HomeMy WebLinkAboutSW3170801 - Davita Spencer (2)TransmittaVLMtor
Date: July 27, 2017
To. Mr. James Moore
Assistant Regional Engineer
NCDEQ Mooresville Office
610 East Center Avenue, Suite 301
Mooresville, NC 28115
704-235-2138
Project: DaVita — Spencer
Rowan County, NC
We Transmit:
(X) herewith
() under separate cover
I)ENR-LAND QUALITY
STORMWA ER PERMITTING
Project #: 17-025/D
For Your:
Q approval
() review and comment
(X) signatures
Copies
Date Description
2
Construction Plans
1
Set of Calculations
1
Signed Permit application
1
Review Fee
Comments:
Please find attached a signed permit application along with two sets of construction plans for
review and approval. Please contact me if you have any questions Thank you.
Copies- File
Submitted by:
4807 -C Koger Boulevard, Greensboro, NC 27407 1 T-336-218-8282
Matthew W Johnson, P.E.
Civil Engineer
F-336-218-8010 I wwwAriad-designgroup corn
L7
N PAR S/P U/IN IL/IN C/C PART IN
l 011 3
Rowan County Assessor's Office
This instrument prepared by, Kennon Craver, PLLC, a licensed North
Carolina attorney. Delinquent taxes, if any, to be paid by the closing
attorney to the county tax collector
upon disbursement of closing proceedings.
Type: CONSOLIDATED REAL PROPERT
Recorded: 6/22/2017 3:12:11 PM
Fee Amt: $336.00 Page 1 of 3
Revenue Tax: $310.00
Rowan, NC
J. E. Brindle Register of Deeds
BK 1291 PCS 891
CEI;
AUG 01 2017
DENR-L-Am auALiTy
Excise Tax: $310.00
STORMWATER PERMtTf(NO
Parcel Identifier No. 046 011
Mail/Box to -
This instrument was prepared by: T. M. Caddell, Shuford Caddell & Fraley, LLP
PO Box 198, Salisbury, NC 28145-0198
Brief description for the Index.
NORTH CAROLINA GENERAL WARRANTY DEED
This instrument was prepared by Thomas M. Caddell, a licensed North Carolina attorney. Delinquent taxes, if any,
will be paid by the closing attorney to the County Tax Administrator upon disbursement of closing proceeds.
THIS DEED made this 2111 day of June, 2017, by and between
GRANTOR GRANTEE
SYLVIA EVERHART MAHALEY and RHGC SPENCER, LLC, a North
husband, DAVID V. MAHALEY Carolina limited liability company
300 Sowers Road 223 US Hwy 70 E, Ste. 100
Salisbury, NC 28144 Garner, NC 27529
The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall
include singular, plural, masculine, feminine or neuter as required by context.
WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged,
has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land
situated in the Town of Spencer, Salisbury Township, Rowan County, North Carolina, and more particularly
described as follows:
BEGINNING at an existing bent rebar in the Northwestern margin of Salisbury Avenue (U.S.
Highway 29) and being the Southernmost corner of Block 1 as shown on the plat recorded in Map
Book 9995 at page 512 (the "Earnhardt Plat") and being in the Northeast margin of an unnamed 30 -
foot right of way shown on the Earnhardt Plat; thence with the Northeastern margin of said unnamed
30 -foot right of way North 54 degrees 24 minutes 41 seconds West 320.00 feet to a rebar set in the
submitted electronically by "Kennon Craver, PLLC"
in compliance with North Carolina statutes governing recordable documents
and the terms of the submitter agreement with the Rowan County Register of Deeds.
centerline (the "Centerline") of the right of way abandoned by Resolution recorded in Deed Book
1289 at page 14, a corner of the property of the Moose Lodge of Spencer (nova or formerly); thence
with the line of the property of the Moose Lodge of Spencer (now or formerly) four lines as follows:
(1) with the Centerline, North 35 degrees 35 minutes 19 seconds East 103.41 feet to a rebar set; (2)
North 86 degrees 41 minutes 03 seconds West 214.74 feet to a stone (crossing a rebar in a root at
193.67 feet); (3) South 43 degrees 43 minutes 12 seconds West 36.25 feet to a stone; and (4) North 51
degrees 02 minutes 49 seconds West 133.00 feet to a rebar set; thence a new line North 38 degrees 05
minutes 41 seconds East 399.53 feet to a rebar set in the Southwestern margin of the right of way of
Sowers Road (S.R. #1919); thence with the Southwestern margin of Sowers Road South 51 degrees
54 minutes 19 seconds East 622.59 feet to a rebar set in the Northwestern margin of Salisbury Avenue;
thence with the Northwestern margin of Salisbury Avenue South 35 degrees 35 minutes 19 seconds
West 332.59 feet (passing a bent rebar at 27.10 feet) to the POINT OF BEGINNING, and being all of
that tract containing 4.951 acres, more or less, as depicted on that plat entitled "A Revised Plat
Showing Property on Sowers Road (near the intersection of Hwy 29)" recorded in Book of Maps 9995
at page 8359 in the Office of the Register of Deeds of Rowan County, North Carolina.
