HomeMy WebLinkAbout20070291 Ver 4_401 Application_20081008Office Use Only: Form Version March 05
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" o " A".)
1. Processing F
D
L r,
??/
1. Check all of the approval(s) requested for this project: l2 I??B
® Section 404 Permit ? Riparian or Watershed=
® Section 10 Permit ? Isolated Wetland Permit from D 0%7?
? 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 12
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here:
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here:
[9 1r-, E
II. A licant Information D V
PP
0 C T 8 2008
1. Owner/Applicant Information
Name: Mr. Don Betz DENR-WATER QUALITY "I tMut M13 S-TeRMWATER 8R
Mailing Address: Lower Cape Fear Water and Sewer Authority
1107 New Pointe Blvd. Suite 17
Leland, NC 28451
Telephone Number: (910) 383-1919 Fax Number: N/A
E-mail Address: N/A
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Kim Williams
Company Affiliation: Land Management, Group, Inc
Mailing Address: P.O. Box 2522
Wilmington, NC 28402
Telephone Number: 910-452-0001 Fax Number: 910-452-0060
E-mail Address: kwilliams(a,lm roup.net
Updated 11/1/2005
Page 1 of 8
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and MRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Kings Bluff Pump Station Expansion
F1 C: U:" >,:,t I- I "a
2. T.I.P. Project Number or State Project Number (NCDOT Only):
7008
3. Property Identification Number (Tax PIN): as
iVV1LM.FLD.0,=C.
4. Location
County: Bladen Nearest Town: Riegelwood
Subdivision name (include phase/lot number): n/a
Directions to site (include road numbers/names, landmarks, etc.): The project is located at
Lock and Dam #1 in Bladen County, NC. From Wilmington take US 74 W towards
Brunswick County. US 74 will merge with NC 87. Take a right and head North on NC 87
where 74/87 splits. Take a right onto Lock Number 1 Road in Bladen County. Veer left at
the end of this road. Property will be straight ahead at 246 Private Road.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 34.40409 N, 78.2965 W
6. Property size (acres): approx. 6.8 acres
7. Name of nearest receiving body of water: Cape Fear River
8. River Basin: Cape Fear River Basin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/mgps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: The site currently houses the King's Bluff Pump Station
Updated 11/1/2005
Page 2 of 8
with three (3) raw water pumps and one 48-inch pipe that extends from the pumping station
to the Cape Fear River. Land use in the vicinity is largely agricultural or undeveloped.
10. Describe the overall project in detail, including the type of equipment to be used: The
lid cant plans to install a 60-inch parallel intake pipe originating at the pumping facility and
ending in the Cape Fear River. The intake pipe will be approximately 1,100 linear ft.
Approximately 800ft of piping will traverse on-site wetlands with a 40 ft construction
corridor, resulting in approximately 0.721 acres of temporary wetland impacts. A track hoe
and bulldozer will be used to create the installation area and then restore to existing grade.
Silt fences will be used to reduce erosion into adjacent wetlands and the Cape Fear River.
11. Explain the purpose of the proposed work: The additional pipe is part of a capacity upgrade
at King's Bluff Pumping Station to account for increased water demands resulting from
recent population growth in Coastal North Carolina.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. The 404 wetland line was delineated by Land Management Group, Inc.
in August 2006 Liz Hair of the U .S. Army _Corps of Engineers field approved the wetland line.
In October of 2007, the applicant received a NWP 18/33 to temporarily impact 0.075 acre of 404
wetlands to install a sediment trap and permanently impact 0.070 acre of 404 wetlands for
grading associated with the expansion of a building (Action ID# SAW-2006-41503).
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No additional wetland impacts are anticipated on this site.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Updated 11/1/2005
Page 3 of 8
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts:
The applicant proposes to temporarily impact 0.721 acre of 404 wetlands and 0.222 acre of open
water for initial construction of water intake pipeline. The applicant has already temporarily
impacted 0.075 acre of wetlands and permanently impacted 0.070 acre of wetlands.
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
cannrntAv lict imnartc rlne to hoth Onlcture and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
(yes/no) Distance to
Nearest
Stream
(linear feet) Area of
Impact
(acres)
1 Excavation/Fill (Temp) forested yes 0-900 ft 0.721
Total Wetland Impact (acres) 0.721
3. List the total acreage (estimated) of all existing wetlands on the property: approx. 5.4 acres
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.)., excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
mnct 1,P inr1iided Tn calculate acreage- multinlv length X width. then divide by 43.560.
