Loading...
HomeMy WebLinkAbout20170965 Ver 1_Shoreline Stabilization_20170803DUKE ENERGY INTERNAL USE ONLY: 2 0 1 7 0 9 6 5 Construction Date Received: E::-FAF Paid Application �� KE Application Complete „fy�ii14p ^Y HEP Fund-�� Permit No. F Duke Energy Lake Serv' es OM Mail Code EC12Q 4&, " C Site ID 526 S. Church St. Close -Out Date O � Charlotte, NC 28202 I. DATE OF APPLICATION*ffFiD== g Permit/Ta #.: S A R'yORO�s 11. APPLICANT INFORMATION (applicant mailing address and contact information) ANG Name*S PrimaryPhone* Address* Rl*ot {-G' r U i, Secondary Phone �- city- MR�N State* Zip Code*Fax Number Email* 111. PROPERTY INFORMATION (location of permit) -� Address*AB Mun+ Ai G r nr. County* City* 1+�oa�GSU, lit State*19 Zip Code � * �� 1 County Parcel ID number �i iA�(� y _ i r✓ Lake*:1\L > rrY� �-� (e.g. Pin, Tax ID, TMS 1 000 Number...) Subdivision 5_ ,�� yam_ Lot(s) Plat Book/Page To enter the Latitude and Longitude of the property, please use a service/software to easily acquire the location information. Values Latitude (e.g. 35.12345)* 3� should be provided in Decimal Degrees format (35.1245). example service: http:/rtouchmap.comAatlong.html Longitude (e.g. -80.12345)* IV. PROPOSED ACTIVITY C New/Modification of Existing Structure C Maintenance of Existing Structure N New/Modification of Existing Shoreline Stabilization (~ Maintenance of Existing Shoreline Stabilization C' New/Modification of Existing Structure & Stabilization C Maintenance of Existing Structure & Stabilizatic (' Transfer of ownership i Other (please describe below) Area over land (sq ft) Area over water (sq ft) Total Square Feet Is Dock Covered? If of Slips #of Jetports Shoreline Stabilization (feet) Length of j ( Distance From Shoreline I U orene �5 ;rf •� Stabilization Materials ��id:�(x- Brief Description rnrA l i P, 1c, of the Activity lbouldcr Y -NL k5. Describe Briefly the Existing a {��j. d cn -hG I n u at - Structures Over Land and Water (include sq ft) Y. Dock OUR&- or Engineer Name/Company 2 i` �. (� Address � 3 U R Vc' r1 1 MXM Number (i l• 2 City{• ivI ! ` State { c.1 �i Z+pcade 5 EmaN� C nn nd 11� U i I C.U�- �, �. Vl. checklist of Required Doctnnents (tn hWude with llppication Sbmkdml Ef Recent Survey (stamped/signed by a professional licensed surveyor showing the location of the existing or proposed structure and/or surveyof the existing or proposed stabilization) kAPP"cat'on tos along property shoreline and photos of any existingstructures and/or stabil4ation m or near the water fee (check only, payable to Duke Energy) [-T�gned User Agreement Letter j] Applicable local, state. and federal permits O'flan and profile drawing showing all measurements and elevations ❑ Habitat Enhancement payment (f applicable) VIL Approval Process • Application is reviewed and determined if complete. Fields with an asterisk are required. • If application is not complete or does not include all items and information listed in the checklist, the application will be returned as incomplete. • A Duke Energy representative will visit the site to conduct a visual inspection. • Applicant will be notified of approval or denial. • Applicant is to have the notice, to be supplied by Duke Energy upon application approval, posted and must be viewable from water. The notice must remain posted until a representative inspects the project and determines the project is complete and within the application specifications. VUL Dkoctiorts by Road Directions by � 1 r g, � JZC Road' /t UL Application Sttbxdsslon Please complete, print and sign this application. Then enclose all items from the checklist above In an envelope and submit all the information to the address below. Duke Energy Lake Services Mail Code EC12Q print ham 526 S. Church St. Charlotte, NC29202 I agree that the Information contained within is Scanned by CamScanner State of North Carolina Department of Environment and Natural Resources _D WWI% R Division of Water Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Applicant Information [15A NCAC 02H 0502(a)1 Owner Information Name: C CC Mailing Address: t.l i -f-Lhx..l I Telephone Number: Fax Number: E-mail Address: C1 } c ,,; 1 1� Yl C, (� )-1�� �I�y� �;; ( C Ci-- _ 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http:/lwww.saw.usace army mil/Portals/59/docs/`regulatory/regdocs/Permits/SAMPLE AGENT AUTHO RIZATION FORM 0f) must be attached if the Agent has signed this application form. Name: Company Affiliation: G T(.., CA re - -A i i C+v i Mailing Address: Telephone Number: '� �►- �'J6- �� 5 Fax Number: E-mail Address: C,�' l : �c c,, 6' I/Yi U I; ( MC- l CC,rn Person to receive the Certification Approval: ( ,yl 0 < ti Project Information [15A NCAC 02H .0502(a) & (b)] I. