Loading...
HomeMy WebLinkAboutSW3170802_Stormwater Report_20170802L '' y - WEDDINGTON ROAD SUBDIVISION TOWN OF WEDDINGTON, NORTH CAROLINA PROJECT CALCULATIONS �,�U{ f 11111/,,, ♦�``�'(N CARd'''�. `♦♦ O ..�Np•4j4 �I �� _.••' cm ISAACS '•: Is GROUP, P.C. ENGIN _q -'-.LAND SURVEYIEERING dtNG - NO. C-1069 ; jlzb DTICAIL�- ♦�` �N CARS</'�'i I SEAL 026462 ' Bic o� I SAACSo CIVIL ENGINEERING DESIGN & LAND SURVEYING 8720 RED OAK BOULEVARD, STE. 420 CHARLOTTE, N.C. 28217 PHONE (704) 527-3440 FAX (704) 527-8335 NO. BY DATE REVISION RECEIVED AUG 0 2 2017 DENR-LAND QUALITY STORMWATER PERMITTING Project Narrative Project Description The project site is located in the Town of Weddington, Union County N.C. and is an approximately 50 acre parcel along Weddington-Matthews Road (S.R. 1344). The proposed project consists of thirtyfive (35) single family residential units, driveway access road and two (2) BMP's designed in accordance with Town of Weddington, NCDEQ and NCDOT requirements. The project area drains to unknown tributary that eventually flows to Sixmile Creek and is subject to the site specific Water Quality Management requirements prescribed by the N.C. Division of Environmental Quality (NCDEQ). NCDEQ requirements that have been met in the design of this project include the control and treatment of the difference in the stormwater runoff from the pre -development and post -development conditions for the one-year, 24-hour storm, with structural stormwater controls that promote infiltration of flows and groundwater recharge, if practicable based upon soil conditions. The rainfall amounts used in the analysis of this project were obtained from current data from NOAA. Structural stormwater controls have been provided to meet the following minimum requirements: a. Remove an 85 percent average annual amount of Total Suspended Solids b. Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours, for detention ponds. c. Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one-year 24-hour storm. d. Meet design of Stormwater Management Measures set forth in 15A NCAC 02H .1008. Additional stormwater management measures have been provided for this project as required by Town of Weddington to include the following: a. In accordance with Town of Weddington , the post developed discharge rate at the property boundary is less than or equal to the pre development rate for the (1,2,10,25,50 & 100) one, two, ten, twentyfive, fifty and one hundred year storm events. Natural Resources Inventory The parcel is covered in approximately 65% woods and 35% grass fields. Wetlands and Environmental Planning Group has performed a wetland and riparian buffer delineation and as a result identified two jurisdictional wetland, one along the east side and one on the west portion of the property and also identified two jurisdictional streams that bisect the property. Existing on-site slopes range from 2 to 20 percent on average and existing soil types on site are Cecil (Hydrologic Group B) and Helena (Hydrologic group C). Soil and Forestry Services of the Carolinas Summit has performed on-site geotechnical testing to establish hydraulic conductivity of on-site soils for suitability for infiltration devices along with the vertical location of Seasonal High Water Table at the location of the proposed BMP 1 &2. Existing and Proposed Drainage Patterns Proposed drainage patterns to the proposed on-site BMP are maintaining existing drainage patterns to the maximum extent practicable as need to create a balanced distribution of storm water flow thru BMP 1 and BMP 2 in a consistent manner with existing flows. Proposed BMP Summary Proposed BMP #1 (Sand Filter) BMP #2 (Sand Filter) has been designed per the NCDEQ requirements of the contributing drainage area (8.28 ac.) to meet 85% TSS removal, 25% TN and 40% TP removal targets. The hydraulic conductivity of the existing soils at the location of BMP #2 are _ cm/sec. and do not support infiltration measures. Additionally, the SHWT was established as required to establish the minimum vertical separations as outlined by the NCDEQ requirements. BMP #2 meets or exceeds the following requirements: • The control and treatment of the difference in the stormwater runoff from the pre -development and post - development conditions for the one-year, 24-hour storm. • Removal of an 85 percent average annual amount of Total Suspended Solids (85% TSS removal), 25% TN (min) and 40% TP (min) removals • Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours. • Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one-year, 24-hour storm • Meet design of Stormwater Management Measures set forth in 15A NCAC 02H .1008. • The post developed discharge rate at the property boundary is less than or equal to the pre development rate for the (1,2,10,25,50 & 100) one, two, ten, twentyfive, fifty and one hundred year storm events. Proposed BMP #2 (Wet Pond) BMP #2 (Wet Pond) has been designed per the NCDEQ requirements of the contributing drainage area (16.731 ac.) to meet 85% TSS removal, 25% TN and 40% TP removal targets The hydraulic conductivity of the existing soils at the location of BMP #2 are cm/sec. and do not support infiltration measures. Additionally, the SHWT was established as required to establish the minimum vertical separations as outlined by the NCDEQ requirements. BMP #2 meets or exceeds the following requirements: • The control and treatment of the difference in the stormwater runoff from the pre -development and post - development conditions for the one-year, 24-hour storm. • Removal of an 85 percent average annual amount of Total Suspended Solids (85% TSS removal), 25% TN (min) and 40% TP (min) removals • Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours. • Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one-year, 24-hour storm • Meet design of Stormwater Management Measures set forth in 15A NCAC 02H .1008. • The post developed discharge rate at the property boundary is less than or equal to the pre development rate for the (1,2,10,25,50 & 100) one, two, ten, twentyfive, fifty and one hundred year storm events. _ WEDDINGTON ROAD SUBDIVISION WEDDINGTON, NORTH CAROLINA STORM DRAINAGE CALCULATIONS Note: Refer to Construction Document sheet C6.0 for drainage area maps. //4/LU 1 / ri ci,�Ni �au�i i i icy uci n.y vola .�c� w� NOAA Atlas 14, Volume 2, Version 3 Location name: Matthews, North Carolina, USA* Latitude: 35.0321', Longitude: -30.74320 y�., . Elevation: 725.2 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T Parzybok, M.Yekta, and D. Riley NOAH, National Weather Service, Silver Spring, Maryland PF tabular I PF -graphical I Maps_&_aerials PF tabular AMS -based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Annual exceedance probability (1/years) Duration E::1/2 11100 �0�� 1/2 1 /5 1 /10 1 /25 1 /50 1 /200 1 /500 1 /1000 []F5 -min 5.42 6.68 7.44 8.28 8.82 9.31 9.76 10.3 10.6 (4-99-5 89) (6 14-7 27) (6 83-8 09) I (7 56-8 96) (8 02-9 55) 1 (8 44-10 1) (8 78.10 6) 1 (9 14-11 1) (938-11 5) 10-mrn 4.33 5.35 5.96 6.60 7.03 7.41 7.73 8.12 8.36 (3 98-4 72) 1 (4 91-5 82) 1 (5 46-6 47) (602-7 15) (6 38-7 61) 1 (6 70-8 02) 11 (6 96-8 38) 1 (7 24-8 81) 1 (740-909) 15 -min 3.63 4.51 5.02 5.58 5.93IF 6.24 IF 6.51 6.81 IF 6.99 (334-395) 1 (415-491) 1 (4.61-545) 1 (509-604) (539-642) 11 (564-676) 11 (586-705) 1 (607-7.39) 1 (619-761) IF 5.42 5.66 (483-588) (501-6.16) IF 3.89 4.14 11 11 (3 47-4 22) (3 66-4.50) IF IF 2.-2 2.58 -2 11 (2.1z -z sz) (z zs-z az) 0.645 0.854 0.999 1.19 1.33 1.47 1.62 1.82 1.99 3 hr (0 591-0 709) (0 780-0 938) (0 909-1 09) (1 07-1 30) (1 20-1 45) (1 32-1 60) (1 44-1 77) (1 60-1 99) (1 72-2 17) 0.388 0.515 0.603 0.718 0.807 0.898 0.993 1.12 1.23 6 -hr (0 356-0 426) (0 471-0 564) (0 550-0 660) (0 651-0 783) (0 728-0 879) (0 804-0 978) (0 880-1 08) (0 982-1 22) (1 06-1 33) 12 -hr 0.228 0.304 0.358 0.430 0.486 0.544 0.606 0.692 0.762 (0 210-0 251) (0 279-0 333) (0 327-0 392) (0 390-0 469) (0 437-0 529) (0 485-0 592) (0 534-0 659) (0 600-0 752) (0 652-0 828) 24 -hr 0.135 0.180 0.212 0.254 0.287 0.321 0.356 0.405 0.444 (0 125-0 146) (0 167.0 195) (0 196-0 230) (0 234-0 275) (0 264-0 310) (0 294-0 347) (0 325-0 386) (0 367-0 439)I (0 401-0 482) 0.079 0.105 0.123 0.147 0.166 0.185 0.205 0.232 0.254 2�Jay (0 074-0 086) (0 097-0 114) (0 114-0 133) (0 135-0 159) (0 152-0 179) (0 169-0 200) (0 186-0 222) (0 210-0 252) (0 229-0 277) 0.056 0.074 0.086 0.103 0.116 0.129 0.142 0.161 0.177 3�Jay (0 052-0 061) (0 068-0 080) (0 080-0 093) (0 095-0 111) (0 106-0 125) (0 118-0 139) (0 130-0 154) (0 147-0 175) (0 160-0 192) 0.044 0.058 0.068 0.081 0 090 0.101 0.111 0.126 0.138 4�lay (0 041-0 048) (0 054-0 063) (0 063-0 073) (0 074-0 087) (0 083-0 098) (0 092-0 109) (0 102-0 120) (0 115-0 136) (0 125-0 149) 0.029 0.038 0.044 0.052 0.058 0.064 0.070 0.079 0.087 7 -day (0 027-0 031) (0 035-0,040)11(0 041-0 047) (0 048-0 055) (0.053-0 062) (0 059-0 069) (0 065-0 076) (0 073-0 085) (0 079-0 093) 10�1ay 0.023 0.030 0.034 0.040 0.044 0.048 0.053 0.059 0.064 (0 022-0 025) (0 028-0 032) (0 032-0 037) (0 037-0 043)I(0.041-0 047) (0 045-0 052) (0 049-0 057) (0-054-0 063) (0 059-0 069) 20 -da 0.015 0.019 0.022 0.025 0.028 0.030 0.033 0.037 0.039 1(0015-0016)1(0018-0021)11(0021-0023) (0 024-0 027) (0 026-0 030) (0 028-0 032) (0.031-0 035) (0 034-0 039) (0 036-0 042) 30 -min -T-IF--3.21 3.64 4.13 4.47 4.78 5.07 (231-273) (295-349) (334-395) (3 77-4.47) (406-484) (432-517) (456-549) 60 -min 1.57 2.05 2.37 2.75 3.03 3 29 3.55 (1 45-1 71) (1 89-2 24) (2 17-2 57) {2 51-2 98) (2 75-3 28) (2-98-3 56) (3 20-3 85) 2 -hr ( 0.914 1.20 ) ( 1.40 1.64 1.82 1.99 -----]F I u https //hdsc nws.noaa.gou/hdsclpfds/pfds_pnntpage htm1?1 0 837-1 00) (1 10-1 32 1 27-1 53) (1 49-1 79) (1 64-1 98) (1 79-2 17) (1 94-2 37) at=35 0321&Ion=-80 7432&data=lntenslty&units=engllsh&series=ams 1/4 0.013 0.016 0.017 0.020 1�xo 22 0.023 0.025 0.027 0.029 3 0-day 012-0 013)' (0 015-0 017)I (0 016-0 019) (0 019-0 021) 023) (0 022-0 025) (0 023-0 027) (0 026-0 029) (0 027-0 031 45{!ay 0.011 0.013 I 0.014 0.016 0.017 0.018 0.020 0.021 0.022 (0 010-0 011) (0 012-0 013) (0 013-0 015) (0 015-0 017)I (0 016-0 018) (0 017-0 019) (0 018-0 021) (0 020-0 022) (0 021-0 024 60i1ay 0.009 0.011 0.012 IF 0.014 0.015 ) ( 0.016 0.017 0.018 0.019 (0 009-0 010) (0 011-0 012) (0 012-0 013) (0 013-0 014) (0 014-0 016 0 015-0 017) (0 016-0 018) (0 017-0 019) (0 018-0 021 Precipitation frequency (PF) estimates in this table are based on frequency analysis of annual maxima series (AMS) Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval The probability that precipitation frequency estimates (for a given duration and annual exceedance probability) w ill be greater than the upper bound (or less than the low er bound) is 5% Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values Please refer to NOAA Atlas 14 document for more information Back to Top 100.000 10.000 L r G a u G 1.000 C G c ° 0.100 C. V N 0.010 PF graphical AMS -based intensity -duration -frequency (IDF) curves Latitude: 35-03211, Longitude: -80.7432° 0.001 - 5 -min - 2 -day - 10 -min - 3 -day 15 -min - 4 -day - 30 -min - 7 -day - 60 -min - 10 -day -�- 2 -hr - 20 -day - 3 -hr - 30 -day - 6 -hr - 45 -day - 12 -hr - 60 -day -- 24 -hr E i= rC -0 -0 -0 -0 -0 -0 -0 -0-0 E 6" u1 p p N A 6 N NA V r� d O I I ,-i . i rn Duration 100-000 10-000 c Ui 1-000 c v c c ° 0.100 ti a v IL 0.010 0001, /5 1110 1/25 1/50 1/100 1/200 11500 1/1000 Annual exceedance probability (1/years) NOAA Atlas 14, Volume 2, Version 3 Created (GMT) Tue Jul 4 15 54:18 2017 Back to Top https //hdsc nws noaa gov/hdsc/pfds/pfds_printpage.html?lat=35.0321&Ion=-80 7432&data=intensity&units=english&series=ams Annual exceedance probabilitt (11years) 2 ® 5 - 10 25 50 100 - 200 - - 500 1000 Duration - 5 -min - 2 -day - 10 -min - 3 -day 15 -min - 4 -day - 30 -min - 7 -day - 60 -min - 10 -day -�- 2 -hr - 20 -day - 3 -hr - 30 -day - 6 -hr - 45 -day - 12 -hr - 60 -day -- 24 -hr 2/4 HYDROLOGIC CALCULATIONS FOR CLOSED STORM SYSTEM DRAINAGE DESIGN Weddington NOTE• 10 -YR. INTENSITY OF 7 44 USED FOR CLOSED DRAINAGE SYSTEM AND 8 28 USED FOR 25 -YR INTENSITY IN CULVERT AND ROAD CROSSING LOCATIONS Storm Drainage Hydrology Structure Drainage Area (acres) Accumulated Drainage Area Runoff Coefficient Intesity Flow (cfs) Accumulated Contributing Flow (cfs) Structure Network #1 CB 1G 0.11 Oil 065 8 28, 0.59 0.59 CB 1F 024 0.35 0.75 7.44 1-34 1601 1G & 2A CB 1E 0.11 046 0.75 7.44. 10.51 1662 1F CB 1D 0.14 0.60 075 7.44 0.78. 