Loading...
HomeMy WebLinkAbout20170986 Ver 1_PCN Form Submission_20170808Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 8/8/2017 10:27:51 AM (Start Event) Accept by Carpenter,Kristi 8/8/2017 11:36:16 AM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: August 11, 2017 5:00 PM 8/8/2017 10:28 AM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 28, 2017 Ver 1.8 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx A. Processing Information County (or Counties) where the project is located:* Rowan Is this a NCDOT Project?* C� Yes �' No (NCDOT only) T.I.P. or state project number: WBS # 176P.9.R.62 (for f�1CDOT use only) � 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 14 - Linear transportation 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: I For the record only for Corps Permit: 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? * l" Yes C•' No C' Yes C•' No If so, attach the acceptance letter from rritigation bank or in-lieu fee program �' Yes C' No Acceptance Letter Attachment Qick the upload button or drag and drop files here to attach docurrent i SR 1221 - Bridge 236 - Division 9- STR - YD 05.pdf FlLE IYFE MJST BE FDF 1f. Is the project located in any of NC's twenty coastal counties?* C' Yes �' No B. Applicant Information 1a. Who is the Primary Contact?* Amy Euliss 1b. PrimaryContact Email:* aeuliss@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (336)747-7802 1d. Who is applying for the permit? � Owner rJ Applicant (other than owner) r AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT Division 9 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) Pat Ivey, P.E. Division 9 Engineer 2d.Address Street Address 375 Silas Creek Parkway Address Line 2 �Y Winston-Salem Fbstal / Zip Code 27127 2e. Telephone Number: (xxx)xxx-xxxx (336)747-7800 2f. Fax Number: (336)703-6693 (xxx)xxx-xxxx 2g. Email Address:* pivey@ncdot.gov 3. Applicant Information (if different from owner) 61.31 KB State / R-ovince / F�gion NC Country United States 3a. Applicant is: C' Agent C' Other If other please specify. 3b. Name: Amy Euliss 3c. Business Name: (if applicable) NCDOT Division 9 3d. Address Street Address 375 Silas Creek Parkway Address Line 2 �� Winston-Salem Fbstal / Zip Code 27127 3e. Telephone Number: (336)747-7802 (xxx)xxx-xxxx 3f. Fax Number: (336)703-6693 (xxx)xxx-xxxx 3g. Email Address:* aeuliss@ncdot.gov State / Rovince / F�gion NC Country United States C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Bridge to culvert replacement of Bridge No. 790236 on Bostian Road, Rowan County, NC. 1b. Subdivision name: (if appropriate) NA 1c. Nearest municipality/town:* Landis 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. Take I-40 West to I-85 South. Take I-85 South to Hwy 29 South. Take FMy 29 South turn left on Bostian Rd. The Bridge is located approbmately 0.63 miles south on Bostian Rd. 2. Project Identification 2a. Property Identification Number: (t�vc RN or parcel ID) 2b. Propertysize: (in acres) 0.5 acre 2c. Project Address Street Address Address Line 2 (7iy Fbstal / Zip Code 2d. Site coordinates in decimal degrees State / FYovince / F�gion Country i Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.539877 -80.588076 ex:34208504 -77.796371 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* Town Branch (Tributary to Cold Water Creek) 3b. Water Resources Classification of nearest receiving water:* WS-IV Surface Water Lookup 3c. What river basin(s) is your project located in?* i Yadkin-PeeDee RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The e�sting site is a bridge over Town Branch (Tributary to Cold Water Creek). The surrounding land is a mixture of agricultural, rural residential, and forested areas. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) aick the upload button or drag and drop files here to attach docurrent Figure 1_B-236_USGS.pdf 775.77KB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent Figure 2_B-236_Soils legend.pdf 795.41 KB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 145 LF perennial 4f. Explain the purpose of the proposed project: I Replacing a structurally deficient single span bridge with 2@ 11'x9' Cast-In-Place RCBC's on a 90-degree skew. 4g. Describe the overall project in detail, including the type of equipment to be used: Traffic will be detoured off-site and erosion and sedimentation control measures will be installed. Water will be diverted around the construction area and the old bridge will be removed. The proposed structure is a new culvert 2@ 11' X 9' RCBC cast in place on a 90-degree skew. The channel will then be excavated and realigned for low flow shaping, and a floodplain bench with stabilization will be established on the right bank. Water will be diverted around the work area during construction by installed impervious dikes upstream and downstream of the e�asting bridge. Equipment to be used includes a track hoe, dump truck, paving equipment, pumps, and various hand tools. 