HomeMy WebLinkAbout20170965 Ver 1_Shoreline Stabilization_20170803DUKE ENERGY INTERNAL USE ONLY: 2 0 1 7 0 9 6 5
Construction
Date Received: E::-FAF Paid Application �� KE
Application Complete „fy�ii14p
^Y
HEP Fund-�� Permit No. F Duke Energy Lake Serv' es OM
Mail Code EC12Q 4&, " C
Site ID 526 S. Church St.
Close -Out Date O �
Charlotte, NC 28202
I. DATE OF APPLICATION*ffFiD==
g Permit/Ta #.: S
A R'yORO�s
11. APPLICANT INFORMATION (applicant mailing address and contact information) ANG
Name*S PrimaryPhone*
Address* Rl*ot {-G' r
U i, Secondary Phone �-
city- MR�N State* Zip Code*Fax Number
Email*
111. PROPERTY INFORMATION (location of permit) -�
Address*AB Mun+ Ai
G r nr. County*
City* 1+�oa�GSU, lit State*19 Zip Code �
* �� 1 County Parcel ID number �i iA�(� y _ i r✓
Lake*:1\L > rrY� �-� (e.g. Pin, Tax ID, TMS 1 000
Number...)
Subdivision 5_
,�� yam_ Lot(s) Plat Book/Page
To enter the Latitude and Longitude of the property, please use a
service/software to easily acquire the location information. Values Latitude (e.g. 35.12345)* 3�
should be provided in Decimal Degrees format (35.1245).
example service: http:/rtouchmap.comAatlong.html Longitude (e.g. -80.12345)*
IV. PROPOSED ACTIVITY
C
New/Modification of Existing Structure C Maintenance of Existing Structure
N New/Modification of Existing Shoreline Stabilization (~ Maintenance of Existing Shoreline Stabilization
C' New/Modification of Existing Structure & Stabilization C Maintenance of Existing Structure & Stabilizatic
(' Transfer of ownership i Other (please describe below)
Area over land (sq ft)
Area over water (sq ft)
Total Square Feet
Is Dock
Covered?
If of Slips
#of Jetports
Shoreline Stabilization (feet) Length of j ( Distance From Shoreline
I U orene �5 ;rf •�
Stabilization
Materials ��id:�(x-
Brief
Description rnrA l i P, 1c,
of the Activity lbouldcr Y -NL k5.
Describe Briefly the Existing a {��j. d cn -hG I n u at -
Structures Over Land and
Water (include sq ft)
Y. Dock OUR&- or Engineer
Name/Company
2 i` �. (�
Address � 3 U R Vc' r1 1 MXM Number (i l• 2
City{• ivI ! ` State { c.1
�i Z+pcade 5 EmaN� C nn nd 11� U i I C.U�-
�, �.
Vl. checklist of Required Doctnnents (tn hWude with llppication Sbmkdml
Ef Recent Survey (stamped/signed by a professional licensed surveyor showing the location of the existing or proposed
structure and/or surveyof the existing or proposed stabilization)
kAPP"cat'on
tos along property shoreline and photos of any existingstructures and/or stabil4ation m or near the water
fee (check only, payable to Duke Energy) [-T�gned User Agreement Letter
j] Applicable local, state. and federal permits O'flan and profile drawing showing all measurements and elevations
❑ Habitat Enhancement payment (f applicable)
VIL Approval Process
• Application is reviewed and determined if complete. Fields with an asterisk are required.
• If application is not complete or does not include all items and information listed in the checklist, the
application will be returned as incomplete.
• A Duke Energy representative will visit the site to conduct a visual inspection.
• Applicant will be notified of approval or denial.
• Applicant is to have the notice, to be supplied by Duke Energy upon application approval, posted and
must be viewable from water. The notice must remain posted until a representative inspects the
project and determines the project is complete and within the application specifications.
VUL Dkoctiorts by Road
Directions by � 1 r g, �
JZC
Road' /t
UL Application Sttbxdsslon
Please complete, print and sign this application. Then enclose all items from the checklist above In an envelope and
submit all the information to the address below.