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and FORM: SSGP 10-2013 Page 1 of 3 construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County:�'1 ? - '��- �- � 1 Nearest Town: % "� 5 bdivision name or site address (include phase/lot number): c, 'KI . �vt -14- 5 Sq Directions to site - please include road names and numbers, landmarks, etc.: T4 C, #e"xl� R4L Latitude lin decimal degrees) > L a _)I Lu , Longitude (decimal degrees) v • � � 51 CI 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc): S C4-11-755( 6. Property size (acres): 1 • 755( Q 7. Lake/ river/ ocean adjacent to property: i�Lt_ r Y1 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): . V' M VY✓ 1 ; n -N "- fC ► ( � rz r U✓� w I I c ✓ c)1 !ter � ✓ v . 9. Will work be conducted from land? From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normalpool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 1 r'� r X / f 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 j feet landward to be impacted (number of trees, for instance): � ��s«yO474 ) L1 - fr`S w�i� 7/,�8/17 /A nt's Signature* Printed Name (15A NCAC 02H 0502f 01 Date Agent's signoture is valid only if on outhorizotion letter from the owner is provided. FORM: SSGP 142013 Page 2 of 3 Scanned by CamScanner Full Pond/ Norm LWj,tter e% jI Shoreline Lake (At Full Pond/ Normal Water Level) /8 /t8 PW � Wft ow /l �J MoV CIA -i r Prt I /1'looresv� 4e, JV( ;-S,//l 7—At r*-Yptis 4a f ss 4CCes3 /68osp Please approximately sketch the following information on this plan (provide dimensions for each item, such as loft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation I Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 dSJ+I dN11 C XVHd 6191 31LL —";'i:=,r`� "- - •••1•._• ...�.���� ^�if•'ffi �:s s�mm.�"ia--,� ��r�� �.asrs�f;r b� s , j-_. .. ... T m --... - `,• �=+ e� mar: e'-7s-_"-�+'-tea"-.. a»�z `\ / I8 rr? /rT i ri7 a S� a�.. I,.,,J'��I jrifY • .7'� Hca ti .�++.� y \, rq' N ..., .I f-. .,..� �.. � ` 1�a\ � 1 /f�'' •'+� I Y '� y 1 1 i/tea i� \it 40 �s y t Xf Xf ICr-. .•s-�s.�I�- 'rl� � e ,�. � f �\ �, � I Lw 97 \ .a\ .ilr� \ ;y -'-3 ,�, � , � • �h `Te�/!'_:y'ct°'JN /. / r �9 ' t 1 /f7 Jr1� / I I 1 ` ��'.:3�... �_LST�. �^a• 1 p'9•y iY'Ti �fI . -yV �� 1 ' 71 — I t i. �.�.i- .^..ttT�. _.. .0 ♦5�. i y3' ,I,' I /!� �,Y ti.y". � .m r� .'. ��... 'C•.tR y �'yt;>C �"�J c4-�rsaiiiera'�a 'i�44�•rr'�-{y�� � ��:`=�a � _--._'. .-...� � ��.. — .s,,.m.. �., K„ �;:g" ^L•,!'r �8'�`�e _v+.. = •s�''a�'�.L�e"�3`"�'?i•� �sS'�¢� �.-^i�e�-'•v.?aT;�� --,.tea=?'.�`,�' �.• ar��wv� � .".� �. ,-Jvvr,►c; iv,aps Page 1 of 1 Maps L Ae Norman off" c4evwQ fn's fast NatWnal ON F3�oke•c o Go cel Map data 02017 Google United States 200 ft https://www.google-com/maps/@35.5743972,-80.9357941,17z 7/1 R/')(11 7 1V1ap%—a1U - rnnt your custom map Page 1 of 1 0 0.5 Mi 0 2000 Ft http://map-pass.mytopo-com/maps/Print local.asp?print=l&scale=5.00&laver=T�R(�,�I t= �i1Q��n,� pip I/ r A .. ,t A a f f a i 0 0.5 Mi 0 2000 Ft http://map-pass.mytopo-com/maps/Print local.asp?print=l&scale=5.00&laver=T�R(�,�I t= �i1Q��n,� DUKE ENERGY PRIVATE FACILITIES "APPLICANT'S USER AGREEMENT" (Fill in blanks with required information. Please Print) Date 1-1 TO: Duke Energy c/o Lake Services - EC 12Q 526 S. Church Street Charlotte, NC 28202 RE: (Lake Name) Lc, Kc c ! V 0 C (n"Qn (Lake Address) -� -� /�i U�� �G� �' i) Mo b/e\)Vi I L-, (Applicant's full name) Dooei CA 5 �L_ s i - � I hereby agrees to comply with all requirements and conditions set forth by Duke Energy's Lake Services (Duke Energy) office, and any federal, state or local agencies pertaining to our application to construct and/or maintain L�, I , Zc i h U on LakeIn addition, 1/we have read and agree to comply with Duke Energy's Shoreline Management Guidelines (SMG) and understand that written authorization must be obtained from Duke Energy prior to beginning any activity/construction within