The property hereinabove described was acquired by Grantor by instrument recorded in Book at
page in the office of the Register of Deeds for Rowan County, North Carolina.
A map showing the above described property is recorded in Map Book 9995 at Page 8359 in the office of the Register
of Deeds for Rowan County, North Carolina.
This property is ❑ is not ® the primary residence of the Grantor.
TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the
Grantee in fee simple.
And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same
in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title
against the lawful claims of all persons whomsoever, other than the following exceptions:
1. Ad valorem taxes for 2017 and subsequent years.
2. Utility easements and unviolated conditions, contracts and restrictions that do not materially
affect the value of the property.
3. Any right, easement, setback, interest, claim, encroachment, encumbrance, violation, variations
or other adverse circumstance affecting the title disclosed by plats recorded in Book of Maps 9995,
page 512 and Book of Maps 9995, page 8359, Rowan County Registry.
4. Right of way given by Albert Eugene Everhart to Duke Power Company dated August 8, 1985,
and recorded August 16, 1985, in Book 620, page 416, Rowan County Registry.
5. Any discrepancy, conflict, access, shortage in area or boundary lines, encroachment,
encumbrance, violation, variation, overlap, setback, easement or claims of easement, riparian
right, and title to land within roads, ways, railroads, watercourses, burial grounds, marshes,
dredged or filled areas or land below the mean highwater mark or within the bounds of any
adjoining body of water, or other adverse circumstance affecting the title that would be disclosed
by a current inspection and accurate and complete land survey of the land.
6. Utility easements reserved in favor of Town of Spencer in street closing resolution recorded in
Book 1289, page 14, Rowan County Registry.
-2-
W,
IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year fust above written.
SEAL -STAMP
__
Sylvia Everhart Mahaley -
"'� V/ m �
David V. Mahaley
State of North Carolina - County of North Carolina
I certify that the following person(s) personally appeared before me this day, each
acknowledging to me that he or she voluntarily signed the foregoing document for the purpose
stated therein and in the capacity indicated: Sylvia Everhart Mahalcy and husband, David
V. Mahalev.
-3-
< e f , nota ublic
My commission expires:
L / C) -o'-)_ i
t'
� torp
aey`�n�
�c�aa
Erosion Control and
Stormwater Report
RECEIVED
AUG 01 2017
DENR-LAND QUALITY
STORMWATER PERMITTING
DaVita Spencer
Project Location: Spencer, North Carolina Project #: 17-025
Designer:
Triad Design Group, P.C.
4807-C Koger Blvd
Greensboro, NC 27407
lilt 11111 pff",
oQ. �FESSIp
'A
July 27, 2017
triaddesigngr®up
ARCHITECTURE ENGINEERING I INTERIOR DESIGN
4807 - C Koger Boulevard, Greensboro, NC 27407 1 T - 336-218-8282 F-336-218-8010 I www.triad-designgroup.com
Stormwater Report Rowan County North Carolina
DaVita Spencer 17-025
Narrative:
The purpose of this project is to construct a 9,121 sf building with associated drive and parking aisles on
the 4.951 acre site located at the physical address of 1287 Salisbury Avenue. The existing site currently
has approximately 0. 13 acres of BUA. An additional 0.94 acres of BUA are being proposed due to the
proposed construction, with an area for a 0.07 acres building addition bringing the total BUA to 1.14
acres or 23.02% BUA. A wet detention pond will be constructed to treat hand detain the increased flow
created by the additional BUA created due to the project. The 1, 2, and 10 year storm events have been
modeled and the runoff from wet detention pond has been reduced to pre -development rates. A
summary of the flows are listed below.
