HomeMy WebLinkAbout20170985 Ver 1_B-5371 Union July 25 2017_20170725STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER
GOVERNOR
July 25, 2017
U. S. Army Corps of Engineers
Regulatory Field Ofiice
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
ATTN: Ms. Crystal Amschler
NCDOT Coordinator
JAMES H. TROGDON, III
SECRETARY
Subject: Application for Section 404 Nationwide Permit 13, 23, 33, and 401 Water Quality
Certification for the proposed replacement of Bridge No. 71 over Clear Creek on US 601 in
Union County, Federal Aid Project No. BRSTP-0601(21), Division 10,
TIP No. B-5371. Debit $240 from WBS 46086.1.1.
Dear Madam:
The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 71 over Clear
Creek on US 601 in Union County. Bridge No 71 is a 85- foot long, two span bridge. The replacement
structure will be a 140-foot, two span bridge replaced to the east (downstream) of the current bridge. The
existing bridge will carry trafiic during the construction of the new bridge, as US 601 has trafiic volumes too
high for an off-site detour.
There will be 245 feet of permanent impact to streams by way of:
83 feet of permanent fll to a UT to Clear Creek for placement of the new bridge,
6 feet of permanent fill to a UT to Clear Creek for the placement of rip rap protection at the outlet of
a pipe,
35 feet of permanent fill to a UT to Clear Creek to stabilize existing erosion as it enters Clear Creek.
51 feet of bank stabilization at the outlet of three base ditches (1 @ 15, 1@7, 1@29) into Clear Creek,
70 feet of bank stabilization placed on banks where an existing mass concrete pier currently acts as
the bank.
Total "loss of water" impacts: 1241inear feet,
Total bank stabilization impacts: 121 linear feet.
There will also be a total of 0.02 acre of temporary stream impacts by way o£
<OA1 acre (25 feet) of temporary causeway needed for the removal of an interior mass concrete pier.
(Due to the location of this pier at the edge of a steep bank, this rip rap will be retained to help stabilize
the bank and is accounted for as permanent impact above.)
The remaining 0.01 (78 feet) of temporary impact is necessary for the installation of the bank rip rap
bank stabilization.
MailingAddress: Telephone: (919) 707-6000 Location:
NC DEPARTMENT OF 1i2ANSPORTATION F[iC: (919� 212-57H5 1 OZO BIRCH RIDGE DRNE
NATURAL ENVIRONMENT SECTION Customer Service: 1-877-368-4968 RALEIGH NC 27610
1598 MAIL SERVICE CENTER Website: www.ncdot.gov
Rnt,EiGx NC 27699-1598
Please see enclosed copies of the Pre-Construction Noti�cation (PCN), DMS acceptance letter, stormwater
management plan, permit drawings, and design plans for the above-referenced project. Tl�e Categorical
Exclusion (CE) was completed in January 2016 and distributed shortly thereafter. Additional copies are
available upon request.
This project calls for a letting date of February 20, 2018 and a review date of January 2, 2018.
A copy of this permit application and its distribution list will be posted on tl�e NCDOT Website at:
http://connect.ncdot.gov/resources/Environmental. Ifyou have any questions or need additional information,
please contact Michael Tui•chy at maturchy@ncdot.gov or (9l9) 707-6157.
Sincerely,
�r Philip S. Harris III, P.E., C.P.M.
Natural Environment Section Head
cc: NCDOT Standard Permit Application Distribution List
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre-Construction Notification PCN Form
A licant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 13, 23, 33 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No
1d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes � No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: B-5371 Replacement of Bridge 71 over Clear Creek on US 601
2b. County: Union
2c. Nearest municipality / town: Midland
2d. Subdivision name: n/a
2e. NCDOT only, T.I.P. or state g_5371
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: 919-707-6157
3g. Fax no.: 919-212-5785
3h. Email address: maturchy@ncdot.gov
Page 1 of 11
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 11
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): n/a
1 b. Site coordinates (in decimal degrees):
Latitude: 35.194592 Longitude: - 80.529225
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: Approximately 12 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Clear Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Yadkin-Pee Dee River Basin
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The primary land use is farmland with maintained disturbed homes and small businesses dispersed throughout.
3b. List the total estimated acreage of all existing wetlands on the property:
0.08 acre of wetlands are present on the property.
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
Approximately 842 linear feet of stream exist within project study area.
3d. Explain the purpose of the proposed project:
The purpose of the project is to replace a structurally deficient bridge, built in 1929 (then reconstructed in 1968)
that is approaching the end of its useful life.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project involves replacing a 85-foot long, two- span bridge with a 140-foot long, two-span bridge replaced to
the east (downstream) of the current bridge. The existing bridge will carry traffic during the construction of the
new bridge, as US 601 has traffic volumes too high for an off-site detour.
Standard bridge and road building equipment, such as trucks, dozers, and cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
Page 3 of 11
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
Page 4 of 11
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
Site 1❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of Average Impact length (linear
number - (PER) or jurisdiction stream feet)
Permanent (P) or intermittent (Corps - 404, width
Temporary (T) (INT)? 10 (feet)
DWQ — non-
404, other) Perm Bank Temp
Fill Stab Impact
Site 1� P❑ T Bank Stabilization Clear Creek � PER � Corps 30 121
❑ INT ❑ DWQ
Temporary impact � pER � Corps <0.01 ac
Site 1❑ P� T to install bank Clear Creek � INT ❑ DWQ 30 48
stabilization � ��
Temporary Work � pER � Corps <0.01 ac
Site 1❑ P� T Pad for bridge pier Clear Creek � INT ❑ DWQ 30 25
removal � ��
Riprap at outlet UT to Clear ❑ PER � Corps
Site 2� P❑ T channel Creek (SB) � INT ❑ DWQ 2 6
Temporary impact UT to Clear ❑ PER � Corps <0.01 ac
Site 2❑ P� T to install riprap at Creek SB 2
outlet channel � � � �NT ❑ DWQ (20')
Stabilization of UT to Clear ❑ PER � Corps
Site 2� P❑ T stream at Creek (SB) � INT � p�l�/(� 2 35
confluence
Temporary impact
to above UT to Clear ❑ PER � Corps <0.01 ac
Site 2❑ P� T Stabilization at Creek SB 2
( ) � INT ❑ DWQ (10')
confluence
Permanent fill for UT to Clear ❑ PER � Corps
Site 3� P❑ T new bridge Creek (SA) � INT ❑ DWQ 2 $3
Permanent Fill = 124'
Bank Stabil. = 721
Temporary = 0.02 ac
3h. Total stream and tributary impacts NW 23 = 124'
NW 13 = 121'
NW 33 = 0.02ac (103')
3i. Comments:
Page 5 of 11
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the
U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact
Permanent (P) or (acres)
Tem ora T
01 ❑P�T
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland (acres)
Pond ID Proposed use or purpose of
number pond ded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
Sf. Total
5g. Comments:
5h. Is a dam high hazard permit
required? ❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area
(acres):
5j. Size of pond watershed
(acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason Buffer Zone 1 impact (square Zone 2 impact
Permanent (P) or for Stream name mitigation feet) (square feet)
Tem ora T im act re uired?
B1 ❑P❑T ❑Yes
❑ No
B2 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 6 of 11
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The replacement to the east (downstream) alternative was chosen to avoid more jurisdictional resources
(Wetland A and Stream B). This alternative also provides a better roadway alignment.
A longer bridge will provide an increase in hydraulic connectivity. There will be one interior bent, but it will be
located outside of any jurisdictional resources.
There will be no direct discharge of stormwater into Clear Creek.
The banks of Clear Creek are approximately 5' tall and steep. Bank stabilization will be used in areas of
disturbance to reduce streambank erosion.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Best Management Practices (BMPs) will be utilized during construction to attempt to reduce the stormwater
impacts to the receiving streams due to erosion and runoff.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for � Yes ❑ No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ � Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? � Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. � Yes
4b. Stream mitigation requested: 124 linear feet
4c. If using stream mitigation, stream temperature: � warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
Page 7 of 11
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer ❑ Yes � No
that requires buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
3 (2 for
Zone 1 Catawba
)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
Comments:
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? n/a %
2b. Does this project require a Stormwater Management Plan? � Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
see attached permit drawings
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? n/a
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply):
❑ Session Law 2006-246
❑ Other: N/A
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No n/a
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No n/a
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No n/a
Page 9 of 11
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State � Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) � Yes ❑ No
Comments: - CE completed January 2016.
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetiand Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Not applicable.
Page 10 of 11
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
USFWS website:
Schweinitr's sunflower- No Effect, habitat present, last survey: 10/20/2015.
Michaux's sumac — No Effect, habitat present, last survey: 10/20I2015.
Carolina heelsplitter— No Effect due to the "relatively poor habitat quality, lack of any live native mussel taxa,
and the isolation of this surveyed stream from known species occurrences.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? approved NEPA documents
�Philip S. Harris C.P.M., P.E. �A ��%!� 0�_2S_2o(7
-� / `"
Applicant/Agent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is rovided.
Page 11 of 11
Envirorar�.>r� ;� . -."
���:,..
ROY COOPER
c_ _. �
Mr. PMlip S. Harris, III, P.E., CPM
Project Development and Environmental Analysis Unit
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh, Nort1� Carolina 27699-1598
Dear Mr. Harris:
July 6, 2417
Subject: Mitigation Acceptance Letter:
B-5371, Replace Bridge Number 71 over Clear Creek on US 601, Union County
The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the
compensatory stream mitigation for the subject project. Based on the information supplied by you on July 6, 2017, the
impacts are located in CU 03040105 of the Yadkin River basin in the Southern Piedmont (SP) Eco-Region, and are as
follows:
Yadkin Stream Wetlands Buffer (Sq. Ft.)
03040105 Cold Cool Warm Riparian Non- Coastal Zone 1 Zone 2
SP Riparian Marsh
Impacts (feetlacres) 0 0 124.0 0 0 4 0 0
*3ome of the stream impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See pernut apphcation tor details.
This mitigation acceptance letter replaces the mitigation acceptance letter issiied on June 1, 2017. The
impacts and associated mitigation needs were under projected by the NCDOT in the 2017 impact data. DMS will commit
to implement sufficient compensatory stream mitigation credits to offset the impacts associated with this project as
determined by the regulatory agencies using the delivery tnneline listed in Section F.3.c.iii of the In-Lieu Fee Instrument
dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no
longer be valid and a new mitigation acceptance letter will be required from DMS.
If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420.
Sincerely,
Ja �e B. Stanfill
Credit Management Supervisor
cc: Mr. Crystal Amschler, USACE — Asheville Regulatory Field Office
Ms. Amy Chapman, NCDWR
File: B-5371 Revised
��!��°�iCDiil��d� ����?9b'"t'S�r-._
State oF North Carolina I Environmental QualiTy
217 West Jones Street I 1601 Mail Service Center I Raleigh, North Carolina 27699 1601
9l9 707 8600
l�1�13ti�'�dy North Carolina Department of Transportation
".�Ic.�rt�]^��.'aslt-r �'
. � Highway Stormwater Progrem
STORMWATER MANAGEMENT PLAN `�-�•�^''��
(Version 2.07; Releasetl October 2016) FOR NCDOT PROJECTS
WBS Element: 46086.1.1 TIP No.: B-5371 Count ies : Union Pa e 1 of 10
General Project Information
WBS Element: 46086.1.1 TIP Number: 8-5371 Pro'ect T e: Brid e Re lacement Date: 4!3/2017
NCDOT Contact: WILLIAM G. GALEN CAIL, P.E. Contrector / Desi ner: JEFF RECK, P.E.
Address: HYDRAULICS UNIT Address: MOFFATT & NICHOL
1590 MAIL SERVICE CENTER 4700 FALLS OF NEUSE RD, SUITE 300
RALEIGH, NC 27699 RALEIGH, NC 27609
Phone: 919 707-6711 Phone: 919 781-4626
Emaii: cail ncdot. ov Email: �reck moffattnichol.com
Cit ITown: Fairview Count ies : Union
River Basin(s : Yadkin-Pee Dee CAMA Count ? No
Wetiands wi[hin Project Limi[s? No
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.369 miles Surroundin Land Use: Woods, wetlands, light residential areas, and pastures.
Pro osed Pro'ect Existin Site
Pro'ect Built-U on Area ac. 2.4 ac. 22 ac.
Typical Cross Section Description: 12' TRAVEL LANES. 8' SHOULDER ON BOTH SIDES OF THE ROADWAY. 42'-2" 12' TRAVEL LANES. 3'-6" SHOULDER ON BOTH SIDES OF THE ROADWAY. 35.9'
BRIDGE OUT TO OUT. BRIDGE OUT TO OUT.
Annual Avg Daily Treffic (vehlhr/day): Desi n/Future: 13005 Year. 2032 Existin : 7641 Yeac 2018
General Project Narrative: The project will replace Bridge #71 over Clear Creek on US 601 and its approaches in Union County. The proposed replacement structure is a 54" Prestressed Girder with a
(Description of Minimization of Water face to face length of 150' with a clear roadway width of 40'. This structure provides for 2- 12' travel lanes with 8' shoulders.
