Loading...
HomeMy WebLinkAbout20170955 Ver 1_Build Maps_20170804 (2)P E R S I M M O N C R E E K { .95 .69 64%74 DECEM BER 19, 2017 DECEM BER 16, 2016 N ATHAN N . ADIM A, PE BRID GE NO. 148 OVER PERSIM M ON CREEK ON SR 1127 (BELL H ILL RD ) GRAD IN G, PAVIN G, D RAIN AGE, AN D STRU CTU RE 25 50 10050 25 50 10050 5 10 20 10 D T V = = = = = = 11 55 3 % % M PH ADT ADT 2017 2037 % * * TTST =1% FUN C CLASS = LO CAL RURAL SUB-REG IO N AL TIER 0 0 0 PRO FILE (HO RIZO N TAL) PROJECT LENGTH RIGH T OF W AY D ATE: LETTING D ATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 D ESIGN D ATA Prepared in the Office of: SIGNATU RE: SIGNATU RE: P.E. P.E. D IVISION OF H IGH W AYS 2012 STAND ARD SPECIFICATIONS PROJECT ENGINEER PROJECT D ESIGN ENGINEER GRAPH IC SCALES PLAN S PRO FILE (VERTICAL) H YD RAU LICS ENGINEER ENGINEER ROAD W AY D ESIGN LOCATION: TYPE OF W ORK : 0 9 / 0 8 / 9 9 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 0 5 - A P R - 2 0 1 7 1 5 : 4 9 R : \ R o a d w a y \ P r o j \ B 4 4 6 2 _ R d y _ t s h . d g n $ $ $ $ U S E R N A M E $ $ $ $ 1000 B irch R idge D r., R aleigh N C , 27610 C O N T R A C T : T I P P R O J E C T : B - 4 4 6 2 A R T MEN N A S O H D E P T O F T R A S PORT T I O N T A TEOFN RT C AR O LI N A -L- { 4 K LEN G TH RO ADW AY TIP PRO JECT B-4462 = 0.123 M ILE TO TAL LEN G TH TIP PRO JECT B-4462 = 0.137 M ILE LEN G TH STRUCTURE TIP PRO JECT B-4462 = 0.014 M ILE 25 -L- STA. 17+23.76 END TIP PROJECT B-4462 SR 1127 BELL H ILL RD - Y 1 - KEVIN E. M O O RE, PE -Y1- STA. 10+80.00 BEGIN CONSTRU CTION -Y1- STA. 11+99.75 END CONSTRU CTION THIS IS N O T A CO N TRO L O F ACCESS PRO JECT. LETITIA TO -L- STA. 10+00.00 BEGIN TIP PROJECT B-4462 SU IT TO NC 294 JOH NSONVILLE TO U S 64/74 DUAL=2% D O C U M EN T N O T C O N SID ER ED FIN A L U N LESS A LL SIG N A TU R ES C O M PLETED See Sheet 1A For Index of Sheets B-4462 P.EBRZ-1127(12)38376.1.2 220 310 CREEKPERSIMMON CH ERO K EE CO U N TY -L- 12+96.70 BEG IN BRIDG E -L- 13+69.30 EN D BRIDG E CLEARIN G O N THIS PRO JECT SHALL BE PERFO RM ED TO THE LIM ITS ESTABLISHED BY M ETHO D ll. R/W38376.2.1 THIS PRO JECT IS N O T W ITHIN AN Y M UN ICIPAL BO UN DARIES. 1130 1130 11141113 1116 1130 1127 1129 1128 1127 1303 1302 1308 1307 1309 1165 1123 1119 1125 1124 294( 294( VICIN ITY M AP LOCATION PROJECT N A D 8 3 / 9 5 Slope Ditch Front EST. 7 SY G EO TEXTILE EST. 2 TO N CLASS B RIP RAP EST. 7 SY GEO TEXTILE EST. 2 TO N CLASS B RIP RAP Grade Ditch 2.0’ GEO TEXTILE Grade Ditch 2.0’ GEO TEXTILE SEE DETAIL D SEE DETAIL C SEE DETAIL C SEE DETAIL A SEE DETAIL A SEE DETAIL A SEE DETAIL A (STRUCTURES ITEM ) CLASS II RIP RAP (TYP.) SEE DETAIL B FILL LO CALIZED DEPRESSIO N W ITH CLASS II RIP RAP TO ELEV. 1546’ Slope Fill Slope Fill Grade Ditch 2.0’ GEO TEXTILE Grade Ditch 2.0’ GEO TEXTILE (STRUCTURES ITEM ) CLASS II RIP RAP (TYP.) concrete footing Key-in behind exist. FOR PROFILES, SEE SHEET 5. PAVEM ENT REM OVAL R E V I S I O N S HYDRAULICSROADWAY DESIGN ENG INEER ENG IN EER R/W SHEET N O . SHEET N O .PRO JECT REFERENCE N O . 