Stream Impact
Number
(indicate on map)
Stream Name
Type of Impact Perennial or
Intermittent? Average
Stream Width
Before Impact Impact
Length
(linear feet) Area of
Impact
(acres)
n/a n/a n/a n/a n/a n/a n/a
Total Stream Impact (by length and acreage)
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill- excavation- dredging. flooding. drainage. bulkheads. etc.
Open Water Impact . of
Wate
Name Type of Waterbody Area of
Site Number e)
(if ap
applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact
(indicate on map) ocean, etc.) (acres)
1 Cape Fear River Excavation/ fill (temp) River 0.222
Total Open Water Impact (acres) 0.222
Updated 11/1/2005
Page 4 of 8
6. List the cumulative impact to all Waters of the U.S. resulting from the project:
Stream Impact (acres): 0
Wetland Impact (acres): 0.866
Open Water Impact (acres): 0.222
Total Impact to Waters of the U.S. (acres) 1.088
Total Stream Impact (linear feet): 0
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USAGE.
n/a
8. Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The temporary wetland and open water impacts are necessary to access the Cape Fear River for water
intake purposes. After the pipe has been installed, the area will be returned to natural grade and all but a
10' wide maintenance corridor will be allowed to re-vegetate. The construction corridor has been
minimized to 40' in width to reduce initial wetland impacts. The intake pipe was designed to be
constructed on the opposite side of the walkway from the existing pipe for several reasons. First, both the
existing and the proposed intake pipes are verge and if the proposed intake pipe was placed in the
previously cleared corridor, it would have to cross the existing intake to enter the wetwell (based on the
wetwell expansion project that has already started and will be complete in November 2008). This crossing
would have to be very deep and would not enable both pipes to enter the wetwell and still maintain the
necessary slope for the water to enter the wetwell by gravity. Secondly, the Kings Bluff Ex ap nsion
Project is well underway and the wetwell expansion is directly inline with the proposed intake pipe route.
Therefore, the proposed design is the only feasible alternative.
Updated 11/1/2005
Page 5 of 8
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.ne.us/ncwetlands/stlmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
To mitigate for the 10' wide maintained corridor (approximately 0.18 ac) the applicant
proposes to buy into the NCEEP for the restoration of 0.25 acre of riparian wetlands. In
addition a section of remaining wetlands on site will be preserved. The applicant is currently
in the process of determining the location and amount of these wetlands.
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet):
Updated 11/1/2005
Page 6 of 8
Amount of buffer mitigation requested (square feet): n/a
Amount of Riparian wetland mitigation requested (acres): 0.25
Amount of Non-riparian wetland mitigation requested (acres): n/a
Amount of Coastal wetland mitigation requested (acres): n/a
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call, the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ® No ?
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ? No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact Multiplier Required
(souare feet) Mitigation
1 3 (2 for Catawba)
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement,. or Payment into the
Updated 11/1/2005
Page 7 of 8
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or.0244, or.0260. N/A
XI.
XII.
Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. The proposed project will not result in increased
impervious surface coverage A stormwater plan is not required.
Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
There will be no additional wastewater resulting from the proposed project.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
This project will not provide access to other tracts. The applicant proposes to preserve a section
of remaining wetlands on site
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Ll(_? V(?/,Jv
l Applicant/ gent'i Signature Date
(Agent's signature is va id only if an authorization letter from the applicant is provided.)
Updated 11/1/2005
Page 8 of 8
Kings Bluff Pump Station Expansion
Adjacent Property Owners
?Fp
?008
4. t?z
Alexander-Alma Daniel Properties
23835 NC 87 Hwy East
Riegelwood, NC 28456
PIN #: 221300184415
Cape Fear Public Utility Authority
235 Government Center Drive
Wilmington, NC 28403
PIN 9: 221300282518 & 221300285931
Corbett Bros.
PO Box 210
Wilmington, NC 28401
PIN #: 221400452139
cr
o
ry
I 0
W ?
z
U) U) a
Q
0-
0
W N
U
W
noo
N
I
i
F
-
2
r
'
U)
Q
W
a
•?
