Loading...
HomeMy WebLinkAbout20170912 Ver 1_Design/Map/Site Plans_20170724VICINITY MAP - NOT TO SCALE REV REVISIONS BY DATE JEC APPROVED BY: CDJ PROJECT 2.0 EXISTING CONDITIONS 3.0 N0. 15-149-034 EROSION & SEDIMENT CONTROL PLAN 4.1 DETAILS - EROSION & SEDIMENT CONTROL PLAN 5.0 ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 CONCEPT DO NOT USE FOR CONSTRUCTION CITY OF WINSTON SALEM SPRING PARK SCOPE STABILIZATION, STREAM RESTORATION, DRAINAGE AND ROADWAY IMPROVEMENTS PREPARED BY: PREPARED FOR: JEWELL City of ENGINEERING CONSULTANTS PC WINSTON-SALEM PO BOX 2294 LIC # C1842 NORTH CAROLINA KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro CITY DRAWN BY: AWB N0. CHECKED BY: CDJ JEC APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 CONCEPT DO NOT USE FOR CONSTRUCTION CITY OF WINSTON SALEM SPRING PARK SCOPE STABILIZATION, STREAM RESTORATION, DRAINAGE AND ROADWAY IMPROVEMENTS PREPARED BY: PREPARED FOR: JEWELL City of ENGINEERING CONSULTANTS PC WINSTON-SALEM PO BOX 2294 LIC # C1842 NORTH CAROLINA KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro CITY PROJECT N0. 000024497 JEC 1.1 PROJECT 2.0 EXISTING CONDITIONS 3.0 N0. 15-149-034 EROSION & SEDIMENT CONTROL PLAN 4.1 DETAILS - EROSION & SEDIMENT CONTROL PLAN JUNE, 2017 PRELIMINARY DESIGN SET SHEETINDEX SHEET DESCRIPTION 1.0 COVER SHEET & VICINITY MAP 1.1 NOTES, ABBREVIATIONS, AND LEGEND 2.0 EXISTING CONDITIONS 3.0 TRAFFIC CONTROL PLAN - SIXTH STREET 4.0 EROSION & SEDIMENT CONTROL PLAN 4.1 DETAILS - EROSION & SEDIMENT CONTROL PLAN 5.0 DEMOLITION PLAN 6.0 STORMWATER DRAINAGE SYSTEM PLAN 6.1-6.2 PLAN & PROFILE - LINE A 6.3 PLAN & PROFILE - LINE E 6.4-6.6 DETAILS - STORMWATER DRAINAGE SYSTEM 7.1 ROADWAY PLAN - NOTES 7.2-7.3 ROADWAY PLAN - TYPICAL SECTIONS 7.4-7.6 ROADWAY PLAN - PLAN SHEETS 7.7-7.9 TRAFFIC CONTROL PLAN - WEST END BOULEVARD 7.10-7.12 PAVEMENT MARKING & SIGNING PLAN 7.13-7.23 ROADWAY PLAN - CROSS SECTIONS 8.0-8.1 STREAM RESTORATION PLAN 8.2 DETAILS - STREAM RESTORATION PLAN 9.0 PLANTING PLAN Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements PROJECT LOCATION & SHEET INDEX SHEET NO. wt STANDARD SITE ABBREVIATIONS GENERAL NOTES ABC AGGREGATE BASE COURSE MAX MAXIMUM AC ACRES MB MAIL BOX Legend ANSI AMERICAN NATIONAL STANDARDS INSTITUTE MED MEDIAN 1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE MOST RECENT VERSION OF THE CITY OF WINSTON-SALEM'S INFRASTRUCTURE AND ALBC APPROX ALUMINUM BOX CULVERT APPROXIMATE MH MIN MANHOLE MINIMUMIron DEVELOPMENT STANDARDS AND TECHNICAL SPECIFICATIONS (FEB. 2015), AND IN ACCORDANCE WITH APPROVED PLANS BY THE ENGINEER. WHERE Found 0i Limits of Disturbance LOD CONFLICTS ARISE, THE FINAL AUTHORITY SHALL BE THE CITY. ASPH ASPHALT MJ MECHANICAL JOINT ASTM AMERICAN SOCIETY FOR TESTING MATERIALS MON MONUMENT 2. ALL COORDINATES ARE BASED ON NAD 83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD 88. Storm Manhole 0 Temp Silt Fence El El AVC ASPHALT VALLEY CURB MTL METAL AWWA AMERICAN WATER WORKS ASSOCIATION MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES 3. CONSTRUCTION AND/OR DEMOLITION ACTIVITY, INCLUDING LOADING AND UNLOADING OF MATERIAL, IS PROHIBITED BEFORE 7 AM AND AFTER 7 PM Catch Basin ® Temp Con s tr Easement TCE MW MONITOR WELL MONDAY THROUGH FRIDAY. NO WORK IS PERMITTED ON WEEKENDS OR HOLIDAYS UNLESS PRIOR WRITTEN APPROVAL IS OBTAINED FROM THE CITY. B -B BACK OF CURB TO BACK OF CURB Slabto Basin p ® Tem Constr Fence p BL B/L BASELINE BASELINE N/A NAD 27 NOT APPLICABLE NORTH AMERICAN DATUM 1927 4. ALL CONTRACTORS SHALL BE PROPERLY LICENSED UNDER NC STATE LAWS GOVERNING THEIR TRADE. Storm Sewer Natural Constructed Riffles BLDG BM BUILDING BENCHMARK NAD 83 NBL NORTH AMERICAN DATUM 1983 NORTH BOUND LANE 5. CONTRACTOR SHALL VISIT THE SITE, BECOME FAMILIAR WITH ACTUAL CONDITIONS, AND SHALL VERIFY EXISTING CONDITIONS IN THE FIELD. BOC BACK OF CURB NC NORMAL CROWN Sanitary Manhole 0 Log Sill � BOL BOLLARD NC GRID NORTH CAROLINA GRID 6. CONTRACTOR HEREBY WARRANTS HIS WORK FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE CITY AGAINST ANY DEFECTS BVC BEGIN VERTICAL CURVE NCDENR NORTH CAROLINA DEPARTMENT DUE TO FAULTY MATERIALS OR WORKMANSHIP. Clean Out *CO Woody Debris Toe Sod Mat qIr BW BARB WIRE OF ENVIRONMENT AND NATURAL RESOURCES NCDEQ NORTH CAROLINA DEPARTMENT 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF PUBLIC SAFETY ON THE SITE DURING THE PERIOD OF CONSTRUCTION, INCLUDING WEEKENDS AND HOLIDAYS. Sanitary Sewer Double Step Drop Log Structure C&G CURB AND GUTTER OF ENVIRONMENTAL QUALITY CATV CABLE TELEVISION NCDOT NORTH CAROLINA DEPARTMENT Light Pole Root � CAP CORRUGATED ALUMINUM PIPE OF TRANSPORTATION 8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL OF THE CITY FACILITIES. wads CB CATCH BASIN NCGS NORTH CAROLINA GEODETIC SURVEY SHOULD DAMAGES OCCUR, THE CONTRACTOR SHALL AT HIS OWN EXPENSE REPAIR IMMEDIATELY TO THE SATISFACTION OF THE CITY AND THE CBL CABLE NEMA NATIONAL ELECTRICAL ENGINEER. Utility Pole Cover Log CFS CUBIC FEET PER SECOND MANUFACTURERS ASSOCIATION CHL CHAIN LINK NIP NEW IRON PIPE 9. CONTRACTOR SHALL HOLD HARMLESS THE CITY AND THE ENGINEER FOR DAMAGES, INJURIES, OR OTHER ACCIDENTS WHICH OCCUR DURING THESE Lamp Level Spreader CI CURB INLET N0. NUMBER CONSTRUCTION ACTIVITIES. CIP CAST IRON PIPE NTS NOT TO SCALE Power Meter o Log Drop Step Riffle CENTERLINE 10.CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY OF THE CONSTRUCTION SITE, INCLUDING BUT NOT LIMITED TO: HIS EQUIPMENT, C/L CENTERLINE 0/C ON CENTER COMPLETED WORK, STAGED MATERIALS, AND SITE ACCESS BY AUTHORIZED AND UNAUTHORIZED PERSONS. Aerial Utility Line Diversion Channel �/ v CM CONCRETE MONUMENT OD OUTSIDE DIAMETER CMP CORRUGATED METAL PIPE OH OVERHEAD 11.CONTRACTOR SHALL NOT LEAVE ANY EXCAVATION OPEN OR UNPROTECTED DURING NON -WORKING HOURS. THE CONTRACTOR SHALL UTILIZE Gas Meter CO CLEAN OUT OSHA OCCUPATIONAL SAFETY AND FENCES, SIGNS, BARRICADES, AND APPROPRIATE MEANS AS NECESSARY TO ENSURE THE SAFETY OF BOTH AUTHORIZED AND UN -AUTHORIZED o Rock Step Riffle COM CONC COMMUNICATION CONCRETE OVH HEALTH ADMINISTRATION OVERHANG PERSONS WHO ENTER THE SITE. Water Valve Log / Rock Riffle CONSTR CONSTRUCTION 12.CONTRACTOR SHALL ENSURE THAT ALL TREES AND EXISTING LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONTR CONTRACTOR P/A PARKING AREA CONSTRUCTION.�So Water Meter Log Jam COR CPP CORNER CORRUGATED PLASTIC PIPE PC PCBC POINT OF CURVATURE PRECAST CONCRETE BOX CULVERT 13.CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATION OF ALL ILLUSTRATED CONSTRUCTION ACTIVITIES AT THE PROJECT o CULV CULVERT PCC POINT OF COMPOUND CURVATURE Fire H y Bran t o LO b g J — Hook Combo w / Roo t wad SITE. Y CW CHILLED WATER PED PI PEDESTAL POINT OF INTERSECTION Spigot ��� Single Lo Vane Arm g g A 14.CONTRACTOR SHALL ENSURE THAT ALL WORK SHALL BE PERFORMED ACCORDING TO CURRENT OSHA SAFETY REGULATIONS. CONTRACTOR SHALL DCV DELTA DETECTOR CHECK VALVE PINC PIV POINT OF INTERSECTION NO CURVE POST INDICATOR VALVE PROVIDE SAFETY TRAINING CERTIFICATION DOCUMENTATION IF REQUESTED BY THE CITY. Water Line W Double Step Rock Cross—Vane DDCV DOUBLE DETECTOR CHECK VALVE IL PROPERTY LINE 15.CONTRACTOR SHALL COORDINATE WITH THE ENGINEER, THE CITY, AND ADJACENT PROPERTY OWNERS AS REQUIRED FOR WORK ON PRIVATE PD DI DROP INLET POC POINT ON CURVE PROPERTY. Telephone Pedestal Rock Cross—Vane �p DIA DIAMETER POS POINT ON SPIRAL 0 DIAMETER POT PP POINT ON TANGENTs POWER POLE 16.CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK AS SHOWN ON PLANS AND SHALL VERIFY ALL DIMENSIONS AND GRADES AT THE Cable Box V Q DIP DPC DUCTILE IRON PIPE DUKE POWER COMPANY PRC POINT OF REVERSE CURVATURE JOB SITE. IF DIFFERENCES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SO THAT MODIFICATIONS CAN BE MADE. Birdbath DRW DRIVEWAY PSI POUNDS PER SQUARE INCH � DW DOMESTIC WATER PT POINT OF TANGENCY 17.CONTRACTOR SHALL MAINTAIN A SET OF ANNOTATED DRAWINGS SHOWING ANY FIELD CHANGES TO THE PROJECT. THE CONTRACTOR IS NOT HVAC Unit PVC POLYVINYL CHLORIDE AUTHORIZED TO MAKE FIELD CHANGES WITHOUT THE APPROVAL OF THE ENGINEER. EBL EAST BOUND LANE PVI POINT OF VERTICAL INTERSECTION Mailbox EG EXISTING GRADE PVMT PAVEMENT 18.UTILITIES WERE LOCATED BASED ON FIELD MARKINGS PROVIDED BY 811 ONE -CALL. NO SUB -SURFACE LOCATIONS HAVE BEEN PERFORMED. ALL EIP EXISTING IRON PIPE PZ PIEZOMETER SUB -SURFACE UTILITY LOCATIONS ARE APPROXIMATE. Bore Bore ELEC ELECTRIC EL ELEVATION R RADIUS 19.CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFYING APPROPRIATE UTILITY ELEV ELEVATION R/W RIGHT OF WAY PROVIDER OF ANY CONFLICTS. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXERCISING REASONABLE EFFORTS TO PROTECT ANY Tra ffic Sign EM ELECTRIC METER RCP REINFORCED CONCRETE PIPE KNOWN AND UNKNOWN UNDERGROUND FEATURES. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING IMMEDIATELY IF UTILITY Bollard EOP EDGE OF PAVEMENT RETW RETAINING WALL INFORMATION IS DISCOVERED THAT WOULD NECESSITATE MODIFICATION TO THE ILLUSTRATED DESIGN. ESMT EASEMENT REV REVISED EVC END VERTICAL CURVE RJ RESTRAINED JOINT 20. WITHIN THE WORK AREA, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION AND ELEVATION ADJUSTMENTS OF ANY EXISTING VAULTS Barrier - — — — — - EX EXISTING RPZ REDUCED PRESSURE ZONE (REGARDLESS OF FUNCTION), METER BOXES, FIRE HYDRANTS, CLEAN OUTS, MANHOLES, ETC. TO MATCH FINISHED GRADES AND SITE PLAN. ALL SUCH EXT EXTENSION RT RIGHT WORK SHALL BE COORDINATED WITH THE ENGINEER PRIOR TO PERFORMING ADJUSTMENTS. Wall RWM RIGHT OF WAY MONUMENT FES FLARED END SECTION 21. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF THE PROJECT FROM EFFECTS OF FLOOD AND STORM EVENTS, INCLUDING BUT NOT Boundary Line FFE FINISHED FLOOR ELEVATION LIMITED TO WORK IN PROGRESS, COMPLETED WORK, EQUIPMENT, MATERIALS, UTILITIES, WITHIN THE PROJECT AREA OR AFFECTED BY THE PROJECT FG FINISHED GRADE SAN SANITARY OR DAMAGED AS A RESULT OF THE PROJECT. Un surveyed Line FH FIRE HYDRANT SB SOIL BORING FL FLOOD LIGHT SBL SD SOUTH BOUND LANE STORM DRAIN 22. TRAFFIC CONTROL DEVICES, SIGNS, LANE CLOSURES, SIDEWALKS, ETC. SHALL BE INSTALLED IN ACCORDANCE WITH CITY AND NCDOT STANDARDS. Ditch D FNC FENCE FOC FACE OF CURB SHT SIA SHEET SIAMESE CONNECTION 23. THE CONTRACTOR SHALL BE REQUIRED TO FURNISH, INSTALL, RELOCATE, AND MAINTAIN ALL TRAFFIC CONTROL MEASURES (SIGNS, BARRICADES, Fence X FPS FT FEET PER SECOND FOOT (OR) FEET SI G SIGNAL ETC.) FOR WORK SITES AS REQUIRED. THE LOCATION AND POSITIONING OF THESE TRAFFIC CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE Handrail HR ' FOOT (OR) FEET SETBACK LINE PLANS AND APPROVED IN FIELD BY THE ENGINEER BEFORE CONSTRUCTION BEGINS. Creek GALV GALVANIZED SP SPECS SIGNAL POLE SPECIFICATIONS 24. TWO BORING LOCATIONS WERE SELECTED PRIOR TO DESIGN AND THEY ARE SHOWN ON THE EXISTING CONDITIONS SURVEY ON SHEET 2.0. NOTE GB GRILL BASIN SS SANITARY SEWER THAT THE BORINGS ARE NOT BEHIND THE EXISTING RETAINING WALLS AND THERE IS NO SUBSURFACE INFORMATION IN THE VICINITY OF THE WALLS Contour Line — 31 GC GENERAL CONTRACTOR STA STATION WHERE PROPOSED GUARD RAILS ARE TO BE INSTALLED. THE GEOTECHNICAL SERVICES REPORT IS PROVIDED IN THE TECHNICAL SPECIFICATIONS. GL GAS LINE STD STANDARD Hedgerow GM GAS METER STM STORM GPM GALLONS PER MINUTE SW SIDEWALK Shrub GR GRADE GRV GRAVEL T TANGENT Woods Line GV GATE VALVE T/ TOP GSV GAS VALVE TBM TEMPORARY BENCHMARK Crepe Myrtle GW GUY WIRE TCP TEL TERRA COTTA PIPE TELEPHONE Deciduous Tree H HORIZONTAL TEMP TEMPORARY HC HANDICAP TOC TOP OF CURB Coniferous Tree HCP HANDICAP PARKING TOE TOE OF SLOPE HCR HANDICAP RAMP TOP TOP OF SLOPE HDPP HIGH DENSITY POLYPROPYLENE TOW TOP OF WALL Plan t HDW HEADWALL TP TELEPHONE POLE HP HIGH POINT TRANS TRANSFORMER Rose Bush HT HEIGHT TYP TYPICAL LandscapingIIIiIi -111-111-111-111-11f= r, ID INSIDE DIAMETER U/C UNDER CONSTRUCTION lllll,,L-Ir',TIr ll IN INCH OR INCHES U/G UNDERGROUND IN/HR INCH (OR) INCHES INCHES PER HOUR UP UTILITY POLE , CONTACT PHONE NUMBERS: INV ISL INVERT ISLAND V VERTICAL CITY/COUNTY UTILITIES 336-727-8000 ITL INDEPENDENT TESTING LABORATORY VC VERTICAL CURVE WINSTON-SALEM STORMWATER 336-727-8000 VCP VITREOUS CLAY PIPE PIEDMONT NATURAL GAS 800-752-7504 JB JUNCTION BOX N// WITH Know what's below. L LENGTH WBL WEST BOUND LANE all before you dig. LF LINEAR FEET WL WATER LINE DEFINITION OF TERMS: WM WATER METER T LIGHT WV WATER VALVE CITY - THE CITY OF WINSTON-SALEM, NC BEFORE YOU DIG! LP LS LIGHT POLE LANDSCAPED WW WOVEN WIRE CCUC - CITY/COUNTY UTILITY COMMISSION CONTACT ONE -CALL CENTER LT LEFT 1-800-632-4949 OR 811 LOC LOCATION PREPARED BY: PREPARED FOR: REV DATE DRAWN BY: AWB CONCEPT City of JEWELL Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements SHEET NO. REVISIONS BY ISSUE DATE: June 23, 2017 # - WINSTON-SALEM CITY PROJECT NUMBER: CHECKED BY: CDJ 000024497 DO NOT USEPO ENGINEERING CONSULTANTS, PC NORTH CAROLINA NOTES,ABBREVIATIONS 8� LEGEND JEC PROJECT NUMBER: BOX 2294 LIC # C1842 APPROVED BY: CDJ 15-149-034 FOR CONSTRUCTION KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro c° / © c, r o 5 a SS ss / ?6 S �, 5 5 w Gonc. 5/ S r� Ssyo So OO Sanitary Manhole OCotch Basin Rim 903.58 Gutter 827.57 Shelf 896.43 Inv. in 803.47 q Inv. 895.93 Inv. Out 801.07 © Sanitary Manhole OO Slobtop Basin Rim 901.13 Throat 828.98 Shelf 892.48 Inv. Out 825.68 q Inv. 892.28 OQ Slab top Basin © Sanitary Manhole Throat 832.97 Rim 899.67 Inv. Out 827.67 Shelf 883.87 Inv. In 887.52(both) ©Slobtop Basin Aerial Utility Line Throat 832.34 q Inv. 883.62 Inv. In 826.54 OO Sanitary Manhole Inv. Out 826.44 Rim 875.92 Shelf 871.12 OO Slobtop Basin Inv. In 4"Service(East) Throat 870.87 Inv. In 871.12(South) Inv. In 869.67 Inv. In 870.65(South) Inv. Out 867.67 q Inv, 870.62 OO Slobtop Basin Birdbath Throat 876.42 HVAC Unit Shelf 872.87 OO Sanitary Manhole Inv. Out 869.47 Rim 858.24 Oo Storm Manhole Shelf 853.74 Rim 899.94 Inv. In 853.64 Inv, In 894.74(15") q Inv 852.99 Inv. In 881.24(30") OO Sanitary Manhole inv. Out 880.44 Rim 845.45 ©Storm Manhole Shelf 841.15 Rim 899.49 q Inv. 840.60 inv. In 893.84(15") ©Sanitary Manhole Inv. in 888.09(24") Rim 830.96 Inv. In 882,24(24" Shelf 828.46 Inv. Out 882.19 q inv. 827.86 - - OO Sanitary Manhole Rim 824.31 Shelf 821.01 q Inv, 820.51 ti } zT 00 d ° S $nI n .-fi"""r f, �..- .. ' , co, •,�" . ,,•, "",._ _- `^� Ca,c. -1 sign" SY••. "" ..,7°° rn` ��``°`ti `"'v'."".. \ ''.�' `~.^•'' w„ "�. . `°„ A°p`� M, p4 n iX . '*�°�" ewy --•., ,,�� � \_ �,or° pr pe ,o o� o �`' ` r�+ `\/�. ,~ ',, O,F ,� `-•, ,\ ..,,,` -� `'"+,. ..",,. � .' "`.,� � � 6°0 -, � cel 6p ,. ..° ",\ ,�=--.....,,_, � ."� . --., �.\ 4p� •.r..,,.,4--,... �.. ` ""^ "...,,'^^..,�L�rfir.. �4' % a •F "\ '�.. Gen �> - _„_ ,�'`, �� ^ , `' „ ...,, ,_,,,. -., a ,�,. ,.,M .,. `�,. "„ , Location Map "` �`~�•'•.. , .- e � � � � �Not to scale o - - SS i ~ � ` -°ar� - . y°4o -�' � '/ `,���, \�,\ �5��' `' e, „ y '�s` ,.. 1� ..,,n..�' -"., _•.. ,�'� '^,., ,�.., "' �0 04 ---�" X _ ss -4,,, S - j - K °,ems S ra GOnc ��k 24'VC \ S G) O� �,, \ a... ..L' - \ 24"Conc ©� '� `,, 113 .-- `' �``�,,, - - ° e ° ?•'�,_. \� �`",,. `. :,. �-- �'� .(j `^w _._ .a• .G"'rA�f � t�%r g o eee opo0y9e.. ----` ,%. S - - J, p, `-.. � O. `r., �, `"o \ ^�"" "'° �'«, A,o X64 oO Chi y '-i-,.k ` f \ "h a \. O. �. \.-"'.'R. o`W.-/^.+o•`� J.. Ooh 4 --- y aY \ / X X X \ �` 87q, 00/ Ga t.. %1 Basin n _...,_'•--�.. . ,. -,.. v r, -,'v 6e��j'"•`' w;, �"/ ��yr ',-." „a•.:'�; '"� "'ao y r' k ,:,�". =� _. i' s�� O• Gd '2 °°0Gutter 899.18 ec c°o inV. Out 893.78 ° 4 OS Storm Manhole 30° Rim 903.06 \ o° �1..-„ ,,,~ '`+•/ Oe j 9 r•'. B' °6j F ,'.,A,'. -',,s G' ",� Porch inv. in 898.86(15") 3 \ \ \`` °®\ tip%„� ``• \ i e se i ' ee e r ✓" ,. �+. °\..�_ �^v.leech,' Inv. In 890.26(24") °p% ' ss . �` \ - c " � ` ` t o� ."; 1 t t ' inv. Out 889.66 eLn4 o \ `\`. " \ w __. `• + C° i I A` i it OSlobtop Inlet ° s ,. ��- ° 4- ° c G • �"+.. ,. �� . ' ,,tO "...i•..., "`"•`'. C4 '� °I GLi 6 pia f 3?° Thraot 903.02 n P ��' � � __...�.-$ -�.. ~` � \°� ,.� � �: p« Inv, Out 902,17 \. \ R CLCZ "s " o _� \' \Q I O Gatch Basin•,,'\.spa. 1 �p Gutter 856.75 R 1 r ' o Inv. in 51.45 N `(( g Inv. Out 841.5Q _......,°•110. .36 OO Storm Manhole Rim 886.81 2OQ� __ 4��\'`"QCs- _ _.� --`�� inv. In 879.71 ,�°�? ti� °� \' .� -_.` �• __ - ��� Ft 0a toq�t, j 3 inv. Out 874.3177 \ JZ Slobtop Basin*hGh �N l Sooq"o �6Ap''�0� a* a ,~ O, Throat 98.87 a . ' ` ~ _ 2400 eeec \ �s C'i o,� _ ° Inv. Out 895-32�Oa ® C / °'"/o. `�6'' '"' '' /; 1. U •�/� �o %6+ r,.0 L°Qk, X 5„r` ,.-,wtiwt _._ .. ,• e. "^,..,� 3pA _.._... eee I - " -� , Air . �, \ °„ ,,\ ....., Fv+'e• .,9 6 O� 59 p Cr //✓ OStorm Manhole a'•....,,_.. dc;. r" °,cio °h ._\ \\ °' _ �'y J'.. G a Ci ff pP ° 82S O C" ? Rim 901.66 ,°9M1\`9%¢®9� 8c�6c9PLr%i Inv. In 887.16(12") a ., o-� 08) 3 O inv. In 885.11(24") po �° �" �p sr O ,yam R � � i n v. In 898.91(10") men eeo ro ao o sEa _ 1 �� ti \ ee�� '1ia SS G \` \ aro ^-'v"✓ \ r N\ .O G Inv. Out 884.99 � � , '� .-- `� F �u . ��z; , � �;,.� :,� T� ° \ •3 0 �, 9 \ \,,\ �ro� ao s®? a,,,c� \\,r,, , G 3. / /�', p� V' fr" 0, O Storm Manhole .. `� Rim 912.53 .. \ \ y °., . ` \ n MOIV iron Found p Storm Manhole By: Catch Basin 4-28-16 Slobtop Basin cz� Storm Sewer Sanitary Manhole Q Clean Out *C0 Sanitary Sewer - SS -. Light Pole 0 Utility Pole Lamp Power Meter o Aerial Utility Line - Au - Gas Meter ?� Water Valve WV Water Meter Fire Hydron t Spigot .0. Water Line -W - Telephone Pedestal Cable Box Birdbath o HVAC Unit ED Mailbox 16 Bore Bore Traffic Sign -� Bollard eDl Barrier ------- Wall Boundary Line Unsurveyed Line Ditch _D - Fence - X - Handrail _HR - Creek - Contour Line - - Hedgerow Shrub, Woods Line Crepe Myrtle Deciduous Tree (as noted) Coniferous Tree (as noted) Pian t Rose Bush ° Landscaping Inv. Out 895.93 w°°o �� * i v r' °no �. \ \ rp. U , \ .O l` V' odb � J *� rr a+t�\P�yN9� 7n P 6�. B / Co 2G.�, / .004 .Q/°f 61 x O� "s� ° _ J 6 I . r pr °) _ a n° a b J No m. V, _ v p �0 u� �O F �" 1� ? o b l / O 0,, i !` /y ar Ct,�\ of°r °� b" S " 'fell; ��S �O Cp�v r: s� ' .O p Pr \ Q� ' loo �a O/ .i 0 F� O i4` t3^ 8 P N C� 5 Pf O� Cif ry ' Ch r]` �` % See °9 ? �• o/® �0 70 h , C'95 1 t5� S r r ° °OO ° ° �< ° j �pf f a� 2j rP? fjej ? S r r c Q � . `r" � .3/, C� ° c° y,:� ° cs G° aa� 1� • AP C+h 9 'Jro'Ore • F. kQ -.. o > X ._-.:X, / S• j, ` �F� k yPV�a. . �1- �(��� O p'c0� (5'82S Forsyth County, North Carolina �- , /t g c° ° ��oX �g \ s y o V /1,C `'• o w. Notes: (� � __,.... mss. c° ei• ° � e 2d, 1 V ®Leas. c XFU o / !j ¢ :3�.°'ae �c �. ri� moo'` F 3 � c3S 1. � � AB �. -Q> P,9Ey fp� (Q. 10 r ,� O $ 2004 r ep QO�V•`' "'•,..... ai% , qhO„ °o� l ��VG X06 :,:,K,",• ^,, s�,�6' 1) Brady Surveying Company, P.A., located all surface utilities (vertical 1, Jerry W. Ellis, certify that this map was drown under my supervision„ from an actual traditional and a GPS surve made under m and horizontal) which were accessible to a survey crew. Underground w y y supervision (deed description recorded in Deed Book 2428, Page 2825 and other reference sources as shown); that the boundaries not surveyed are indicated as dashed lines and drawn from information shown; that the ratio of precision or positional accuracy for the traditional survey as calculated by latitudes and departures is 1/20,000+; the following information was used to perform the GPS survey. (1) Class of survey: A (2) Positional accuracy. 0.10' (3) Type of GPS field procedure: RTK (4) Date of survey. 2-8-16 (5) Datum: NAD83(2011) (6) NCGS VRS/RTN (7) Geoid model: 2012a (8) Combined grid foctor(s): 0.9999364 (9) Units: US Survey Feet; that the area was calculated by coordinates; that this ground survey was performed at the 95% confidence level (2 sigma) to meet Federal Geographic Data Committee Standards; that this survey was performed to meet the requirements for a topographic/plonimetric survey to the accuracy of Class AA and vertical accuracy when applicable to the Class A standard,, and that the original data was obtained on various days in January and February, 2016; that the survey was compfeted on February 8, 2016; and all coordinates are based on the NCGS URS/RTN NAD83 and realization (2011) and al/ elevations are based on NAVD88 (Geoidl2a); and that this map meets the requirements of The Standards of Practice for Land Surveying in North Carolina (21 NCAC 56.1600) and does not meet the requirements of NCGS 47-30 as amended. Witness my hand and seal this 17th day of March, 2016. 01111luttt� �ry % . CnA RO,�r''r afessi�_R I Land Surveyor L-4558 _ : a SEAL L 451 ' C/) ubuties not discernible by surface appurtenances shown per Information obtained from public/privote records, utility entities or others and should be considered approximate only. Some underground utilities may not be shown. Brady Surveying Company, P.A., does not guarantee that all utilities are shown on this map, nor do we guarantee that all underground utilities are shown accurately. 