HomeMy WebLinkAbout20170988 Ver 1_temporary stream crossing_201708080
om
H �
G �
H Z
��0�
r��l��
�-m+z-I=D
=�DDm
� Z
2�0�
z,��i-�
• � o ,-�
�DDD
"� �
� O
z�
iHEET 1 OF 1
1645.01
NOTE:
�.
STREAM
VAH.
NATUHAL
GHOUND
%\\�i\�i\�i
PLAN VIEW
�
#57 STONE, 6" DEPTH (MIN.)
CflOSS PIPE(S) (SEE NOTE)
SECTION A-A
NOT TO SCALE
NATURAL
GHOUND
i,/i�/i��/i��/i��/i��/i
PIPE(S) FOR TEMPORARY STREAM CROSSING SHALL BE DESIGNED TO PASS THE PEAK OR
BANKFULL FLOW, WHICHEVER IS LESS, FROM A 2-YEAR PEAK STORM, WITHOUT OVER TOPPING.
z
� �
H �
�
Q Q
H�C(='�C�
L.LJ�Hz
oo�=
wQQ�'=
QU��H
H
cnH�OJ
oo�Q
z H °C
1 � � H
0�
V
�
Z
� H
LL (n
z O
��
Q�
o �
� W
� �
o�
z y
Q
� �
�
=a
��
H
J O
c� a
z �
w W
r
3HEET 1 OF 1
1645.01