 1.24 0.01 0.02 11.00 1.34 0.01 0.04 11.25 1.46 0.03 0.07 11.50 1.61 0.05 0.12 11.75 2.21 0.20 0.83 12.00 3.78 0.90 4.30 12.25 4.02 1.04 0.68 12.50 4.19 1.14 0.45 12.75 4.30 1.21 0.33 13.00 4.40 1.27 0.28 13.25 4.48 1.32 0.24 13.50 4.55 1.36 0.22 13.75 4.62 1.40 0.19 14.00 4.67 1.44 0.17 14.25 4.73 1.47 0.16 14.50 4.77 1.51 0.15 14.75 4.82 1.54 0.15 15.00 4.86 1.56 0.14 15.25 4.91 1.59 0.13 15.50 4.95 1.62 0.12 15.75 4.98 1.64 0.12 16.00 5.02 1.66 0.11 16.25 5.05 1.69 0.10 16.50 5.08 1.71 0.10 16.75 5.11 1.73 0.10 17.00 5.14 1.75 0.10 17.25 5.17 1.77 0.09 17.50 5.20 1.79 0.09 17.75 5.22 1.80 0.09 Time Precip. Excess Runoff hours) (inches) (inches) (cfs) 18.00 5.25 1.82 0.09 18.25 5.27 1.84 0.08 18.50 5.30 1.86 0.08 18.75 5.32 1.87 0.08 19.00 5.35 1.89 0.07 19.25 5.37 1.90 0.07 19.50 5.39 1.92 0.07 19.75 5.41 1.93 0.07 20.00 5.43 1.94 0.06 Warren Co culverts Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 6 Summary for Pond 1 P: Culvert 1 Inflow Area = 1.556 ac, 0.00% Impervious, Inflow Depth > 1.76" for 10 yr 24 hr event Inflow = 2.29 cfs @ 12.32 hrs, Volume= 0.228 of Outflow = 2.29 cfs @ 12.32 hrs, Volume= 0.228 af, Atten= 0%, Lag= 0.0 min Primary = 2.29 cfs @ 12.32 hrs, Volume= 0.228 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 344.68'@ 12.32 hrs Device Routing Invert Outlet Devices #1 Primary 343.08' 12.0" Round Culvert w/ 1.0" inside fill L= 67.0' CMP, projecting, no headwall, Ke= 0.900 Inlet/ Outlet Invert= 343.00'/ 342.25' S=0.0112'/' Cc= 0.900 n=0.025 Corrugated metal, Flow Area= 0.75 sf Primary OutFlow Max=2.28 cfs @ 12.32 hrs HW=344.66' (Free Discharge) t-1=Culvert (Barrel Controls 2.28 cfs @ 3.02 fps) Pond 1 P: Culvert 1 Hydrograph ❑ Inflow ❑ Primary — — I — — r — r I II I I I 2- Inflow Area=1.556 ac Peak Elev=344.68' 12.0„ Round Culvert w/ 1.0" inside fill n=0.025 L=67.0' S=0.0112'/' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) I I I I I I 3 4- -4 1 1 4- a I I I I 1 I I I I I I I Inflow Area=1.556 ac Peak Elev=344.68' 12.0„ Round Culvert w/ 1.0" inside fill n=0.025 L=67.0' S=0.0112'/' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Warren Co culverts Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 7 Hydrograph for Pond 1 P: Culvert 1 Time Inflow Elevation Primary (hours) (Cf S) (feet) (Cf S) 5.00 0.00 343.08 0.00 5.25 0.00 343.08 0.00 5.50 0.00 343.08 0.00 5.75 0.00 343.08 0.00 6.00 0.00 343.08 0.00 6.25 0.00 343.08 0.00 6.50 0.00 343.08 0.00 6.75 0.00 343.08 0.00 7.00 0.00 343.08 0.00 7.25 0.00 343.08 0.00 7.50 0.00 343.08 0.00 7.75 0.00 343.08 0.00 8.00 0.00 343.08 0.00 8.25 0.00 343.08 0.00 8.50 0.00 343.08 0.00 8.75 0.00 343.08 0.00 9.00 0.00 343.08 0.00 9.25 0.00 343.08 0.00 9.50 0.00 343.08 0.00 9.75 0.00 343.08 0.00 10.00 0.00 343.08 0.00 10.25 0.00 343.08 0.00 10.50 0.00 343.08 0.00 10.75 0.00 343.08 0.00 11.00 0.00 343.10 0.00 11.25 0.02 343.14 0.02 11.50 0.04 343.17 0.04 11.75 0.10 343.24 0.10 12.00 0.67 343.56 0.67 12.25 2.19 344.56 2.19 12.50 1.81 344.05 1.81 12.75 1.01 343.71 1.01 13.00 0.63 343.54 0.63 13.25 0.45 343.46 0.45 13.50 0.36 343.41 0.36 13.75 0.30 343.38 0.30 14.00 0.26 343.35 0.26 14.25 0.23 343.34 0.23 14.50 0.21 343.32 0.21 14.75 0.20 343.31 0.20 15.00 0.19 343.31 0.19 15.25 0.18 343.30 0.18 15.50 0.17 343.29 0.17 15.75 0.16 343.29 0.16 16.00 0.15 343.28 0.15 16.25 0.14 343.27 0.14 16.50 0.13 343.27 0.13 16.75 0.13 343.26 0.13 17.00 0.13 343.26 0.13 17.25 0.12 343.26 0.12 17.50 0.12 343.25 0.12 17.75 0.12 343.25 0.12 Time Inflow Elevation Primary (hours) (Cf S) (feet) (Cf S) 18.00 0.11 343.25 0.11 18.25 0.11 343.25 0.11 18.50 0.11 343.24 0.11 18.75 0.10 343.24 0.10 19.00 0.10 343.24 0.10 19.25 0.10 343.23 0.10 19.50 0.09 343.23 0.09 19.75 0.09 343.23 0.09 20.00 0.08 343.22 0.08 Warren Co culverts Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 