2) Field survey was completed by 2-8-16. This drawing shows topo- graphic conditions of the site at the time of the survey. 3) This property is subject to any easements, agreements, or rights-of- way of record prior to the dote of this map which were not apparent at the time of my inspection and might otherwise be disclosed by an attorney's title opinion which as of date shown hereon has not been supplied to Brody Surveying Company, P.A. There may be easements or other matters of record affecting this property not shown hereon. 4) Geodetic Datum via the NCGS VRS/RTN, 5) All distances shown are measured horizontal ground distances unless specifically noted otherwise. Revisions No, Date Description By: 1 4-28-16 updated topo of washout Changed border size JWE u Conc. 1/700 12cr ,' $ n0 0n4 11 1.. O �< :>Bs°Usk .aati',.. nk w -mo4n ol-^a8_.._.. _ - l ,.. i 'I>•� Wae c' ,g - >t; -` SS �,`»,.`� ,S' h- 'a'�` " j ,ooch S,coar.. epi°c4"`.. �• \, `'.t^\ '��ce° , f _ S ?Ow ... P-- ...-.- .... .w .,. .f j /� ,..: ny 4,yr, C+ ..t ,�,�'"�:,. «�"` he %° e '•• "ee \ �""+., Q S A. X5.0 rf.J ,.� a, •....:ah -n Wr / ,,.y °- a .x� f t © C•i Q� ` �O - ya s0n4 14-5 51 5 { f oS61 'Ch r 7696 pp, �Rad 90 ZOS3O'' o�fopographic & Partial Boundary Survey � , \S'NS o.%30 26 0htKakf 0 O % ,0 �6�Spring Park O , a"\ es�a�003 +`�00- City o Winston-Salem "&a* �y Winston Township Forsyth County, North Carolina March 17, 2016 GRAPHIC SCALE ( IN FEET ) 1 inch = 40 ft Wuad y g • rveyin omp any, P.A. C--583 2990 Bethesda Place, Suite 601-B Winston-Salem, North Carolina 27103 (336) 760-2716 06 b°0� >y��° oe?0� tK o Oe0 o�0'0* � �s'S cP �`SO .ray °r o �o?�'r5 0 96 un i '�e�0o end v ry °ted °f 0^, cF� ! cy, ' K r�0 �2t % Off' Drawing 15164.dwg N Z rn �aL INSTALL INLET PROTECTION SEE DETAIL 1 / 4.0 1 T s �U g 7Z Og 0 ACPO �� 2 SEDIMENT TRAP ' �iSt �8j S Gb 498 s - SEE DETAIL 3 / 4.1 OTECT T S AS POSS)ILE /C? INSTALL INLET PROTECTION 0� - a/ SEE DETAIL 1 4.0 -Ogg /g8�, \ cx 4 _ SS` SSSS SE cz, �S o qtl 0 0 ti o G �u �luage vv Jam\ o Os i s '0 V SS oe Pude (0Cb a /A o � 0 PUMP A R (65ud D STATION OPTION SEE DETAIL 5 / 4.1 P(su 99' 98 o a �SSQ• Oc \ \ \ \ \ \ CP C51 8 6g\ \ a \ CP \ 6 0 TEMPORARY _� ��` �Cb. � �� CP SILT FENCE SEE DETAIL 2 / 4.0 � I M/Sauoj Cb q I I I {5 l I a cb 00 �/I I S i'e � � �4LIMITS OF / /oti�o�� S 9898 DISTURBANCE J / S _zL8 oz8- 2.8 ACRES q = g o S 9zS-g- ��/ g� 8L8 5 / �f0 qZ //'✓ice � / _n uo„ EROSION CONTROL NOTES: 1. THE CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AND DEVICES ACCORDING TO THE STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY AND APPLICABLE STATE AND LOCAL LAWS AND ORDINANCES, AND PREVENT STANDING WATER WITHIN PROJECT LIMITS. 2. PERMITS HAVE BEEN/WILL BE OBTAINED FROM NCDEQ AND THE US ARMY CORPS OF ENGINEERS FOR THIS PROJECT. CONTRACTOR SHALL COMPLY WITH ALL PERMIT CONDITIONS. 3. CONTRACTOR SHALL INSTALL ALL TEMPORARY EROSION CONTROL DEVICES WITHIN THE PROJECT AREA AS INDICATED ON THE PLANS PRIOR TO COMMENCING EARTHWORK. IF ADDITIONAL STAGING/STOCKPILE AREA IS REQUIRED, THE AREA MUST BE APPROVED BY THE CITY AND SILT FENCE MUST BE INSTALLED BEFORE USE. CONTRACTOR SHALL ENSURE THAT DRAINAGE IS DIRECTED INTO TEMPORARY SEDIMENT DEVICES THROUGHOUT THE CONSTRUCTION PERIOD. 4. AS EACH PORTION OF CONSTRUCTION IS COMPLETE INSTALL PERMANENT STABILIZATION. AT END OF PROJECT WHEN AUTHORIZED BY THE ENGINEER, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES, INSTALL PERMANENT STABILIZATION, AND RESTORE THE SITE AS SHOWN ON PLANS, OR AS CLOSELY AS POSSIBLE TO ORIGINAL CONDITIONS. 5. CONTRACTOR SHALL PROVIDE SOIL STABILIZATION FOR ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 6. DEMOLITION SHALL INCLUDE THE REMOVAL FROM THE SITE OF TREES WHERE NOTED, STUMPS, BRUSH, VEGETATION, TRASH, DEBRIS, WASTE STONE, WASTE PIPING/STRUCTURES, AND ANY OTHER UNSUITABLE MATERIAL FROM WITHIN THE PROJECT AREA BOUNDARY AND CLEARING LIMITS, UNLESS INDICATED OTHERWISE ON THESE PLANS OR DIRECTED BY THE ENGINEER. 7. TREES WITHIN CONSTRUCTION LIMITS THAT DO NOT CONFLICT WITH CONSTRUCTION SHALL REMAIN AND BE PROTECTED FROM DAMAGE, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCOMMODATION AND MAINTENANCE OF BASE AND STORM FLOWS IN ALL AREAS OF THE PROJECT SITE THROUGHOUT THE CONSTRUCTION PERIOD. 9. CONTRACTOR SHALL INSPECT SITE AFTER EACH RUNOFF PRODUCING RAINFALL AND REPAIR VISIBLE EROSION. REPAIR AND REPLACE EROSION CONTROL DEVICES AS NECESSARY. 10.DEMOLITION SHALL INCLUDE THE COLLECTION AND REMOVAL OF ALL DEBRIS GENERATED FROM CONSTRUCTION AND DEMOLICTION ACTIVITIES. 11.CONTRACTOR SHALL TAKE APPROPRIATE MEASURES TO PREVENT SEDIMENT FROM LEAVING SITE. STREETS AND PAVED PARKING AREAS SHALL BE SWEPT REGULARLY TO KEEP THE TRACKED SEDIMENT FROM ENTERING THE STORM DRAINS AND STREAM. 12.ALL PIPE SYSTEM AND STREAM WORK PERFORMED IS TO BE DONE IN THE DRY. THE CONTRACTOR SHALL TAKE APPROPRIATE ACTION TO ENSURE THAT SUCH REQUIREMENTS ARE SATISFIED. 13.DE-WATERING OF STRUCTURES WITH SEDIMENT -LADEN WATER DIRECTLY TO STREAMS OR STORM DRAINAGE SYSTEM IS PROHIBITED. THE CONTRACTOR SHALL TAKE APPROPRIATE ACTION TO ENSURE THAT SUCH PROHIBITED ACTIVIES DO NOT OCCUR. 14.PERMANENT GROUND COVER IS REQUIRED ON ALL DISTURBED AREAS OF THE CONTRACT. MULCHING SHALL BE PROVIDED FOR ALL AREAS REQUIRING SEEDING. 15.WHEN VEGETATION IS ESTABLISHED, CONTRACTOR SHALL CALL FOR FINAL SITE INSPECTION BY THE CITY OF WINSTON SALEM. REV REVISIONS BY DATE APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 _ ..... PRqTECT TREES/ Sg �- SS AS�fOSSIBLE S' SV O O ^ Ztr azo - 8Z8 - i -°Zzp- yy i C r s PUMP AROUND STATION OPTION S � �STAGING/ " -- -,�g- _ \��g SEE DETAIL 5 / 4.1 STOCKPILE 992- / AREA TEMPORARY CONSTRUCTION 66092' y civ 4,0­1 `��' SEE DETAIL 4 / 4.1 CONSTRUCTION ENTRANCE SEE DETAIL 1 / 4.1 RUNOFF WATER WITH, SEDIMENT OVERFLOW SEDIMENT WIRE SCREEN 2" X 4" WOOD STUD �JCK FILTERED WATER CURB INLET BLOCK AND GRAVEL INLET PROTECTION INLET PROTECTION DETAILS NOT TO SCALE CONCEPT DO NOT USE FOR CONSTRUCTION SECURED/STAk PREPARED BY: JEWELL ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro INLET PROTECTION -SEDIMENT TUBE PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA 0 20' 40' 80' iiiiii SCALE: 1"= 40' S� oaay x0e ouo�„8tr C CONSTRUCTION ENTRANCE SEE DETAIL 1 / 4.1 EROSION & SEDIMENT CONTROL SEQUENCE FOR EACH PHASE: 1. INSTALL SILT FENCE AND TEMPORARY CONSTRUCTION FENCE AS SHOWN ON PLANS. 2. INSTALL INLET PROTECTION ON ALL EXISTING INLETS AS SHOWN ON PLANS. 3. INSTALL SEDIMENT TRAP BEHIND PROPOSED HEADWALL AS SHOWN ON PLANS. 4. PERIODICALLY INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES. MAINTAIN, REPAIR, AND REPLACE AS NECESSSARY. PERIODIC INSPECTION SHALL BE DEFINED AS AFTER EACH RAINFALL EVENT (0.5 INCHES PER 24 HOURS) OR WEEKLY, WHICHEVER IS MOST FREQUENT. 5. PERFORM STREAMBANK STABILIZATION, UTILITIES CONSTRUCTION, ROADWAY IMPROVEMENTS, AND ABANDON EXISTING PIPES AND STRUCTURES AS REQUIRED. 6. INSTALL INLET PROTECTION ON ALL NEW INLETS AS WORK IS COMPLETED. 7. STREAMBANK GRADING AREAS AND VEGETATION GEOLIFT INSTALLATION SHALL BE STABILIZED WITH COIR FIBER MATTING AT THE END OF EACH WORK DAY. 8. GRADE DISTURBED AREAS TO FINISHED GRADE. 9. STABILIZE ALL DISTURBED AREAS AS REQUIRED. 10. REMOVE ALL TEMPORARY EROSION CONTROL DIVIDES WHEN AREA IS PERMANENTLY STABILIZED AND CONSTRUCTION IS COMPLETE. SUGGESTED CONSTRUCTION SEQUENCE: 1. INSTALL EROSION & SEDIMENT CONTROL MEASURES AS SHOWN ON PLANS. 2. PERFORM UTILITIES CONSTRUCTION FROM SIXTH STREET TO MANHOLE A8 AND ALONG WEST END BOULEVARD. 3. INSTALL PUMP AROUND OPERATION PRIOR TO STREAM RESTORATION CONSTRUCTION. 4. PERFORM STREAM RESTORATION. 5. COMPLETE UTILITIES CONSTRUCTION FROM MANHOLE A8 TO HEADWALL, USING SEDIMENT TRAP STONE FOR EROSION PROTECTION ALONG THE BANKS AT THE HEADWALL. 6. PERFORM ROADWAY CONSTRUCTION. 7. STABILIZE ALL DISTURBED AREAS AS REQUIRED. 8. REMOVE ALL TEMPORARY EROSION CONTROL DEVICES WHEN AREA IS PERMANENTLY STABILIZED AND CONSTRUCTION IS COMPLETE. 8' MAX STEEL POST--�,j STEEL POST WOVEN FILTER WOVEN FILTER FABRIC FABRIC z W U O J co n� N FLOW o I� I I 1=1 11=1 I I I I 1=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 I I 11=1 11=1 11= �``� !� N -III-III-III-III III -III -III -III -III -III -III -III -III -III -III -III -III -III -III -I III -III -II �_ -I I -I I -I I III -III -III -III -III -III -III -III -III -III -III -III -III -III -III I -I I -I I- S II = EWA II1� 11=1 11 1 I I 111=111= SI -III -III -I � II � �I � I Illi 1 � 1=1 � 1=1 � 1=1 � 1=1 � 1=1 � 1=1 � 1-� -III=1�1_�I�ITII�IIill�1- -11,; 1�1-_�I�IIIII�IIII1111111�1 i�l�1=1�1=1�1-�1 ANCHOR SKIRT 8" MINIMUM TEMPORARY SILT FENCE NOTES: 1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC TO BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 4. TURN SILT FENCE UP SLOPE AT ENDS. 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. 8. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FENCE. 9. ATTACH THE FABRIC TO EACH POST WITH THREE TIES WITH THE TOP TIE WITHIN 8" OF THE TOP OF THE FABRIC. 10. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 11. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. TEMPORARY SILT FENCE MAINTENANCE NOTES: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF THE SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 2 TEMPORARY SILT FENCE 4.0 NOT TO SCALE Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements EROSION & SEDIMENT CONTROL PLAN SHEET NO. DRAWN BY: AWB CHECKED BY: CDJ APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 _ ..... PRqTECT TREES/ Sg �- SS AS�fOSSIBLE S' SV O O ^ Ztr azo - 8Z8 - i -°Zzp- yy i C r s PUMP AROUND STATION OPTION S � �STAGING/ " -- -,�g- _ \��g SEE DETAIL 5 / 4.1 STOCKPILE 992- / AREA TEMPORARY CONSTRUCTION 66092' y civ 4,0­1 `��' SEE DETAIL 4 / 4.1 CONSTRUCTION ENTRANCE SEE DETAIL 1 / 4.1 RUNOFF WATER WITH, SEDIMENT OVERFLOW SEDIMENT WIRE SCREEN 2" X 4" WOOD STUD �JCK FILTERED WATER CURB INLET BLOCK AND GRAVEL INLET PROTECTION INLET PROTECTION DETAILS NOT TO SCALE CONCEPT DO NOT USE FOR CONSTRUCTION SECURED/STAk PREPARED BY: JEWELL ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro INLET PROTECTION -SEDIMENT TUBE PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA 0 20' 40' 80' iiiiii SCALE: 1"= 40' S� oaay x0e ouo�„8tr C CONSTRUCTION ENTRANCE SEE DETAIL 1 / 4.1 EROSION & SEDIMENT CONTROL SEQUENCE FOR EACH PHASE: 1. INSTALL SILT FENCE AND TEMPORARY CONSTRUCTION FENCE AS SHOWN ON PLANS. 