Loading...
HomeMy WebLinkAbout20170949 Ver 4_Memo-Calcs_20170808 D&A WOLVERINE PLLC 6120 BROOKSHIRE BLVD., Unit R CHARLOTTE NC, 28216 TEL: 517.404.6588 WWW.DNAWOLVERINE.COM COMMITMENT * RESPONSIVENESS * PERFORMANCE aĻƒƚƩğƓķǒƒ 5ğƷĻʹ June 26, 2017 ƚʹ Mr. Richard McMillan, PE Town of Midland, NC CƩƚƒʹ Christopher Fleck, PE/Sean Coldren, PE D&A Wolverine, PLLC {ǒĬƆĻĭƷʹ Brentwood (Saddlebrook) Bypass Design (D&A Project #172012) ___________________________________________________________________ True Homes tasked D&A Wolverine PLLC (D&A) with providing an engineering resolution for USACE/NCDEQ permitting violations associated with the construction of the Saddlebrook (aka Brentwood) subdivision in the Town of Midland, NC (Cabarrus County). D&A performed a GIS analysis of the offsite drainage area draining to the project site from the north. GIS data was obtained from Cabarrus County for use in this analysis. D&A used the results of this analysis as the basis for sizing and designing the proposed bypass storm system. The upstream drainage area consists of two sub areas which drain to two distinct points along the northern property line of the project site. Drainage Area 1 is the more western of the two drainage areas and flows to the existing wetlands (Analysis Point 1). Drainage Area 2 is the more eastern of the two drainage areas and flows to an existing low point along the property line (Analysis Point 2). Two hydrologic methods were used in calculating the runoff from these drainage areas for the 10-yr storm event, the Rational Method and the SCS method. Approximate percentages of different land covers were determined by using recent aerial photography of the drainage areas. The drainage area land cover was broken into three categories: impervious, grass and woods. See Figure 1 for a map of the two drainage areas in relation to the project site. Drainage Area 1 is 19.3 acres and consists of 10% impervious, 13% grass and 77 % wooded surfaces. The Rational Method calculations resulted in a 10-year peak flow of 36 cfs at Analysis Point 1. See Table 1 for the Rational Method input parameters and calculations. The SCS method requires the calculation of times of concentration (Tc) based on the hydrologic parameters of the drainage area. The Tc for Drainage Area 1 was calculated as 33 minutes. See Table 2 for the Drainage Area 1 SCS Tc calculations. The SCS Method parameters were input into Hydraflow Hydrographs to determine the peak outflow for the 10-year storm event. The Drainage Area 1 SCS peak flow for the 10-year storm is 19 cfs. See Table 4 for the Drainage Area 1 SCS input parameters and peak flows. Drainage Area 2 is 18.9 acres and consists of 11% impervious, 5% grass and 84% wooded surfaces. The Rational Method calculations resulted in a 10-year peak flow of 34 cfs at Analysis Point 2. See Table 1 for the Drainage Area 1 Rational Method input parameters and calculations. The Tc for Drainage Area 2 was calculated as 31 minutes. See Table 3 for the Drainage Area 1 SCS Tc calculations. The SCS Method parameters were input into Hydraflow Hydrographs to determine the peak outflow for the 10-year storm 1 June 26, 2017 Brentwood (Saddlebrook) Bypass Design D&A Project #172012 event. The Drainage Area 1 SCS peak flow for the 10-year storm is 19 cfs. See Table 4 for the Drainage Area 1 SCS input parameters and peak flows. The total flows from both drainage areas were calculated as 70 cfs (Rational) and 38 cfs (SCS). The average total peak flow is 54 cfs. D&A used a flow of 60 cfs for sizing and laying out the proposed 42 bypass storm system on the plans. 