4B-4462 0 5 - A P R - 2 0 1 7 1 5 : 4 9 R : \ R o a d w a y \ P r o j \ B 4 4 6 2 _ R d y _ p s h _ 4 . d g n $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 D O C U M EN T N O T C O N SID ER ED FIN A L U N LESS A LL SIG N A TU R ES C O M PLETED APPROACH SLAB NOTE: R / W R E V I S I O N : A D D E D D R I V E W A Y S T O P A R C E L 1 A T - L - S T A . 1 1 + 3 7 . 5 0 L T & R T . B C K 0 2 / 2 1 / 1 7 SENSITIVE AREA ENVIRONM ENTALLY SENSITIVE AREA ENVIRONM ENTALLY 2 0 ’ -L- EXIST 0404 +59.00 1 7’ I N C. -Y1- PT Sta. 11+13.60 -Y1- PC Sta. 10+00.00 -L- PT Sta. 17+10.65 -L- POT Sta. 17+86.11 -L- PC Sta. 14+72.34 -L- STA. 17+23.76 EN D TIP PRO JECT B-4462 -L- STA. 10+00.00 BEG IN TIP PRO JECT B-4462 BEG IN CO N STRUCTIO N -Y1- STA. 10+80.00 EN D CO N STRUCTIO N -Y1- STA. 11+99.75 20’R 20’R 10’R 10’R 50’R 50’R 18’ 18’ PI Sta 16+19.83 D L = 238.31’ T = 147.48’ R = 160.00’ SE= See plans -L--Y1- PI Sta 10+56.91 D L = 113.60’ T = 56.91’ R = 750.00’ 0 2 0 1 0 0 0 1 0 2 0 3 0 4 0 40 3 0 2 17’ INC. + 9 5 .0 1 0 2 0 2 0 1 0 0 0 1 0 2 2 0 ’ 0 3 0 3 + 2 6 03 02 04 01 04 00 04 01 04 02 0304 1 4 ’ 1 5 -Y1- POT Sta. 11+50.60 -L- POT Sta. 10+00.00 = 17’ IN C. 8:1 8:1 8 : 1 8:1 - Y 1 - GRAU 350 TL-2 GRAU 350 TL-2GRAU 350 TL-2 GRAU 350 TL-2 12’ GUARDRAIL BARRICADE TYPE-III TYPE-III TYPE-III -L- 13+69.30 END BRIDG E -L- 12+86.00 BEGIN APPR. SLAB -L- 13+80.00 END APPR. SLAB 1 0 ’ 0 2 0 2 1 0 ’ 2 0 ’ TYPE-III 2 ’ - 5 " 2 ’ - 5 " DETAIL SHO W IN G PAVEM EN T TO BRIDG E RELATIO N SHIP 0 2 0 2 2 0 ’ 2 4 ’ - 1 0 " -L- 12+96.70 BEG IN BRIDGE -L- 13+87.22 BEGIN SBG -L- 14+00.00 END SBG -L- 13+72.78 BEG IN SBG -L- 13+86.00 END SBG 1 2 ’ TES TES 0 2 0 2 EXIST EXIST -Y 1 - -L- -L- STA 12+75 BEGIN TEM P SHO RING -L- STA 13+15 END TEM P SHO RIN G -L- STA 13+50 BEGIN TEM P SHO RING -L- STA 13+75 END TEM P SHO RIN G O N PARCEL 4 DO NO T DISTURB TREES L T & R T 1 4 ’ T A P E R 5’R 8’ 20’R20’R 20’R 20’R 25’ 25’ X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX XX X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXX X X X X X X X X X X X X XX X X XXX X X X X X X XX X X YYYYY XX X X X X X X X X X 1 4 T 1 4 T T T T W OODS WOODS W OODS 1SFD SMTL S ABANDONED G R G R B S T B S T BST G R G R G R S OI L G R W OODS S U N N Y P O I N T R D S R 1 1 3 0 1 S F D 5’ PL ASTIC FE NCE T A N K P R OP A N E W ELL UNIT CONDITIONING AIR S W OOD CARPORT M TL S 1SFD H T R S W OODS W OODS W OODS W ELL BOX POW ER 15" CMP 15" CM P HEADW ALL BLOCK S R 1 1 2 7 B E L L H I L L R D 12" CM P 15" CMP 18" HDPE W ELL SO I L 15" CMP W OODS ELEV.