Loading...
HomeMy WebLinkAbout20070291 Ver 4_401 Application_20081008Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" o " A".) 1. Processing F D L r, ??/ 1. Check all of the approval(s) requested for this project: l2 I??B ® Section 404 Permit ? Riparian or Watershed= ® Section 10 Permit ? Isolated Wetland Permit from D 0%7? ? 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 12 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: [9 1r-, E II. A licant Information D V PP 0 C T 8 2008 1. Owner/Applicant Information Name: Mr. Don Betz DENR-WATER QUALITY "I tMut M13 S-TeRMWATER 8R Mailing Address: Lower Cape Fear Water and Sewer Authority 1107 New Pointe Blvd. Suite 17 Leland, NC 28451 Telephone Number: (910) 383-1919 Fax Number: N/A E-mail Address: N/A 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Kim Williams Company Affiliation: Land Management, Group, Inc Mailing Address: P.O. Box 2522 Wilmington, NC 28402 Telephone Number: 910-452-0001 Fax Number: 910-452-0060 E-mail Address: kwilliams(a,lm roup.net Updated 11/1/2005 Page 1 of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and MRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Kings Bluff Pump Station Expansion F1 C: U:" >,:,t I- I "a 2. T.I.P. Project Number or State Project Number (NCDOT Only): 7008 3. Property Identification Number (Tax PIN): as iVV1LM.FLD.0,=C. 4. Location County: Bladen Nearest Town: Riegelwood Subdivision name (include phase/lot number): n/a Directions to site (include road numbers/names, landmarks, etc.): The project is located at Lock and Dam #1 in Bladen County, NC. From Wilmington take US 74 W towards Brunswick County. US 74 will merge with NC 87. Take a right and head North on NC 87 where 74/87 splits. Take a right onto Lock Number 1 Road in Bladen County. Veer left at the end of this road. Property will be straight ahead at 246 Private Road. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 34.40409 N, 78.2965 W 6. Property size (acres): approx. 6.8 acres 7. Name of nearest receiving body of water: Cape Fear River 8. River Basin: Cape Fear River Basin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mgps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site currently houses the King's Bluff Pump Station Updated 11/1/2005 Page 2 of 8 with three (3) raw water pumps and one 48-inch pipe that extends from the pumping station to the Cape Fear River. Land use in the vicinity is largely agricultural or undeveloped. 10. Describe the overall project in detail, including the type of equipment to be used: The lid cant plans to install a 60-inch parallel intake pipe originating at the pumping facility and ending in the Cape Fear River. The intake pipe will be approximately 1,100 linear ft. Approximately 800ft of piping will traverse on-site wetlands with a 40 ft construction corridor, resulting in approximately 0.721 acres of temporary wetland impacts. A track hoe and bulldozer will be used to create the installation area and then restore to existing grade. Silt fences will be used to reduce erosion into adjacent wetlands and the Cape Fear River. 11. Explain the purpose of the proposed work: The additional pipe is part of a capacity upgrade at King's Bluff Pumping Station to account for increased water demands resulting from recent population growth in Coastal North Carolina. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. The 404 wetland line was delineated by Land Management Group, Inc. in August 2006 Liz Hair of the U .S. Army _Corps of Engineers field approved the wetland line. In October of 2007, the applicant received a NWP 18/33 to temporarily impact 0.075 acre of 404 wetlands to install a sediment trap and permanently impact 0.070 acre of 404 wetlands for grading associated with the expansion of a building (Action ID# SAW-2006-41503). V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No additional wetland impacts are anticipated on this site. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Updated 11/1/2005 Page 3 of 8 Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The applicant proposes to temporarily impact 0.721 acre of 404 wetlands and 0.222 acre of open water for initial construction of water intake pipeline. The applicant has already temporarily impacted 0.075 acre of wetlands and permanently impacted 0.070 acre of wetlands. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, cannrntAv lict imnartc rlne to hoth Onlcture and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain (yes/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) 1 Excavation/Fill (Temp) forested yes 0-900 ft 0.721 Total Wetland Impact (acres) 0.721 3. List the total acreage (estimated) of all existing wetlands on the property: approx. 