Drainage Area 1 -
Flows —
Flows
Pre -Development
DA -1
Post -Development
DA -1
Drainage Area
1.67 AC
2.23 AC
CN
64
82
BUA
0.13 Acres
1.14 Acres
Tc
10 min
5 min
Flows —
Flows
Pre -Development
Condition DA -1
Post -Development
Condition DA -1
Routed Condition
DA -1
1 -yr 24 -hr
0.587 cfs
4.453 cfs
0.016cfs
2 yr 24 -hr
1.229 cfs
6.115 cfs
0.146 cfs
10 yr 24 -hr
3.380 cfs
10.81 cfs
3.005 cfs
100 yr 24 -hr
7.435 cfs
18.30 cfs
8.961 cfs
11 Page
FrOND CHECK Future- RISER2.gpw
07/28/17
PERMANENT
WET DETENTION POND DESIGN - RISER/BARREL
Revised 8-24-99
GUILFORD COUNTY
PLANNING & DEVELOPMENT DEPARTMENT
PROJECT:a
e a pencer INDEX NO:. INDEX
CHECKED BY: MWJ
LOCATION:
Spencer NC DATE: April 06, 2017
REVISED:
SITE DATA
TOTAL SITE AREA = 4.99 WATERSHED = RANDLEMAN DAM
Existing
BUILT UPON AREA = 0.13 CLASSIFICATION: WS - IV
Proposed
BUILT UPON AREA = 1.01 (GWA/WCA) _ GWA
TOTAL ON-SITE
BUILT UPON AREA = 1.14
PERCENT BUILT -UPON = 22.85%
ON-SITE DRAINAGE AREA TO POND = 2.23
ON-SITE BUA TO POND = 1.14
NSITE % BUA FOR POND SUB -BASIN = 51.12%
OFF-SITE DRAINAGE AREA TO POND = 0.36 MAX. OFF-SITE B.U.% = 70%
TOTAL WATERSHED AREA TO POND = 2.59
DISTURBED AREA = 2.50
TEMP. SED. STOR. USED /N
DESIGN DATA
TEMPORARY SEDIMENT STORAGE 0.5 acre -inch per disturbed acre
PERMANENT SEDIMENT STORAGE 0.125 acre -in per total drainage area
PERMANENT WATER QUALITY
COMPOSITE B.U. % = 53.75. percent
DEPTH (minimum 3 feet) 3.4 feet
SADA (Figure 5.6-2) 3.26 percent
TEMPORARY WATER QUALITY 1.0 rainfall to be controlled
PRINCIPAL SPILLWAY
TYPE X corrugated aluminum
reinforced concrete
DESIGN STORM 10 ,year
RAINFALL INTENSITY 6.89 _inches per hour
RUNOFF COEFFICIENT 0.63
EMERGENCY SPILLWAY
TYPE X grass lined
rip -rap lined
DESIGN STORM 100 year
RAINFALL INTENSITY 8 inches per hour
RUNOFF COEFFICIENT 0.8
POND DATA
ELEV. @ BOT. OF POND = 730.5 SURFACE AREA =.829
fELEV.@ BOT. OF PSS = 730.5 SURFACE AREA= 829
ELEV. @ BOT. OF PWQ = 732 SURFACE AREA = 1364
ELEV.
@ NORMAL POOL = 736.5 SURFACE AREA = 5660
ELEV.
@ TOP. OF RISER = 737.75 SURFACE AREA = 7978
ELEV.
