HomeMy WebLinkAbout20170631 Ver 1_Compliance Evaluation Inspection_20170809Wetland Inspection Report
Project Num: 20170631 Version: 1
Project Name: Bard - South Fork of the New Ri
County: Ashe
Location: Bard - South Fork of the New River (SFNR) Project
Latitude: +36' 25' 18"
SW Plan Location
Site Owner Name New River State Park
Inspection Date: 8/9/2017
Reason for Inspection Routine
Inspection Type: Site Inspection (non -DOT)
Status: Issued
Project Type: Other
Region: Winston-Salem
Longitude: -81 ° 54' 44"
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Sue L Homewood Phone: 336-776-9694
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
page: 1
Site Number: 20170631 Owner: Bard, Rachel
Inspection Date: 8/9/2017 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Routine
Permit (401 WQC)
Yes
No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
0
❑
❑
❑
Are the culverts and/or filled areas installed properly?
❑
❑
❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
❑
❑
❑
Comment: Construction of one J-hook complete. 2nd J-hook under construction.
Site very stable and work was being
conducted as carefully as possible to avoid turbidity issues. Overall construction activities were in
compliance with 401 conditions.
page: 2
Y r��
�/ -- _.
�. �-��!?
i �{
a�,a
C: Aq � � c� a � � g'� r �
' � i�
r
_ _.. J � i�f .b __ � _.
p
0
0
00
0
z'. x
Y
. L-
Q\