X OZ5
U
w
Y
z
a LU Z Q Z
cn
Z
W
L
J I Y
Q
F-
U)
Z W
L
C Z
-
W
W
I LLI
4 ?
Q
z W
z F-
U
_
Q ..
'
v Z
C) :D
fl
7 W V J
00
-
O
Z
CL
p W
W
Cd
C V
I
I
I
:- Ln
V)
J z
W f- I
m II
W Q'
N
DW W
CL
Y
V
Q i
00
W
Z Y :D
U
Z =
Z Cl)
Cn Z
W
X CK
ui U
.. cn
/i?
(nruro atat aAYlt)
Z3?Tl US RUM n3i
I
I
I
e ? ? I
j
I '
f I^
? I
I I
? II ? I
r
I
i
1
I
I
I ,
I
I
I
I I
I I ?
I
I
I
I I
I
I ?
I
I
i
I
I
I
? I
i
I
I
I
I
I
I
?gg
.x
I
M
O ^ I
I
a g
? I
L,j
Yd
I
ti
I I ?? I
I '
A 11 ?
•
itf
•t 1 +
l II
? I
?? ? fi
g R P4 o 0 0 ¢
I ?
z
0
Q
W
0
z
W
W
Q
Q
W
CL
V
J
(nruro a ist am)
'MM US wan 011
53 g R ? o o
f - T -- I--T-?I-"-T--1
I
s
\ 78;
W. ? I
w
U
N I
I
I
8 r--. ? I
I
I
,b
? I I
I I
. I
? I I
? I
/ I
I
I I I
I
I
I
I
I
I I
I
I I
I
I
I I I
? I I
I
z
I
I
I
?
?
I ? I
II 1 I
I
I I
I ?g
?I I
?I
I I I
l I
I I I
I
I I
U
N /
?J
C-13
z
-1 d
1
O / ia l
-------
`1
b I
a
r?n
3
300
N W E
Z2
?C
o
a°
w
I
"N° Z
II ?Ia ? a 11
R g R R ? o 0
i
J
Z
U
C2
Z
Q
Z
0
1=
W
w
W
C?
LL
?z
w
M?
=o
a. ?
o?
d w
?C.D
o MW--
V) y
" ZCJ
w
U
Z
N UQ
?
Qf
a
w =
O ¢
C);
w w
°
C:) Ln
Z° w
Z ¢ Y
OO W Z
C-D
Z ¢ J
w w N
0
CL ?-
0699
_A
ohm
ak
Z
J
L0
V
Q
ml 'Yf?? SIOYJ2IV Lou
0
IIW :qoj Inaoj 6Mp,tpc SC)mMDS B 3Hr10L!YSR.IJI KM oqo1u w • aNgold lulwo Il'S Q01- Ih1-LZ090L\HMM\-'0 : ow'N 410d p.pwlro ; ?woq ?x(I
1°LoY18
60 Z - LOOd uof 60 'onl :owl\olo0 (4ao1 sm) °011H : uolu*A poor
1
W
¢U
`\ Q?
W? V
? .? ZIY
C/) Z
aw
z
0 U
o w
W
CL? ? •,CS/
'0p ?
XU
b
0 OS/ LL U)
Cei
O
Z
L
Y
FQ-
N ?
4?11 p0
p C)
z 10;
00/
+ N
r 3
n a \
I
u?
I \'
I T
a U
a z
W
<
c? a
z w
¢ Y
w Q
a j?
a LLI o
? e
? m
Q M
• Z ? v
(n U
o ? Z a ?
0 w p
W ?' I z C7 Q F- o WJ
J z z
g ?V N
c? Y
M O
a
W z
J
I u
A. '? I U
0b 0 09 N
I-
cD y w
z
a \ a
+ -m
U
Q 0
I
/ -\
\
Z
0 Z W N
4 U
W
?>
?
lL
U. o
LL Z Z N
m
/ N
v
J U
- - ?
In U) 10 091
.89b
-
?--
-
IZ
za - Z
W i pa
_
- ,
-- F
N 1 J
! r
/ / \ UZ i u? o
I I
z
YW
?? z a
Y a
I 0*bI
N ,n
- / as I I ON 0
/ k
' W
` I I S?ppG
O?zj
I / ?
i 2 5 £ I I
I / Z ?i V q
/ OW Sb
l?