@ EMER. SPILLWAY = 738.5
ELEV. @ TOP OF DAM = 740
INVERT OF BARREL= 728
POND DESIGN
TEMPORARY SEDIMENT STORAGE VOLUME REQUIRED
Page 1
4538
POND CHECK Future- RISER2.gpw
07/28/17
Page 2
VOLUME PROVIDED
LEV. @ BOT. OF POND= 730.50
LEV. 0 NORMAL POOL = 736.50
SURFACE AREA = 829
SURFACE AREA= 5660
ALLOW 75% OF BASIN VOLUME TO WQ ORIFICE =
14600
OK
PERMANENT SEDIMENT STORAGE VOLUME REQUIRED
VOLUME PROVIDED
ELEV. @ BOT. OF PSS = 730.50 SURFACE AREA = 829
ELEV. @ BOT. OF PWQ =.732.00 SURFACE AREA = 1364
VOLUME PROVIDED =
1175
1645
OK
PERMANENT WATER QUALITY SURFACE AREA REQ'D
3678
NORMAL POOL ELEVATION =
SURFACE AREA PROVIDED =
736.50
5660
OK
TEMPORARY WATER QUALITY STORAGE REQUIRED
Rv=
0.534
VOLUME REQUIRED =
5018
VOLUME PROVIDED
ELEV. @ BOT. OF TWQ = 736.50
ELEV. @ TOP OF TWQ = 737.75
SURFACE AREA = 5660
SURFACE AREA = 7978
VOLUME PROVIDED =
8524
OK
Page 2
ti
DaVita Spencer
Average Pond Depth NC DEG Stormwater
Manual Figure 10-2b
jAverage Depth
Option 1
Permanent pool voulme divided by permanent pool surface area
(Pool Volume Pv = 167322
Perm Pool Surface Arer. PSA = 49924.08
Depth davg = 3.351529
1Option 2
A bottom shelf
Abs =
4148
A perm pool
App =
5660
A bottom pond
Abp =
1366
Depth
D =
4.5
davg = 3.424175
Hydro Flow
Pond Check Sheet
4807-C Koger Blvd
Greensboro, NC 27407
336-218-8282 * 336-218-8010 Fax
Water Quality Draw Down Time
Size of Hole 10. 0.003068
Storage Volume 6919
Surface Area of Pond ft^2 (As) 6r
Head of Water above Hole, ft (h)
Coefficient of Contraction of an orrifice (0.6) &.a
Time to Dewater Days 3.83328
CE
Qmin
Qmax
0.02089 cfs
0.01602 5 days
0.04004 2 days
,Watershed Model Schematic HydraflowHydrographsExtensionforAutoCAD@Civil3D®2016byAutodesk,lnc.v11
1
22'`
CD
Legend
Hvd• Origin Description
1 SCS Runoff Pre Development
2 SCS Runoff Post Development
3 Reservoir Proposed Pond
Project: Pond Routing.gpw
Wednesday, 06 / 7 / 2017
,Hydrograph Return Period Rec;q
y ow Hydrographs Extension for AutoCAD®Civil 3130 2016 by Autodesk, Inc. v11
Hyd.
Hydrograph
Inflow
Peak Outflow (cis)
Hydrograph
No.
we
hyd(s)
Description
(origin)
1 -yr
2 -yr
3 -yr
5 -yr
10 -yr
25 -yr
50 -yr
100 -yr
1
SCS Runoff
0.587
1.229
3.380
7.435
Pre Development
2
SCS Runoff
4.453
6.115
10.81
1830
Post Development
3
Reservoir
2
0.015
0.096
1.681
8.035
Proposed Pond
Proj. file: Pond Routing.gpw
Wednesday, 06 / 7 / 2017
3
, Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3DB 2016 by Autodesk, Inc. v11
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cult)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cult)
Hydrograph
Description
1
SCS Runoff
0.587
2
724
2,251
Pre Development
2
SCS Runoff
4.453
2
718
8,937
Post Development
3
Reservoir
0.015
2
1444
3,914
2
737.53
21,376
Proposed Pond
Pond Routing.gpw
Return Period: 1 Year
Wednesday, 06 / 7 / 2017
1 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 1
Time to peak
Pre Development
Hyd. volume
Hydrograph type
= SCS Runoff
Storm frequency
= 1 yrs
Time interval
= 2 min
Drainage area
= 1.670 ac
Basin Slope
= 0.0%
Tc method
= User
Total precip.
= 2.74 in
Storm duration
= 24 hrs
Wednesday, 06 / 712017
Peak discharge
= 0.587 cfs
Time to peak
= 12.07 hrs
Hyd. volume
= 2,251 cuft
Curve number
= 64*
Hydraulic length
= 0 ft
Time of conc. (Tc)
= 10.00 min
Distribution
= Type II
Shape factor
= 484
Composite (Area/CN) = [(0.130 x 98) + (1.540 x 61)] / 1.670
Pre Development
Q (GfS) Hyd. No. 1 --1 Year Q (S)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0 2 4
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 2
Time to peak
Post Development
Hyd. volume
Hydrograph type
= SCS Runoff
Storm frequency
= 1 yrs
Time interval
= 2 min
Drainage area
= 2.230 ac
Basin Slope
= 0.0%
Tc method
= User
Total precip.
