HomeMy WebLinkAbout20170969 Ver 1_Build Maps_20170804 (2)FEBRUARY 20, 2018
FEBRUARY 9, 2017
M ITCH ELL CO U N TY
BRID GE NO. 29 OVER ROCK CREEK ON NC 226
GRAD ING, PAVING, D RAINAGE, AND STRU CTU RE
25 50 10050
25 50 10050
5 10 20 10
D
T
V
=
=
=
=
=
55
10
40
%
M PH
ADT
ADT
2018
2038
% *
* TTST =7%
FUN C CLASS =
REG IO N AL TIER
0
0
0
PRO FILE (HO RIZO N TAL)
R/W & UTIL.
BRSTP-0226(14)
PROJECT LENGTH
RIGHT OF W AY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
D ESIGN D ATA Prepared in the Office of:
SIGNATU RE:
SIGNATU RE:
P.E.
P.E.
D IVISION OF H IGH W AYS
2012 STAND ARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT D ESIGN ENGINEER
GRAPH IC SCALES
PLAN S
PRO FILE (VERTICAL)
H YD RAU LICS ENGINEER
ENGINEER
ROAD W AY D ESIGN
LOCATION:
TYPE OF W ORK :
0
9
/
0
8
/
9
9
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
0
9
-
F
E
B
-
2
0
1
7
0
9
:
5
8
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
b
5
1
7
0
_
r
d
y
_
t
s
h
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
1000 B irch R idge D r., R aleigh N C , 27610
C
O
N
T
R
A
C
T
:
T
I
P
P
R
O
J
E
C
T
:
A
R
T
MEN
N
A
S
O
H
D
E
P
T
O
F T R A S PORT
T
I O
N
T
A TEOFN RT
C AR
O
LI
N
A
4
LEN G TH RO ADW AY TIP PRO JECT B-5170 = 0.103 M ILE
TO TAL LEN G TH TIP PRO JECT B-5170 = 0.116 M ILE
LEN G TH STRUCTURE TIP PRO JECT B-5170 = 0.013 M ILE
CO LLECTO R
B-5170
B
I G
R
O
C
K
C
R
E
E
K
U
N
N
A
M
E
D
B
R
A
N
C
H
SPR ING CR E E K
-L-
-DET-
B
-
5
1
7
0
THIS IS N O T A CO N TRO L O F ACCESS PRO JECT.
K =11 %
DUAL =3%
P.E.42328.1.1
See Sheet 1A For Index of Sheets
2,123
1,970
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
KEVIN E. M O O RE, PE
N ATHAN N . ADIM A, PE
-Y 1 -
(S
R
1 3
3
4
)
B
L
E
V
I N
S
B
R
A
N
C
H
R
D
.
NC 226
TE NNE SSE ETO
B
A
K
E
RS
VIL
L
E
T
O
N
C
2
2
6
BI
G
R
O
C
K
C
R
E
E
K
CLEARIN G O N THIS PRO JECT SHALL BE PERFO RM ED TO THE LIM ITS ESTABLISHED BY M ETHO D II.
THIS PRO JECT IS N O T W ITHIN AN Y M UN ICIPAL BO UN DARIES.
BEG IN DETO UR CO N STRUCTIO N
-DET- STA. 10+00.00
BEG IN DETO UR BRIDG E
-DET- STA. 12+40.00
-Y1- STA. 12+11.00
EN D CO N STRUCTIO N
EN D DETO UR BRIDG E
-DET- STA. 13+03.00
-DET- STA. 15+41.57
EN D DETO UR CO N STRUCTIO N
BEG IN BRIDG E
-L- STA. 15+20.88
BEG IN TIP PRO JECT B-5170
-L- STA. 12+90.00
EN D TIP PRO JECT B-5170
-L- STA. 19+00.00
EN D BRIDG E
-L- STA. 15+88.13
42328.2.1
(226
(261
.94
.7 3
1.20
.20
0
.
6
0
0
.
6
2
0.27
(226
(
(226
261
1333
1330
1334
1332
1331 1330
1329
1358
1337
1337
1326
1338
1341
1343
VICINITY M AP
PROJECT LOCATION
NAD
8
3
/
N
SRS
2
0
0
7
Existing Edge of Pavem ent
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing M etal G uardrail
Existing Cable G uiderail
Proposed G uardrail
Equality Sym bol
Pavem ent Rem oval
Baseline Control Point
RIGH T OF W AY:
Existing Right of W ay M arker
Existing Right of W ay Line
h
Existing Control of Access
Proposed Control of Access
Proposed Right of W ay Line
C
F
Existing Easem ent Line
Proposed Tem porary Construction Easem ent
Proposed Tem porary Drainage Easem ent
Proposed Perm anent Drainage Easem ent
Proposed Perm anent Utility Easem ent
H YD ROLOGY:
Stream or Body of W ater
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;
z
v
W
K
Proposed Lateral, Tail, Head Ditch
False Sum p
Proposed Cable G uiderail
M AJO R:
Bridge, Tunnel or Box Culvert
Bridge W ing W all, Head W all and End W all
M IN O R:
Head and End W all
Pipe Culvert
Footbridge
Paved Ditch G utter
U TILITIES:
ROAD S AND RELATED FEATU RES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power M anhole
Power Line Tower
Power Transform er
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone M anhole
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}
T
p
Q
l
]
/
b
H-Fram e Pole O O
PO W ER:
TELEPHO N E:
Telephone Cell Tower
W ATER:
W ater M anhole
W ater M eter
W ater Valve
W ater Hydrant
4
I
H
a
TV:
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
|
I
]
G AS:
G as Valve
G as M eter n
c
SAN ITARY SEW ER:
Sanitary Sewer M anhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
d
o
A/G W ater
Above G round G as Line
A/G Gas
Above G round W ater Line
Above G round Sanitary Sewer A/G Sanitary Sew er
M ISCELLAN EO US:
Utility Pole O
F
S
3
Utility Pole with Base
Utility Located O bject
Utility Traffic Signal Box
?
CONC
CONC W W
v
v
Drainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer M anhole m
U/G Tank; W ater, G as, O il
A/G Tank; W ater, G as, O il
BOU ND ARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Corner
Property M onum ent
Existing Fence Line
Proposed W oven W ire Fence
Proposed Chain Link Fence
Proposed Barbed W ire Fence
g
F
123
Existing W etland Boundary
Proposed W etland Boundary
Existing Endangered Anim al Boundary
Existing Endangered Plant Boundary
BU ILD INGS AND OTH ER CU LTU RE:
Area O utline
G as Pum p Vent or U/G Tank Cap
Church
School
Dam
Sign
Sm all M ine
W ell
V
M
WW
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
W oods Line
O rchard
Vineyard
RAILROAD S:
Standard G auge
RR Signal M ilepost
Switch
RR Abandoned
RR Dism antled
S
FLOW
*S.U .E. = Subsurface U tility Engineering
WLB
EIP B
ECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cem etery
EXISTING STRU CTU RES:
Parcel / Sequence N um ber
E
AATUR
End of Inform ation E.O .I.
SHEET NO .PRO JECT REFEREN CE NO .
1BB-5170
Abandoned According to Utility Records
WLB
EAB
EPB
R
W
R
W
R
W
C
A
E
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
0
4
/
0
6
/
1
5
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
W etland
Proposed Perm anent Easem ent with
Iron Pin and Cap M arker
Proposed Tem porary Utility Easem ent TUE
Iron Pin and Cap M arker
Proposed Right of W ay Line with
DUEProposed Perm anent Drainage / Utility Easem ent
AUEProposed Aerial Utility Easem ent
CRProposed Curb Ram p
CO N VEN TIO N AL PLAN SHEET SYM BO LS
Underground Storage Tank, Approx. Loc.