2. INSTALL INLET PROTECTION ON ALL EXISTING INLETS AS SHOWN ON PLANS. 3. INSTALL SEDIMENT TRAP BEHIND PROPOSED HEADWALL AS SHOWN ON PLANS. 4. PERIODICALLY INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES. MAINTAIN, REPAIR, AND REPLACE AS NECESSSARY. PERIODIC INSPECTION SHALL BE DEFINED AS AFTER EACH RAINFALL EVENT (0.5 INCHES PER 24 HOURS) OR WEEKLY, WHICHEVER IS MOST FREQUENT. 5. PERFORM STREAMBANK STABILIZATION, UTILITIES CONSTRUCTION, ROADWAY IMPROVEMENTS, AND ABANDON EXISTING PIPES AND STRUCTURES AS REQUIRED. 6. INSTALL INLET PROTECTION ON ALL NEW INLETS AS WORK IS COMPLETED. 7. STREAMBANK GRADING AREAS AND VEGETATION GEOLIFT INSTALLATION SHALL BE STABILIZED WITH COIR FIBER MATTING AT THE END OF EACH WORK DAY. 8. GRADE DISTURBED AREAS TO FINISHED GRADE. 9. STABILIZE ALL DISTURBED AREAS AS REQUIRED. 10. REMOVE ALL TEMPORARY EROSION CONTROL DIVIDES WHEN AREA IS PERMANENTLY STABILIZED AND CONSTRUCTION IS COMPLETE. SUGGESTED CONSTRUCTION SEQUENCE: 1. INSTALL EROSION & SEDIMENT CONTROL MEASURES AS SHOWN ON PLANS. 2. PERFORM UTILITIES CONSTRUCTION FROM SIXTH STREET TO MANHOLE A8 AND ALONG WEST END BOULEVARD. 3. INSTALL PUMP AROUND OPERATION PRIOR TO STREAM RESTORATION CONSTRUCTION. 4. PERFORM STREAM RESTORATION. 5. COMPLETE UTILITIES CONSTRUCTION FROM MANHOLE A8 TO HEADWALL, USING SEDIMENT TRAP STONE FOR EROSION PROTECTION ALONG THE BANKS AT THE HEADWALL. 6. PERFORM ROADWAY CONSTRUCTION. 7. STABILIZE ALL DISTURBED AREAS AS REQUIRED. 8. REMOVE ALL TEMPORARY EROSION CONTROL DEVICES WHEN AREA IS PERMANENTLY STABILIZED AND CONSTRUCTION IS COMPLETE. 8' MAX STEEL POST--�,j STEEL POST WOVEN FILTER WOVEN FILTER FABRIC FABRIC z W U O J co n� N FLOW o I� I I 1=1 11=1 I I I I 1=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 I I 11=1 11=1 11= �``� !� N -III-III-III-III III -III -III -III -III -III -III -III -III -III -III -III -III -III -III -I III -III -II �_ -I I -I I -I I III -III -III -III -III -III -III -III -III -III -III -III -III -III -III I -I I -I I- S II = EWA II1� 11=1 11 1 I I 111=111= SI -III -III -I � II � �I � I Illi 1 � 1=1 � 1=1 � 1=1 � 1=1 � 1=1 � 1=1 � 1-� -III=1�1_�I�ITII�IIill�1- -11,; 1�1-_�I�IIIII�IIII1111111�1 i�l�1=1�1=1�1-�1 ANCHOR SKIRT 8" MINIMUM TEMPORARY SILT FENCE NOTES: 1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC TO BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 4. TURN SILT FENCE UP SLOPE AT ENDS. 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. 8. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FENCE. 9. ATTACH THE FABRIC TO EACH POST WITH THREE TIES WITH THE TOP TIE WITHIN 8" OF THE TOP OF THE FABRIC. 10. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 11. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. TEMPORARY SILT FENCE MAINTENANCE NOTES: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF THE SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 2 TEMPORARY SILT FENCE 4.0 NOT TO SCALE Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements EROSION & SEDIMENT CONTROL PLAN SHEET NO. NOTES: 1. A STABILIZED ENTRANCE PAD OF 2"-3" COURSE AGGREGATE SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET OR EXISTING GRAVEL/PAVED SURFACE. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN SEE STD. NO. 30.11 B. 6. NCDOT MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 10.24 & 10.25) TO ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE. EXISTING GROUND IJill►11 .ZZ • ZZ .w _. . t t r CONSTRUCTION ENTRANCE NOT TO SCALE STAKE SP^^'"'^ " -1 CENTER PUBLIC STREET TYPE II FILTER FABRIC UNDER 2"-3" COURSE AGGREGATE F- W W H U J m IL TEMPORARY PROTECTION FENCE NOT TO SCALE REV REVISIONS BY DATE # 0.40 IN (1.02 CM) LEG WIDTH 0.60 IN (1.52 CM) (TAPERED TO POINT) LEG THICKNESS 0.40 IN 1.02 CM TOTAL LENGTH 12.00 IN (30.48 CM) DRAWN BY: AWB CHECKED BY: CDJ APPROVED BY: CDJ 3" HIGH DENSITY ORANGE DLYETHYLENE SAFETY FENCE TAKES: 66" T -POST DRIVEN 18" =LOW GRADE (IRE OR ZIP TIES TO SECURE AFETY FENCE TO POST NISHED GRADE ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 TRENCH TOP OF BANK TOE OF SLOPE EROSION CONTROL MATTING SHALL BE PLACED IN 12 INCH DEEP TRENCH, STAKED, BACKFILLED AND COMPACTED STOP OF STREAMBANK 2'TRENCHv STAKE WITH NAIL WOOD STAKE - [/TOE OF SLOPE EROSION CONTROL MATTING SHALL BE PLACED IN 12 INCH DEEP TRENCH, STAKED, BACKFILLED AND COMPACTED BOTTOM OF CHANNEL 2'TRENCH STAKE WITH NAIL CROSS-SECTION EROSION CONTROL MATTING TO BE EXTENDED TO TRENCH AT TOE OF SLOPE >Wi\\\111 MffAA IMPERVIOUS DIKE (SE PROJECT SPECIP PROVISION: EXISTING GROUND FILTER FABRIC FOR DRAINAGE TYPE 2 (NON -WOVEN) CONCEPT DO NOT USE FOR CONSTRUCTION rra�� TRENCH /-TOP OF BANK -WOOD STAKE THE WOOD STAKE SHALL BE THE NORTH AMERICAN GREEN ECO -STAKE OR APPROVED EQUAL WITH THE FOLLOWING DIMENSIONS: LEG LENGTH 11.00 IN (27.94 CM) HEAD WIDTH 1.25 IN (3.18 CM) HEAD THICKNESS 0.40 IN (1.02 CM) LEG WIDTH 0.60 IN (1.52 CM) (TAPERED TO POINT) LEG THICKNESS 0.40 IN 1.02 CM TOTAL LENGTH 12.00 IN (30.48 CM) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EROSION CONTROL MATTING TO BE EXTENDED TO TRENCH AT TOE OF SLOPE >Wi\\\111 MffAA IMPERVIOUS DIKE (SE PROJECT SPECIP PROVISION: EXISTING GROUND FILTER FABRIC FOR DRAINAGE TYPE 2 (NON -WOVEN) CONCEPT DO NOT USE FOR CONSTRUCTION rra�� TRENCH /-TOP OF BANK -WOOD STAKE THE WOOD STAKE SHALL BE THE NORTH AMERICAN GREEN ECO -STAKE OR APPROVED EQUAL WITH THE FOLLOWING DIMENSIONS: LEG LENGTH 11.00 IN (27.94 CM) HEAD WIDTH 1.25 IN (3.18 CM) HEAD THICKNESS 0.40 IN (1.02 CM) LEG WIDTH 0.60 IN (1.52 CM) (TAPERED TO POINT) LEG THICKNESS 0.40 IN 1.02 CM TOTAL LENGTH 12.00 IN (30.48 CM) TYPICAL TRENCH STAKE EROSION CONTROL MATTING NOTES 1. BANKS SHALL BE SEEDED (PERMANENT & TEMPORARY) PRIOR TO PLACEMENT OF MATTING. 2. WOODEN STAKES SHALL BE PLACED IN A DIAMOND SHAPE PATTERN PER THE PLAN VIEW. 3. TRENCH STAKES AND WOOD STAKES SHALL BE PLACED A MAXIMUM DISTANCE APART OF 3'. 4. EROSION CONTROL MATTING (ECM) SHOULD BE USED TO AID PERMANENT VEGETATED STABILIZATION OF SLOPES 2:1 OR AREAS SPECIFIED IN THE PLANS. 5. RCM SHOULD BE USED WHEN MULCH CANNOT BE ADEQUATELY TACKED AND WHERE IMMEDIATE GROUND COVER IS REQUIRED TO PREVENT EROSION DAMAGE. 6. 6" MINIMUM OVERLAP IN THE HORIZONTAL EROSION CONTROL MATTING MAINTENANCE NOTES 1. INSPECT ECM AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT. REPAIR IMMEDIATELY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE ECM. 3. ANY AREAS OF THE ECM THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5. MONITOR AND REPAIR THE ECM AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. EROSION CONTROL MATTING NOT TO SCALE SPECIAL STILLING BASIN G PUMP IMPERVIOUS DIKE SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND 1. INSTALL SPECIAL STILLING BASINS AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK SITE. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL FLOW INTO A SPECIAL STILLING BASIN. 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE STILLING BASINS AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. NOTES: 1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS OF CHANNEL. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. 4. PROVIDE STABILZED OUTLET TO STREAM BANK. Silt Bog �57 stone lass B ---�� --J�ilter Fabric 12" MIN. CLASS ASTON E -TOP OF STREAM BANK PROVIDE STABILIZED OUTLET TO STREAM BANK TYPICAL PUMP AROUND OPERATION NOT TO SCALE PREPARED BY: UEWELL ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro PREPARED FOR: SILT BAG DETAIL SILT BAG NOTES: Silt bags shall be used for all dewatering operations. Bags must be constructed of a 10oz non -woven geotextile and appropriately sized for the intended flowrate. Silt bags shall be placed on a pad of Class B erosion control stone built to elevation where specified. Rock pad shall be topped with at least 3 inches of #57 stone. SANDBAG/ST E BASEFLOW WORKING AREA FLOW IMPERVIOUS SHEET City of WINSTON-SALEM NORTH CAROLINA IMPERVIOUS DIKE DETAIL CONSTRUCTION AREA UPSTREAM OF PROPOSED HEADWALL FLOW # 5 WASHED STONE OEXISTING CHANNEL DOWNSTREAM O aCLASS B RIP RAP-/ PLAN VIEW 1'-6" MIN. # 5 WASHED STONE 2 CLASS B RIP RAPF1 -\ FLOW 2' MAX \\\ AT CENTER 4' TO 6' FILTER FABRIC TYPE 2 CROSS SECTION 3 TEMPORARY SEDIMENT TRAP 4.1 NOT TO SCALE FILTER FABRIC B RIPRAP NOTES: 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW. 2. HAVE ALL NECESSARY MATERIALS AND EQUIPMENT ON-SITE BEFORE WORK BEGINS. 3. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. 4. LINE STREAMBANK AND ACCESS RAMP AREA WITH NON -WOVEN FILTER FABRIC. 5. INSTALL STREAM CROSSING PERPENDICULAR TO THE FLOW. 6. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL. 7. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE MUD MAT. 8. THE WOOD MAT SHALL BE OF SUFFICIENT SIZE AND WIDTH TO SUPPORT THE LARGEST VEHICLE CROSSING THE CHANNEL. 9. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED, RECOMMENDED AT A 5:1 SLOPE. 10. SEE SPECIFICATION DOCUMENTS FOR ADDITIONAL INFORMATION PERTAINING TO TEMPORARY STREAM CROSSING. 61 TEMPORARY STREAM CROSSING 4-1 / NOT TO SCALE Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements EROSION & SEDIMENT CONTROL PLAN SHEET NO. 4.1 �_7 uo-/l do dL'I-10 U=8 / � 0 \ \ C i V EMO lC I S SAND 1 CONCRETE M 0 s� uo0 ' 0E ouo0<<0 / REMOVE TEMPORARY BARRICADE WALLS 000, 41, V / MO CONC L uoa g/�, " ZLg� — —0 g\- soft MSS uua0 fav, PIP NDC ASIN �/ n �- �6 O �� _ S C� 90 � �l - R TE RY � -. <� - � --- �I D RE 7.1 - ZEXIS R RO OAD ALT CUE SHE Y DES R C�; � it / V__ _ \ IMP SG 111111111W °o, =Nr °m / 1) op./sLI �0= P U. J �e 8 = o �_\ \ , � 'MO COIF ti\ woo / \ V PI ND REMOE 3 ONCRET 6g cp \ PE HOLESCD CP S - -- S L Sg g���� — _ g F'% EMOV C�ExISTING CMPPjPE /g�I g' \— \\ 9998_ — —_Z_ = 0 \ \� � \l� —/� / / — — — —Cb\ 00 8 y \ \ \ v --�� /� --- � / ♦ �_ � _ � y Av v �C)\ � \�� � 0 \\ Ogg rcul c" CP PZP— DOci ci C \�-6. V — A \ \ \ \� \ \ V A� �\ \ �� p \ A � �� ('V BEGIN REMOVAL OF EXISTING Qg D uuo O� D OS DO\\ �O\�= D �\\ �g�� DO 0) / /V WOOD GUARDRAIL Cp D \ 0 ° ° D OODO\ D� O °0 U D � 0 cul 03 DO `°o DO D � ° O UIJV D UO\ D UOO Do z D DO °o � Zc- V `59BEGIN REMOVAL OF EXISTIN GRANITE CU O O \ D D _ C�� \ C\ �J ° �% \� v�� \ \= \ CP o S—° g \ � \ � \ \ -,yam-� � � \ DO uoal<<g/� =9 A \ ��� ��'� \ 00 0 °0 V 0 c g _ _ / U o — � SURF \ YDES 0 / D RE L OF ING \ WOOD RDRA -- M/S .o u00 s`S 1'�D JGQ-) y / \ \ �S — A �ENb�O REM -OVAL OF EXISTING \ _ \ / --- — — �/ �ANITE CURB —off, �\ EMO IS I = \ ��� �\ BRIDGE 0�9 \\ �0 / // / ul 'A" \ REMOVE EXISTING �/ / \ — �— — // — -6U/ nig Z� 30" CMP AND END W�L�� _/ \\ — — — 00 0 6Z 8 8 9 y \\ / \ ;zzg_ �� / - z ��n0 �u_ ul °cul o 61 40 pt 09 --,.jn0 Aul a REMOVE EXI G BRIDGE ABUTMENTS Ogg— —� ° — \ / Z � \ REMOVE XISTINO _ a° \ \ �� gz° A ul IL, _\Owl REV REVISIONS BY DATE APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 CONCEPT DO NOT USE FOR CONSTRUCTION PREPARED BY: JEWELL, ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA DEMOLITION NOTES: 1. ALL WORK SHALL BE PERFORMED WITHIN EXISTING CITY EASEMENTS OR TEMPORARY EASEMENTS WITHIN THE PROJECT AREA AS SHOWN ON THE PLANS. 