STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
May 30, 2017
Justification for onsite detour on NCDOT Bridge Replacement Project
Bridge 400135, (over Squirrel Creek) SR1001 N, Deep River Rd.
JAMES H. TROGDON, III
SECRETARY
The North Carolina Department of Transportation (NCDOT) is preparing the planning studies for
the above referenced bridge replacement project. The purpose of this letter is to solicit our
justification concerning the potential impacts of the proposed projects' offsite detour. We
anticipate that this project will need an onsite detour.
For this bridge replacement project there are two possible detour routes;
Detour 1: This detour goes from N Church St to HWY 150, then to Spencer-Dixon Rd. The
current ADT on N. Church ST is 5500. The ADT on HWY 150 is 6500 and the ADT for Spencer-
Dixon Rd is 3400.
Detour 2: This detour goes from N Church St to Archergate Rd, from Archergate Rd to
Yanceyville Rd, and from Yanceyville Rd to Hwy 150. Archergate Rd has an ADT of 2700.
Yanceyville Rd has an ADT of 820 and Hwy 150 has an ADT of 6200.
Acceptable delay (also referred to as additional travel time) is based on the idea that there are
limits to how long the Department can reasonably expect a person to be delayed from their
normal travel time. For this project, the duration of road closure is acceptable for both
possible offsite detours; however there are other factors that need to be considered for this
project. All issues including delay, overriding considerations, impacts to human and natural
environment as well as economics must be weighted in making the final determination. Adding
this much traffic to either possible detour could ruin the integrity of the detour roads. The
detour roads currently show a large amount of crackin�. Also, with the time constraints on
moneys allotted by the NCDOT, we would be forced to begin the project during the school
year. Northern Guilford High School is located on the detour route on Spencer-Dixon rd. The
additional traffic from the detour route would cause large conflicts during school hours;
consequently affecting the fire and EMS response times as well. The possibility of extensively
delaying emergency response times is unacceptable. Therefore, the high ADT and concerns by
the Schools, Fire, and EMS nullify the liability of an offsite detour.
If you have any questions or comments concerning the project, please contact me at 336-487-
0000. Thank you for your assistance.
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION 7, DISTRICT 2 OFFICE
P.O. BOX 14996
GREENSBORO, NC 27415-4996
Sincerely,
Tim Powers, P.E.
Division Bridge Project Manager