G eoenvironm ental Boring
Concrete or G ranite R/W M arker
Proposed Right of W ay Line with
C
A Concrete C/A M arker
Proposed Control of Access Line with
HPBExisting Historic Property Boundary
U/G Power Line LO S B (S.U.E.*)
U/G Power Line LO S C (S.U.E.*)
U/G Power Line LO S D (S.U.E.*)
P
U/G Telephone Cable LO S B (S.U.E.*)
U/G Telephone Cable LO S C (S.U.E.*)
U/G Telephone Cable LO S D (S.U.E.*)
T
U/G Telephone Conduit LO S B (S.U.E.*)
U/G Telephone Conduit LO S C (S.U.E.*)
U/G Telephone Conduit LO S D (S.U.E.*)
TC
U/G Fiber O ptics Cable LO S B (S.U.E.*)
U/G Fiber O ptics Cable LO S C (S.U.E.*)
U/G Fiber O ptics Cable LO S D (S.U.E.*)
T FO
U/G W ater Line LO S B (S.U.E*)
U/G W ater Line LO S C (S.U.E*)
U/G W ater Line LO S D (S.U.E*)
W
U/G TV Cable LO S B (S.U.E.*)
U/G TV Cable LO S C (S.U.E.*)
U/G TV Cable LO S D (S.U.E.*)
TV
U/G Fiber O ptic Cable LO S B (S.U.E.*)
U/G Fiber O ptic Cable LO S C (S.U.E.*)
U/G Fiber O ptic Cable LO S D (S.U.E.*)
TV FO
U/G G as Line LO S B (S.U.E.*)
U/G G as Line LO S C (S.U.E.*)
U/G G as Line LO S D (S.U.E.*)
G
SS Forced M ain Line LO S B (S.U.E.*)
SS Forced M ain Line LO S C (S.U.E.*)
SS Forced M ain Line LO S D (S.U.E.*)
FSS
Utility Unknown U/G Line LO S B (S.U.E.*)
U/G Test Hole LO S A (S.U.E.*)
STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS
Note: Not to Scale
UST
Contam inated Site: Known or Potential
Known Contam ination Area: Soil
Potential Contam ination Area: Soil
Known Contam ination Area: W ater
Potential Contam ination Area: W ater
IN FORM ATION IS N EEDED, PLEASE CON TACT TH E LOCATION AN D SU RVEYS U N IT.
SITE CALIBRATION IN FORM ATION H AS N OT BEEN PROVIDED FOR TH IS PROJECT. IF FU RTH ER
TH E FILES TO BE FOU N D ARE AS FOLLOW S:
IN DICATES GEODETIC CON TROL M ON U M EN TS U SED OR SET FOR H ORIZON TAL PROJECT CON TROL
BY TH E N CDOT LOCATION AN D SU RVEYS U N IT.
PROJECT CON TROL ESTABLISH ED U SIN G GLOBAL POSITION IN G SYSTEM .
N ETW ORK ESTABLISH ED FROM N GS ON LIN E POSITION IN G SERVICE (OPU S)
N OTES:
H TTP://W W W .DOH .DOT.STATE.N C.U S/PRECON STRU CT/H IGH W AY/LOCATION /PROJECT/
PROJECT CON TROL DATA AT:
1. TH E CON TROL DATA FOR TH IS PROJECT CAN BE FOU N D ELECTRON ICALLY BY SELECTIN G
B
I G R
O C
K
C
R
E
E
K
B5170_LS_CON TROL.TXT
1C-1
BL-1
1
4
’
B
S
T
GR
B
S
T
BM 2
1 6
.5
’ B
S
T
BRIDGE No. 29
BRIDGE
FOOT GR
GR
BST
1
8
’
B
S
T
GR
B
S
T
BL-3
BL-4
8
’
SO
IL
18’ B ST
BI
G
R
O
C
K
C
R
E
E
K
W
D
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "B5170-2"
WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF
NORTHING: 871935.5780(ft) EASTING: 1056083.6075(ft)
ELEVATION: 2745.77(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.999863428
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "B5170-2"
WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF
ELEVATION: 2745.77(ft)
(GROUND TO GRID) IS: 0.999863428
THE N.C. LAMBERT GRID BEARING AND
VERTICAL DATUM USED IS NAVD 88
"B5170-2" TO -L- STATION 12+90.00 IS
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
N 27 33’44.56" E 1094.73’
BY-5
N = 872636.1226
E = 1056503.9500
LOCALIZED PROJECT COORD INATES
NCD OT BASELINE M ONU M ENT (BL-1)
TO BAKERSVILLE
N = 873133.9868
E = 1056594.8759
N = 873555.0929
E = 1056423.8125
LOCALIZED PROJECT COORD INATES
NCD OT BASELINE M ONU M ENT (BL-3)
N 34 47’51.29" W 523.82’
TO TEN N ESSEE
SR 1330
H
U
G
HS
G
AP R
D.
19.5’ BST
N = 873985.2380
LOCALIZED PROJECT COORD INATES
NCD OT BASELINE M ONU M ENT (BL-4)
E = 1056124.8808
N = 873082.8196
E = 1056886.0872
LOCALIZED PROJECT COORD INATES
NCD OT BASELINE M ONU M ENT (BY-5)
N 2733’44.56" E 1094.73’
B
L
E
V
I N
S
B
R
A
N
C
H
R
D
(S
R
1 3
3
4
)
LOCALIZED PROJECT COORD INATES
NCD OT BASELINE M ONU M ENT (BL-2=BY2)
BL-2=BY2
8
6
3.
7
5
N
0
7
4
8
’
0
0.
7
7
"
E
TIE LI
NE
T
I
E
L
I
N
E
B
I G
R
O
C
K
C
R
E
E
K
SPRING CREEK
SPRING CREEK
GPS1=B5170-1
LOCALIZED PROJECT COORD INATES
NCD OT GPS M ONU M ENT (B5170-1)
N = 871079.8200
E = 1055966.3800
LOCALIZED PROJECT COORD INATES
NCD OT GPS M ONU M ENT (B5170-2)
N = 871935.5780
E = 1056083.6075
B5170-2
GPS2=
LOCALIZED PROJECT COORD INATES
N = 872906.0632
E = 1056590.1538
BEG STATE PROJECT 42328.1.1
-L- POC STA. 12+90.00
LOCALIZED PROJECT COORD INATES
N = 873487.2724
E = 1056436.2655
END STATE PROJECT 42328.1.1
-L- POT STA. 19+00.00
ELEV.=2767.90’
46.22’ RIGH T
-L- STA 15+08.88
BM #2
LOCALIZED PROJECT COORD INATES
N = 873103.6301
E = 1056787.9023
END STATE PROJECT 42328.1.1
-Y1- POT STA. 12+11.00
-
L-
-L-
-Y
1 -
-
Y
1
-
****************************************
NAIL IN THE BASE OF A 30" RED OAK
L STATION 15+08.88 46.22’ RIGHT
N 873134 E 1056618
BM2 ELEVATION = 2767.90
****************************************
****************************************
NAIL IN THE BASE OF A 13" MAPLE
N 872235 E 1056275
BM1 ELEVATION = 2753.30
****************************************
****************************************
NAIL IN THE BASE OF A 12" PINE
N 873931 E 1056120
BM3 ELEVATION = 2795.60
****************************************
E = 1056582.8461
N = 873081.0202
-Y1- POT STA. 10+00.00
-L- POC STA.14+66.00=
NC 226
N C 226
22’ BST
2
2’
B
S
T
B-5170
ELEV.=2753.30’
462.12’ FROM BL-1
IS S 29 39’ 09" W
BM #1
ELEV.=2795.60’
483.60’ FROM BL-3
IS N 38 55’22" W
BM #3
N
C
G
R
I
D
N
A
D
8
3
/
N
S
R
S
2
0
0
7
4 BL4 873985.2380 1056124.8808 2799.78 OUTSIDE PROJECT LIMITS
3 BL3 873555.0929 1056423.8125 2775.84 19+65.94 20.17 RT
2 BL2=BY2 873133.9868 1056594.8759 2766.70 15+14.59 24.07 RT
1 BL1 872636.1226 1056503.9500 2760.63 10+08.45 21.51 RT
GPS2 B5170-2 871935.5780 1056083.6075 2745.77 OUTSIDE PROJECT LIMITS
GPS1 B5170-1 871079.8200 1055966.3800 2729.03 OUTSIDE PROJECT LIMITS
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BL
5 BY5 873082.8196 1056886.0872 2770.00 OUTSIDE PROJECT LIMITS
2 BL2=BY2 873133.9868 1056594.8759 2766.70 10+29.02 45.91 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y1 STATION OFFSET
BY
SHEET N O .PRO JECT REFERENCE N O .
