Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3170802_Plansheet (Set)_20170808
••PROP. BMP #2(WETPOND)PROP. BMP #1(SAND FILTER)P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C0.0, 7/5/2017 2:32:06 PM, rrovillos, 1:1 WEDD I N G T O N - M A T T H E W S R O A D (SR #1 3 4 4 )HEMBY ROAD(SR #1346)BEULAH CHURCH ROAD(SR #1346)BROMLEY DRIVEP:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C1.2, 7/3/2017 5:04:49 PM, rrovillos, 1:1 “” ’“”’’ P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C1.1, 7/5/2017 2:22:44 PM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C1.2, 7/3/2017 1:15:17 PM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C1.3, 7/3/2017 1:14:07 PM, rrovillos, 1:1 MATCHLINE "A" MATCHLINE "A"P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-RP.dwg, C3.0, 6/28/2017 9:40:01 AM, rrovillos, 1:1 MATCHLINE "A" MATCHLINE "A"P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-RP.dwg, C3.1, 6/28/2017 9:40:14 AM, rrovillos, 1:1 PROP. BMP #2(WETPOND)PROP. BMP #1(SAND FILTER)P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C4.0, 7/3/2017 4:32:41 PM, rrovillos, 1:1 MATCHLINE - (SEE SHT. C4.2 FOR CONTINUATION)P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C4.1, 7/2/2017 11:50:47 AM, rrovillos, 1:1 MATCHLINE - (SEE SHT. C4.1 FOR CONTINUATION)MATCHLINE - A (SEE INSET)INSET "A"MATCHLINE "A"MATCHLINE - (SEE SHT. C4.1 FOR CONTINUATION)P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C4.2, 7/3/2017 1:49:09 PM, rrovillos, 1:1 EMERGENCY SPILLWAY X-SECTIONBMP #1 (SAND FILTER)BMP #1 OUTLET PIPE PROFILEOUTLET STRUCTUREANTI-FLOTATION DEVICE DETAILBEST MANAGEMENT PRACTICES SAND FILTER / DETENTION POND DETAILSSAND FILTER MEDIA SECTIONBMP (SAND FILTER) FOREBAY BERM DETAILCONCRETE ANTI-SEEP COLLAR TYPICAL DETAILPIPE CRADLE DETAILPIPE CRADLE JOINTSECTION E-EEP:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.0-BMP 1, 7/2/2017 12:18:49 PM, rrovillos, 1:1 EMERGENCY SPILLWAY X-SECTIONBMP #2 (WET POND)CONCRETE RISER DETAIL BMP#2684.0042"683.90692.67691.50688.504"689.50687.00684.006"RISER PLAN VIEWFOREBAY SPILLWAY DETAIL SECTION A-ABMP #2 OUTLET PIPE PROFILEPOND SIDE VIEW (NORTH SIDE)SOUTH, EAST & WEST SIDE VIEWBMP #2 OUTLET STRUCTUREORIFICE AND WEIR DETAILPIPE CRADLE DETAILPIPE CRADLE JOINTCONCRETE ANTI-SEEP COLLAR TYPICAL DETAILSECTION E-EEPROP. BUFFER IMPACT CHANNELFOR WETPOND BMP #2 OUTLET FLOW TO STREAMP:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.1-BMP 2, 7/2/2017 12:28:14 PM, rrovillos, 1:1 ••••ZONE 1ZONE 2P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.2, 6/28/2017 11:08:42 AM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C6.0, 7/2/2017 12:03:34 PM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C6.1-PRE, 7/2/2017 12:17:31 PM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C6.2-POST, 7/2/2017 12:16:56 PM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C7.0, 7/2/2017 11:58:20 AM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C7.1, 7/2/2017 11:58:54 AM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C7.2, 7/2/2017 11:59:17 AM, rrovillos, 1:1 MATCHLINE - (SEE SHEET C8.1 FOR CONTINUATION)WEDDINGTON-MATTHEWS ROAD(SR #1344)BMP#1 (SAND FILTER) OUTLET STRUCTURE W/ MOFIFICATIONHE M B Y R O A D (S R # 1 3 4 6 )MATCHLINE - (SEE SHEET C8.1 FOR CONTINUATION)SEE MATCHLINE INSET "A" SEE MATCHLINE INSET "A"INSET "A"WEDDINGTON-MATTHEWS ROAD(SR #1344)P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.0, 7/3/2017 4:06:50 PM, rrovillos, 1:1 X X X X X X X XPRE-DEV. D.A.