Loading...
HomeMy WebLinkAbout20170938 Ver 1_2017_0519 McFalls Little Phone Conversation with sas edits_20170731.T STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER JAMES H. TROGDON, III GOVERNOR SECRETARY DATE: May 22, 2017 TO: Tim Little, PE, Division Engineer Division 4 FROM: Eddie McFalls, PE, Rail Division Strategic Initiatives Consultant SUBJECT: P-5711 C, CCX Intermodal Facility, Edgecombe County Phone Call Documenting Scope and Anticipated Impacts of Highway Improvements Associated with construction of the CCX Intermodal Hub and Terminal On May 19, 2017, Tim Little and Eddie McFalls discussed the scope and anticipated impacts associated with the highway improvements that will be constructed in the vicinity of the CCX Intermodal Hub and Terminal. Eddie noted that CSX's consultant was preparing the environmental documentation associated with the terminal and double track. CSX's consultant must provide information to the US Army Corps of Engineers (USACE) about the anticipated impacts of the highway improvements, as USACE considers the permit for the terminal and double track. Currently, the Draft State Transportation Improvement Program includes up to $10 million for associated highway improvements. The scope of the highway improvements are briefly described below: 1. Resurfacing Improvements on NC 4 (North and South) from I-95 to US 301 2. Resurfacing Improvements on Red Oak Battleboro Road from NC 4 to US 301 3. Resurfacing Improvements on Morning Star Church Road from US 301 to Old Battleboro Road 4. Turn lane and resurfacing on Old Battleboro Road from Morning Star Church Road to CCX entrance 5. Turn Lane to accommodate traffic moving from Red -Oak Battleboro onto NC 4 6. Shoulder and Resurfacing Improvements to Old Battleboro from CCX entrance to NC 97 (Cool Spring Road) 7. Shoulder and Resurfacing Improvements to Fountain School Road from Old Battleboro Road to Tanner Road 8. Shoulder and Resurfacing Improvements to Tanner Road from Fountain School Road to NC 97 (Cool Spring Road) 9. Roundabout at Old Battleboro and Morning Star Church Road The shoulder improvements listed above are on two-lane secondary roads. The shoulder improvements will consist of converting approximately 1-2 feet of the existing grassed shoulders Mailing Address: Telephone: (919) 707-4700 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (919) 715-6580 1 SOUTH WILMINGTON STREET RAIL DIVISION Customer Service: 1-877-368-4968 RALEIGH, NC 27601 1553 MAIL SERVICE CENTER RALEIGH, NC 27699-1553 Website: www.ncdot.gov www.ncbytrain.org to paved shoulders. No significant additional embankment is anticipated to be constructed to accommodate the wider paved shoulders. Tim Little noted the improvements are not currently anticipated to have additional impacts to jurisdictional waters. Due to the scope and nature of the improvements, if impacts are identified as designs continue to progress, they are anticipated to be minor and a Minimum Criteria Checklist would be prepared for the improvements. These notes are intended to document the conversation held on May 19, 2017. If you have any questions or concerns about the information included, please call me at (919) 707-4727 or email me at ebmcfallskncdot.gov. 1910,105 cc: John Dillard, CSX Sandra, Stepney, PE Jason Orthner, PE Brad Smythe, PE