Loading...
HomeMy WebLinkAbout20170969 Ver 1_Build Maps_20170804(Version 2.07; Released October 2016) 42328.1.1 TIP No.:B-5170 County(ies):Mitchell Page 1 of 1 TIP Number:Date: Phone:Phone: Email:Email: County(ies): CAMA County? No Design/Future:Year:2038 Existing:Year: Aquatic T&E Species?No Comments: Yes No No N/A Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) ac. 2 lanes undivided highway with11' lanes crown. 2123 anottingham@mi-engineers.com Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer? NRTR Stream ID: Annual Avg Daily Traffic (veh/hr/day): Existing Site Project Length (lin. miles or feet): ac. Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Body N/ABuffer Rules in Effect:Big Rock Creek None 1970 2 lanes undivided highway with12' lanes crown. Waterbody Information 2018 NCDWR Stream Index No.: 42328.1.1 Impairments: Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.) The existing 51.8' (1@17.5', 1@16.9', and 1@17.4') bridge on NC 226 spans Big Rock Creek. The existing bridge will be replaced utilizing an onsite detour (upstream of the existing bride). The replacement bridge is a single span of 1@65' 24" cored slab bridge with end bent caps extended to scour line and spans the creek with no bents in the water. The proposed bridge does not have any bridge deck drains, therefore, direct discharge into the stream is eliminated. Bridge deck drainage is collected into TB 2GI's at each end of the bridge on the downstream side and oulets to the downstream side of the bridge into rip rap pads and then disperses into the floodplain before entering creek. Roadway drainage on the southwestern (Beg. Proj.) side of the project drains via grassed fill slopes and disperses into floodplain before entering creek. Roadway drainage on the northwestern (End Proj.) side of the project drains through a rip rapped lined base ditch before entering into an unnamed tributary to Big Rock Creek. Offsite drainage in the southeastern quadrant of the project is conveyed via an 18" RCP and then disperses into the floodplain before entering the creek. The unnamed tributarty to Big Rock Creek, located in the northeastern quadrant, is conveyed via a 42" RCP with bank stabiliztion at the outlet before entering Big Rock Creek. A temporary work pad will be required to remove the existing interior pier on the south side of the creek. 1011 Schaub Dr. North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS Project Type: 1020 Birchridge Drive Address: General Project Information B-5170 WBS Element: Bridge ReplacementWBS Element: Andrew NottnghamNCDOT Contact: 919-707-6754 Suite 100 Raleigh NC, 27606 Contractor / Designer: 919-851-6606 jtwisdale@ncdot.gov Raleigh NC 27699-1590 Address: 3/7/2017 MitchellBuladean, NC Jay Twisdale 1590 Mail Service Center River Basin(s): City/Town: 0.6 Typical Cross Section Description: Surrounding Land Use: General Project Narrative: (Description of Minimization of Water Quality Impacts) No Rural farmland and some residential Big Rock Creek 7-2-64 0.4 0.12 Project Description Proposed Project French Broad None Supplemental Classification: Trout Waters (Tr) Wetlands within Project Limits? FEBRUARY 20, 2018 FEBRUARY 9, 2017 MITCHELL COUNTY BRIDGE NO. 29 OVER ROCK CREEK ON NC 226 GRADING, PAVING, DRAINAGE, AND STRUCTURE 25 50 10050 25 50 10050 5 10 20 10 D T V = = = = = 55 10 40 % MPH ADT ADT 2018 2038 % * * TTST =7% FUNC CLASS = REGIONAL TIER 0 0 0 PROFILE (HORIZONTAL) R/W & UTIL. BRSTP-0226(14) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA Prepared in the Office of: SIGNATURE: SIGNATURE: P.E. P.E. DIVISION OF HIGHWAYS 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK: 0 9 / 0 8 / 9 9 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 1000 Birch Ridge Dr., Raleigh NC, 27610 C O N T R A C T : T I P P R O J E C T : A R T MEN N A S O H D E P T O F TRA SPORT T I O N T A TEOFN RT CAR O LI N A 4 LENGTH ROADWAY TIP PROJECT B-5170 = 0.103 MILE TOTAL LENGTH TIP PROJECT B-5170 = 0.116 MILE LENGTH STRUCTURE TIP PROJECT B-5170 = 0.013 MILE COLLECTOR B-5170 B I G R O C K CR E E K U N N A M E D B R A N C H SPRING CREEK -L- -DET- B - 5 1 7 0 THIS IS NOT A CONTROL OF ACCESS PROJECT. K =11 % DUAL =3% P.E.42328.1.1 See Sheet 1A For Index of Sheets 2,123 1,970 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED KEVIN E. MOORE, PE NATHAN N. ADIMA, PE -Y 1 - (S R 13 3 4 ) B LE V I N S B R A N C H R D . NC 226 TENNESSEETO B A KE RS VILL E T O N C 2 2 6 BI G R O C K C R E E K CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. BEGIN DETOUR CONSTRUCTION -DET- STA. 10+00.00 BEGIN DETOUR BRIDGE -DET- STA. 12+40.00 -Y1- STA. 12+11.00 END CONSTRUCTION END DETOUR BRIDGE -DET- STA. 13+03.00 -DET- STA. 15+41.57 END DETOUR CONSTRUCTION BEGIN BRIDGE -L- STA. 15+20.88 BEGIN TIP PROJECT B-5170 -L- STA. 12+90.00 END TIP PROJECT B-5170 -L- STA. 19+00.00 END BRIDGE -L- STA. 15+88.13 42328.2.1 WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET _1_ OF _9_ PERMIT DRAWING SITE 2 SITE 1 (226 (261 .94 .7 3 1.20 .20 0 .6 0 0 .62 0.27 (226 ( (226 261 1333 1330 1334 1332 1331 1330 1329 1358 1337 1337 1326 1338 1341 1343 VICINITY MAP PROJECT LOCATION N A D 8 3 /N S R S 2 0 0 7 R E V I S I O N S HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 B-5170 4 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NOTES: (3) SEE SHEETS S-1 TO S-XX FOR STRUCTURE PLANS (2) SEE SHEET 5 FOR PROFILES (1) SEE SHEET 2B-1 FOR -DET- DESIGN APPROACH SLAB N AD 8 3 /N SR S 2 0 0 7 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY GRAPHIC SCALE 0’100’200’300’100’ SHEET _2_ OF _9_ PERMIT DRAWING 1 8 " R C P - I I I HW 4 2 " R C P - I I I 1 8 " R C P-I V 2GI 1 5 " TO STA. 17+17 -L- LT FROM END APPROACH SLAB PROP. SBG 1 8 " REMOVE HW REMOVE PIPEREMOVE PIPE PIPE OUTLET CHANNEL SEE DETAIL A FROM STA. 16+50 TO STA. 17+00-L-LT LATERAL BASE DITCH W/CL B RIP RAP SEE DETAIL B TB 2GI TB 2GI 18" RCP-IV EXIST. PIPE REMOVE 60LF PLUG AT R/W 1 5 " P PASTURE (TYP.) TO SHOULDER ELEVATION RIP RAP CLASS II 24 TONS BANK STABILIZATION RIP RAP CLASS II 80 TONS BANK STABILIZATION RIP RAP CLASS II TB 2GI TO BEGIN APPROACH SLAB FROM STA. 15+00 -L- LT PROP. SBG 10 20 15 R R S PI K E 15" C MP S S P R I N G C R E E K BI G R O C K C R E E K B I G R O C K C R E E K 22’ BSTNC 226 19.5’ BST HUGHS GAP RD. (SR 1330) TENNESSEETO 1 0 0 . 0 0 ’ 5 0 . 0 0 ’ 5 0 . 0 0 ’ EXISTING R/W 6 0. 0 0’ 3 0. 0 0’ 3 0. 0 0’ E X I S T I N G R /W E X I S T I N G R /W 2 4 . 0 0 ’ E XIS TIN G R/ W E XIS TIN G R/ W EX IST ING R /W EXISTING R/W EXISTING R/W EXISTING R/W E XIS TI N G R/ W E XIS TI N G R/ W A M A N D A H U G H S SANDRA G. CALHOUN EIP FENCE POST METAL FENCE POST METAL FENCE POST METAL F E N C E P O S T M E T A L E I P E I P ROGER L. JENKINS T T 10’ GR 10’ GR 8 ’ S O IL S 1 4 ’ B S T HEAD WALL ROCK B S T GR 48" WD GR W D GR B S T 72"CHL 1 8 ’ B S T BST WD DECK 7 2 " C H L CONC G R W G R G R 2 3 4 5 6 7 8 9 14 15 16 17 18’ B S T C O N C. B A T H B IR D L T 8 ’ S O I L 7 2 " C H L ABAND. POLE ABAND. POLE W/LT W/LT W/ L T W / L T BRIDGE #29 DESCRIPTION 2 STEEL SUPPORT BEAMS WITH WOODEN DECK & RAILS IS A FOOT BRIDGE ATTACHED TO BRIDGE METAL GUARD RAIL 12 STEEL SUPPORT BEAMS WOODEN WING WALLS WOODEN DECK 2 LANE BST BRIDGE 15" CMP INV.