5.4 acres 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.)., excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams mnct 1,P inr1iided Tn calculate acreage- multinlv length X width. then divide by 43.560. Stream Impact Number (indicate on map) Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) n/a n/a n/a n/a n/a n/a n/a Total Stream Impact (by length and acreage) 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill- excavation- dredging. flooding. drainage. bulkheads. etc. Open Water Impact . of Wate Name Type of Waterbody Area of Site Number e) (if ap applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact (indicate on map) ocean, etc.) (acres) 1 Cape Fear River Excavation/ fill (temp) River 0.222 Total Open Water Impact (acres) 0.222 Updated 11/1/2005 Page 4 of 8 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0 Wetland Impact (acres): 0.866 Open Water Impact (acres): 0.222 Total Impact to Waters of the U.S. (acres) 1.088 Total Stream Impact (linear feet): 0 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USAGE. n/a 8. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The temporary wetland and open water impacts are necessary to access the Cape Fear River for water intake purposes. After the pipe has been installed, the area will be returned to natural grade and all but a 10' wide maintenance corridor will be allowed to re-vegetate. The construction corridor has been minimized to 40' in width to reduce initial wetland impacts. The intake pipe was designed to be constructed on the opposite side of the walkway from the existing pipe for several reasons. First, both the existing and the proposed intake pipes are verge and if the proposed intake pipe was placed in the previously cleared corridor, it would have to cross the existing intake to enter the wetwell (based on the wetwell expansion project that has already started and will be complete in November 2008). This crossing would have to be very deep and would not enable both pipes to enter the wetwell and still maintain the necessary slope for the water to enter the wetwell by gravity. Secondly, the Kings Bluff Ex ap nsion Project is well underway and the wetwell expansion is directly inline with the proposed intake pipe route. Therefore, the proposed design is the only feasible alternative. Updated 11/1/2005 Page 5 of 8 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.ne.us/ncwetlands/stlmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. To mitigate for the 10' wide maintained corridor (approximately 0.18 ac) the applicant proposes to buy into the NCEEP for the restoration of 0.25 acre of riparian wetlands. In addition a section of remaining wetlands on site will be preserved. The applicant is currently in the process of determining the location and amount of these wetlands. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Updated 11/1/2005 Page 6 of 8 Amount of buffer mitigation requested (square feet): n/a Amount of Riparian wetland mitigation requested (acres): 0.25 Amount of Non-riparian wetland mitigation requested (acres): n/a Amount of Coastal wetland mitigation requested (acres): n/a IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call, the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (souare feet) Mitigation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement,. or Payment into the Updated 11/1/2005 Page 7 of 8 Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0244, or.0260. N/A XI. XII. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The proposed project will not result in increased impervious surface coverage A stormwater plan is not required. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. There will be no additional wastewater resulting from the proposed project. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: This project will not provide access to other tracts. The applicant proposes to preserve a section of remaining wetlands on site XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Ll(_? V(?