Quality Impacts)
There are no wetlands present within the proposed limits of construction. Riprap bank stabilization at the end of proposed ditches and on Ihe banks under the existing bridge will
result in 245 linear teet of permanent stream impacts.
STORMWATER CONTROLS: The proposed bridge project does not utilize deck drains. A stormwater inlet at station -L- 22+� g LT collects runoff from the bridge deck and
discharges it through a pipe to a mitigable jurisdictional stream that flows into Clear Creek. A new ditch is proposed from -L- 13+00 to 22+16 RT and -L- 30+50 to 23+51 RT to
collect runoff from the roadway and discharge it to Clear Creek.
Waterbod �nformation
Surface Water Bod 1: Clear Creek NCDWR Stream Indez No.: 13-17-17
NCDWR Surface Water Classification for Water Body Prima Classification: Class C
Su lemental Classification:
Other Stream Classification:
Im airments: turbidit mercur H
A uatic T&E Species9 No Commenis:
NRTR Stream ID: N!A Buffer Rules in Effect: N/A
Pro'ect Includes Brid e S annin Water Bod ? Yes Deck Drains Dischar e Over Buffer? N/A Dissi ator Pads Provided in Buffer? N/A
Deck Dreins Discharge Over Water Body? No Qf yes, provide justification in the General Project Narrative) Qf yes, describe in the General Project Narrative; if no, justify in the
Qf yes, provide justification in the General Project Narrative) General Project Narrative)
�
�
• �
�
V
�
�
O
V
� i
� � IOWN � O'.
� � St�B9�J? � kO�.AMDIqND
.: .--- � �f\�� BURc o �'�'; ���� o , r � �; �
� �� �°"' co Q �e�yb,e E N D
y� Ie�,�K'aa �� _, �r�o�- � PROJECT
w � r
2 ' _ �
� � BEGIN ����� ��'� '
I_�_ S g�. .Y� y o__
PROJECT I e�`� �9��<� �;-
607 ! P�� a �'
\
�
y--� 601
. � o . � � � � � � , <
� � n y�.��,�� � �"� � ���?��
� �
� � W a y� �� t
I'"o m�� ui !� . O Nlv� .., \
� � � z��� y � s��
� --- VwZI U� CAB HOPEWBtIil HORCH �-� •
[ �_ � N �
� 4 � ,T.. � � � _� �
� �I / STHN LS COUNTY �
���� �� � �Y COUNTY�RO: Kr �
�-..� �xi�fR .
.. � . �i �� �- i— _
�� TO
VICINITY MAP
(NTS)
��'���'I� �� I � ��� I ; �' I�--� ��"��������; s'`�
� 1 `J�� 1L i.�.� 1L `�,O S `V `� � �� � �� ll �� ���, �r� .i19 �.Y
U1�141� CO U1�TY
LOCATION: REPLACE BRIDGE No. 71 OVER CLEAR CREEK ON US 601
TYPE OF WORK: GRADING, DRAI11lAGE, PAVING, A1VD STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
PERMIT DRAWING
SHEET 2 OF 10
'
i�2° �
,�P
O $
NP
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
THERE IS NO CONTROL OF ACCESS ON THIS PROJECT.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III
NCDOT CONTACT: GALEN CAIL, P.E.
dIiT�C'�O1�lilP1L�"ll'lE ll�ll.,�N�
6D VOT USC FOR Rf W A('QUISiI'ION
DOCIIMENT NOT CONSIOERED FINAL
UNLE55 ALL SIGNATURES GOMPLETED
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH l'repa�ed for NcooT in the Offlce of: gyDRAULICS ENGINEER
1/11moffatt & nlchol ,",
50 25 0 50 10o ADT 2018 = 7,641 g�, �i
ADT 2038 = 13,005 �� ��� � �� N� ����� ���� moffatt & nichol ;� �,�
p 2012 STANDARD SPECIFICATIONS
v /
/ .>' ^- .
K= 10 /o LENGTH OF ROADWAY TIP PROJECT B-5371 = 0.341 MILES � �>`�
PLANS G
D= 55 % LENGTH OF STRUCTURE TIP PROJECT B-5371 = 0.028 MILES sicNaTri�e; P� l� --� �
50 25 0 50 i00 T— Zp %* RIGHT OF WAY DATE: TIM R. REID, P.E. ROADWAY DESIGN ��
TOTAL LENGTH OF TIP PROJECT B-5371 = 0.369 MILES PRo�Ecr s�•crxFFx I a��' �`>�
V= 60 MPH FEBRUARY 17, 20V ENGINEER ��� ��� �,
PROFILE (HORIZONTAL) * TTST =11% DUAL 9% ,", �� "'°� �
\ `:,"��i rva��;:��
l0 5 0 l0 20 FUNC CLASS = LETTING DATE: TRENT E. HUFFMAN, P.E. moffatt & nichol
MINOR ARTERIAL FEBRUARY 20, 2018 rno�Ecr DEsrcx sxc7NCEn
PROFILE (VERTICAL) REGIONAL TIER PE
SIGNA7TIRE:
DETAIL A DETAIL C
NT DITCH LATERAL BASE DITCH
� No� �a smiel I n.,i io s�oie�
�°r` �
�n
sioae
Gro�nd 3;� D F��s� G�ound 3.� p 3� ��'��- slop�
B Min, D- 1.0 Ff.
O ! Min. �= 1.0 F. � B= 4.0 Fi.
6- 5.0 Ff.
-L- STA. 13 - 00(LT) TO STA. 74 i 93.30jLT)
-L- STA. 29+OO�Ln TO STA. 30+SO�LT) -L- STA. 18+OO�R"n TO STA. 22+16�RT)
DETAIL B
SPECIAL CUT BASE DITCH
( Not to Scale)
Naw,oi � o� �. r,o��
GrounA 3:/ 3' t�e< prt<n
d � F�� sioce
B M n. �= 1.0 Ft.
Max.d= 1.0 F.
B- 4.0 FI.
Type of Liner- PSRM
-L- STA. 73+OO�RT) TO STA. 18+OO�RT�
DETAIL D
PIPE OUTLET CHANNEL
� Nai �o Smlel
"c-,wa"'°'r . . ,, o �� ---c:'o��a
�
Lengrh- 5 Ft.@^^r��
d= 1.5 Fr. �v���anie�
Est. = 4 Tons oi Closs I Rip-Rop
5 SY of GEOTEXTILE
FROM STA 22+20 -L- TO STA 22+25 -L- LT
—DR5— PT 10+57.0/
SKETCH SHOWING BRIDGE RELATIVE
TO PROPOSED PAVEMENT
t -L- STA 22+45.00
�
-L - '='l :tr,' �/tc,4.7i
u
�
L
L GRAU 350 Tl-� TYPE B-77
s' TVPE �77
- BEGIN APPROACH SLAB
" -L- STA. 22+20.86
�r r
�N
� ��, a
END BRIDGE
N 2 1' : J-! 3Gef"„ r
!D APPROACH SL
-L- STA. 24+19.14
�
—DR5— PT 13+19.97
END CONSTRUCTl�1�
NOTES: O
1. PRE-FENCING SHALL FOILOW PROPOSED EASEMENT �. .'
OR PROPOSED RIGHT OF WAY LINES. BEGIN AND
END OF PRE-FENCING IS LABELED ON PLP,N
2. ACCESS TO EXISTING DRIVEWAYS -DRI-,-DR2-,
-DR3- AND -DR4- SHAIL BE MAINTAINED DURING
CONSTRUCTION
3. THE EXISTING PAVEMENT STRUCTURE ON THE
PORTION OF US 601 TO BE ABANDONED
SHALL BE REMOVED ONCE TRAFFIC HAS BEEN SHIFTED
TO FINAL PAT(ERN. RIGHT OF WAY WILL REMAIN
ANO SHALL NOT BE ABANDONEO FOR FUTURE USE.
PROJECT REFERENCE NO. SHEET NO.
F,-c_ � ri4��_
RNJ SHEEf NO. P�H-O�rt
- ROADWAY DESIGN HYDRAULICS
- - - - ENGINEER ENGINEER
�dN��i�1�l�1LE ]E ➢�1L�N�
0�1 DD VOT VSP. FUR !W' ACQUI9ITION
P2 �
�a.Y
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
,,,,moftatt & nlcnoi �- -
PERMIT DRAWING
SHEET 3 OF 10
i �
�
; � 0�
���,i � � � � �.
� ' � .�
�I I �� SITE 1
RAP ENBANKMENT
8 IMPACTS IN
iURFACC WATER
/SrtE 1
TEMP.CAUSFWAV
8 TEMP.IMPAGTS IN
� Sl1RFACE WATER
SITE 3
BRIDGE & IMPACTS
IN SURFACE WATER
/J
�
�
�
�
+ �
� W
N w
Q =
� N
N W
W w
Z N
J
_
V
H
2
s�rE �
�TREAM STnBILIZATION
6 IMPACTS IN
SURFACE WAiER
N
Z
�
N
�
K
J
�
0
� �
0 �
� �
+ � �
� f'"' �
N W �
= I
NN �
W
W N �
Z
J
_
U
2
O---. .... ___.--- - � � . _._ . — ..
5 ___ - ---- --- - -- --- --- ----
. . . _ � �_' --�
� i
� DENOTES IMPACTS IN � -
SURFACE WATER ! � � ��=
,
- i - -
N . ;, __ y =_ �y ��� �
w .M.,,.. _ �„��,�-; ' r'�� 't ;n,� ;
1 i` � i y r`w' `'' i
, ���� �= �`
� , � � ,� � � , - -
, � r� __
� �' � ��� r�
� -L- PC Sto. 25+03.2/ ' ( � r �3 ' ' � % !
'L ' � i I ' � � L
� � I ,
- j �� �- ='� � , -, � �;' ,,
�
� � I � -�� n� �1 �'�
� �
1':_,��� � � I i' - .
O
r
NOTES:
1. PRE-FENCING SHALL FOLLOW PROPOSED EASEMENT
OR PROPOSED RIGHT OF WAY LINES. BEGIN AND
END OF PRE-FENCING IS LABELED ON PLAN �
2. ACCESS TO E%ISTING DRNEWAYS -DRI-,-OR2-,
-DR3- AND -0R4- SHALL BE MAINTAINED DURING
CONSTRUCTION
3. THE EXISTING PAVEMENT STRUCTURE ON THE
PORTION OF US 601 TO BE ABANDONED
SHALL BE REMOVED ONCE TRAfFIC HAS BEEN SHIFfED �i
TO FINAL PATTERN. RIGHT OF WAY WILL REMAIN 1\
AND SHALL NOT BE ABANDONED FOR FUTURE USE.
�J I � --- —� . RET ; --- . .
� I
_r =- '�,nV�e .—w RFT DI� � I � �J -- �
'ROTECTION' �, .: - � ��� I µ� '
ETAIL H �/ �,I ,-- _-'_ � '� S_.
0 SY PSRAk -� —
_ . �� 1 � l�: ��/r, -
/ � ::�d,.'� �' r� -
_ / � � w
. _�''___---, �
'_ � I -.-,--..,_ i�s.�-�.�,.".
- � /
r� � C� � / � -�
�: 1 i ,�-. ._ ,.
�
� ��-� -�- � � � . �
� � �> � , _
-- `1u/ ; ? 1
- j %
� �'�' , � '�'� , �
� � � �
, , �
F�' � �. •" ��i
� ,,,
�� �.; i _
�r 4_ �� .. / / r ,
� -..� . ��� i
; I . _ DETAIL D__.. �
-L-STA.24+14(RT)TO STA.26+50(RT)
-L- STA. 26+SO�RTJ TO STA. 30+SO�RT�
S �'
�
PROJECT REFERENCE NO. SHEET NO.
r;-�J/�i �'c�r.�-'
RMI SHEEf NO. P_` f"I-i��''
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
����moffatt & rilcnoi -,x
PERMIT DRAWING
SHEET 4 OF 10
-L- STA.13r00(LT)TO STA.74:g3.30(LT)
-l- STA. 29+p0�LT) TO STA. 30+SO�LTf
-L-STA.23+51(RT�TO STA.24+14(RT�
-L- STA. 30+85(RT� TO STA. 32+00(RT�
DETAIL A DETAIL C
NT DITCH LATERAL BASE DITCH
� No� �a smiel I n.,i io s�oie�
�°r` �
�n
sioae
Gro�nd 3;� D F��s� G�ound 3.� p 3� ��'��- slop�
B Min, D- 1.0 Ff.
O ! Min. �= 1.0 F. � B= 4.0 Fi.
6- 5.0 Ff.
-L- STA. 13 - 00(LT) TO STA. 74 i 93.30jLT)
-L- STA. 29+OO�Ln TO STA. 30+SO�LT) -L- STA. 18+OO�R"n TO STA. 22+16�RT)
DETAIL B
SPECIAL CUT BASE DITCH
( Not to Scale)
Naw,oi � o� �. r,o��
GrounA 3:/ 3' t�e< prt<n
d � F�� sioce
B M n. �= 1.0 Ft.
Max.d= 1.0 F.