4h. Please upload project drawins for the proposed project. IGick the upload button or drag and drop files here to attach docurrent 790236 Complete Set.pdf 1.73M6 Fle type rrust be pdF 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* G Yes C' No f" Unknown Comments: Delineations have not been verified by USACE or NCDWR Sb. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary C' Approved C•' Unknown Corps AID Number: 6carrple: SAVw2017-99999 Sc. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Unknown Mulkey, inc (now Caylx) 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Jurisdictional verification not requested by the USACE and DWR 5d1. Jurisdictional determination upload C7ick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes �' No �' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. NA D. Proposed I m pacts I nventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands rJ Streams-tributaries r Open Waters r Pond Construction r Buffers 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. Row 1 Row 2 Row 3 3a. Site # - 3b.lmpact Reason for type impact 1 P N�p label (e.g. F2rrranent (P� or 13�ad Qossing 1) Terrporary (� 3c. Type of 3d. Stream 3e. Stream 3f. 3g. Stream 3h. Impact impact name Type Jurisdiction width length type Culvert Town Perennial Both Average 48 BranCh F�rennial (� or � � (linear feet) interrrittent (IfV� 1 P Bank Town N�p label (e.g. F�rrranent (P� or Stabilizatio Branch 13�ad Qossing 1) Terrporary (� n 1 T Dewatering Town fv�p label (e.g. F�rrrenent (P) or BranCh R�ad Qossing 1) Terrporary (� Perennial Both F�rennial (� or interrrittent (IfV� Perennial Both F2rennial (FH�) or interrrittent (IN� �` All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 121 3i. Total temporary stream impacts: 23 3i. Total stream and tributary impacts: 144 (feet) Average 11 (feet) Average 11 (feet) 3j. Comments: Of the 144 LF of stream impacts, 121 LF are associated with permanent impacts to the stream for the purpose of culvert installation and floodplain bench stabilization. The 23 LF of temporary impacts are associated with dewatering and work in the dry to install the bank stabilization. 73 (linear feet) 23 (linear feet) 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. , E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The proposed project will remove and replace a structurally deficient bridge and replace it with a double box culvert. Roadway approach work is minimized as much as is practical to reduce the overall project footprint. An off- site detour will be employed to avoid the need for a temporary parallel structure. The proposed culvert slope is 1.00%, matching the e�sting stream bed slope of 1.00%. Native bed material shall be placed between the sills in the culvert to provide a continuous lowflowchannel. Furtherjustification is provided in the stormwater management plan. Bank stabilization will be minimized to those areas where deemed necessary 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* i Erosion and sedimentation BMPs will be installed prior to construction. Water will be diverted around the work area to prevent sedimentation of downstream aquatic resources. Impacts will be minimized by strict enforcement of Best Management Practices for the protection of surface waters, restrictions against the staging of equipment in or adjacent to waters of the US and coordination (including a pre-construction meeting) with the Division Environmental Supervisor. I 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C•' Yes C' No 2c. If yes, mitigation is required by (check all that apply): r DWR �J Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank �7 Payment to in-lieu fee program r Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. fJ Yes 4b. Stream mitigation requested: (linear feet) 48 4c. If using stream mitigation, stream temperature: warm 4d. Buffer mitigation requested (DWR only): (squarefeet) 0 4e. Riparian wetland mitigation requested: (acres) 0 4f. Non-riparian wetland mitigation requested: (acres) 0 4g. Coastal (tidal) wetland mitigation requested: (acres) 0 4h. Comments Mitigation requested at 2:1 ratio. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? r Yes l" No 1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Stormwater Management Plan is attached. 1c. What is the overall percent imperviousness of this project? 