Loading...
HomeMy WebLinkAbout20170971 Ver 1_Buffer and/or Stream Determination_20170803,A F'ElCDENR North Carolina Department of Environment and Natural Resources Pat McCrory AUG 3 017 Governor Water Quality W Operations Section John E. Skvarla, III Secretary ashington Regional umes DWQ Use Only: Project # �O L-70 2 7 i2.e:c�r � . 5; 1-711-7 Stream Origin/Buffer Applicability Determination Required Information 1. Owner Information (corporation/individual who is legally responsible for the property and its compliance) la. Name(s) on Recorded Deed Graham Place LLC 1 b. Responsible Party (for LLC) Laura Norment 1c. Mailing Address 4503 Wentworth Court, New Bern, NC 28562 1d. Telephone Number pbaker@cravencountync.gov 1e. Email Address lauraunderhillnorment@yahoo.com 2. Location of Project Site - please include the cor�� nearest named town and highway number: Craven County, New Bern (James City/Tabernal,'OId Airport Road 3. Has anyone from DWQ visited the site? No Staff Name N/A Date of Visit? N/A Additional Requested Information 4. Agent/Consultant Information (if applicable) 4a. Name, Company Patrick Baker, Craven Soil and Water Conservation District 4b. Mailing address 302 Industrial Drive, New Bern, NC 28562 4c. Telephone no. 252-633-0397 4d. Email address pbaker@cravencountync.gov 5. Project and Site Information: Craven Count Tax Parcel ID 7-108-012 5a. Name of project Graham Place Drainage 5b. County Craven 5c. Nearest Named Stream Brice Creek 5d. River Basin Neuse 5e. Provide a brief description of this project (attach site plan if available): Construct new v -bucket ditch on existing pastureland for farm for drainage. Outlet this new ditch into an adjoining stream which may be subject to riparian forest buffer rules. New ditch will not have to be cut all the way through the buffer or directly into the stream. New ditch will end prior to the stream and water can sheet flow into the stream. (Stream does not show on topo but does appear on printed soil map). Please attach a map of the site indicating project boundaries on the USGS 1:24,000 Topo and/or NRCS Soil Survey. If you are unable to locate either of these maps, please contact the Regional Office for assistance. DWQ Use Only: Is this stream call for the purpose of: buffer mitigation nutrient offset credit Please return form to: Anthony Scarbraugh 943 Washington Square Mall Washington, NC 27889 Note: Submittals on Friday after 12:00 pm will be stamped as received on the Fax: (252) 946-9215 next business day. Email: anthony.scarbraugh u ncdenr.gov Please contact Anthony Scarbraugh at (252) 946-6481 if you have any questions. Division of Water Resources - Water Quality Regional Operations Section - Washington Regional Office 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946.6481 1 Fax: 252-975-37161 Internet: www.ncdenr.gov An Equal Opportunity 1 Affirmative Action Employer— Made in part by recycled paper Neo bell 2Y30" I L Scarbraugh, Anthony From: Patrick Baker <pbaker@cravencountync gov> Sent: Thursday, August 03, 2017 4 55 PM To: Scarbraugh, Anthony Subject: Buffer site evaluation form Attachments: Graham Place Stream Request DRAFT docx, Scanned Topo pdf Hey Anthony, Attached is a buffer determination request form that I completed for the landowner Basically the plans are to dig a new ditch along the edge of the pasture to provide drainage This ditch will need to drain into an adjoining ditch inside the woods. This outlet ditch in the woods does not appear on the topo map as a stream but does appear on the printed soil map. Due to the natural slope of the land, we will not need to cut the new ditch all the way through the buffer or cut into the stream The new ditch will play out before reaching the stream and sheet flow the rest of the way You'll understand it better when you see the site The farm manager and myself have already met onsite with Gary Beecher to make sure there were no wetland issues with digging a new ditch. He gave them the green light however they don't have it in writing yet. I believe the plan was to get the "final" plan figured out,, submit those to him and he would give the official written green light. But,, the buffer/stream question could effect the final plan. Thanks„ any questions let me know Patrick Baker Craven SWCD CnB /StA DO La oll V1, Thutr GI Qr AaA LxI OnO /StA DO La oll V1, Thutr Mom, KR=TQ L0 M,. i Ra r AaA Q. SUD- -� �:.+_AaA -�=—=.•�r _ I � � �_ : ,,; ,t fir. - r j iC:i �7 /FI Lia CL EXA t • . Y t t� 1 / I 1 7 r. _RSt Il�lr , !� I = F t. '.- GOA Y% i A" �} ,. t ; �' , a�� • r�, 1 II I � 'I �.. .-i� ,.�� lj'D `t ,r -.i � J j'e � .,ti r ,y} toys �.. NSA .' y l / ,' , -�, a � J r •, �'+., PO 0117 Gloogl'e 1 _ _ -- iy � �; � _ fir,,-•� — -- d 7 !' ' ' __-_ ri �, Imagery Date: 10 23iHli-9 Llat. ?5.C153683° Pori-77.a2536�k__} ele