18.75 1E & 3A CB 1C 0.09 0.69 0.75 8.281 0 55 34.30 1D, 4A & 6A CB 1B 0.11 0.80 0 65 7.44 `0.53 34.83 1C FES 2A 3.44 344 0.55 7.44 14.08 1408 CB 3A 0.25 0.25 0.65 8.28 1.35~ 1.35 CB 4D 0.25 0.25 0.65 8 28 i.351 1.35 CB 4C 0.21 046 075 7.44 1-17, 2.52 4D CB 4B 0.38 0.84 0.50 744--- 1.41 3.93 4C CB 4A 0.09 0.93 075 7.44 i 0.50 6.32 4B & 5A CB 5A 0.35 0.35 0.65 8 28 , 1.88 188 FES 6A 2.12 2.12 0.55 7.44 8 68; 8.68 Network #1 Tota l• 34.83 HYDROLOGIC CALCULATIONS FOR CLOSED STORM SYSTEM DRAINAGE DESIGN Structure Drainage Area (acres) Accumulated Drainage Area Runoff Coefficient Intesity Flow (cfs) Accumulated Contributing Flow (cfs) Structure Network #2 CB 7L 0.22 0.22 0 65 8.28 1.18 1.18 CB 7K 0.61 0.83 060 7.44 2.72, 3.91 7L CB 7J 0 49 1.32 060 7.44 2:19 15.25 7K, 8A & 9A CB 7H 0.44 1.76 0.60 7.44 196 1721 7.1 CB 7G 1.05 2.81 0.60 744 4 69 28.26 7H & 10A CB 7F 083 364 0.60 828 412 32.38 7.1 CB 7E 0 12 3 76 0.65 7.44 0 58 4065 7F & 11A CB 7D 0.09 3 85 075 7.441,--- 0.50 4115 7E CB 7C 024 4.09 0.75 7.441-- .44 1.34 42.49 7D DI 7B 0.22 4.31 0.50 7.44 0 82 43.31 DI 8A 220 220 050 744 r _ 8 18. 8 18 CB 9A 0.18 0.18 0.65 8.28 0 97 0.97 DCB 10A 1.28 1.28 0.60 828 6 36 6.36 FES 11D 0.78 0.78 0.55 7.44 3:19 3.19 CB 11C 026 104 0.65 8.28 1:410 459 11D CB 11B 0 18 1.22 0.651 7.44 _ _0.87' 636 11C & 12A CB 11A 0.08 1.30 065 7.44 _ _0:39 7.69 11B & 13A FES 12A 0.22 022 055 7.44 , 0, 9d 090 FES 13A 023 0.23 0.55 7.44 0.94 0.94 Network #2 Total. J _43;31 HYDROLOGIC CALCULATIONS FOR CLOSED STORM SYSTEM DRAINAGE DESIGN Structure Drainage Area (acres) Accumulated Drainage Area Runoff Coefficient Intesity Flow (cfs) Accumulated Contributing Flow (cfs) Structure Network #3 FES 14B 024 0.24 050 423 • 0.51 18 42 17A DI 17D 7.56 756 0.50 4.231 1.5.99 15.99 JB 17C 0.00 7.56 060 423 000 15 99 17D JB 17B 000 7.56 0.60 4.23. 0.00 15.99 17C FES 17A 0.91 8.47 050 4.23 1.92 17.91 17A HW 15B 19.59 19.59 050 4.90 48.00 4800 HW 16D 15.60 15.60 050 3.72 29 02 29 02 JB 16C 0.00 15.60 0.50 3.72 0.00 0.00 16C JB 16B 0 15.60 0.50 372. 0 00 0.00 16B Page 1 R io®®rter%r%r* my t "Nv■ Line Inlet Gnd/Rim Invert Invert Line Line Line Line n-val Line Known Flow Capac Vel HGL HGL Dn No. ID EI Up Up Dn Size Length Slope Type Pipe ID Q Rate Full Ave Up (ft) (ft) (ft) 70250 (in) (ft) M (cfs) (cfs) (cfs) (ft/s) (ft) (ft) 15 2508 100 Cir 0 012 3A 1 35 1 35 700 242 70321 70334 14 CB 3A 70676 70275 13 FES 6A 70599 70420 70325 18 3815 250 Cir 0 012 6A 868 868 1799 806 70534 70398 12 FES 2A 70833 70600 70452 24 18406 080 Cir 0 012 2A 1408 1408 21 96 656 70735 70576 11 CB 1G 70902 70527 70503 15 2508 097 Cir 0 012 IG 054 054 689 1 64 70556 70576 10 CB 1F 70903 70432 70325 24 15291 070 Cir 0 012 1F 1 34 1596 2050 690 70576 70458 9 CB 1E 70800 70305 701 99 24 15222 070 Cir 0 012 1E 061 1657 2050 699 70452 70335 8 CB 1D 70684 701 79 69881 24 8429 352 Cir 0 012 1D 078 1870 4600 761 70334 70020 7 CB 5A 70926 70551 70504 15 2345 200 Cir 0 012 5A 1 88 1 88 989 294 706061 70585 6 CB 4D 71420 71037 71012 15 2464 1 00 Cir 0 012 4D 1 35 1 35 700 343 71082 71055 5 CB 4C 71418 70992 70756 15 15734 1 50 Cir 0 012 4C 1 17 252 857 417 71055 70816 4 CB 4B 711 17 70736 70504 15 16069 144 Cir 0 012 4B 141 393 840 469 708 16 i 70585 3 CB 4A 70926 70484 70325 15 16467 097 Cir 0 012 4A 050 631 688 614 70585 70419 2 CB IC 70735 69821 69796 30 2520 1 00 Cir 0 012 1C 056 3425 4443 861 70020 69976 1 CB 1113 707 35 69776 69689 30 12450 070 Cir 0 012 1B 053 3478 3707 826 69976 69889 Number of lines 14 Date 6/10/2017 Project File Storm Network -1 stm NOTES —Critical depth Page 1 RA%i®0wa%r+ Line Inlet Gnd/Rim Invert Invert Line Line Line Line n-val Line Known Flow Capac Vel Ave HGL Up HGL Dn No. ID EI Up Up Dn Size Length Slope Type Pipe ID Q Rate Full (ft) (ft) (ft) (in) (ft) M (cfs) (cfs) (cfs) (ft/s) (ft) (ft) 18 DCB 10AF09 70284 70235 15 2450 200 Cir 0 012 10A 636 636 989 609 70386 70332 17 FES 12A 70768 70642 15 3339 376 Cir 0 012 12A 090 090 1357 203 708 05 70719 16 FES 11D 70800 70685 15 2433 472 Cir 0 012 11D 319 319 1519 459 70872 70752 15 CB 11C 71034 70665 70642 15 2312 1 00 Cir 0 012 11C 140 459 700 539 70752 70719 14 CB 11B 71034 70622 70448 18 13417 1 30 Cir 0 012 11B 087 636 1297 591 70719 70528 13 CB 11A 70835 70428 70271 18 10430 1 50 Cir 0 012 11A 039 675 1393 659 70528 70345 12 CB 9A 711 36 70763 70734 15 2362 124 Cir 0 012 9A 097 097 778 201 70802 70825 11 DI 8A 711 59 70838 70734 18 14892 070 Cir 0 012 8A 818 818 952 595 70949 70841 10 CB 7L 71504 711 28 71079 15 2445 200 Cir 0 012 7L 1 18 1 18 989 261 711 71 I 711 39 9 CB 7K 71504 71059 70736 15 21504 1 50 Cir 0 012 7K 272 390 857 446 711 391 70825 8 CB 7J 711 36 70684 70600 24 14039 060 Cir 0.012 7J 219 1524 1898 659 70825 70735 7 CB 7H 70975 70580 70201 24 18970 200 Cir 0 012 7H 1 96 1720 3465 735 70729 70332 6 CB 7G 70657 701 51 70072 30 131 93 060 Cir 0 012 7G 469 2825 3441 759 70332 70245 5 CB 7F 70696 70052 70027 30 2460 1 00 Cir 0 012 7F 412 3237 4443 797 70245 70219 4 CB 7E 70696 70007 69926 30 6773 1 20 Cir 0 012 7E 058 3970 4867 1000 70219 70098 3 CB 7D 70814 69876 69726 36 30039 050 Cir 0 012 7D 050 4020 51 09 788 70082 69926 2 CB 7C 70791 69706 691 70 36 17875 300 Cir 0 012 7C 1 34 41 54 12514 11 89 69916 69289 1 DI 7B 69700 68971 68950 36 4279 049 Cir 0 012 7B 082 4236 5062 794 691 83 691 62 Number of lines 18 Date 6/25/2017 Project File Storm Network -2 stm NOTES " Critical depth Page 1 RA%sDawr%r# Line No. Inlet ID Gnd/Rim EI Up Invert Up Invert Dn Line Size Line Length Line Slope Line Type n-val Pipe Line ID Known Q Flow Rate Capac Full Vel Ave HGL Up HGL Dn (ft) (ft) (ft) (in) (ft) M (cfs) (cfs) (cfs) (ft/s) (ft) (ft) 69483 36 8730 387 Cir 0 012 15B 4408 4408 14209 797 700 37 / 69705 8 HW 15B 70437 69821 7 FES 14B 70532 70299 701 67 24 9409 1 40 Cir 0 012 14A 1979 1979 2904 789 70459 70307 6 HW 16D 71204 70800 70755 30 2261 200 Cir 0 012 16D 2902 2902 6283 1003 70984 70874 5 JB 16C 71333 70341 701 58 30 36528 050 Cir 0 012 16C 000 2902 31 45 591 70660 70504 4 JB 16B 711 38 701 48 701 00 30 9532 050 Cir 0 012 16B 000 2902 31 53 591 70450 70409 3 DI 17D 71417 70985 70925 24 10051 060 Cir 0 012 17D 1561 1561 1898 664 711 27 71063 2 JB 17C 71786 70905 70773 24 21908 060 Cir 0 012 17C 000 1561 1902 664 71047 709 11 1 JB 17B 71527 70752 70679 24 104 14 070 Cir 0 012 17B 000 1561 2052 654 70894 70821 Project File Storm Network -3 stm Number of lines 8 Date 6/25/2017 NOTES ** Critical depth Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc RPM Tuesday, Jul 4 2017 Circular Culvert (STORM RUN 14) Invert Elev Dn (ft) = 701.67 Calculations Pipe Length (ft) = 94.09 Qmin (cfs) = 19.76 Slope (%) = 1.40 Qmax (cfs) = 19.76 Invert Elev Up (ft) = 702.99 Tailwater Elev (ft) _ (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 19.76 No. Barrels = 1 Qpipe (cfs) = 19.76 n -Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 6.64 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 7.35 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 703.47 HGL Up (ft) = 704.59 Embankment Hw Elev (ft) = 705.89 Top Elevation (ft) = 709.46 Hw/D (ft) = 1.45 Top Width (ft) = 50.00 Flow Regime = Inlet Control Crest Width (ft) = 10.00 Eley (fl) <Name> Hw Depth (R) 71000 70900 70800 707 W 70600 70500 70400 70300 70200 701 00 70000 0 1 Grcula, Culvert HGL Embank 701 001 501 4.01 3A1 201 1 01 001 -039 -1 99 299 Reach (1l) RPM 701 001 501 4.01 3A1 201 1 01 001 -039 -1 99 299 Reach (1l) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Circular Culvert (STORM RUN 15) Invert Elev Dn (ft) = 694.83 Calculations Pipe Length (ft) = 87.30 Qmin (cfs) Slope (%) = 3.87 Qmax (cfs) Invert Elev Up (ft) = 698.21 Tailwater Elev (ft) Rise (in) = 36.0 Shape = Circular Highlighted Span (in) = 36.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n -Value = 0.012 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 707.63 Hw/D (ft) Top Width (ft) = 50.00 Flow Regime Crest Width (ft) = 10.00 Tuesday, Jul 4 2017 = 44.08 = 44.08 _ (dc+D)/2 = 44.08 = 44.08 = 0.00 = 6.82 = 8.09 = 697.41 = 700.37 = 701.71 = 1.17 = Inlet Control Hw Depth (tt) Cccdar Cdvert HGL Embank Reach (ft) 979 779 579 379 1 79 -021 -221 A21 -621 TR55 Tc Worksheet Mod Rational <Name> Time of Concentration to HW -15B Description A► B Sheet Flow Wetted perimeter ((ft)) = 18.44 Manning's n -value = 0.240 0.011 Flow length (ft) = 150.0 0.0 Two-year 24 -hr precip. ((in)) = 3.12 0.00 Land slope (%) = 2.50 0.00 Travel Time (min) = 18.28 + 0.00 Shallow Concentrated Flow 0.0 0.0 Flow length (ft) = 234.00 0.00 Watercourse slope (%) = 3.79 0.00 Surface description = Unpaved Paved Average velocity (ft/s) = 3.14 0.00 Travel Time (min) Channel Flow Hydraflow Express by Intelisolve C Totals 0.011 0.0 0.00 0.00 + 0.00 = 18.28 0.00 0.00 Paved 0.00 = 1.24 + 0.00 + 0.00 = 1.24 X sectional flow area ((sqft)) = 18.00 0.00 0.00 Wetted perimeter ((ft)) = 18.44 0.00 0.00 Channel slope (%) = 2.26 0.00 0.00 Manning's n -value = 0.035 0.015 0.015 Velocity (ft/s) = 6.30 0.00 0.00 Flow length (ft) = 869.0 0.0 0.0 Travel Time (min) = 2.2999769.00 0 + 0 = 2.30 TotalTravel Time, Tc.............................................................................. 22.00 min TR55 Tc Worksheet Mod Rational <Name> Time of Concentration (TC) to DI -16C Description A B Sheet Flow Wetted perimeter ((ft)) = 0.00 Manning's n -value = 0.240 0.011 Flow length (ft) = 150.0 0.0 Two-year 24 -hr precip. ((in)) = 3.12 0.00 Land slope (%) = 1.00 0.00 Travel Time (min) = 26.38 + 0.00 Shallow Concentrated Flow 0.0 0.0 Flow length (ft) = 1358.00 0.00 Watercourse slope (%) = 1.30 0.00 Surface description = Unpaved Paved Average velocity (ft/s) = 1.84 0.00 Travel Time (min) Channel Flow Hydraflow Express by Intelisolve C Totals 0.011 0.0 0.00 0.00 + 0.00 = 26.38 0.00 0.00 Paved 0.00 = 12.30 + 0.00 + 0.00 = 12.30 X sectional flow area ((sqft)) = 0.00 0.00 0.00 Wetted perimeter ((ft)) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0 + 0 + 0 TotalTravel Time, Tc.............................................................................. 0.00 39.00 min TR55 Tc Worksheet Mod Rational <Name> Time of Concentration (TC) to DI -17D Description A C Sheet Flow X sectional flow area ((sqft)) = 0.00 Manning's n -value = 0.240 0.011 Flow length (ft) = 150.0 0.0 Two-year 24 -hr precip. ((in)) = 3.12 0.00 Land slope (%) = 1.50 0.00 Travel Time (min) = 22.43 + 0.00 Shallow Concentrated Flow 0.00 0.00 Flow length (ft) = 835.00 0.00 Watercourse slope (%) = 1.93 0.00 Surface description = Unpaved Paved Average velocity (ft/s) = 2.24 0.00 Travel Time (min) Hydraflow Express by Intelisolve C Totals 0.011 0.0 0.00 0.00 + 0.00 = 22.43 0.00 0.00 Paved 0.00 = 6.21 + 0.00 + 0.00 = 6.21 Channel Flow X sectional flow area ((sqft)) = 0.00 0.00 0.00 Wetted perimeter ((ft)) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0 + 0 + 0 TotalTravel Time, Tc.............................................................................. 0.00 29.00 min WEDDINGTON ROAD SUBDIVISION WEDDINGTON, NORTH CAROLINA DROP INLET CALCULATIONS DROP INLET CALCULATIONS Rational Method Project: Weddington Road Design Objective: PROVIDE 6" FREEBOARD AT INLET FOR DESIGN STORM (10 YR) A Structure Area Coeff. Tc (t) Intensity ( i) Flow Orifice Weir Depth of Water Acerage (Min) (in/hr) ds (ft) ft) over D.I. (ft) 7/4/2017 B Rim EI. (ft) A+B Water EI H.P. EI. (ft.) (ft) D1 -7B 0.22 0.5 5.00 7.44 0.82 0.00 0.08 0.08 697.00 697.08 698.50 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Calculations\16240-Dl.xls O.K. DROP INLET CALCULATIONS Project Weddmgton Road Subdivision Design ObjectiveThe flow capacity of a slab type inlet (NCDOT STD.)* with 10" (height of opening) and 14" (height to top of slab) (DI -17D) Q (10) = 15 99 cfs See previous runoff calc's Slab Type Drop Inlet for 24" RCP Top of Slab Elevation= 714.17 10" opening w/ 4" thick slab Opening Elevation= 713.00 General Equation for a broad -crested weir for calculating the max. flow capacity, Q=CLH^1.5 1) Calculating flow using 10" of head Difference in Head= 200 A_ 713.00 B 714.17 C= 3.087 C= 3.087 L= 4.00 L= 2.67 H= 0.83 H= 083 Q= 9.39 Q= 6.27 Q(total)= 3133 31.33cfs > 15 99 cfs, therefore O K. * See attachment for description and dimensions Opening Elevation= 713.00 Top of Slab Elevation= 714.17 High Point Elevation= 715.00 Freeboard = 0.83 > 0.5 ft therefore, OK P \Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Calculations\16240-DI As 7/4/2017 1111 EDDINGTON ROAD SUBDIVISION WEDDINGTON, NORTH CAROLINA FES CALCULATIONS � J .ter 1.FJ,Iir . � �'�i� •, ors � ' r �ri { dp �� �� Iia•® tel• `t7RQ�ll{O�a I�ltll_ r!•{� i //� ��O fel al I �mI lIRIAmlpquaai �IRn)l��>O tln[IIlmi�im{ lu" mwuatmtn�>araasii{.m „�fsi��{�nlF_Q SI'�IQQ ' attat�a� rm ®III m v ,1►Y' uau oata�av�um.rtunll� ncmmttmltmmmmlw>r»r-� • �( mar ` .i�i'�� mrtai• _ ire Rm.�{imem'li� HUI �Quwmuluntuni o� r • Q,�u �� . Imu�ananx{umounwaant® � �Isa• ar���s - ' mmla RSEEN" Rltma�1101 l(Cutnnttattta mR��sutmu�Rt nlpAtauattttatatl>.rr (Quuan �mR �• �� ` �-a���► . Rnt®{In{al{w®lIR ICIAtt�OIQtvInQ{ :R {Im Q�apjr��//� e�l�t�{ainmwuntilwuirmatttttt� o o�{sas�s 19 � ,r iterntt►.