B- 4.0 FI.
Type of Liner- PSRM
-L- STA. 73+OO�RT) TO STA. 18+OO�RT�
—L— POT Sta. 10-�-00.00
s \
`
DETAIL D
PIPE OUTLET CHANNEL
� Nai �o Smlel
"c-,wa"'°'r . . ,, o �� ---c:'o��a
�
Lengrh- 5 Ft.@^^r��
d= 1.5 Fr. �v���anie�
Est. = 4 Tons oi Closs I Rip-Rop
5 SY of GEOTEXTILE
FROM STA 22+20 -L- TO STA 22+25 -L- LT
/� \
% / ` \
\ a
�
F\ \ , \
\\ � ,-_ � `__ a
�\ ��.._\ �
// f
m
�
14+17.85=
� C �pE'�T
� -�`>��F
-- \ \f�
�
\
\
� F
\
2�,1
�� P
O �
�P
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
SITE ]
RIPRAP OUTLET CHANNEL
8 IMPACTS IN
a � SURFACE WATER
� ��s��sr�� —L — PT Sta. 2l +94.7/
- _..._ � \ ` � � .. _
� C�
C �� --,.. � `�—C!
\. '�= �--__�_-7�SL-= —_
� ` '�._ \ ` .. . . .. _-"---Y�-cf= -- — �5._- .
� ._ lo � .. _ ._______ —Sf—.—:._.
J� � -�' � I � �� � � - .. . - . - -- - . - - - - � �
4:.� � � - __ __'. _ __ _
�� � � � - � O - -� �
' �C �c� �I�o
p�� ..� �� �a �� �� - � - - . -�� ��
F E�\�vF�����,
m �4 \� \ \ \a �
� � aPU� �d ..
—DR5— OT 10+00.0 E\_ F � \
\
F � �
F E �
-ORS- PC 10+37.0/ F .
BEGIN CONSTRUCTION —DRS— PC 12+86.75 �
—DR5— PT 10+57.0/
SKETCH SHOWING BRIDGE RELATIVE
TO PROPOSED PAVEMENT
—DR5— PT 13+19.97
END CONSTRUCTlO�
—np�— Ar r�-cR�
NOTES:
1. PRE-FENCING SHALL FOILOW PROPOSED EASEMENT
OR PROPOSED RIGHT OF WAY LINES. BEGIN AND
END OF PRE-FENCING IS LABELED ON PLP,N
2. ACCESS TO EXISTING DRIVEWAYS -DRI-,-DR2-,
-DR3- AND -DR4- SHAIL BE MAINTAINED DURING
CONSTRUCTION
3. THE EXISTING PAVEMENT STRUCTURE ON THE
PORTION OF US 601 TO BE ABANDONED
SHALL BE REMOVED ONCE TRAFFIC HAS BEEN SHIFTED
TO FINAL PAT(ERN. RIGHT OF WAY WILL REMAIN
ANO SHALL NOT BE ABANDONEO FOR FUTURE USE.
\� . �
�\
�4�\
't�� a �� � = _ _
y ��v�`� . _- � �_ _ _ — —
� ��_—F-�t � r��- F
�S'i r ��_
0
PROJECT REFERENCE NO. SHEET NO.
F,—c � / C'Lf�/„�--�
/V
RNJ SHEEf NO. P�H—O-rt
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
dN��i�1�l�1LE ]E ➢�1L�N4
DD VOT VSP. FUR !W' ACQUI9ITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
,,,,moftatt & nlcnoi �- -,x
PERMIT DRAWING
SHEET 5 OF 10
� /
/ O/
/ j
/ I
III I �
��, —, �
�o� �SITE 4 \ � .��
STREAM STABILIZATION ��
8 IMPnCTS IN �� TS
SURFACE WATER \I N
— PDE .�N PD� m
; TS TS -� ;�
vi. I R �
u
SITE 1
RIPRAP ENBAI
a iMrntr
SURFACC N
" SITE 1
TEMP.CAUSFWAV
8 TEMP.IMPAGTS IN
' Sl1RFACE WATER
SITE 3
BRIDGE & IMPACTS
IN SURFnCE WATER
�
�
i', Q
1I �
1" + "'
�.�
�� � W
� !� N W
Q =
� N
N W
W w
li i ? N
� i-
_
V
_ �
2
Z
�
w
�
O---. .... ___.-
�DENOTES IMPACTS IN
SURFACE WATER
N
SITE 3
BRI�GE 8 IMPACTS
IN SURFACE WATER
J —
I _
� � �,�,�
O � �' � - � -
o � ' �i S G�
O �°
+� �
� i""' �
N W �
= i
NN �
W N
W
Z `n � �'�
_ =��-,=
U
Z
-L- PC Sto.25+03.21
I -� ._
� � _——
,
� ,
v .. �,, ,.r.-, -.,..�� t'� k
�,_, �
� �w�
_ ��.��' .� .
' � -OR4- PT 10+00.00
�'
�l�lliL���ss ��_".-".-,, _
Y„
� 1 1 1 1 1 1 x r 1 i x 1 1�, 4�
�,� 1' 1� 1 Jc � 1�. �z' 1 4 i i� .
i i i'.ti �� �s 1.k 1 1'.r.
. . . . � ��av � i 4 1 y �LFd'" ._ _ .. . t . .
� =- � � �
�o
, ,
�
-- __ . _ --- _, �--�
� p � _ _
�� t�� �- ��—_ —Q� _-__ _ . C- __ � _ — _ _
u �
_— PPES y
� CI �CF
_ � _� ;:�_ �-��' c " � �
-OR4- Pl ll+/7.56
�
�
�P L
�a
NP
f-- --- _ . �
�
I II ,
I I
I
i
p RET
I !0 '�
�
I I �
� __
� � -L- PT Sta; 33+78.83
I— /I
-: I �, �� � � ,.
I' / I
I � I
— � I . _ _ _- I
__ F�
5°0.. -- . --- F _ � r- _ _ - . _
� _ -- 4
REM � __ 4-��
f =— -
� �------ �
-- �,y i w
m
F 'F
-DR2- POT Il+1034
�
�� �
� ���._ - _ � I�� � �_
^�� � F? I 1
-�:1�� - � _ ���J! II . II �.
I +�
1
�I - / I II
� �
O
r
NOTES:
1. PRE-FENCING SHALL FOLLOW PROPOSED EASEMENT
OR PROPOSED RIGHT OF WAY LINES. BEGIN AND �
END OF PRE-FENCING IS LABELED ON PLAN
2. ACCESS TO E%ISTING DRNEWAYS -DRI-,-OR2-,
-DR3- AND -0R4- SHALL BE MAINTAINED DURING
CONSTRUCTION
3. THE EXISTING PAVEMENT STRUCTURE ON THE
PORTION OF US 601 TO BE ABANDONED
SHALL BE REMOVED ONCE TRAfFIC HAS BEEN SHIFfED
TO FINAL PATTERN. RIGHT OF WAY WILL REMAIN
AND SHALL NOT BE ABANDONED FOR FUTURE USE.
� ,.r,/� -
G�
1 / ��i
�r,' � „n�� � k.;. �
O
��
i �
�
F �
/ � . TOE PROTECTION I
SEE DETAIL H
� I E5T.80 SY PSRM �
+
PROJECT REFERENCE NO. SHEET NO.
r;—�Jl�i l-���h'�—c
RMI SHEEf NO. P_` f"I—�J�-. �
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
����moffatt & rilcnoi -,x
PERMIT DRAWING
SHEET 6 OF 10
RET ,
� �
_ � � I
__ - _,—,�S;V+c ri w RET DI - I
I;
� IJ
� {..7
` ¢'.�3 �li; -
`,
I\ - � ��.� �. � _
i �
,J�/ . � \
/ / 1
� � �_ ` ,
`�' �'i � � � �''' � DETAIL A
� / � � � NT DITCH
`� / / � •,` � \ � ��f I No�jo 5cole)
-�I � �/ \/ I � � `Dii�h
/ / � � Gro�+d 3� �� �'F�o��s Slope
f D
� } Min. D��� 1.0 F1.
� -L- STA.13r00(LT)TO STA.74:g3.30(LT)
-l- STA. 29+p0�LT) TO STA. 30+SO�LTf
I : DETAIL D DETAIL F
L4TERAl BASE DITCH LATERAL BASE DITCH
� N i�o s�oiel I�� va smlel
I � j'� 6 ''{
,I Gro�nd J,.l p 3.\ �•�iF� \— Fill G�o�nd l.� p�,� �� � SIaPe
siooe d
..�'I Min. D= 1.0 Ft. G[Oi[nit[ B
I B= 2.0 Ft. Min. D= 7.0 Fi.
b- 5.0 Ft_ Max.d- 1.0 R.
•when e I: < bo' B= Z.0 F�.
-L- $TA.24+14(RT)TO $TA.26+50(RT) Type of�ner= Cu55 B Rip-Rap 6= 5.0 Ft.
-L-STA.23+51(RT�TO STA.24+14(RT�
DETAIL G DETAII H
SPECIAL NT BASE DITCH TpE PROTECTION
� H�.o s�aie� I Nm ro s�oiai
( \ re
Nai�ral `o� —F,;F 'S�F`\%�ope
G.aund 3�� p 3� Noiurol —
� � � P°'�e � Gro��d d
�.,�� Min.�= 1.0 Fisla �.. -� —PSRm
B= 2.0 Ft. d- 1.0 Ft.
-L- STA.26+SO�RTJ TO STA. 30+SO�RT� Type o(L�ner= PSRM
-L- STA. 30+85(RT� TO STA. 32+00(RT�
0
�
�
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
DENOTES IMPACTS IN
SURFACE WATER P Zp11
���
SITE 2
RIPRAP OUTLET CHANNEL
& IMPACTS IN
SURFACE WATER
- TS
-5�==--- -- ���
—_�i
F
�
— —c�
�� �
� �
� �
TB 2G1
I I
�I�
` L� �
N �/1
—_1
�1
��` V
�
\
SITE 2 m ' ��,�
STREAM STABILIZATION �
& IMPACTS IN `' °'
SURFACE WATER `� TS
PDE � �, P E `�
S TS TS
� ��'�i-i
�_ -_ -_��_ i��� i-ii� _ � i�� �i
� �- �-
��
�
C�
i' � �� � - - - m
;�_i,�
a ���u��«u�,�
a_�'�-�`� ��� �; S -- TS
�.�_�a i �
� �,���a � — ' ' —,
— ����
� � � — � �.�_��� � ��, �
�i � �i'�i_�I+ �
fii��.
i1ii��i ��
��1��� iiii I
�� �i �.
��i��� I � i i
�I�li� - iii =
��� ( ��II
_ - '1��,' J
� �I I_� ` � - � _�_
I i_l
�
��i�
�"T �i
��
SITE 3
BRIDGE & IMPACTS
IN SURFACE WATER
SITE 1
RIPRAP ENBANKMENT
& IMPACTS IN
SURFACE WATER
SITE 1
TEMP. CAUSEWAY
& TEMP. IMPACTS IN
SURFACE WATER
PDE
,
, � � F _ ---
� ��1� ��� --_ - -
���l�l l I i � �� �,
�-,- i ��'
�Y i��, ,Y� — ----
/��i r i � �;�,�- rl -
$ ��;,���' "''
�� �� ,Z� � — —
����i�_�;
�
�� �}l�l.i Q� QI
�-� �-� --
�,� % t� � C�
i=y �� � Y'
1 i �. ,
�� � �� i,i;,
r � I I Y I� -
�i � -
% :i.�i
� � �i
�~ ' � i I i
_ _._r�r-rTY I !.� � \
� I��Ll l �_� l`I � �y
� I i I�II i t�=-- �1 �- -- — _,I��
iiii_i_�� �
���1�' � �
-- —%��_����� �
F�, / ,,
� � , �_
� TS
���� �� s ��TS
��ia� il�rl.� , ��
�,i�l �vl�.l � i i ,
Ill��if� � �
� ii
� rl I�1 I I 1_1 ". /� .01
SITE 1
STREAM STABILIZATION
& IMPACTS IN
SURFACE WATER
SITE 1
RIPRAP ENBANKMENT
& IMPACTS IN
SURFACE WATER
PROJECT REFERENCE NO. SHEET NO.
-_� �-, Fr�M-�
RM/ SMEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
IIN�C����JL1E 'E 1�]L�N�
DO NOT L�SE FOR ! W .1COUt51TlON
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
���\�n�f�a,�r & ���no� „� o„
� ��_ ��_ No`:"F �,
PERMIT DRAWING
SHEET 7 OF 10
; �
--- - BRIDGE HYDRAULIC DATA
i - L� I DESIGN DISCHAR�E = 4500
. . . . . . . . . . . . . . . . . . . . .
DESIGN FREOUENCY = 50
� ' DESIGN HW ELEVATION = 974.9
. ___ I_ � � I I i i I BASE DISCHARGE = 5206
_ i_ li
��. : : � � � . . . . . . . . �.. .. �I I I i i ,... .�,. i i � .. � . ��. �� i i � �:� - I00
� � I BASE FREQUENCY -
il
BASE HVy ELEVATION - 975.7/
j I I�� I � I II I I I I I I I � I I� I� I I I I I OVERTOPPING DISCHARGE _ 12000
CFS
YRS
FT
CFS
YRS
FT
CFS
PERMIT DRAWING
SHEET 8 OF 10
_� ............ . _...... .;....... ...........