the Federal Energy Regulatory Commission (FERC) Project boundary. The construction will be completed as described in the approved application and within twelve (12) months following the date of approval by Duke Energy. An extension will be considered for legitimate extenuating circumstances (as determined by the sole discretion of Duke Energy) provided a specific timeframe in which to complete the construction, not to exceed an additional 12 months, is provided in writing to Duke Energy by the applicant. Failure to complete construction within the 12 -month build -out period or any Duke Energy approved extension will require the applicant to file a new application that complies with the then -current SMG. The new application filing will include any applicable fees and security deposits. Vine attest to be the owner or lease holder of the tract of land immediately adjoining the Project boundary where the proposed private facility is to be constructed. Uwe agree to comply with all FERC orders (as modified or interpreted by FERC), with all other applicable FERC Rules and Regulations implemented by Duke Energy, and with all rules or regulations imposed on Duke Energy by any governmental agency. Pagel of 5 Rev 11/9/2076 1/we understand the physical location of my/our lot in relation to the common property line with Duke Energy, if any, the FERC Project boundary, and any deeded flood easements or required building setbacks. I/we understand that this lake was constructed as a working hydropower reservoir for the primary purpose of producing cost-effective electric energy and that this remains as the lake's primary purpose. Uwe understand the lake and its associated hydroelectric facilities are operated by Duke Energy under the terms of a license issued by the FERC and there will be no change in hydro project operations as a result of the construction and/or use of any facilities that Uwe may be allowed to place within the FERC Project boundary or on any Duke Energy -owned property. I/we understand during drought conditions Duke Energy may request reduced usage or discontinued usage of any water withdrawal or related systems, until such drought conditions improve. Failure to do so may cause possible removal of the system and/or any other permitted facilities that Uwe may have, and any costs associated with removal of the facilities will be assessed to the lot owner. Ave understand lake levels will rise and fall over time in response to weather events and hydro Project operations and Duke Energy does not guarantee an approved facility will always have sufficient water depth to be accessible by boat or for other water depth related recreation activities. Uwe acknowledge Duke Energy provides no guarantee of any specific quantities (except those identified in the FERC license) or quality of water in the lake. Uwe understand the facilities to be installed and/or maintained are mylour property and Uwe therefore agree to be fully responsible for the permitted reservoir use including maintaining facilities in good repair. If the private facility is deemed unsafe by Duke Energy, Uwe agree to repair or remove the private facility at mylour own expense and within the specified timeframe set by Duke Energy. Uwe understand Duke Energy approval of the requested reservoir use in no way constitutes assignment of any interest in real property Duke Energy may have (i.e. land rights). The approval is granted and maintained solely at Duke Energy's discretion. Uwe also understand the permitted use may be revoked at any time by Duke Energy or its successors for any reason whatsoever. if the approval is revoked, Uwe agree to remove the facility at mylour own expense within the specified timeframe set by Duke Energy. 