Duke Energy Lake Services
Mail Code EC12Q print ham
526 S. Church St.
Charlotte, NC29202
I agree that the Information contained within is
Scanned by CamScanner
State of North Carolina
Department of Environment and Natural Resources
_D WWI% R Division of Water Resources
Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
Shoreline Stabilization Application Form
Three copies of the application (including attachments) and the application fee should be sent to:
Division of Water Resources
401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Applicant Information [15A NCAC 02H 0502(a)1
Owner Information
Name: C CC
Mailing Address:
t.l i -f-Lhx..l I
Telephone Number: Fax Number:
E-mail Address: C1 } c ,,; 1 1� Yl C, (� )-1�� �I�y� �;; ( C Ci-- _
2. Agent/ Contact Person Information
A signed and dated copy of the Agent Authorization letter (a form can be downloaded here:
http:/lwww.saw.usace army mil/Portals/59/docs/`regulatory/regdocs/Permits/SAMPLE AGENT AUTHO
RIZATION FORM 0f) must be attached if the Agent has signed this application form.
Name:
Company Affiliation: G T(.., CA re - -A i i C+v i
Mailing Address:
Telephone Number: '� �►- �'J6- �� 5 Fax Number:
E-mail Address: C,�' l : �c c,, 6' I/Yi U I; ( MC- l CC,rn
Person to receive the Certification Approval: ( ,yl 0 < ti
Project Information [15A NCAC 02H .0502(a) & (b)]
I. Attach a vicinity map (i.e. street map) clearly showing the location of the property with
respect to local landmarks such as towns, rivers, and roads.
2. Provide a detailed site plan showing property boundaries and proposed locations of
vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.),
rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and
FORM: SSGP 10-2013
Page 1 of 3
construction access corridors. You may use the diagram provided at the end of this
application form.
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of
some sort- a yard stick, shovel handle, etc.)
4. Location of the property (where work is to be conducted)
County:�'1 ?
- '��- �- � 1 Nearest Town: % "�
5 bdivision name or site address (include phase/lot number): c, 'KI .
�vt -14- 5 Sq
Directions to site - please include road names and numbers, landmarks, etc.: T4 C, #e"xl� R4L
Latitude lin decimal degrees) > L a _)I Lu ,
Longitude (decimal degrees) v • � � 51 CI
5. Describe the existing land use or condition of the site at the time of this application
(residential, undeveloped, etc): S C4-11-755(
6. Property size (acres): 1 • 755( Q
7. Lake/ river/ ocean adjacent to property: i�Lt_ r Y1
8. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary): . V' M VY✓ 1 ; n -N "- fC ► ( � rz r U✓�
w I I c ✓ c)1 !ter � ✓ v .
9. Will work be conducted from land?
From water? ❑
10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.)
below the normalpool lake level/ Normal Water Level in square feet or acres:
11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining
walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in
square feet or acres: 1 r'� r X / f
12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 j
feet landward to be impacted (number of trees, for instance): � ��s«yO474 )
L1 - fr`S w�i� 7/,�8/17
/A nt's Signature* Printed Name
(15A NCAC 02H 0502f 01 Date
Agent's signoture is valid only if on outhorizotion letter from the owner is provided.
FORM: SSGP 142013
Page 2 of 3
Scanned by CamScanner
Full Pond/
Norm LWj,tter e% jI
Shoreline
Lake
(At Full Pond/ Normal Water Level)
/8
/t8
PW
� Wft ow
/l �J MoV CIA -i r Prt I
/1'looresv� 4e, JV( ;-S,//l
7—At r*-Yptis 4a f ss
4CCes3
/68osp
Please approximately sketch the following information on this plan (provide dimensions for each
item, such as loft x 100 ft) *:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
I Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013
Page 3 of 3
dSJ+I dN11 C XVHd 6191 31LL —";'i:=,r`� "- - •••1•._•
...�.���� ^�if•'ffi �:s s�mm.�"ia--,� ��r�� �.asrs�f;r
b�
s ,
j-_. .. ... T m --... - `,• �=+ e� mar: e'-7s-_"-�+'-tea"-..
a»�z `\ / I8 rr? /rT i ri7 a S� a�.. I,.,,J'��I jrifY • .7'� Hca
ti
.�++.� y \, rq' N ..., .I f-. .,..� �.. � ` 1�a\ � 1 /f�'' •'+� I Y '� y 1 1 i/tea i� \it
40
�s
y t Xf
Xf
ICr-. .•s-�s.�I�- 'rl� � e ,�. � f �\ �, � I Lw 97 \ .a\ .ilr� \ ;y -'-3 ,�,
� , � • �h `Te�/!'_:y'ct°'JN /. / r �9 ' t 1 /f7 Jr1� / I I 1 ` ��'.:3�... �_LST�.