50 % 1d. Who will be responsible for the review of the Stormwater Management Plan?* r Certified Local Government r DEMLR Stormwater Review r DWR 401 & Buffer Permitting Branch �J DWR Transportation Permitting Branch 2. Diffuse Flow Plan 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes r No If no, explain why: Project does not occur in Riparian Buffer River Basin. 5. DWR 401 Stormwater Review Sa. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached? C' Yes C' No Stormwater Management Plan Upload aick the upload button or drag and drop files here to attach docurrent 7) 236 SMP.pdf 60.13K6 file type rrust be pdf G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* �' Yes l" No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes �' No Comme nts: * i � 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes �' No 2b. Is this an after-the-fact permit application?* C' Yes C•' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): NA 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes �' No 3b. If you answered "no," provide a short narrative description. This project is a bridge to culvert project and will not increase access to nearby properties. 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. It is not anticipated that this project will generate any wastewater as it is a roadway project. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* �' Yes C' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes C•' No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is this a DOT project located within Division's 1-8?* C' Yes C•' No 5e. Will you cut anytrees in order to conduct the work in waters of the U.S.?* C� Yes C' No 5f. Does this project involve bridge maintenance or removal?* C� Yes C' No 5f(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. C� Yes C' No Link to the NLEB SLOPES document: http://sav�reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pctf If you answered "Yes" to 5f(1), did you discover any signs of bat use?* C' Yes �' No C' Unknown If yes, please show the location of the bridge on the permit drawings/project plans. Gick the upload button or drag and drop files here to attach docurrent 790236 Complete Set.pdf 1.73MB Fle rrust be FDF 5g. Does this project involve the construction/installation of a wind turbine(s)?"`* C' Yes C•' No If yes, please show the location of the wind turbine(s) on the permit drawings/project plans. qick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 5h. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* C•' Yes C' No If yes to either, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. Gick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* IField surveys on September 25, 2014 and November 12, 2014 for Schweinitz's sunflower (no species present). A bridge survey for NLEB August 4, 2014 (no bats observed). A nest survey for bald eagle was conducted on January 14, 2014. No eagles or eagle nests located. Project not within 0.25 of known NLEB roosting site. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* This bridge replacement project takes place in Rowan County which is not near any coastal or tidal habitat that would support EFH (i.e. salt marshes, oyster reefs, etc.). 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * See attached Historic Architecture and Landscapes "No Survey Required Form" and Archeological Resources "No Historic Places or Archaeological Sites present or Affected' form. 7c. Historic or Prehistoric Information Upload Gick the upload button or drag and drop files here to attach docurrent 5) 790236_AR15-01-0027effects.pdf I 6) 790236_14-11-0016_NoSurveyReq.pdf Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C•' Yes C' No 5.67M6 3.08MB 8b. If yes, explain how project meets FEMA requirements: The project is in a FEMA Detailed Study. The Project will be an MOA Type 2B. For more information please refer to the Culvert Survey Report 8c. What source(s) did you use to make the floodplain determination?* FEMA FIRM Maps. Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent Figure 3_B-236_Project Vicinity.pdf 482.04KB 9) 790236_CSR 2016_SF-790236_TOWN BRANCH SR1221_Sealed.pdf 1.99MB Br 236 cover letter.pdf 75.54K6 Fle rrust be Ft7F Signature * � By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Amy Euliss Signature �� �Gl�,�'S` Date 8/8/2017 Initial Review Is this project a public transportation project? C� Yes C' No Only change this if the project has been reassigned. Has this project met the requirements for acceptance in to the review process?* C� Yes C' No BIMS # Assigned* i 20170986 Version#� 1 Reviewing Office * Winston-Salem Regional Office - (336) 776-9800 Select Project Reviewer* � Dave Wanucha:eads\djwanucha