6
/
2
/
9
9
0
9
-
F
E
B
-
2
0
1
7
0
9
:
5
8
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
B
5
1
7
0
_
l
s
_
1
c
-
1
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
Location and Surveys
N OTE: DRAW IN G N O T TO SCALE
(FIN AL)
SU RVEY CO N TROL SH EET B-5170
0
9
-
F
E
B
-
2
0
1
7
0
9
:
5
8
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
b
5
1
7
0
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIG N
ENG IN EER EN GINEER
R/W SHEET NO .5
/
1
4
/
9
9
SHEET N O .PRO JECT REFEREN CE NO .
D O C U M EN T N O T C O N SID ER ED FIN A L
U N LESS A LL SIG N A TU R ES C O M PLETED
TYPICAL SECTIO N N O . 2
CL
G RADE TO THIS LIN E
C1
U
W 1
22’ EXISTIN G
E1
2:
1
N ATURAL G RO UN D
T
12’
PS
4’
C2
E1
4:1
2:
1
8’
N ATURAL G RO UN D
T
12’
PS
4’
C2
TYPICAL SECTIO N N O . 3
CL
2:
1
N ATURAL G RO UN D
T
12’
PS
4’
4:1
2:
1
8’
N ATURAL G RO UN D
T
12’
PS
4’
C2C2
E1
B-5170 2A-1
-L- (N C 226)
-L- (N C 226)
PO IN T
G RADE
CL
C2
E2E2
C3
E2
U
C2
-L-, -Y1-
.04 .04
G RADE
PO INT
12’12’7’-11"7’-11"
1’-1"1’-1"
G RADE TO THIS LIN E
42’ - 0"
TYPICAL SECTIO N N O . 1
CL
G RADE TO THIS LIN E
C1
U
22’ EXISTIN G
E1
2:
1
N ATURAL G RO UN D
T
PS
4’
C2
E1
4:1
2:
1
8’
N ATURAL G RO UN D
T
PS
4’
C2
-L- (N C 226)
M IN.
RAIL
BRIDG E
3"
39’-10" CLEAR RO ADW AY
PAVEM EN T SCH ED U LE
14 CO RED SLAB UN ITS
C1
C2
C3
E1
E2
J
T
on Structure (W 2)
W edging Detail for W earing Surface
M IN .
3"
M IN .
3"
DETAIL SHO W IN G M ETHO D O F W EDG IN G (W 1)
W 1
W 2
U
E1
8.5"
8.5"8.5"
8.5"8.5"
P 1 :1 1 :1 CRO W N
PO IN T 1 :1 1 :1 G RADE
PO IN T
USE TYPICAL SECTIO N N O . 3
-L- STA. 16+60.00 TO -L- STA. 18+40.00
-L- STA. 13+50.00 TO -L- STA. 14+70.00
USE TYPICAL SECTIO N N O . 2
USE TYPICAL SECTIO N N O . 1
-L- STA. 12+90.00 TO -L- STA. 13+50.00
-L- STA. 18+40.00 TO -L- STA. 19+00.001:1 1 :1 .02 .02 .08.08
.08 .02 .02 .08
.08 EXIST.EXIST..08
-L- STA. 14+70.00 TO -L- STA. 15+20.88 (BEG IN BRIDG E)
-L- STA. 15+88.13 (EN D BRIDG E) TO -L- STA. 16+60.00
L4 3/4" @ C BRG .
@ C BRG .
4 3/4"@ C BRG .
4 3/4"
L
L
W 2C2 C2
-L- STA. 15+20.88 (BEG IN BRIDG E) TO -L- STA. 15+88.13 (EN D BRIDG E)
TYPICAL SECTIO N O F CO RED SLAB BRIDG E
E2C3
CL -L- (N C 226)
@ C BRG .
4 3/4"
L
G RADE
PO IN T
11’ W /G R 11’ W /G R
8’8’
11’ W /G R
8’
11’ W /G R
8’
11’ W /G R 12’-EXIST.12’-EXIST.11’ W /G R
8’VAR.VAR.8’
C2
O RIG INAL G RO UND
G RADE TO THIS LIN E
SHO ULDER BERM G UTTER DETAIL:
VAR. 2:1
TO 6:1
8.5"
E1
T
R1
E2
-L- STA. 15+00.00 TO STA. 15+07.00 LT
C2
R1
-L- STA. 16+02.00 TO STA. 17+17.00 LT
BE PLACED IN LAYERS NOT TO EXCEED 3" DEPTH.
AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. PER 1 " DEPTH. TO
PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
PROP. APPROX. 2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 627 LBS. PER SQ. YD.
PROP. APPROX. 5 " ASPHALT CONCRETE BASE COURSE, TYPE B25.0,
AT AN AVERAGE RATE OF 224 LBS. PER SQ. YD.
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0,
AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO
THAN 5 " IN DEPTH.
BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER
PROP. 8" AGGREGATE BASE COURSE.
EARTH MATERIAL
VAR. DEPTH ASPHALT WEDGING (SEE DETAIL)
VAR. DEPTH ASPHALT WEDGING FOR WEARING SURFACE (SEE DETAIL)
EXISTING PAVEMENT TO BE RETAINED
PRIME COAT AT THE RATE OF 0.35 GALLONS PER SQ. YARD
AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO
LAYERS.
(FINAL PAVEMENT DESIGN)
SHOULDER BERM GUTTER
NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.
C1
E1
C2
T
U
W 1
PAVEM EN T SCHEDULE
0
9
-
F
E
B
-
2
0
1
7
0
9
:
5
8
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
b
5
1
7
0
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIG N
ENG IN EER EN GINEER
R/W SHEET NO .5
/
1
4
/
9
9
SHEET N O .PRO JECT REFEREN CE NO .
