Loading...
HomeMy WebLinkAbout20160191 Ver 3_R-2250_Wetland Impact Summary Sheet (May 2017)_20170809WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac (ft) (ft) (ft) 1 23+91 - 39+93 -FLYBY7- ROADWAY FILL 0.14 < 0.01 1,532 92 2 26+00 - 28+50 -Y7RPC- UTILITY RELOCATION 0.01 50 3 99+52 - 101+50 -L- 72" RCP-III 0.03 0.01 246 117 5 67+77 - 69+66 -Y9- 54" RCP-III 0.03 < 0.01 128 20 6 247+gg - 252+06 -L- 54" RCP-IV 0.08 0.02 383 75 7 436+30 - 437+83 -L- 10' x 7' RCBC 0.05 0.06 233 244 8 638+38 - 639+g6 -L- ROADWAY FILL 0.33 9 39+16 - 41+02 -FLYBY7- 60" PIPE EXTENSION 0.02 < 0.01 132 38 10 54+55 - 55+79 -Y8- 96" CSP EXTENSION < 0.01 < 0.01 38 46 11 5+7g - 7+11 -Y18- 9' x 7' RCBC 0.01 0.01 61 59 12 11+26 - 12+17 -SR5- ROADWAY FILL 0.04 MOYE PROPERTY* TEMPORARY CROSSING 19 TOTALS': 0.37 0.37 0.14 2,753 760 0 "Rounded totals are sum of actual impacts NOTES: SITE 1 PROPOSED STREAM RELOCATION: 1,914 FT. SITE 4 HAS BEEN ELIMINATED *BdRROW SITE LOCATION Site 12 wetlands are total take 2013 10 24