MEMORANDUM OF AGREEMENT
AMONG
THE UNITED STATES ARMY CORPS OF ENGINEERS, WILMINGTON DISTRICT,
THE NORTH CAROLINA STATE HISTORIC PRESERVATION OFFICER,
THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION, CSX
TRANSPORTATION, INC.
AND
CSX INTERMODAL TERMINALS, INC.
FOR THE
CENTRAL CAROLINA INTERMODAL FACILITY PROJECT
EDGECOMBE COUNTY, NORTH CAROLINA
WHEREAS, the CSX Intermodal Terminals, Inc. (CSXIT) propose to construct the Central
Carolina Intermodal Facility (CCX) in Edgecombe County, North Carolina, consisting of an
intermodal freight terminal, lead tracks to existing rail lines, office buildings, roadways, storm
water management basins, and ancillary facilities; and
WHEREAS, the United States Army Corps of Engineers, Wilmington District (USACE) is
considering the issuance of a Department of the Army permit for the Central Carolina Intermodal
Facility project; and
WHEREAS, the project is an Undertaking under Section 106 of the National Historic
Preservation Act (Section 106) (16 U.S.C. §470); and
WHEREAS, USACE is the responsible federal agency under Section 106 and the National
Environmental Policy Act (NEPA) (42 U.S.C. §4321 et seq.); and
WHEREAS, USACE consulted with the North Carolina State Historic Preservation Officer
(SHPO) pursuant to 36 C.F.R. §800, the regulations implementing Section 106; and
WHEREAS, through consultation with SHPO, USACE determined that the Undertaking has an
area of potential effects (APE), as shown in Appendix A, and SHPO concurred in that
determination on June 2, 2017; and
WHEREAS, the Odom-Cooper-Flye Farm (ED1639), including the Henry Odom Tenant House
(ED0624), which USACE previously determined to be eligible for inclusion in the National
Register of Historic Places (NRNP), is within the APE; and
WHEREAS, USACE has determined that the Undertaking will have an adverse effect on the
Odom-Cooper-Flye Farm; and
WHEREAS, USACE has consulted with SHPO in accordance with Section 106 and its
implementing regulations to resolve the adverse effect of the Undertaking on the Odom-Cooper-
Flye Farm; and
Page 1 of 6
Draft Memorandum of Agreement (MOA)
Central Carolina Intermodal Facility Project
Edgecombe County, North Carolina
WHEREAS, NCDOT participated in the consultation and has been invited to be a signatory to
this MOA; and
WHEREAS, CSX AND CSXIT participated in the consultation and has been invited to be a
signatory to this MOA;
NOW, THEREFORE, USACE and SHPO agree that the Undertaking shall be implemented in
accordance with the following stipulations to consider the adverse effect of the undertaking on
the Odom-Cooper-Flye Farm.
STIPULATIONS
I. Mitigation
A. Contextual Study of Extant Historic Farm Resources in Edgecombe County
NCDOT will prepare a contextual study of extent historic farm resources
in Edgecombe County. CSXIT will provide funding for the study. The
study will focus on those farm resources that are over 50 years of age at
the time of the study and retain sufficient standing buildings, structures,
and/or objects to be readily identified as a farm, whether active,
repurposed, or abandoned. The study will address tenant houses if they
appear to be associated with extant farm resource. The study will provide:
a. reconnaissance -level documentation of the range of surviving
historic farm resources in the county;
b. intensive -level documentation for a limited number of farm
resources with representation of at least one resource in each of the
fourteen townships of the county;
C. recommendations for resources to be included in the North
Carolina Study List;
d. a written report that includes a general historic context and an
architectural context for the farms of the county.
2. Prior to initiation of the study, NCDOT and CSXIT will prepare and
submit a detailed scope of work to SHPO and USACE for review and
approval. The scope of work will define a proposed level of effort,
parameters for context development, and the format of deliverables,
including GIS documentation requirements. The scope of work will
establish a finite number of resources to be documented at the
reconnaissance and intensive levels. It will also specify that planning and
background research for reconnaissance -level documentation will utilize
information on previously recorded resources from SHPO survey files,
Page 2 of 6
Draft Memorandum of Agreement (MOA)
Central Carolina Intermodal Facility Project
Edgecombe County, North Carolina
information from the 1905 Map of Edgecombe County, North Carolina
and the 1938 Map of Edgecombe County (Statewide Highway Planning
Survey) showing individual properties in the townships outside the
municipalities, the current list of Century Farms posted by the North
Carolina Department of Agricultural and Consumer Services, and a local
advisory committee or focus group assembled based on recommendations
from such agencies as the North Carolina Cooperative Extension Service,
Edgecombe County Center. For intensive -level documentation, the scope
of work will outline a procedure for SHPO and USACE to approve
selected resources.
3. NCDOT will conduct fieldwork for reconnaissance -level documentation
from public rights-of-way. The fieldwork will involve digital photography
(up to 6 photos per resource) and the collection of minimal information for
each resource (name, address, construction date, style of primary resource,
number of outbuildings and key outbuilding types, and integrity). NCDOT
will complete a SHPO Survey Site Form with required photographic
documentation for each newly identified resource and an updated form for
each previously recorded resource. For intensive -level documentation of
selected resources NCDOT will secure permission of property owners to
obtain access for digital photography and the preparation of sketch site
plans showing the relationship of component buildings. Interiors of
dwellings will not be accessed; interiors of other farm buildings will be
accessed if required to determine building function, but no floor plans will
be prepared. NCDOT will conduct informant interviews, as appropriate,
and deed, will, and/or census research to provide sufficient context for
understanding the historic themes associated with the farms, including
ethnicity. NCDOT will update SHPO Survey Site Forms based on
intensive -level documentation and prepare a one -or -two-page survey
narrative for the SHPO survey file.