=2777.62’1 5 " C M P INV.=2774.43’ 15" RCP 18" CMP 18" CMP 18" CMP 1 5 " R C P HEAD WALLCONC. EIP 12" CMP ONLYDIRECTIONAL EIP BRIDGE FOOT BRIDGE No. 29 U N N A M E D B R A N C H W W SH IRLEY SU E W H ITSO N SM ITH G R U N D STR O M 16 LIFT STATIONSEWERSANITARY 10 12 1 11 MARK JAMES SHEETS 13 C H A D T R A V I S & L I S A H U G H S C A L H O U N 1 6 .5 ’ B S T B L E V I N S B R A N C H R D . (S R 1 3 3 4 ) 2 2’ B S T N C 2 2 6 IVETTE M. SOCARRAS WESTERN CAROLINA TELEPHONE CO. SHIRLEY SUE WHITSON SMITH GRUNDSTROM BULADEAN COMMUNITY CENTER BIRCHFIELD BOBBY & BARBARA BIRCHFIELD BOBBY & BARBARA DORIS BOONE ANGELA M. JARRETT HEIRS TRULA BURLESON & ALVIN D. OLLIS JETER & ZEDA PARKER IVETTE M. SOCARRAS NORTH CAROLINA MITCHELL COUNTY, ROGER & BASIA JENKINS BILLIE GARLAND WILLIAM & PROPOSED WORKPAD SITE 1 SITE 2 RALEIGH, NC 27606 (919) 851-6606 FIRM PE NUMBER : P-0671 MI ENGINEERING 1011 SCHAUB DRIVE, SUITE 100 F F C F F F F F F F F F C C C F F F F F C C C C F F F F F F F F F F F F F F R E V I S I O N S HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 B-5170 4 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NOTES: (3) SEE SHEETS S-1 TO S-XX FOR STRUCTURE PLANS (2) SEE SHEET 5 FOR PROFILES (1) SEE SHEET 2B-1 FOR -DET- DESIGN APPROACH SLAB NAD 83 /N SR S 20 0 7 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY GRAPHIC SCALE 0’100’200’300’100’ SHEET _3_ OF _9_ PERMIT DRAWING 18 " RC P - I I I HW 4 2 " R C P - I I I 1 8 " R C P- I V 2GI 15 " TO STA. 17+17 -L- LT FROM END APPROACH SLAB PROP. SBG 1 8 " REMOVE HW REMOVE PIPEREMOVE PIPE PIPE OUTLET CHANNEL SEE DETAIL A FROM STA. 16+50 TO STA. 17+00-L-LT LATERAL BASE DITCH W/CL B RIP RAP SEE DETAIL B TB 2GI TB 2GI 18" RCP-IV EXIST. PIPE REMOVE 60LF PLUG AT R/W 1 5 " P PASTURE (TYP.) TO SHOULDER ELEVATION RIP RAP CLASS II 24 TONS BANK STABILIZATION RIP RAP CLASS II 80 TONS BANK STABILIZATION RIP RAP CLASS II TB 2GI TO BEGIN APPROACH SLAB FROM STA. 15+00 -L- LT PROP. SBG 10 20 15 R R SPI K E 15" C MP S S P R I NG CR E E K BI G R O C K C R E E K B I G R O C K C R E E K 22’ BSTNC 226 19.5’ BST H U G H S G AP RD. (SR 13 3 0 ) TENNESSEETO 1 0 0 . 0 0 ’ 5 0 . 0 0 ’ 5 0 . 0 0 ’ EXISTING R/W 6 0. 0 0 ’ 3 0. 0 0’ 3 0. 0 0’ E X I S T I NG R /W E X I S T I NG R /W 2 4 . 0 0 ’ E XIS TIN G R/ W E XIS TIN G R/ W EX IST ING R /W EXISTING R/W EXISTING R/W EXISTING R/W E XIS TI N G R/ W E XIS TI N G R/ W A M A ND A HU G H S SANDRA G. CALHOUN EIP FENCE POST METAL FENCE POST METAL FENCE POST METAL F E N C E P O S T M ET A L E I P E I P ROGER L. JENKINS T T 10’ GR 10’ GR 8 ’ S O IL S 1 4 ’ B S T HEAD WALL ROCK B S T GR 48" WD GR W D GR B S T 72"CHL 1 8 ’ B S T BST WD DECK 7 2 " C H L CONC G R W G R G R 2 3 4 5 6 7 8 9 14 15 16 17 18’ B S T C O N C. B A T H B IR D LT 8 ’ S O I L 7 2 " C H L ABAND. POLE ABAND. POLE W/LT W/LT W/ LT W / LT BRIDGE #29 DESCRIPTION 2 STEEL SUPPORT BEAMS WITH WOODEN DECK & RAILS IS A FOOT BRIDGE ATTACHED TO BRIDGE METAL GUARD RAIL 12 STEEL SUPPORT BEAMS WOODEN WING WALLS WOODEN DECK 2 LANE BST BRIDGE 15" CMP INV.=2777.62’1 5 " C M P INV.