D O C U M EN T N O T C O N SID ER ED FIN A L
U N LESS A LL SIG N A TU R ES C O M PLETED
B-5170 2A-2
TYPICAL SECTIO N N O . 4
CL
2:
1
N ATURAL G RO UN D
T
E1
G RADE TO THIS LIN E
-Y1-
9’
4:12:
1
8’
N ATURAL G RO UN D
T
9’
C2
TYPICAL SECTIO N N O . 5
CL
2:
1
N ATURAL G RO UN D
T
-Y1-
4:12:
1
8’
N ATURAL G RO UN D
T
C2
W 1
U
THIS LIN E
G RADE TO
E1E1
TYPICAL SECTIO N N O . 6
CL
6’ W /G R
4’
2:
1
N ATURAL G RO UN D
T
G RADE TO THIS LIN E
6’ W /G R
4’3’
C1
-DET-
FDPS
2’
FDPS
2’
4:1
2:
1
N ATURAL G RO UN D
8.5"8.5"
8.5"
10"
J P
P
T
J
.08 .02 .02 .081:1 1 :1 USE TYPICAL SECTIO N N O . 4
-Y1- STA. 10+12.10 TO -Y1- STA. 11+00.00
USE TYPICAL SECTIO N N O . 5
-Y1- STA. 11+00.00 TO -Y1- STA. 11+86.00
N O TE:
(1) TRAN SITIO N FRO M T.S. N O . 5 TO EXISTIN G
-Y1- STA. 11+86.00 TO -Y1- STA. 12+11.00
USE TYPICAL SECTIO N N O . 6
.08 .02 .02 .08
G RADE
PO IN T
G RADE
PO INT 1 :1 1 :1
G RADE
PO IN T
.02 .02 .08.08
6"6"
2" S9.5B
3" S9.5B
5.5" B25.0B
8" Aggregate Base Course
PRIM E CO AT
EARTH M ATERIAL
EXISTIN G PAVEM EN T
W EDG IN G DETAIL
G RADE
PO IN T
2’-0"2’-0"
(O NE LAN E TW O W AY TRAFFIC)
Detour Bridge
TYPICAL SECTIO N O F DETO UR BRIDG E
-DET- STA. 13+03.00 (EN D DETO UR BRIDG E)
-DET- STA. 12+40.00 (BEG IN DETO UR BRIDG E) TO
-DET- STA. 10+52.68 TO -DET- STA. 12+40.00 (BEG IN DETO UR BRIDG E)
-DET- STA. 13+03.00 (EN D DETO UR BRIDG E) TO -DET- STA. 14+86.33
CL -DET-
5’-6"5’-6"
.02 .02
C1
2’2’
2’
5’-6"
VAR
TO 10’
5’-6"
VAR
TO 10’
4:1
2:
1
T
6"
2’
7’ W /G R
9’-EXIST.
VAR.VAR.
9’-EXIST.
16.5’ EXISTIN G
(FINAL PAVEMENT DESIGN)
UNLESS SHOWN OTHERWISE.
NOTE: PAVEMENT EDGE SLOPES ARE 1:1
TO STA. 17+17 -L- LT
FRO M EN D APPRO ACH SLAB
PRO P. SBG
REM O VE HW
REM O VE PIPEREMOVE PIPE
PIPE O UTLET CHAN NEL
SEE DETAIL A
Slope
Fill
GEO TEXTILE
FRO M STA. 16+50 TO STA. 17+00-L-LT
LATERAL BASE DITCH W /CL B RIP RAP
SEE DETAIL B
2 TO N S, 7 S.Y. G EO TEXTILE
CLASS B RIP RAP
1 TO N, 5 S.Y. GEO TEXTILE
CLASS B RIP RAP
1 TO N , 5 S.Y. G EO TEXTILE
CLASS B RIP RAP
EXIST. PIPE
REM O VE 60LF
PLUG AT R/W
(TYP.)
TO SHO ULDER ELEVATIO N
RIP RAP CLASS II
24 TO NS
BAN K STABILIZATIO N
RIP RAP CLASS II
80 TO N S
BANK STABILIZATIO N
RIP RAP CLASS II
350 CY
TO ELEV. 2760.5’ (TYP.)
PRO P. EXCAVATIO N
R
E
V
I
S
I
O
N
S
R
/
W
R
E
V
I
S
I
O
N
:
U
P
D
A
T
E
D
P
E
R
M
A
N
E
N
T
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
O
N
P
A
R
C
E
L
5
7
/
2
7
/
2
0
1
7
A
J
F
HYDRAULICSROADWAY DESIG N
EN GIN EER EN G INEER
R/W SHEET NO .
SHEET NO .PRO JECT REFEREN CE NO .
2
7
-
J
U
L
-
2
0
1
7
1
1
:
3
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
b
5
1
7
0
_
r
d
y
_
p
s
h
_
4
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
B-5170 4
D O C U M EN T N O T C O N SID ER ED FIN A L
U N LESS A LL SIG N A TU R ES C O M PLETED
N O TES:
(3) SEE SHEETS S-1 TO S-XX FO R STRUCTURE PLAN S
(2) SEE SHEET 5 FO R PRO FILES
(1) SEE SHEET 2B-1 FO R -DET- DESIG N
APPRO ACH SLAB
NAD
83
/
NSRS
2007
AT-1
AT-1
20’
BEG IN PRO JECT B-5170
-L- PO C STA. 12+90.00
-L- PO T STA. 19+00.00
EN D PRO JECT B-5170
20’
+
4
6
0
6
0
5
+
3
0
.5
7
0
4
0
4
0
5
0
5 0
4
0
3
0
6
-L- PCC STA. 13+50.00
BEG IN G RADE -L- PO T STA. 18+40.00
EN D G RADE
TRAFFIC DIAGRAM
2037
2018
ADT
-L-
2,523
2,305
NC 226
2,115
1,970
-
Y
1
-
508435
S
R
1
3
3
4
B
R
A
N
C
H
R
D
B
L
E
V
I
N
S
100100
5
3
5
6
0
8
0
2
0
1
0
0
0
1
E
X
I
S
T.
02
01
-Y1- PO T STA. 12+11.00
EN D CO N STRUCTIO N
+38
1 2
’
1 2
’
E
X I S
T .
1
2
’
1
2
’
E
X
I
S
T
.
+
3
8
.
4
9
I
N
C
1
8
’
8
:
1
8
:
1
4
’ P S
4
’ P
S
TYPE-III
TYPE-III
1
2
’
1
2
’
7
’
-
1
1
"
7
’
-
1
1
"
(NOT TO SCALE)
SKETCH SHOWING PAVEMENT / BRIDGE RELATIONSHIP
TYPE-III
SHO P CURVE
3
9
’
-
1
0
"
TYPE-III
SHO P CURVE
INC
25
’
INC
25’
I N
C18
’
IN C
25’
4
’
P
S
IN C25’
4
’
P
S
+
4
0
+
7
5
.0
0
TL-3GRAU 350
G RAU 350 TL-3
-L- STA. 15+20.88
BEGIN BRIDGE
-L- STA. 15+88.13
END BRIDGE
-L- STA. 15+07.00
BEGIN APPROACH SLAB
-L- STA. 16+02.00
END APPROACH SLAB
50’R
30’R
20’R
20’R
20’R
50’R
20’R
20’R
20’R
AT-1
0
4
0
4
0
5
9
’9
’
6
0
’
TA
P
ER
LT&
R
T
L T
&
R
T
T
A
P
E
R
2
5
’
60’ TAPER LT&RT
(STR. PAY ITEM )
(STR. PAY ITEM )
(STR. PAY ITEM )
-L- STA. 16+02.00
BEGIN SBG
70’ RT
78’ RT
74’ RT
EX. RW
EX. RW
75’ RT
+44.00 -L-
EX. R/W
+16.00 -L-
EX. RW
+42.00 -L-
EXIST R/W
61’ LT
EX. R/W
94’ RT
+88.00 -L-
+25.00 -L-
+58.00 -L-
+51.00 -L-
+90.00 -L-
+52.00 -L-
+32.00 -L-
EX. RW
75’ RT
88’ RT
EXIST R/W
110’ RT
+86.00 -L-
+91.00 -L-
EXIST R/W
+44.00 -L-
52’ LT
208’ LT
+52.00 -L-
245’ LT
+79.00 -L-
+76.00 -L-
80’ LT
98’ LT
+98.00 -L-
+03.00 -L-
+16.00 -L-
+74.00 -L-
61’ LT
+08.00 -L-
+43.00 -L-
+31.51 -L-
+05.00 -L-
EXIST R/W
1 8
"
R
C
P
-
I I I
HW
4
2
"
R
C
P
-
I
II
1
8
"
R
C
P-I
V
2GI 1 5 "1
8
"
( Not to Scale)
PIPE O UTLET CHANNEL
DETAIL A
FRO M STA. 16+42 -L- LT
Ground
Natural
G round
Natural
(Variable)
CHANNEL BED
Est.= 9 Tons of Class I Rip-Rap
d= 2.0 Ft.