I
�
BM2 ELEVATION = 472.99'
N 529,335.02 E 1,543,084.54
_. -L- STA 23+68.27 151.91' (LT) _
PROJECT REFERENCE NO. SHEET NO.
B-537/ PRM-7
ROAOWAV DESIGN HYDRAULICS
ENGWEER ENGINEER
p1�CtC➢l�l[1P1LE�f'lE ��,.�N�
Il0 NOT L�56 i�`OR i! W ACqU151TiDN
DOCUMENT NOT CONSIDERED FINAL
I � i i OVERrOPPING FREQUENCY- �500 YRS � RR SPIKE IN ROOT OF 36 OAK TREE UNLESS ALL SIGNATURES COMPLETED
� � OVERTOPPING ELEVATlON = 479.3 FT � ���� � �
_. BEGIN GRADE � , I, � � mo,�arf & ���h��
N �� �` � F �.,9...
-L - ST A 12+50.00 i __ . . ,
_ ---- �`� DATE OF SURVEY = 02/04/20/6 -' ----
-
510 ' � � � o�� i i I�I! i I ' I I '! �
__
3,52 � � �
ELEV 4S' i � II i i I I I I I W.S.ELEVATION = 462.6 FT , END BRIDGE
' � + ��n iu � � � � � � � � � --- -'--- --' i BEGIN BRIDGE
500 -_-___ _ _ o� J �i I --- A J DATE OF SURVEY STA 22+45.00 - - --STA 23+95.00 _,
__� I'- Pl - l5 65.00 �, � i � i i i i I � _ I -- ' --
i i
PI 20+00.00 � � � j �
EL - 477.92 I i I i � � � � i � � � I EL = 482.02' I � �
. .�. . . . . . . . . . . . . . . . . . . . . . . . . ' KC = l 390' . . . �. . �, . ��. i .:I ; i ; . . �. . .. VC-= IZO� . . . . . .�. . . I APPROXIMATE � I . . . �,
4QO ,_ � : : . .� ��, � � � � I� � � .. K l86 � EXCAVATION = 7,200 CY
- - ----- --- - � - �
. _. _ .. � � . _--i - ---
-. i _ . - �. : . : - : . �: : - : - : : � �. , . . . � I �:I i i I i i I i � '. i i ' i i � . . . . - _ . _ - - _ ,' _. - STRUCTURE PAY ITEM � � �. : : . _ .
�
. . . . �� .. '� �� i � . I : . . � i i i . : � � �..
. . . . . . . i . �. . i . . , , ,
: i
� � . . . . . .. . .. . . i . . i �. ..,
-- � _ � � - -- -- _ _ _ __ __ - i _ _. _ _ 1+10.9444% �+10.3000% __ �. ___ __- �- � I ___ _ ---- - '
i � il � i , __
480 ' -- -
- —� �- � � � �
i-- = - r-J 347% ` - - - - � _
_
___ I - - _ _ _ �-J1.7779% (+J0,9444'/.
- -- 1- ` i CLASS II RIPRAP
� (-J.3..yyp� - - -
� - _�__ .. ��t ^` EST.370 TONS .56 �'R� - � ` _.
. . . . J . . � . . , . _ � _- � - - - _ '�.. _ �l -J /..35% i . , � . I � `` . . . . . . . . . ._ . . .. STRUCTURE PAY ITEM . . _ L V 9 (+J 'i �: . .
47� - ��: O � O p - - - -� - -'- - - - -- _ . . , '�' � �_ --,— — — -� ` . _ '� . . ,
O p � . �. � I � . _ � ����� . . I �-"� . ' � a �.•t ; - . , , . — .
o� +� `- oo -� i i - -- -�- --�--j------ - Il_05%'----_ ~!_ �` �__ �I
62%
+ � o �. � o -�-- __ � � --� � -- ' � 1 � - - � � � '; —
DITCH LEGEND o Q� * I �� � � � � � � � � � � � � I I i i i o o , _ _ - -- � ' -o , i._
� o
rn 1 (- i i i
� � � M i i I
460 * � � - � � o �o - �- �-� � II'� ~ I � + � '
I � -i �r i �� �1 fi�, , , �1 I a t , , � ; I� � i ivws 46z.s �r i-. � -_
LEFT DITCH - — i F y N I r y I I + `i1
- o�n ; ! i �
RIGHT DITCH - - - - - - ' � _ _ _ _ _ � � : � : FOR PLa, _ I � � _ -_ _ _ _ c�a.ss u eiPaaP '. -
_ ___
45� N VIEW SEE SHEET 4 �o ES7.32o 7oN5
'�' V �� - STRUCTURE PAY REM
11 12 13 14 15 16 17 18 19 20 21 22 23 24
510
� 5Q0
� 490
�
480
�`- 470
G��
���i:
, � , ,
i i � i i � � � � � � � � � I � � I I
� , , , � , ,
---- i i - i - , i - -i -, . --i - - —_ _
. . _ . _ . . -- �- -- : . ,_ _ . ' . . ' . _ .J— il. �.. il il �.. il . . il . il il : ii ' i �, �. I �, � ��. il ���. . .. : _ .. - - . . . : . : : : _ . . : _ — - - - . . -,� : �. --- : _ I �. _ �.
.. �:- -- - -- -.. ._.- -- - -'- - --- - -- ---_ __. �i�.: � _. —.. .__: .
---- , �. .. , �,. i. �. : , . . -�.. . '_ _ --� - . , , �..
- �-r -- --�-- . T . . : - �� - ii �i - n��i i ��- � -- -� - - --.. .. -._.
- - - - -- . - .. . - � r� r il i � � i i - � il �.� 7 il �. ii r� i� � - - — - -- - -� - _� - . - _ ..
_ � .: :. _. _ .. .. :.. � - - �. �. : I -- i . I i ��. � .� .. ; .. _._ .. __ .. i �. . __ . -__
I- r -; I I 1 I �: I : I� r
� � I_ i i i � I I � I I � - I � i i -- _ � i
�—u i� u�i - �u � i u� i i -- I i
� � i
-� - � - � � � �� -- _
_ � � ; r k �� - I �� k � I =r, � ��� ; I k ` , � --� _-� � ; - ; _- _ �
� , - -�7—�� i 7 � r i -� r�l r�� � . -� -- - . - �
� � � a— �� �-�� '�. � i � �� � �u � i , -
_ a
- - �
_
T -_ =� _ _ � �� � k � I END GRADE � - _ - w � - - --
-- _
-- -- - h � �-, n � �- h ;T �� -L - ST A 32+00,00 ' -; >
� - -- --� �—�� � _ �r � - ��, � � rn � , - Q '- - —
_ _ -- _
_ ,— --- L � : _ � a � I � � _ � '_ � a _ � � I � : ELEV = 503,33 , -- � J � == - - —
� -- : —� _ _ �— � 1 ' N L ' _- � y � � u U � � � --� � _ w - - _
� � . � o ' -- � � � � � �- _ +- -- _
� ' ��I I I� � I � i m t -- - -
--- I_ � �
__ �c _ i . . __
1 � �
— -- -
� n r, 7 , � �
i —T- - � cn � � � i i �- �
� . � � � �i � �I �i �
- -- = -- ----- - . . _ _ _
-- -- _ i i i
- T - -_ . , �- � Q � k L �I � l � � �` Pl = 3/-h00.00 � � � � - _ - I
-� h h 7�T EL = 500.56' i i i i`'i '� _ -- � � _
--- --- , --- - ---- i h i _
-- _ - ---
� KC = /70, ii �
� , � 'I�� ��I I� il � _ /5/ � �
_ m _� I I _ I__ V � I_. '-- i -
I � - i l i I I i I l i , i ! I _- I � �- - i � �
--- _ ----
-- � _ , --' _ ---- -_ .
� _ _ �+12T633% I J
_ _ : : J EL-_ �4.05'� _ i �� � I __I I i � - I I g855'� ___ _' - - - :_ � - - _ _ _ ' - - . . �
� � � �+)3. �
: { VC 490' 1 I l — / I
_ _- - — , �- -� _ - -- --- - -- -- -- - ------ -- ---- - --- --- --
, : - � s �_'(+) 4p69 _ _ -� ;
_ � �
i__ ; � - • i I; il ,i
( J 073% i ,
`I
--- - ---- ' —
--,- _ ,
_ ,- -II � � _ �+) 4.5 ! � � �-i � ---; -
� � � I I��I � �
--',48% �� l o 0 0 o g o �� F'' - I DITCH LEGE D
�+13.8 �� oN oo� �� __ N '
S55° (+) 3- -.- _ - � _',
� � i__ .� i � � - � v � v . I�' � � � � LEFT DITCH _: __. .
- ti � o
�-,�' � o +v
_ p
I (+)2.8����+)030001% I �� o� . o� , � -------
�.
� ' ' � "' v +�- � i � I� I� I� I I I II �
_
� rt �1-� � � � � , + v i � �� , � i RIGHT DITCH .
i � i I
0
. � : � �i � � I ...f �.. I.I �, . �, �. �, . . �. i II �..lill ,I1 ill, Ilii I ,I ��iill Il��i I .I��ii.l ..... .. . . .. i�.. I . �. I : .. .. �. .. I
- i --- -,— - I- -I - � � � ,
-- ---'�-- o � -- -
--- �
� , � I , i _ �----- ----
�� -f I r i �I I ii il i-ii iil
.. . .. � .. � ...
� � . I... + ..�I I II �,II I III II I I I �II ... .: I . . .. .. .. .
O� . . - . '. �. . : . ', �. �. ', . , . �. . : �. . . ', . : �. . �. �.
24 25 26 27
28 29 30 31 32 33
II FOR PLAN VIEW SEE SHEET S I
34 35
490_
480
470
460
510
5QQ
490
480
470
' � ', � i PROJECT REFERENCE NO.
_ � --- _ _ _ ------ ---- - 8-5371
� � �
�
- - - - _ _ __ _ _. --- _-- — -'--- -- �'--_
. . . � � . i . i ��-� � I ...- �-� -'�� ��� ROADWAV DESIGN
II ENGINEER
SHEET NO.
HYDRAULICS
ENGINEER
— — — -_ ___ II I I_I_ � � � f_- �__ .� I,,
� I
' --' BRIDGE HYDRAULIC DATA d�s��o����.� � ��.�iv�
R E M O VA L O F E X I S T I N G B E N T. __ � NQT �.SF FOR s,w ��Q�„S,T,oN
DESIGN DISCHARGE = 4500 CFS ;
DESIGN FREOUENCY = 50 YRS
-- - — -- : _ _ - - DESIGN HW ELEVATION = 4749 FT __ :
' ' I � , BASE DISCHARGE = 5206 CFS
— I II I'� I I , ' , ri� BASE FREQUENCY = l00 YRS —_
� i�T � i� �� i� I1'I�� ,
� I �� � � � ��- i I�� � i I � I . i ,I .. i I ' BASE HNl ELEVATION = 475.7/ FT � �� DOCUMENT NOT CONSIDERED PINAL
- - - � � - - :� ��. - - - 4 � II- I I I T �'- � II II I� II I .. � .I II � I � II : I I II ', ��'i II - - OVERTOPPING DISCHARGE _ l2OOO CFS � � UNLESS ALL SIGNATURES COMPLETED
j I� I� I I 'I I I II i I i I I I'' II '� � �I I � II li OVERTOPPING FREQUENCY= �500 YRS
_� — � I� �� �- L — � � � I� IL' '� L� ��I� II _'� � � � I OVERTOPPIIyG ELEVATION = 479.3 FT -- P E RM I T D RAW I N G
� �a ��H� H� � �� �H� � � ��H� H, � H
-- _ -- --- : __ - , � ;� H '!, . _ SHEET 9 OF 10
-
; � I�� �� li li I li I� li li i li I�i li li li i li li i li I�i li li i li � 'I li li li i I' I� DATE OF SURVEY = 02/04/20/6
, '---
_ __ _ ----
---- i-- � ' � i' � � � � i I i i � ' I � i_ � � � i W.S.ELEVATION I
, j � i � �i i i � I �i �i � �I � i � r-P � i AT DATE OF SURVEY = 4626 FT ; i
�� �� � �i � �
� � ���� ��
- � _ ���: i � � ���� , �� ,�� �� i I i .i
I _ _ � � � �
- � 490
��� � � � � � ', i_ '�,
490 � �, � � � � '� � �
� ,�' 'I ', � , �� ;�,� - _
_ __ _ -
: � � �
_ � j '''� � I, � I�'
__ _ _ _ ' �,' -- - _ __ __ _ _ - --
!� � �, �, , �� �
, �
� �
�
,
' ' �� � �
� ��I � i �I� �I �I��,� � �� , � , '��� I!�',I ',��!��, j
�
: ' EXCAVATION'FROM--�----
� � � �
-- �-_ ,_I- _ _ _�_-� — � ----
� ', EX. GROUND TO j
___ - __ - ---= --- --- ---- --- - - �' ' . _ I� --� — --- -� --- -- - ELEV 470.1' TO �,, --- -- -
I _---- ��_ � �-_ � I, EXISTFNG BRIDGE ��,-' I �
4 � � � ' I ' � ELEV 470.5' ; � '
+—=_=_ — I __ _
j
---
, ; — —
'--- ----- —_ —_--
— — — — .— — — — — — —; — — — — — — — — — — — — I �� ,�� ,^
------�-------L��- -L--.� � - -� — —�— I `r--
i � T - I - - - _ , i
�
�
---- -.. ;.. . __ :_. ._._i_ ._.. �.___.__ � _ -I_I_ .. _ I .. _. I .�_ �.I. _. I -... _. .._ . . . �: .. ____ _ _ _ .. .. .. ._ __ "'I_---
. . ._ _ . . I . . . . I_ . �" f t'� _
. . i ., . . I . . . . - � .