=2774.43’ 15" R CP 18" CMP 18" CMP 18" CMP 1 5 " R C P HEAD WALLCONC. EIP 12" CMP ONLYDIRECTIONAL EIP BRIDGE FOOT BRIDGE No. 29 U N N A M E D B R A N C H W W SH IRLEY SU E W H ITSON SM ITH G R UND STR O M 16 LIFT STATIONSEWERSANITARY 10 12 1 11 MARK JAMES SHEETS 13 C HA D T R A V I S & L I S A HU G H S C A L HO UN 1 6 .5 ’ B S T B LE V I N S B R AN C H R D . (S R 13 3 4 ) 22’ B S T N C 22 6 IVETTE M. SOCARRAS WESTERN CAROLINA TELEPHONE CO. SHIRLEY SUE WHITSON SMITH GRUNDSTROM BULADEAN COMMUNITY CENTER BIRCHFIELD BOBBY & BARBARA BIRCHFIELD BOBBY & BARBARA DORIS BOONE ANGELA M. JARRETT HEIRS TRULA BURLESON & ALVIN D. OLLIS JETER & ZEDA PARKER IVETTE M. SOCARRAS NORTH CAROLINA MITCHELL COUNTY, ROGER & BASIA JENKINS BILLIE GARLAND WILLIAM & PROPOSED WORKPAD SITE 1 SITE 2 RALEIGH, NC 27606 (919) 851-6606 FIRM PE NUMBER : P-0671 MI ENGINEERING 1011 SCHAUB DRIVE, SUITE 100 2 7 5 0 2 7 5 1 2 7 5 1 2 7 5 2 2 7 5 2 2 7 52 2 7 5 2 2 7 53 2 7 5 3 2 7 5 3 2 7 5 3 2753 2 7 5 3 2 7 5 3 2 7 5 4 2 7 5 4 2 7 5 4 2754 2 7 5 4 2754 2 7 5 5 2755 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 27 55 2755 275 6 2 7 5 6 2 7 5 6 2 7 5 6 2 7 5 6 2 7 56 2 7 5 6 27 5 6 2 756 2756 2 7 5 6 2 7 5 6 2 7 5 6 2 7 5 7 2 7 5 7 2 7 5 7 2 7 5 7 2 7 5 7 2757 2 7 5 7 2 7 5 7 2 7 5 7 2 75 7 2 7 5 7 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 2758 2758 27 58 275 8 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 9 2 7 5 9 2 7 5 9 2 7 5 9 2 7 5 9 2 7 5 9 2759 2 7 5 9 2 7 5 9 2 7 5 9 2759 2759 2 7 5 9 2 7 5 9 2 7 5 9 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 27 6 0 2 7 6 0 2 76 0 2760 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2760 2760 2 7 60 2 7 6 0 2 7 6 0 2 7 6 1 2 7 6 1 2 7 6 1 2 7 6 1 2 7 6 1 27 61 2 7 6 1 2 7 6 1 2 7 6 1 2 7 6 1 2761 276 1 2761 2 7 6 1 2 7 6 1 2 7 61 2 7 6 2 2 7 6 2 2 7 6 2 2 7 6 2 27 6 2 2 7 62 2 7 6 2 2 7 62 2 7 6 2 2 7 6 2 2 7 6 2 2762 2762 27 6 2 2762 2 7 6 2 2762 27 6 2 2 7 6 2 2762 2 7 6 2 2 7 6 2 2 7 6 3 2763 2 7 6 3 27 6 3 276 3 2 7 6 3 2 7 6 3 2 7 6 3 2 7 63 2 7 6 3 2 7 6 3 2763 2 7 6 3 2 7 6 3 27 6 3 2 7 6 3 2 7 6 4 2 7 6 4 2764 2 7 64 2 7 6 4 27 6 4 2 7 6 4 2 7 6 4 2 7 6 4 2764 2764 2 7 6 4 2 7 6 4 2764 2 7 6 4 27 6 4 2 7 6 4 2 7 6 4 2 7 6 5 2765 2 7 6 5 27 65 2 7 6 5 2765 2 7 6 5 27 6 5 27 6 5 2 7 6 5 2 76 5 2 7 6 5 2 7 6 5 2 7 6 5 2765 2765 2 7 6 5 2 7 6 5 2 7 6 5 2 7 6 5 2 7 6 5 27 6 5 2766 2 7 6 6 2 7 6 6 2 7 6 6 2 7 6 6 2 76 6 2766 2 7 6 6 2 7 6 6 2 7 6 6 2766 2 7 6 6 2 7 6 6 2 7 6 6 2 7 6 6 2 7 6 6 2 7 6 6 2766 2 7 6 6 276 6 2 7 6 7 2 7 6 7 276 7 2 7 6 7 2 7 6 7 2767 2767 2767 27 6 7 2 7 6 7 2 7 6 7 2 7 6 7 2 7 6 7 2 7 6 7 2767 2767 276 7 2 7 6 8 2 7 6 8 2768 2 7 6 8 2 7 6 8 2768 2768 2 7 6 8 276 8 2 7 6 8 2 7 6 8 2 7 6 9 2 7 6 9 2 7 6 9 2769 27 69 27 6 9 276 9 2 7 6 9 2769 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 27 7 0 2770 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 1 2 7 7 1 2 7 7 1 2 7 7 1 2771 2 771 2 7 7 1 2 7 7 1 2 7 7 1 2 7 7 2 2 7 7 2 2 7 7 2 2 7 7 2 2 7 7 2 2772 2 7 7 2 2 7 7 3 2 7 7 3 2 7 7 3 2 7 7 3 2 7 7 3 2 7 7 3 2773 2 7 7 3 2 7 7 3 277 3 2 7 7 3 2 7 7 4 2774 2 7 7 4 2 7 7 4 2774 2774 2 7 7 4 27 7 4 2 7 7 4 2 7 7 5 2 7 7 5 2 7 7 5 2 7 7 5 2 7 7 5 2775 2 775 2775 2 7 7 6 2 7 7 6 2 7 7 6 2 7 7 6 27 7 6 2 7 7 6 2 7 7 6 2 7 7 6 2776 2776 2 7 7 6 2 7 7 6 2 7 7 7 2 777 2 7 7 7 2777 2 7 7 7 2777 2777 2777 2 7 7 7 27 7 8 2 7 7 8 2 7 7 8 2 7 7 8 2 7 7 8 2778 2778 2 7 7 9 2 7 7 9 2 7 7 9 2 7 7 9 2 7 7 9 2779 2779 2780 2780 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2781 2 7 8 1 2 7 8 1 2 7 8 1 2 7 8 1 2782 2 7 8 2 2 7 8 2 2 7 8 2 2782 2 7 8 2 2 7 8 2 2 7 8 2 2783 2 7 8 3 2 7 8 3 2 7 8 3 2 7 8 3 2 7 8 3 2783 2784 2 7 8 4 2 7 8 4 2 7 8 4 27 84 2 7 8 4 2784 2785 2 7 8 5 2 7 8 5 2 7 8 5 2786 2 7 8 6 2 7 8 6 2 7 8 6 2787 2 7 8 7 2 7 8 7 2 7 8 7 2788 2 7 8 8 2 7 8 8 2 7 8 8 2789 2 7 8 9 2 7 8 9 2 7 8 9 2790 2 7 9 0 2 7 9 0 2 7 9 0 2 7 9 0 2 7 9 0 2 7 9 0 2791 2 7 9 1 2 7 9 1 2 7 9 1 2792 2 7 9 2 2 7 9 2 2 7 9 2 2792 2793 2 7 9 3 2 7 9 3 2794 2 7 9 4 