Loading...
HomeMy WebLinkAbout20140762 Ver 3_R-2915E Final Design Field Inspection and green sheet_20170803'� SUT�,.'., =a' .w:.'ho'�. : .5`' 4a :. :� a� �,�r s'. ;� ���;: ,y� r. �. �r, .,,.o �. .�': , �..,,,,.,.,.�':= STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR MEMO TO: Michael A. Pettyjohn, PE Eric Williams, PE Brian Skeens, PE Keith Paschal, PE John W. Twisdale, Jr., PE J. Dale Burton, PE, PLS Dave Wanucha - DEQ Todd Hiatt, PE Daniel Sellers, High Country MPO FROM DATE: Joe. L. Laws, PE Roadway Design Project Engineer August 3, 2017 Heath Slaughter Jimmy Hamrick, PE Don Lee Jim Martin, PE Matthew Lauffer, PE Jason Galloway, PE JAMES H. TROGDON, III SECRETARY SUBJECT: Project 34518.1.FR6 (R-2915E) Ashe County F. A. Project: STP-0221(45) US 221 from US 221 Bypass to US 221 Business/NC 88 in Jefferson Final Design Field Inspection We have completed the preliminary plans for the above project and would like to review them in the field with all personnel involved. In accordance with Trent Beaver, PE, Division Construction Engineer, the field inspection will begin at 10:00 am on August 16, 2017 in the Division 11 Conference Room. I request that each of you attend this meeting ar have a representative attend for you. Plan sheets are available electronically for your review and files reside in two locations: Microstation design files and PDF plans are accessible on Connect NCDOT at: Division 11 Preconstruction - R-2915E US 221 Ashe County — To DOT folder This field inspection is a critical step in the Plan & Permit Review Process. It is imperative that design and construction issues be discussed and iinalized during this meeting (see attached checklist). These issues include construction limits, drainage, right of way, and utilities. Any design features that affect slope stakes, especially in environmentally sensitive areas (ESA), should be finalized at this meeting. No revisions will occur in the ESAs once the permit review meeting (4C meeting) takes place. Please note that the field inspection questions have been updated to include constructability issues, environmental commitments, and other issues that need to be addressed before the 4C meeting which will be held approximately 3 months after the Final Design Field Inspection. Also, if this project contains any new or unique construction techniques, processes, and / or products that are unfamiliar to the Department, Division, or the assigned Resident Engineer, please notify us so that special provisions, details, technical bulletins, etc. can be provided prior to the field inspection. Mailing Address: NC DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION 11 801 STATESVILLE ROAD NORTH WILKESBORO, NC 28659 Telephone: (336) 903-9101 Fax: (336)667-4549 Customer Service: 1-877-368-4968 Website.• www.ncdot.gov Location: 801 STATESVILLE ROAD NORTH WILKESBORO, NC 28659 Attached is a list of the environmental commitments that were developed during the planning stage of the project. Review these commitments to ensure all construction-related commitments can be properly executed. I request the Division Construction Engineer contact the proper city officials and furnish them a set of plans for their use at the field inspection. JLL Attachment ec: Patrick Norman, PE Glenn Mumford, PE John Pilipchuk, LG, PE Dr. Joseph Hiumiier, PE Kevin Lacy, PE, CPM Jessica Kuse, PE Colin Mellor Byron Moore, PE Jared Gray Cyrus Parker, LG, PE Clark Morrison, PhD, PE Kathy Herring Daneil Miles Richard Pegg Carey Muse Jim McGowan Runette Nowlin Mike Gwyn Jeremy Goodwin, PE, CPESC, CPSWQ Majed Al-Ghandour, PhD, PE, CPM Kelvin L. Jordan Beverly Robinson Don A. Parker, PE Tracy Roberts Print Distribution: Normal Michael A. Pettyjohn, PE Barry Whitaker LeiLani Paugh Carla Dagnino James B. Harris, PE Meredith McLamb Wayne Patterson Heather L. Fulghum William S. Zerman, Jr., PE Renee B. Roach, PE, CPM Ron Allen, PE, CPM Proposed US 221 Widening From US 421 to US 221 Business/NC 88 in Jefferson Watauga and Ashe Counties WBS Element 34518.1.1 Federal Aid Project STP-0221(13) STIP Project No. R-2915 Project Commitments The following special commitments have been agreed to by NCDOT: • NCDOT will coordinate with the North Carolina Wildlife Resources Commission to determine the status of the potential WRC public access project at South Fork New River. • NCDOT will comply with the North Carolina Wildlife Resources Commission's moratorium prohibiting in-stream work and land disturbance within the 25-foot trout buffer from October 15 to April 15 for all streams supporting wild trout, including, but not limited to, Beaver Creek, Call Creek, Cole Branch, Gap Creek, Little Gap Creek, and Old Field Creek. • Design Standards in Sensitive Watersheds will be adhered to during project construction (15A NCAC 4B.0124). • NCDOT will re-survey the South Fork New River within the footprint of the existing and proposed bridge at that crossing prior to permitting to ensure no individuals of Virginia spiraea have inhabited the area. • The Hydraulics Unit will coordinate with the NC Floodplain Mapping Program (FMP) to determine the status of the project with regard to applicability of NCDOT's Memorandum of Agreement or approval of a Conditional Letter of Map Revision (CLOMR) and subsequent final Letter of Map Revision (LOMR). • NCDOT will provide an individual Section 404 permit for the U.S. Army Corps of Engineers and a Section 401 Water Quality Certification for the North Carolina Division of Water Quality. • NCDOT will design the roadway alignment and profile in front of the Fleetwood Community Center to not impact the underground storage tanks. No permanent right of way will be purchased from the Fleetwood Community Center. Temporary construction easement may be necessary to properly tie the proposed to the existing.