8 Summary for Pond 2P: Culvert 2 Inflow Area = 1.198 ac, 7.59% Impervious, Inflow Depth > 1.94" for 10 yr 24 hr event Inflow = 4.41 cfs @ 11.98 hrs, Volume= 0.194 of Outflow = 4.41 cfs @ 11.98 hrs, Volume= 0.194 af, Atten= 0%, Lag= 0.0 min Primary = 4.41 cfs @ 11.98 hrs, Volume= 0.194 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 346.99'@ 11.98 hrs Device Routing Invert Outlet Devices #1 Primary 345.00' 15.0" Round Culvert L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet/ Outlet Invert= 345.00'/ 344.50' S=0.0100'/' Cc= 0.900 n=0.025 Corrugated metal, Flow Area= 1.23 sf Primary OutFlow Max=4.23 cfs @ 11.98 hrs HW=346.90' (Free Discharge) t-1=Culvert (Barrel Controls 4.23 cfs @ 3.45 fps) N V 3 0 LL 2 1 Pond 2P: Culvert 2 Hydrograph i I I I I I I I I I I C I I I I I I I I I I I I I I I I Inflow.Area-1.198 ac Peak Elev=346.99' 15.0„ Round Culvert n=0.025 L=50.0' S=0.0100 /' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Primary Warren Co culverts Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Page 9 Hydrograph for Pond 2P: Culvert 2 Time Inflow Elevation Primary (hours) (Cf S) (feet) (Cf S) 5.00 0.00 345.00 0.00 5.25 0.00 345.00 0.00 5.50 0.00 345.00 0.00 5.75 0.00 345.00 0.00 6.00 0.00 345.00 0.00 6.25 0.00 345.00 0.00 6.50 0.00 345.00 0.00 6.75 0.00 345.00 0.00 7.00 0.00 345.00 0.00 7.25 0.00 345.00 0.00 7.50 0.00 345.00 0.00 7.75 0.00 345.00 0.00 8.00 0.00 345.00 0.00 8.25 0.00 345.00 0.00 8.50 0.00 345.00 0.00 8.75 0.00 345.00 0.00 9.00 0.00 345.00 0.00 9.25 0.00 345.00 0.00 9.50 0.00 345.00 0.00 9.75 0.00 345.00 0.00 10.00 0.00 345.00 0.00 10.25 0.00 345.01 0.00 10.50 0.01 345.06 0.01 10.75 0.02 345.09 0.02 11.00 0.04 345.12 0.04 11.25 0.07 345.16 0.07 11.50 0.12 345.21 0.12 11.75 0.83 345.57 0.83 12.00 4.30 346.94 4.30 12.25 0.68 345.51 0.68 12.50 0.45 345.41 0.45 12.75 0.33 345.35 0.33 13.00 0.28 345.33 0.28 13.25 0.24 345.30 0.24 13.50 0.22 345.29 0.22 13.75 0.19 345.27 0.19 14.00 0.17 345.26 0.17 14.25 0.16 345.25 0.16 14.50 0.15 345.24 0.15 14.75 0.15 345.24 0.15 15.00 0.14 345.23 0.14 15.25 0.13 345.22 0.13 15.50 0.12 345.22 0.12 15.75 0.12 345.21 0.12 16.00 0.11 345.20 0.11 16.25 0.10 345.20 0.10 16.50 0.10 345.20 0.10 16.75 0.10 345.20 0.10 17.00 0.10 345.19 0.10 17.25 0.09 345.19 0.09 17.50 0.09 345.19 0.09 17.75 0.09 345.19 0.09 Time Inflow Elevation Primary (hours) (Cf S) (feet) (Cf S) 18.00 0.09 345.18 0.09 18.25 0.08 345.18 0.08 18.50 0.08 345.18 0.08 18.75 0.08 345.17 0.08 19.00 0.07 345.17 0.07 19.25 0.07 345.17 0.07 19.50 0.07 345.16 0.07 19.75 0.07 345.16 0.07 20.00 0.06 345.16 0.06 Temporary Diversion Hydrology Temporary Diversion Velocity Calculations Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/19/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pa ece11 Summary for Subcatchment 1S: SW Diversion upper section Runoff = 5.26 cfs @ 11.90 hrs, Volume= 0.238 af, Depth> 4.76" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 22,500 96 Gravel surface, HSG B 2,710 86 Fallow, bare soil, HSG B 960 100 Concrete slab foundation for plant 26,170 95 Weighted Average 25,210 96.33% Pervious Area 960 3.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.2 271 0.0060 3.92 26.17 Parabolic Channel, SW Channel Up -Slope Section W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.022 Earth, clean & straight N 0 0 LL Subcatchment 1 S: SW Diversion upper section Hydrograph 5.26 cfs I I I I r 1 Type 1124�h r 110 yr 24 hr Rainfall=00" L - - 11 Runoff AreaL26,17011-sf Runoff Volume -0.2381 of Runoff DepthAA - Flow Length=271' Slope -0.0060 '/' TC -1.2 min - CNJ95 1 1 I I 1 1 1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) — Runoff Temporary Diversion Velocity Calculations Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 2S: SW Diversion upper -middle section Runoff = 3.20 cfs @ 11.91 hrs, Volume= 0.144 af, Depth> 2.75" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 yr 24 hr Rainfall=3.50" Area (sf) CN Description 22,500 96 Gravel surface, HSG B 3,960 86 Fallow, bare soil, HSG B 960 100 Concrete slab foundation for plant 27,420 95 Weighted Average 26,460 96.50% Pervious Area 960 3.