� I i . . . . . . i . . I � I : I i '. I I�,� I I I I , i i , _ i I i i : � -I _ . � J , ` � � II ; . . ..
. _ I _ . _ . .. � I � -I �i. ,'i i li II , . � � ' _ .
, - �� :I I I _ CLASS II RIPRAP � �
I� � � I I �II II ' '� '� ,�.
4 7 � _ _ _ � _ -!- _ � — �.�, � ,— � ��: _ _ I I _ _ _ K EY E D N 3. 5 � _��. �� 4 7 �
._ —
I ��I � �i � _
_ —_ � � ��� � � � ���i � �, / ��- , �_
F � � �
� �
. 1
� � � �
� �� � _ �_ . j �� � � � � ' � T5 � � ' ' '�,� . � � - � ��I � �� � - � � E E P TY P , _ � �
� � EL. 464.6
_ , i_ I I
� MIN. � i � � � � � �
_' � � � � _ , � ' � ) �__ � -�_�� ! _ _ �'� ,v� _ _ . i. �� : _�
� � - � � �,11 t i i-�_ � I � � ---- � --- � ----'-- �
EXCAVATION �F�ROM �� � '-- � � � � ` , �_ri� � � � - �-- - �
� ___ � - --- � �� � ----
ELEV 400.5' D �0--- k - _.��i�`�, 1 _ � i 1`�' , - � --- -- ---
_ � �,��� � ' - � �= I' ! � , 460
460 , -- _ j - - - .
� � ; � �_ ��� »���� � ��
� � _�
� �, _ _
450
� , �, � i � ; ; ! �
�
' . � TEMP. M AC SAY & i � , T� I - i _' :-i-
,
, NWS 462.6 � �I
�
_ � _ , _ I I,I _ IN SURFACE WATER — � I��� ���� � �� _ . _ __--- _ , _
� � �
j j-= � � � I �� I� I��' �� ',I � I� I I � � I ,
� � �� � �� �� � � �
_ _ , _ � �� - , �� ' : _ � - _ ; �, _
� : � i � �� ����� � � � � � � � �� �� � �� � I�� � �'��� � �!� � �� ���� � � � : 450
---- f � � � � � � � � � � � �� � ���� : ,
,
,
�
: � i� i i iI I I I i I iI �i i� � � �', i i. �� i i ' � I
--- - _ ,_ - - - - - --- - - - - --
,__ __ � _,1_ �, I, I �� � I 1i I I' I 1-'- � i ��� i � .
; � � �� � �� 1� � , � 1 � � � , � �� 1� �� � � 1 ; , ; � _ ; ;
� �� �� � � �� �� � � �� � �� �� � �� ��
� ��� � � �'�� �� �� � �� �� �� � , _,
' � ,, --
�i � _ i ,
_ _ _, _ :_ , ��� �� � � �� �� � ,�� �� � � , � � �� �; � _ �
�. .. .. .. : . .. � .. i i i i i ,i �i i �, �.i - li'��I il - � � �. .... . .. ;. :i .. . .. .
. . . .. .: ; . .; : :� I I I I I II I I I .- . : . �. � - .� . . .. .. .. I �.� �.� . �� :
��� .. ... i.. ..: _:._.. . I�..ii �III �i_i I il i ii I I iil i.l�l lill ii.:l il i..lii liil ... ... ... . ��
l_ II I III I II�III ��I �� I�il
� ,
:
_
. . . . . . . �. . . . . . . I - . . . . . � __. _ . . . I . . . . . I. . . ___- '_`.__. I I . .I_ . i . . I. I i i . i i . . ..i.. i I. i i i_L. . i . . I. . . i i i.i.._ j. i . _L.___ i.. . i i . _ . . . . . . � . . . . . . . . . . . . . . �. . _ _�_.,. . . . . . . . . . . i .. . .
� ._-_. ��_ ... ... ... �. I_I I I. I I�,�, II I. I II�„ II.�... I ', I.I II. .i.. I �.L II �.:i,l. .,_ ...; ____ i ____. . ..._ ____�.
. ' ..�� . ... '. �.. . . .. I . I �. �� ��. .... . '. ._ . : __ I� . .'. I
. : _..ii... . . . . . .._li... .... . . . ...i_.. ,.'.i,..ii. .I. I,'.�. i,li...i..i, lil, i ii... iiJ. li.i...i.. ...... .... . .... . . ._ . . . ..
li i
. . �. ,. ii . i . . . li I. ,i .i ii . i . i . . I I I. ! �! � . �!i
. ..I . .. . . i.i ili ii iil, i i.li Ilii :il ii i.i lili i ii i,I Ili iil ii illl.il . .. . i .I . . II'
. .. . .. J _. , . .. _.� II I i I 1 I ... . .. . . . .. .. . . ..
_: . .. ...�. �... , ...� II �I II I� II �I ..II II i..11 .. . . ��. . . .. _ . ... . �.�. �.. -.
�. . ; , , . . . i. i
: . . . . . . I ' � � �
�
. �. - . ,i , . . ,i . . .i. "i. I i. . . . . . .
i
.. . .. .. .... ....... ...1... ..... ...... ...1 I_ i .I. ,.. !. i ,...II!I. i ,�i i..l. ..... ..__. .. . . .-. ._ ...._.. !. . .._...I... .. .. ... �
.... ... ... .._ . !i.
.!,. ....i . .. .... _�... ..�..�. �. ..� . I�.I ii�. lii i.l. �, ii.l�,�, iil..11i.li Il�,�,.liil �,I.I ill I.�li I ��iil .I��i I Il�ii.l ..:. ._. . I .. ... ._.. .�:... ...I. _...� .. . . .;
.... . . . . . . . . . . .. .. .. ...
�{- -. j �.. .... ��I.� �''i,!. �... . .�. ..
. . . . � . . � ' . �. I . I. . I �, I I I. I �, I I �. �. I I I .', I I I , �, �, I . I I .� . . . . . -. .. .� . I �. . . . .
I f I I I I I I II II l i i� i i, li I
I _ _i
_ -- - _—� _ __ . _ _ _ _ . __ .— �— _ _ � _ --�— __
- --- — -- _ . _ . _
_ —
--- -
�. � _::i �. �.. �.�. {::: �: �. ' :::4 . I I�� � I .i I . _. ... ... ... : . .. : .�. i�. �.i .. .. ..
. .. .. .. . .-... �._. .�.,-. ... ...: i �, i ii. ' .�� I.. I _ i ... . I .�.. ... .i �, i'.i.i� .::: : : . .. . . .. .. .; .�... .. _
. . .... . . . . ...�... ..�. . . : .. ... ri .iir ��i.i.iri. i�.�.� i��i iiri -iii ri�� ii ��i�i iri� i��ii i��i iiii -i^i i ...ijji. ... .... . . . - . . .
. ..._:.. . .� . i. ..i.. . . . �. .... ...:
-- -- --- --- � : ' � �. i i I I � �I. i � � � .. � � � i : � i � i i � i i ���. I � ' i �I�. i � � � i i� � � �� . , . . . . . ��. ��. � � � . �� . ���� � : : . . �_ I.
� �
I ._..__- ____ _ _ -_. I �
: . .. . :. .. : . `' � I i ... . . . . .. . I
.:- . . . �.., . !� i I ii �. iil . :. ... . .. .
. �.-i . . . . --� I I . ' I I.�',,. . . . .
� ii i i i i i !i . i I I I
i
.,. ...i . . . . . . .% ... .. liii i., i il �, . i �,li .. . . . . . . . .
.. I � � I . �� I . , , . . i . . '�..
I_ I II I II II II II II II II II I J'II _: � I _ I ;
�
, , I, , ,'
'
_ ___ __ _ _ _ _ _ � � I� I � � �� _ _ _ _ _ _ _ _ � �
70 60 50 40 30 20 10 0 10 20 30 40 50 60 70
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L- 23+19 LT to 23+65 LT Riprap Enbankment < 0.01 < 0.01 15 8
1 -L- 23+31 LT to 23+70 LT Stream Stabilization 0.02 < 0.01 70 25
1 L- 23+32 RT to 23+53 R Riprap Enbankment < 0.01 < 0.01 7 20
1 L- 22+26 RT to 22+68 R Riprap Enbankment < 0.01 < 0.01 29 20
2 -L- 22+14 LT to 22+40 LT Riprap Outlet Channel < 0.01 < 0.01 6 20
2 -L- 22+82 LT to 23+27 LT Stream Stabilization < 0.01 < 0.01 35 10
3 -L- 23+62 LT to 24+46 LT Bridge 0.01 83
TOTALS*: 0.04 0.02 245 103 0
*Rounded totals are sum of actual impacts
NOTES:
�
�
�
• �
�
V
�
�
O
V
�ec. he�1' %��A Fn� IndF�x of l� �,t.
IOWN O'.
_—_ �M IO � � 'n1�B9�1 � q�NADIFND
� f ck�FNB / Yv �� ' -' � ��� 4 , ,� r � �; �
. _ 2 (py��CO URG ] ' °
� � � � °"' co Q �e�y �,e E N D
y� Ie�,�K'aa �� , �r�o�- � PROJECT
w � r
2 ' _ �
� � BEGIN ����� ��'� '
I_�_ S g�. .Y� y o__
PROJECT I e�`� �9��<� �;-
607 ! P�� a �'
\
�
y--� 601
. � o . � � � � � � , <
� � n y�.��,�� � �"� � ���?��
� �
� � W a y� �� t
I'"o m�� ui !� . O Nlv� .., \
� � � z��� y � s��
� --- VwZI U� CAB HOPEWBtIil HORCH �-� •
[ �_ � N �
� 4 � ,T.. � � � _� �
� �I / STHN LS COUNTY �
���� �� � �Y COUNTY�RO: Kr
...._.. �x�\R , ��.