2 Table 1: Rational Method Input Parameters and Calculations Drainage AreaTotal AreaQ (cfs) 119.335.5 218.934.2 Total38.2 69.8 Area 1 SurfacePercentageArea (ac)CIntensity (in/hr)Q (cfs) Impervious10%1.90.957.3813.5 Lawn13%2.50.37.385.6 Woods77%14.90.157.3816.5 35.5 Area 2 SurfacePercentageArea (ac)CIntensity (in/hr)Q (cfs) Impervious11%2.10.957.3814.6 Lawn5%0.90.37.382.1 Woods84%15.90.157.3817.6 34.2 Table 2: Drainage Area 1 SCS Method Time of Concentration Calculations TYPESHEETDATE:6/21/2017 Flow Length (ft)100PROJECT:Saddlebrook Upstream Elev (ft)567PROJECT #:172012 Downstream Elev (ft)566DESIGNER:SMC 0.400Drainage Area 1 Mannings nCATCHMENT: 0.010 Slope (ft/ft) 3.12 P (in) 2 Travel Time, T (min)28.7 t SHALLOW CONCENTRATED TYPE SECTION12345 Flow Length (ft)395 Upstream Elev (ft)567 Downstream Elev (ft)555 Surface TypeUnpavedN/AN/AN/AN/A Slope (ft/ft)0.030N/AN/AN/AN/A V (ft/s)2.81N/AN/AN/AN/A 2.35N/AN/AN/AN/A Travel Time, T (min) t Travel Time, T (min)2.35 t OPEN CHANNEL TYPE SECTION12345 Channel TypeCircularTrapezoidalN/AN/AN/A Width, b (ft)2 Flow Depth, h (ft)1 Top Width, T (ft)8 Side Slope, z3 Pipe Dia., D (ft)24 2 452.395.00N/AN/AN/A Area (ft) Wetted Perimeter (ft)75.408.32N/AN/AN/A Hydraulic Radius (ft)6.000.60N/AN/AN/A Flow Length (ft)50537 Upstream Elev (ft)555553 Downstream Elev (ft)553541 Mannings n0.0240.040 Slope (ft/ft)0.0400.022N/AN/AN/A Velocity, V (ft/s)41.003.96N/AN/AN/A 0.022.26N/AN/AN/A Travel Time, T (min) t Travel Time, T (min)2.28 t TOTAL Tc (min)33 COMMITMENT * RESPONSIVENESS * PERFORMANCEWWW.DNAWOLVERINE.COM Table 3: Drainage Area 2 SCS Method Time of Concentration Calculations TYPESHEETDATE:6/21/2017 Flow Length (ft)100PROJECT:Saddlebrook Upstream Elev (ft)564PROJECT #:172012 Downstream Elev (ft)562DESIGNER:SMC Mannings n0.400CATCHMENT:Drainage Area 2 Slope (ft/ft)0.020 3.12 P (in) 2 Travel Time, T (min)21.7 t SHALLOW CONCENTRATED TYPE SECTION12345 Flow Length (ft)527165375 Upstream Elev (ft)562548544 Downstream Elev (ft)548544536 Surface TypeUnpavedPavedUnpavedN/AN/A Slope (ft/ft)0.0270.0240.021N/AN/A V (ft/s)2.633.172.36N/AN/A 3.350.872.66N/AN/A Travel Time, T (min) t Travel Time, T (min)6.87 t OPEN CHANNEL TYPE SECTION12345 Channel TypeCircularTrapezoidalN/AN/AN/A Width, b (ft)2 Flow Depth, h (ft)1 Top Width, T (ft)8 Side Slope, z3 Pipe Dia., D (ft)24 2 452.395.00N/AN/AN/A Area (ft) Wetted Perimeter (ft)75.408.32N/AN/AN/A Hydraulic Radius (ft)6.000.60N/AN/AN/A Flow Length (ft)50469 Upstream Elev (ft)536534 Downstream Elev (ft)534526 Mannings n0.0130.040 Slope (ft/ft)0.0400.017N/AN/AN/A Velocity, V (ft/s)75.693.46N/AN/AN/A 0.012.26N/AN/AN/A Travel Time, T (min) t Travel Time, T (min)2.27 t TOTAL Tc (min)31 COMMITMENT * RESPONSIVENESS * PERFORMANCEWWW.DNAWOLVERINE.COM Table 4: SCS Method Time of Concentration Calculations Drainage AreaTotal AreaQ (cfs) 1 19.319 2 18.919 Total 38.238 CURVE NUMBER CALCULATION Drainage Area 1 AreaHSGCNCN*Area Impervious1.93C98189.14 Grass2.51C79198.211 Woods14.86C731084.853 1472.204Sum 76CN Weighted Drainage Area 2 AreaHSGCNCN*Area Impervious2.08C98203.742 Grass0.95C7974.655 Woods15.88C731158.948 1437.345Sum 76CN Weighted