Length= 10 Ft.
E
XI
S
TI
N
G
B
A
N
K
EXISTIN G BAN KMIN. 2:1 TO TIE
M
I
N.
2:
1
T
O
TI
E d
( Not to Scale)
LATERAL BASE DITCH
2:
1
D
B
b
d
2:1 1"/Ft.
FRO M STA. 16+50 TO STA. 17+00 -L- LT
DETAIL B
b= 5.0 Ft.
B= 2.0 Ft.
M ax. d= 1.0 Ft.
M in. D= 1.0 Ft.
*W hen B is < 6.0’
Type of Liner= CLASS B Rip-Rap
Ground
Natural
0401
0404
0409
0411
0403
0402
0405
0406
0407
0408
04100412
TB 2GI TB 2G I 18" RCP-IV 1
5
"
PASTURE
TB 2GI
RIP RAP
CL B
PI Sta 11+28.15
D
L = 140.67’
T = 70.53’
R = 780.00’
PI Sta 12+74.85
D
L = 151.70’
T = 76.55’
R = 457.47’
PI Sta 14+15.62
D
L = 130.57’
T = 65.62’
R = 525.00’
-L-
-Y1-
PI Sta 17+06.18
D
L = 202.75’
T = 101.86’
R = 850.00’
-L- PC Sta. 10+57.62
-L - P C C S t a . 1 1 +9 8 .3 0
-
L -
P
C
C
S
t a
. 1 3
+
5
0
.0
0
-
L
-
P
C
S
t
a
. 1 6
+
0
4
.3
3
-
L
-
P
T
S
t
a
.
1
8
+
0
7
.
0
8
-
L
-
P
O
T
S
t
a
.
2
0
+
4
7
.
3
5
-L-
PI Sta 11+12.19
D
L = 78.19’
T = 39.89’
R = 160.00’
-
Y
1
-
P
T
S
t
a.
1
1
+
5
0.
4
9
-Y1- POT Sta. 10+00.00
-L- POC Sta. 14+66.00
-
Y
1
-
P
O
T
S
t
a.
1
2
+
2
8.
9
2
SE = EXIST.SE = SEE PLANS SE = SEE PLANS
SE = SEE PLANS
-Y1- PC Sta. 10+72.30
-L- POT Sta. 10+00.00
10
20
15
-
L
-
P
T
S
t
a
. 1 4
+
8
0
.5
7
R
R
S
PI
K
E
15" C
MP
S
LANDSCAPE AREADECK S P R
I N
G
C R
E E K
BI
G
R
O
C
K
C
R
E
E
K
B
I G
R
O
C
K
C
R
E
E
K
22’ BSTNC 226
19.5’ BST
HUGHS GAP RD. (SR 1330)
TENNESSEETO
BL-1
BL-2
BL-3
1
0
0
.
0
0
’
5
0
.
0
0
’
5
0
.
0
0
’
EXISTING R/W
6
0.
0
0
’
3
0.
0
0
’
3
0.
0
0
’
E
X
I S
T
I N
G
R
/W
E
X
I S
T
I N
G
R
/W
2
4
.
0
0
’
E
XISTIN
G
R/
W
E
XISTIN
G
R/
W
EXISTING
R
/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
A M
A N D A H U G H S
P B 1 P G 7
D B 3 5 3 P G 117
PB 1 PG 7
DB 523 PG 877
SANDRA G. CALHOUN
DB 311 PG 114
EIP
FENCE POST
M ETAL
FENCE POST
M ETAL
FENCE POST
M ETAL
FENCE
PO
ST
M
ETAL
E
IP
E
IP
DB 431 PG 68
ROGER L. JENKINS
N
8
8
4
3
’3
5
" E
5
2
.4
8
’
S
8
4
2
8
’1 3
" E
6
0
.5
3
’
N
7
7
3
9
’
2
2
"
E
5
2
.
4
8
’
N
6
9
0
0
’
0
6
"
E
5
2
.
4
8
’
N
6
5
4
6
’
4
9
"
E
8
4
.
1
3
’
N
8
5
4
9
’
1
5
"
E
5
6
6
.
4
4
’
N 3055’40" E119.79’
N 64 00’47" W
138.20’
S 64 00’47" E
100.74’
N 2823’00" E
50.00’
S 64 21’27" E
239.37’
S 64 21’27" E
140.00’
N 64 21’27" W102.82’S 3028’33" W
100.00’
N
7
2
1
1
’
4
3
"
E
9
5
.
2
5
’
N
8
5
4
1
’
4
3
"
E
6
6
.
0
0
’
N
8
1
1
1
’
4
3
"
E
1
7
3
.
2
5
’
S
7
0
1 1 ’
4
3
"
W
9
9
.
4
8
’
S
5
0
1
1
’
4
3
"
W
9
9
.
0
0
’
S 4311’43"
W
82.50’
N
5
2
13’
2
2
"
E
117.7
2’
N
19
3
5’
5
8"
E
1
0
1.
3
4’
N 5525’18" W150.88’
S 3555’54"
W
204.04’
N 5404’06" W195.43’
S 33 08’12" E103.19’2
9
.4
6
’
N
8
7
0
2
’
1
6
"
W
6
0
.
1
5
’
S
03 32’32" E
289
.71’
S 23 47’00" E261.98’
S
4
8
15’3
6"
W
15
7.8
0’
N 37 10’22" W50.79’
N 33 11’07" W50.44’
N
5
1
2
1’5
0
"
E
10
4.9
7’
S
5
1
2
1’5
0
"
W
9
5.7
7’
N 4746’10" W
99.84’
N 35 49’10" W
134.09’
S
6
4
0
4
’
3
7
"
W
6
6
.
0
0
’
S
5
4
5
1’
2
4
"
W
1
6
9.
9
9’
2
0
4
.3
8
’
N 43 15’31" W
N
8
1
0
8
’4
3
" W
2
3
.8
5
’
S 4218’09"
W
195.41’
N 5557’37" W195.41’
N
22
13’0
1"
E
78.12’
N 3822’05" E
61.99’
N
6
2
0
7
’
2
4
"
E
3
8
.
2
5
’
N 86 14’42" E
30.93’S
8
8
0
1
’
3
2
"
W
2
3
.
8
4
’
N 24 00’08" W
193.88’
N 59 23’20" E
43.02’
S
5
9
2
3
’
2
0
"
W
4
8.