2. CONSTRUCTION AND/OR DEMOLITION ACTIVITY, INCLUDING LOADING AND UNLOADING OF MATERIAL, IS PROHIBITED BEFORE 7 AM AND AFTER 7 PM MONDAY THROUGH FRIDAY. NO WORK IS PERMITTED ON WEEKENDS OR HOLIDAYS WITHOUT PRIOR WRITTEN APPROVAL FROM THE CITY. 3. DEMOLITION SHALL INCLUDE THE REMOVAL FROM THE SITE OF TREES WHERE NOTED, STUMPS, BRUSH, VEGETATION, TRASH, DEBRIS, WASTE STONE, AND ANY OTHER UNSUITABLE MATERIAL FROM WITHIN THE PROJECT AREA BOUNDARY AND CLEARING LIMITS, UNLESS INDICATED OTHERWISE ON THESE PLANS OR DIRECTED BY THE ENGINEER. 4. TREES ALONG THE STREAM AND WITHIN PORTIONS OF THE CONSTRUCTION LIMITS OR LIMITS OF DISTURBANCE THAT DO NOT CONFLICT WITH CONSTRUCTION SHALL REMAIN AND BE PROTECTED FROM DAMAGE, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 5. EXISTING TOPSOIL SHALL BE STOCKPILED FOR LATER USE BY THE CONTRACTOR. 6. DEMOLITION SHALL INCLUDE THE COLLECTION AND REMOVAL OF ALL DEBRIS GENERATED FROM CONSTRUCTION AND DEMOLITION ACTIVITIES. 7. A PORTION OF THE TREES SCHEDULED TO BE REMOVED MAY BE USED ON SITE TO COMPLETE STREAM RESTORATION. SEE SHEETS 8.0-8.2 FOR LOCATIONS AND SPECIFICATIONS OF LOGS AND ROOT WADS. 0 10' 20' 40' 60' SCALE: 1"= 20' (HORZ) Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements DEMOLITION PLAN SHEET NO. 5.0 DRAWN BY: AWB CHECKED BY: CDJ APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 CONCEPT DO NOT USE FOR CONSTRUCTION PREPARED BY: JEWELL, ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA DEMOLITION NOTES: 1. ALL WORK SHALL BE PERFORMED WITHIN EXISTING CITY EASEMENTS OR TEMPORARY EASEMENTS WITHIN THE PROJECT AREA AS SHOWN ON THE PLANS. 2. CONSTRUCTION AND/OR DEMOLITION ACTIVITY, INCLUDING LOADING AND UNLOADING OF MATERIAL, IS PROHIBITED BEFORE 7 AM AND AFTER 7 PM MONDAY THROUGH FRIDAY. NO WORK IS PERMITTED ON WEEKENDS OR HOLIDAYS WITHOUT PRIOR WRITTEN APPROVAL FROM THE CITY. 3. DEMOLITION SHALL INCLUDE THE REMOVAL FROM THE SITE OF TREES WHERE NOTED, STUMPS, BRUSH, VEGETATION, TRASH, DEBRIS, WASTE STONE, AND ANY OTHER UNSUITABLE MATERIAL FROM WITHIN THE PROJECT AREA BOUNDARY AND CLEARING LIMITS, UNLESS INDICATED OTHERWISE ON THESE PLANS OR DIRECTED BY THE ENGINEER. 4. TREES ALONG THE STREAM AND WITHIN PORTIONS OF THE CONSTRUCTION LIMITS OR LIMITS OF DISTURBANCE THAT DO NOT CONFLICT WITH CONSTRUCTION SHALL REMAIN AND BE PROTECTED FROM DAMAGE, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 5. EXISTING TOPSOIL SHALL BE STOCKPILED FOR LATER USE BY THE CONTRACTOR. 6. DEMOLITION SHALL INCLUDE THE COLLECTION AND REMOVAL OF ALL DEBRIS GENERATED FROM CONSTRUCTION AND DEMOLITION ACTIVITIES. 7. A PORTION OF THE TREES SCHEDULED TO BE REMOVED MAY BE USED ON SITE TO COMPLETE STREAM RESTORATION. SEE SHEETS 8.0-8.2 FOR LOCATIONS AND SPECIFICATIONS OF LOGS AND ROOT WADS. 0 10' 20' 40' 60' SCALE: 1"= 20' (HORZ) Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements DEMOLITION PLAN SHEET NO. 5.0 '0 '/ do _dwia� Jueg L aoq,?a air T06 i /P n aoga�j„8/s oY I UU00 �UaB S c V O n UoJ/"9/Z *__11!1114� 1� 00 X -7 --- LINE AT� See Sheets 6.1 and 6.2 for Plan & Profile 0 30' 60' 90' a �°a SCALE: 1"= 30' 0 uog / qua ', ' / - �� - - 9 ° 8 o A , - W u�a„8i£ zLg - = '' 099�- _g _ - ../// /s �u � w0 r X ggg- i 6 E 1 S> 998 = anti a �\ 00 Q ti �n0 .4U/ 6 �Q �� j j S O� (� _ - - = 098- _ Z �� iU S S- �� S �� SS Al / - �� S s s �- o�e,% SS \ 6P t,�G Q _ S / no /_�_ ��- \ _ -- socj �S\- �_� j ���f SS00 / ONS �s �8 y�yA `� �g� �g�g ii - - - - y i� SS 0 S� 99 97 �- �Q 65, � �� �` _ /-- / A5 \}\\ - _ _\ �z5g�� \ �g �g _ ti�� �rn - S� fie# few- \\ �- �\ �� Plan &Prr�i1�� / \A \ \ \ V A �- \ \ \ \ \ A �� A 69 gl8 8 cp _ i g -� � u _ �� ul nu/ nu\ b0 6Z 8119 Q 01 ° ° 09 nZ�n U/-- "W lm \ �\ V A A V °o� \ �� �� ° \ �� •7�(7 ° c ° °L2��� ao�0����7�_ f�. \ A V \ � ° ° ° ° � /L C• � -or \ Cp / W \ • ° C -8�8- �� L1�� \ am a�� ° V-8��� C � C C \�� , AC E� a 1 � s a 00 00 0 I ° ° 66 099 l / �/ ° ° W �� Ino n Ul W -99g- � t'LB 9L 8- - / r� �� / %" Z �°P PLAN AND PROFILE NOTES: 1. ALL STATION INFORMATION ALONG WEST END BOULEVARD IS BASED ON ROADWAY ALIGNMENT. STATION INFORMATION FROM SIXTH STREET, ACROSS WEST END BOULEVARD, TO DISCHARGE LOCATION IS BASED ON CENTERLINE OF PIPE. 2. EXISTING AND PROPOSED FINISHED GRADES SHOWN IN PROFILE ARE CENTERLINE ELEVATIONS ALONG THE PIPE ALIGNMENT CENTERLINE. 3. STORM DRAIN PIPE LENGTHS ARE ALONG CENTERLINE OF PIPE AND FROM CENTER TO CENTER OF UP AND DOWNSTREAM STRUCTURES. 4. STATION OFFSETS ARE DISTANCES FROM ALIGNMENT TO CENTER OF STRUCTURE. 5. RIM ELEVATIONS FOR CURB INLETS AND DROP INLETS ARE APPROXIMATE AND SHOULD BE INSTALLED TO MATCH PROPOSED ROADWAY ELEVATION. 6. INSTALL INLET PROTECTION ON ALL EXISTING INLETS PRIOR TO ANY LAND DISTURBING WORK. 7. INSTALL INLET PROTECTION ON ALL NEW INLETS IMMEDIATELY FOLLOWING CONSTRUCTION OF EACH INLET. 8. SEE SHEETS 4.0 AND 4.1 FOR EROSION CONTROL PLAN, NOTES AND DETAILS. 9. ALL EXISTING SUB -SURFACE UTILITY LOCATIONS SHOWN ARE APPROXIMATE. REV REVISIONS BY DATE APPROVED BY: CDJ Alignment Largest Pipe Size Rim Elevation Invert Out Elevation LINE A MH Al Manhole NCDOT 840.52 10+00.00 0 DRAWN BY: AWB CHECKED BY: CDJ APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 CONCEPT DO NOT USE FOR CONSTRUCTION PREPARED BY: JEWELL, ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro Drainage Structures Table ID Structure Structure Specification Station Station Offset Alignment Largest Pipe Size Rim Elevation Invert Out Elevation LINE A MH Al Manhole NCDOT 840.52 10+00.00 0 Line A 36" 899.49 881.06 MH A2 Manhole NCDOT 840.52 10+32.89 0 Line A 36" 899.94 880.44 DI A3 Drop Inlet NCDOT 840.17 11+12.71 0 Line A 36" 893.00 878.31 CI A4 Curb Inlet NCDOT 840.02 11+76.58 0 Line A 36" 876+/- 867.50 22+04.10 19.85 RT Roadway CI A5 Curb Inlet NCDOT 840.02 12+06.93 0 Line A 36" 876+/- 866.00 22+03.90 10.5 LT Roadway MH A6 Manhole NCDOT 840.52 12+75.35 0 Line A 36" 871.00 855.00 MH A7 Manhole NCDOT 840.52 13+52.17 0 Line A 36" 855.00 840.30 MH A8 Manhole NCDOT 840.52 13+86.72 0 Line A 36" 847.00 839.80 HEADWALL Headwall NCDOT 838.80 13+97.00 0 Line A 36" 845.00 839.75 Cl B1 Curb Inlet NCDOT 840.02 10+00.65 6.21 LT Line A 18" 899.18 895.00 Cl C1 Curb Inlet NCDOT 840.02 10+22.81 2.55 LT Line A 18" 898.87 895.32 Cl D1 Curb Inlet NCDOT 840.02 12+59.18 74.95 LT Line A 18" 870.7+/_ 867.00 21+08.88 19.06 RT Roadway LINE E Cl E1 Curb Inlet NCDOT 840.02 18+78.08 19.48 RT Roadway 18" 859.6+/- 852.00 CI E2 Curb Inlet NCDOT 840.02 18+49.54 9.89 LT Roadway 18" 858.5+/- 843.50 MH E3 Manhole NCDOT 840.52 17+79.81 39.80 LT Roadway 18" 843.00 830.70 CIF1 Curb Inlet NCDOT 840.02 16+31.61 19.68 RT Roadway 18" 848.32+/- 844.00 PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA Drainage Pipes Table Upstream Structure Downstream Structure Pipe Size Pipe Length Upstream Invert Downstream Invert LINE A Al A2 36" 32.89 881.06 880.64 A2 A3 36" 79.83 880.44 878.81 A3 A4 36" 63.86 878.31 871.00 A4 A5 36" 30.36 867.50 866.50 A5 A6 36" 68.42 866.00 864.00 A6 A7 36" 76.82 855.00 849.00 A7 A8 36" 34.55 840.30 840.00 A8 Headwall 36" 10.4 839.80 844.50 131 A 1 18" 6.24 895.00 894.88 C1 A2 18" 10.4 895.32 895.14 D1 A5 18" 76.72 867.00 862.00 LINE E E1 E2 18" 41.17 852.00 850.78 E2 E3 18" 71.88 843.50 838.50 E3 Stream 18" 37.77 830.70 830.50 F1 E3 18" 153.89 844.00 838.50 Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements STORMWATER DRAINAGE SYSTEM PLAN SHEET NO. 0 10' 20' 40' SCALE: 1"= 20' (HORZ) M. apga�,�g/s C) o \/ \ o yob cb u j/ / o a /« /o / a --- / \�\ MH -A10 \ o MXS \ ' NC DOT 840.52 , STA 12+75.35 (Line A) 6 NC DOT 840.02 61\ �� MH - A8 o \ STA 12+59:1, 8 74.95 LT (LineA) \ �' Lt 1 98 MH - A7 NC DOT 840.52 \\ PROTECT TREES uo STA 21+08.88 19 6 RT (Roadway) N, n0 Aul \ STA 13+86.72 61 AS p9SSIBLE d� a� d\ \ /\ ( Y) \ NC DOT 840.52 (Line A) ----- �ua8 CI - B1 S \ \ STA�i3+52.17 (Line A) \ �— \S NC DOT 842 \ \ y y y" SS HEADWALL NC DOT STA 1\0+00.65, 6.21 L \ o \ \ \ - , — - S \ NC DOT 838.80 STA 18+49.54, 9 aruga�,g/s o oT�o� , \� DI - A'3 - \ \ — \�S\V _ ASTA 13+97.00 (Line A) —1 � � � NC DOT 840.14 �� , � / � � CI A5 o Q>` OT 840.0, S STA 11+12.71 (Line A)\ \ o ,- 22+03. 0, 10.50 RT y J �\ _ — \ ►_ _ — o \\�0 (Roadway) SS SS D 0 // NC DOT � S — — _ v \ STA 10+22.81, 2:55 Lxo \q \ o 'V ti004 \ NC DOT 840.02 V \ \ \ \ A \ v CD TA 11+76.58 (Line \ V A \V C T 840.52 , o X T 10 00� g O \ STA 22+04.10, 19.85 LR / M A \ oadway) N 60T 840.52 \ + 2.89 � X � � v egg 44 E SAW If Ciq 3 L10— v A V INSTALL GAURDRAILV ON HEAD ALL \s SEE DETAI ` ?� \_ uoC) � y \V \ \ \ \ \ \ \ \ \ \ \ \\ V _ o \\ uoa s REV REVISIONS BY DATE APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 00 � �V LINEA � ,��\,,,\ 7,0 6\ y�V\See Sheet-� _ \ \ CP for Profile — —%l _ \ �� \ \ -- �_ a Cb _77 \O� DC 1 �\ arQ� CONCEPT DO NOT USE FOR CONSTRUCTION PREPARED BY: JEWELL, ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro uo3 00 O� \ l l' \ I 66 OS8 i J� / \ oODo / X n X A \\ PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements PLAN VIEW & GRADING PLAN - LINE A SHEET NO. Me DRAWN BY: AWB CHECKED BY: CDJ APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 00 � �V LINEA � ,��\,,,\ 7,0 6\ y�V\See Sheet-� _ \ \ CP for Profile — —%l _ \ �� \ \ -- �_ a Cb _77 \O� DC 1 �\ arQ� CONCEPT DO NOT USE FOR CONSTRUCTION PREPARED BY: JEWELL, ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro uo3 00 O� \ l l' \ I 66 OS8 i J� / \ oODo / X n X A \\ PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements PLAN VIEW & GRADING PLAN - LINE A SHEET NO. Me MH -Al MH - A2 STA 10+00 STA 10+32.89 RIM 899.49 RIM 899.94 INV IN 894.88 (18") INV IN 895.14 (18") INV IN 888.09 (24") INV IN 880.64 (36") INV OUT 881.06 INV OUT 880.44 G- 10+00 10+50 11+00 11+50 12+00 SIXTH ST \ DI - A3 STA 11+12.71 895 90 BY DATE RIM 893.00 CDJ RIM 870.7 +/- 76+/- STA 12+06.93 INV OUT 867.00 INV IN 878.81 880-98 L11NE: /AD C 871.00 RIM 876 +/- INV OUT 878.31 INV IN 862.0 (18") INV OUT 855.0 T 867.50 INV IN 866.50 890-00- FINISHED GRADE 85-5.90-- Ex. 8" SS nv. 884.5 WEST END LVD \ 0 EXISTING GRADE 875.0 MH -A6 -- g6tOq, V W 12+75.35 Ex.a" ss Inv. 872 ??? Inv. Z RI 33 LF 36" RCP @ 1.3% _ U IN IN 864.0 (36") Q 0 LF 36., RCP @ 2.0% IN IN 862.0 (18") 880-00 - CI - A4 870.00 3oCF36 STA 11+76.58 CI - A5 6� �.