Loading...
HomeMy WebLinkAbout20170938 Ver 1_Appendix H - Flood Study and No-Rise Cert_20170731Appendix H CSX CCX Intermodal Rail Terminal & Second Mainline Edgecombe and Nash Counties, North Carolina Project No. 643009004 APPENDIX H FLOOD STUDY AND NO -RISE CERTIFICATION Appendix H CSX CCX Intermodal Rail Terminal & Second Mainline Edgecombe and Nash Counties, North Carolina Project No. 643009004 THIS PAGE INTENTIONALLY LEFT BLANK Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Carolina Connector Intermodal Rail Terminal Flood Study CSX Intermodal Terminals, Inc July 25, 2017 �FESSipN`��9 9� ' 040473 — /V J. \N INTERMODAL TERMINALS Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Carolina Connector Intermodal Rail Terminal Flood Study CSX Intermodal Terminals, Inc July 25, 2017 NO -RISE CERTIFICATION This document is to certify that I am duly qualified engineer licensed to practice in the State of North Carolina. It is to further certify that the attached technical data supports the fact that the proposed Carolina Connect Intermodal Rail Terminal Project will not increase the base flood elevations or floodway elevations, or impact the floodway widths, on Tar River Backwater at published cross-sections in the Flood Insurance Study for Edgecombe/Nash Counties, North Carolina, FEMA Map Numbers 3720386100K, 3720385100K, 3720386000K, and 3720385000K dated June 18, 2013 and will not increase the base flood elevations or floodway elevations, or impact the floodway widths at unpublished cross-sections in the area of the proposed development. ���►ti�rr�iii -CARoZ/f� J 40473 — i �FjV 'IN�CEQ`� Seal and Signature Nathan Ortega Name Project Manager Title 725 West Town and Country Road, Suite 300 Orange, CA, 92868 Address 7/17/2017 Date FOR COMMUNITY USE ONLY ❑ Approved ❑ Disapproved Name and Title Signature Date NO -RISE CERTIFICATION This document is to certify that I am duly qualified engineer licensed to practice in the State of North Carolina. It is to further certify that the attached technical data supports the fact that the proposed Carolina Connect Intermodal Rail Terminal Project will not increase the base flood elevations or floodway elevations, or impact the floodway widths, on Hornbeam Branch at published cross-sections in the Flood Insurance Study for Edgecombe/Nash Counties, North Carolina, FEMA Map No. 3720386100K dated June 18, 2013 and will not increase the base flood elevations or floodway elevations, or impact the floodway widths at unpublished cross-sections in the area of the proposed development. \�� J I I I I/// � C � SEAL 040473 _- 4NJ.WiD`�ti 111 Seal and Signature Nathan Ortega Name Project Manager Title 725 West Town and Country Road, Suite 300 Orange, CA, 92868 Address 7/17/2017 Date FOR COMMUNITY USE ONLY ❑ Approved ❑ Disapproved Name and Title Signature Date NO -RISE CERTIFICATION This document is to certify that I am duly qualified engineer licensed to practice in the State of North Carolina. It is to further certify that the attached technical data supports the fact that the proposed Carolina Connect Intermodal Rail Terminal Project will not increase the base flood elevations or floodway elevations, or impact the floodway widths, on Compass Creek at published cross-sections in the Flood Insurance Study for Edgecombe/Nash Counties, North Carolina, FEMA Map No. 3720386100J dated June 18, 2013 and will not increase the base flood elevations or floodway elevations, or impact the floodway widths at unpublished cross-sections in the area of the proposed development. �� H=CAR041��,. � 'ta•` ,, 5l,� ` �,9 i r.EAL - - '� 040473 /V J �W, Seal and Signature Nathan Orteqa Name Project Manager Title 725 West Town and Country Road, Suite 300 Orange, CA, 92868 Address 7/17/2017 Date FOR COMMUNITY USE ONLY ❑ Approved ❑ Disapproved Name and Title Signature Date NO -RISE CERTIFICATION This document is to certify that I am duly qualified engineer licensed to practice in the State of North Carolina. It is to further certify that the attached technical data supports the fact that the proposed Carolina Connect Intermodal Rail Terminal Project will not increase the base flood elevations or floodway elevations, or impact the floodway widths, on Beech Branch at published cross-sections in the Flood Insurance Study for Edgecombe/Nash Counties, North Carolina, FEMA Map No. 3720386300) dated November 3, 2004 and will not increase the base flood elevations or floodway elevations, or impact the floodway widths at unpublished cross-sections in the area of the proposed development. H-CARO���'r -, EAL - 040473 - '4 '"zNGINES\ J.W•��` /f/J1111��r Seal and Signature Nathan Ortega Name Project Manager Title 725 West Town and Country Road, Suite 300 Orange, CA, 92868 Address 7/17/2017 Date FOR COMMUNITY USE ONLY ❑ Approved ❑ Disapproved Name and Title Signature Date Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= Contents 1. Introduction..................................................................................................................................................... 1 1.1 Tar River........................................................................................................................................................ 