�� �,— -
�� TO
VICINITY MAP
(NTS)
��'��`�I 'I� �� I � ��� I ; �' II---� ��°��������; s'`�
�����i.�.Y�'�,;5'b `�ll ��1L�������,�r�"� �9�.Y
U1�141� CO U1�TY
LOCATION: REPLACE BRIDGE No. 71 OVER CLEAR CREEK ON US 601
TYPE OF WORK: GRADING, DRAI11lAGE, PAVING, A1VD STRUCTURE
RIGHT OF WAY PLANS
I
�� �0 �
,�1P
oa
aP
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III
NCDOT CONTACT: THAD DUNCAN� P.E. DOCIIMENTNOTCON5IOEREDFINAL
UNLE55 ALL SIGNATURES GOMPLETED
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH l'repa�ed for NcooT in the Offlce of: gyDRAULICS ENGINEER
1/11moffatt & nlchol ,",
50 25 0 50 10o ADT 2018 = 7,641 g�, �i
�� ��� � �s N� � o� ,� moffatt & nichol
ADT 2038 = 13,005 �� �� �
p 2012 STANDARD SPECIFICATIONS
P L A N S K= 10 /o LENGTH OF ROADWAY TIP PROJECT B-5371 = 0.341 MILES �� V � �°G�
. ��� ,�, �
D= 55 % LENGTH OF STRUCTURE TIP PROJECT B-5371 = 0.028 MILES sicNaTri�e; P� �, �-
$0 2$ 0 $0 700 - L' �
T- 20 %* RIGHT OF WAY DATE: TIM R. REID, P.E. ROADWAY DESIGN I$ �.�
TOTAL LENGTH OF TIP PROJECT B-5371 = 0.369 MILES PRo�Ecr s�•crxFFx �'� /�\ '
V= 60 MPH PEBRUARY 24, 2017 ENGINEER �� �" "T ���,
-- 1.`�/
PROFILE (HORIZONTAL) * TTST =11% DUAL 9% ,", �� "°�
\ `:,"��i rva��;:�� ;
l0 5 0 l0 20 FUNC CLASS = LETTING DATE: TRENT E. HUFFMAN, P.E. moffatt & nichol
MINOR ARTERIAL FEBRUARY 20, 2018 rno�Ecr DEsrcx sxc7NCEn
PROFILE (VERTICAL) REGIONAL TIER PE
SIGNA7TIRE:
BOUNDARIES AND PROPERTY.•
State Line ----- -----
County Line
Township Line
City Line
Reservation Line
Properfy Line
Existing Iron Pin ;,'
Computed Property Corner
Properfy Monument �
E,.M
Parcel/Sequence Number iz3
Existing Fence Line -` � �-
Proposed Woven Wire Fence �
Proposed Chain Link Fence a
Proposed Barbed Wire Fence
Existing Wetland Boundary - - - -w' °_ _ _ _
Proposed Wetland Boundary � �
Existing Endangered Animal Boundary �°
Existing Endangered Plant Boundary �FE
Existing Historic Property Boundary �PE
Known Contamination Area: Soil � s �'��-
Potential Contamination Area: Soil -a� -s ��2�
Known Contamination Area: Water -���� W �'�b
Potential Contamination Area: Water -;?� -W-;�?�
s
Contaminated Site: Known or Potential ��h �%
BUILDINGS AND OTHER CULTURE.•
Gas Pump Vent or U�G Tank Cap =
Sign ''
Well °
Small Mine ��
Foundation 0
Area Outline I�
Cemetery �t I
Building �
School �
Church �
Dam
HYDROLOGY.•
Stream or Body of Water -
Hydro, Pool or Reservoir � �
Jurisdictional Stream —.15 -
Buffer Zone 1 sz i
B�ffer Zone 2 az z
Flow Arrow � - --
Disappearing Stream
Spring C� - �_-�
Wetland �
Proposed Lateral, Tail, Head Ditch ���
False Sump �
��]['���'1 e' ��][� N �� lE�'1�' lE�[ ���'�1 ]E��;�1L, ]I �.��, �][ �y ][ � 1I!�1� �� lE� 1�T ][�C� �� �S� �1 ���y 5
CONVENTIONAL PLAN SHEET SYMBOLS
RAILROADS.• Note: Not to Scale *S. U.E. = Subsurface Utility Engineering
Standard Gauge :�-I-:N-�-I-:r-�- Hedge ,,.-.-.-.,,.-.v:..-.-:
csr rr,wsrorranom
RR Si nal Mile ost �' Woods Line f`-'`"�'�J"�'-"``
9 P MiccF�oSr ;_
Switch 0 Orchard � ti� ti3 {�; �
sW�rch
RR Abandoned — — Vineyard ����-,-��
RR Dismantled EXISTING STRUCTURES•
RIGHT OF W9Y f� PROfECT CONTROL:
Secondary Horiz and Vert Control Point ♦
Primary Horiz Control Poinf �;;1
Primary Horiz and Vert Control Point �
Exist Permanent Easment Pin and Cap
New Permanent Easement Pin and Cap O
Vertical Benchmark �
Existing Right of Way Marker _
Existing Right of Way Line
New Right of Way Line �
New Right of Way Line with Pin and Cap
New Right of Way Line with
Concrete or Granite R/W Marker
New Control of Access Line with
Concrete C/A Marker
Existing Control of Access
New Control of Access
Existing Easement Line
New Temporary Construction Easement -
New Temporary Drainage Easement
New Permanent Drainage Easement
New Permanent Drainage / Utility Easement
New Permanent Utility Easement
New Temporary Utility Easement
New Aerial Utility Easement
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall -
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm $ewer Manhole
Storm Sewer
�� UTILITIES.•
� POWER:
Existing Power Pole
�� Proposed Power Pole
� �� Existing Joint Use Pole
n
� Proposed Joint Use Pole
r Power Manhole
E Power Line Tower
TDE Power Transformer
PDE �G Power Cable Hand Hole
H-Frame Pole
DUE
PUE U/G Power Line LOS B(S.U.E.*)
rue � Power Line LOS C(S.U.E.*)
AUE U/G Power Line LOS D(S.U.E.*)
ROADS AND RELATED FEATURES.•
Existing Edge of Pavement
Existing Curb
Proposed Slope Stakes Cut --- �---
Proposed Slope Stakes Fill --- F---
Proposed Curb Ramp c�
Existing Metal Guardrail =-
Proposed Guardrail T T T T-
Existing Cable G�iderail ° ° °
Proposed Cable Guiderail -° ° ° °
Eqvality Symbol �
Pavement Removal �
T�EGETATION.•
Single Tree
Single Shrub `�
TELEPHONE:
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
Telephone Cell Tower
U/G Telephone Cable Hand Hole
U/G Telephone Cable LOS B(S.U.E.*)
WG Telephone Cable LOS C(S.U.E.*)
U/G Telephone Cable LOS D(S.U.E.*)
WG Telephone Conduit LOS B(S.U.E.*)
U/G Telephone Conduit LOS C(S.U.E.*)
WG Telephone Conduit LOS D(S.U.E.*)
WG Fiber Optics Cable LOS B(S.U.E.*)
WG Fiber Optics Cable LOS C(S.U.E.*)
WG Fiber Optics Cable LOS D(S.U.E.*)
0
� � ���� WW �
�� ��._ �W
�--------�
— U: �
�
�—•
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
WG Water Line LOS B(S.U.E*)
WG Water Line LOS C(S.U.E*)
WG Water Line LOS D(S.U.E*)
Above Ground Water Line
rv:
N Pedestal
N Tower —
WG N Cable Hand Hole —
WG N Cable LOS B(S.U.E.*)
WG N Cable LOS C(S.U.E.*) —
WG N Cable LOS D(S.U.E.*)
U/G Fiber Optic Cable LOS B(S.U.E.*)
lVG Fiber Optic Cable LOS C(S.U.E.*)
U/G Fiber Optic Cable LOS D(S.U.E.*)
GAS:
Gas Valve
Gas Meter
U/G Gas Line LOS B(S.U.E.*)
U/G Gas Line LOS C(S.U.E.*)
U/G Gas Line LOS D(S.U.E.*)
Above Ground Gas Line
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Above Ground Sanitary Sewer
SS Forced Main Line LOS B(S.U.E.*)
SS Forced Main Line LOS C(S.U.E.*)
SS Forced Main Line LOS D(S.U.E.*)
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
Utility Unknown U/G Line LOS B(S.U.E.*)
WG Tank; Water, Gas, Oil
Underground Storage Tank, Approx. Loc. -
A/G Tank; Water, Gas, Oil
Geoenvironmental Boring
ll/G Test Hole LOS A(S.U.E.*)
Abandoned According to Utility Records -
End of Information
a; c w�,��
0
��
o ��: �_��
�
❑
�
�
-usr )
� I
�
�:i
AATUR
E.O.I.
DETAIL A DETAIL C _�_
NT DITCH LATERAL BASE DITCH
,��� �� ��°��� '"°"° s°°'g� Pl Sta 15+29.5/ Pl Sta /9+35.20
-o',�' � p= 6° 23' 16.6" �RTJ p= 22` 39' 32.2" �LTI
,h
�'°a° D= 2' l7' 30.6" D= 9' l8' 28.6"
Gro�nd 3;� D F��s� G�ound 3.� p 3� ��'��- slop�
M��, o- ,.o Fr L= 278.73' L= 525.98'
� nn��. o= �.o �+. � s= a.o F�. T= 139.5/' T= 266.47'
6- S o F'. R= 2.500.00' R= I,330.00'
-L- STA. 13 - 00(LT) TO STA. 74 i 93.30jLT) SE = 05 SE = 06
-L- STA. 29+OO�Ln TO STA. 30+SO�LT) -L- STA. 18+OO�R"n TO STA. 22+16�RT) Ro = l35' Ro = 162�
DETAIL B
SPECIAL CUT BASE DITCH
( Not to Scale)
�a��,o� � o� � F.o�,
GrounA 3:/ 3' t�e< prt<n
d � F�� sioce
e m��. o= i.o F�.
Max.d= 1.0 F.
B- 4.0 FI.
Type of Liner- PSRM
-�- sTn. is+oo�er� ro sTn. is+oa�er�
-L- POT Sta. 10-�-00.00
BEGIN TIP PROJECT B-5371
STA 12+50.00 -L-
DETAIL D
PIPE OUTLET CHANNEL
� Na� ie s�aiei
� , o �� --c:'o��d
�
Lengrh- 5 Ft.@^^r��
d= 1.5 Fr. �v���anie�
Est. = 4 Tons oi Closs I Rip-Rop
5 SY of GEOTEXTILE
FROM STA 22+20 -L- TO STA 22+25 -L- LT
S7A 12 -i- 75.81
., � c� ., r� 60' LT
\ REMOVE FENCE
+50 O%.170 LF
- _ � � � \ 60' L7 ... , .
A
_ `�� ex.2nv
- � \ -50
_ -- ' � �_ . 65' LT
_ ��` ..` , -'� � ;,-� -
�-4p�20'4ry�n� � . � : � ��� _�\
\ 6 � w y \ -�.�
�2 � 4 P
� ' - o !rv o S _ �'
:kisnN� F � �7'
W \ N
�'_
� o
,_ � F� - <'Pg
I \ `\ \ �
_ '
-50 SP. CUT BASE DI
SEE DETAIL B
EX 2W EST. 100 SY PSRM -
60' RT
S 53' 35' /7.3"
-DR5-
o I0+47.84 Pl Sta 13+07.98
54` 34' 04.4" �RTI p= 90° 38' 06.2" �RTJ
272° 50' 13.4" D= 272° 50' 13.4"
20.00' L = 33.22'
10.83' T = 21.23'
2/.00' R = 2I.00'
_ .-urF� ri - urvo.cv
S 63' l7' 00.4" E
-DRI- POT 11+37.75
�!
h
CUT DITCH
SEE DEfAIL A
END PRE-fENCING --
14+34.94
61.02' LT
- POC Sfa.l4+17.85=
l7l- PnT in�nnnn
-ORI-
Pl Sta 10+74.44
p= 9' 4/' 43.2" (LT I
D = l4'l9' 26.2"
L = 67.69'
T = 33.92'
R = 400.00'
EXCAVATiON STREAM
FROM EX GROUN�
ELEV = 470.1' TD REMDVE PROP. EXCAVATION
ELEV = 470.5 EX BRI�GE ELEV = 479.5'
ELEV = 479.5 EX.GRADE
�_ _ - - - - - 655:1�:1 NORMAU
� �
CLASS II RIPRAP I � �
KEYED IN 3.5' DEEP I X= 14.3' TO RIRAP AT BOTH
TYP. �� p8.6' STREAM BANKS
2' THICK
FROM 10' LT TO 85' LT
DETAIL J CLASS II
EX. BRI�GE REMOVAL, EST 130 TONS
STREAM BANK RIP RAP &
aROPosEo ExcavnnoN
O
TRUSTEES OF THE
FAl.�ILY TRUS7 UNOER
THE EARLE PIGG iRUST
DATED 01/11/99
Ei No. 14-E-0413
,L��1
�Q� P
Q V
�P
EXTEND -/- 5' BEYOND
EXISTING BENT - STR PAY ITEM
NREMOVE EX. BRIDGE, SEE DETAIL 1
COMPLETIV REMOVE EACH PIER BENT
OR CUT THEM DOWN TO t FT BELOW
F. +95 TOP OF GROUND
76' LT ^� CLA55 I RIPRAP
TIE TO AT EMBANKMENT
EX DITCH SEE DETAIL E
. +75 � v ��• EST.50 TONS
EX.ILW LT RIPRAP PAD `er�� (� EST.60 SY GT
d0 LT ���. . CLASS B N � CLASS II RIPRAP
EST.2 TONS a x
�' .'(�� T � EST.7 SY GT +15 3 e � TO ELEV - 4759'
' $TRUCTURE PAY ITEM
o,- �C�_ � � �� ..tz3 EX. RhV LT pF �- SEE STRUCTURE PLANS
� � EX.ILW L7,� . " �
q 2j \\ 60' LT -- � REMOVE EX. PAVEMENT PIPE OUTLET CHANNEL
+�'.-WC � \\\� �-�-'�. Q APPROI(.2,1805Y $�54 TONS ��
oa --' �� \v :.. �..� EST.S SV GT
o � . � ' � SEE DETAI+10
, \ REMOVE EX. GR E%� 040. ��
PPR X LF
�, - -. O. 685 PROP SHOULDER BERM GUTTER �
3 \ . _..._ � o �o _ ... � C _ � `, �.tS����. RE OVE � GRS/0. I
� h
C , \ ,� \\�-� ... ory , o \ . _ ; �.... ' . y�� ._. _ . __ �... .,. __. , _ ___.: ,. _ . APPRO%.190 LF 2/�"9L{.7� � II
a 22+15.88 TO 22�26.54
' �II ,.;; \a ...-. _....o \\`� �, -,:- _ -- -- - - -- - -�.�. ��- ---,., �r ,�. - .. oao PD �
I
o, �� __ �- � zo-�
rn '�� � I +15 � ¢, � C-- '..-- �� .: - .. _. I 6 "''_ -,�_ __ � -- - - - _ -- -- � - � - - C L' �
EX RNJ J +0�� __.' C9 . ,�' -- _ _ .__ ___ _ - � � .. �J� ' J
I � . 90' RT , ,.y� E% WW \ a � � - l� , .,� �� _ _' _
� �' 60' RT , \\ 7T ^ oN- o _:_p ._ � _. �� �� _ _ _I Q- f- F r. -� � ��� �i3 a -tr
,=�I i il , ���� pUf �- �af a� �__ ry � � ----- __ --- -------__----- /� � -- - i� < - -- - o � ,
r�l � ��°�� �F E�� ��a \ _,� .__` �__,__--�_ o ______ . _.____- -. ____ I � +- - -GR�� - �� aF�3:oLT J��
a � 3-- _� �
. . . �1�, � /iy" \�� a . . U 350 7L-� - �8 PS ��. �TVP 77 � I
n OT IO+OO.O \� /6,�'� PU� ��_ � e � _ _� ___ AP _ _ TB 2GI
F _
; \F '�� 190'�RT
�R5 PC tD+37.01
=GIN CONSTRUCTION
-DR5- PT 10+57.0/ �
SKETCH SH WING BRIDGE RELATIVE
TO PR POSED PAVEMENT
SP. CUT BASE DITCH \�
F
SEE DETAIL 8
E5T.397 SY PSRM 50 �
95' RT
-DRS- PC 12+86.75
�
\ '. \ .o'.. .. . .. m G2N.U.350 T�_, �, ,� �. KNO�WNj � y , ,_4 0
\ a 3 = " 0 12'