{►aa i . . d (in.) Q (cfs) Description of Apron 1 BMP #1 36 33.80 » 161 x1 9'W x 18"D CLASS B APRON 2 BMP #2 42 56.76 » 221 x 255W x 18"D CLASS B APRON » P \Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Calculations\16157-fes As THE ISAACS GROUP FLARED END SECTION RIP RAP APRON DESIGN WEDDINTON ROAD SUBDIVISION UNION COUNTY, NORTH CAROLINA Minimum Tailwater Conditions D = OUTLET PIPE DIAMETER (In) Do =OUTLET PIPE DIAMETER (ft) La = LENGTH OF APRON (ft) [FROM FIGURE 8-1, CHARLOTTE STORMWATER DESIGN MANUAL] (MINIMUM La = 10) W = WIDTH OF APRON (ft) [W = Do + Lj Q = FLOW (cfs) d50 = STONE SIZE (ft) [FROM FIGURE 8-1, CHARLOTTE STORMWATER DESIGN MANUAL] "MIN APRON SIZE NOT TO BE LESS THAN 8'Wx11'Lx18"D CLASS B APRON ®®--- "MIN APRON SIZE NOT TO BE LESS THAN 8'Wx11'Lx18"D CLASS B APRON 1 • •. , , ;e:�ii�ii���ii�� I��I=�1/i11�..�11/11� . / . � . -/I1 • :� ,� WIN IIIIIIlIIIIII1II1II"III1II111IlI llIlI ll 111110.1I111l.1111i11lI■• �� �► �'::,; )1. {If „III it , �ri�, , unnnnlmwtl .niiuuuw�ii�l r ��� �i��' /)#� ill j II!I � lii 11 I I'�h � Illllllllllllllllltll I1III IIiilllill� �Ii■ �■ I 11 111111 1 / 1 1 d 1 II1111111i1111111 IIIIt1I1.III1111111111114MAI17•11.►. =i. �11 I�i!/ i,ji�IIIIIIIII�111� I I uuw uuuulluulnulluljuuu5lutmrJll . .�.:.fi�':j=:��S, ji191YWlIP�� i::iSli:lilli!i!!!II!S:ji.... i li` �nmiiiiil7liC�!!!H iililill!T.' mh���iliiiiiiaiGililYY1 IIIIIiIiiiifiiiiE111(SHION��■�llYi� �q�ImI1�B�9 3 5 10 d (in.) Q (cfs) I FES 14 24 18.42 II FES 15 36 48.00 IIl FES 16 30 29.02 20 50 100 200 Discharge (0/sec) Maximu Tailwater Condi II III Description of Apron » 11'L x 8'W x 18"D CLASS B APRON u 13'L x 8'W x 18"D CLASS B APRON » 13'L x8'W x 18"D CLASS B APRON P•\Active Projects\Hopper Comm unities\Weddington Matthews Rd Dev 16157\Engineering\Calculations\16157-fes.xls THE ISAACS GROUP FLARED END SECTION RIP RAP APRON DESIGN WEDDINGTON ROAD SUBDIVISION UNION COUNTY, NORTH CAROLINA Maximum Tailwater Conditions D = OUTLET PIPE DIAMETER (in) Do =OUTLET PIPE DIAMETER (ft) La = LENGTH OF APRON (ft) [FROM FIGURE 8-2, CHARLOTTE STORMWATER DESIGN MANUAL] (MINIMUM La = 10) W = WIDTH OF APRON (ft) [W = Do + 0.4 La] Q = FLOW (cfs) d50 = STONE SIZE (ft) [FROM FIGURE 8-2, CHARLOTTE STORMWATER DESIGN MANUAL] *MIN. APRON SIZE NOT TO BE LESS THAN 8'Wx10'Lx18'D CLASS B APRON or, . 11 • 1 ----- *MIN. APRON SIZE NOT TO BE LESS THAN 8'Wx10'Lx18'D CLASS B APRON WEDDINGTON ROAD SUBDIVISION WEDDINGTON, NORTH CAROLINA SWALE CALCULATIONS -' North American Green Erosion Control Materials Design Software was used to determine the following: • The normal depth of the swale under poorly maintained grass depth conditions. The vegetation stability when the grass is properly maintained by a homeowner. • The temporary liner stability before the site is stabilized. The drainage areas and swale slopes were determined from the construction drawings. The retardance class was changed to D (grass depth 2-6 inches) for a properly maintained grass swale to determine vegetation stability. The normal water depth was determined by using a unreinforced vegetation matting type with a retardance class of B (grass depth 12-24 inches) for an under or none maintained grass swale for use with the freeboard calculations. Then the swale was changed to unvegetated with a S75 temporary liner to determine liner stability. Swales that were unstable for any reason either were widened and/or lined with different temporary liners. If the calculations of the temporary linear showed a velocity of less than 2 fps during a 10 year storm event then the temporary linear was removed. "Each swale cross section was analyzed using the largest contributing flow" SWALE CALCULATIONS Weddington Road Subdivision NOTE: 10 -YR. INTENSITY OF 7.44 USED FOR SWALE Storm Drainage Hydrology Swale toDrainage Structure Area (acres) Runoff Coefficient Intesity I Flow (cfs) SLOPE TYPE LINER SWALE TO FES 2A 2A-1 1.44 0.55 7.44 5.89 2.00% A S75_. 2A-2 1.72 O.SS 7.44 7.04 5.50% B SC -150 2A-3 2.52 0.55 7.44 10.31 2.00% A - S75 2A-4 0.331 0.551 7.441 1.35 2.50% A 575 h SWALE TO FES 6A 6A-1 0.95 0.56 7.44 3.96 5.00% A 'STS 6A-2 1.35 0.54 7.44 5.42 2.00% A 6A-3 0.77 0.55 7.44 3.15 5.25% A i S75 SWALE TO DI 8A 8A-1 0.21 0.50 7.44 0.78 6.50% A'� 8-A2 1.71 0.5 7.44 6.36 2.50% A = S75 8A-3 2.2 0.5 7.44 8.18 2.00% A SWALE TO DI 7B 76-1 0.221 0.501 7.441 0.821 2.00%1 A SWALE TO BMP 2 2A 1.33 0.55 7.44 5.44 6.00% B SC150_ 2B 1.99 0.55 7.44 8.14 3.00% A 2C 0.55 0.55 7.44 2.25 2.00% A SWALE TO FES 11D 11D-1 0.781 0.601 7.441 3.481 3.00%1 A ;S75 SWALE TO FES 12A 12A-1 2.321 0.401 7.441 6.901 1.50%j A Iv: ,S75. SWALE TYPE WITH MAXIMUM SLOPE AND FLOWS USED IN SIZING SWALE. SWALE:TYPE}A `TYP,E B w S1-3,& B -� -3 (7yFPE -,6) RDbi_STATION/REACH _ _ ITO STA HYDRAULIC RESULTS Discharge fcfsl Peak Flow Period hrs Velocity (fps) Area (sq ft) Hydraulic Radius ft Normal Depth ft P03 01 162 1 634 068 1 116 LINER RESULTS EA _252 _ DESIGN FREQUENCY Unreinforced Vegetation (n=0100) S = 0 0200 1 L Bottom J 1 30 Width =200 ft 30 Not to Scale Matting Type Reach Stability Analysis Staple Pattern Vegetation Characteristics Permissible Calculated Safety Factor Remarks Shear Stress Shear Stress (psf) (psf) Phase Class Type Density Straight Unreinforced Vegetation B Bunch 75-95% 573 1 45 396 STABLE Soil Clay Loam 0 050 0 018 284 STABLE �---/PE- Al OJECT NO ROM STATION/REACH ___ ___ _ _ ITO STATIO_WREACH HYDRAULIC RESULTS Discharge fcfsI Peak Flow Velocity (fps) Period (hrsl Area (sq ft) Hydraulic Radius(ft Normal Depth ft 103 01 395 261 042 066 LINER RESULTS EA 252_ __ _ _ __'IDESIGN FREQUENCY_ Unrernforced Vegetation (n=0 030) S = 0 0200 1 L Bottom 1 30 Width =200 ft 30 Not to Scale Reach Matting Type StabilityAnalysrs Vegetation Characteristics Permissible Calculated Safety Factor Remarks Shear Stress Shear Stress (psf) (psf) Staple Pattern Phase Class Type Density Straight Unfeinforced Vegetation D Bunch 75-95 4 333 082 406 STABLE Soil Clay Loam 0 050 0111 045 UNSTABLE �D ALE :1�- 3 (TYPE - A� RONl STATION/REACH_.- _ JTO STATION/REACH HYDRAULIC RESULTS Discharge fcfsl Peak Flow Period (hrsl Velocity (fps) Area (sq ft) Hydraulic Radius ft Normal Depth ft 103 1 01 281 367 051 082 LINER RESULTS 317 _ _10952 AMICUMPUTED BY_ HHUVILLUS NO-- ---- - - - - -- - - - - E_AREA _2 52 _ _ DESIGN FREQUENCY_ 10 -YRS S75 (r=0 048) Not to Scale Reach S = 0 0200 Stability Analysis 1 L Permissible Calculated Safety Factor Remarks Shear Stress Shear Stress (psf) (psf) 1 Phase Bottom �J 30 Width =200 ft 30 Not to Scale Reach Matking Type Stability Analysis Vegetation Characteristics Permissible Calculated Safety Factor Remarks Shear Stress Shear Stress (psf) (psf) Staple Pattern Phase Class Type Density Straight S75 Unvegetaked 155 102 151 STABLE Staple D SwQ LE �.p-�- CPE 'B� ROM_STATION /REACH_ _ _ _ _ _ 1TO STATION/REACH- HYDRAULIC RESULTS Discharge fcfsl Peak Flow Period fhrsl Velocity (fps) .Area [sq ft) Hydraulic Radius ft Normal Depth ft 1 70 01 214 328 048 076 LINER RESULTS 17!112017 - 10955AMICUMPUTED BY HHUVILLUS_ - -- ---- - - -- - -- - -- ---- --- - - -- -- - - - - - DRAINAGEAREA 252 _ DESIGN FREQUENCY_ 10YPS U nreinforced Vegetation (n=0100) S = 0 0550 1 L Bottom J 1 30 Width =200 It 30 Not to Scale Reach Matting Type Vegetation Characteristics Stability Analysis Phase Class Type Density Permissible Calculated Safety Factor Remarks Shear Stress Shear Stress (psf) (psf) Staple Pattern Straight Unreinforced Vegetation B Bunch 75-95% 573 262 219 STABLE Soil Clay Loam 0 050 0 032 1 57 STABLE ROM STATI0NIREACH HYDRAULIC RESULTS Discharge cfs Peak FlowVelocity Period (hrsl (fps) Area (sq ft) Hydraulic Radius ft 1 Normal Depth ft 1 V0 01 1 513 1 136 029 042 LINER RESULTS ROJECT_NO. 16157 _ _ ___ ___ RAINAGE AREA 2 52 _ _ _ _ _. _ DESIGI Unremforced Vegetation (n=0 030) / S = 0 0550 1 L 1 Bottom 30 Width =200 ft 30 Not to Scale Matting Type Vegetation Characteristics Reach Stability Analysis Permissible Calculated Safety Factor Remarks Staple Pattern Phase Classb�i6 Shear Stress Shear Stress IPA (psf) Straight Unreinforced Vegetation D 333 144 232 STABLE Soil Clay Loam 0 050 0194 026 UNSTABLE ROM_STATION/REACH -__. - _ ITO_STATIOWR--EACH_ _ _ _ (DRAI HYDRAULIC RESULTS Discharge fcfsl Peak Flow Period (hisl Velocity (fps) Area (sq ft] Hydraulic Radius ft Normal Depth ft 70 01 359 1 95 036 054 LINER RESULTS -- - - - ---- - -- -- ---- - -- - - - - ---- - - _j DESIGN FREQUENCY 1 -0 -YRS SC150 (n=0 049) 3 WidBtht= 2 00 ft 3 Not to Scale Reach Matting Type Vegetation Characteristics Stability Analysis Phase Class Type Density Permissible Calculated Safety Factor Remarks Shear Stress Shear Stress (psf) (psf) Staple Pattern Straight SC150 Unvegetated 200 185 1 08 STABLE Staple D RIP t -AP 6-0,4Nrjf-�L ROM STATION/REACH_ HYDRAULIC RESULTS Discharge fcfsl Peak Flow Period hrsl Velocity (fps) Area (sq ft) I Hydraulic I Radius ft Normal Depth ftl �6 8 01 351 1616 109 177 LINER RESULTS IDESIGN FREQUENCY_ 10YRS Rock Riprap (n=0100) ' S = 10501 1 L Bottom J 1 29 Width =400 It 29 Not to Scale Matting Type Vegetation Characteristics Reach Stability Analysis Permissible Calculated Safety Factor Remarks Staple Pattern Phase Class Type Density Shears Iress Shear Stress (psf) (psf) Straight Rock Riprap Unvegetated 600 552 109 STABLE 18in WEDDINGTON ROAD SUBDIVISION WEDDINGTON, NORTH CAROLINA EROSION CONTROL CALCULATIONS Narrative: Erosion control measures have been designed in accordance with Town of Weddington and North Carolina Department of Environmental Quality requirements and standards. Erosion control is maintained on the site via silt fence, diversion ditches, storm drainage inlet protection and riser and skimmer basins. The sediment pond and skimmer have been sized for the 10 year storm event. The /SAACS GROUP Date 6122/2017 Weddington Road Subdivision Weddington, North Carohna Skimmer Basin Design & Calculations (BASIN #1) Time of Concentration Calculation Peak Flow Calculation Total Time of Concentration, T. 5.00 (min.) 1, 10 yr Rainfall Intensity (table 2 3) 7.33 (in /hr) C, Rainfall Runoff Coefficient 045 AD, Drainage Area to Structure (Pre -Developed) 224,490 (sq ft) 5 15 (ac ) Ad, Drainage Area to Structure (Post -Developed) 260,130 (sq ft) 5 97 (ac ) Drainage Area to Structure 597 (ac ) Area of disturbance for structure 4.80 (ac ) Q,,, Peak Flow = Ci A 19.698 (cfs) Skimmer Basin Design #1 Volume Calculation Bottom of Basin Elevation = 69400 Depth of Basin (to spillway) 450 (ft.) Emergency Spillway Elev = 69850 Top of Dam Elevation = 70000 Diff b/t spillway and top dam = 1 5 feet Contour Area Area Volume Total Elev (sq ft.) (ac ft) (cu ft) (cu ft ) 69400 1,497 0 034 695.00 3,132 0.072 2,315 2,315 69600 4,581 0 105 3,857 6,171 69700 6,600 0 152 5,591 11,762 698.00 8,562 0.197 7,581 19,343 6_98.50 _9,583_ 0,220_ j ^. 17,705; -23,876 ` 6 00 13,444 0 309 99 5,757 29,633 70000 14,919 0.342 14,182 43,814 Basin Volume Required (1800cu ft Mist ac) = 8,647 (cu. ft.) Basin Volume Provided at Spillway = 23,876 (cu. ft.) Greater than required, therefore OK Required Basin Surface Area (Q,ox325 sq.ft.) = 6,402 (sq ft ) As, Surface Area Provided = 9,583 (sq ft.) Greater than required, therefore OK See following sheet for Skimmer Size Calculation from Fairclothskimmer com Emergency Spillway Calculation Q=CLH^1.5 C= 28 Q,o= 19 698 (cfs) Spillway Width = 20.0 (ft) h= 0.50 (ft) <0.5', Therefore OK Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* In NC assume 3 days to drain 123,87,6 Cu. Ft 3 Days Skimmer Size w _ 3:0; Inch Orifice Radius 1:4� Inch[es] Orifice Diameter 2.71 Inch[es] The ISAACS GROUP Date 6/22/2017 Weddington Road Subdivision Weddington, North Carolina Skimmer Basin Design & Calculations (BASIN #2) Time of Concentration Calculation Peak Flow Calculation Total Time of Concentration, T. 5.00 (min.) 1, 10 yr Rainfall Intensity (table 2 3) 733 (in /hr) C, Rainfall Runoff Coefficient 0.45 Ac, Drainage Area to Structure (Pre -Developed) 225,355 (sq ft) 5.17 (ac) Ad, Drainage Area to Structure (Post -Developed) 222,048 (sq ft) 5.10 (ac.) Drainage Area to Structure 5.17 (ac ) Area of disturbance for structure 229 (ac) Q,o, Peak Flow = CiA 17.065 (cfs) Skint wer Basin Design #2 Volume Calculation Bottom of Basin Elevation = 70300 Depth of Basin (to spillway) 250 (ft) Emergency Spillway Elev = 705.50 Top of Dam Elevation = 70700 Diff b/t spillway and top dam = 1 5 feet Contour Area Area Volume Total Elev. (sq. ft) (ac ft.) (cu ft.) (cu ft ) 703.00 1,653 0 038 70400 3,548 0.081 2,601 2,601 705_.00 5,096 0117 4,322_ 6,923 _"705.50 _ _ 5,551 _: 0.12_7 2,662 _ 9,5_84 70600 6,019 0.138 2,893 12,477 707.00 6,998 0161 6,509 18,985 Basin Volume Required (1800cu.ft./dist. ac) = 4,126 (cu ft.) Basin Volume Provided at Spillway = 9,584 (cu ft ) Greater than required, therefore OK Required Basin Surface Area (Q,ox325 sq