Loading...
HomeMy WebLinkAbout20170988 Ver 1_temporary stream crossing_201708080 om H � G � H Z ��0� r��l�� �-m+z-I=D =�DDm � Z 2�0� z,��i-� • � o ,-� �DDD "� � � O z� iHEET 1 OF 1 1645.01 NOTE: �. STREAM VAH. NATUHAL GHOUND %\\�i\�i\�i PLAN VIEW � #57 STONE, 6" DEPTH (MIN.) CflOSS PIPE(S) (SEE NOTE) SECTION A-A NOT TO SCALE NATURAL GHOUND i,/i�/i��/i��/i��/i��/i PIPE(S) FOR TEMPORARY STREAM CROSSING SHALL BE DESIGNED TO PASS THE PEAK OR BANKFULL FLOW, WHICHEVER IS LESS, FROM A 2-YEAR PEAK STORM, WITHOUT OVER TOPPING. z � � H � � Q Q H�C(='�C� L.LJ�Hz oo�= wQQ�'= QU��H H cnH�OJ oo�Q z H °C 1 � � H 0� V � Z � H LL (n z O �� Q� o � � W � � o� z y Q � � � =a �� H J O c� a z � w W r 3HEET 1 OF 1 1645.01