= 2.74 in
Storm duration
= 24 hrs
* Composite (Area/CN) = [(0.800 x 61) + (1.070 x 98) + (0.360 x 78)] / 2.230
Q (cfs)
5.00
4.00
3.00
all
1.00
0.00 ' 1'
0 2 4
Hyd No. 2
6 8
Wednesday, 06 / 7 / 2017
Peak discharge
= 4.453 cfs
Time to peak
= 11.97 hrs
Hyd. volume
= 8,937 cuft
Curve number
= 82*
Hydraulic length
= 0 ft
Time of conc. (Tc)
= 5.00 min
Distribution
= Type II
Shape factor
= 484
Post Development
Hyd. No. 2 --1 Year
Q (cfs)
5.00
4.00
3.00
2.00
1.00
J* - ' ' ' 0.00
10 12 14 16 18 20 22 24 26
Time (hrs)
6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11
Wednesday, 06 / 7 / 2017
Hyd. No. 3
Proposed Pond
Hydrograph type
= Reservoir
Peak discharge
= 0.015 cfs
Storm frequency
= 1 yrs
Time to peak
= 24.07 hrs
Time interval
= 2 min
Hyd. volume
= 3,914 cuft
Inflow hyd. No.
= 2 - Post Development
Max. Elevation
= 737.53 ft
Reservoir name
= Proposed Pond
Max. Storage
= 21,376 cuft
Storage Indication method used. Wet pond routing start elevation = 736.25 ft.
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00 '
0 10
Hyd No. 3
Proposed Pond
Hyd. No. 3 -- 1 Year
20 30 40
Hyd No. 2
50 60 70 80 90
D Total storage used = 21,376 cuft
Q (cfs)
5.00
4.00
3.00
2.00
1.00
1 0.00
100
Time (hrs)
,Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3130 2016 by Autodesk, Inc. A 1
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cult)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
1.229
2
722
3,821
Pre Development
2
SCS Runoff
6.115
2
716
12,347
Post Development
3
Reservoir
0.096
2
1098
5,946
2
737.76
23,270
Proposed Pond
Pond Routing.gpw
Return Period: 2 Year
Wednesday, 06 / 7 / 2017
Hydrograph
Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. v11
Wednesday, 06 / 7 / 2017
Hyd. No. 1
Pre Development
Hydrograph type
= SCS Runoff
Peak discharge
= 1.229 cfs
Storm frequency
= 2 yrs
Time to peak
= 12.03 hrs
Time interval
= 2 min
Hyd. volume
= 3,821 cuft
Drainage area
= 1.670 ac
Curve number
= 64*
Basin Slope
= 0.0%
Hydraulic length
= Oft
Tc method
= User
Time of conc. (Tc)
= 10.00 min
Total precip.
= 3.31 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Composite (Area/CN) = [(0.130 x 98) + (1.540 x 61)] / 1.670
Q (cfs)
2.00-
1.00
0.00
0 2 4
Hyd No. 1
Pre Development
Hyd. No. 1 -- 2 Year
6 8 10 12 14 16 18 20 22 24
Q (cfs)
2.00
1.00
0.00
26
Time (hrs)
9
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. v11
Wednesday, 06 / 7 / 2017
Hyd. No. 2
Post Development
Hydrograph type
= SCS Runoff
Peak discharge
= 6.115 cfs
Storm frequency
= 2 yrs
Time to peak
= 11.93 hrs
Time interval
= 2 min
Hyd. volume
= 12,347 cuft
Drainage area
= 2.230 ac
Curve number
= 82*
Basin Slope
= 0.0%
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.31 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
' Composite (Area/CN) = [(0.800 x 61) + (1.070 x 98) + (0.360 x 78)] / 2.230
Q (cfs)
7.00
5.00
4.00
3.00
2.00
1.00
0.00 ' 1'
0 2 4
Hyd No. 2
a
Post Development
Hyd. No. 2 -- 2 Year
Q (cfs)
7.00
5.00
4.00
3.00
2.00
1.00
' ' ' ' 0.00
8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hydrograph
Report
10
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11
Wednesday, 06 / 7 1 2017
Hyd. No. 3
Proposed Pond
Hydrograph type
= Reservoir
Peak discharge
= 0.096 cfs
Storm frequency
= 2 yrs
Time to peak
= 18.30 hrs
Time interval
= 2 min
Hyd. volume
= 5,946 cuft
Inflow hyd. No.