1/we understand ownership/interest in a Common Use Facility or residential marina eliminates the option of having a separate private facility on any other owned or leased lot within the affected subdivision. Uwe understand this lake is open for use by the general public and that maintaining safe and lawful public use is one of the primary lake management objectives ofDuke Energy. Page 2 of 5 Rev 11iAM16 Uwe understand the use for which we are applying is a private use and it should not interfere with the general public's safe and lawful use of the lake. I/we understand lake use permit holders have the authority to prevent others from trespassing on the facilities Ave have built IAve also understand Uwe, however, do not have any authority to impede anyone from pursuit of the lawful public recreation enjoyment of FERC Project lands and waters. Except as specified otherwise in the SMG, other Duke Energy documents (e.g. Public Safety Plans), or a separate lease agreement, anyone may fish around/under facilities built by others, may walk/wade/fish within the FERC Project boundary, boat in the lake's waters, etc. without having to get anyone's permission to do so. Uwe agree to fully disclose all information regarding the approved private facility to any prospective buyer/leaseholder of the property and any new owner/leaseholder. Ave agree to notify Duke Energy immediately of any saleltransfer of the property, including the name and address of the new owner and to transfer the permit and/or Duke Energy lease to the new owner. Uwe agree the adjacent Duke Energy Project property, if any, shall be used exclusively for non- commercial recreational purposes and that Uwe shall not rent or otherwise allow third parties (except for temporary use by guests, family members, and leaseholders of the residential property) to use any facilities permitted to me/us by Duke Energy. Uwe agree not to allow any use of the adjacent property, and will exercise due care and diligence to prevent all other persons that are affiliated with my/our property (including invitees, family members, guests, etc.), to violate an applicable federal, state or local law or regulation. Examples include, but are not limited to nudity, illegal discharge of firearms or fireworks, controlled substance abuse, public drunkenness, public urination or defecation, or other activities determined to be a nuisance by law enforcement officials. Uwe agree to exercise all care and due diligence to preserve and maintain the character of the Duke Energy's adjacent property, if any. Uwe agree to comply with the Duke Energy vegetation management requirements as stated in the SMG. Ave agree further to not allow sewage, including discharge from septic tanks (or similar facilities) or boat holding tanks, garbage, trash, or other waste material to be discharged or dumped into the reservoir, tributaries or adjacent property - Uwe understand that as an adjoining property owner Uwe can make no change in land form of land within the FERC Project boundary or land owned by Duke Energy, if any, such as grading, excavation or filling without prior written approval by Duke Energy. Uwe agree for myself/ourselves, members of my/our family, guests and invitees that Uwe assume all risks of personal injury or property damage incident to my/our occupancy and use of the FERC Project boundary or land owned by Duke Energy, if any; including, but not limited to, any personal injury or property damage which may be sustained as a result of flood waters or in connection with the rise and fall of water in the reservoir as a result of floods or of the operation of Duke Energy's hydroelectric facilities. Uwe as the adjoining property owner(s) further agree Ave will indemnify, protect, defend, and save harmless Duke Energy from any and all loss, cost, Page 3 of 5 Rev I JIW l I6 claims damages, expenses, judgments and causes of action for all injuries and damages sustained by the members of my/our family, guests, and invitees arising or claimed to have arisen in connection with their occupancy or use of the Duke Energy permitted facility(s). Live agree if any action is taken by Duke Energy to enforce any provision, covenant or agreement contained in this user agreement or Duke Energy SMG or if Duke Energy is required to retain an attorney to enforce any provision, covenant or agreement contained in this user agreement or SMG (including, without limitation, the payment of fees due hereunder or the removal of an encroachment constructed in violation of this user agreement or SMG), then Duke Energy shall be entitled to recover all of its reasonable costs associated with such an action, including but not limited to, attorneys' fees and court costs incurred in such action and/or enforcement. Uwe understand certain activities specified in the SMG are prohibited because of environmental