HomeMy WebLinkAbout20171000 Ver 1_Build Maps_20170810k 11�;11��'<14' North Carolina Department of Transportation ��
SL[�rtl]�YdtPf Highway Stormwater Program
���`
STORMWATER MANAGEMENT PLAN ��--•
(Version 2.07; Released October 2016) FOR NCDOT PROJECTS
WBS Element: 45572.1.1 TIP No.: B-5617 County(ies): Craven Page 1 of 1
General Project Information
WBS Element: 45572.1.1 TIP Number: B-5617 Project Type: Bridge Replacement Date: 8/2/2017
NCDOT Contact: Jay B. Johnston Contractor I Designer: Wetherill Engineerin
Address: 105 Pactolus Hwy. (NC 33) Address: 1223 Jones Franklin Road
PO Box 1587 Raleigh, NC 27606
Greenville, NC 27835
Phone: 252-469-2800 P hone: 919-851-8077
Email: 'b'ohnston ncdot. ov Email: mharve wetherillen .com
Cit ITown: Vanceboro Count ies): Craven
River Basin s: Neuse CAMA County? Yes
Wetlands within Project Limits? No
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.09 Surroundin Land Use: Rural, Wooded, Agricultural
Proposed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. 0.3 ac. 0.2 ac.
Typical Cross Section Description: Two 10 foot Travel Lanes with 4 foot grassed shoulders on each side Two 10 foot Travel Lanes with 4 foot grassed shoulders on each side
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 250 Year: 2040 Existin : 200 Year: 2015
General Project Narrative: The purpose of the project is to replace Bridge No. 41 on SR 1464 over Swift Creek in Craven County. The existing bridge is 135 feet long. The replacement structure will be a
(Description of Minimization of Water 1@ 30', 1@70', and 1@ 40' long bridge, providing a 27.83' clear deck width. The roadway grade of the new structure will be approximately the same as the existing structure.
Quality Impacts) There will be no direct discharge into the stream (deck drains on the bridge). The existing bridge had two bents in the stream, and while the proposed bridge has one bent in the
stream and one bent in the stream bank. All existing stormwater drainage patterns were maintained on the project to the fullest extent. The storm drainage systems picking up
the bridge deck drainage on the east and west sides of the bridge will both be outleted outside of the Riparian Buffer onto dissipator pads. The storm drain system that outlets to
the west will drain into an existing draw in the northwest quadrant of the bridge. The storm drain system that outlets to the east will drain into a proposed ditch that ties into a
cross pipe just as the existing drainage did in the northeast quadrant of the bridge. There were no existing or proposed ditches in the southeast and southwest quadrants.
Waterbody Information
Surface Water Body (1): Swift Creek NCDWR Stream Index No.: 27-97-(0.5)
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Supplemental Classification: Swamp Waters (Sw) (NSW)
Other Stream Classification: None
Impairments:
Aquatic T&E Species? No Comments:
NRTR Stream ID: Buffer Rules in Effect: Neuse
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? No
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
T �
� �0
m
= V
>
°
r �
� �c�
��� O�
oa� V
�"�o
�v��
� e-
� r� a:
See Sheet 9 A Fo� Index of Sheets
GEGIN PROJECT B-56/7
-L- 57ATlON I1+00.00
TO SR I458 HONOLULU H0.
��� 1L � �� ����� `�/�������
���%����� �IF �1��II���1�5
cn� vE� CO U1�TY
LOCATI011I: BRIDGE #41 OVER SWIFT CREEK
011t SR 1464 (PUGHTOWN RD.)