=1551.71 ELEV.=1551.21 1 4 1 4 S 6 7 13 ’4 2 " E13 0 4 .12 ’ N 64 59’28" E 37.90’ N 1 1 3 8 ’ 3 5 " W 1 2 5. 0 9 ’ N 3 0 2 8 ’4 2 " E 1 7 2 .8 5 ’ S 0 6 2 5 ’ 5 6 " W S 2 0 4 0 ’4 4 " W 9 8 .6 2 ’ S 8110’30" W 73.37’ S 8110’30" W 14.00’ N 0 9 1 2 ’ 0 0 " W 4 9. 0 0 ’ N 0 0 0 1 ’ 3 2 " E 6 3 . 6 2 ’ N 1 2 1 4 ’ 2 8 " W 4 3. 4 8 ’ N 73 53’28" W 105 .17’ N 2858’21" W 45.08’ N 0 2 3 0 ’ 5 5 " W 1 1 3 . 4 8 ’ W OODS E X I S T I N G R / W S 8111’40" W 58.37’ SR 1127 BELL H ILL RD 15 .3 2 ’ N 6 7 4 6 ’4 3 " W 9 5 0 .7 9 ’ S 6 8 24 ’4 3 " E10 0 8 .59 ’ EX IST ING R /W EXISTING R/W S 5 4 5 6’ 1 4 " E 9 9 5. 1 8’ N 3 7 4 6 ’ 0 9 " W 7 0 . 17 ’ 60.00’ E X I S T I N G R / W 5 0 . 0 0 ’ EXISTING R/W 17’ BST CLE A N O UT SEPTIC T A N K 50.00’ 6 0 .0 0 ’ EX I S T I NG R /W P E R S I M M O N C R E E K DOROTHY W ILKERSON DB 1286 PG 12 DB 1067 PG 003 KATHERINE BURRELL JOHNNIE BURRELL JACQUELINE S. HALL CARSON E. HALL DB 664 PG 86 W ILLIAM T. M IZE DB 1171 PG 676 DB 1474 PG 819 M ARY L. M ANN DB 1426 PG 602 KATHERINE BURRELL JOHNNIE BURRELL KATHERINE BURRELL JOHNNIE BURRELL DB 1426 PG 602 SUSAN F. CANTOR RANDOLPH J. CANTOR DB 1067 PG 3 NC GRID -BY1-6 -BY1-22 -BL-2 -BL-1 -BL-3 -BL-4 -BL-5 BM -3 BM 4 BM -1 BM -2 40.19’ +34.13 31 .91 ’ + 6 1 .99 EX. R/W EX. R/W 40.0’ LT +72.34 -L- 40’ LT 40’ LT +15.00 -L- +35.00 -L- EX R/W 70’ RT 1 2 3 4 EX. R/W EX. R/W EX. R/W EX. R/W EX. R/W EX. R/W EX. R/W EX. R/W +00.00 -L- +72.00 -L- 40’,50’ LT 40’,50’ LT EX. PL EX. PL REM O VE 2GI TB 1 5 " 1 5 " TO DRAIN GRADE TO DRAIN GRADE REM O VE 1 5 " 15" RETAIN REMOVE VARIES D V A RI E S ( Not to Scale) SPECIAL CUT DITCH DETAIL B M in. D=0.8 Ft. Ground Natural (SEE DITCH G RADE SHEET 5) (SEE XSCS SHEET X-6 & X-7) FRO M -L- STA. 16+42 TO 17+00 LT 0401 0402 0404 0403 0405 0406 SBG2GI TB ( Not to Scale) RIP RAP AT EM BANKM ENT DETAIL C 10’m in. 1.0’m in. flow=10’ W idth parallel to stream -L- STA. 13+36 RT -L- STA. 13+67 LT Est. Total Class II: 30 Tons, Est. Total Geotextile: 35 SY Type of Liner=Class II Rip-Rap on Geotextile Fabric ( Not to Scale) RIP RAP AT EM BANKM ENT DETAIL D 10’m in. 1.0’m in. flow=5’ W idth parallel to stream -L- STA. 13+06 RT Est. Total Class II: 10 Tons, Est. Total Geotextile: 10 SY Type of Liner=Class II Rip-Rap on Geotextile Fabric GRADE TO DRAIN LATERAL ’V’ DITCH ( Not to Scale) D 2: 1 2:1 b 1"/Ft. b=2 Ft. M in. D=1 Ft. DETAIL A Ground Natural (SEE DITCH G RADE SHEET 5) EST. DDE: 50 CY FRO M -L- STA. 13+67 TO 16+08 LT EST. DDE: 240 CY FRO M -L- STA. 13+36 TO 16+00 RT EST. DDE: 40 CY FRO M -L- STA. 12+50 TO 13+06 RT EX. CO NC. FO O TING TO BE RETAIN ED. SLO PES CUT BACK AT 2:1 TO BE REM O VED AND EX. W O O DEN ABUTM EN TS LATERAL ’V’ DITCH ( Not to Scale) D 2: 1 2:1 b 1"/Ft. b=2 Ft. M in. D=1 Ft. DETAIL A Ground Natural (SEE DITCH GRADE SHEET 5) FRO