/,Jv l Applicant/ gent'i Signature Date (Agent's signature is va id only if an authorization letter from the applicant is provided.) Updated 11/1/2005 Page 8 of 8 Kings Bluff Pump Station Expansion Adjacent Property Owners ?Fp ?008 4. t?z Alexander-Alma Daniel Properties 23835 NC 87 Hwy East Riegelwood, NC 28456 PIN #: 221300184415 Cape Fear Public Utility Authority 235 Government Center Drive Wilmington, NC 28403 PIN 9: 221300282518 & 221300285931 Corbett Bros. PO Box 210 Wilmington, NC 28401 PIN #: 221400452139 cr o ry I 0 W ? z U) U) a Q 0- 0 W N U W noo N I i F - 2 r ' U) Q W a •? X OZ5 U w Y z a LU Z Q Z cn Z W L J I Y Q F- U) Z W L C Z - W W I LLI 4 ? Q z W z F- U _ Q .. ' v Z C) :D fl 7 W V J 00 - O Z CL p W W Cd C V I I I :- Ln V) J z W f- I m II W Q' N DW W CL Y V Q i 00 W Z Y :D U Z = Z Cl) Cn Z W X CK ui U .. cn /i? (nruro atat aAYlt) Z3?Tl US RUM n3i I I I e ? ? I j I ' f I^ ? I I I ? II ? I r I i 1 I I I , I I I I I I I ? I I I I I I I ? I I i I I I ? I i I I I I I I ?gg .x I M O ^ I I a g ? I L,j Yd I ti I I ?? I I ' A 11 ? • itf •t 1 + l II ? I ?? ? fi g R P4 o 0 0 ¢ I ? z 0 Q W 0 z W W Q Q W CL V J (nruro a ist am) 'MM US wan 011 53 g R ? o o f - T -- I--T-?I-"-T--1 I s \ 78; W. ? I w U N I I I 8 r--. ? I I I ,b ? I I I I . I ? I I ? I / I I I I I I I I I I I I I I I I I I I I ? I I I z I I I ? ? I ? I II 1 I I I I I ?g ?I I ?I I I I l I I I I I I I U N / ?J C-13 z -1 d 1 O / ia l ------- `1 b I a r?n 3 300 N W E Z2 ?C o a° w I "N° Z II ?Ia ? a 11 R g R R ? o 0 i J Z U C2 Z Q Z 0 1= W w W C? LL ?z w M? =o a. ? o? d w ?C.D o MW-- V) y " ZCJ w U Z N UQ ? Qf a w = O ¢ C); w w ° C:) Ln Z° w Z ¢ Y OO W Z C-D Z ¢ J w w N 0 CL ?- 0699 _A ohm ak Z J L0 V Q ml 'Yf?? SIOYJ2IV Lou 0 IIW :qoj Inaoj 6Mp,tpc SC)mMDS B 3Hr10L!YSR.IJI KM oqo1u w • aNgold lulwo Il'S Q01- Ih1-LZ090L\HMM\-'0 : ow'N 410d p.pwlro ; ?woq ?x(I 1°LoY18 60 Z - LOOd uof 60 'onl :owl\olo0 (4ao1 sm) °011H : uolu*A poor 1 W ¢U `\ Q? W? V ? .? ZIY C/) Z aw z 0 U o w W CL? ? •,CS/ '0p ? XU b 0 OS/ LL U) Cei O Z L Y FQ- N ? 4?11 p0 p C) z 10; 00/ + N r 3 n a \ I u? I \' I T a U a z W < c? a z w ¢ Y w Q a j? a LLI o ? e ? m Q M • Z ? v (n U o ? Z a ? 0 w p W ?' I z C7 Q F- o WJ J z z g ?V N c? Y M O a W z J I u A. '? I U 0b 0 09 N I- cD y w z a \ a + -m U Q 0 I / -\ \ Z 0 Z W N 4 U W ?> ? lL U. o LL Z Z N m / N v J U - - ? In U) 10 091 .89b - ?-- - IZ za - Z W i pa _ - , -- F N 1 J ! r / / \ UZ i u? o I I z YW ?? z a Y a I 0*bI N ,n - / as I I ON 0 / k ' W ` I I S?ppG O?zj I / ? i 2 5 £ I I I / Z ?i V q / OW Sb l? Q Y m N 0 S r x _. K,..I ' I z' ? O? I J? pa Llj 11 k 0 0 I I / mo ?? I ?pz {.? o I m F- I w mz? IZ a? - - ?1-- a I ? U m N m a p~ h r CY) W ;? Z X 12f W LLI Q Y f z Of LLI F- ?z Q J LU LLJ CL CL V) O N w z z z w J W_ a U H T U tr Q x w Z Z W 41)) .................. ._.._.... Q cJ ~?\V1 Y • R: -a v m ?' ? a I.l L,l • V7 LJ fl, ,_ ? _ v. TF L a / QrO E E / I AI v i a) N C / . J." S !l c)? U) m ce ; ?Y 8r { .y z S:) 7 'C n k m (0 a v ? U C (ti tU _ a N v 4/!ix CT . ?• y 4? Q.Z, e A'; f N b d 3 .. )r Fhgq A' ?/ r.., f ? k ? U X ) t I/ x T 1 Y. V s ? y c1 ru U 41 n, ci. k K f}; k? a U O O N C C II C7 U r W Q U LO O U) c ? :1 +-, p K 1 0 a d O 0 25 v) A r'2 I U U L.. p p w I 4 { w I::7 \ w i yy --.- _ ?-- Iwo ................. Z __... _ U w c? Ul :: U a U O .O Ill s ri ?i " I } O N } r > n._ I- I...._ O + O (..Y_ ~ 0 I a..l f YLiI (? (..D LiI `L ii ~ ! L)_ -7 0 Z z ' ? + L7 I CL LIJ 5 a. (r- < AyI wv0 CL C) 'A P-- Z. I Ld •2 -- L A.. Lj ) 3 <+ LAJ (f) F - ? A. (n ti co "1 0 ........ ...... . I I C? GT X tu? Q 1 N m I N N O 0 ? o E N V I u Irv M y ,tZO is `u om n E ° E M ?E o $ 3 Z,5 av t a ; . . . . . . . . . . . . . .......... . . . . . . . . . . . . . . . . . . .................... . ................................................... . . . . . . . . .. . .. . Preliminary 404 Wetlands NOTE: All boundaries and distances are considered approximate This represents a preliminary map prepared from field sketches. A survey of delineated areas and review and approval by the US Army Corps of Engineers is recommended prior to specific site planning. Numbers represent flag labels. Map Source: 1998 NAPP aerial photography SCALE 1" = 300' King's Bluff Pump Station LMG Figure 5 Bladen County, NC LA 4DMANAGH,b1HrTGROUP-; Preliminary wetlands map 40-06-477W _ E„vi,onme„« July 2006 i i SITE '•t _ l I Lock •'Gaoin4 Sta Puri* ng- i eta ` « t • f {I '. f Ali* 1 -S ale meant to Map Source: Kelly Quadrangle 7.5 minute (topographic) 1990. SCALE V = 1000' King's Bluff Pump Station A4?LMG Figure 2 Bladen County NC LAND MATAGEMENTGROUP„c USGS Topgraphic Map 40-06-477W Environmental Consultants Jul 2006 W?Otfv °. I m tofnf i Na Point .. ?q., = KNOT 171 Jn SITE vv? . i? a Wit odha r ? RID _ ?0 .? if l YJ OLD l 4 f' i V MOW i Map Source: North Carolina Atlas & Gazetteer. Pg 83.2003 SCALE 1" 1 Mile King's Bluff Pump Station LMG Figure 1 Bladen County, NC LANDMANAGEM&NTGROUP iwc. Vicinity Map 40-06-477W Environmental Consulronts -- _ - - --- 'I - - - !- July 2000' - - -- - --- - - - -