6
6
’
N 3257’56" E156.97’
N
4
8
2
6’17"
E
4
2.2
4’
N 3704’03" E
77.63’
N
5
1
0
0’2
2"
E
9
9.2
4’
N 45
23’27" E
47.37’
S 45
32’09"
W
52.87’
10.14’
N 5141’29" W189.46’
S 5354’45" E102.62’
S 5354’45" E
50.30’
S 3811’03"
W
107.24’
N 5407’09" W103.81’
8.15’
S 5357’01" E119.17’
S 3423’56"
W
79.98’
S 3514’47"
W
60.70’
S 3131’44" W
68.15’
S 6129’29" E243.98’
T
T
PED #L220 P1
PED #717 12
1SBRKD
10’ GR
10’ GR
8
’
SO
IL
1SF
D
1SF
D
S
M TL S
S
1SF & BRKD
1
4
’
B
S
T
(BUS)
1SBRK
HEAD W ALL
ROCK
B
S
T
2SFD
A
P
T
.
G
A
R
A
G
E
S
ABAN
S
GR
48" W D
GR
STATIONTELEPHONE SW ITCH
W
D
(BUS)1SF
GR
B
S
T
72"CHL
1SBRKD
1
8
’
B
S
T
BST (BUS)1SBRK
2SFD
W D DECK
(BUS)
1SF & STUCCO
7
2"
C
H
L
CO NC
G
R
W
G
R
G
R
2
3
4
5
6
7
8
9
14
15
16
17
18’ B ST
C
O
N
C
.
BA
TH
B
IRD
LT
8
’ S
O I L
2
’ R
O
C
K
W A
L
L
7
2"
C
H
L
ABAND. POLE
ABAND. POLE
W/LT
W/LT
W
/
L
T
W
/LT
BRIDGE #29 DESCRIPTION
2 STEEL SUPPORT BEAM S
W ITH W OODEN DECK & RAILS
IS A FOOT BRIDGE
ATTACHED TO BRIDGE
M ETAL GUARD RAIL
12 STEEL SUPPORT BEAMS
W OODEN W ING W ALLS
W OODEN DECK
2 LANE BST BRIDGE
15" CM P
INV.=2777.62’15
"
C
M
P
INV .=2774.43’
15" RCP
1SFBRAMPWHEELCHAIR
S
18" CMP
18" C
MP
18" CMP
15
"
R
C
P
HEAD W A LLCONC.
EIP
12" CM P
O NLYDIRECTIONA L
EIP
W IRE ELEV.=2786.27’
O/H LOW
BRIDGE
FOOT
BRIDGE No. 29
U
N
N
A
M
E
D
B
R
A
N
C
H
W
W
S 64 21’27" E
104.22’
R EF. D B 171 PG 27
D B 393 PG 561
SHIRLEY SUE W
H ITSO N SM
ITH G RU N D STRO M
16
N 29 28’41" W
26.92’
LIFT STA TIO NSEWERSANITARY
10
S
0
1
4
2
’3
8
"
W
12
1
S
11
N
8
3
1
1
’
4
3
"
E
1
8
1
.
5
0
’
MARK JAMES SHEETS
13
C
H
A
D
T
R
A
V
I S
&
L
I S
A
H
U
G
H
S
C
A
L
H
O
U
N
D
B
2
3
8
P
G
4
0
2
1 6
.5
’ B
S
T
B
L
E
V I N
S
B
R
A
N
C
H
R
D
. (S
R
1 3
3
4
)
2
2’
B
S
T
N
C
2
2
6
IVETTE M . SOCARRAS
DB 435 PG 931
DB 168 PG 280
WESTERN CAROLINA TELEPHONE CO.
SHIRLEY SUE W HITSON SM ITH GRUNDSTROM
REF. DB 171 PG 27
DB 393 PG 561
BULADEAN COM M UNITY CENTER
PB 1 PG 7
DB ? PG ?
BIRCHFIELD
BOBBY & BARBARA
DB 162 PG 75
DB 497 PG 863
DB 162 PG 545
BIRCHFIELD
BOBBY & BARBARA
DORIS BOONE
DB 538 PG 468
ANGELA M . JARRETT
DB 218 PG 817, FIRST TRACT
HEIRS
TRULA BURLESON
DB 133 PG 519
& ALVIN D. OLLIS
JETER & ZEDA PARKER
DB 370 PG 596, FIRST TRACT
IVETTE M . SOCARRAS
DB 434 PG 116
NORTH CAROLINA
M ITCHELL COUNTY,
DB 280 PG 646
ROGER & BASIA JENKINS
BILLIE GARLAND
W ILLIAM &
DB 530 PG 895
51.40’+18.48
49.83’
+89.52
57.03’
+08.65
51.16’
+47.69
50.14’
+06.23
50.70’
+18.13
6
3
.
2
7
’
+
7
0
.
2
8
BM 2
F
F C F
F F
F F
F
F F F
C
C
C
F
F
F
F
F
C
C
C
C F
F
F
F F
F
F
F
F
F F
F
F
F
REM O VE 10 LF EXIST. 18" RCP
EST. 25cy
ELEV=2761.5’
EXCAVATIO N TO
BAN K STABILIZATIO N
CLASS II RIP RAP
ELEV=2760.5’
EXCAVATIO N TO
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
9
-
F
E
B
-
2
0
1
7
0
9
:
5
8
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
b
5
1
7
0
_
r
d
y
_
p
s
h
_
d
e
t
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
2B-1B-5170
D O C U M EN T N O T C O N SID ER ED FIN A L
U N LESS A LL SIG N A TU R ES C O M PLETED
N O TES:
(2) SEE SHEETS S-1 TO S-XX FO R STRUCTURE PLAN S
(1) SEE SHEET 4 FO R -L- DESIG N
(2) SEE SHEET 5 FO R PRO FILES
DETO UR DETAIL
TYPE-III
TYPE-IIITYPE-III
TYPE-III
1 1 ’
2
0
’
+
1 5
-DET- PC STA. 10+00.00
BEGIN DETOUR CONSTRUCTION
-DET- PT STA. 15+41.57
END DETOUR CONSTRUCTION
-DET- STA. 10+52.68
BEGIN GRADE
-DET- STA. 14+86.33
END GRADE
2
0
’
1 1 ’
+
7
0
AT-1
1
5
’
P
S2’
P S2’
1
1
’
GRAU 350 TL-2
G RAU 350 TL-2
0 7
+8 5
0 6
0
5
0
4
0
2
0
3
0
2
0
3 0
4
0
5
0
6
20’ INC+
5
0
2
0’ I
N
C
9
’
-Y1- POT STA. 12+11.00
END CONSTRUCTION
E
X
I
S
T.
0
1
9
’
0
0
0
1
0
2IN
C18
’
+
3
8
.4
9
02
00
E X
I S T
E
X
I
S
T
01
TL-2
G RAU 350
0
3
20’R 15’R
-DET- STA. 12+40.00
BEGIN DETOUR BRIDGE
-DET- STA. 13+03.00
END DETOUR BRIDGE
0 4
0 3
0
3
0
3
TAPER
LT&RT
5
0
’
L T
&
R
T
T
A
P
E
R
2
5
’
50’ TAPE R LT&RT
(STR. PAY ITEM )
R
R
S
PI
K
E
15" C
MP
S
LANDSCAPE AREADECK S P R
I N
G
C R
E E K
BI
G
R
O
C
K
C
R
E
E
K
B
I G
R
O
C
K
C
R
E
E
K
22’ BSTNC 226
19.5’ BST
HUGHS GAP RD. (SR 1330)
TE NNESSE ETO
BL-1
BL-2
BL-3
1
0
0
.
0
0
’
5
0.
0
0
’
5
0.
0
0
’
EXISTING R/W
6
0.
0
0
’
3
0.
0
0
’
3
0.
0
0
’
E
X
I S
T
I N
G
R
/W
E
X
I S
T
I N
G
R
/W
2
4
.