�^a• 1 p'9•y iY'Ti �fI . -yV �� 1 ' 71 — I t i. �.�.i- .^..ttT�.
_.. .0 ♦5�. i y3' ,I,' I /!� �,Y ti.y". � .m r� .'. ��... 'C•.tR
y �'yt;>C �"�J c4-�rsaiiiera'�a 'i�44�•rr'�-{y�� � ��:`=�a � _--._'. .-...� � ��..
— .s,,.m.. �., K„ �;:g" ^L•,!'r �8'�`�e _v+.. = •s�''a�'�.L�e"�3`"�'?i•� �sS'�¢�
�.-^i�e�-'•v.?aT;�� --,.tea=?'.�`,�' �.• ar��wv� � .".� �.
,-Jvvr,►c; iv,aps Page 1 of 1
Maps
L Ae Norman
off" c4evwQ
fn's
fast NatWnal ON F3�oke•c
o Go cel
Map data 02017 Google United States 200 ft
https://www.google-com/maps/@35.5743972,-80.9357941,17z 7/1 R/')(11 7
1V1ap%—a1U - rnnt your custom map
Page 1 of 1
0 0.5 Mi
0 2000 Ft
http://map-pass.mytopo-com/maps/Print local.asp?print=l&scale=5.00&laver=T�R(�,�I t= �i1Q��n,�
pip
I/
r
A
..
,t
A
a
f f
a
i
0 0.5 Mi
0 2000 Ft
http://map-pass.mytopo-com/maps/Print local.asp?print=l&scale=5.00&laver=T�R(�,�I t= �i1Q��n,�
DUKE ENERGY PRIVATE FACILITIES
"APPLICANT'S USER AGREEMENT"
(Fill in blanks with required information. Please Print)
Date 1-1
TO: Duke Energy
c/o Lake Services - EC 12Q
526 S. Church Street
Charlotte, NC 28202
RE: (Lake Name) Lc, Kc c ! V 0 C (n"Qn
(Lake Address) -� -� /�i U�� �G� �' i)
Mo b/e\)Vi I L-,
(Applicant's full name) Dooei CA 5 �L_ s i - � I hereby
agrees to comply with all requirements and conditions set forth by Duke Energy's Lake Services
(Duke Energy) office, and any federal, state or local agencies pertaining to our application to
construct and/or maintain
L�, I , Zc i h U on LakeIn addition,
1/we have read and agree to comply with Duke Energy's Shoreline Management Guidelines
(SMG) and understand that written authorization must be obtained from Duke Energy prior to
beginning any activity/construction within the Federal Energy Regulatory Commission (FERC)
Project boundary. The construction will be completed as described in the approved application
and within twelve (12) months following the date of approval by Duke Energy. An extension
will be considered for legitimate extenuating circumstances (as determined by the sole discretion
of Duke Energy) provided a specific timeframe in which to complete the construction, not to
exceed an additional 12 months, is provided in writing to Duke Energy by the applicant. Failure
to complete construction within the 12 -month build -out period or any Duke Energy approved
extension will require the applicant to file a new application that complies with the then -current
SMG. The new application filing will include any applicable fees and security deposits.
Vine attest to be the owner or lease holder of the tract of land immediately adjoining the Project
boundary where the proposed private facility is to be constructed.
Uwe agree to comply with all FERC orders (as modified or interpreted by FERC), with all other
applicable FERC Rules and Regulations implemented by Duke Energy, and with all rules or
regulations imposed on Duke Energy by any governmental agency.
Pagel of 5
Rev 11/9/2076
1/we understand the physical location of my/our lot in relation to the common property line with
Duke Energy, if any, the FERC Project boundary, and any deeded flood easements or required
building setbacks.
I/we understand that this lake was constructed as a working hydropower reservoir for the primary
purpose of producing cost-effective electric energy and that this remains as the lake's primary
purpose. Uwe understand the lake and its associated hydroelectric facilities are operated by Duke
Energy under the terms of a license issued by the FERC and there will be no change in hydro
project operations as a result of the construction and/or use of any facilities that Uwe may be
allowed to place within the FERC Project boundary or on any Duke Energy -owned property.
I/we understand during drought conditions Duke Energy may request reduced usage or
discontinued usage of any water withdrawal or related systems, until such drought conditions
improve. Failure to do so may cause possible removal of the system and/or any other permitted
facilities that Uwe may have, and any costs associated with removal of the facilities will be
assessed to the lot owner.