� � + F � s; �
�- _ 27, �„ „
� � _-� � �� iNc -� _ �,,a,_,�,�
� . � � - B PS
LAT BASE DITCH � � - F -
+65 SEE DEfAIL C
115' RT -. EST. 565 Cv DDE
-DR5- PT l3t19.97 b'�, ! Peoa ww
END CONSTRUCTION � "s RT
-DRS- PC I2+86.75 �
NOTES: O
1. PRE-FENCING SHALL FOILOW PROPOSED EASEMENT LUKE A. RUSSELL, JR.
OR PROPOSED RIGHT OF WAY LINES. BEGIN AND �VIAN LONG RUSSELL
DB 98 PG 4g2
END OF PRE-FENCING IS LABELED ON PLP,N
2. ACCESS TO EXISTING DRIVEWAYS -DRI-,-DR2-,
-DR3- AND -DR4- SHAIL BE MAINTAINED DURING
CONSTRUCTION
3. THE EXISTING PAVEMENT STRUCTURE ON THE
PORTION OF US 601 TO BE ABANDONED
SHALL BE REMOVED ONCE TRAFFIC HAS BEEN SHIFTED
TO FINAL PAT(ERN. RIGHT OF WAY WILL REMAIN
ANO SHALL NOT BE ABANDONEO FOR FUTURE USE.
80' RT CL455 II RIPRAP
STRUCTURE PAY ITEM
SEE STRUQURE PL4N5
- 00
100' Rl
BEGIN BRIDGE
-L- STA 22+45 +i-
CLA55 I RIPRAP
ATEMBANKMENT
SEE DETAIL E
E5T,90 TONS
EST. 100 SY GT �
DETAIL E I
RIP RAP AT EMBANKMENT
� No� �o xaiei �, %
xm �
ou�n - l.o�min.-�
Grade -�'25
}" ♦
� �
GEOTEX�ILE � /
Nw5 -'
Type afL�ner- Cl IRip-Rap
Geo�ext�le= SEE OELOW
-L- STA. 23+08�115' LT) TO STA 23-27�100' LT�; 50 TONS CL I, 60 SY GEOTEXT; X=30'
-L- STA 23+63(108' LT) TO STA. 24+00(118' LTJ; 30 TONS CL I, 30 SY GEOTEXT;%=20'
-L- STA 22+16186' RTI TO STA. 22+52f65' RTI� 90 TONS CL I. 100 SY GEOTEXT� X=10'
PROJECT REFERENCE NO.
B-537/
RNJ SHEEf NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
,,,,moffatt & rilchol 5 -,x
/
z
/.' , CL 55 I RIPRAP
� � I�EMBANKMENT
O ' BEE DEI'AIL E
�'�� 5 �Esr.3o 1oNs
y- EST.30 SY GT-
PER A NUNEZ
DB 42 PG 877
� CAB D fILE 991. LOT 1
RIP�P AT BOTH
- ST AM BANKS 2' DEEP
FR M 10' LT TO 85' LT
.�'I I CLImbS IIEST 130 TONS
b
� SEFj DETAIL 1 �
� �;
t /
��5
�� S� I RIPRAP •
AT EMBANI(MENT
SEE DETAIL f
EST.20 TONS'��
EST.30 SY GT
Ri O
4
GERAL� L CLONTZ
A�IY B. CtONTZ
DB a21 PG 326
REMOVE EX. FENCE
APPROX.300 LF-
END BRIDGE
-L- STA. 23+95.00
FOR L PROFILE SEE SHEET 6
FOR DRl PROFILE SEE SHEET 7
PROJECT REFERENCE NO.
B-537/
RNJ SHEEf NO.
ROADWAY DESIGN
� ENGINEER
SHEET NO.
HYDRAULICS
ENGINEER
-c- I� P ,L0�1
Pl Sto 26+4/.80 Pl Sto 29+05.42 Pl Sta 32+04.78 �
�_/!° 53' 53.2" �LT J �_ l0° 49' 34.3" �RT J �_/' 59' 40.6" �LT l a3�
D= 4' l8' 28.6" D= 4° l8' 28.6" D= 0° 34' 22.6"
L= 276.19' L= 25/3l' L= 348.13' i IJP�
T=/38.59' T= 126.03' T= 174.08'
R= 1.330.00' R= 1,330.00' R= 10 D00.00' �
� SE = 06 SE = 06 SE = tiC ;`� I_,
��- Ro = l62' Ro = l62' Ro = exisY i _
��- I DOCUMENT NOT CONSIDERED FINAL
O�- UNLESS ALL SIGNATURES COMPLETED
5 � ����moffatt & rilcnoi
PERLA NUNEZ � I Ir�j �
DB 6542 PG 877 �
i
CAB D FILE 991. LOT i � .
M � � �
�
-' -� � AlONZO E. MORRISON _ i i i �.
.. PRISCiI.LA i, MORRi50N _, - m
OB 65a2 PG 877 I� ;� I }
CAB D FILE 991, L0T 1 . �
�i _ .• ..,.,._. � _ _ _ � � �� � M
N � - . ^��' I . � o
- .. .. .,.�. i
_{ � � � � �
i' END TIP PROJECT B-5371 �
r' STA�"3�2+00.00 -L- � I� �, o
T�' �
-L- POC Sta 28+08.96= �`� � � � " �� �� REr �
-L- PC Sto. 25+03.2/ � � - � -OR4=� PT lO+1�0.00 � � _ � • � ' � i
-DR3- POT Sta l0+00.00 -- - � i -�
BEGIN > CONSTR.
REMOVE EX. PAVEMENT I�� j m �_' /�j-; - II /-.
-L- PRC Sta. 27+79,40 -DR4- STA. 10+ 5.00 i� �
-L- POC Sta 27+57.44= ir . � � '� - � �' ' 17 ' - � , � -_ __ _ �..� �� � �
APPROX.1,670 SY I -
- i
-DR2- POT Sta 10+00.00 - +is I � S 65 25 .9' E > Z i i ,I
� �
CL45S II RIPRAP '�"-` '� ' 125' LT PL ' - � Z o -� .
io e�ev a75.9' APP OXE 60 LF , '_��, �, . ��� C�nSs:BA�X � F I F .� I-- I-� =I� I�� I� �
STRUCTURE PAY ITEM REMOVE EX. GR t+"��"-.�� �zs �T p;�' I ' -L- PT SfQ 3+78.8�
SEE STRUCTURE PIANS DR4- Pl ll+17.56 w I�- .
APPROX 497 LF
+45 �-�'-�'-i� 1� 11 EST2 TON$ � o� ��
,,, iao� �r � � � � � � � � � � � � 4. ' esr � sv �r �, p� 62' 53' 49.6" E z � I "kt � '
OZ EX RrW _�� � 1 Y � i 1 i�� �� �� '�.� I EX RhV �I m -�' _ �`�.i,i I'',
� . Lr � - _-. . - ...'_ � � �' Y�. �_ 4 _4y k i i 1 , , _ �� � ,J'_F_I ' ' �. .�� 5 ETDETAIN A O50 PP S _ TO EPIPE�I N ET � , - . �Y � I � ��
> D . �n L-.o � ,'' �� IP
. I �:-. ._._ ' �
u, .. � .:- ` � I �
� -D' / eais�uae eiw�.r _ .
�, � �_i.. ', �...- -_r� ��__�.... ' �- p O, .... Mt �� ^ INC .i �._.. ... -r�'_ _- �.--,-- , . -�� Mi:l�!i__ � i '� I �
F - ,.. _ _ � . ...
I - .. �.._ . - ' _.. _ _ _ -�� _ _ _ - � - _ _ _ _ _. i r�, - - i � . . __
' O
_ _� . . . � i - �^. _
J . - L` L_ i_" . _ ' - + _�s - _ _ i _ _ _ - '- _ - � _ ..
� � � sz a- � r � �, �� � I � �,__ �� �-;.r.��i �� £ '_= � - _ - is'� _ - _--- - _ __ _ - F=_z - 21' 00' 31.0" E � -
_Fc r _
_ _ , �_. _ _
_ -c_ _ .:,
�_f p / . . � Ps �':i t .:.
' � - � � - - -
_ F�
p - - ,� �� �� a
o _ - _ - - - -= � � i o 0 0 o F,z I M �L N ---
. � �' o 0L 0 0 0 � , 5 Q o � -- �- � _ � lz �/' -- --�-- - - -- - ------
a- - - -
0 � �I t71�! ij i�� v 27' �� -- �� --- Q P ,-' - -- - --- - -- r --- -- -
p� � _ � 27� _ � - - - - - - - -
+ � �-� -k.,--INC a +�-IAC . GR � 35� 71.- _ _ a:� - �. ,�. , ' ' 4 P ml I• I RET. >
N W � -PE'&-77� 8'PS EM _ - - � 4�_ � -/ /" _y h_ rw = �� I I' '
_
0
_
I _
: , i '
�y .. a .:. � 4 _ _ _ _-- Evis'rinc F - RET DIJ .'
� Z ' 'a � --L- � ��-- - � � � -= - - ` - - � � � RErc�, ��� � -- � � - - - � �7
� i� �
�
v) \ iz o 0 0 0 _ 5oi
� + _ . � �- 18 - .:- �, °E SP.CUT BASE DITCH�� C ` . -., 50EDETAILCHION� .. / _
Z==-� N PE B-77 GRAU 350 L 3 �^N a�' � 4 PS P'P,E`$ ��' ° C w L- POC S1a 3� l-3�.��l- EST 8 II �
- p SEE DEfAIL G 0 SY PSRM �
/�
c/� � __ _ +ea zn '
� C � - I �:�
,a8 PS � -� c 1 -DR4- PT Sta 1/+82.03 +so Ex R^" _ �= ��7
� S 7/° l9 /6.G' eo ar o coNsrR. m I� � �
J "' - � � 75'RT ��c� I �
= a _. -
. � � F w r um . .� � ,-+�,��r'.,s ..� .
� S 6ea-srn,.io+ss.00 9wa -_ � _ _
� EN
� m ; ; o
� N 24° 4' 30.6° E 4' S6' 47.3" E: � o o , I , -
+so -DR2- POT Il+10.34 -L- PRC Sto. 30+3070 `� � '- " �N
+20 70' RT
- zl
75 RT :. �,qT BAS�bITCH -'�5 �
� ��' see oErna o _ raor anv � +es � -DR3- POT 11+06.44 � � �' � �
CLA55 II RIPRAP . END PRE-FENCING EST. 92 CY DDE .��0' Ri ��5 RT _ � � I `�� -,
STRUCTURE PAY ITEM, ::$TA 25-I-43.53 �. -' � - - -`-�� � � �- I II
END
SEE STRUCTURE PLANS 70.08 RT �._ CONSTR. - I �• I � I' �� �/.' � �
� _ ox2 srn �i+oo 0o I I _ �, -_ J �l DETAIL A
� il y � �� � / - NT DITCH
- L4T BASE DITCH � - I�� I - /- z�, � . � I No�+o 5coie�
_ I I
� � : .� . I �/ � � % ,
i
� '- `r�„m
SEE DETAIL F -. _ - � `o
I oii�n
� REMOVE EX. FENCE � f' I � ^ / >' "� � r^� ' � . �� ✓ t,.� No�„ o J ' siope
' �J 'i � . 3- �e�
L.
EST.20 CY DDE I I _ __
EST.20 TONS CL B -� -- 1 � � -
i
esr. as sv cr i� z� � � �� � �`� � �� �' �� � _ _ � -- � le- I _- i � �' - � s.o�,a a� p F�o,
�-�nvaeox. aoo �F � � �� �
, � r _� � ,C. . �� , - I �e' I ____� I . . I '� Min. D.. 1.0 FI.
