Loading...
HomeMy WebLinkAbout20170951 Ver 1_PCN Form Submission_20170802Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 8/2/2017 4:49:35 PM (Start Event) Accept by Carpenter,Kristi 8/3/2017 2:26:00 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: August 7, 2017 5:00 PM 8/2/2017 4:50 PM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 28, 2017 Ver 1.8 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx A. Processing Information County (or Counties) where the project is located:* Onslow Is this a NCDOT Project?* C� Yes �' No (NCDOT only) T.I.P. or state project number: W-5601A WBS # 50138.1. F D2 (for f�1CDOT use only) � 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 14 - Linear transportation 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: I For the record only for Corps Permit: 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? * l" Yes C•' No C•' Yes C' No If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No 1f. Is the project located in any of NC's twenty coastal counties?* C� Yes l" No 1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* C' Yes �' No C' Unknown B. Applicant Information 1a. Who is the Primary Contact?* Anneliese Westphal 1b. Primary Contact Email:* awestphal@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (910)341-2037 1d. Who is applying for the permit? r Owner �J Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: State of North Carolina 2b. Deed book and page no.: f�UA 2c. Responsible party: (for Corporations) Karen Collette, P.E. � 2d.Address Street Address 5501 Barbados Blvd. Address Line 2 �� Castle Hayne Fbstal / Zip Code 28429 2e. Telephone Number: (xxx)xxx-xxxx (910)341-2000 2f. Fax Number: (910)675-0143 (xxx)xxx-xxxx 2g. Email Address:* kecol lette@n cdot. g ov 3. Applicant Information (if different from owner) 3a. Applicant is: State / Rovince / F�gion NC Country USA C� Agent C' Other If other please specify. 3b. Name: Anneliese Westphal 3c. Business Name: (if applicable) NCDOT Division 3 3d.Address Street Address 5501 Barbados Blvd. Address Line 2 �� Castle Hayne Fbstal / Zip Code 28429 3e. Telephone Number: (910)341-2037 (xxx)xxx-x�cx 3f. Fax Number: (910)675-0143 (xxx)xxx-xxxx 3g. Email Address:* awestphal@ncdot.gov State / Rovince / F�gion NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Rhodestown Road Curve Realignment 1b. Subdivision name: (if appropriate) wa 1c. Nearest municipality/town:* Richlands 1d. Driving directions* If it is a new project and can not easily be found in a C�5 rrapping system Rease provide directions. From Wilmington, NC travel north on US 17 to Jacksonville, NC. In Jacksonville, travel west on US 258/NC 24 for appro�amately 7.1 miles and then turn right onto SR 1329 Rhodestown Fire Department Rd. Travel for 732 feet and then turn right onto SR 1317 Briarneck Rd. Travel for 788 feet and then turn left onto SR 1316 Rhodestown Rd. Travel for 2.2 miles and arrive at the project site. 2. Project Identification 2a. Property Identification Number: (t�vc RN or parcel ID) � wa 2b. Propertysize: (in acres) wa 2c. Project Address Street Address Address Line 2 (7iy Fbstal / Zip Code 2d. Site coordinates in decimal degrees State / FYovince / F�gion Country i Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) i Latitude:* Longitude:* 34.851197 -77.49343 ex:34208504 -77.796371 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* i New River 3b. Water Resources Classification of nearest receiving water:* C; NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* White Oak RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The conditions within the e�asting 60 feet of R/W include a secondary road facility with grassed shoulders ditch sections. The property to the north of the project is developed as residential property and the property to the south is both forested and agricultural. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Gick the upload button or drag and drop files here to attach docurrent W-5601A Rhodestown Rd_Topo.pdf 289.69KB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Gick the upload button or drag and drop files here to attach docurrent W-5601A Rhodestown Rd_Soil.pdf 618.78KB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 0 4f. Explain the purpose of the proposed project: The purpose of this project is to improve safety by reducing runoff road crashes by widening shoulder widths and improving the curve radius. 4g. Describe the overall project in detail, including the type of equipment to be used: W-5601A is a curve realignment project in Onslow County. Therefore, part of this project is on new location. Therefore, road construction activities will include clearing, grading, fill, drainage, and paving. Typical road building and construction equipment will be used including excavators, dump trucks, motor graders, milling and paving equipment. 4h. Please upload project drawins for the proposed project. aick the upload button or drag and drop files here to attach docurrent W-5601 A_Permit_Drawings_20161031.pdf 1.19M6 Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* �' Yes C' No c' Unknown Comments: The features have been delineated, but a PJD request has not yet been submitted to the Corps. It will be submitted soon. 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary C' Approved C•' Unknown Corps AID Number: I 6carrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Christopher Dustin SEPI 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. NCDOT will submit a PJD request via email. NCDOT's Corps representative and NCDWR representative met on-site on 1/6/2016. 