ft) = 5,546 (sq ft.) As, Surface Area Provided = 5,551 (sq ft ) Greater than required, therefore OK See following sheet for Skimmer Size Calculation from Falrclothskimmer com Emergency Spillway Calculation Q=CLH"1.5 C= 28 Q,o= 17.065 (cfs) Spillway Width = 200 (ft ) h= 045 (ft ) <0.5', Therefore OK Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* 'In NC assume 3 days to drain 9,584 Cu.Ft r 3 Days Skimmer Size 11 2.0'1 Inch Orifice Radius 1011 Inch[es] Orifice Diameter i_��_,. _ 1.911 nch[es] The ISAACS GROUP Date 6/22/2017 Weddington Road Subdivision Weddington, North Carolina Skimmer Basin Design & Calculations (BASIN #3) Time of Concentration Calculation Peak Flow Calculation Total Time of Concentration, Tc 500 (min) /, 10 yr Rainfall Intensity (table 2.3) 733 (in /hr) C, Rainfall Runoff Coefficient 045 AD, Drainage Area to Structure (Pre -Developed) 319,609 (sq ft) 7.34 (ac ) Ad, Drainage Area to Structure (Post -Developed) 0 (sq. ft.) 0 00 (ac.) Drainage Area to Structure 734 (ac.) Area of disturbance for structure 3.84 (ac) Q,a, Peak Flow = CiA 24.202 (cfs) Sklnuner Basin Design #2 Volume Calculation Bottom of Basin Elevation = 70250 Depth of Basin (to spillway) 300 (ft) Emergency Spillway Elev = 70550 Top of Dam Elevation = 707.00 Contour Area Area Volume Total Elev. (sq ft.) (ac ft) (cu ft) (cu ft ) 70250 2,697 0.062 70300 3,806 0.087 1,626 1,626 70400 5,665 0 130 6,272 6,272 705.00 10,157 0 233 13,963 15,589 705.50 12,769 0.293 5,732 21,320 70700 15,471 0.355 21,180 42,500 Basin Volume Required (I800cu.ft Mist ac) = 6,915 (cu ft.) Basin Volume Provided at Spillway = 15,589 (cu. ft) Greater than required, therefore OK Required Basin Surface Area (Q,ox325 sq.ft) = 7,866 (sq. ft.) As, Surface Area Provided = 10,157 (sq ft ) Greater than required, therefore OK See following sheet for Skimmer Size Calculation from Fairclothsklmmer com Emergency Spillway Calculation Q=CLH^1.5 C= 28 Qio= 24.202 (cfs) Spillway Width = 25.0 (ft.) h= 0.49 (ft.) <0.5', Therefore OK Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* *In NC assume 3 days to drain 15,,589 Cu.Ft 3 Days Skimmer Size 2.5 Inch Orifice Radius 1.1; Inch[es] Orifice Diameter 2.3; Inch[es] The 15AACS GROUP Date 6/22/2017 4Veddington Road Subdivision Weddington, North Carolina Skimmer Basin Design & Calculations (BASIN #4) Time of Concentration Calculation Peak Flow Calculation Total Time of Concentration, T. 500 (min ) 1, 10 yr Rainfall Intensity (table 2 3) 7.33 (in /hr.) C, Rainfall Runoff Coefficient 045 AD, Drainage Area to Structure (Pre -Developed) 193,232 (sq ft) 4.44 (ac ) Ad, Drainage Area to Structure (Post -Developed) 0 (sq ft.) 0.00 (ac.) Drainage Area to Structure 444 (ac.) Area of disturbance for structure 2.60 (ac ) Q,o, Peak Flow = CiA 14.632 (cfs) Skimmer Basin Design #2 Volume Calculation Bottom of Basin Elevation = 701 00 Depth of Basin (to spillway) 250 (ft ) Emergency Spillway Elev = 70350 Top of Dam Elevation = 705.00 Diff b/t spillway and top dam = 1 5 feet Contour Area Area Volume Total Elev (sq ft) (ac. ft) (cu ft.) (cu ft ) 701.00 448 0 010 702.00 1,896 0.044 1,172 1,172 703.00 3,493 0.080 2,695 3,867 703.50-- 4,820 0.111 2,078 70400 5,148 0.118 2,492 8,437 705.00 5,833 0134 5,491 13,927 Basin Volume Required (1800cu ft Mist ac) = 4,678 (cu ft.) Basin Volume Provided at Spillway = 5,945 (cu. ft.) Greater than required, therefore OK Required Basin Surface Area (Q,ox325 sq ft) = 4,755 (sq ft.) As, Surface Area Provided = 4,820 (sq ft) Greater than required, therefore OK See following sheet for Skimmer Size Calculation from Fairclothskimmer cam Emeraencv Snillwav Calculation: Q=CLH^1.5 C= 28 Q,p= 14 632 (cfs) Spillway Width = 15.0 (ft) h= 0.50 (ft) <0.5', Therefore OK Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 5,945 Cu.Ft '3 Days Skimmer Size 2.OI Inch Orifice Radius 0.711 nch[es] Orifice Diameter 1.5i, Inch[es] The /5AAC5 GROUP Weddington Road Subdiuision Weddington, North Carolina Riser -Shimmer Basin Design & Calculations (BASIN #5) Peak Flow Calculation Total Time of Concentration, T. 500 (min) /. 10 yr Rainfall Intensity 733 (in /hr) C, Rainfall Runoff Coefficient 045 AD, Drainage Area to Structure (Pre -Developed) 236,646 (sq ft) AD, Drainage Area to Structure (Post -Developed) 701,049 (sq ft ) Drainage Area to Structure 1609 (ac) Area of disturbance for structure 725 (ac ) Q1o, Peak Flow= CiA 53.09 (cfs) Volume Calculation Bottom of Basin Elevation = 68400 Depth of Basin (to top riser) 750 (ft ) Riser Spillway Elevation = 691 50 Emergency Spillway Elev = 69250 Top of Dam Elevation = 69400 Contour Area Area Volume Total Elev (sq ft) (ac ft) (cu ft) (cu ft ) 68400 12,897 0 296 68500 14,635 0 336 13,766 13,766 68600 16,450 0 378 15,543 29,309 68700 18,340 0 421 17,395 46,704 68800 20,305 0 466 19,323 66,026 68900 22,345 0 513 21,325 87,351 68950 25,270 0 580 11,904 99,255 69000 29,281 0 672 25,813 113,164 691 00 32,252 0 740 30,767 143,931 691 50 33,888 0 778 16,535 160,465 69200 35,523 0 815 17,353 177,818 69250 37,317 0 857 18,210 196,028 69400 43,025 0 988 60,257 256,285 Elevation of measured Storage and Surface Area = 68950 Basin Volume Required (1800cu ft Mist ac) = 13,050 (cu ft ) Basin Volume Provided at Spillway= 99,255 (cu ft ) Required Basin Surface Area (Qlox435 sq ft) = 23,092 (sq ft ) A5, Surface Area Provided = 25,270 (sq ft ) Skimmer Size Calculated Using Attachment Volume to be drained in 24-72 hrs = 99,255 (cu ft ) 6" Skimmer drains 51,840 cf/24 hrs. & 155,520 cf/72 hrs Skimmer Size= 6" Diameter Of, Orifice adjustment factor = 5442 Orfice diameter adjustment ((CF Volume/Of)/3 14)A0 5)x2= 482 Orfice = 4 8 Diameter (in ) 6/22/2017 543 (ac) 1609 (ac ) (INCLUDES HOMEBUILDER PHASE) Greater than required, therefore OK Greater than required, therefore OK P \Active Projects\Hcpper Communities\Weddington Matthews Rd Dev 16157\Engineering\Calculations\16157-EC-RISER As Riser -Skimmer Basin Design & Calculations (BASIN #1) Principal Spillway System using Riser for 2 Yr. Storm Flows Objective Insure principal spillway riser carries 2 yr storm flows without activating emergency spillway Q (2 Yr) = 30 54 cfs (See BMP #2 Hydrology Summary) Use orifice equation to check riser hydraulic capacity Orifice equation = Q= 6 (2(g)(H))^ 5 (Area) H = emergency spillway elevation — center of riser orifice opening = 692 5-691 83 = 0 67' Area = area of riser orifice opening = 4'( 67') x 4 sides = 10 72 s f Q(Riser) = 54 54 cfs , which is greater than 30 54 cfs, therefore o k Emergency Spillway Calculations Objective Insure emergency spillway and primary riser spillway carries 25 yr storm flows with 1' minimum freeboard on embankment Q (25 yr) = 84 96 cfs (see BMP #2 Hydrology Summary) Use orifice equation to check riser hydraulic capacity Orifice equation = Q= 6 (2(g)(H))1.5 (Area) H = 0 5' flaw depth elevation over emergency spillway— center of riser orifice opening = 693-691 83 = 1 17' Area = area of riser orifice opening = 4'( 67') x 4 sides = 10 72 s f Q(Riser) = 72 08 cfs Use weir equation to check grass emergency spillway hydraulic capacity Weir equation = Q = 2 9 (H)A3/2 (L) H = 0 5'= maximum head to achieve 1' freeboard L = length of emergency spillway = 20' Q ( 5' flow depth elevation over emergency spillway) = 20 51 cfs Q (total) = 72 08 + 20 51 = 92 59 cfs, which is greater than 84 96 cfs , therefore o k P \Active Protects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Calculations\16157-EC-RISER xls Calculate Skimmer Size Basin Volume in Cubic Feet 99255. Cu.Ft Skimmer Size f ;' ' , :°.6.Oi Inch Days to Drain* �' _ °3 Days Orifice Radius Inches] y Orifice Diameter `4:8!Inch[es] *In NC assume 3 days to drain WEDDINGTON ROAD SUBDIVISION TOWN OF WEDDINGTON, NORTH CAROLINA BMP DETENTION & WATER QUALITY CALCULATIONS ®%%I% ��,,,,, �`C�4R eeo e�i ® .• •e �i THE IISMM /s to GROUP. P.C. ENGINEERING d� ; LAND SURVEYING •. N0. C-1069 ///O�`�s•.•••••.e••••'•• s1OF6A te``�%%% ``,,,,,11...,,..//e CAR E S SEAL 026462 e 401 1 I IB111� O` ` �ISAACSo CIVIL ENGINEERING DESIGN & LAND SURVEYING 8720 RED OAK BOULEVARD, STE. 420 CHARLOTTE, N.C. 28217 PHONE (704) 527-3440 FAX (704) 527-8335 Existing and Proposed Drainage Patterns & Points of Analysis Drainage patterns to the five (2) proposed on-site BMP's are maintaining existing drainage patterns to the maximum extent practicable as needed to create a balanced distribution of storm water flow thru BMP's 1, and 2 in a consistent manner with existing flows. Special consideration was given to the proposed locations of BMP outfalls to minimize off-site impacts during various storm events due to existing off-site Infrastructure limitations. As seen on the attached Pre -Developed Drainage Area map (Sheet C6.1 ) and Post -Developed Drainage Area Map (Sheet C6.2), one anallysis point was selected for evaluation of Pre and Post Developed stormwater flows resulting from the development of the Weddington Road Subdivision. Drainage area limits shown are total drainage area to point of analysis to evaluate the net increase or decrease in stormwater flows for the 1, 2, 10, 25, 50, and 100 year storm events for the contributing areas which encompass the entire Weddington Road Subdivision parcel. As seen below in the Results Summary, there is no net increase in stormwater flow for all storm events up to and including the 100 -year storm for the points of analysis evaluated and are being conveyed thru stable channels without negative impacts to downstream properties. Hydrologic Precipitation Data used in the detention and water quality analysis for the 1, 2, 10, 25, 50 and 100 year storm events was taken from the City of Charlotte Stormwater Services Dept. published data per the attached documents on the following pages. The project site is close to the City of Charlotte limits and the rainfall depths used accurately approximate average rainfall amounts per the NOAA National Weather Service Hydrometeorological Design Studies Center. Results Summary DETENTION ANALYSIS SUMMARY TABLE STORM EVENT POINT OF ANALYSIS PRE -DEV. FLOW POST -DEV FLOW 1 -YR 24 HR STORM 14.82 10.09 2 -YR 24 HR. STORM 2927 19.81 10 -YR 24 HR STORM 9215 77.20 25 -YR 24 HR STORM 13445 134.45 118.42 50 -YR 24 HR STORM 16805 158.44 100 -YR 24 HR. STORM 191 13 188.39 BMP CALCULATIONS WEDDINGTON Proposed BMP #1 (Sand Filter) Sand Filter Designed per NCDEQ (Div. of Environmental Quality) and Town of Weddington Regulations See Sheet C6 1 & C6 2 for Pre and Post -develop drainage area maps, Soil types, Tc flow path, CN data and overall projet narrative. Project Narrative: Proposed BMP #1 (Sand Filter) BMP #2 (Sand Filter) has been designed per the NCDEQ requirements of the contributing drainage area (8.28 ac.) to meet 85% TSS removal, 25% TN and 40% TP removal targets. The hydraulic conductivity of the existing soils at the location of BMP #2 are _ cm/sec. and do not support infiltration measures. Additionally, the SHWT was established as required to establish the minimum vertical separations as outlined by the NCDEQ requirements. BMP #2 meets or exceeds the following requirements• • The control and treatment of the difference in the stormwater runoff from the pre -development and post - development conditions for the one-year, 24-hour storm. • Removal of an 85 percent average annual amount of Total Suspended Solids (85% TSS removal), 25% TN (min) and 40% TP (min) removals • Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours • Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one-year, 24-hour storm • Meet design of Stormwater Management Measures set forth in 15A NCAC 02H .1008. • The post developed discharge rate at the property boundary is less than or equal to the pre development rate for the (1,2,10,25,50 & 100) one, two, ten, twentyfive, fifty and one hundred year storm events. Storm Event (BMP #1 -Sand Filter) 1 Yr. -24 hr. 2 Yr. -24 hr. 10 Yr. - 24 hr. 25 Yr. - 24 hr. 50 Yr. - 24 hr. 100 Yr. - 24 hr Post-Dev Flow 7.72 cfs 12.06 cfs 27.51 cfs 37.09 cfs 44.80 cfs 50.02 cfs Routed Flow 0.20 cfs 0.31 cfs 16.92 cfs 33.60 cfs 42.29 cfs 49.26 cfs Water Surface EI. 697.02 698.00 698.54 698.75 698.84 698.91 Freeboard Depth 2.98 1 2.00 1 1.46 1 1.25 1 1.16 1 1.09 BMP Drainage Information: Proposed BMP No. 1 (Sand Filter) Proposed Drainage Area, AD (Ac.) = 8.28 See Drainage Area Exhibit Existing Impervious Area (BUA) (Ac.) = 0.55 Proposed Impervious Area (BUA) (Ac.) = 261 Proposed Percent Impervious Area, IA = 31 Reference Post -Developed section of this report for Curve Numbers, Time of Concetration values, and Post -Developed Flows for 1, 2, 10, 25, 50 and 100 year storm events to BMP #1. P \Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engmeenng\Calculations\BMP\16157-SAND FILTER BMP1 As Stage -Storage Information: Trip of Filter Media = 69400 Elevation