4. NCDOT will prepare a written report on the study, designed to serve as a
resource for the evaluation of similar resources in the region and as a
suitable document for public dissemination. The report will address the
early history of farming in the county and how it is reflected in the built
environment, as well as the impact of twentieth-century developments,
such as mechanization and the tobacco allotment program, on the nature of
farm architecture and landscapes. NCDOT will create GIS shapefile data
for addition to SHPO's HPOWEB GIS Service. Shapefile data will
comply with SHPO standards.
IL Unanticipated Discovery
Page 3 of 6
Draft Memorandum of Agreement (MOA)
Central Carolina Intermodal Facility Project
Edgecombe County, North Carolina
A. In accordance with 36 CFR §800.11(a), and prior to initiation of construction
activities, USACE shall ensure preparation of a plan of action should
archaeological or architectural resources be inadvertently or accidentally
discovered during the construction phase of the Undertaking. The plan shall
provide for an assessment of the significance of the discovery in consultation with
SHPO. Inadvertent or accidental discovery of human remains will be handled in
accordance with North Carolina General Statutes 65 and 70.
III. Dispute Resolution
A. Should any party to this MOA, per 36 CFR §800.6(c)(1) and (2), object within
thirty (30) days to any plans or documentation provided for review or object to the
way the terms of this MOA are implemented, USACE shall consult with such
party to resolve the objection. The objection must specify how the actions or
manner of implementation is counter to the goals, objectives, or specific
stipulation of this MOA. If USACE determines that such objection cannot be
resolved, USACE will forward all documentation relevant to the dispute,
including USACE's proposed resolution, to the Advisory Council on Historic
Preservation (ACHP). ACHP shall provide USACE with its advice on resolution
of the objection within thirty (30) days of receiving adequate documentation.
Prior to reaching a final decision on the dispute, USACE shall prepare a written
response that considers any timely advice or comments regarding the dispute from
ACHP and signatories, and provide them with a copy of this written response.
USACE will then proceed per its final decision. If ACHP does not provide its
advice regarding the dispute within the thirty (30) -day period, USACE may make
a final decision on the dispute and proceed accordingly. Prior to proceeding,
USACE shall notify the parties to this MOA of its decision regarding the dispute.
B. USACE's responsibility to carry out all other actions subject to the terms of this
MOA that are not the subjects of the dispute remain unchanged.
IV. Amendment
A. Any signatory or invited signatory to this MOA may propose to USACE that the
agreement be amended, whereupon USACE shall consult with the other parties to
this MOA to consider such an amendment. 36 CFR §800.6(c) (1) and (7) shall
govern the execution of any such amendment. No amendment shall be made
without the written consent of USACE, SHPO, NCDOT, CSXT and CSXIT.
V. Termination
A. If any signatory or invited signatory to this MOA determines that its terms will
not or cannot be carried out, that party shall immediately consult with the other
signatories to attempt to develop an amendment. If within thirty (30) days (or
Page 4 of 6
Draft Memorandum of Agreement (MOA)
Central Carolina Intermodal Facility Project
Edgecombe County, North Carolina
another time period agreed to by all signatories) an amendment cannot be
reached, any signatory may terminate the MOA upon written notification to the
other signatories.
VI. Duration
A. This agreement shall terminate five (5) years from the date of its execution, unless
the signatories agree in writing to an extension for carrying out its terms.
VII. Miscellaneous
A. USACE, SHPO, NCDOT, and CSX shall comply with Article 2, Chapter 64, of
the North Carolina General Statutes. USACE, SHPO, NCDOT, CSXT and CSXIT
hereby certify that USACE, SHPO, NCDOT, CSXT and CSXIT, respectively, are
not on the Iran Final Divestment List created by the North Carolina State
Treasurer pursuant to N.C.G.S. 147-86.58.
B. There are no third -party beneficiaries to this MOA.
Execution of this MOA by USACE, SHPO, NCDOT, CSX and CSXIT and implementation of its
terms, evidences that USACE has complied with Section 106 on the Undertaking and its effects
on Odom-Cooper-Flye Farm and that USACE has considered the effects of the Undertaking on
Odom-Cooper-Flye Farm.
AGREE:
United States Army Corps of Engineers, Wilmington District
By: Kevin P. Landers, Sr. Date
Colonel, U.S. Army
District Commander
North Carolina State Historic Preservation Officer
By: Kevin Cherry, Ph.D. Date
North Carolina State Historic Preservation Officer
North Carolina Department of Transportation
By: Beverly G. Robinson Date
Project Development Group
Page 5 of 6
Draft Memorandum of Agreement (MOA)
Central Carolina Intermodal Facility Project
Edgecombe County, North Carolina
CSX Transportation, Inc.
By: name Date
title
CSX Intermodal Terminals, Inc.
By: name Date
title
Page 6 of 6