� RIM 876 +/- STA 12+06.93 FINISHED GRADE INV IN 871.00 RIM 876 +/- 0 INV OUT 867.50 INV IN 866.50 INV OUT 866.0 68 kF ,`sem 0 WEST END BLVD 36„ Rc A 87-5.00- X70-00- 2.9/ 0 4 Ex. 8" SS Inv. 872 ??? 865.00 LINE Ap@ 36 4'c. 36, R� J U Q .3/ 0 0 10' 20' 40' 60' SCALE: 1 "= 20' (HORZ) 1" = 2' (VERT) REV REVISIONS BY DATE APPROVED BY: CDJ RIM 870.7 +/- 76+/- STA 12+06.93 INV OUT 867.00 Al to A2 880-98 L11NE: /AD C 871.00 RIM 876 +/- DRAWN BY: AWB CHECKED BY: CDJ APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 CONCEPT DO NOT USE FOR CONSTRUCTION 1+76.58 CI - A5 895.00 6 LF 18" RCP @ 2.0% 890� 00 RIM 870.7 +/- 76+/- STA 12+06.93 INV OUT 867.00 Al to A2 880-98 L11NE: /AD C 871.00 RIM 876 +/- INV IN 862.0 (18") INV OUT 855.0 T 867.50 INV IN 866.50 Ex. 8" SS Inv. 866.50 INV OUT 866.0 "�'c865.00A WEST END LVD \ 0 EXISTING GRADE 875.0 MH -A6 -- g6tOq, LINE AD STA 12+75.35 Ex.a" ss Inv. 872 ??? Inv. RI 871.00 IN IN 864.0 (36") IN IN 862.0 (18") IN OUT 855.0 - 870.00 3oCF36 RcA@ FINISHED GRADE 0 68 kF 36„ Rc A 2.9/ 0 865.00 I W Z_ J U Q 860.00 LIE A 1 I_ CqNT. M 1 - A7 STA 13+52.17 RIM 855.00 INV IN 849.00 INV OUT 840.30 .O clk> I So \ \ GUAF DRAIL SEE DETA�L 2/6.006 MH - A8 STA 13+86.72 RIM 847.00 INV IN 840.0 INV OUT 839.8 EXISTIN GRADE H AIiWALL SIA TOP 3+97.00 PF WALL 844.50 IIN QUT 839.75 V 845.00 0 A 0 Iq 35 LF 36" RC @ 0. 71/o 0 d U c.0 c� J V 840.00 PREPARED BY: JEWELL, ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA MH -Al CI - 131 STA 10+00 STA 10+00.65,6.21 LT RIM 899.49 RIM 899.18 INV IN 894.88 (18") INV OUT 895.00 INV IN 888.09 (24") INV OUT 881.06 900_00- 00+00 FINISHED GRADE 895.00 6 LF 18" RCP @ 2.0% 890� 00 RIM 870.7 +/- 885 90 STA 12+75.35 INV OUT 867.00 Al to A2 880-98 L11NE: /AD CI - C1 STA 10+22.81, 2.55 LT RIM 898.87 INV OUT 895.32 MH - A2 STA 10+32.89 RIM 899.94 INV IN 895.14 (18") INV IN 880.64 (36") INV OUT 880.44 00+00 RCP @ 1.8% '12 to q3 Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements PROFILE -LINE A SHEET NO. 6.2 FINISHED GRADE CI -D1 STA 12+59.18, 74.95 LT MH - A6 RIM 870.7 +/- STA 12+75.35 INV OUT 867.00 RIM 871.00 C INV IN 864.0 (36") INV IN 862.0 (18") INV OUT 855.0 WEST END BLVD Ex. 8" SS Inv. 866.50 "�'c865.00A 0 EXISTING GRADE g6tOq, LINE AD Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements PROFILE -LINE A SHEET NO. 6.2 CI- El REVISIONS BY DATE APPROVED BY: STA 18+78.08,19.48 RT / RIM 859.6 +/- CI -F1 INV OUT 852.00 STA 16+31.61, 19.68 RT 0+00 0+50 - 1 00 1+50 -860.00- STA 18+ RIM 858.5 49.54, 9.89 LT +/- FINISHED GRADE INV IN 8 0.78 WEST END BLV\ INV OU 843.50 0 nv. 847.0 Ex. 8" SS Inv. 855.0 MH -E3 STA 17+79.81, 39.804 EXISTING GRADE 42 LF 18„ RCP RIM 844.00 - @2.9% INV IN 838.5 (N) FINISHED GRADE 850.00 INV OUT 830.70 7g4 �F 1,9RCP MH -E3 @ .6% STA 17+79.81, 39.80 LT RIM 844.00 INV IN 838.5 (S) E3 to S TREq INV IN 838.5 (N) SEE LINE E INV OUT 830.70 INE EF �1�oo 840.00 835.00 830.00 38 LF 18" RCP @ 0.5% INE E 0 10' 20' 40' 60' SCALE: 1"= 20' (HORZ) 1" = 2' (VERT) REV REVISIONS BY DATE APPROVED BY: CDJ / CI -F1 DRAWN BY: AWB CHECKED BY: CDJ APPROVED BY: CDJ ISSUE DATE: June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 15-149-034 CONCEPT DO NOT USE FOR CONSTRUCTION I � \ Zig / -OL 9 w ,, �9 - �uo0 CV Ogg ouo� aoiiiiiool CI -E1 NC DOT 84. 02 � A �48RT PROTECT TREES STA 18+J AS PO-SSIBL _ ` J - E2 iA/ALL NC DOST 840 02 )T 838.80 3+97.00 (Line A) / I C STA 18+49.54, 9.89 LT 00 PREPARED BY: JEWELL, ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA J MH -E3 NC DOT 840.52 �� PA� STA 17+79.81,, 39.80 LT �'Sva FAM aouaj SS \ \� 0�g C1 - F1 _ S NC DOT 840.02_ 16+31.61, 19.6$��`\ S / \ �f �0 Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements PLAN & PROFILE - LINE E SHEET NO. 6.3 EXISTING GRADE / CI -F1 STA 16+31.61, 19.68 RT RIM 848.32 +/- INV OUT 844.00 FINISHED GRADE 0 nv. 847.0 MH -E3 STA 17+79.81, 39.804 RIM 844.00 - INV IN 838.5 (N) INV OUT 830.70 7g4 �F 1,9RCP @ .6% E3 to S TREq SEE LINE E INE EF CONCEPT DO NOT USE FOR CONSTRUCTION I � \ Zig / -OL 9 w ,, �9 - �uo0 CV Ogg ouo� aoiiiiiool CI -E1 NC DOT 84. 02 � A �48RT PROTECT TREES STA 18+J AS PO-SSIBL _ ` J - E2 iA/ALL NC DOST 840 02 )T 838.80 3+97.00 (Line A) / I C STA 18+49.54, 9.89 LT 00 PREPARED BY: JEWELL, ENGINEERING CONSULTANTS, PC PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro PREPARED FOR: City of WINSTON-SALEM NORTH CAROLINA J MH -E3 NC DOT 840.52 �� PA� STA 17+79.81,, 39.80 LT �'Sva FAM aouaj SS \ \� 0�g C1 - F1 _ S NC DOT 840.02_ 16+31.61, 19.6$��`\ S / \ �f �0 Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements PLAN & PROFILE - LINE E SHEET NO. 6.3 U/ 'A u, i ioldOd,9� gq g aOldod„ 0z 0 \ g o aadoz- d ,d 9aa,do0�' g - -- - - .. _� o try -ems -Riffle qVg p d C Cross Vanes otwads and — r �y _ �Cb Pool oldod', L5�_ \� Bench Enhancement �\ C\ (planting) Bench Enhancemet x �� �aa,dod 0� 0 g J g 9g t �60� aa,dod OpJ �,aOldod,Ot � Boulder Steps � Uoaag ZI p OM� O -,_i; 4.j `ce lda A ald°d 99 Rootwads and ao,d0 V Pool >,Do" t,z � _ mac, B�kfull Bench U 8 8z UoaaB„0� l Root wads and- oaa ao c _ Pool D O oilou6oW l \ \ D D o uo0 D O� �Qo °� °U 00 rCP Q� ° 4°0” 0I' ° a� °►�°0, 9� Q°0 poOMana \ \\ S« z as \ ' o Co'mbi 0 792 �7\ ;7WC3*��' UoaeB 01� �Cb move --c 0 0) Lt8ZP n0 -A ul Zig CP z' g �g S uM o u� un - —aoldod,,0o JO aa}sn10GO z, a0 . 0 10' 20'_ 40' O � M/S ouo-) sod SCALE: 1 "= 20' r \\v a o ua� \� \ 00 p . ��°0«zl gold d„zl 100„9l � gzg l\aOddod 0� ��m ve- aaldod„0Z air Bench Enhancement - / crossln a0 do 8„ z� aO,dad 9� d l d„ 9� - (planting) tZg �_ 0uaunsaad �,l--��,dod,-z g -- - Remokn_ - -- - 00 nul cul aan g-�x Cross Va e - snoo \� (Y Constructed, Riffle �� Q❑ O Q ao do -)ol dod« gg _ Bank enc#1 od« 1a0 Zai �\ 41)0"Gz joldo6«0t, aUo� M/S ao,dod« 01� P V' 0, JR N StraRestoration Schematic a Ion 99+75 10011 10111 10211 10311 10411 10511 105+49 BY 85 Cour Pool Top of Bank Culvert 84 _-- _ - -- Top of Bank Boulder - ---_ Steps - °° culvert F71 8 3 I'D Cross Vane ° --------- I \ �'--_� ��' �/ -'----- -\� Constructed Constructed -_ __ Riffle - - � <+ - Top of Bank O o ° - Existing Riffle Boulder/Log Ste Pools Scour Pool 8 2 ---- -- I Bou der/Log I I -- ConEtructed,_"-- Riffle L Single Arm - Vane Constructed Cross Vane /Z Riffle 810- 80 99+75 100+00 101+00 102+00 103+00 104+00 105+00 105+49 0 10' 20' 40' SCALE: 1"= 20' (HORZ) Stream Restoration Profile 1" = 5' VERT REV REVISIONS BY DATE DRAWN BY: KB CHECKED BY: AWB APPROVED BY: CDJ ISSUEI A 49-034 June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: CONCEPT DO NOT USE FOR CONSTRUCTION PREPARED BY: PREPARED FOR: bKRIS BASS UEWELL ENGINEERING ENGINEERING CONSULTANTS, PC 625S Lakeside Drive LIC # P1133 PO BOX 2294 LIC # C1842 Raleigh, NC 27606 KERNERSVILLE, NC 27284 (919) 960.1552 kbeng.org (336) 996-9974 jewel lengineering.pro City of WINSTON-SALEM NORTH CAROLINA STREAM RESTORATION PLAN i SHEET NO. 8.0 t i )CD 0 98 O / aoldod g� --off - V - +0` ti�ZSg �� O o ol docy" 9�'gqg 0 0� A � yoaaB,zL _ v '100 O ao dr _ '�ticFAgr 4� l ti - yoaa8«8z \ � oilouboW l `Jo 8z OCO O O 03 O O N \p\oo0oo �t \ �� �0 O CP 400" 9� V �� r10 00,00 - - uo0(� pooManos zl Section: SL—PO 100+09.21 i Slope 2:1 / Bankfull Bench Maintenance Path Bankfull Bench Section: SL—P3 Slol 102+54.83 REV REVISIONS BY DATE CHECKED BY: AWB APPROVED BY: CDJ Maintenance IssuE1 9A 49-034 June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 792 r �� yoaa ,Q D D �J O O O°On \ D I�iO QDO D O DO O ��J DOi C�O DO Cb g CI 00 Cv Ogg O D O �OO D �O D O p D O OF OF L y 6 D �Q" DV OO D /O no /1 Ul D `'(J % Q �U ---------- 400 ---------4o0" Of 0 10' 20' 40' 60' g aol dod« g� SCALE: 1 "= 20' 17 g Section: SL—P1 100+58.13 103+50,0 000 — �np nul S uMou�un �o aa�sn10 M/S o L sod ao ua_j Qdsnoo� Q� gG P 0 Q (fit JD/ Ci0 Jol d od 0g \ d„ z� aoldod« 9C 1a0 Zai ylooOZ aoldod 01� aoldod«oP DRAWN BY: KB CHECKED BY: AWB APPROVED BY: CDJ IssuE1 9A 49-034 June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: 792 r �� yoaa ,Q D D �J O O O°On \ D I�iO QDO D O DO O ��J DOi C�O DO Cb g CI 00 Cv Ogg O D O �OO D �O D O p D O OF OF L y 6 D �Q" DV OO D /O no /1 Ul D `'(J % Q �U ---------- 400 ---------4o0" Of 0 10' 20' 40' 60' g aol dod« g� SCALE: 1 "= 20' 17 g Section: SL—P1 100+58.13 103+50,0 000 — �np nul S uMou�un �o aa�sn10 M/S o L sod ao ua_j Qdsnoo� Q� gG P 0 Q (fit JD/ Ci0 Jol d od 0g \ d„ z� aoldod« 9C 1a0 Zai ylooOZ aoldod 01� aoldod«oP Section: SL—P4 1103+58,1791 \ Geolift (see details) Bank Repair Area Bankfull Bench DO NOT USE FOR CONSTRUCTION PREPARED BY: PREPARED FOR: KRIS BASS A EWELL E N G I N E E R IN G ENGINEERING CONSULTANTS, PC 625S Lakeside Drive LIC # P1133 PO BOX 2294 LIC # C1842 Raleigh, NC 27606 KERNERSVILLE, NC 27284 (919) 960.1552 kbeng.org (336) 996-9974 jewellengineering.pro City of WINSTON-SALEM NORTH CAROLINA X� 00 g' C-1) - - �o0«Z In fold d,, (n— 9l g g Z aoldod � � aolOd,.90 ob aoldod 9�, g uouauaisaa o ldod«O g �aoldo '.0.7 °� � 0 �ao4o H L,d a d oC- Oo„ o f �5 4 0 00 / 105+00.00 �aanl 104+00,00 g�X<<9� aoldod,, 9z d0 jolOd«O oUo� M/S Stream Restoration Grading Section: SL—P2 1101+31.271 Section: SL—P5 Channel W: 10' D: 2' Tie to existing nkfu-11 Bench STREAM RESTORATION PLAN SHEET NO. 8.1 nnel 10' 2' Maintenance \_Rnnkfijll Bench Path Section: SL—P4 1103+58,1791 \ Geolift (see details) Bank Repair Area Bankfull Bench DO NOT USE FOR CONSTRUCTION PREPARED BY: PREPARED FOR: KRIS BASS A EWELL E N G I N E E R IN G ENGINEERING CONSULTANTS, PC 625S Lakeside Drive LIC # P1133 PO BOX 2294 LIC # C1842 Raleigh, NC 27606 KERNERSVILLE, NC 27284 (919) 960.1552 kbeng.org (336) 996-9974 jewellengineering.pro City of WINSTON-SALEM NORTH CAROLINA X� 00 g' C-1) - - �o0«Z In fold d,, (n— 9l g g Z aoldod � � aolOd,.90 ob aoldod 9�, g uouauaisaa o ldod«O g �aoldo '.0.7 °� � 0 �ao4o H L,d a d oC- Oo„ o f �5 4 0 00 / 105+00.00 �aanl 104+00,00 g�X<<9� aoldod,, 9z d0 jolOd«O oUo� M/S Stream Restoration Grading Section: SL—P2 1101+31.271 Section: SL—P5 Channel W: 10' D: 2' Tie to existing nkfu-11 Bench STREAM RESTORATION PLAN SHEET NO. 8.1 ELEVATION POI( 1/3 BOTTOM ELEVATION POINT "A" TOP OF BANK LARGE ROCK VANE STRUCTURE TABLE STREAMBANK TIE-IN STRUCTURE ID L (FT) FLOW G - STREAMBED ELEVATION �tI viy, MC -1 BACKFILL (ON-SITE ALLUVIUM) 6.0 SEE PLAN TYPE II FILTER FABRIC 811.0' CLASS 1, A & B 575- 6.0 STONE BACKFILL TION POINT "A" 812.0' PROFILE VIEW CLASS B STONE CLASS A STONE STREAMBED (ON-SITE ALLUVIUM)'%, \�S/I \-SCOUR POOL EXCAVATED PLAN VIEW PER DIRECTION OF ENGINEER LARGE ROCK VANE STRUCTURE NOTES: 1. BOULDERS MUST BE AT LEAST 4'x3'x2'. 