Surface Area IncludingForebay 2 Y (ft) s Incremental Volume (ft) Cumulative Volume Including a g Forebay (ft) ) Forebay Surface Area (ft2) Forebay Cumulative Volume (ft3) 69400 1497 0 0 470 0 695.00 3132 2,315 2,315 1031 751 69600 4581 3,857 6,171 1825 2,179 69700 6600 5,591 11,762 022 Forebay Volume Provided @ WQ Storage Elevation (ft3) = 698.00 8570 7,585 19,347 243 Depth of sand filter bed, df (ft) = 69850 9587 4,539 23,886 = 1 75 inch/hour Time required to drain WQv through sand filter, tf (day) = 69900 10604 5,048 28,934 = WQ„ Storage Depth 26,198 69950 11491 5 5,524 34,457 700.00 12379 5,968 40,425 Temporary Water Qualitv Storage Calculations: (Simple Method) hf (ft) Q. (cf/day) Where: Rv=Runoff coefficient, IA=Impervious fraction (Imp. DA/Total DA), V=Volume, RD=Design rainfall 2.78 (in), A=Watershed Area 69400 000 Pre -Development Rv=O 05+(0 9 x IA) 0 110 000 Post -Development Rv=O 05+(0 9 x IA) 0 333 8,733 V=3,630 x RD x (Rv Post-Rv Pre) x A 18,677 (cu ft) Water Quality Volume (adjusted), WQv (ft3) 14,008 (cu. ft) Temporary Water Quality Storage Provided @ elev - 69730 Interpolated from Storage Table Compute Pretreatment System Requirements: 018 1.82 The sediment chamber storage area above the filter media must be sized to hold 20 percent of the water quality volume Required Sediment Forebay Volume (ft3) = 2801.552 022 Forebay Volume Provided @ WQ Storage Elevation (ft3) = 2179 1555% of WQv Sand Filter Bed Surface Area: 024 243 Depth of sand filter bed, df (ft) = 1.5 = minimum depth of 1 5 ft (Per NCDENR Manual) Coefficient of permeability for sand filter bed, k (ft/day) = 35 = 1 75 inch/hour Time required to drain WQv through sand filter, tf (day) = 1 66 = 40 hours Average head, hf (ft) = 1 75 = WQ„ Storage Depth Required Surface Area for Sand Filter Bed, Af (ft2) = Provided Surface Area for Sand Filter Bed, Af (ft2) = Staae-Discharge for Sand Filter Media: Af=(WQ„)(df)/[(k)(tf)(hf+df)] Darcy'sEquation (WQv)/(tf) = Qo = (Af)(k)(hf + df)/(df) Af = provided surface area of filter bed (ft2) df = filter bed depth (ft) k = coefficient of permeability of filter media (ft/day) hf = average height of water above filter bed (ft) 1,483.68 = (W QJ(df)/(k)(tf)(hf + df) Darcy's Equation 1,49700 Elevation hf (ft) Q. (cf/day) Qo (cfs) 10'Qo (cfs) 69400 000 0 000 000 695.00 1 00 8,733 010 1 01 69600 2.00 12,226 014 1 41 697.00 300 15,719 018 1.82 698.00 400 19,212 022 2.22 69850 4.50 20,958 024 243 69900 5.00 22,705 026 2.63 69950 550 24,451 0.28 2.83 70000 600 26,198 030 303 P \Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Calculations\BMP\16157-SAND FILTER BMP1 As CONCRETE ANCHOR ANTI -FLOTATION CALCULATION: BMP #1 (WET POND) Height of riser = 7.9 ft Cross Sectional Area (25.0 sf 4'x4' box w/ 6" wall thickness = 5'x5' box Vol of riser= 197 cf Wt. of H2O displaced =12,262 lbs Conc pad thickness= 24 in Conc. pad width/lengtl' 10 ft Vol. of conc pad = 200 cf Wt of H2O displaced =12,480 lbs Total Wt. of H2O displ,, 24,742 Unit wt. of concrete (pc 150 Wt. of conc. pad (lb.) = 30,000 Vol of conc. box (cf.) - 70 ((25-16)*(7.86)+(0.5`4*4))-((16*0.67)+(3.1416*3*3)/4)0*0.50 Wt. of conc. box (lb ) =10,477 Total Wt. of conc. (lb.) 40,477 Factor of safety = wt. Conc. Pad + Conc. Box wt. Of H2O displaced F.S.= 1.64 698457 BMP CALCULATIONS WEDDINGTON PROPOSED BMP #2(WETPOND) Wet Pond & EFS/LS Designed per NCDEQ (Div. of Environmental Quality) and Town of Weddington Regulations See Sheet C6 1 & C6 2 for Pre and Post -develop drainage area maps, Soil types, Tc flow path, CN data and overall projet narrative. Project Narrative: Proposed BIVIP #2 (Wet Pond) BMP #2 (Wet Pond) has been designed per the NCDEQ requirements of the contributing drainage area (16.731 ac.) to meet 85% TSS removal, 25% TN and 40% TP removal targets. The hydraulic conductivity of the existing soils at the location of BMP #2 are cm/sec. and do not support infiltration measures Additionally, the SHWT was established as required to establish the minimum vertical separations as outlined by the NCDEQ requirements BMP #2 meets or exceeds the following requirements: • The control and treatment of the difference in the stormwater runoff from the pre -development and post - development conditions for the one-year, 24-hour storm. • Removal of an 85 percent average annual amount of Total Suspended Solids (85% TSS removal), 25% TN (min) and 40% TP (min) removals • Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours • Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one-year, 24-hour storm • Meet design of Stormwater Management Measures set forth in 15A NCAC 02H .1008. • The post developed discharge rate at the property boundary is less than or equal to the pre development rate for the (1,2,10,25,50 & 100) one, two, ten, twentyfive, fifty and one hundred year storm events. StormEvent _ (BMP 42-Wetpond) 1 Yr. -24 hr. 2 Yr. -24 hr. 10 Yr. - 24 hr. 25 Yr. - 24 hr. 50 Yr. - 24 hr. 100 Yr. - 24 hr Post-Dev Flow 20 85 cfs 30 54 cfs 63 94 cfs 84.96 cfs 101 02 cfs 111.80 cfs Routed Flow 0.41 cfs 0 51 cfs 12.53 cfs 34 82 cfs 55 93 cfs 71.97 cfs Water Surface EI. 690 68 691 24 691.86 69229 69257 692.71 Freeboard Depth 3.32 276 214 1 71 1.43 1.29 Pond Drainage Information: Proposed BMP No Proposed Drainage Area (Ac.) _ Existing Impervious Area (BUA) (Ac) _ Proposed Impervious Area (BUA) (Ac) _ Proposed Percent Impervious Area = 2 (Wet Pond) 1673 See Drainage Area Exhibit 024 4.92 29.4 Reference Post -Developed section of this report for Curve Numbers, Time of Concetration values, and Post -Developed Flows for 1, 2, 10, 25, 50 and 100 year storm events to BMP #2 P \Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineenng\Calculations\BMP\16157-WETPOND BMP2 As Pond Stage -Storage Information: Perm. Water surface elevation = 6895 684 12897 0 0 Cummulative 685 14635 Forebay 13,766 3582 3,244 686 16450 Total Surface AreaWet Cummule Volume Forebay Cumulative Percentage of 5084 11,885 Elevation Including Forebays u ft) (c ft) Volume (c Including Surface Area Volume(cu total Volume 6786 23,730 689.5 25270 (s f) 99,255 Forebays (s f) 13,638 (20% desired) 0 0 691 32252 44,404 143,659 (cu ft.) 692 35523 78,292 177,547 0 0 684 12897 0 0 2906 0 685 14635 0 13,766 3582 3,244 686 16450 0 29,309 4308 7,189 687 18340 0 46,704 5084 11,885 688 20305 0 66,026 5910 17,382 689 22345 0 87,351 6786 23,730 689.5 25270 0 99,255 7243 27,237 2744 690 29281 13,638 112,893 0 0 691 32252 44,404 143,659 0 0 692 35523 78,292 177,547 0 0 6925 37317.5 96,502 195,757 0 0 693 39112 115,609 214,864 0 0 694 43025 156,759 256,014 0 0 Permanent Pool Calculations: Permanent Pool Elevation = 6895 See Plan Per NCDEQ average depth Permanent Pool Average Depth = 390 equation 3 Interpolated From C-3 Wetpond Table 1 in NCDEQ SA/DA ratio for 85% Pollutant Removal Efficiency = 084 BMP Manual Required Surface Area of Wet Pond (s f.) = 6,112=((SA/DA)/100) (Ac )(43560) Surface Area Provided (s.f.) @ 68950 25,270 OK Temporary Water Quality Storage Calculations: (Simple Method) Where: Rv=Runoff coefficient, IA=Impervious fraction (Imp. DA/Total DA), V=Volume, RD=Design rainfall 2.78 (in), A=Watershed Area Pre -Development Rv=O 05+(0 9 x IA) 0 063 Post -Development: Rv=0.05+(0 9 x IA) 0 315 V=3,630 x RD x (Rv Post-Rv Pre) x A 42,531 (cu. ft) Water Quality Volume (adjusted), WQv (ft3) 31,898 (cu ft) Water Quality Storage Provided @ elev. 69058 Interpolated from Storage Table Temporary Water Quality De -watering Time Summary: See Pond Pak calculation dewatering time for the 1 yr. -24 hr storm. Using a 4" orifice, the time to drain the water at peak elevation of 690 68 is around 110 hrs Therefore 4" orifice is sufficient. P \Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Calculations\BMP\16157-WETPOND BMP2 As CONCRETE ANCHOR ANTI -FLOTATION CALCULATION: BMP #1 (WET POND) Height of riser = 88 ft Cross Sectional Area of Riser = 36.0 sf 5,x5' box w/ 6" wall thickness = 6'x6' box Vol of riser = 316 cf Wt of H2O displaced = 19,701 lbs Conc pad thickness = 30 in Conc. pad width/length = 10 ft Vol of conc. pad= 250 cf Wt. of H2O displaced = 15,600 lbs Total Wt of H2O displaced = 35,301 Unit wt of concrete (pcf) = 150 Wt of conc pad (lb ) = 37,500 Vol of conc box (cf ) = 98 ((36-25)"(8 7)+(0 67"4*4))-((16"0.67)+(3 14163 5*3 5)/4)0'0 50 Wt of conc box (lb.) = 14,704 Total Wt of conc. (lb) = 52,204 Factor of safety = wt Conc Pad + Conc Box wt. Of H2O displaced FS= 148 PRE AND POST DEVELOPED NETWORK SUMMARY DETENTION ANALYSIS (REFERENCE C6.1 & C6.2) PRE -DEVELOPED A -PRE DEV 1 PRE- . A -PRE OUT -A2 A -PRE DEV 2 POST DEVELOPED B -POST DEV 3 B -POST DEV 1 B3(BY S) POST -Bl BMP1 BMP . B -POST OUT POST -B2 10 W B -POST DEV 2 BMP 2 0 B -POST DEV 4 Job Fite: W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Rain Dir: W:\PONDPAK\RAINFALL\ -------------------------- -------------------------- JOB TITLE -------------------------- -------------------------- WEDDINGTON ROAD SUBDIVISION UNION COUNTY, NORTH CAROLINA OVERALL DETENTION ANALYSIS S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ********************** TC CALCULATIONS ********************* A -PRE DEV 1..... Tc Calcs ........................... 2.01 A -PRE DEV 2..... Tc Calcs ........................... 2.05 B -POST DEV 3.... Tc Calcs ........................... 2.08 B -POST DEV 4.... Tc Calcs ........................... 2.12 ********************** CN CALCULATIONS ********************* A -PRE DEV 1..... Runoff CN -Area ..................... 3.01 A -PRE DEV 2..... Runoff CN -Area ..................... 3.02 B -POST DEV 1.... Runoff CN -Area ..................... 3.03 B -POST DEV 2.... Runoff CN -Area ..................... 3.04 B -POST DEV 3.... Runoff CN -Area ..................... 3.05 B -POST DEV 4.... Runoff CN -Area ..................... 3.06 *********************** POND VOLUMES *********************** BMP 1........... Vol: Elev-Volume ................... 4.01 S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Table of Contents Table of Contents (continued) ii BMP 2........... Vol: Elev-Volume ................... 4.02 ******************** OUTLET STRUCTURES ********************* BMP 1........... Outlet Input Data .................. 5.01 BMP 2........... Outlet Input Data .................. 5.04 *********************** POND ROUTING *********************** BMP 1........... Pond E -V -Q Table ................... 6.01 BMP 2........... Pond E -V -Q Table ................... 6.03 BMP 2 OUT 1 Pond Routed HYG (total out) ........ 6.04 S/N: C21BO2A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID STORMS.RNQ Meck Co NC 24 Storage 102.86 Total 128.43 12.3000 145.98 Node ID 12.3000 Type Depth Rainfall ft ----------------- 32.72 12.2000 ---- ------ Return Event in Type 1 RNF File 1 RNF ID ------------ 1 ------ 2.5800 ---------------- Synthetic Curve -------- DETENT ---------------- SCS TP II -6 MIN 2 3.1200 Synthetic Curve DETENT SCS Type II 10 4.8000 Synthetic Curve DETENT SCS Type II 25 5.7600 Synthetic Curve DETENT SCS Type II 50 6.4800 Synthetic Curve DETENT SCS Type II 100 6.9600 Synthetic Curve DETENT SCS Type II MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Qpeak Qpeak Max WSEL Pond hrs cfs ft ac - 12.4000 11.87 12.3500 22.85 Return HYG Vol Storage 102.86 12.3000 128.43 12.3000 145.98 Node ID 12.3000 Type Event ac -ft Trun ft ----------------- 32.72 12.2000 ---- ------ ---------- -- A -PRE DEV 1 AREA 1 2.088 A -PRE DEV 1 AREA 2 3.455 A -PRE DEV 1 AREA 10 8.910 A -PRE DEV 1 AREA 25 12.578 A -PRE DEV 1 AREA 50 15.506 A -PRE DEV 1 AREA 100 17.526 A -PRE DEV 2 AREA 1 .539 A -PRE DEV 2 AREA 2 .923 A -PRE DEV 2 AREA 10 2.500 A -PRE DEV 2 AREA 25 3.578 A -PRE DEV 2 AREA 50 4.444 A -PRE DEV 2 AREA 100 5.045 *A -PRE OUT JCT 1 2.626 *A -PRE OUT JCT 2 4.378 *A -PRE OUT JCT 10 11.410 *A -PRE OUT JCT 25 16.155 *A -PRE OUT JCT 50 19.950 *A -PRE OUT JCT 100 22.571 Max Qpeak Qpeak Max WSEL Pond hrs cfs ft ac - 12.4000 11.87 12.3500 22.85 12.3000 70.65 12.3000 102.86 12.3000 128.43 12.3000 145.98 12.3000 3.13 12.3000 6.60 12.2500 22.09 12.2000 32.72 12.2000 41.37 12.2000 47.33 12.4000 14.82 12.3000 29.27 12.3000 92.15 12.3000 134.45 12.3000 168.05 12.3000 191.13 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 5/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Qpeak Qpeak Max WSEL Pond hrs cfs ft ac - 11.9500 7.72 11.9500 12.06 Return HYG Vol Storage 37.09 11.9000 44.80 11.9000 50.02 Node ID 20.85 11.9500 Type Event ac -ft Trun ft ----------------- 84.96 11.9000 ---- ------ ---------- -- B -POST DEV 1 AREA 1 .451 B -POST DEV 1 AREA 2 .680 B -POST DEV 1 AREA 10 1.522 B -POST DEV 1 AREA 25 2.059 B -POST DEV 1 AREA 50 2.479 B -POST DEV 1 AREA 100 2.765 B -POST DEV 2 AREA 1 1.171 B -POST DEV 2 AREA 2 1.694 B -POST DEV 2 AREA 10 3.545 B -POST DEV 2 AREA 25 4.695 B -POST DEV 2 AREA 50 5.585 B -POST DEV 2 AREA 100 6.188 B -POST DEV 3 AREA 1 1.474 B -POST DEV 3 AREA 2 2.440 B -POST DEV 3 AREA 10 6.294 B -POST DEV 3 AREA 25 8.884 B -POST DEV 3 AREA 50 10.953 B -POST DEV 3 AREA 100 12.379 B -POST DEV 4 AREA 1 .338 B -POST DEV 4 AREA 2 .591 B -POST DEV 4 AREA 10 1.643 B -POST DEV 4 AREA 25 2.369 B -POST DEV 4 AREA 50 2.955 B -POST DEV 4 AREA 100 3.362 *B -POST OUT JCT 1 3.431 *B -POST OUT JCT 2 5.396 *B -POST OUT JCT 10 12.990 *B -POST OUT JCT 25 17.993 *B -POST OUT JCT 50 21.956 *B -POST OUT JCT 100 24.679 Max Qpeak Qpeak Max WSEL Pond hrs cfs ft ac - 11.9500 7.72 11.9500 12.06 11.9500 27.51 11.9000 37.09 11.9000 44.80 11.9000 50.02 11.9500 20.85 11.9500 30.54 11.9000 63.94 11.9000 84.96 11.9000 101.02 11.9000 111.80 12.4500 7.92 12.4000 15.24 12.3500 47.07 12.3500 68.46 12.3500 85.43 12.3500 97.08 12.3000 1.86 12.2500 4.12 12.2000 14.68 12.2000 22.16 12.2000 28.17 12.2000 32.32 12.4000 10.09 12.3500 19.81 12.2500 77.20 12.1500 118.42 12.0500 158.44 12.0500 188.39 S/N: C21BO2A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Master Network Summary Page 1.03 Name.... Watershed File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Qpeak Qpeak Max WSEL Pond hrs cfs ft ac - 11.9500 7.72 11.9000 63.94 BMP#1 Return HYG Vol Storage ELEVATION 691.86 WATER Node ID Type Event ac -ft Trun ft ----------------- SURFACE 11.9000 ---- ------ ---------- BMP 1 IN POND 1 .451 BMP 1 IN POND 2 .680 BMP 1 IN POND 10 1.522 BMP 1 IN POND 25 2.059 BMP 1 IN POND 50 2.479 BMP 1 IN POND 100 2.765 BMP 1 OUT POND 1 .451 .273 BMP 1 OUT POND 2 .679 .445 BMP 1 OUT POND 10 1.522 .557 BMP 1 OUT POND 25 2.059 .607 BMP 1 OUT POND 50 2.478 .628 BMP 1 OUT POND 100 2.764 .643 BMP 2 IN POND 1 1.171 BMP 2 IN POND 2 1.694 BMP 2 IN POND 10 3.545 BMP 2 IN POND 25 4.695 BMP 2 IN POND 50 5.585 BMP 2 IN POND 100 6.188 BMP 2 OUT POND 1 1.167 .795 BMP 2 OUT POND 2 1.685 1.209 BMP 2 OUT POND 10 3.532 1.690 BMP 2 OUT POND 25 4.681 2.050 BMP 2 OUT POND 50 5.570 2.289 BMP 2 OUT POND 100 6.173 2.406 Max Qpeak Qpeak Max WSEL Pond hrs cfs ft ac - 11.9500 7.72 11.9000 63.94 BMP#1 11.9500 12.06 11.9000 101.02 ELEVATION 691.86 WATER 11.9500 27.51 11.9000 37.09 SURFACE 11.9000 44.80 ELEVATION 11.9000 50.02 15.9000 .20 697.02 17.3500 .31 698.00 12.0500 16.92 698.54 12.0000 33.60 698.75 11.9500 42.29 698.84 11.9500 49.26 698.91 11.9500 20.85 BMP#2 11.9500 30.54 WATER 11.9000 63.94 17.8000 11.9000 84.96 SURFACE 11.9000 101.02 ELEVATION 11.9000 111.80 17.6000 .41 690.68 17.8000 .51 691.24 12.1500 12.53 691.86 12.1000 34.82 692.29 12.0500 55.93 692.57 12.0500 71.97 692.71 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.01 Name.... A -PRE DEV 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: TR -55 Channel Flow Area 21.0000 sq.ft Wetted Perimeter 12.40 ft Hydraulic Radius 1.69 ft Slope .016900 ft/ft Mannings n .0350 Hydraulic Length 956.00 ft Avg.Velocity 7.86 ft/sec Segment #1 Time: .0338 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR -55 Channel Flow Area 6.3790 sq.ft Wetted Perimeter 9.83 ft Hydraulic Radius .65 ft Slope .024200 ft/ft Mannings n .0350 Hydraulic Length 1046.00 ft Avg.Velocity 4.96 ft/sec Segment #2 Time: .0585 hrs Segment #3: Tc: TR -55 Shallow Hydraulic Length 1341.00 ft Slope .013000 ft/ft Unpaved Avg.Velocity 1.84 ft/sec Segment #3 Time: .2025 hrs ------------------------------------------------------------------------ S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Name.... A -PRE DEV 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Segment #4: Tc: TR -55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .2400 150.00 ft 3.1200 in 015000 ft/ft 11 ft/sec Page 2.02 Segment #4 Time: .3738 hrs ------------------------------------------------------------------------ ------------------------- ------------------------- Total Tc: .6686 hrs ------------------------- ------------------------- S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.03 Name.... A -PRE DEV 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ___= SCS TR -55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ==== SCS TR -55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft S/N: C21BO2A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.04 Name.... A -PRE DEV 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW SCS Channel Flow R = Aq / Wp V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n Tc = (Lf / V) / (3600sec/hr) Where: R = Hydraulic radius Aq = Flow area, sq.ft. Wp = Wetted perimeter, ft V = Velocity, ft/sec Sf = Slope, ft/ft n = Mannings n Tc = Time of concentration, hrs Lf = Flow length, ft S/N: C21BO2A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.05 Name.... A -PRE DEV 2 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: TR -55 Channel Flow Area 112.5000 sq.ft Wetted Perimeter 75.24 ft Hydraulic Radius 1.50 ft Slope .030000 ft/ft Mannings n .0350 Hydraulic Length 1257.00 ft Avg.Velocity 9.64 ft/sec Segment #1 Time: .0362 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR -55 Shallow Hydraulic Length 1119.00 ft Slope .019300 ft/ft Unpaved Avg.Velocity 2.24 ft/sec Segment #2 Time: .1387 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR -55 Sheet Mannings n .2400 Hydraulic Length 150.00 ft 2yr, 24hr P 3.1200 in Slope .015000 ft/ft Avg.Velocity .11 ft/sec Segment #3 Time: .3738 hrs ------------------------------------------------------------------------ ------------------------- ------------------------- Total Tc: .5487 hrs ------------------------- ------------------------- S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.06 Name.... A -PRE DEV 2 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR -55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ==== SCS TR -55 Shallow Concentrated Flow ===== Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.07 Name.... A -PRE DEV 2 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW ==== SCS Channel Flow R = Aq / Wp V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n Tc = (Lf / V) / (3600sec/hr) Where: R = Hydraulic radius Aq = Flow area, sq.ft. Wp = Wetted perimeter, ft V = Velocity, ft/sec Sf = Slope, ft/ft n = Mannings n Tc = Time of concentration, hrs Lf = Flow length, ft S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.08 Name.... B -POST DEV 3 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: TR -55 Channel Flow Area 21.0000 sq.ft Wetted Perimeter 12.40 ft Hydraulic Radius 1.69 ft Slope .016900 ft/ft Mannings n .0350 Hydraulic Length 956.00 ft Avg.Velocity 7.86 ft/sec Segment #1 Time: .0338 hrs ----------------------------------------------------------------------- Segment #2: Tc: TR -55 Channel Flow Area 6.3790 sq.ft Wetted Perimeter 9.83 ft Hydraulic Radius .65 ft Slope .024200 ft/ft Mannings n .0350 Hydraulic Length 614.00 ft Avg.Velocity 4.96 ft/sec Segment #2 Time: .0344 hrs ----------------------------------------------------------------------- Segment #3: Tc: TR -55 Channel Flow Area 4.2100 sq.ft Wetted Perimeter 5.54 ft Hydraulic Radius .76 ft Slope .010000 ft/ft Mannings n .0120 Hydraulic Length 486.00 ft Avg.Velocity 10.34 ft/sec Segment #3 Time: .0131 hrs ------------------------------------------------------------------------ S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.09 Name.... B -POST DEV 3 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Segment #4: Tc: TR -55 Shallow Hydraulic Length 1341.00 ft Slope .013000 ft/ft Unpaved Avg.Velocity 1.84 ft/sec Segment #4 Time: .2025 hrs ------------------------------------------------------------------------ Segment #5: Tc: TR -55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .2400 150.00 ft 3.1200 in 010000 ft/ft 09 ft/sec Segment #5 Time: .4396 hrs ------------------------------------------------------------------------ ------------------------- ------------------------- Total Tc: .7233 firs ------------------------- ------------------------- S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.10 Name.... B -POST DEV 3 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ == SCS TR -55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ==== SCS TR -55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Name.... B -POST DEV 3 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALY51S.PPW Page 2.11 ==== SCS Channel Flow R = Aq / Wp V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n Tc = (Lf / V) / (3600sec/hr) Where: R = Hydraulic radius Aq = Flow area, sq.ft. Wp = Wetted perimeter, ft V = Velocity, ft/sec Sf = Slope, ft/ft n = Mannings n Tc = Time of concentration, hrs Lf = Flow length, ft S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.12 Name.... B -POST DEV 4 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: TR -55 Channel Flow Area 112.5000 sq.ft Wetted Perimeter 75.24 ft Hydraulic Radius 1.50 ft Slope .030000 ft/ft Mannings n .0350 Hydraulic Length 1343.00 ft Avg.Velocity 9.64 ft/sec Segment #1 Time: .0387 hrs ----------------------------------------------------------------------- Segment #2: Tc: TR -55 Channel Flow Area 2.6900 sq.ft Wetted Perimeter 4.43 ft Hydraulic Radius .61 ft Slope .007000 ft/ft Mannings n .0120 Hydraulic Length 430.00 ft Avg.Velocity 7.45 ft/sec Segment #2 Time: .0160 hrs Segment #3: Tc: TR -55 Shallow Hydraulic Length 835.00 ft Slope .019300 ft/ft Unpaved Avg.Velocity 2.24 ft/sec Segment #3 Time: .1035 hrs ------------------------------------------------------------------------ S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Name.... B -POST DEV 4 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Segment #4: Tc: TR -55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .2400 150.00 ft 3.1200 in 015000 ft/ft 11 ft/sec Page 2.13 Segment #4 Time: .3738 hrs ------------------------------------------------------------------------ ------------------------- ------------------------- Total Tc: .5320 hrs ------------------------- ------------------------- S/N: C21B02AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Page 2.14 Name.... B -POST DEV 4 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR -55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ==== SCS TR -55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Tc Calcs Name.... B -POST DEV 4 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Page 2.15 ==== SCS Channel Flow R = Aq / Wp V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n Tc = (Lf / V) / (3600sec/hr) Where: R = Hydraulic radius Aq = Flow area, sq.ft. Wp = Wetted perimeter, ft V = Velocity, ft/sec Sf = Slope, ft/ft n = Mannings n Tc = Time of concentration, hrs Lf = Flow length, ft S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Runoff CN -Area Page 3.01 Name.... A -PRE DEV 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... 5/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- Pasture/Open, Class B -Good ---- 61 --------- 31.912 ----- ----- ------ 61.00 Wooded, Class B -Good 55 5.455 55.00 Impervious 98 5.510 98.00 Pasture/Open, Class C -Good 74 6.500 74.00 Wooded, Class C -Good 70 14.838 70.00 COMPOSITE AREA ........................................................................... ........................................................................... & WEIGHTED CN ---> 64.215 67.06 (67) 5/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Runoff CN -Area Page 3.02 Name.... A -PRE DEV 2 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Soil/Surface Description Pasture/Open, Class B -Good Wooded, Class B -Good Impervious Pasture/Open, Class C -Good Wooded, Class C -Good COMPOSITE AREA & WEIGHTED CN ---> 19.710 64.59 (65) ........................................................................... ........................................................................... S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Impervious Area Adjustment Adjusted CN acres %C %UC CN ---- 61 --------- 11.331 ----- ----- ------ 61.00 55 2.199 55.00 98 .689 98.00 74 2.261 74.00 70 3.230 70.00 COMPOSITE AREA & WEIGHTED CN ---> 19.710 64.59 (65) ........................................................................... ........................................................................... S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Runoff CN -Area Page 3.03 Name.... B -POST DEV 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Impervious Area Ad]ustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- Impervious (Road, SW & BUA) ---- 98 --------- 2.610 ----- ----- ------ 98.00 Pasture/Open, Class B -Good 61 3.457 61.00 Wooded, Class v -Good 55 1.014 55.00 Pasture/Open, Class C -Good 74 1.199 74.00 COMPOSITE AREA & WEIGHTED CN ---> ........................................................................... .......................................................................... 