Ave understand lake levels will rise and fall over time in response to weather events and hydro
Project operations and Duke Energy does not guarantee an approved facility will always have
sufficient water depth to be accessible by boat or for other water depth related recreation
activities.
Uwe acknowledge Duke Energy provides no guarantee of any specific quantities (except those
identified in the FERC license) or quality of water in the lake.
Uwe understand the facilities to be installed and/or maintained are mylour property and Uwe
therefore agree to be fully responsible for the permitted reservoir use including maintaining
facilities in good repair. If the private facility is deemed unsafe by Duke Energy, Uwe agree to
repair or remove the private facility at mylour own expense and within the specified timeframe
set by Duke Energy.
Uwe understand Duke Energy approval of the requested reservoir use in no way constitutes
assignment of any interest in real property Duke Energy may have (i.e. land rights). The approval
is granted and maintained solely at Duke Energy's discretion. Uwe also understand the permitted
use may be revoked at any time by Duke Energy or its successors for any reason whatsoever. if
the approval is revoked, Uwe agree to remove the facility at mylour own expense within the
specified timeframe set by Duke Energy.
1/we understand ownership/interest in a Common Use Facility or residential marina eliminates
the option of having a separate private facility on any other owned or leased lot within the
affected subdivision.
Uwe understand this lake is open for use by the general public and that maintaining safe and
lawful public use is one of the primary lake management objectives ofDuke Energy.
Page 2 of 5
Rev 11iAM16
Uwe understand the use for which we are applying is a private use and it should not interfere with
the general public's safe and lawful use of the lake.
I/we understand lake use permit holders have the authority to prevent others from trespassing on
the facilities Ave have built IAve also understand Uwe, however, do not have any authority to
impede anyone from pursuit of the lawful public recreation enjoyment of FERC Project lands
and waters. Except as specified otherwise in the SMG, other Duke Energy documents (e.g.
Public Safety Plans), or a separate lease agreement, anyone may fish around/under facilities built
by others, may walk/wade/fish within the FERC Project boundary, boat in the lake's waters, etc.
without having to get anyone's permission to do so.
Uwe agree to fully disclose all information regarding the approved private facility to any
prospective buyer/leaseholder of the property and any new owner/leaseholder. Ave agree to
notify Duke Energy immediately of any saleltransfer of the property, including the name and
address of the new owner and to transfer the permit and/or Duke Energy lease to the new owner.
Uwe agree the adjacent Duke Energy Project property, if any, shall be used exclusively for non-
commercial recreational purposes and that Uwe shall not rent or otherwise allow third parties
(except for temporary use by guests, family members, and leaseholders of the residential
property) to use any facilities permitted to me/us by Duke Energy.
Uwe agree not to allow any use of the adjacent property, and will exercise due care and diligence
to prevent all other persons that are affiliated with my/our property (including invitees, family
members, guests, etc.), to violate an applicable federal, state or local law or regulation. Examples
include, but are not limited to nudity, illegal discharge of firearms or fireworks, controlled
substance abuse, public drunkenness, public urination or defecation, or other activities
determined to be a nuisance by law enforcement officials.
Uwe agree to exercise all care and due diligence to preserve and maintain the character of the
Duke Energy's adjacent property, if any. Uwe agree to comply with the Duke Energy vegetation
management requirements as stated in the SMG. Ave agree further to not allow sewage,
including discharge from septic tanks (or similar facilities) or boat holding tanks, garbage, trash,
or other waste material to be discharged or dumped into the reservoir, tributaries or adjacent
property -
Uwe understand that as an adjoining property owner Uwe can make no change in land form of
land within the FERC Project boundary or land owned by Duke Energy, if any, such as grading,
excavation or filling without prior written approval by Duke Energy.
Uwe agree for myself/ourselves, members of my/our family, guests and invitees that Uwe assume
all risks of personal injury or property damage incident to my/our occupancy and use of the
FERC Project boundary or land owned by Duke Energy, if any; including, but not limited to, any
personal injury or property damage which may be sustained as a result of flood waters or in
connection with the rise and fall of water in the reservoir as a result of floods or of the operation
of Duke Energy's hydroelectric facilities. Uwe as the adjoining property owner(s) further agree
Ave will indemnify, protect, defend, and save harmless Duke Energy from any and all loss, cost,
Page 3 of 5
Rev I JIW l I6
claims damages, expenses, judgments and causes of action for all injuries and damages sustained
by the members of my/our family, guests, and invitees arising or claimed to have arisen in
connection with their occupancy or use of the Duke Energy permitted facility(s).