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.2 271 0.0060 3.92 26.17 Parabolic Channel, SW Channel Upper Section W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.022 Earth, clean & straight 0.5 125 0.0080 4.53 30.21 Parabolic Channel, Upper -Middle section W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.022 Earth, clean & straight 1.7 396 Total Temporary Diversion Velocity Calculations Type 1124 -hr 2 yr 24 hr Rainfall=3.50" Prepared by Microsoft Printed 6/30/2017 HydroCAD® 10.00-18 s/n 06725 © 2016 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 7S: SW Diversion lower -middle section Runoff = 2.97 cfs @ 11.96 hrs, Volume= 0.146 af, Depth> 2.66" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 yr 24 hr Rainfall=3.50" Area (sf) CN Description 22,500 96 Gravel surface, HSG B 5,210 86 Fallow, bare soil, HSG B 960 100 Concrete slab foundation for plant 28,670 94 Weighted Average 27,710 96.65% Pervious Area 960 3.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.2 271 0.0060 3.92 26.17 Parabolic Channel, SW Channel Upper Section W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.022 Earth, clean & straight 4.6 125 0.0080 0.45 3.02 Parabolic Channel, SW Upper -Middle Section W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.220 0.2 125 0.0640 12.82 85.46 Parabolic Channel, Lower -Middle section W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.022 Earth, clean & straight 6.0 521 Total Temporary Diversion Velocity Calculations Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/19/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pa ece11 Summary for Subcatchment 3S: SW Diversion lower section Runoff = 5.90 cfs @ 11.92 hrs, Volume= 0.279 af, Depth> 4.67" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 22,500 96 Gravel surface, HSG B 7,830 86 Fallow, bare soil, HSG B 960 100 Concrete slab foundation for plant 31,290 94 Weighted Average 30,330 96.93% Pervious Area 960 3.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.2 271 0.0060 3.92 26.17 Parabolic Channel, SW Channel Up -Slope Section W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.022 Earth, clean & straight 0.5 250 0.0280 8.48 56.53 Parabolic Channel, Middle section W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.022 Earth, clean & straight 0.8 262 0.0110 5.31 35.43 Parabolic Channel, Swale lower setion W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.022 2.5 783 Total Temporary Diversion Velocity Calculations Type Il 24 -hr 10 yr 24 hr Rainfall=5.70" Prepared by Microsoft Printed 6/19/2017 HydroCAD® 10.00-18 s/n 06725 @2016 HydroCAD Software Solutions LLC Pa ece11 Summary for Subcatchment 4S: Northeast Side Diversion Runoff = 2.41 cfs @ 11.89 hrs, Volume= 0.107 af, Depth> 4.76" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 yr 24 hr Rainfall=5.70" Area (sf) CN Description 10,000 96 Gravel surface, HSG B 1,710 86 Fallow, bare soil, HSG B 11,710 95 Weighted Average 11,710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 171 0.0230 7.68 51.23 Parabolic Channel, Northeast Swale W=10.00' D=1.00' Area=6.7 sf Perim=10.3' n= 0.022 Earth, clean & straight N 3 0 LL Subcatchment 4S: Northeast Side Diversion Hydrograph I I L2 I I � I � I � � Type II 24*hr 10 -yr 24 hr Rainfall=00"- Runoff Area_11,710'sf Runoff Volume -0.107 of Runoff Depth>4J6" Flow Length -171' - Mope -0.0230~/r tc-0.4 m i n CNJ95 I I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) — Runoff