HomeMy WebLinkAbout20170971 Ver 1_Buffer and/or Stream Determination_20170803,A
F'ElCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory AUG 3 017
Governor Water Quality
W
Operations Section
John E. Skvarla, III
Secretary
ashington Regional umes
DWQ Use Only: Project # �O L-70 2 7
i2.e:c�r � . 5; 1-711-7
Stream Origin/Buffer Applicability Determination
Required Information
1. Owner Information (corporation/individual who is legally responsible for the property and its compliance)
la. Name(s) on Recorded Deed
Graham Place LLC
1 b. Responsible Party (for LLC)
Laura Norment
1c. Mailing Address
4503 Wentworth Court, New Bern, NC 28562
1d. Telephone Number
pbaker@cravencountync.gov
1e. Email Address
lauraunderhillnorment@yahoo.com
2. Location of Project Site - please include the cor�� nearest named town and highway number:
Craven County, New Bern (James City/Tabernal,'OId Airport Road
3. Has anyone from DWQ visited the site?
No
Staff Name
N/A
Date of Visit?
N/A
Additional Requested Information
4. Agent/Consultant Information (if applicable)
4a. Name, Company
Patrick Baker, Craven Soil and Water Conservation District
4b. Mailing address
302 Industrial Drive, New Bern, NC 28562
4c. Telephone no.
252-633-0397
4d. Email address
pbaker@cravencountync.gov
5. Project and Site Information: Craven Count Tax Parcel ID 7-108-012
5a. Name of project
Graham Place Drainage
5b. County
Craven
5c. Nearest Named Stream
Brice Creek
5d. River Basin
Neuse
5e. Provide a brief description of this project (attach site plan if available): Construct new v -bucket ditch on existing pastureland
for farm for drainage. Outlet this new ditch into an adjoining stream which may be subject to riparian forest buffer rules. New ditch
will not have to be cut all the way through the buffer or directly into the stream. New ditch will end prior to the stream and water
can sheet flow into the stream. (Stream does not show on topo but does appear on printed soil map).
Please attach a map of the site indicating project boundaries on the USGS 1:24,000 Topo and/or NRCS Soil Survey.
If you are unable to locate either of these maps, please contact the Regional Office for assistance.
DWQ Use Only: Is this stream call for the purpose of: buffer mitigation nutrient offset credit
Please return form to: Anthony Scarbraugh
943 Washington Square Mall
Washington, NC 27889 Note: Submittals on Friday after 12:00 pm
will be stamped as received on the
Fax: (252) 946-9215 next business day.
Email: anthony.scarbraugh u ncdenr.gov
Please contact Anthony Scarbraugh at (252) 946-6481 if you have any questions.
Division of Water Resources - Water Quality Regional Operations Section - Washington Regional Office
943 Washington Square Mall, Washington, NC 27889
Phone: 252-946.6481 1 Fax: 252-975-37161 Internet: www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer— Made in part by recycled paper
Neo bell
2Y30"
I
L
Scarbraugh, Anthony
From: Patrick Baker <pbaker@cravencountync gov>
Sent: Thursday, August 03, 2017 4 55 PM
To: Scarbraugh, Anthony
Subject: Buffer site evaluation form
Attachments: Graham Place Stream Request DRAFT docx, Scanned Topo pdf
Hey Anthony,
Attached is a buffer determination request form that I completed for the landowner
Basically the plans are to dig a new ditch along the edge of the pasture to provide drainage This ditch will need
to drain into an adjoining ditch inside the woods. This outlet ditch in the woods does not appear on the topo map
as a stream but does appear on the printed soil map. Due to the natural slope of the land, we will not need to cut
the new ditch all the way through the buffer or cut into the stream The new ditch will play out before reaching
the stream and sheet flow the rest of the way You'll understand it better when you see the site
The farm manager and myself have already met onsite with Gary Beecher to make sure there were no wetland
issues with digging a new ditch. He gave them the green light however they don't have it in writing yet. I
believe the plan was to get the "final" plan figured out,, submit those to him and he would give the official
written green light. But,, the buffer/stream question could effect the final plan.
Thanks„ any questions let me know
Patrick Baker
Craven SWCD
CnB
/StA DO
La
oll
V1,
Thutr
GI
Qr
AaA
LxI
OnO
/StA DO
La
oll
V1,
Thutr
Mom, KR=TQ L0 M,. i
Ra
r
AaA
Q. SUD-
-�
�:.+_AaA
-�=—=.•�r _ I � � �_ : ,,; ,t fir.
-
r j iC:i �7 /FI Lia
CL
EXA
t •
. Y
t
t� 1 / I 1 7
r.
_RSt Il�lr ,
!� I = F t.
'.- GOA
Y% i A" �} ,.
t ;
�' , a�� • r�, 1 II I � 'I �.. .-i� ,.�� lj'D `t ,r -.i �
J j'e
� .,ti
r ,y} toys
�.. NSA .' y l / ,' , -�, a � J r •, �'+.,
PO
0117 Gloogl'e
1 _ _ -- iy � �; � _ fir,,-•� — -- d 7
!' ' ' __-_ ri �, Imagery Date: 10 23iHli-9 Llat. ?5.C153683° Pori-77.a2536�k__} ele