8.280 73.81 (74) S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Runoff CN -Area Page 3.04 Name.... B -POST DEV 2 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- Impervious (Road, SW & BUA) ---- 98 --------- 4.920 ----- ----- ------ 98.00 Wetpond 98 .768 98.00 Pasture/Open, Class B -Good 61 4.854 61.00 Wooded, Class B -Good 55 .195 55.00 Open Space, Class B -Good 74 4.974 74.00 Wooded, Class B -Good 70 1.020 70.00 COMPOSITE AREA & WEIGHTED CN ---> ........................................................................... ........................................................................... 16.731 77.92 (78) S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Runoff CN -Area Page 3.05 Name.... B -POST DEV 3 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- Exist. Impervious ---- 98 --------- 4.766 ----- ----- ------ 98.00 Pasture/Open, Class B -Good 61 26.232 61.00 Wooded, Class B -Good 55 2.675 55.00 Pasture/Open, Class C -Good 74 2.078 74.00 Woodwd, Class C -Good 70 9.592 70.00 COMPOSITE AREA & WEIGHTED CN ---> ........................................................................... ........................................................................... 45.343 67.03 (67) S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Runoff CN -Area Page 3.06 Name.... B -POST DEV 4 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Soil/Surface Description Existing Impervious Pasture/Open, Class b -Good Wooded, Class B -Good Pasture/Open, ClassC-Good Wooded, Class C -Good COMPOSITE AREA & WEIGHTED CN ---> 13.577 64.29 (64) ........................................................................... ........................................................................... S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Impervious Area Adjustment Adjusted CN acres %C %UC CN ---- 98 --------- .689 ----- ----- ------ 98.00 61 8.021 61.00 55 1.863 55.00 74 .819 74.00 70 2.185 70.00 COMPOSITE AREA & WEIGHTED CN ---> 13.577 64.29 (64) ........................................................................... ........................................................................... S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Vol: Elev-Volume Name.... BMP 1 Page 4.01 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Title... BMP 1 -SAND FILTER USER DEFINED VOLUME RATING TABLE Elevation Volume (ft) (ac -ft) 694.00 .000 695.00 .053 696.00 .142 697.00 .270 698.00 .444 698.50 .548 699.00 .664 699.50 .791 700.00 .928 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Vol: Elev-Volume Name.... BMP 2 Page 4.02 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW USER DEFINED VOLUME RATING TABLE Elevation Volume (ft) (ac -ft) 689.50 .000 690.00 .313 691.00 1.019 692.00 1.797 693.00 2.654 693.50 3.114 694.00 3.597 5/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Outlet Input Data Name.... BMP 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 694.00 ft Increment = .20 ft Max. Elev.= 700.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) < ---> Forward and Reverse Both Allowed Page 5.01 Structure No. Outfall E1, ft E2, ft ----------------- User Defined Table ---- Pi ------- ---> TW --------- .000 --------- 700.000 Weir -Rectangular ES ---> TW 698.500 700.000 Orifice -Area OR ---> TW 698.000 700.000 Weir -Rectangular W1 ---> TW 698.000 700.000 TW SETUP, DS Channel S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Outlet Input Data Name.... BMP 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW OUTLET STRUCTURE INPUT DATA Structure ID = P1 Structure Type = User Defined Table ------------------------------------ ELEV-FLOW RATING TABLE Elev, ft Flow, cfs 694.00 .00 .00 .11 696.00 .15 697.00 .20 698.00 .24 698.50 .27 699.00 .29 699.50 .31 700.00 .33 Structure ID = ES Structure Type = Weir -Rectangular ------------------------------------ # of Openings = 1 Crest Elev. = 698.50 ft Weir Length = 20.00 ft Weir Coeff. = 2.800000 Weir TW effects (Use ad]ustment equation) Structure ID = OR Structure Type = Orifice -Area ------------------------------------ # of Openings = 1 Invert Elev. = 698.00 ft Area = .3300 sq.ft Top of Orifice = .00 ft Datum Elev. = 698.00 ft Orifice Coeff. _ .600 Page 5.02 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Outlet Input Data Name.... BMP 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW OUTLET STRUCTURE INPUT DATA Structure ID = W1 Structure Type = Weir -Rectangular ------------------------------------ # of Openings = 1 Crest Elev. = 698.00 ft Weir Length = 12.00 ft Weir Coeff. = 3.100000 Weir TW effects (Use adjustment equation) Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs Page 5.03 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Outlet Input Data Name.... BMP 2 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALY51S.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 689.50 ft Increment = .50 ft Max. Elev.= 694.00 ft ********************************************** OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < ---> Forward and Reverse Both Allowed Page 5.04 Structure No. Outfall E1, ft E2, ft Orifice -Circular OR ---> TW 689.500 694.000 Weir -Rectangular W1 ---> TW 691.500 694.000 Weir -Rectangular ES ---> TW 692.500 694.000 TW SETUP, DS Channel S/N: C21BO2A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Outlet Input Data Name.... BMP 2 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW OUTLET STRUCTURE INPUT DATA Structure ID = OR Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 689.50 ft Diameter = .3300 ft Orifice Coeff. _ .600 Structure ID = W1 Structure Type = Weir -Rectangular ------------------------------------ # of Openings = 1 Crest Elev. = 691.50 ft Weir Length = 15.00 ft Weir Coeff. = 3.100000 Weir TW effects (Use adjustment equation) Structure ID = ES Structure Type = Weir -Rectangular ------------------------------------ # of Openings = 1 Crest Elev. = 692.50 ft Weir Length = 20.00 ft Weir Coeff. = 2.800000 Weir TW effects (Use adjustment equation) Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs Page 5.05 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Pond E -V -Q Table Page 6.01 Name.... BMP 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW LEVEL POOL ROUTING DATA HYG Dir = W:\PONDPAK\16157\ Inflow HYG file = NONE STORED - BMP 1 IN 1 Outflow HYG file = NONE STORED - BMP 1 OUT 1 Pond Node Data = BMP 1 Pond Volume Data = BMP 1 Pond Outlet Data = BMP 1 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 694.00 ft Starting Volume = .000 ac -ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Infilt. Q Total 2S/t + 0 ft cfs ac -ft cfs cfs cfs ------------------------------------------------------------------------------ 694.00 .00 .000 .00 .00 .00 694.20 .15 .011 .00 .15 5.29 694.40 .15 .021 .00 .15 10.44 694.60 .15 .032 .00 .15 15.58 694.80 .15 .043 .00 .15 20.72 695.00 .15 .053 .00 .15 25.86 695.20 .15 .071 .00 .15 34.44 695.40 .15 .089 .00 .15 43.01 695.60 .15 .106 .00 .15 51.58 695.80 .15 .124 .00 .15 60.15 696.00 .15 .142 .00 .15 68.72 696.20 .16 .167 .00 .16 81.15 696.40 .17 .193 .00 .17 93.59 696.60 .18 .219 .00 .18 106.02 696.80 .19 .244 .00 .19 118.45 697.00 .20 .270 .00 .20 130.88 697.20 .21 .305 .00 .21 147.74 697.40 .22 .340 .00 .22 164.60 697.60 .22 .374 .00 .22 181.45 697.80 .23 .409 .00 .23 198.30 698.00 .24 .444 .00 .24 215.16 698.20 4.29 .486 .00 4.29 239.37 698.40 10.68 .527 .00 10.68 265.92 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Pond E -V -Q Table Page 6.02 Name.... BMP 1 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW LEVEL POOL ROUTING DATA HYG Dir = W:\PONDPAK\16157\ Inflow HYG file = NONE STORED - BMP 1 IN 1 Outflow HYG file = NONE STORED - BMP 1 OUT 1 Pond Node Data = BMP 1 Pond Volume Data = BMP 1 Pond Outlet Data = BMP 1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 694.00 ft Starting Volume = .000 ac -ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Infilt. Q Total 2S/t + 0 ft cfs ac -ft cfs cfs cfs ------------------------------------------------------------------------------ 698.50 14.55 .548 .00 14.55 279.86 698.60 20.56 .571 .00 20.56 297.09 698.80 37.52 .618 .00 37.52 336.48 699.00 58.88 .664 .00 58.88 380.27 699.20 83.74 .715 .00 83.74 429.68 699.40 111.62 .765 .00 111.62 482.12 699.60 142.21 .818 .00 142.21 538.24 699.80 175.29 .873 .00 175.29 597.85 700.00 210.67 .928 .00 210.67 659.75 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Pond E -V -Q Table Page 6.03 Name.... BMP 2 File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW LEVEL POOL ROUTING DATA HYG Dir = W:\PONDPAK\16157\ Inflow HYG file = NONE STORED - BMP 2 IN 1 Outflow HYG file = NONE STORED - BMP 2 OUT 1 Pond Node Data = BMP 2 Pond Volume Data = BMP 2 Pond Outlet Data = BMP 2 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 689.50 ft Starting Volume = .000 ac -ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Infilt. Q Total 2S/t + 0 ft cfs ac -ft cfs cfs cfs ------------------------------------------------------------------------------ 689.50 .00 .000 .00 .00 .00 690.00 .24 .313 .00 .24 151.77 690.50 .38 .666 .00 .38 322.83 691.00 .48 1.019 .00 .48 493.86 691.50 .56 1.408 .00 .56 682.20 692.00 17.07 1.797 .00 17.07 886.98 692.50 47.19 2.226 .00 47.19 1124.42 693.00 105.98 2.654 .00 105.98 1390.52 693.50 188.33 3.114 .00 188.33 1695.60 694.00 287.54 3.597 .00 287.54 2028.41 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Pond Routed HYG (total out) Page 6.04 Name.... BMP 2 OUT Tag: 1 Event: 1 yr File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Storm... SCS TP II -6 MIN Tag: 1 POND ROUTED TOTAL OUTFLOW HYG... HYG file = HYG ID = BMP 2 OUT HYG Tag = 1 ----------------------------------- Peak Discharge = .41 cfs Time to Peak = 17.6000 hrs HYG Volume = 1.167 ac-ft ----------------------------------- 5/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 10.7500 .00 .00 .00 .00 .00 11.0000 .00 .00 .00 .00 .00 11.2500 .00 .00 .00 .01 .01 11.5000 .01 .01 .01 .02 .03 11.7500 .04 .06 .09 .14 .20 12.0000 .25 .28 .30 .30 .31 12.2500 .32 .32 .33 .33 .33 12.5000 .34 .34 .34 .35 .35 12.7500 .35 .35 .36 .36 .36 13.0000 .36 .36 .37 .37 .37 13.2500 .37 .37 .37 .38 .38 13.5000 .38 .38 .38 .38 .38 13.7500 .38 .38 .38 .38 .39 14.0000 .39 .39 .39 .39 .39 14.2500 .39 .39 .39 .39 .39 14.5000 .39 .39 .39 .39 .39 14.7500 .39 .40 .40 .40 .40 15.0000 .40 .40 .40 .40 .40 15.2500 .40 .40 .40 .40 .40 15.5000 .40 .40 .40 .40 .40 15.7500 .40 .40 .40 .40 .40 16.0000 .40 .40 .40 .40 .41 16.2500 .41 .41 .41 .41 .41 16.5000 .41 .41 .41 .41 .41 16.7500 .41 .41 .41 .41 .41 17.0000 .41 .41 .41 .41 .41 17.2500 .41 .41 .41 .41 .41 17.5000 .41 .41 .41 .41 .41 17.7500 .41 .41 .41 .41 .41 18.0000 .41 .41 .41 .41 .41 18.2500 .41 .41 .41 .41 .41 - 18.5000 .41 .41 .41 .41 .41 18.7500 .41 .41 .41 .41 .41 5/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Pond Routed HYG (total out) Page 6.05 Name.... BMP 2 OUT Tag: 1 Event: 1 yr File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Storm... SCS TP II -6 MIN Tag: 1 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 19.0000 .41 .41 .41 .41 .41 19.2500 .41 .41 .41 .41 .41 19.5000 .41 .41 .41 .41 .41 19.7500 .41 .41 .41 .41 .41 20.0000 .41 .41 .41 .41 .41 20.2500 .41 .41 .41 .41 .41 20.5000 .41 .41 .41 .41 .41 20.7500 .41 .41 .41 .41 .41 21.0000 .41 .41 .41 .41 .41 21.2500 .41 .41 .41 .41 .41 21.5000 .41 .41 .41 .41 .41 21.7500 .41 .41 .41 .41 .41 22.0000 .41 .41 .41 .41 .41 22.2500 .41 .41 .41 .41 .41 22.5000 .41 .41 .41 .41 .41 22.7500 .41 .41 .41 .41 .41 23.0000 .41 .41 .41 .41 .41 23.2500 .41 .41 .41 .41 .41 23.5000 .41 .41 .41 .41 .41 23.7500 .41 .41 .41 .41 .41 24.0000 .41 .41 .41 .40 .40 24.2500 .40 .40 .40 .40 .40 24.5000 .40 .40 .40 .40 .40 24.7500 .40 .40 .40 .40 .40 25.0000 .40 .40 .40 .40 .40 25.2500 .39 .39 .39 .39 .39 25.5000 .39 .39 .39 .39 .39 25.7500 .39 .39 .39 .39 .39 26.0000 .39 .39 .39 .39 .39 26.2500 .39 .39 .38 .38 .38 26.5000 .38 .38 .38 .38 .38 26.7500 .38 .38 .38 .38 .38 27.0000 .38 .38 .38 .38 .38 27.2500 .38 .38 .38 .38 .37 27.5000 .37 .37 .37 .37 .37 27.7500 .37 .37 .37 .37 .37 28.0000 .37 .37 .37 .37 .37 28.2500 .36 .36 .36 .36 .36 28.5000 .36 .36 .36 .36 .36 28.7500 .36 .36 .36 .36 .36 29.0000 .36 .36 .36 .35 .35 29.2500 .35 .35 .35 .35 .35 29.5000 .35 .35 .35 .35 .35 29.7500 .35 .35 .35 .35 .35 30.0000 .34 .34 .34 .34 .34 30.2500 .34 .34 .34 .34 .34 30.5000 .34 .34 .34 .34 .34 S/N: C21B02A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 O >> 3 I M M M M N N N N r -i ri -i a--1 O O O O 0 0 0 0 00 m 00 00 00 1,- n e n lD lD l0 lD lO Ln Ln Ln Ln Ln -qT d' qT �t M M M N • O M M M M M M M M M M M M M M M M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 1 bA 4-I U I m C m i N Cl aJ aJ I- > IT U-1 3 C I 0 o_ r I o_ I • w aJ MMMNNNNr1 cA r -1r -I O O O O OI OI m Ol Ol 0000 co 00 r�I\ I\ N N LO l0 LO l0 Ln Ln Ln Ln Ln MMN O Vl L I M M M M M M M M M M M M M M M M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N .. aJ N } ra i O > I '~ J O m Q Ln 4-J I p Z — O to I Q Ln L N CL Z U II 4- �. � lD HO i -J L i cj'MMMNNNr4-irlr-Ir1 OOOO OI OI OI Ol Ol 00000000 I, n n n n lfl l0 to lfl lD Ln Ln Ln Lnt Nr �t fi d' M M M ON I- V) C O I M M M M M M M M M M M M M M M M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N L Z W QJ 4- I m L F- E to O H L Q aJ QJ Z L E U .. p h -I U •r i N p C +•+ 1 J Ine • r i LA . J O to I I ~ Q (LJ 4 0!