2 7 9 4 2795 2 7 9 5 2 7 9 5 2796 2 7 9 6 2 7 9 6 2797 2 7 9 7 2798 2 7 9 8 2799 2 7 9 9 2800 2 8 0 0 2 8 0 0 2 8 0 0 2801 2 8 0 1 2802 2 8 0 2 2803 2 8 0 3 2804 2 8 0 4 2805 2 8 0 5 2806 2 8 0 6 2807 2 8 0 7 2808 2 8 0 8 2809 2 8 0 9 2810 2 8 1 0 2 8 1 0 2811 2 8 1 1 2812 2 8 1 2 2813 2 8 1 3 2814 2 8 1 4 2815 2 8 1 5 2816 2 8 1 6 2817 2 8 1 7 2 8 1 8 2 8 1 8 2 8 1 9 2 8 1 9 2 8 2 0 2 8 2 0 2 8 2 0 28 2 1 2 8 2 1 2 8 2 2 2 8 2 2 2 8 2 3 2 8 2 3 2 8 2 4 2 8 2 4 2 8 2 5 2 8 2 6 2 8 2 7 2 8 2 8 2 8 2 9 2 8 3 0 2 8 3 1 2 8 3 2 2 8 3 3 2 8 3 4 2 8 3 5 2 8 3 6 2 8 3 7 2 8 3 8 2 8 3 9 2 8 4 0 2 8 4 1 2 8 4 2 2 8 4 3 2 8 4 4 2 8 4 5 2 8 4 6 2 8 4 7 2 8 4 8 2 8 4 9 2 8 5 0 2 8 5 1 2 8 5 2 2 8 5 3 2 8 5 3 2 8 5 4 2 8 5 4 2 8 5 5 2 8 5 6 2 8 5 7 2 8 5 8 2 8 5 9 2 8 6 0 2 8 6 1 2 8 6 2 2 8 6 3 2 8 6 4 2 8 6 5 2 8 6 6 2 8 6 7 2 8 6 8 2 8 6 9 2 8 7 0 2 8 7 1 2 8 7 2 2 8 7 3 2 8 7 4 2 8 7 5 2 8 7 6 2 8 7 7 2 8 7 8 2 8 7 9 2 8 8 1 2 8 8 2 2 8 8 3 2 8 8 4 2 8 8 5 F F C F F F F F F F F F C C C F F F F F C C C C F F F F F F F F F F F F F F DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R E V I S I O N S HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALE 0’40’80’120’40’ S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY BANK STABILIZATION RIP RAP CLASS II BANK STABILIZATION RIP RAP CLASS II SHEET _4_ OF _9_ PERMIT DRAWING SITE 1, SITE 2 ENLARGEMENT 1 8 " R C P - I I I HW 4 2 " R C P - I I I 1 8 " R C P-I V 2GI1 5 " 1 8 " TB 2GI TB 2GI 18" RCP-IV PLUG AT R/W 1 5 " P PASTURE TB 2GI B I G R O C K C R E E K EXISTING R/W EXISTING R/W T HEAD WALL ROCK B S T GR 48" WD GR 1 8 ’ B S T BST G R W G R 4 5 7 8 ’ S O I L W / L T 18" CMP 18" CMP 1 5 " R C P HEAD WALLCONC. BRIDGE FOOT B L E V I N S B R A N C H R D . (S R 1 3 3 4 ) PROPOSED WORKPAD SITE 1 SITE 2 RALEIGH, NC 27606 (919) 851-6606 FIRM PE NUMBER : P-0671 MI ENGINEERING 1011 SCHAUB DRIVE, SUITE 100 F C F F F F F F F F C C F F C C C C F F F F F F F F F F F F R E V I S I O N S HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 2B-1B-5170 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NOTES: (2) SEE SHEETS S-1 TO S-XX FOR STRUCTURE PLANS (1) SEE SHEET 4 FOR -L- DESIGN (2) SEE SHEET 5 FOR PROFILES NAD 8 3 /N SR S 200 7 GRAPHIC SCALE 0’100’200’300’100’ TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET _5_ OF _9_ PERMIT DRAWING 15" C MP S SP R I N G CR E E K BI G R O C K C R E E K B I G R O C K C R EE K 22’ BSTNC 226 19.5’ BST HU G H S G AP RD. (SR 13 3 0 ) TENNESSEETO 1 0 0 . 0 0 ’ 5 0 . 0 0 ’ 5 0 . 0 0 ’ EXISTING R/W 6 0. 0 0 ’ 3 0. 0 0 ’ 3 0. 0 0 ’ E X I S T I N G R /W E X I S T I N G R /W 2 4 . 0 0 ’ E XIS TIN G R/ W E XIS TIN G R/ W EX IST ING R /W EXISTING R/W EXISTING R/W EXISTING R/W E XIS TI N G R/ W E XIS TI N G R/ W A M AN D A HU G H S SANDRA G. CALHOUN ROGER L. JENKINS T T 10’ GR 10’ GR 8 ’ S O IL S 1 4 ’ B S T B S T GR 48" WD GR GR B S T 72"CHL 1 8 ’ B S T BST 7 2 " C H L CONC G R W G R G R 2 3 4 5 6 7 8 9 14 15 16 17 18’ B S T B A T H B IR D LT 8 ’ S O I L 7 2 " C H L ABAND. POLE ABAND. POLE W/LT W/LT W / L T W / LT 15" CMP 1 5 " C M P 15" R CP 18" CMP 18" CMP 18" CMP 1 5 " R C P HEAD WALLCONC. 12" CMP U N N A M E D B R A N C H W W SH IRLEY SU E W H ITSON SM ITH G R UND STR O M 16 LIFT STATIONSEWERSANITARY 10 12 1 11 MARK JAMES SHEETS 13 C H AD T R AV I S & L I S A HU G H S C A L HO U N 16 .5 ’ B S T B L E V I N S B R A N C H R D . (S R 13 3 4 ) 22’ B S T N C 22 6 IVETTE M. SOCARRAS WESTERN CAROLINA TELEPHONE CO. SHIRLEY SUE WHITSON SMITH GRUNDSTROM BULADEAN COMMUNITY CENTER BIRCHFIELD BOBBY & BARBARA BIRCHFIELD BOBBY & BARBARA DORIS BOONE ANGELA M. JARRETT HEIRS TRULA BURLESON & ALVIN D. OLLIS JETER & ZEDA PARKER IVETTE M. SOCARRAS NORTH CAROLINA MITCHELL COUNTY, ROGER & BASIA JENKINS BILLIE GARLAND WILLIAM & -DET- 10 -DET- 15 SITE 2 RALEIGH, NC 27606 (919) 851-6606 FIRM PE NUMBER : P-0671 MI ENGINEERING 1011 SCHAUB DRIVE, SUITE 100 2 4 " 1 8 " REMOVE 10 LF EXIST. 