, ��� � RELOCATE EXIST. SIGNS �� � � �?'� ___- �� � -L- STA.13r00(LT)TO STA.74:g3.30(LT)
� O � OUTSIDE PROP WW _ - O�+ �' -l- STA. 29+p0�LT) TO STA. 30+50(LTf
4 �J � Z GERALD L CLONTZ
� DETAIL D DETAIL F
o n�Av e aoHn
�� V DB 5494 PG 787 LP.TERAL BASE DITCH LATERAL BASE DITCH
-- DONAID B. MeLAIN v� I N�� �� smie� I���+a s�olei
CERALO L CLONTZ �IANE G lAc�AIN j ' 6 _, � y , �
Al�Y B. CLONTZ DB <26 PG 797 jlm n��ur�l � p 3. "'�', I Slove G�a��d I p ti� ' �'�i. ' sap�
OB 421 PG 326 � � �,o��d 3. ♦ I � e�'^� d z I i F�ii
�U ���'I Min.D= 1.0 Ft. G[Oi[nit[�' g
B= 2.0 Ft. Min. D= 7.0 Fi.
I b- 5.0 Ft_ f: c 60' Max.d- 1.0 R.
•whe,� e' B= Z.0 F�.
-L-STA.24+14(RT)TO STA.26+50(RT) 6= S.oF�.
Type of�ner= CLA55 B Rip-Rap
NOTES: -L-STA.23+51(RT�TO STA.24+14(RT�
1. PRE-FENCING SHALL FOLLOW PROPOSED EASEMENT I
OR PROPOSED RIGHT OF WAY LINES. BEGIN AND DETAIL G DETAII H
END OF PRE-FENCING IS LABELED ON PLAN I SPECIAL NT BASE DITCH TpE PROTECTION
� Hm �o s�aie� I Nm o s�oiai
2. ACCESS TO E%ISTING DRNEWAYS -DRI-,-OR2-, j �P��e
-DR3- AND -0R4- SHALL BE MAINTAINED DURING � Noi��ai � o� -p,o„i 3�F`�S°pg
CONSTRUCTION I Graund 3�� p 3� V Noiurol -
P°'�e Gro��d d
3. THE EXISTING PAVEMENT STRUCTURE ON THE u -PSRm
PORTION OF US 601 TO BE ABANDONED min. o= 1.0 R.
B= 2.0 Ft. d- 1.0 Ft.
SHALL BE REMOVED ONCE TRAFFIC HAS BEEN SHIFfED
TO FINAL PAITERN. RIGHT OF WAY WILL REMAIN I -L- STA.26+SO�RTJ TO STA. 30+SO�RT� Type o(L�ner= PSRM
AND SHALL NOT BE ABANDONEO FOR FUTURE USE. -L- STA. 30185(RT� TO STA. 32+00(RT�
�� FOR L PROFILE SEE SHEET 6
FOR DR2 PROFILE SEE SHEET 7
FOR DR3 PROFILE SEE SHEET 7
. . . . . . . . . . . . . . . . . . ... .. .. ... .. ... .. .. . ,
; �
--- - BRIDGE HYDRAULIC DATA
,
� i - L� I DESIGN DISCHAR�E = 4500
DESIGN FREOUENCY = 50
I
,
� : � I ' ,_ . _ DESIGN HW ELEVATION = 974.9
__ _ -- _
' I,__ � � I I i i I BASE DISCHARGE = 5206
, il � � � I BASE FREQUENCY - I00
� i� 'i � � I � I BASE HVy ELEVATION - 975.7/
i
iij �� ��
I ' I � � ' I � I II I I � � I I I I I � I I I I I � OVERTOPPING DISCHARGE _ 12000
CFS
YRS
FT
CFS
YRS
FT
CFS
_._�.._........'.._ ....... ...... i.. ......
, i
�
BM2 ELEVATION = 472.99'
N 529,335.02 E 1,543,084.54
_ . -L- STA 23+68.27 151.91' (LT) _
PROJECT REFERENCE NO.
B-537/
ROAOWAV DESIGN
ENGWEER
SHEET NO.
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
I � i i OVERrOPPING FREQUENCY- �500 YRS � RR SPIKE IN ROOT OF 36 OAK TREE UNLESS ALL SIGNATURES COMPLETED
� � OVERTOPPING ELEVATlON = 479.3 FT � ���� � �
_. BEGIN GRADE � , I, � � mo,�arf & ���h��
N �� �` � F �.,9...
-L - ST A 12+50.00 i __ . . ,
_ ---- �`� DATE OF SURVEY = 02/04/20/6 -' ----
-
510 ' � � � o�� i i I�I! i I ' I I '! �
__
3,52 � � �
ELEV 4S' i � II i i I I I I I W.S.ELEVATION = 462.6 FT , END BRIDGE
' � + ��n iu � � � � � � � � � --- -'--- --' i BEGIN BRIDGE
500 -_-___ _ _ o� J �i I --- A J DATE OF SURVEY STA 22+45.00 - - --STA 23+95.00 _,
__� I'- Pl - l5 65.00 �, � i � i i i i I � _ I -- ' --
i i
PI 20+00.00 � � � j �
EL - 477.92 I i I i � � � � i � � � I EL = 482.02' I � �
. .�. . . . . . . . . . . . . . . . . . . . . . . . . ' KC = l 390' . . . �. . �, . ��. i .:I ; i ; . . �. . .. VC-= IZO� . . . . . .�. . . I APPROXIMATE � I . . . �,
4QO ,_ � : : . .� ��, � � � � I� � � .. K l86 � EXCAVATION = 7,200 CY
- - ----- --- - � - �
. _. _ .. � � . _--i - ---
-. i _ . - �. : . : - : . �: : - : - : : � �. , . . . � I �:I i i I i i I i � '. i i ' i i � . . . . - _ . _ - - _ ,' _. - STRUCTURE PAY ITEM � � �. : : . _ .
�
. . . . �� .. '� �� i � . I : . . � i i i . : � � �..
. . . . . . . i . �. . i . . , , ,
: i
� � . . . . . .. . .. . . i . . i �. ..,
-- � _ � � - -- -- _ _ _ __ __ - i _ _. _ _ 1+10.9444% �+10.3000% __ �. ___ __- �- � I ___ _ ---- - '
i � il � i , __
480 ' -- -
- —� �- � � � �
i-- = - r-J 347% ` — — — — � _
_
___ I - - _ _ _ �-J1.7779% (+J0,9444'/.
- -- 1- ` i CLASS II RIPRAP
� (-J.3..yyp� - - —
� - _�__ .. ��t ^` EST.370 TONS .56 �'R� - � ` _.
. . . . J . . � . . , . _ � _- � - - - _ '�.. _ �l -J /..35% i . , � . I � `` . . . . . . . . . ._ . . .. STRUCTURE PAY ITEM . . _ L V 9 (+J 'i �: . .
47� - ��: O � O p - - - -� - -'- - - - -- _ . . , '�' � �_ --,— — — -� ` . _ '� . . ,
O p � . �. � I � . _ � ����� . . I �-"� . ' � a �.•t ; - . , , . — .
o� +� `- oo -� i i - -- -�- --�--j------ - Il_05%'----_ ~!_ �` �__ �I
62%
+ � - o v � "� R � t ��' t i�i I� � i � r i ��� i . i o � —_ � -� � � l- i � - -,�� - - � ��� � � = I . ��—
� p h
DITCH LEGEND O� Q� *� � i rn� , I � �, � � � I o� I I _ _ i � o� `
rn
460 i —1 * �r � �- � � � � _ � i i i � o � � _ � I , • ,
�
— � � II� � � ,� � __ � _
LEFT DITCH F y 1 N' I r y I' �I - �o `° y1 i
� { � � �-fi �� - �� � d- � '� ; � , � J
RIGHT DITCH - - - - - - � � - _ _ _ _ _ � � : � : _ _ - I _ � ,`� _ -_ _ _ cv,ss u eiPaaP � _
� ,
FOR PLAN VIEW SEE SHEET 4 �o ES7. 320 7oN5
'�' V �� - STRUCTURE PAY REM ��
450 : :
11 12 13 14 15 16 17 18 19 20 21 22 23 24
510
5Q0
490
480
470
, � , ,
i i � i i � � � � � � � � � I � � I I
� , , , � , ,
---- i i - i - , i - -i -, . --i - - —_ _
. . _ . _ . . -- �- -- : . ,_ _ . ' . . ' . _ .J— il. �.. il il �.. il . . il . il il : ii ' i �, �. I �, � ��. il ���. . .. : _ .. - - . . . : . : : : _ . . : _ — - - - . . -,� : �. --- : _ I �. _ �.
.. �:- -- - -- -.. ._.- -- - -'- - --- - -- ---_ __. �i�.: � _. —.. .__: .
---- , �. .. , �,. i. �. : , . . -�.. . '_ _ --� - . , , �..
- �-r -- --�-- . T . . : - �� - ii �i - n��i i ��- � -- -� - - --.. .. -._.
- - - - -- . - .. . - � r� r il i � � i i - � il �.� 7 il �. ii r� i� � - - — - -- - -� - _� - . - _ ..
_ � .: :. _. _ .. .. :.. � - - �. �. : I -- i . I i ��. � .� .. ; .. _._ .. __ .. i �. . __ . -__
I- r -; I I 1 I �: I : I� r
� � I_ i i i � I I � I I � - I � i i -- _ � i
�—u i� u�i - �u � i u� i i -- I i
� � i
-� - � - � � � �� -- _
_ � � ; r k �� - I �� k � I =r, � ��� ; I k ` , � --� _-� � ; - ; _- _ �
� , - -�7—�� i 7 � r i -� r�l r�� � . -� -- - . - �
� � � a— �� �-�� '�. � i � �� � �u � i , -
_ a
- - �
_
T -_ =� _ _ � �� � k � I END GRADE � - _ - w � - - --
-- _
-- -- - h � �-, n � �- h ;T �� -L - ST A 32+00,00 ' -; >
� - -- --� �—�� � _ �r � - ��, � � rn � , - Q '- - —
_ _ -- _
_ ,— --- L � : _ � a � I � � _ � '_ � a _ � � I � : ELEV = 503,33 , -- � J � == - - —
� -- : —� _ _ �— � 1 ' N L ' _- � y � � u U � � � --� � _ w - - _
� � . � o ' -- � � � � � �- _ +- -- _
� ' ��I I I� � I � i m t -- - -
--- I_ � �
__ �c _ i . . __
1 � �
— -- -
� n r, 7 , � �
i —T- - � cn � � � i i �- �
� . � � � �i � �I �i �
- -- = -- ----- - . . _ _ _
-- -- _ i i i
- T - -_ . , �— � Q � k L �I � l � � �` Pl = 3/-h00.00 � � � � - _ - I
-� h h 7�T EL = 500.56' i i i i`'i '� _ -- � � _
--- --- , --- - ---- i h i _
-- _ - ---
� KC = /70, ii �
� , � 'I�� ��I I� il � _ /5/ � �
_ m _� I I _ I__ V � I_. '-- i -
I � - i l i I I i I l i , i ! I _- I � �— — i � �
--- _ ----
-- � _ , --' _ ---- -_ .
� _ _ �+12T633% I J
_ _ : : J EL-_ �4.05'� _ i �� � I __I I i � - I I g855'� ___ _' - - - :_ � - - _ _ _ ' - - . . �
� � � �+)3. �
: { VC 490' 1 I l — / I
_ _- - — , �- -� _ - -- --- - -- -- -- - ------ -- ---- - --- --- --
, : - � s �_'(+) 4p69 _ _ -� ;
_ � �
i__ ; � - • i I; il ,i
( J 073% i ,
`I
--- - ---- ' —
--,- _ ,
_ ,- -II � � _ �+) 4.5 ! � � �-i � ---; -
� � � I I��I � �
--',48% �� l o 0 0 o g o �� F'' - I DITCH LEGE D
�+13.8 �� oN oo� �� __ N '
S55° (+) 3- -.- _ - � _',
� � i__ .� i � � - � v � v . I�' � � � � LEFT DITCH _: __. .
- ti � o
�-,�' � o +v
_ p
I (+)2.8����+)030001% I �� o� . o� , � -------
�.
� ' ' � "' v +�- � i � I� I� I� I I I II �
_
� rt �1-� � � � � , + v i � �� , � i RIGHT DITCH .
i � i I
0
. � : � �i � � I ...f �.. I.I �, . �, �. �, . . �. i II �..lill ,I1 ill, Ilii I ,I ��iill Il��i I .I��ii.l ..... .. . . .. i�.. I . �. I : .. .. �. .. I
- - � i - --- -�— - I -- -- I I I I I : . �.
-- ---'�-- o � -- -
--- �
� , � I , i _ �----- ----
�� -f I r i �I I ii il i-ii iil
.. . .. � .. � ...
� � . I... + ..�I I II ;II I III II I I I �II ... .: I . . .. .. .. .
O� . . - . '. �. . : . ', �. �. ', . , . �. . : �. . . ', . : �. . �. �.
24 25 26 27
28 29 30 31 32 33
II FOR PLAN VIEW SEE SHEET S I
34 35
490_
480
470
460
510
5QQ
490
480
470