= 2 -Post Development
Max. Elevation
= 737.76 ft
Reservoir name
= Proposed Pond
Max. Storage
= 23,270 cult
Storage Indication method used Wet pond routing start elevation = 736 25 ft
Proposed Pond
Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs)
7.00 7.00
6.00 6.00
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
1.00 1.00
0 00 000
0 10 20 30 40 50 60 70 80 90 100
Time (hrs)
Hyd No. 3 Hyd No. 2 D Total storage used = 23,270 cuft
11
.Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2016 by Autodesk, Inc. v11
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cult)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
3.380
2
722
9,118
Pre Development
2
SCS Runoff
10.81
2
716
22,082
Post Development
3
Reservoir
1.681
2
726
15,673
2
737.91
24,429
Proposed Pond
Pond Routing.gpw
Return Period: 10 Year
Wednesday, 06 / 7 / 2017
Hyrdrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 1
Time to peak
Pre Development
Hyd. volume
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 2 min
Drainage area
= 1.670 ac
Basin Slope
= 0.0%
Tc method
= User
Total precip.
= 4.81 in
Storm duration
= 24 hrs
Composite (Area/CN) = [(0.130 x 98) + (1.540 x 61)] / 1.670
Q (cfs)
4.00
3.00
2.00
1.00
0.00 ' 1'
0 2 4
Hyd No. 1
6 8
12
Wednesday, 06 / 7 / 2017
Peak discharge
= 3.380 cfs
Time to peak
= 12.03 hrs
Hyd. volume
= 9,118 cuft
Curve number
= 64*
Hydraulic length
= 0 ft
Time of cone. (Tc)
= 10.00 min
Distribution
= Type II
Shape factor
= 484
Pre Development
Hyd. No. 1 --10 Year
Q (cfs)
4.00
3.00
2.00
1.00
a.� 0.00
10 12 14 16 18 20 22 24 26
Time (hrs)
Hydrograph
Report
13
Hydraflow Hydrographs Extension for AutoCADO Civil 3130 2016 by Autodesk, Inc_ v11
Wednesday, 06 17
/ 2017
Hyd. No. 2
Post Development
Hydrograph type
= SCS Runoff Peak discharge =
10.81 cfs
Storm frequency
= 10 yrs
Time to peak =
11.93 hrs
Time interval
= 2 min
Hyd. volume =
22,082 cuft
Drainage area
= 2.230 ac
Curve number =
82*
Basin Slope
= 0.0%
Hydraulic length =
0 ft
Tc method
= User
Time of conc. (Tc) =
5.00 min
Total precip.
= 4.81 in
Distribution =
Type II
Storm duration
= 24 hrs
Shape factor =
484
Composite (Area/CN) _ [(0 800 x 61) + (1.070 x 98) + (0.360 x 78)] / 2.230
Post Development
Q (Gfs)
Hyd. No. 2 --10 Year
Q (cfs)
12.00
12.00
10.00
10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00
0.00
0.0 2.0
4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0
20.0 22.0
Hyd No. 2
Time
(hrs)
14
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD@ Civil 3DO 2016 by Autodesk, Inc v11
Wednesday, 06 / 7 / 2017
Hyd. No. 3
Proposed Pond
Hydrograph type
= Reservoir
Peak discharge
= 1.681 cfs
Storm frequency
= 10 yrs
Time to peak
= 12.10 hrs
Time interval
= 2 min
Hyd. volume
= 15,673 cuft
Inflow hyd. No.
= 2 -Post Development
Max. Elevation
= 737.91 ft
Reservoir name
= Proposed Pond
Max. Storage
= 24,429 cuft
Storage Indication method used. Wet pond routing start elevation = 736 25 ft.
Proposed Pond
Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs)
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 3 Hyd No. 2 �� Total storage used = 24,429 cuft
15
.Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. v11
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cult)
Hydrograph
Description
1
SCS Runoff
7.435
2
720
19,431
Pre Development
2
SCS Runoff
1830
2
716
38,305
Post Development
3
Reservoir
8 035
2
722
31,889
2
73851
29,571
Proposed Pond
Pond Routing.gpw
Return Period: 100 Year
Wednesday, 06 / 7 / 2017
,Ffydrograph
Report
16
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Wednesday, 06 / 7 / 2017
Hyd. No. 1
Pre Development
Hydrograph type
= SCS Runoff
Peak discharge
= 7.435 cfs
Storm frequency
= 100 yrs
Time to peak
= 12.00 hrs
Time interval
= 2 min
Hyd. volume
= 19,431 cuft
Drainage area
= 1.670 ac
Curve number
= 64*
Basin Slope
= 0.0%
Hydraulic length
= Oft
Tc method
= User
Time of conc. (Tc)
= 10.00 min
Total precip.