2. USE FILTER FABRIC TO SEAL GAPS BETWEEN BOULDERS. 3. DIG A TRENCH BELOW THE BED FOR FOOTER BOULDERS. START AT BANK AND PLACE FOOTER BOULDERS FIRST AND THEN HEADER BOULDERS. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 4. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE TOP OF THE HEADER BOULDERS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER BOULDERS, AND THEN UPSTREAM FOR A MINIMUM OF SIX FEET. 5. USE WELL GRADED MIX OF CLASS 1, A AND B STONE ON STREAMBANK SIDE OF STRUCTURE, SEE SECTION A -A FOR STONE DIMENSIONS. JOIN STONE BACKFILL WITH GEOLIFT STONE BACKFILL WHERE APPROPRIATE. 6. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE STREAMBANK SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER BOULDER, FILLING IN VOIDS OF THE BACKFILL. 7. FILTER FABRIC SHALL BE TRIMMED ALONG THE TRANSITION BETWEEN THE STONE BACKFILL AND THE HEADER BOULDERS SO THAT THE FILTER FABRIC DOES NOT EXTEND OVER THE HEADER BOULDERS. TYPE II FILTER SECTION A - A BOULDER LEVATION POINT "B" )OTER BOULDER EADER BOULDER "-FOOTER BOULDER LASS 1 STONE SINGLE ARM VANE NOT TO SCALE B' BO LARGE ROCK VANE STRUCTURE TABLE L (FT) STRUCTURE ID L (FT) S (FT) F (DEGREES) G (DEGREES) ELEV. POINT "A" ELEV. POINT "B" MC -1 37.0 6.0 SEE PLAN 8.0 808.0' 811.0' MC -2 575- 6.0 SEE PLAN 8.0 808.0' 812.0' MC -3 37.0 6.0 SEE PLAN 8.0 808.0' 811.0' SINGLE ARM VANE NOT TO SCALE B' w 0- 0 O U) O w O O LL STREAM WELL GRADED CLASS A & B S' BACKFILL (ON-SITE ALLUVIU TYPE II FILTER FABR NO GAPS BETWEEN FOOTER BOULDERS SECTION A - A' FLOW - TOP OF BANK LEVATION POINT EADER BANKFULL STREAMBE WELL GRADED MIX CLASS A & B STONE G 4 BACKFILL (ON-SITE ALLUVIUM 4'- TYPE II FILTER FABRIC OC 3 PROFILE VIEW B -B' ROCK CROSS VANE STRUCTURE NOTES: NEL BED TED PER PROFILE BURIED INTO BANK MINIMUM 5' BOULDER BO GAPS BETWEEN L (FT) W HEADER BOULDERS DIG A TRENCH BELOW THE BED FOR FOOTER BOULDERS. START AT BANK AND S (FT) OOTER BOULDER ELEVATIO W EADER BOULDER UJ 0 3. 3 r ROCK CROSS VANE STRUCTURE TABLE LL 4. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE Z v O GAPS BETWEEN J L (FT) J Z In LL LL yLL o m LL O z.. a J Y O Z ¢ O m w &^ a m O STRUCTURE. A / A' SCOUR POOL EXCAVATED w 0- 0 O U) O w O O LL STREAM WELL GRADED CLASS A & B S' BACKFILL (ON-SITE ALLUVIU TYPE II FILTER FABR NO GAPS BETWEEN FOOTER BOULDERS SECTION A - A' FLOW - TOP OF BANK LEVATION POINT EADER BANKFULL STREAMBE WELL GRADED MIX CLASS A & B STONE G 4 BACKFILL (ON-SITE ALLUVIUM 4'- TYPE II FILTER FABRIC OC 3 PROFILE VIEW B -B' ROCK CROSS VANE STRUCTURE NOTES: NEL BED TED PER PROFILE BURIED INTO BANK MINIMUM 5' BOULDER ROCK CROSS VANE NOT TO SCALE ELEVATION POINT "C" LEVATION POINT 2. USE FILTER FABRIC TO SEAL GAPS BETWEEN BOULDERS. L (FT) W 3. DIG A TRENCH BELOW THE BED FOR FOOTER BOULDERS. START AT BANK AND S (FT) LL 2. PLACE FOOTER BOULDERS FIRST AND THE HEADER BOULDERS. CONTINUE WITH UJ 0 3. STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. ROCK CROSS VANE STRUCTURE TABLE LL 4. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE EL "D" 1 OHEADER O GAPS BETWEEN BOULDERS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM L (FT) W FOOTER BOULDERS, AND THEN UPSTREAM FOR A MINIMUM OF SIX FEET. W (FT) STREAMBE WELL GRADED MIX 5. USE WELL GRADED MIX OF CLASS A AND B STONE ON UPSTREAM SIDE OF S (FT) W OOTER BOULDER STRUCTURE. F(DEGREES SCOUR POOL EXCAVATED 6. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE G (DEGREES PER PROFILE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE 6 HEADER BOULDER. SCOUR POOL EXCAVATED 7. FILTER FABRIC SHALL BE TRIMMED ALONG THE TRANSITION BETWEEN THE Y Z Z STONE BACKFILL AND THE HEADER BOULDERS SO THAT THE FILTER FABRIC Y OOTER BOULDE DOES NOT OVERLAP THE HEADER BOULDERS. w ROCK CROSS VANE NOT TO SCALE ELEVATION POINT "C" LEVATION POINT STREAMBE NO GAPS BETWEEN WELL GRADED MIX FOOTER BOULDERS CLASS A & B STONE G 4' BACKFILL (ON-SITE ALLUVIUM a' TYPE II FILTER FABRIC PROFILE VIEW B -B' REVISIONS DOUBLE DROP CROSS VANE STRUCTURE NOTES, L (FT) 25 FT 1. BOULDERS MUST BE AT LEAST 2,5'x2.0x1,5', S (FT) J 2. USE FILTER FABRIC TO SEAL GAPS BETWEEN BOULDERS. UJ W 3. LL EL "B" 834.75 FT EL "C" BANK AND PLACE FOOTER BOULDERS FIRST AND THE HEADER EL "D" 1 B O GAPS BETWEEN BOULDERS, CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND BLL U- SLOPE SPECIFICATI❑NS, HEADER BOULDERS STREAMBE WELL GRADED MIX EADER BOULDER INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE UJ W OOTER BOULDER CLASS A & B STONE HANNEL BED ELEVATION POINT "A" WEADER BOULDER 4• j o ° FOR A MINIMUM OF SIX FEET. 6 USE WELL GRADED MIX OF CLASS A AND B STONE ON UPSTREAM SCOUR POOL EXCAVATED BACKFILL (ON-SITE ALLUVIUM Y Z Z y _ Y OOTER BOULDE m w ¢ TYPE II FILTER FABRIC 7. FILTER FABRIC SHALL BE TRIMMED ALONG THE TRANSITION w m SCOUR POOL EXCAVATED O Y °"`. Y p THAT THE FILTER FABRIC DOES NOT OVERLAP THE HEADER PER PROFILE O BOULDERS. Z a 3 DOUBLE DROP CROSS VANE m A s m O SECTION A - A' R5 A' - SCOUR, a i POOL FLOW POINT "B" f LEVATION POINT "A" TOP OF BANK EADERrLEVATION �URIED INTO BANK BANK TIE -I BOULDER MINIMUM 5' STREAMBE NO GAPS BETWEEN WELL GRADED MIX FOOTER BOULDERS CLASS A & B STONE G 4' BACKFILL (ON-SITE ALLUVIUM a' TYPE II FILTER FABRIC PROFILE VIEW B -B' BOULDER CROSS VANE TABLE REVISIONS DOUBLE DROP CROSS VANE STRUCTURE NOTES, L (FT) 25 FT 1. BOULDERS MUST BE AT LEAST 2,5'x2.0x1,5', S (FT) 5.0 FT 2. USE FILTER FABRIC TO SEAL GAPS BETWEEN BOULDERS. UJ W 3. DIG A TRENCH BELOW THE BED FOR FOOTER BOULDERS, START AT EL "B" 834.75 FT EL "C" BANK AND PLACE FOOTER BOULDERS FIRST AND THE HEADER EL "D" 1 835.75 FT BOULDERS, CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND BLL U- SLOPE SPECIFICATI❑NS, O O 4. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE UJ W OF THE HEADER BOULDERS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER BOULDERS, AND THEN UPSTREAM FOR A MINIMUM OF SIX FEET. 5. USE WELL GRADED MIX OF CLASS A AND B STONE ON UPSTREAM SCOUR POOL EXCAVATED SIDE OF STRUCTURE. PER PROFILE 6. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SILL OR HEAD OF RIFFLEJ SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION POINT "D" ELEVATION OF THE TOP OF THE HEADER BOULDER, 7. FILTER FABRIC SHALL BE TRIMMED ALONG THE TRANSITION BETWEEN THE STONE BACKFILL AND THE HEADER BOULDERS S❑ THAT THE FILTER FABRIC DOES NOT OVERLAP THE HEADER BOULDERS. 3 DOUBLE DROP CROSS VANE 8.2 NOT TO SCALE BOULDER CROSS VANE TABLE REVISIONS STATION 0+20 L (FT) 25 FT W (FT) 3.0 FT S (FT) 5.0 FT F(DEGREES) 20 G (FT/FT) 0.06 EL "A" 836.75 FT EL "B" 834.75 FT EL "C" 836.25 FT EL "D" 1 835.75 FT RIFFLE STONE TO TIE INTO CHANNEL 3: A HEAD OF RIFFLE BANKS 0.5' HEAD OF RIFFLE r ELEVATION POINT ELEVATION POINT TAIL OF RIFFLE BL} } HEAD OF POOL J g ELEVATION TOE OF SLOPE a GL\OE RIFFLE POINT (TYP) 77 1a B 4 TOP OF BANK (TYP) 12" DEPTH OF QUAL PARTS CLASS A, B, AND 1 RIP RAP FORM HORSESHOE OF BED MATERIAL AT UPSTREAM JA PROFILE A -A AND DOWNSTREAM RIFFLE EXTENTS TOP OF TAIL OF RIFFLE PLAN VIEW NOTE BANK (TYP) SCHEMATIC CR❑SS-SECTI❑N PLAN VIEW ELEVATION POINT HORSESHOE NOT REQUIRED Log Cobble WHERE RIFFLE TIES INTO DRAINAGE ACKFILL AND COMPACT 6" DEEP TRENCH PPER LIFTS STRUCTURE OR STREAM GRADE To OF SLOPE SECURE MATTING IN TRENCH WITH STAKES IVE CUTTING LAYER WITH NO GAPS HORIZONTALLY CONTROL STRUCTURE (I.E. LOG SILL, I i J -HOOK, CROSS VANE, ETC.) II SECTION B -B IVE STAKES 3' EROSION CONTROL MATTING (TYP. OWER LIFT NOTES: ON CENTER LIFT ROSION CONTROL MATTING (TYP.) DGE OF WATER 1. BOULDERS MUST BE AT LEAST 2.5' x 2.0' x 1.5', SMALLER BOULDERS WILL DEPTH` TRENC TOE OF BANK BE REJECTED BY THE ENGINEER. 4 CONSTRUCTION RIFFLE IGH LIFT ELEVATION* lil I ' 2. THESE STRUCTURES SHALL CONSIST OF THE NECESSARY AMOUNT OF 8.2 NOT TO SCALE i\\ >:>::z>::z :::z:>: X* I BOULDER STEPS TO DROP THE CHANNEL THALWEG ACCORDING TO THE DESIGN PROFILE, EACH STEP SHALL DROP THE BED ELEVATION VARIES PER GRADING ��/j�/j�'i;:;:;:;:;:;:`;:;:`;:;:;:`;.• 1,0 IVE CUTTING LAYER (TYP.) �I , APPROXIMATELY 1.0 FOOT. PLAN //\//\/ :•:::::::::::. NO GAPS HORIZONTALLY I \/"II 3. BOULDERS SHALL BE EMBEDDED WITHIN CHANNEL BANK A MINIMUM OF 2.0 ....;............;;•: ROSION CONTROL MATTING WRAPS AROUND ATTI G ROLL LIFT AND COIR BLOCK/LOG (SEE NOTE #5) WI TH 4. USECLASSAAND #57 STONE TO BACKFILL BOULDER ROWS ONCE FILTER // OMPACTEDAMENDED SOIL �iw Pool FABRIC HAS BEEN INSTALLED. In Ili 5. FINISH STREAM BANKS WITH EROSION CONTROL MATTING AND LIVE STAKES EXCAVATEDSUBGRADE//� \ .:_;;;<:.::;;:>:<. PLANTED 3 FEET ON CENTER. �jj\jj OW LAYER INVERT* - TOP OF STONE TOE BACKFILL TONE BACKFILL Gravel /�////� :;; ::;%%:::.::.:::..•::•::::: LIFT HEIGHT* /\\ _ BA E FLOW (WSEL XISTING STREAMBED MATTING SEAM LOCATION TO BE UNDISTURBED EAR •/' ALTERNATED WITH EACH LIFT Plan View T \��� •� TOP OF BANK Water ROOT WAD CROSS-SECTION EQUAL PARTS CLASS A, CLASS BACKFILL TOE OF BANK "OVERLAP, SHINGLED IN Surface \\t N.T.S. AND CLASS 1 RIP RAP, 2.0' DEPTH x BACKFILL DEPTH DIRECTION OF FLOW Cobble Log Coir \\\\\x ROOTWAD INSTALLATION NOTES: DEPTH*, BACKFILL VOIDS WITH ONSITE SOIL Live / / / / VEGETATED GEOLIFT STRUCTURE NOTES: stakes /\�j\��\�j\�j 1. ROOTWADS SHALL CONSIST OF HARDWOOD TREES WITH A MINIMUM DIAMTER Bankfull / �j���j��j/���\� OF 8 INCHES. 2. ROOTWADS SHALL INCLUDE A SUBSTANTIAL ROOT BALL AND INCLUDE A 1. FOR XS B & C, IF GEOLIFT IS NOT FRONTED BY A ROCK VANE, INCORPORATE A STRAIGHT TRUNK OF AT LEAST 8 FEET IN LENGTH. BOULDER TOE WITHIN THE STONE BACKFILL. BOULDERS SHALL BE 3. ROOTWADS SHALL BE INSTALLED ON A FOOTER LOG OR BOULDER TO PREVENT NO LESS THAN 4.0'x3.0'x2.0'. SINKING. 