TYPE OF WORK: BRIDGE REPLACEME11lT, GUARDRAIL,
PAVING, GRADIIIIG AND DRAI11tAGE
WETLAND AND SURFACE WATER IMPACTS PERMIT
END CONSTRUC7/ON
-D- S7ATlON 11+09.48
� �
BEGIN BRIOGE �
-L- STATION I2+66.75
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD
GRAPHIC SCALES DESIGN DATA
50 25 0 50 100 ADT 200 = 2015
ADT 250 = 2040
PLANS K = %
D = %
Sa 2S � S� ��� T= %*
V = 60 MPH
PROFILE (HORIZONTAL) * TTST =3% DUAL 3%
l0 5 0 l0 20 FUNC CLASS =
RURAL LOCAL TIER
END RRIOGE
-�- 57ATlON 14+09.25
PROJECT LENGTH
LENGTH ROADWAY PROJECT= Oo052 MILE
LENGHT STRUCTURE PROJECT= Oo033 MILE
TOTAL LENGTH �'l,'OJECT= Oo085 MILE
FND CON51"RUC/70N
-02- 57�ITlON 12+F1,t3f�
END PROJECT B-56Q
-L- S�A7/ON lS+y0D0
50'
TO SR l53/ BE.�1VER DAM R0. � I
eeciN coNsrRur.noN
-oz- srarioN io+�oa.00
��� , r�of Transportatian inuthe O�ce of.� ��
�WETHERILL
ENGINEERING �»�.��_������� �,.�,
20l2 STANDARD SPECIF7CATIONS
RIGHT OF WAY DATE: EDWARD G. WETHERILL, PE
TBD PROJECT ENGINEER
LETTIIVG DATE: g06 A. MAY, PE
MARCH ZO�H PROJECT DESIGN ENGINEER
NCDOT CONTACT: �NG JONES
D!V/SION 2 DOC CONTACT
9TAT6 9TATE PROJCCT ftEPERENC6 NO.
1a�o B-5617
PR01.N0. .A.PROI.NO.
45572.1.1
45572.2.1
45572.3.1
HI'DRAULICS ENGINEER
ROADWAY DESIGN
ENGINEER
PB.
PERMIT DRAWING
SHEET 1 OF 5
NC GRID
NAD 83/NSRS 2007
s�
OF�9CNPlY
PE
RW
CONST
INC�1M1�d.ETE PL.�NS
DO NOT USE FOft RAW AC�L*IgITION
DOCUMENT NOT CONSIDERED FINAL
UNLE55 ALL SIGNATURES COMPLETED
Z
0
w
�
Q ~
� � � PERMIT DRAWING
U � SHEET 4 OF 5
WETLAND AND SURFACE WATER IMPACTS PERMIT �
�
�DENOTES TEMPORARY z �I O� O� � O� H O� I� O�
IMPACTS IN SURFACE WATER =,
NC GRID
NAD 83/NSRS 2007
i
i �WOODS V� WOODS
F/ '��
c o� �,
�-k��— F/� � — � �
/ 1 �
-- Fi TF/ W— — / ' `�'�
� - OH � � �
F P°"' , � CRA41
N �
� 20.00'
�
� G�Q�HI� S�A�E
RIP RAP AT EMBANKME z
SEE DETAIL
�
w
z
J
�
F-
�
� �
� i
o i
� i
� 2O �O' � I I
, � 20.00�� SPECIAL CUT DITCH
� � I �•o�� �� SEE DETAIL A
30.00� � � (v H
� I y
� C �F ti
i1�----- �
m
� - < —�\
~ �` � _ \
� � _
� � \
� �
EXISITNG R/W
RE , O� � o I
� C
�` ' ��� �v � F _ c
� , i�� .� oH
�I I� V POWER
/�m I I [O �v�.���.<�
F-
PROPOSED ',,-�� FX ,' /F F c
BRIDGE � ,
� � / ExisirNc Riw
�� ,
� , �� — -�
N� ►°Dv F �' � BM#I F
N ,' �� �� WOODS
REM VE � � m V '� ' �
EXI�-T NG � �?oo- � ,'�
�E `` 20�0�
� o
� � z
� O J
� � �
�
' � �L/
Q � U
� � �
w 3
Z
'' WIGGINS OGDEN LLOYD
�' 6063 CLARK FORD ROAD
�
� AYDEN. NC 285/3
� DB 693 PG 523
�
� 10696 AC
�
�
PROIECT REFERENCE NO. SHEET NO.
B-5617 4
RNJ SHEET NO.
ROADwAY DESIGN HYDRAULICS
ENGINEER ENGINEER
INC�MQ�LE E I�LAN3
DO NOT USE FOR / W ACQU[SITION
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
13+78 Lt. Bridge < 0.01 < 0.01 4 8
TOTALS*: < 0.01 < 0.01 4 8 0
*Rounded totals are sum of actual impacts
NOTES:
5 sf of Permanent SF Impacts for the proposed bents in the water.
2016 09 09