Loading...
HomeMy WebLinkAbout20170968 Ver 1_PCN Form Submission_20170804Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 8/4/2017 2:43:17 PM (Start Event) Accept by Carpenter,Kristi 8/4/2017 4:52:56 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: August 9, 2017 5:00 PM 8/4/2017 2:44 PM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 28, 2017 Ver 1.8 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx A. Processing Information County (or Counties) where the project is located:* Durham Is this a NCDOT Project?* C� Yes �' No (NCDOT only) T.I.P. or state project number: WBS # 15005.1032011 (for NCDOT use only) � 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 03 - Maintenance 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express �7 Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: I For the record only for Corps Permit: 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? * l" Yes C•' No C•' Yes C' No If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No 1f. Is the project located in any of NC's twenty coastal counties?* C' Yes �' No B. Applicant Information 1a. Who is the Primary Contact?* Chris Murray 1b. Primary Contact Email:* cmurray@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (919)220-4633 1d. Who is applying for the permit? r% Owner r Applicant (other than owner) r AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: Not available 2c. Responsible party: (for Corporations) 2d.Address Street Address Address Line 2 (3ty State / Rovince / F�gion R�stal/Zip Code Country 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* cmurray@ncdot.gov 2a. Name(s) on recorded deed: United States of America 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) Attn: USACE 2d.Address Street Address Address Line 2 11405 Falls of the Neuse Road a� Raleigh Fbstal / Zip Code 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* cmurray@ncdot.gov State / R-ovince / I�gion NC Country C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Removal of damaged roadway and pipe structure on SR 1637 (Redv�rood Road) in Durham County 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Durham 1d. Driving directions* IIf it is a new project and can not easily be found in a C�5 rrapping system Rease provide directions. 1. Travel on I-85 northbound, 2. Take Redwood Road e�at and 3. Travel to site. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) 171478, 211011, 171480, 170207 and 170217 2b. Propertysize: (in acres) 1.0 acre 2c. Project Address Street Address near 4609 Redvuood Road Address Line 2 Qty Durham Fbstal / Zip Code 27704 2d. Site coordinates in decimal degrees State / Rovince / F�gion NC Country Durham Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) � Latitude:* Longitude:* 36.052 -78.775 ex:34208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Falls Lake 3b. Water Resources Classification of nearest receiving water:* WS-IV; B; NSW; CA Surface Water Lookup 3c. What river basin(s) is your project located in?* Neuse River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* i Existing site is failed roadbed with sinkhole at pipe crossing under road. Surrounding land includes wooded land, open water and boat ramp. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) qick the upload button or drag and drop files here to attach docurrent Redwood Road site map formatted.pdf 1.46MB Fle type rrust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Qick the upload button or drag and drop files here to attach docurrent Redwood Road Durham soil survey.pdf Fle type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0.0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 190 linear feet of open water 847KB 4f. Explain the purpose of the proposed project: Storm event during Hurricane Matthew (October 2016) resulted damage to 2@ 10 feet wide pipe structures that are 119 feet long. The storm event resulted in failed pipe structures, contributing to a sink hole in the road above the structures. The purpose of this project is to removed a portion of the road bed and failed pipe structures and then construction of a Class II rip rap open channel. 4g. Describe the overall project in detail, including the type of equipment to be used: Contractor will conduct the following: 1. Removal of "dry" roadbed above open water; 2. Removal of "wet or I submerged" roadbed below water surtace, 3. Remove damaged pipe structures and 4. Construct Class II rip rap lined open channel. Equipment MAY include: excavator, long-arm stick excavator, dredge bucket, vacuum system, etc. 4h. Please upload project drawins for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent REDWOOD ROAD FINAL PLANS for permit application.pdf 3.09MB Fle type rrust be pdF 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C� Yes C' No C' Unknown Comments: Delineated by jason Dilday (NCDOT); no wetlands in project limits. 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary �' Approved C' Unknown Corps AID Number: 6carrple: SAV�2017-99999 SAW-2017-00908 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Jason Dilday NCDOT 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Gick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes C•' No f Unknown 7. Future Project Plans 7a. Is this a phased project?* C� Yes C' No 7b. If yes, explain. This PCN form covers the following: 1. Removal of "dry" roadbed above open water; 2. Removal of "wet or submerged" roadbed belowwater surface, 3. Remove damaged pipe structures and 4. Construct Class II rip rap lined open channel. The NCDOT will install a crossing structure (likely a one-span bridge) in 2018. The Department has not determined at this time if there will be additional stream, wetland, buffer or open water impacts associated with the crossing structure. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed I m pacts I nventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r Streams-tributaries rJ Buffers fJ Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites I impacted. '" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Site #- Reason for 4b. Impact i impact type Road crossing P N�p label (e.g. F�ad Qossing 1) F2rrranent (F) or Terrporary (� 4g. Total temporary open water Impacts: 0.00 4g. Total permanent open water impacts: 0.20 4g. Total open water impacts: 0.20 4h. Comments: 4c. Name of waterbody Falls Lake (if applicable) 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 4d. Activity 4e. Waterbody4f. Impact area type type Excavation Lake 0.20 (acres) 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply. fJ Neuse r Catawba r Goose Creek r Other r Tar-Pamlico r Randleman r Jordan Lake 6b. Impact Type 6c. Per or 6d. Stream name Te mp Allowable P Falls Lake Location and Exerrpt, Allowable, allowable w/ rritigation F�rrranent (F) or Terrporary (� 6h. Total buffer impacts: Temporary impacts Permanent impacts: Total buffer impacts: 6i. Comments: Zone 1 0.00 Zone 1 22,850.00 Zone 1 22,850.00 Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. C7ick the upload button or drag and drop files here to attach docurrent Redw�ood Road open water permit drawing.pdf Redw�ood Road buffer impact permit drawing.pdf Fle rrust be FiJF 6e. Buffer mitigation required? No Zone 2 0.00 Zone 2 4,780.00 Zone 2 4,780.00 E. Impact Justification and Mitigation 1. Avoidance and Minimization 531.06KB 406.79KB 6f. Zone 1 6g. Zone 2 impact impact 22,850 4,780 (square feet) (square feet) 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The Department will remove by excavation only the minimum amount necessary of fill material to construct the Class II rip rap lined open channel. Removal of material will be restricted to within 20 feet of the toe of existing slope or 10 feet from the pipe structure, whichever is less. The contractor may temporarily store excavated material on-site, but will eventually be required to remove the material from the project site. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* The Department has had several conversations ond meetings with the regulatory agencies regarding this project since October 2016. The regulatory agences requested that the Department evaluate all options to remove both "dry" and "wet or submerged " portions of the fill slope and the damaged pipe structures. On June 13, 2017 NCDOT Dlvision 5 staff and Dewberry staff inet with the USACE, NCDENR-DWR and NCWRC to evaluate all possible construction options. See the attached Redwood Road Study Final Report. After presentation of the study alternatives and analysis, the consensus of opinion among those present and participating by phone was that the wet excavation method (Alternate III) detailed in this report is the recommended alternative for development of the pipe replacement project for construction and permitting. The primary environmental issue of concern e�ressed by the permitting agencies present is control of additional turbidity potentially generated by construction activities. The method of control during construction is to be turbidity curtains and turbidity monitoring. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes C•' No i 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The nature of the project and use of NWPs and WQCs indicate that mitigation is not required for this activity. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? C' Yes C•' No 1e. If this project DOES NOT require a Stormwater Management Plan, explain why: The project does not result in any changes to the current stormwater runoff at the site. The Department will reconstruct grasses shoulders to convey runoff from the roadway. 2. Diffuse Flow Plan 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C� Yes C' No 2b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. Include a plan that fully documents how diffuse flow will be maintained. If, due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form What documentation are you providing? r Level Spreader r Other BMP (check all that apply) Diffused Flow Documentation Qick the upload button or drag and drop files here to attach docurrent Fle type rrust be f�F G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* C� Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes C' No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPAor SEPAfinal approval letter.)* f Yes C•' No Comments:* The document will not be sent to the clearing house. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * f Yes C•' No 2b. Is this an after-the-fact permit application?* C' Yes �' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes �' No 3b. If you answered "no," provide a short narrative description. The project replaces the damaged roadway and structure. 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. The project will not generate sewage. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* C� Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes C•' No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is this a DOT project located within Division's 1-8?* �' Yes C' No 5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* The Department will adhere to the programmatic agreement made for the NLEB in Division 5. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Mapping 7. Historic or Prehistoric Cultural Resources (Corps Requirement) I Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Consulation with NCDOT staff. 7c. Historic or Prehistoric Information Upload aick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) I Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C� Yes l" No 8b. If yes, explain how project meets FEMA requirements: Project has been designed by NCDOT hydro unit 8c. What source(s) did you use to make the floodplain determination?* Mapping. Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent REDWOOD ROAD STUDY FINAL REPORT.pdf 5.15MB Fle rrust be FDF Signature * rJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name:* Christopher A. Murray Signature �'�1��' �L►r'r'�c� d Date 8/4/2017 Initial Review Is this project a public transportation project? �' Yes C' No Only change this if the project has been reassigned. Has this project met the requirements for acceptance in to the review process?* �' Yes C' No BIMS # Assigned* 20170968 Version#* 1 Reviewing Office * Central Office - (919) 707-9000 Select Project Reviewer* i Rob Ridings:eads\rgridings