Q
Y m
N
0
S
r
x
_. K,..I
' I
z'
?
O? I J?
pa
Llj 11 k
0 0 I
I /
mo
?? I
?pz
{.? o
I m F- I
w
mz? IZ a?
- - ?1-- a
I ? U m
N
m
a p~ h r
CY)
W
;? Z
X 12f
W LLI
Q
Y
f
z
Of LLI
F-
?z
Q
J LU
LLJ CL
CL
V)
O
N
w
z
z
z
w J
W_ a
U
H
T
U
tr
Q
x
w
Z
Z
W
41))
.................. ._.._....
Q
cJ ~?\V1
Y
• R:
-a v
m ?'
? a I.l
L,l • V7
LJ
fl, ,_ ?
_ v.
TF L a
/
QrO
E E /
I
AI v
i
a) N
C /
.
J."
S !l
c)?
U) m
ce ;
?Y 8r
{ .y
z S:) 7
'C
n
k m
(0 a
v
? U
C (ti
tU _
a N
v
4/!ix
CT . ?• y
4? Q.Z, e
A';
f
N
b
d
3 ..
)r
Fhgq A' ?/ r..,
f ?
k ? U
X )
t I/
x
T 1
Y.
V
s
? y c1
ru U
41
n,
ci.
k
K
f};
k?
a
U
O
O
N
C
C
II
C7
U r
W
Q
U
LO
O
U)
c ?
:1
+-,
p
K 1
0 a
d O
0
25 v) A
r'2
I
U U
L.. p p
w
I
4
{ w
I::7
\ w i yy
--.- _ ?--
Iwo
.................
Z __... _
U
w c?
Ul :: U
a U
O
.O
Ill s ri
?i " I
}
O
N
}
r
> n._
I- I...._
O
+ O
(..Y_
~ 0 I a..l
f YLiI (?
(..D LiI `L ii
~
! L)_ -7
0
Z z
'
?
+ L7
I
CL LIJ
5 a. (r-
< AyI wv0
CL C) 'A P-- Z.
I
Ld •2 --
L
A.. Lj
) 3 <+
LAJ
(f) F
- ?
A. (n
ti co
"1 0
........ ...... .
I
I
C?
GT X
tu?
Q
1
N
m
I
N
N
O
0
? o E
N V
I u
Irv
M y
,tZO is
`u
om n E
°
E
M ?E o $ 3
Z,5
av t a ;
. . . . . . . . . . . . . .......... . . . . . . . . . . . . . . . . . . .................... . ................................................... . . . . . . . . .. . .. .
Preliminary 404 Wetlands
NOTE: All boundaries and distances are considered approximate
This represents a preliminary map prepared from field sketches.
A survey of delineated areas and review and approval by the
US Army Corps of Engineers is recommended prior to specific
site planning. Numbers represent flag labels.
Map Source: 1998 NAPP aerial photography
SCALE 1" = 300'
King's Bluff Pump Station LMG Figure 5
Bladen County, NC LA 4DMANAGH,b1HrTGROUP-; Preliminary wetlands map
40-06-477W _ E„vi,onme„«
July 2006
i
i SITE
'•t _ l I
Lock •'Gaoin4 Sta
Puri* ng-
i eta
` « t
•
f {I
'. f Ali* 1
-S ale
meant to
Map Source: Kelly Quadrangle 7.5 minute (topographic) 1990. SCALE V = 1000'
King's Bluff Pump Station A4?LMG Figure 2
Bladen County NC LAND MATAGEMENTGROUP„c USGS Topgraphic Map
40-06-477W Environmental Consultants
Jul 2006
W?Otfv
°.
I
m
tofnf i Na
Point .. ?q., = KNOT
171
Jn
SITE
vv?
. i?
a
Wit odha r ?
RID
_ ?0
.? if l YJ
OLD
l 4 f' i V
MOW
i
Map Source: North Carolina Atlas & Gazetteer. Pg 83.2003 SCALE 1" 1 Mile
King's Bluff Pump Station LMG Figure 1
Bladen County, NC LANDMANAGEM&NTGROUP iwc. Vicinity Map
40-06-477W Environmental Consulronts
-- _ - - --- 'I - - - !- July 2000'
- - -- - --- - - - -