5d1. Jurisdictional determination upload C7ick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes �' No �' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed I m pacts I nventory 1. Impacts Summary I 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r Streams-tributaries r Buffers fJ Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. '* All Perennial or Intermittent streams must be verified by DWR or delegated local government. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Site # - Reason for impact Site 1 N�p label (e.g. Finad Qossing 1) Site 1 fv�p label (e.g. I�ad Qossing 1) 4b. Impact type P F2rrranent (F) or Terrporary (� T F2rrrenent (Pj or Terrporary (� 4g. Total temporary open water Impacts: 0.01 4g. Total permanent open water impacts: 0.01 4g. Total open water impacts: 0.02 4h. Comments: Site 1 Permanent impacts: 425 sq. ft. Site 1 Temporary impacts: 79 sq. ft. 4c. Name of waterbody N/A (if applicable) N/A (if applicable) 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 4d. Activity 4e. Waterbody4f. Impact area type type Culverts Tributary 0.01 (acres) Dewatering Tributary 0.01 (acres) 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The project will utilize ditches to convey stormwater runoff and the e�sting drainage patterns have been maintained as closely as possible. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:* The project will be constructed utilizing approved Best Management Practices for Construction and Maintenance Activities. All permit plans and conditions will be enforced so that the amount of impacts is limited to what is enumerated in this application. I 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes �' No 2b. If this project DOES NOT require Compensatory M itigation, explain why: The only impacts are to a non-mitigable tributary. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? C�' Yes C' No 1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: I The project consists of roadway curve realignment to improve traffic safety. The e�asting 2-lane roadway with ditches will be relocated as a 2-lane roadway facility with improved shoulders in Onslow County. The existing and proposed typical section will utilize ditches to convey stormwater runoff. E�asting drainage patterns have been maintained as closely as possible. 1c. What is the overall percent imperviousness of this project? 23 % 1d. Who will be responsible for the review of the Stormwater Management Plan?* r Certified Local Government r DWR 401 & Buffer Permitting Branch 2. Diffuse Flow Plan r DEMLR Stormwater Review �J DWR Transportation Permitting Branch 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes �' No If no, explain why: There are no protected riparian buffers in the White Oak River Basin. 5. DWR 401 Stormwater Review 5a. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached? C� Yes C' No Stormwater Management Plan Upload aick the upload button or drag and drop files here to attach docurrent file type rrust be pdf G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* C� Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes C•' No Comments:* A CE document was completed for this project. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or i DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes C•' No 2b. Is this an after-the-fact permit application?* f Yes C•' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes �' No 3b. If you answered "no," provide a short narrative description. This project is one which qualifies as an action "27" categorical exclusion under 23 CFR 771.117. As such, the project is in a category of projects that add either no or a minor amount of new impervious surface directly, � indirectly, or cumulatively. Consequently, the project will not result in cumulative impacts that cause or will cause a violation of downstream water quality standards. 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. f�UA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * C' Yes C•' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes �' No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is this a DOT project located within Division's 1-8?* C� Yes C' No 5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* An evaluation of the natural communities and threatened and endangered species for this project included a GIS- based review of aerial imagery, a review of the North Carolina Natural Heritage Program (NCNHP) web-based mapping tool, and a field survey by environmental scientists. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* I NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * NCDOT PDEA Human Environment Section screening. Please see attached forms. 7c. Historic or Prehistoric Information Upload qick the upload button or drag and drop files here to attach docurrent Fle rrust be F�F 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C' Yes C•' No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination?* NC Floodplain Mapping Program Miscellaneous attachments not previously requested. C7ick the upload button or drag and drop files here to attach docurrent Vicinity Map.pdf 134.37KB Fle rrust be Ft7F Signature * fJ By checking the box and signing below, I certify that: . I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Anneliese Westphal Signature A��eleSe �es��rs� Date 8/2/2017 Initial Review Is this project a public transportation project? r Yes C' No Only change this if the project has been reassigned. Has this project met the requirements for acceptance in to the review process?* �' Yes C' No BIMS # Assigned* 20170951 Version#* Reviewing Office * Wilmington Regional Office - (910) 796-7215 Select Project Reviewer* Joanne Steenhuis:eads\jhsteenhuis