= 7.14 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
* Composite (Area/CN) = [(0.130 x 98) + (1.540 x 61)] / 1.670
Q (cfs)
8.00
6.00
4.00
2.00
0.00 '
0 2 4
Hyd No. 1
Pre Development
Hyd. No. 1 -- 100 Year
6 8 10 12 14 16
Q (cfs)
8.00
M
4.00
2.00
0.00
18 20 22 24 26
Time (hrs)
,Kydrograph
'
Report
17
Hydraflow Hydrographs Extension for AutoCADO Civil 3139) 2016 by Autodesk, Inc. v11
Hyd. No. 2
Post Development
Hydrograph type = SCS Runoff Peak discharge =
Storm frequency = 100 yrs Time to peak =
Time interval = 2 min Hyd. volume =
Drainage area = 2.230 ac Curve number =
Basin Slope = 0.0% Hydraulic length =
Tc method = User Time of conc. (Tc) =
Total precip. = 7.14 in Distribution =
Storm duration = 24 hrs Shape factor =
Wednesday, 06 / 7 / 2017
18.30 cfs
11.93 hrs
38,305 cuft
82*
Oft
5.00 min
Type Il
484
Composite (Area/CN) _ [(0.800 x 61) + (1.070 x 98) + (0.360 x 78)] 12.230
Post Development
Q (cfs) Hyd. No. 2 -- 100 Year
Q (cfs)
21.00
21.00
18.00
18.00
1
115.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0.0 2.0
Hyd No. 2
4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0
0.00
20.0 22.0
Time (hrs)
18
ydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Wednesday, 06 / 7 / 2017
Hyd. No. 3
Proposed Pond
Hydrograph type
= Reservoir
Peak discharge
= 8.035 cfs
Storm frequency
= 100 yrs
Time to peak
= 12.03 hrs
Time interval
= 2 min
Hyd. volume
= 31,889 cuft
Inflow hyd. No.
= 2 -Post Development
Max. Elevation
= 738.51 ft
Reservoir name
= Proposed Pond
Max. Storage
= 29,571 cuft
Storage Indication method used. Wet pond routing start elevation = 736.25 ft
Proposed Pond
Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs)
21.00 21.00
18.00 18.00
15.00 15.00
12.00 12.00
9.00 9.00
6.00 6.00
3.00 3.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 3 Hyd No. 2 O Total storage used = 29,571 cuft
t
O
Na
Ii
m
m
w
N
0
O
LL
C
E W
_m
Q �
Z +
v
U
To `
c ca
11
c C
� C
E
3
co
CNC,
O
N
N
Iq
�
m
2
p
r
h
't
co
O
N
N
N
N
EL.
M
co
O
LOC)
O
O
O
O
O
in
.—
r
O
N
N
N
N
M
C
C
IN
O
O
N
I
N
LQ
O
O
N
AD
IALn
r
r
O
N
CV
CV
M
M
u
m
O
N
Ivo
~
C
CD
cCD oo
O
N
CV
M
M
M
d)
N
LO
O
r
O)
N
N
LOfi,
N
O
CD
M
M
M
!�
V
m
ccoo
o
m
m
n
m
m
2
W
�
CV
C
N
M
M
ch
M
N
d
0
0
0
0
0
0
0
0
C
r
U�
O
O7
O
cq
co
M
!�0
M
N
N
O
M
M
M
;r
't
3
w
d
C
H
M
m
O
O
CP
N
O
0
N
N
N
C
M
Cl)
RT
-It
d'
C
N
o
c~O
co
! I
T
N
3CD
N
CN
M
C
CD
V
�
'cY
In
in
O
pOp
O
O
O
CD
O
O
CD
O
C+
m
c0
O
CO
O
O
LL
D
Cho
T
O
r
C�
co
4
q
C
r
aN—
V,
C
LU
to
cam-
C
CA
O
C
COC
co
O
�
O
M
fC
O
E
v
LO
O
to
r,:
N
oo
m
un
7
O
CD
CD
N
M
In
N
�
�a
O
N
OOi
In
p02
Ni
O
co
M
C
O
CNo
Cl)
QO),
m
0
CNC
co
O
co
Rd,
v
CCD
o
_
7 2 �
N
M
In
N
� D
N
0
O
LL
C
E W
_m
Q �
Z +
v
U
To `
c ca
11
c C
� C
E
p
co
CNC,
O
N
N
Iq
�
m
p
r
h
't
co
O
N
N
N
N
M
co
O
LOC)
O
O
O
O
O
in
.—
r
O
N
N
N
N
M
C
IN
O
O
N
I
N
LQ
O
O
N
IALn
r
r
O
N
CV
CV
M
M
m
O
N
Ivo
~
C
CD
cCD oo
O
N
CV
M
M
M
0
Ing,
LO
O
COC
N
O)
N
N
LOfi,
N
CV
O
M
M
c�1
•C'
•�%
M
N
O
m
7
Lfj
ti
CP
2
M
�
CV
C
N
M
M
ch
M
N
d
�p
r
U�
O
O7
O
cq
co
M
C_
M
N
N
O
M
M
M
;r
't
{C
N
c
d
C
H
M
m
O
O
CP
N
O
0
N
N
N
C
M
Cl)
RT
-It
d'
N
o
c~O
co
! I
T
N
N
CN
M
C
M
V
�
'cY
In
in
LO
r
Ir.,
N
O
CMC
V
CD
N
a
C+
U
U
C2
Cho
�
O
N
n
co
�
q
r
M
V,
O
LU
to
Co
co
CD
C
COC
co
O
�
O
M
fC
O
E
v
LO
O
to
r,:
N
oo
m
un
CO
CD
CD
N
M
In
N
�
�a
C
r
O
O
O
O
O
O
p
r
h
't
co
O
O
C7
C7
!-I
co
O
LOC)
O
O
O
O
O
c0
CO
O
(6
O
6
O
6