18" RCP TB JB w/SLAB LID TB JB w/SLAB LID F F F F C C F F F F F F R E V I S I O N S HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 2B-1B-5170 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NOTES: (2) SEE SHEETS S-1 TO S-XX FOR STRUCTURE PLANS (1) SEE SHEET 4 FOR -L- DESIGN (2) SEE SHEET 5 FOR PROFILES NAD 8 3 /N SR S 200 7 GRAPHIC SCALE 0’100’200’300’100’ TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET _6_ OF _9_ PERMIT DRAWING 15" C MP S SP R I N G CR E E K BI G R O C K C R E E K B I G R O C K C R EE K 22’ BSTNC 226 19.5’ BST HU G H S G AP RD. (SR 13 3 0 ) TENNESSEETO 1 0 0 . 0 0 ’ 5 0 . 0 0 ’ 5 0 . 0 0 ’ EXISTING R/W 6 0. 0 0 ’ 3 0. 0 0 ’ 3 0. 0 0 ’ E X I S T I N G R /W E X I S T I N G R /W 2 4 . 0 0 ’ E XIS TIN G R/ W E XIS TIN G R/ W EX IST ING R /W EXISTING R/W EXISTING R/W EXISTING R/W E XIS TI N G R/ W E XIS TI N G R/ W A M AN D A HU G H S SANDRA G. CALHOUN ROGER L. JENKINS T T 10’ GR 10’ GR 8 ’ S O IL S 1 4 ’ B S T B S T GR 48" WD GR GR B S T 72"CHL 1 8 ’ B S T BST 7 2 " C H L CONC G R W G R G R 2 3 4 5 6 7 8 9 14 15 16 17 18’ B S T B A T H B IR D LT 8 ’ S O I L 7 2 " C H L ABAND. POLE ABAND. POLE W/LT W/LT W / L T W / LT 15" CMP 1 5 " C M P 15" R CP 18" CMP 18" CMP 18" CMP 1 5 " R C P HEAD WALLCONC. 12" CMP U N N A M E D B R A N C H W W SH IRLEY SU E W H ITSON SM ITH G R UND STR O M 16 LIFT STATIONSEWERSANITARY 10 12 1 11 MARK JAMES SHEETS 13 C H AD T R AV I S & L I S A HU G H S C A L HO U N 16 .5 ’ B S T B L E V I N S B R A N C H R D . (S R 13 3 4 ) 22’ B S T N C 22 6 IVETTE M. SOCARRAS WESTERN CAROLINA TELEPHONE CO. SHIRLEY SUE WHITSON SMITH GRUNDSTROM BULADEAN COMMUNITY CENTER BIRCHFIELD BOBBY & BARBARA BIRCHFIELD BOBBY & BARBARA DORIS BOONE ANGELA M. JARRETT HEIRS TRULA BURLESON & ALVIN D. OLLIS JETER & ZEDA PARKER IVETTE M. SOCARRAS NORTH CAROLINA MITCHELL COUNTY, ROGER & BASIA JENKINS BILLIE GARLAND WILLIAM & -DET- 10 -DET- 15 SITE 2 RALEIGH, NC 27606 (919) 851-6606 FIRM PE NUMBER : P-0671 MI ENGINEERING 1011 SCHAUB DRIVE, SUITE 100 2 4 " 1 8 " REMOVE 10 LF EXIST. 18" RCP TB JB w/SLAB LID TB JB w/SLAB LID 2 7 5 0 2 7 5 1 2 7 5 1 2 7 5 2 2 7 5 2 2 7 5 2 2 7 5 2 27 5 3 2 7 5 3 2 7 5 3 2 7 5 3 2753 2 7 5 3 2 7 5 3 2 7 5 4 2 7 5 4 2 7 5 4 2754 2 7 5 4 2754 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 2 7 5 5 2755 2755 2 7 5 6 2 7 5 6 2 7 5 6 2 7 5 6 2 7 5 6 27 5 6 2 7 5 6 27 5 6 2756 2756 2 7 5 6 2 7 5 6 2 7 5 6 2 7 5 7 2 7 5 7 2 7 5 7 2 7 5 7 2 7 5 7 2757 2 7 5 7 2 7 5 7 2 7 5 7 2 75 7 2 7 5 7 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 275 8 2758 2758 2758 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 8 2 7 5 9 2 7 5 9 2 7 5 9 2 7 5 9 2 7 5 9 2 7 5 9 27 5 9 2 7 5 9 2 7 5 9 2 7 5 9 2759 275 9 2 7 5 9 2 7 5 9 2 7 5 9 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 27 60 2 7 6 0 2 760 27 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2 7 6 0 2760 2760 27 6 0 2 7 6 0 2 7 6 0 2 7 6 1 2 7 6 1 2 7 6 1 2 7 6 1 2 7 6 1 2 76 1 2 7 6 1 2 7 6 1 2 7 6 1 2 7 6 1 2761 276 1 2761 2 7 6 1 2 7 6 1 2 76 1 2 7 6 2 2 7 6 2 2 7 6 2 2 7 6 2 276 2 2762 2 7 6 2 27 6 2 2 7 6 2 2 7 6 2 2 7 6 2 2762 2762 276 2 2762 2 7 6 2 2762 2762 2 7 6 2 2762 2 7 62 2 7 6 2 2 7 6 3 2763 2 7 6 3 276 3 27 63 2 7 6 3 2 7 6 3 2 7 