Live agree if any action is taken by Duke Energy to enforce any provision, covenant or
agreement contained in this user agreement or Duke Energy SMG or if Duke Energy is required
to retain an attorney to enforce any provision, covenant or agreement contained in this user
agreement or SMG (including, without limitation, the payment of fees due hereunder or the
removal of an encroachment constructed in violation of this user agreement or SMG), then Duke
Energy shall be entitled to recover all of its reasonable costs associated with such an action,
including but not limited to, attorneys' fees and court costs incurred in such action and/or
enforcement.
Uwe understand certain activities specified in the SMG are prohibited because of environmental
concerns, boating capacity limitations, safety considerations and other reasons.
Live specifically waive any claim against Duke Energy for consequential damages arising out of
or relating to this application, Duke Energy's approval or denial of it, or subsequent revocation
of approval, and Uwe specifically understand and acknowledge that, because Duke Energy can
revoke the permitted use at any time, Uwe am/are not entitled to reliance damages.
Uwe understand the proposed facility will be used only for the purposes described in the
information submitted to Duke Energy and other appropriate governing bodies for approval.
Live understand every reasonable effort must be made to minimize adverse impacts on fish,
wildlife, and other natural resources.
Uwe understand trees and vegetation growing within the Project boundary play an important role
in the overall environmental condition of the lake. The ecological benefit the vegetation has on
the fish and wildlife habitat supports a sound and healthy lake environment. Live also understand
unauthorized removal of shoreline vegetation and/or disturbance of the shoreline buffer may
result in suspension or denial of lake use permitting requests and require me/us to re-establish the
vegetation, if the disturbance is found to be in violation of the state or county watershed buffer
regulations or Duke Energy's vegetation management requirements as stated in the SMG.
Uwe agree to maintain any prescribed mitigation activities that are required in order to gain
approval for facility construction, as long as the facility exists.
Live recognize Uwe have the continuing responsibility to ensure that the constructed facilities are
maintained in good repair, including, but not limited to maintenance of the facilities, and proper
erosion control within the permit area and along the shoreline, and agree to take all reasonable
steps necessary to meet this responsibility. Live agree to maintain all facilities within the Project
boundary and on Duke Energy -owned property, if any, in a sound condition and in a neat
appearance and pay all costs for said maintenance.
Page 4 of 5
Nav i VW2016
Uwe understand Duke Energy representatives may issue Stop Work Directives for any
violation(s) of the SMG or engagement in prohibited acts or activities on Duke Energy property,
if any, as specifically identified in the SMG. Ave understand persons found to be in violation
will be subject to Duke Energy sanctions which can include, but are not necessarily limited to: 1)
restoration of the impacted area at the person's expense; 2) loss of consideration of any future
lake use permitting activities for up to five years for improper vegetation removal or until
vegetation is satisfactorily re-established (even if there is a change in property ownership); 3)
revocation of a previously issued permit and loss of consideration of any future lake use
permitting activities and/or reinstatement of the revoked permit; 4) increase in fees; 5)
modification or removal of non -complying facilities; and/or 6) fiuther legal action being taken
by Duke Energy.
Uwe agree that if any historic or archaeological resources are discovered during construction of
an approved activity the applicant must stop work immediately and contact Duke Energy. Ave
understand that in the event that anyone discovers a potential site of archaeological or historic
significance including any gravesite within the Project, the individual must immediately notify
Duke Energy.
Uwe acknowledge Duke Energy has the right to charge reasonable user's fees for private use of
its property, if any, and the Project and failure to pay any applicable user's fees in a timely
manner can result in the suspension or cancellation of any previously approved lake use permit.
Uwe agree to notify Duke Energy when construction is completed and during the construction
period, Uwe will post the Duke Energy approval (to be provided by Duke Energy) at the job site
visible from the water's edge.
`Dou %s-rw; IcAe II
Applicihd Name
I 18 MON M PJ; r r.
Lake Street Address --
1' \OOr'tSyi Ile, HC. 28/17
City/StatetZip Code
Home Mailing Address
[A?) o Svi
I I APY& 41U17--
City/Stit Code
704 . (60.79413 770 �. ( GAO.7%M3
Preferred contactPhoneNumber Home Phone Number
d i 7 Ch WC."(-D%I,o�-YVl1A-i �. eooff\ 6 7
Email Address Date
Page 5 of 5
Rev i l"16