� S E C aJ 4-J L O_ r aJ I d•MMre) MNNNNr-i-1-4-10 O O O Ol OI Ol Ol 00000000 Imo r, N r� N LD l0 lD l0 l0 Ln Ln Ln Ln Ln 4� C r1 > Q 0 I M M M M M M M M M M M M M M M M M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N I-- C Q .. i L7 +-I L I r bA I, • • O 7 O_ O (O m Lr) bA af O_ aJ i U 4--i ♦- r -I f6 p d --I L i O LD I--• } C 4J rl S O 4- 4- I LD Ln Z r }Or --IH i -z4-MMMMNNN x14-1--1r-ir--I OOOO OI OI Ol Ol0000000000 I� N N N LD l0 lD lD lO Ln m m m m•c7':T qt z* M M M U S lD C I M M M M M M M M M M M M M M M M M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N LD r -I O i 00 _ i lD aJ Y I aJ i 4--I Q " E 7 0_ I --I •r I N Ln O in F- I 00 Z D I Q I� N O I LD .O C I O C O_ V) I ¢ L O•• U — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — N aJ o_ m 3 L' O � I O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O m aJ 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 • E In I Ln O m O m O Ln O Ln O Ln O m O Ln O m O Ln O m O Ln O m O m O Ln O Ln O Ln O Ln O Ln O Ln O Ln O Ln O Ln O Ln N U • •r L I I,ONLnI,CZ) NLnflONLnI,ONLn1�ONLr) I,ONLnr1 C)NLnI-ONLnIlONLn1�ONLf) I"ONLnI,ON U r0 -r I CL aJ aJ aJ L I O r--1 a --I r --I r -I N N N N M M M M d' � � � Ln Ln Ln Ln lD lO lD to 1� ^ � � 00 00 00 00 Ol Ol OI OI O O CD, (D* r--1 r --I r --I N N • • 'D Q. E r� O I M M M fn M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M d' d' d' d' Z r- T M •r +I >, I O I--• Z L V1 o_ LTOZIVOILO :ajea Zti:9Z:60 :@WLJ_ aindwoD (a98L) S'L 'JGA �aedpuod dnoag SDeeSI aUl ZRV90VZOOTZD :N/S TT' TT' TT' TT' TT' 1 0000'bS TT' TT' TT' TT' TT' I OOSL'£S TT' TT' TT' TT' TT' 10005'£5 TT' TT' TT' TT' TT' I OOSZ'£S TT' TT' TT' TT' ZT' 10000'£5 ZT' ZT' ZT' ZT' ZT' I OOSL'ZS ZT' ZT' ZT' ZT' ZT' 10005'ZS ZT' ZT' ZT' ZT' ZT' I OOSZ'ZS ZT' ZT' ZT' ZT' ZT' 10000'ZS ZT' ZT' ZT' ZT' ZT' I OOSL'TS £T' £T' £T' £T' £T' I OOOS'TS £T' £T' £T' £T' £T' I OOSZ'TS £T' £T' £T' £T' £T' 10000'TS £T' £T' £T' £T' £T' I OOSL'OS £T' £T' £T' £T' £T' 10005'05 VT VT' VT' VT' 17T' I OOSZ'OS tiT' VT' tiT' VT' 17T' 10000'0S tiT' VT' VT' VT' VT' I OOSL'6b tiT' VT' VT' bT' VT' I OOOS'6b t7T' VT' ST' ST' ST' I OOSZ'6V ST' ST' ST' ST' ST' 10000'6V ST' ST' ST' ST' ST' I OOSL'8ti ST' ST' ST' ST' ST' 10005'8b ST' ST' ST' ST' 9T' I OOSZ'8b 9T' 9T' 9T' 9T' 9T' 1 0000'8ti 9T' 9T' 9T' 9T' 9T' I OOSL'Lti 9T' 9T' 9T' 9T' 9T' I OOOS'Lb 9T' 9T' 9T' LT' LT' I OOSZ'Lti LT' LT' LT' LT' LT' 10000'Lb LT' LT' LT' LT' LT' I OOSL'9ti LT' LT' LT' LT' LT' 10005'9t, LT' LT' 8T' 8T' 8T' I OOSZ'9t, 8T' 8T' 8T' 8T' 8T' 10000'9ti 8T' 8T' 8T' 8T' 8T' I OOSL'Sv 8T' 8T' 8T' 8T' 8T' 10005'Sb 6T' 6T' 6T' 6T' 6T' I OOSZ'Sb 6T' 6T' 6T' 6T' 6T' 10000'Sb 6T' 6T' 6T' 6T' 6T' I OOSL'tib 6T' 6T' OZ' OZ' OZ' 10005'tit, OZ' OZ' OZ' OZ' OZ' I OOSZ'tib OZ' OZ' OZ' OZ' OZ' 10000'tib OZ' OZ' TZ' TZ' TZ' I OOSL'£b TZ' TZ' TZ' TZ' TZ' 10005'£ti TZ' TZ' TZ' TZ' TZ' I OOSZ'£b TZ' TZ' TZ' ZZ' ZZ' 10000'£v ZZ' ZZ' ZZ' ZZ' ZZ' I OOSL'Zv ZZ' -------------------------------------------------------------- ZZ' ZZ' ZZ' ZZ' 10005'Zb -MOJ uaea UL amen JSJL� ao� awLJ squasaadai Jeal uo aw l --------- I sau sau OOSO' = JuawaJDUL awLl Indln0 I aw l (spa) S31dNIa10 HdV�JDHGAH T :tel NIW 9 -II dl SDS Mdd'SIS,k]dNV NOIlN313a lld�f3AO-LST9T\LST9T\NddaNOd\:M JA T :juan3 T :tel 100 Z dW9 aweN LO'9 aged (Ino lejol) 9AH Pajno�j puod ....adAi LTOZIVOILO :aIe0 ZV:9Z:60 :awL1 a;ndwoD (o98L) S'L 'aaA >Iopdpuod dnoag saeesI ayl ZSV90VZOSTZD :N/S SO' SO' SO' SO' SO' I OOSL'S9 SO' SO' SO' SO' SO' 10005'59 SO' SO' SO' SO' SO' I OOSZ'S9 SO' SO' SO' SO' SO' 10000'59 SO' SO' SO' SO' 90' I OOSL'V9 90' 90' 90' 90' 90' 10005'ti9 90' 90' 90' 90' 90' I OOSZ'ti9 90' 90' 90' 90' 90' 10000't9 90' 90' 90' 90' 90' I OOSL'£9 90' 90' 90' 90' 90' 10005'£9 90' 90' 90' 90' 90' I OOSZ'£9 90' 90' 90' 90' 90' 10000'£9 90' 90' 90' 90' 90' I OOSL'Z9 90' 90' 90' 90' 90' 10005'Z9 90' 90' 90' 90' 90' I OOSZ'Z9 90' 90' LO' LO' LO' 10000'Z9 LO' LO' LO' LO' LO' I OOSL'T9 LO' LO' LO' LO' LO' I OOOS'T9 LO' LO' LO' LO' LO' I OOSZ'T9 LO' LO' LO' LO' LO' 10000'T9 LO' LO' LO' LO' LO' I OOSL'09 LO' LO' LO' LO' LO' 10005'09 LO' LO' LO' LO' LO' I OOSZ'09 LO' LO' LO' LO' LO' 10000'09 LO' LO' LO' 80' 80' I OOSL'6S 80' 80' 80' 80' 80' I OOOS'6S 80' 80' 80' 80' 80' I OOSZ'6S 80' 80' 80' 80' 80' 10000'6S 80' 80' 80' 80' 80' I OOSL'8S 80' 80' 80' 80' 80' 10005'85 80' 80' 80' 80' 80' I OOSZ'85 80' 80' 80' 80' 80' 10000'85 80' 80' 80' 60' 60' I OOSL'LS 60' 60' 60' 60' 60' I OOOS'LS 60' 60' 60' 60' 60' I OOSZ'LS 60' 60' 60' 60' 60' 10000'LS 60' 60' 60' 60' 60' I OOSL'9S 60' 60' 60' 60' 60' 10005'95 60' 60' 60' 60' 60' I OOSZ'95 60' 60' 60' OT' OT' 10000'95 OT' OT' OT' OT' OT' I OOSL'SS OT' OT' OT' OT' OT' 10005'55 OT' OT' OT' OT' OT' I OOSZ'SS OT' OT' OT' OT' OT' 10000'55 OT' OT' OT' OT' OT' I OOSL*VS OT' OT' OT' OT' OT' 10005'b5 TT' TT' TT' TT' TT'I OOSZ'bS I---- ---------- 'Moa uaea ---------------- UL anleA lsaLJ --------- ao� 3WLI --------------- s:luasaadaa q}al ----------- uo awLl ------ I say say OOSO' = JUawaJDUL awL1 gndln0 I aw l (spa) S31VNIMIO Hdd'd9H0AH T :tel NIW 9 -II dl SDS Mdd'SIS,kIdNV NOI1N3130 lldb3AO-LST9T\LST9T\>IddONOd\:M JA T :}uaA3 T :8e1 100 Z dW9 ...'aweN 80'9 aged (;no le;o;) DAH Pajno�j Puod ....adA1 O rt J. W << Z3 z VVVVVVVVVVVV -1 VV�IV�Immmmmmmmmmmmmmmm 1 0 El _0 Q VV V mmmm UllnlrlvlA•P•PJ:. W W W W NNNNI--I- OOOOIDlDl09.000000000-�I V V V mmmm 1 "'S rD (D rD . *vi Di r) (.nN O �l In N O V Ul N o V Ul N O V Ul N O V vi N O V ul N o V U1 N O V vl N O V Ul N O V N O V Ul N 0 1 J• n N OviCD LnC)Llou'totil OvlovtOun0vl0tnOvlOv"lCD nOtnovlOvlOvioviovlOtnOtil Ov'IOtnO I vl a T. I-' O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 0 0 1 rD • W O O O O O O o O O O O O o O O O O O O O O O O o O O O O o O O O O o 0 o O O O O O O O O O O O I G o c u L cu � D N / 0 7 O Q m I -SON V 00 'D Z Z7 • 00 -4 u O N I J. H "p r_Ul 3 H D rt n (D 7;� (D V m/ Q O F C) o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 3 m S n N W W W W W W W W W W W W W W W W W W W W W W •P •P .9�- A A •A• P. -P, .A •P A S A •P •P •P VI In vi Ul Ul Ul vl Ul 1 H F O r ; vLri rD V 1 —h 1 rt O S I--' rt I C G -I (n O 1 -1 rt p N rt r) 1 rD -o X n v, w a) O I -O C O •• V Qq r-' = I -1 rt Gl I .. a . . . . 1 rD X I O O h OO000OOOOOOOOOOOOOooOOOOOO000OOO00000OOOOO000CDCD0ID G�c S Ili LI) Ww Www W W WwWwW W wWwW Wwww4!�. 4�,.p.p.p.i�-Ph P�-P,•A-P-P�-P�•AvlvlVlvlvlininvl I rD -u rn rt I 7 S 70 I rt rD D I J r wrt 7 Q7 m w J. n H 0 a -S z mn I rD rD D O a --I rn N -S O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 to Ul Ul Ul , Ul Ul vl Ul N IIJ W W W W UJ W W W W W W W W W W W l.0 W W W W •P -P -P •P .4-•A � � -P- •P •P -P- •P •P -P, � V 1 'l rt H m r — o _0 -h II n z A N -1 V1 D Ln o Z I rt ul D v O r rt < O rD w V1 oOooOOOOOOOOOOOOOO00000OOOO0000OOOOOOOO0000OOOOIC-1 Ln O N N W W w W W W W w w w w w w W w w w w w W W •P � A J�:. •P •P •P •P A •A A�:- 4�- •P •P -1�:- Ul Ul Ul vl vl Ul Ul Ul I rD 0 � I C g m 4 I < rD (D N I w 7 N 0 I n rt Uq 1--� I = • . rD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I 1 -1 �- m OOOOOOOOOOOOOOOOOO000OOO00000OOOOOOOOO000OOOOOO10 N N w W w w w w w W W W W W W W W w w w w W W A4�:- A •P •P •P •A �4�- 4N4�- J�- � J, •P vl vl Ul v1 Ul Ul Ul Ul I f O I � lD Type.... Pond Routed HYG (total out) Page 6.10 Name.... BMP 2 OUT Tag: 1 Event: 1 yr File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Storm... SCS TP II -6 MIN Tag: 1 S/N: C21B02AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 77.7500 .02 .02 .02 .02 .02 78.0000 .02 .02 .02 .02 .02 78.2500 .02 .02 .02 .02 .02 78.5000 .02 .02 .02 .02 .02 78.7500 .02 .02 .02 .02 .02 79.0000 .02 .02 .02 .02 .02 79.2500 .02 .02 .02 .02 .02 79.5000 .02 .02 .02 .02 .02 79.7500 .02 .02 .02 .02 .02 80.0000 .02 .02 .02 .02 .02 80.2500 .02 .02 .02 .02 .02 80.5000 .02 .02 .02 .02 .02 80.7500 .02 .02 .02 .02 .02 81.0000 .02 .02 .02 .02 .02 81.2500 .02 .02 .02 .02 .02 81.5000 .02 .02 .02 .02 .02 81.7500 .02 .02 .02 .02 .02 82.0000 .02 .02 .02 .02 .02 82.2500 .02 .02 .02 .02 .02 82.5000 .02 .02 .02 .02 .02 82.7500 .02 .02 .02 .02 .02 83.0000 .02 .02 .02 .02 .02 83.2500 .02 .02 .02 .02 .02 83.5000 .02 .02 .02 .02 .02 83.7500 .02 .02 .02 .02 .02 84.0000 .02 .02 .02 .02 .02 84.2500 .02 .02 .02 .02 .02 84.5000 .02 .02 .02 .02 .02 84.7500 .02 .02 .02 .02 .02 85.0000 .02 .02 .02 .02 .02 85.2500 .02 .02 .02 .02 .01 85.5000 .01 .01 .01 .01 .01 85.7500 .01 .01 .01 .01 .01 86.0000 .01 .01 .01 .01 .01 86.2500 .01 .01 .01 .01 .01 86.5000 .01 .01 .01 .01 .01 86.7500 .01 .01 .01 .01 .01 87.0000 .01 .01 .01 .01 .01 87.2500 .01 .01 .01 .01 .01 87.5000 .01 .01 .01 .01 .01 87.7500 .01 .01 .01 .01 .01 88.0000 .01 .01 .01 .01 .01 88.2500 .01 .01 .01 .01 .01 88.5000 .01 .01 .01 .01 .01 88.7500 .01 .01 .01 .01 .01 89.0000 .01 .01 .01 .01 .01 89.2500 1 .01 .01 .01 .01 .01 S/N: C21B02AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Pond Routed HYG (total out) Page 6.11 Name.... BMP 2 OUT Tag: 1 Event: 1 yr File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Storm... SCS TP II -6 MIN Tag: 1 S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 89.5000 .01 .01 .01 .01 .01 89.7500 .01 .01 .01 .01 .01 90.0000 .01 .01 .01 .01 .01 90.2500 .01 .01 .01 .01 .01 90.5000 .01 .01 .01 .01 .01 90.7500 .01 .01 .01 .01 .01 91.0000 .01 .01 .01 .01 .01 91.2500 .01 .01 .01 .01 .01 91.5000 .01 .01 .01 .01 .01 91.7500 .01 .01 .01 .01 .01 92.0000 .01 .01 .01 .01 .01 92.2500 .01 .01 .01 .01 .01 92.5000 .01 .01 .01 .01 .01 92.7500 .01 .01 .01 .01 .01 93.0000 .01 .01 .01 .01 .01 93.2500 .01 .01 .01 .01 .01 93.5000 .01 .01 .01 .01 .01 93.7500 .01 .01 .01 .01 .01 94.0000 .01 .01 .01 .01 .01 94.2500 .01 .01 .01 .01 .01 94.5000 .01 .01 .01 .01 .01 94.7500 .01 .01 .01 .01 .01 95.0000 .01 .01 .01 .01 .01 95.2500 .01 .01 .01 .01 .01 95.5000 .01 .01 .01 .01 .01 95.7500 .01 .01 .01 .01 .01 96.0000 .01 .01 .01 .01 .01 96.2500 .01 .01 .01 .01 .01 96.5000 .01 .01 .01 .01 .01 96.7500 .01 .01 .01 .01 .01 97.0000 1 .01 .01 .01 .01 .01 97.2500 .01 .01 .01 .01 .01 97.5000 .01 .01 .01 .01 .01 97.7500 .01 .01 .01 .01 .01 98.0000 .01 .01 .01 .01 .01 98.2500 .01 .01 .01 .01 .01 98.5000 .01 .01 .01 .01 .01 98.7500 .01 .01 .01 .01 .01 99.0000 .01 .01 .01 .01 .01 99.2500 .01 .01 .01 .01 .01 99.5000 .01 .01 .01 .01 .01 99.7500 .01 .01 .01 .01 .01 100.0000 .01 .01 .01 .01 .01 100.2500 .01 .01 .01 .01 .01 100.5000 .01 .01 .01 .01 .01 100.7500 .01 .01 .01 .01 .01 101.0000 1 .01 .01 .01 .01 .01 S/N: C21BO2AO6A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Type.... Pond Routed HYG (total out) Page 6.12 Name.... BMP 2 OUT Tag: 1 Event: 1 yr File.... W:\PONDPAK\16157\16157-OVERALL DETENTION ANALYSIS.PPW Storm... SCS TP II -6 MIN Tag: 1 S/N: C21BO2A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 101.2500 .01 .01 .01 .01 .01 101.5000 .01 .01 .01 .01 .01 101.7500 .01 .01 .01 .01 .01 102.0000 .01 .01 .01 .01 .01 102.2500 .01 .01 .01 .01 .01 102.5000 .01 .01 .01 .01 .01 102.7500 .01 .01 .01 .00 .00 103.0000 .00 .00 .00 .00 .00 103.2500 .00 .00 .00 .00 .00 103.5000 .00 .00 .00 .00 .00 103.7500 .00 .00 .00 .00 .00 104.0000 .00 .00 .00 .00 .00 104.2500 .00 .00 .00 .00 .00 104.5000 .00 .00 .00 .00 .00 104.7500 .00 .00 .00 .00 .00 105.0000 .00 .00 .00 .00 .00 105.2500 .00 .00 .00 .00 .00 105.5000 .00 .00 .00 .00 .00 105.7500 .00 .00 .00 .00 .00 106.0000 .00 .00 .00 .00 .00 106.2500 .00 .00 .00 .00 .00 106.5000 .00 .00 .00 .00 .00 106.7500 .00 .00 .00 .00 .00 107.0000 .00 .00 .00 .00 .00 107.2500 .00 .00 .00 .00 .00 107.5000 .00 .00 .00 .00 .00 107.7500 .00 .00 .00 .00 .00 108.0000 .00 .00 .00 .00 .00 108.2500 .00 .00 .00 .00 .00 108.5000 .00 .00 .00 .00 .00 108.7500 .00 .00 .00 .00 .00 109.0000 .00 .00 .00 .00 .00 109.2500 .00 .00 .00 .00 .00 109.5000 .00 .00 .00 .00 .00 109.7500 .00 .00 .00 .00 .00 110.0000 .00 .00 .00 .00 .00 110.2500 .00 .00 .00 .00 .00 110.5000 .00 .00 .00 .00 .00 110.7500 1 .00 S/N: C21BO2A06A82 The Isaacs Group PondPack Ver. 7.5 (786c) Compute Time: 09:26:42 Date: 07/04/2017 Appendix A Index of Starting Page Numbers for ID Names ----- A ----- A-PRE DEV 1... 2.01, 3.01 A -PRE DEV 2... 2.05, 3.02 ----- B ----- B-POST DEV 1... 3.03 B -POST DEV 2... 3.04 B -POST DEV 3... 2.08, 3.05 B -POST DEV 4... 2.12, 3.06 BMP 1... 4.01, 5.01, 6.01 BMP 2... 4.02, 5.04, 6.03, 6.04 ----- W ----- Watershed... 1.01 S/N: C21BO2AO6A82 PondPack Ver. 7.5 (786c) A-1 The Isaacs Group Compute Time: 09:26:42 Date: 07/04/2017