6 3 2 76 3 2 7 6 3 2 7 6 3 2763 2 7 6 3 2 7 6 3 27 6 32 7 6 3 2 7 6 4 2 7 6 4 27 6 4 2764 2 7 6 4 2 76 4 2 7 6 4 2 7 6 4 2 7 6 4 2764 2764 2 7 6 4 2 7 6 4 2764 2 7 6 4 27 6 4 2 7 6 4 2 7 6 4 2 7 6 5 2765 2 7 6 5 2765 2 7 6 5 2 76 5 2 7 6 5 27 6 5 2 7 65 2 7 6 5 27 6 5 2 7 6 5 2 7 6 5 2 7 6 5 2765 27 65 2 7 6 5 2 7 6 5 2 7 6 5 27 6 5 2 7 6 5 27 6 5 2766 2 7 6 6 2 7 6 6 2 7 6 6 2 7 6 6 27 6 6 2766 2 7 6 6 2 7 6 6 2 7 6 6 2766 2 7 6 6 2 7 6 6 2 7 6 6 2 7 6 6 2 7 6 6 2 7 6 6 2766 2 7 6 6 2766 2 7 6 7 2 7 6 7 2767 2 7 6 7 2 7 6 7 2767 2767 2767 276 7 2 7 6 7 2 7 6 7 2 7 6 7 2 7 6 7 2 7 6 7 276 7 2767 2 767 2 7 6 8 2 7 6 8 2768 2 7 6 8 2 7 6 8 2768 2768 2 7 6 8 27 6 8 2 7 6 8 2 7 6 8 2 7 6 9 2 7 6 9 2 7 6 9 2769 27 69 2 76 9 27 69 2 7 6 9 2769 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 0 2770 2 7 7 0 2 7 7 0 2 7 7 0 2 7 7 1 2 7 7 1 2 7 7 1 2 7 7 1 2771 2 7 7 1 2 7 7 1 2 7 7 1 2 7 7 1 2 7 7 2 2 7 7 2 2 7 7 2 2 7 7 2 2 7 7 2 2772 2 7 7 2 2 7 7 3 2 7 7 3 2 7 7 3 2 7 7 3 2 7 7 3 2 7 7 3 2773 2 7 7 3 2 7 7 3 27 73 2 7 7 3 2 7 7 4 2774 2 7 7 4 2 7 7 4 277 4 2774 2 7 7 4 2 7 74 2 7 7 4 2 7 7 5 2 7 7 5 2 7 7 5 2 7 7 5 2 7 7 5 2775 27 7 5 2775 2 7 7 6 2 7 7 6 2 7 7 6 2 7 7 6 27 7 6 2 7 7 6 2 7 7 6 2 7 7 6 2776 2776 2 7 7 6 2 7 7 6 2 7 7 7 2 77 7 2 7 7 7 27 7 7 2 7 7 7 2777 2777 2777 2 7 7 7 2778 2 7 7 8 2 7 7 8 2 7 7 8 2 7 7 8 2778 2778 2 7 7 9 2 7 7 9 2 7 7 9 2 7 7 9 2 7 7 9 2779 2779 2780 2780 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2 7 8 0 2781 2 7 8 1 2 7 8 1 2 7 8 1 2 7 8 1 2782 2 7 8 2 2 7 8 2 2 7 8 2 27 8 2 2 7 8 2 2 7 8 2 2 7 8 2 2783 2 7 8 3 2 7 8 3 2 7 8 3 2 7 8 3 2 7 8 3 2783 2784 2 7 8 4 2 7 8 4 2 7 8 4 2784 2 7 8 4 2784 2785 2 7 8 5 2 7 8 5 2 7 8 5 2786 2 7 8 6 2 7 8 6 2 7 8 6 2787 2 7 8 7 2 7 8 7 2 7 8 7 2788 2 7 8 8 2 7 8 8 2 7 8 8 2789 2 7 8 9 2 7 8 9 2 7 8 9 2790 2 7 9 0 2 7 9 0 2 7 9 0 2 7 9 0 2 7 9 0 2 7 9 0 2791 2 7 9 1 2 7 9 1 2 7 9 1 2792 2 7 9 2 2 7 9 2 2 7 9 2 2792 2793 2 7 9 3 2 7 9 3 2794 2 7 9 4 2 7 9 4 2795 2 7 9 5 2 7 9 5 2796 2 7 9 6 2 7 9 6 2797 2 7 9 7 2798 2 7 9 8 2799 2 7 9 9 2800 2 8 0 0 2 8 0 0 2 8 0 0 2801 2 8 0 1 2802 2 8 0 2 2803 2 8 0 3 2804 2 8 0 4 2805 2 8 0 5 2806 2 8 0 6 2807 2 8 0 7 2808 2 8 0 8 2809 2 8 0 9 2810 2 8 1 0 2 8 1 0 2811 2 8 1 1 2812 2 8 1 2 2813 2 8 1 3 2814 2 8 1 4 2815 2 8 1 5 2816 2 8 1 6 2817 2 8 1 7 2 8 1 8 2 8 1 8 28 1 9 2 8 1 9 2 8 2 0 2 8 2 0 2 8 2 0 2 8 2 1 2 8 2 1 2 8 2 2 2 8 2 2 2 8 2 3 2 8 2 3 2 8 2 4 2 8 2 4 2 8 2 5 2 8 2 6 2 8 2 7 28 2 8 2 8 2 9 2 8 3 0 2 8 3 1 2 8 3 2 2 8 3 3 2 8 3 4 2 8 3 5 2 8 3 6 2 8 3 7 2 8 3 8 2 8 3 9 2 8 4 0 2 8 4 1 2 8 4 2 2 8 4 3 2 8 4 4 2 8 4 5 2 8 4 6 2 8 4 7 2 8 4 8 2 8 4 9 2 8 5 0 2 8 5 1 2 8 5 2 2 8 5 3 2 8 5 3 2 8 5 4 2 8 5 4 2 8 5 5 2 8 5 6 2 8 5 7 2 8 5 8 2 8 5 9 2 8 6 0 2 8 6 1 2 8 6 2 2 8 6 3 2 8 6 4 2 8 6 5 2 8 6 6 2 8 6 7 2 8 6 8 2 8 6 9 2 8 7 0 2 8 7 1 2 8 7 2 2 8 7 3 2 8 7 4 2 8 7 5 2 8 7 6 2 8 7 7 2 8 7 8 2 8 7 9 2 8 8 1 2 8 8 2 2 8 8 3 2 8 8 4 2 8 8 5 F F F F C C F F F F F F DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R E V I S I O N S HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALE 0’40’80’120’40’ TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET _7_ OF _9_ PERMIT DRAWINGSITE 2, DETOUR ENLARGEMENT B I G R O C K CR E E K E X I S T I N G R /W E X I S T I N G R /W EXISTING R/W EXISTING R/W T B S T GR 48" WD GR 1 8 ’ B S T BST G R W G R 3 4 5 B A T H B I R D 8 ’ S O I L W / L T 18" CMP 18" CMP 1 5 " R C P W 12 B LE V I N S B R AN C H R D . (S R 13 3 4 ) WESTERN CAROLINA TELEPHONE CO. BIRCHFIELD BOBBY & BARBARA DORIS BOONE & ALVIN D. OLLIS JETER & ZEDA PARKER ROGER & BASIA JENKINS SITE 2 2 4 " 1 8 " REMOVE 10 LF EXIST. 