concerns, boating capacity limitations, safety considerations and other reasons. Live specifically waive any claim against Duke Energy for consequential damages arising out of or relating to this application, Duke Energy's approval or denial of it, or subsequent revocation of approval, and Uwe specifically understand and acknowledge that, because Duke Energy can revoke the permitted use at any time, Uwe am/are not entitled to reliance damages. Uwe understand the proposed facility will be used only for the purposes described in the information submitted to Duke Energy and other appropriate governing bodies for approval. Live understand every reasonable effort must be made to minimize adverse impacts on fish, wildlife, and other natural resources. Uwe understand trees and vegetation growing within the Project boundary play an important role in the overall environmental condition of the lake. The ecological benefit the vegetation has on the fish and wildlife habitat supports a sound and healthy lake environment. Live also understand unauthorized removal of shoreline vegetation and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests and require me/us to re-establish the vegetation, if the disturbance is found to be in violation of the state or county watershed buffer regulations or Duke Energy's vegetation management requirements as stated in the SMG. Uwe agree to maintain any prescribed mitigation activities that are required in order to gain approval for facility construction, as long as the facility exists. Live recognize Uwe have the continuing responsibility to ensure that the constructed facilities are maintained in good repair, including, but not limited to maintenance of the facilities, and proper erosion control within the permit area and along the shoreline, and agree to take all reasonable steps necessary to meet this responsibility. Live agree to maintain all facilities within the Project boundary and on Duke Energy -owned property, if any, in a sound condition and in a neat appearance and pay all costs for said maintenance. Page 4 of 5 Nav i VW2016 Uwe understand Duke Energy representatives may issue Stop Work Directives for any violation(s) of the SMG or engagement in prohibited acts or activities on Duke Energy property, if any, as specifically identified in the SMG. Ave understand persons found to be in violation will be subject to Duke Energy sanctions which can include, but are not necessarily limited to: 1) restoration of the impacted area at the person's expense; 2) loss of consideration of any future lake use permitting activities for up to five years for improper vegetation removal or until vegetation is satisfactorily re-established (even if there is a change in property ownership); 3) revocation of a previously issued permit and loss of consideration of any future lake use permitting activities and/or reinstatement of the revoked permit; 4) increase in fees; 5) modification or removal of non -complying facilities; and/or 6) fiuther legal action being taken by Duke Energy. Uwe agree that if any historic or archaeological resources are discovered during construction of an approved activity the applicant must stop work immediately and contact Duke Energy. Ave understand that in the event that anyone discovers a potential site of archaeological or historic significance including any gravesite within the Project, the individual must immediately notify Duke Energy. Uwe acknowledge Duke Energy has the right to charge reasonable user's fees for private use of its property, if any, and the Project and failure to pay any applicable user's fees in a timely manner can result in the suspension or cancellation of any previously approved lake use permit. Uwe agree to notify Duke Energy when construction is completed and during the construction period, Uwe will post the Duke Energy approval (to be provided by Duke Energy) at the job site visible from the water's edge. `Dou %s-rw; IcAe II Applicihd Name I 18 MON M PJ; r r. Lake Street Address -- 1' \OOr'tSyi Ile, HC. 28/17 City/StatetZip Code Home Mailing Address [A?) o Svi I I APY& 41U17-- City/Stit Code 704 . (60.79413 770 �. ( GAO.7%M3 Preferred contactPhoneNumber Home Phone Number d i 7 Ch WC."(-D%I,o�-YVl1A-i �. eooff\ 6 7 Email Address Date Page 5 of 5 Rev i l"16