2. THE CHANNEL BASE FLOW OR WATER SURFACE ELEVATION (WSEL) WILL VARY VEGETATED GEOLIFT DIMENSION TABLE o 0 \�\\� 4. ROOTWADS MAY BE INSTALLED BY DRIVING OR WITH AN INSTALLATION TRENCH. SEASONALLY AND MAY BE VERY LOW DURING TIMES OF DROUGHT. DURING CROSS LIFT BACKFILL INITIAL LIFT FINAL LIFT LOW LIFT HIGH LIFT X, DROUGHT, AS DETERMINED BY THE ENGINEER, THE WSEL WILL BE CONSIDERED ������ / 8"-18" diameter hardwood TRENCHES MUST BE BACKFLLED AND COMPACTED ITH CLEAN MATERIAL. 5. INSTALLATION SHALL BE AT ITHE STREAMBED ELEVATION OR BELOW SUCH THAT SECTION HEIGHT (FT) DEPTH (FT) DEPTH (FT) DEPTH (FT) INVERT EL. EL. BANK SLOPE TO BE EQUAL TO THE DOWNSTREAM GRADE CONTROL ELEVATION. (8'-10' long) A 1.0' 10.0' 10.0' 8.8' 813.0' 825.0' 1.1:1.0 3. THE CONTRACTOR WILL BE RESPONSIBLE FOR CHANGES TO THE VEGETATED THE BANK IS PROTECTED AND THE TOP DOES NOT EXTEND FAR ABOVE g .0' 10.0' 10.0' 4.2' 809.5' 824.5' 1.4:1.0 GEOLIFT PLACEMENT IF IT IS DETERMINED BY THE ENGINEER THAT THE Gravel Prole f i VIew BANKFULL ELEVATION. SOII 6. TRIM, PRUNE, OR OTHERWISE CLEAN ROOT MATERIAL AS DIRECTED. C 1.0 10.0' 10.0' 4.7' 1 809.5' 823.5' 1.4:1.0 VEGETATED GEOLIFT WAS NOT INSTALLED PROPERLY. 8"-18" diameter 7. PROTECT COMPACTED BANKS WITH SEEDING AND EROSION CONTROL MATTING 4. LIVE CUTTINGS SHALL MEET MATERIALS SPECIFICATIONS OUTLINED IN THE Bed footer log J IMMEDIATELY FOLLOWING INSTALLATION. SPECIAL PROVISIONS. 8 5. COIR BLOCKS SHALL BE USED IN ALL LIFT LAYERS WITHIN THE GEOLIFT. 6. STREAMBANK AREA ABOVE LIVE CUTTING LAYERS SHALL BE PLANTED WITH LIVE STAKES AT A DENSITY OF 3 FT. ON CENTER. s VEGETATED GEOLIFT 7 TYPICAL BOULDER / LOG STEP POOL DETAIL s ROOTWADS 8.2 NOT TO SCALE 8.2 NOT TO SCALE 8.2 NOT TO SCALE REV REVISIONS BY DATE ISSUEI A 49-034 DRAWN BY: KB June 23, 2017 CITY PROJECT NUMBER: CHECKED BY: AWB 000024497 JEC PROJECT NUMBER: APPROVED BY: CDJ CONCEPT DO NOT USE FOR CONSTRUCTION PREPARED BY: PREPARED FOR: KRIS BASS AWEWELL ENGINEERING ENGINEERING CONSULTANTS, PC 625S Lakeside Drive LIC # P1133 PO BOX 2294 LIC # C1842 Raleigh, NC 27606 KERNERSVILLE, NC 27284 (919) 960.1552 kbeng.org (336) 996-9974 jewel lengineering.pro City of WINSTON-SALEM NORTH CAROLINA ' 1 Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements STREAM RESTORATION PLAN - DETAILS i SHEET NO. O a- Protect as possible 00-- 0 0C) m O 0000- O-- ----o--- 0-0 0 0 0 0 " "---- 0 M/S UUo Protect as \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ o possible \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O Protect as \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O ossible 0000 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O O O --0 -0 --- ---- --- - \ V A \\ V A \\ V A 00000000000 \ Qo Trees to be removed I 00000 Trees to be removed ACcess Constru��� �- 0 10' 20' 40' 60' r SCALE: 1"= 20' (HORZ) PLANTING LIST PERCENT M REV JOE-PYE-WEED (EUPATORIUM FISTULOSUM) BY 10 # RICE CUT GRASS (LEERSIEA ORYZOIDES) 10 SWITCHGRASS (PANICUM VIRGATUM) 10 I-- FOX SEDGE (CAREX VULPINOIDEA) 10 W X z5� DEER TONGUE (PANICUM CLANDESTINUM) 10 SOFT RUSH (JUNCUS EFFUSUS) 10 o LJ UJ w HOP SEDGE (CAREX LUPULINA)) 10 D_ VIRGINIA WILDRYE (ELYMUS VIRGINICUS) 10 BLACK EYED SUSAN (RUDBEKIA HIRTA) 10 APPLY LBS/AC WEEPING LOVE GRASS (ERAGROSTIS CURVULA) 10 QUANTITY ESTIMATE - 5LBS AT 20 QTY WOODY MIX PLANTING TYPE SPACING Cn Q 200 SILKY WILLOW (SALIX SERICEA) LIVE STAKE 5 FT bi > 200 SILKY DOGWOOD (CURNUS AMOMUM) LIVE STAKE 5 FT J 250 SOFT RUSH (JUNCUS EFFUSES) 2 INCH PLUG 5 FT co 250 SEDGE (CAREX LUPIDA) 2 INCH PLUG 5 FT 0 Z250 a SWITCHGRASS (PANICUM VIRGATUM) 2 INCH PLUG 5 FT 3: 250 TBD 2 INCH PLUG 5 FT 250 TBD 2 INCH PLUG 5 FT 50 SWEETBAY (MAGNOLIA VIRGINIANA) CONTAINER #3 10 FT D_ N 50 IRONWOOD (CARPINUS CAROLINIANA) CONTAINER #3 10 FT WOODY MIX PLANTING TYPE SPACING QTY RIVER BIRCH (BETULA NIGRA) CONTAINER #3 10 FT 25 CD SYCAMORE (PLATANUS OCCIDENTALIS) CONTAINER #3 10 FT 25 WILLOW OAK (QUERCUS PHELLOS) CONTAINER #3 10 FT 25 a 0 SHUMARD OAK (QUERCUS SHUMARDI) CONTAINER #3 10 FT 25 W w PERSIMMON (DIOSPYROS VIRGINIANA) CONTAINER #3 10 FT 25 AMERICAN BEECH (FAGUS GRANDIFOLIA) CONTAINER #3 10 FT 25 REV REVISIONS BY DATE # DRAWN BY: KB CHECKED BY: AWB APPROVED BY: CDJ LEGEND VEGETATED GEOLIFT PLANTING ZONE - PERM SEED MIX #1 AND BRUSH CUTTINGS STREAM CORRIDOR PLANTING ZONE - PERM SEED MIX #1, COIR MATTING, WETLAND PLUGS, AND LIVE STAKES RIPARIAN PLANTING, HIGH GRADIENT ZONE - LIVE STAKES ONLY SLOPE PLANTING ZONE - PERM GRASS MIX, COIR MATTING, TREES, AND SHRUBS CONTAINERS AT 1OFT SPACING SEEDING NOTES: 1. Re -seed all slopes and disturbed areas as directed. Temporary seeding of: 120 lbs/acre Ryegrain - November through March 40 lbs/acre Browntop millet -April through October Permanent seeding (Spring/Summer only) of: 15 lbs/acre KY Bluegrass 5lbs/acre centipede 25 lbs/acre bermudagrass (hulled). 2. Apply fertilizer (10-20-20) at a rate of 500lbs/ac and lime at 2000lbs/acre. 3. Spread straw mulch on any disturbed areas at a rate of 1.5 tons /acre. 4. Cover all slopes greater than 3(H): l (V) with coir matting and secure with wooden staking. ind Surface PLANTING SPECIFICATIONS 1. Dig hole with dibble, shovel, or other appropriate device. 2. Dig hole of sufficient size to fit entire root mass without bending or breaking. 3. Place ammendments in the hole as specified. 4. Lower bare root plant into the hole. 5. Heel in or close hole firmly. Ensure that plant Bare Root Planting is secure. ISSUEI 9149-034 June 23, 2017 CITY PROJECT NUMBER: 000024497 JEC PROJECT NUMBER: BARE ROOT PLANTING DETAIL NOT TO SCALE CONCEPT DO NOT USE FOR CONSTRUCTION TOP OF STREAMBANK 3.0' TOE OF SLOPE TOP OF STREAMBANK SQUARE CUT TOP BUDS FACING UPWARD - LIVE CUTTING 0.5" - 2" DIA 2'-3' BETWEEN STAKES, DEPENDING ON LOCATION, SEE NOTE 7 BELOW SLOPE BANK PER PLAN SHEETS TOE OF SLOPE CROSS-SECTION 1' MAX TOP OF 2.1' STREAMBANK 0 0 0 0 0 F0 STAKES SHALL BE 0 0 0 0 0 0 PLANTED & INSTALLED 0 0 0 0 0 0 FROM TOP OF BANK TO 0 0 0 0 0 0 TOE OF SLOPE PLAN VIEW 30" IN LENGTH MINIMUM ANGLE CUT TO -,,,,Q 45 DEGRESS LIVE STAKE DETAIL LIVE STAKE NOT TO SCALE 'MAX NOTES 1. STAKES SHALL BE CUT AND INSTALLED ON THE SAME DAY. 2. STAKES THAT HAVE BEEN SPLIT SHALL BE REJECTED AND NOT USED FOR CONSTRUCTION. 3. STAKES SHALL BE INSTALLED WITH BUDS POINTING UPWARD. 4. STAKES SHALL BE INSTALLED PERPENDICULAR TO BANK. 5. STAKES SHALL BE 0.5" - 2" INCHES IN DIAMETER AND 30" IN LENGTH MINIMUM. 6. STAKES SHALL BE INSTALLED WITH APPROXIMATELY 3" OF STAKE REMAINING ABOVE GROUND. 7. STAKE SPACING SHALL BE 3' ON CENTER. PERMANENT SEEDING AND LIVE STAKE NOTES: 1. PERMANENT SEEDING SHALL NOT CONTAIN ANY FESCUE GRASSES. PLACE SEEDING AS SPECIFIED IN THE PLAN (UNDER THE COIR MATTING). 2. SPREAD SEED UNIFORMLY UNDER COIR FIBER MATTING ALONG CHANNEL BANKS. 3. STABILIZE ALL EXPOSED AREAS AT STREAM BANKS WITH THE PERMANENT RIPARIAN BUFFER SEED MIX. 4. SILKY WILLOW & SILKY DOGWOOD LIVE STAKES PLANTED IN COIR TO BE SPACED AS SHOWN IN DETAIL 2/9.0. PLANT IRONWOOD TREES SPACED EVENLY ALONG TOP OF BANK AS SHOWN. 5. WATER SEEDED AREAS AND LIVE STAKES THOROUGHLY AT PLANTING AND WEEKLY DURING THE FIRST GROWING SEASON. 6. LIVE STAKES AND SEEDED AREAS SHALL BE WARRANTED FOR 80% SURVIVAL AT ONE-YEAR AFTER PLANTING. IF AT THE END OF ONE-YEAR 20% OR MORE ARE DEAD OR DEAD LIKE CONDITION, RE -PLANTING OF SUFFICIENT STOCK TO COMPLY WITH AN 80% SURVIVAL RATE SHALL BE PERFORMED. 7. SEE TECHNICAL SPECIFICATIONS FOR ADDITIONAL INSTRUCTIONS AND REQUIREMENTS. PREPARED BY: PREPARED FOR: City of �JEWELL KRIS BASS T EM ENGINEERING ENGINEEFIING CONSULTANTS, PCWI1VN1STO _ 1� 625S Lakeside Drive LIC # P1133 PO BOX 2294 LIC # C1842 NORTH CAROLINA Raleigh, NC 27606 KERNERSVILLE, NC 27284 (919) 960.1552 kbeng.org (336) 996-9974 jewellengineering.pro b0 �o ­\ 10000,0000 X003 Stream Restoration Planting Zones SECURE TREE TO STAKE WITH SPECIFIED MATERIAL AT 1/2 TREE HEIGHT. HARDWOOD STAKES 2"X2" SET AT APPROXIMATELY 70 DEGREES, DRIVEN (MIN 18") FIRMLY INTO SUBGRADE PRIOR TO BACKFILLING. REMOVE ANY WIRE WRAPPED AROUND TRUNK OF TREE BEFORE PLANTING AND LOOSEN WRAPPING AROUND TRUNK AT PLANTING DO NOT , PILE MULCH AGAINST TRUNK PLANT NO DEEPER THAN GROWN AT NURSERY. PRUNE UP TO 1/3 OF TREE AT PLANTING AS NEEDED, RETAINING NORMAL SHAPE OF CROWN. TRIM AND REMOVE ANY DEAD OR INJURED BRANCHES NOT CUTTING MORE THAN 1/3 OF TREE. PREPARE SAUCER FOR WATER RETENTION -FINISH WITH 4"-6" OF MULCH AS SPECIFIED MULCH LEAVE BURLAP ON BALL - REMOVE ANY WIRES THAT MAY INHIBIT GROWTH OR INJURE THE TREE. PLANTING SOIL: MIX PLANTING SOIL MIXTURE AS SPECIFIED. MOISTEN AND TAMP SLIGHTLY AS PLACED. MIX SUPERPHOSPHATE IN THIS MEDIUM(SEE GUIDE). THOROUGHLY SOAK AFTER PLANTING. SEE SPECS THIS SHEET. LEAVE CROWN ® BASE OF PLANTING SO 2 TIMES DIAMETER OF ROOT BALL. THAT ROOT BALL DOES NOT REST ON BOTTOM OF HOLE. TREE PLANTING AND GUYING NOT TO SCALE CONTAINER PLANTING NOTES: 1. AREAS TO BE PLANTED ARE SHOWN ON THE PLAN. IF UTILITIES ARE ENCOUNTERED, PLANTS MAY BE REPOSITIONED SLIGHTLY TO AVOID IMPACT. 2. EACH PLANTING HOLE SHALL BE EXCAVATED AND PREPARED BY MIXING THE EXCAVATED MATERIAL INTO A PLANTING SOIL MIXTURE OF 2 PARTS PINE BARK SOIL CONDITIONER, 2 PARTS TOP SOIL AND 1 PART NATIVE MATERIAL, THOROUGHLY MIXED. 3. ALL TREES SHOULD BE PLANTED AND FERTILIZED ACCORDING TO DETAILS (SHEET 10.1) AND FERTILIZER CHART GUIDE SHOWN ON THIS SHEET. WHEN HOLE IS ALMOST BACKFILLED, ADD WATER AND ALLOW TO SOAK IN. FILL HOLE TO FINISH GRADE AND FORM A SHALLOW SAUCER AROUND THE TREE AS SHOWN ON DETAIL 3/10.1. WATER ENTIRE PLANTING AREA THROUGHLY. 4. IMMEDIATELY AFTER A TREE IS PLANTED, IT SHOULD BE SUPPORTED WITH STAKES AND GUY WIRES TO FIRMLY HOLD IT IN PLACE. (SEE DETAIL 3/10.1) 5. BEFORE PLACING MULCH, USE WEED CONTROL FABRIC AROUND EACH TREE TO A MINIMAL DIAMETER OF 24" AND FINISH WITH 4"-6" OF WELL AGED HARDWOOD MULCH. 6. SPRAY TREES AND SHRUBS WITH AN ANTI -DESICCANT IF FOLIAGE IS PRESENT. 7. WATER CONTAINER PLANTS THOROUGHLY AT PLANTING AND WEEKLY DURING THE FIRST GROWING SEASON, APRIL THROUGH OCTOBER. B. CONTRACTOR SHALL MONITOR AND WATER AS REQUIRED FOR PLANT SURVIVAL. 9. PLANTS SHALL BE WARRANTED FOR 100% SURVIVAL AT ONE YEAR -YEAR AFTER PLANTING, IF AT THE END OF ONE YEAR ANY PLANTS ARE DEAD OR DEAD LIKE CONDITION, RE -PLANTING OF SUFFICIENT STOCK TO COMPLY WITH AN 100% SURVIVAL RATE SHALL BE PERFORMED. 10. SEE TECHNICAL SPECIFICATIONS FOR ADDITIONAL INSTRUCTIONS AND REQUIREMENTS. Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements PLANTING PLAN i SHEET NO.