0
0
’
E
XISTIN
G
R/
W
E
XISTIN
G
R/
W
EXISTING
R
/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
A M
A N D A H U G H S
P B 1 P G 7
D B 3 5 3 P G 117
PB 1 PG 7
DB 523 PG 877
SANDRA G. CALHOUN
DB 311 PG 114
EIP
FENCE POST
M ETAL
FENCE POST
METAL
FENCE POST
M ETAL
FENC
E
PO
ST
M
ETA
L
E
IP
E
I
P
DB 431 PG 68
ROGER L. JENKINS
N
8
8
4
3
’3
5
" E
5
2
.4
8
’
S
8
4
2
8
’1 3
" E
6
0
.5
3
’
N
7
7
3
9
’
2
2
"
E
5
2
.
4
8
’
N
8
5
4
9
’
1
5
"
E
5
6
6
.
4
4
’
N 3055’40" E119.79’
N 64 00’47" W
138.20’
S 64 00’47" E
100.74’
N 2823’00" E
50.00’
S 64 21’27" E
239.37’
S 64 21’27" E
140.00’
N 64 21’27" W102.82’S 3028’33" W
100.00’
N
7
2
1
1
’
4
3
"
E
9
5
.
2
5
’
N
8
5
4
1
’
4
3
"
E
6
6
.
0
0
’
N
8
1
1
1
’
4
3
"
E
1
7
3
.
2
5
’
S
7
0
1 1 ’
4
3
"
W
9
9
.
4
8
’
S
5
0
1
1
’
4
3
"
W
9
9
.
0
0
’
S 4311’43"
W
82.50’
N
5
2
13’2
2
"
E
117.
7
2’
N
1
9
3
5’
5
8"
E
10
1.
3
4’
N 5525’18" W150.88’
S 3555’54"
W
204.04’
N 5404’06" W195.43’
S 33 08’12" E103.19’2
9
.4
6
’
N
8
7
0
2
’
1
6
"
W
6
0
.
1
5
’
S
03 32’32" E
289
.71’
S 23 47’00" E261.98’
S
4
8
15’3
6"
W
15
7.8
0’
N 37 10’22" W50.79’
N 33 11’07" W50.44’
N
5
1
2
1’5
0
"
E
10
4.9
7’
S
5
1
2
1’5
0
"
W
9
5.7
7’
N 4746’10" W
99.84’
N 35 49’10" W
134.09’
S
6
4
0
4
’
3
7
"
W
6
6
.
0
0
’
S
5
4
5
1’
2
4
"
W
1
6
9.
9
9’
2
0
4
.3
8
’
N 43 15’31" W
N
8
1
0
8
’4
3
" W
2
3
.8
5
’
S 4218’09"
W
195.41’
N 5557’37" W195.41’
N
2
2
13’0
1"
E
78.12’
N 3822’05" E
61.99’
N
6
2
0
7
’
2
4
"
E
3
8
.
2
5
’
N 86 14’42" E
30.93’S
8
8
0
1
’
3
2
"
W
2
3
.
8
4
’
N 24 00’08" W
193.88’
N 59 23’20" E
43.02’
S
5
9
2
3
’
2
0
"
W
4
8.
6
6
’
N 3257’56" E156.97’
N
4
8
2
6’17"
E
4
2.2
4’
N 3704’03" E
77.63’
N
5
1
0
0’2
2"
E
9
9.2
4’
N 45
23’27" E
47.37’
S 45
32’09"
W
52.87’
10.14’
N 5141’29" W189.46’
S 5354’45" E102.62’
S 5354’45" E
50.30’
S 3811’03"
W
107.24’
N 5407’09" W103.81’
8.15’
S 5357’01" E119.17’
S 3423’56"
W
79.98’
S 3514’47"
W
60.70’
S 3131’44" W
68.15’
S 6129’29" E243.98’
T
T
PED #L220 P1
PED #717 12
1SBRKD
10’ GR
10’ GR
8
’
SO
IL
1SF
D
1SF
D
S
M TL S
S
1SF & BRKD
1
4
’
B
S
T
(BUS)
1SBRK
B
S
T
2SFD
A
P
T
.
G
A
R
A
G
E
S
ABAN
S
GR
48" W D
GR
STATIONTELEPHONE SW ITCH
(BUS)1SF
GR
B
S
T
72"CHL
1SBRKD
1
8
’
B
S
T
BST (BU S)1SBRK
2SFD
(BUS)
1SF & STUCCO
7
2"
C
H
L
CO NC
GR
W
G
R
G
R
2
3
4
5
6
7
8
9
14
15
16
17
18’ B ST
BATH
B
I
RD
LT
8
’ S
O I L
2
’ R
O
C
K
W A
L
L
7
2"
C
H
L
ABAND. POLE
ABAND. POLE
W/LT
W/LT
W
/
L
T
W
/LT
15" CM P
15
"
C
M
P
15" RCP
1SFBRAMPWHEELCHAIR
S
18" CMP
18" C
MP
18" CM P
15
"
R
C
P
HEA D W ALLCONC.
EIP
12" CM P
INV.= 2772.66’
EIP
W IRE ELEV.=2786.27’
O/H LOW
U
N
N
A
M
E
D
B
R
A
N
C
H
W
W
S 64 21’27" E
104.22’
R E F. D B 171 PG 27
D B 393 PG 561
SHIRLEY SUE W
H ITSON SM ITH G RU N D STRO M
16
N 29 28’41" W
26.92’
LIFT ST A TIO NSEWERSANITARY
10
S
0
1
4
2
’3
8
"
W
12
1
S
11
N
8
3
1
1
’
4
3
"
E
1
8
1
.
5
0
’
MARK JAMES SHEETS
13
C
H
A
D
T
R
A
V
I S
&
L
I S
A
H
U
G
H
S
C
A
L
H
O
U
N
D
B
2
3
8
P
G
4
0
2
1 6
.5
’ B
S
T
B
L
E
V
I N
S
B
R
A
N
C
H
R
D
. (S
R
1 3
3
4
)
2
2’
B
S
T
N
C
2
2
6
IVETTE M . SOCARRAS
DB 435 PG 931
DB 168 PG 280
W ESTERN CAROLINA TELEPHONE CO.
SHIRLEY SUE W HITSON SMITH GRUNDSTROM
REF. DB 171 PG 27
DB 393 PG 561
BULADEAN COM MUNITY CENTER
PB 1 PG 7
DB ? PG ?
BIRCHFIELD
BOBBY & BARBARA
DB 162 PG 75
DB 497 PG 863
DB 162 PG 545
BIRCHFIELD
BOBBY & BARBARA
DORIS BOONE
DB 538 PG 468
ANGELA M . JARRETT
DB 218 PG 817, FIRST TRACT
HEIRS
TRULA BURLESON
DB 133 PG 519
& ALVIN D. OLLIS
JETER & ZEDA PARKER
DB 370 PG 596, FIRST TRACT
IVETTE M. SOCARRAS
DB 434 PG 116
NORTH CAROLINA
M ITCHELL COUNTY,
DB 280 PG 646
ROGER & BASIA JENKINS
BILLIE GARLAND
W ILLIAM &
DB 530 PG 895
51.40’+18.48
49.83’+89.52
57.03’
+08.65
51.16’
+47.69
50.14’
+06.23
50.70’
+18.13
6
3
.
2
7
’
+
7
0
.