CO
C
cc
O
cr)
O
O
O
O
N
Lh
N
Ali
C
Ln
C
C
O
O
lfi
~
C
CD
cCD oo
O
O
O
C
O
O
m
0
4
CV
q'
C;
O
O
Ch
•C'
•�%
M
O
ti
O
O
O
O
COLI
d
Ch
M
O
N
O
C
CD
O
N
a`
w
00000000
O
O
o
O
O
O
O
O
C_
M
C
O
6
O
6
O
6
6
{C
M
COO,
Imp,
O
O
O
O
0
N'
M
r-
r-
C7
O
O
O
r
O
O
O
O
O
O
O
O
O
O
O
C
O
o
S
C
r°
N
g
2
co
N
c
N
M
s
E
S
C+
U
U
y C
U
to
2
2
2
2
2
U
_,Lydraflow Table of Contents
Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. v11
Pond Routing.gpw
Wednesday, 06 / 7 / 2017
Watershed Model Schematic..................................................................................... 1
Hydrograph Return Period Recap............................................................................. 2
1 -Year
SummaryReport......................................................................................................................... 3
HydrographReports................................................................................................................... 4
Hydrograph No. 1, SCS Runoff, Pre Development.................................................................. 4
Hydrograph No. 2, SCS Runoff, Post Development................................................................. 5
Hydrograph No. 3, Reservoir, Proposed Pond......................................................................... 6
2 - Year
SummaryReport......................................................................................................................... 7
HydrographReports................................................................................................................... 8
Hydrograph No. 1, SCS Runoff, Pre Development.................................................................. 8
Hydrograph No. 2, SCS Runoff, Post Development................................................................. 9
Hydrograph No. 3, Reservoir, Proposed Pond....................................................................... 10
10 - Year
SummaryReport....................................................................................................................... 11
HydrographReports................................................................................................................. 12
Hydrograph No. 1, SCS Runoff, Pre Development................................................................ 12
Hydrograph No. 2, SCS Runoff, Post Development............................................................... 13
Hydrograph No. 3, Reservoir, Proposed Pond....................................................................... 14
100 - Year
SummaryReport ....................................................................................................................... 15
HydrographReports................................................................................................................. 16
Hydrograph No. 1, SCS Runoff, Pre Development................................................................ 16
Hydrograph No. 2, SCS Runoff, Post Development............................................................... 17
Hydrograph No. 3, Reservoir, Proposed Pond....................................................................... 18
OFReport.................................................................................................................. 19