18" RCP TB JB w/SLAB LID TB JB w/SLAB LID RALEIGH, NC 27606 (919) 851-6606 FIRM PE NUMBER : P-0671 MI ENGINEERING 1011 SCHAUB DRIVE, SUITE 100 F F C C F F F F F DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 5 / 2 8 / 9 9 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED LEFT DITCH DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1300 = 5 = 2764.5 = 3100 = 100 = 2767.96 = 2400 = 2766.6 = 6/9/2016 = 2759.5 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 2700 = 50 = 2766.5 = 3100 = 2766.86 = 3200 = 100 = 2767.0 = 6/9/2016 = 2759.0 5B-5170 10 11 12 2,740 2,750 2,760 2,770 -L- -DET--Y1- SEE SHEET 4 FOR -L- PLAN VIEW SEE SHEET 2B-1 FOR -DET- PLAN VIEW 10 11 12 13 14 15 16 17 18 19 2,730 2,740 2,750 2,760 2,770 2,780 10 11 12 13 14 15 16 17 18 19 2,730 2,740 2,750 2,760 2,770 2,780 10 11 12 13 14 15 2,720 2,730 2,740 2,750 2,760 2,770 2,780 SEE SHEET 4 FOR -Y1- PLAN VIEW 2,730 V = 25 MPH V = 25 MPH V = 25 MPH V = 25 MPH 10 11 12 2,720 2,730 2,740 2,750 2,760 2,770 EL = 2767.00 BEGIN GRADE -Y1- STA. 10+12.10 EL = 2,767.98 END GRADE -Y1- STA. 12+11.00 EL = 2,766.08’ BEGIN GRADE -DET- STA. 10+52.68 EL = 2,770.38’ END GRADE -DET- STA. 14+86.33 -L- STA. 15+09 (46’ RT.) -BL- STA. 10+06.00 (23’ RT.) NAIL IN BASE OF 30" RED OAK BM #2 EL = 2767.90 PI = 11+90.00 VC = 80’ K = 26 PI = 13+30.00 EL = 2,767.24’ PI = 14+50.00 EL = 2,770.27’ VC = 50’ K = 36 VC = 30’ K = 14 2,720 2,730 2,740 2,750 2,760 2,770 2,780 (-)0.5000%(+)1.9377% EL = 2,765.56’ BEGIN GRADE -L- STA. 13+50.00 PI = 14+20.00 EL = 2,766.26’ (+)1.0000% (+)0.4232% VC = 120’ PI = 16+63.40 EL = 2,767.29’ (+)0.4232% (+)3.0011% -L- STA. 12+90.00 BEGIN RESURFACING VC = 165’ K = 208 V = 65 MPH -L- STA. 15+20.88 BEGIN BRIDGE -L- STA. 15+88.13 END BRIDGE K = 165 V = 65 MPH EL = 2,772.59’ END GRADE -L- STA. 18+40.00 -L- STA. 19+00.00 END RESURFACING VC = 165’ -Y1- STA. 10+00.00 -L- STA. 14+66.00 = PI = 11+30.00 EL = 2,766.41’ VC = 110’ V = 30 MPH K = 45 PI = 11+00.00 EL = 2,767.35’ (+)2.6839%(-)1.8889% VC = 75’ EL = 2,765.65’ (-)1.8889%(+)1.1357%(+)1.1357%(+)2.5250% (+)2.5250%(+)0.3028% K = 16 SKEW = 90 DEGREE C/L GRADE POINT ELEV. = 2766.83’ WITH END BENT CAPS EXTENDED TO SCOUR LINE PROP 1@65’ 24-INCH CORED SLAB BRIDGE C/L STATION 15+54.50 -L- (+) 8.4000% BEGIN DETOUR CONSTRUCTION -DET- PC STA. 10+00.00 -DET- PT STA. 15+41.57 END DETOUR CONSTRUCTION 18" RCP 42" RCP 18" RCP 24" RCP PROP EXCAVATION TO ELEV. 2760.5’ 60 CY 6/9/2016 = 2759.0’ NWS AND WSEL PROP EXCAVATION TO ELEV. 2760.5’ 350 CY 100 YR WSE = 2766.86’ 50 YR WSE = 2766.5’ 5 YR WSE = 2764.5’ EST. 25cy EXCAVATION TO ELEV=2761.5’ NWS=2759.5’ 100 YR WSE = 2767.96’ SKEW = 90 DEGREE C/L GRADE PT ELEV.=2766.58’ PROP 1@63’ BRIDGE C/L STATION 12+71.50 -DET- END LEFT DITCH STA. 17+00 -L- LT ELEV= 2,764.10’ STA. 16+50 -L- LT ELEV= 2,759.90’ BEGIN LEFT DITCH = 25+ = 100 +- STR. PAY ITEM STR. PAY ITEM STR. PAY ITEM STR. PAY ITEMB-5170 -L- BSR. QUANTITY INCLUDED ON EXCAVATION AND RIP RAP EXCAVATION TO ELEV=2760.5’ ELEV=2761.0’ WORKPAD TEMPORARY 1. 5 : 1 SHEET _8_ OF _9_ PERMIT DRAWING Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 15+45 -L-Temporary Workpad < 0.01 29 2 16+40 -L-Bank Stabilization < 0.01 10 2 16+51 -L-42" RCP < 0.01 < 0.01 20 13 2 13+83 -Det-24" RCP < 0.01 41 TOTALS*: < 0.01 0.02 30 83 0 *Rounded totals are sum of actual impacts NOTES: Revised 2013 10 24 SHEET 9 OF 9 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS MITCHELL COUNTY B-5170 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 3/1/2017