2
8
BM 2
-DET-
PI Sta 10+30.24
D
L = 60.03’
T = 30.24’
R = 200.00’
PI Sta 11+30.42
D
L = 135.37’
T = 70.39’
R = 200.00’
PI Sta 14+11.32
D
L = 119.88’
T = 61.80’
R = 200.00’
PI Sta 15+05.88
D
L = 72.17’
T = 36.48’
R = 200.00’
-DET- PC Sta. 10+00.00
-DET- PRC Sta. 10+60.03
-DET- PT Sta. 15+41.57
-DET- PRC Sta. 14+69.40
SE = SEE PLANS SE = SEE PLANS SE = SEE PLANS SE = SEE PLANS
-DET- PT Sta. 11+95.40
-DET- PC Sta. 13+49.52
-DET-
10
-DET-
15
PI Sta 11+28.15
D
L = 140.67’
T = 70.53’
R = 780.00’
PI Sta 12+74.85
D
L = 151.70’
T = 76.55’
R = 457.47’
PI Sta 14+15.62
D
L = 130.57’
T = 65.62’
R = 525.00’
-L-
-Y1-
PI Sta 17+06.18
D
L = 202.75’
T = 101.86’
R = 850.00’
-L- PC Sta. 10+57.62
-L - P C C S t a . 1 1 +9 8 .3 0
-
L -
P
C
C
S
t a
. 1 3
+
5
0
.0
0
-
L
-
P
C
S
t
a
. 1 6
+
0
4
.3
3
-
L
-
P
T
S
t
a
.
1
8
+
0
7
.
0
8
-
L
-
P
O
T
S
t
a
.
2
0
+
4
7
.
3
5
-L-
PI Sta 11+12.19
D
L = 78.19’
T = 39.89’
R = 160.00’
-
Y
1
-
P
T
S
t
a.
1
1
+
5
0.
4
9
-Y1- POT Sta. 10+00.00
-L- POC Sta. 14+66.00
-
Y
1
-
P
O
T
S
t
a.
1
2
+
2
8.
9
2
SE = EXIST.SE = SEE PLANS SE = SEE PLANS
SE = SEE PLANS
-Y1- PC Sta. 10+72.30
-L- POT Sta. 10+00.00
10
20
15
-
L
-
P
T
S
t
a
. 1 4
+
8
0
.5
7
2
4
"
1 8
"
0414
0415
0417
0418
TB JB w/SLAB LID
TB JB w/SLAB LID
*SEE NO TE
*SEE N O TE
W ITH -L- LIN E DRAINGE
*NO TE:Q UANTITY PRO VIDED
F
F
F
F
C C
F F
F
F
F
F
NAD
83
/
NSRS
2007
D O C U M EN T N O T C O N SID ER ED FIN A L
U N LESS A LL SIG N A TU R ES C O M PLETED
5
/
2
8
/
9
9
SHEET N O .PRO JECT REFEREN CE NO .
HYDRAULICSROADWAY DESIG N
ENG INEER ENG IN EER
5B-5170
0
9
-
F
E
B
-
2
0
1
7
0
9
:
5
8
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
b
5
1
7
0
_
r
d
y
_
p
f
l
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
D O C U M EN T N O T C O N SID ER ED FIN A L
U N LESS A LL SIG N A TU R ES C O M PLETED
10 11 12
2,740
2,750
2,760
2,770
-L-
-DET--Y1-
SEE SHEET 4
FOR -L- PLAN VIEW
SEE SHEET 2B-1
FOR -DET- PLAN VIEW
10 11 12 13 14 15 16 17 18 19
2,730
2,740
2,750
2,760
2,770
2,780
10 11 12 13 14 15 16 17 18 19
2,730
2,740
2,750
2,760
2,770
2,780
10 11 12 13 14 15
2,720
2,730
2,740
2,750
2,760
2,770
2,780
SEE SHEET 4
FOR -Y1- PLAN VIEW
2,730
V = 25 MPH V = 25 MPH V = 25 MPH V = 25 MPH
10 11 12
2,720
2,730
2,740
2,750
2,760
2,770
EL = 2767.00
BEGIN GRADE -Y1- STA. 10+12.10
EL = 2,767.98
END GRADE -Y1- STA. 12+11.00
EL = 2,766.08’
BEGIN GRADE -DET- STA. 10+52.68
EL = 2,770.38’
END GRADE -DET- STA. 14+86.33
-L- STA. 15+09 (46’ RT.)
-BL- STA. 10+06.00 (23’ RT.)
NAIL IN BASE OF 30" RED OAK
BM #2 EL = 2767.90
PI = 11+90.00
VC = 80’
K = 26
PI = 13+30.00
EL = 2,767.24’
PI = 14+50.00
EL = 2,770.27’
VC = 50’
K = 36
VC = 30’
K = 14
2,720
2,730
2,740
2,750
2,760
2,770
2,780
(-)0.5000%(+)1.9377%
EL = 2,765.56’
BEGIN GRADE -L- STA. 13+50.00 PI = 14+20.00
EL = 2,766.26’
(+)1.0000%
(+)0.4232%
VC = 120’
PI = 16+63.40
EL = 2,767.29’
(+)0.4232%
(+)3.0011%
-L- STA. 12+90.00
BEGIN RESURFACING
VC = 165’
K = 208
V = 65 MPH
-L- STA. 15+20.88
BEGIN BRIDGE
-L- STA. 15+88.13
END BRIDGE
K = 165
V = 65 MPH
EL = 2,772.59’
END GRADE -L- STA. 18+40.00
-L- STA. 19+00.00
END RESURFACING
VC = 165’
-Y1- STA. 10+00.00
-L- STA. 14+66.00 =
PI = 11+30.00
EL = 2,766.41’
VC = 110’
V = 30 MPH
K = 45
PI = 11+00.00
EL = 2,767.35’
(+)2.6839%(-)1.8889%
VC = 75’
EL = 2,765.65’
(-)1.8889%(+)1.1357%(+)1.1357%(+)2.5250%
(+)2.5250%(+)0.3028%
K = 16
SKEW = 90 DEG REE
C/L GRADE PO IN T ELEV. = 2766.83’
W ITH END BENT CAPS EXTENDED TO SCO UR LINE
PRO P 1@ 65’ 24-INCH CO RED SLAB BRIDGE
C/L STATIO N 15+54.50 -L-
(+) 8.4000%
LEFT DITCH
BEGIN DETOUR CONSTRUCTION
-DET- PC STA. 10+00.00
-DET- PT STA. 15+41.57
END DETOUR CONSTRUCTION
18" RCP
42" RCP
18" RCP
24" RCP
PRO P EXCAVATIO N
TO ELEV. 2760.5’
60 CY
6/9/2016 = 2759.0’
N W S AND W SEL PRO P EXCAVATIO N
TO ELEV. 2760.5’
350 CY
100 YR W SE = 2766.86’
50 YR W SE = 2766.5’
5 YR W SE = 2764.5’
EST. 25cy
EXCAVATIO N TO ELEV=2761.5’
N W S=2759.5’
100 YR W SE = 2767.96’
SKEW = 90 DEG REE
C/L GRADE PT ELEV.=2766.58’
PRO P 1@ 63’ BRIDG E
C/L STATIO N 12+71.50 -DET-
END LEFT DITCH
STA. 17+00 -L- LT
ELEV= 2,764.10’
STA. 16+50 -L- LT
ELEV= 2,759.90’
BEGIN LEFT DITCH
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 1300
= 5
= 2764.5
= 3100
= 100
= 2767.96
= 2400
= 2766.6
= 6/9/2016
= 2759.5
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 2700
= 50
= 2766.5
= 3100
= 2766.86
= 3200
= 100
= 2767.0
= 6/9/2016
= 2759.0
= 25+
= 100
+-
STR. PAY ITEM
STR. PAY ITEM
STR. PAY ITEM
STR. PAY ITEMB-5170 -L- BSR.
Q UANTITY IN CLUDED O N
EXCAVATIO N AND RIP RAP
EXCAVATIO N TO ELEV=2760.5’