M -L- STA. 13+67 TO 16+08 LT FRO M -L- STA. 13+36 TO 16+00 RT FRO M -L- STA. 12+50 TO 13+06 RT ( Not to Scale) RIP RAP AT EM BANKM ENT DETAIL C 10’m in. 1.0’m in. flow=10’ W idth parallel to stream -L- STA. 13+36 RT -L- STA. 13+67 LT Type of Liner=Class II Rip-Rap on Geotextile Fabric ( Not to Scale) RIP RAP AT EM BANKM ENT DETAIL D 10’m in. 1.0’m in. flow=5’ W idth parallel to stream -L- STA. 13+06 RT Type of Liner=Class II Rip-Rap on Geotextile Fabric 15" 15" 0407 0408 F F F F F F F C F C F F F F F F N A D 8 3 / 9 5 PRO P. EXC. (STR. ITEM ) PRO P. EXC. (STR. ITEM ) CLASS II RIP RAP Q TY. 10 TO N S 10 11 12 13 14 15 16 17 D O C U M EN T N O T C O N SID ER ED FIN A L U N LESS A LL SIG N A TU R ES C O M PLETED 5 / 2 8 / 9 9 SHEET N O .PRO JECT REFEREN CE NO . HYDRAULICSROADWAY DESIG N ENG INEER ENG IN EER 5B-4462 0 5 - A P R - 2 0 1 7 1 5 : 4 9 R : \ R o a d w a y \ P r o j \ B 4 4 6 2 _ R d y _ p f l . d g n $ $ $ $ U S E R N A M E $ $ $ $ D O C U M EN T N O T C O N SID ER ED FIN A L U N LESS A LL SIG N A TU R ES C O M PLETED 1,530 1,540 1,550 1,560 1,570 1,580 1,590 1,600 1,610 1,530 1,540 1,550 1,560 1,570 1,580 1,590 10 11 1,520 1,530 1,540 1,550 1,560 1,570 1,520 1,530 1,540 1,550 1,560 1,570 SEE SHEET 4 FOR -L- PLAN VIEW SEE SHEET 4 FOR -Y1- PLAN VIEW -L- STA. 13+61 (95’ RT.) -BL- STA. 9+57 (69’ RT.) 8" SPIKE IN BASE OF 16" WALNUT TREE BM #2 EL = 1,549.47’ -L- -Y1- V = 30 MPH -L- STA 17+23.76 EN D TIP PRO JECT EL. 1,551.92 -L- STA 17+10.00 EN D G RADE -L- STA 10+00.00 BEG IN TIP PRO JECT V = 30 MPH PI = 11+50.00 EL = 1,556.40’ ( - )4 . 9205% (-)2.0556% VC = 120’ K = 42 PI = 15+10.00 EL = 1,549.00’ (-)2.0556% (+)1.4600% VC = 140’ K = 40 EL. 1,563.33’ -L- STA 10+09.16 BEG IN G RADE -Y1- STA 11+99.75 EN D RESURFACIN G -Y1- STA 10+80.00 BEG IN RESURFACIN G LEFT DITCH RIGHT DITCH -L- STA 13+67 EL 1,545.46 BEG DITCH GRADE LT -L- STA. 15+75 EL 1546.71 PI DITCH GRADE LT -L- STA 16+00 EL 1,547.21 END DITCH GRADE RT (+) 0.60% (+) 3.60% -L- STA 16+42 EL 1,549.45 BEG DITCH GRADE LT -L- STA. 16+75 EL 1550.44 PI DITCH GRADE LT (+) 3.00%(+) 1.28% -L- STA 13+36 EL 1,546.42 BEG DITCH GRADE RT (+) 0.30% -L- STA 16+08 EL 1,547.90 END DITCH GRADE LT -L- STA 12+50 EL 1,549.60 BEG DITCH GRADE RT ( - ) 7 . 2 0 % -L- STA 13+06 EL 1,545.57 END DITCH GRADE RT DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA = 750 = 1548.5 = 3540 = 100 = 1552.46 = 1400 = 5 = 1550.0** B E G I N B R I D G E E N D B R I D G E - L - S T A . 1 2 + 9 6 . 7 0 - L - S T A 1 3 + 6 9 . 3 0 12 = 2* W.S. ELEVATION TAKEN AT RIVER STATION 31260 * NOTE: DESIGN MAINTAINS EXISTING LEVEL OF SERVICE (LEFT EDGE OF PAVEMENT) AT SAG @ -L- STA. 15+21.86 HIGH POINT ON DECK/ROADWAY, WHICH OCCURS ** OVERTOPPING ELEVATION REPRESENTS LOWEST -L- STA 17+00 EL 1,550.76 END DITCH GRADE LT