=7.34 ac.DIST. AREA=3.84 ac.SKIMMER BASIN #3PRE-DEV. D.A.=4.44 ac.DIST. AREA=2.60 ac.SKIMMER BASIN #4PRE-DEV. D.A.=5.43 ac.POST-DEV. D.A.=16.09 ac.DIST. AREA=7.25 ac.SKIMMER BASIN #5D.A.=0.97 AC.D.A.=0.34 AC.LOT 17LOT 18LOT 19LOT 20LOT 21LOT 22LOT 23LOT 24LOT 25LOT 26LOT 27LOT 28LOT 29LOT 30LOT 31LOT 32LOT 33LOT 34LOT 35SOUTH, EAST & WEST SIDE VIEWSKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTUREORIFICE AND WEIR DETAILSEDIMENT BASIN PHASEPOND SIDE VIEW NORTH SIDENOTE: FOR ELEVATIONS, CONSTRUCTION DETAILS/SPECIFICATIONSON THE BMP 2 OUTLET STRUCTURE, PIPE AND EMBANKMENT,SEE SHEET C5.1MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION)SEE MATCHLINE INSET "A"SEE MATCHLINE INSET "A"INSET "A"NOTE:EXISTING DRIVEWAY TO HELMS PROPERTYTO RAMAIN OPEN AT ALL TIMES.P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.1, 7/3/2017 4:05:22 PM, rrovillos, 1:1 XX X XXXXXPRE-DEV. D.A.=5.40 ac.POST-DEV. D.A.=5.97 ac.DIST. AREA=4.80 ac.SKIMMER BASIN #1PRE-DEV. D.A.=5.17 ac.POST-DEV. D.A.=5.10 ac.DIST. AREA=2.29 ac.SKIMMER BASIN #2LOT 1LOT 1LOT 2LOT 3LOT 4LOT 5LOT 6LOT 7LOT 8LOT 9LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15LOT 16LOT 17LOT 18LOT 35MATCHLINE - (SEE SHEET C8.3 FOR CONTINUATION)WEDDINGTON-MATTHEWS ROAD(SR #1344)HE M B Y R O A D (S R # 1 3 4 6 )BMP#1 (SAND FILTER) OUTLET STRUCTURE W/ MOFIFICATIONSEE MATCHLINE INSET "A" SEE MATCHLINE INSET "A"INSET "A"WEDDINGTON-MATTHEWS ROAD(SR #1344)P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.2, 7/3/2017 3:32:57 PM, rrovillos, 1:1 X X X X X X X XPRE-DEV. D.A.=7.34 ac.DIST. AREA=3.84 ac.SKIMMER BASIN #3PRE-DEV. D.A.=4.44 ac.DIST. AREA=2.60 ac.SKIMMER BASIN #4PRE-DEV. D.A.=5.43 ac.POST-DEV. D.A.=16.09 ac.DIST. AREA=7.25 ac.SKIMMER BASIN #5D.A.=0.97 AC.D.A.=0.34 AC.LOT 17LOT 18LOT 19LOT 20LOT 21LOT 22LOT 23LOT 24LOT 25LOT 26LOT 27LOT 28LOT 29LOT 30LOT 31LOT 32LOT 33LOT 34LOT 35MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION)SOUTH, EAST & WEST SIDE VIEWSKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTUREORIFICE AND WEIR DETAILSEDIMENT BASIN PHASEPOND SIDE VIEW NORTH SIDENOTE: FOR ELEVATIONS, CONSTRUCTIONDETAILS/SPECIFICATIONS ON THE BMP 2 OUTLETSTRUCTURE, PIPE AND EMBANKMENT, SEE SHEETC5.1SEE MATCHLINE INSET "A"SEE MATCHLINE INSET "A"INSET "A"NOTE:EXISTING DRIVEWAY TO HELMS PROPERTYTO RAMAIN OPEN AT ALL TIMES.P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.3, 7/3/2017 4:10:28 PM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.0 DETAIL, 7/3/2017 10:50:05 AM, rrovillos, 1:1 •••P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.1 DETAIL, 7/3/2017 10:47:52 AM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.2 DETAIL, 7/3/2017 10:47:54 AM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.3 DETAIL, 7/3/2017 10:47:58 AM, rrovillos, 1:1 ³P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.4 DETAIL, 7/3/2017 10:48:02 AM, rrovillos, 1:1 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.5 DETAIL, 7/3/2017 10:48:05 AM, rrovillos, 1:1