2 1.2 Hornbeam Branch.......................................................................................................................................... 3 1.3 Compass Creek............................................................................................................................................ 4 1.4 Beech Branch................................................................................................................................................ 5 2. Hydrologic Analysis....................................................................................................................................... 6 3. Hydraulic Analysis — Tar River...................................................................................................................... 7 3.1 Effective and Duplicate Effective Models...................................................................................................... 7 3.2 Corrected Effective/Existing Conditions Model.............................................................................................. 7 3.3 Proposed Conditions..................................................................................................................................... 8 3.4 Floodway...................................................................................................................................................... 10 4. Hydraulic Analysis — Hornbeam Branch.................................................................................................... 11 4.1 Effective and Duplicate Effective Models.................................................................................................... 11 4.2 Corrected Effective/Existing Conditions Model............................................................................................ 11 4.3 Proposed Conditions................................................................................................................................... 12 4.4 Floodway...................................................................................................................................................... 13 5. Hydraulic Analysis — Compass Creek........................................................................................................ 14 5.1 Effective and Duplicate Effective Models.................................................................................................... 14 5.2 Corrected Effective/Existing Conditions Model............................................................................................ 14 5.3 Proposed Condition Model.......................................................................................................................... 15 5.4 Floodway...................................................................................................................................................... 16 6. Hydraulic Analysis — Beech Branch........................................................................................................... 17 6.1 Effective and Duplicate Effective Models.................................................................................................... 17 6.2 Corrected Effective/Existing Conditions Model............................................................................................ 17 6.3 Proposed Condition Model.......................................................................................................................... 18 6.4 Floodway...................................................................................................................................................... 19 7. Conclusion.................................................................................................................................................... 20 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS' Appendix 1 Intermodal Project Exhibits Appendix 1A — Tar River Appendix 1A(1) Exhibits Appendix 1A(2) Hydrologic Data Appendix 1A(3) Hydraulic Model Appendix 1A(4) Supplemental/Additional Data Appendix 1 B - Hornbeam Branch Appendix 1B(1) Exhibits Appendix 1 B(2) Hydrologic Data Appendix 1 B(3) Hydraulic Model Appendix 1 B(4) Supplemental/Additional Data Appendix 1 C - Compass Creek Appendix 1C(1) Exhibits Appendix 1C(2) Hydrologic Data Appendix 1C(3) Hydraulic Model Appendix 1C(4) Supplemental/Additional Data Appendix 1 D - Beech Branch Appendix 1D(1) Exhibits Appendix 1 D(2) Hydrologic Data Appendix 1 D(3) Hydraulic Model Appendix 1D(4) Supplemental/Additional Data Carolina Connector Intermodal Rail Terminal Flood Study JACOBS 1. Introduction Carolina Connector Intermodal Rail Terminal (CCX) is a gateway connecting eastern North Carolina to CSX's expansive railway system. It is located north of Rocky Mount along CSX's north -south main line near Highway 301, Highway 97 and Battleboro Leggett (Appendix 1). The project extends from Airport Road north to Battleboro Avenue. Table 1 summarizes the affected crossings, flows, existing structure sizes and proposed structure sizes. A portion of the project is located in FEMA designated Special Flood Hazard Area (SFHA). Therefore, this analysis has been prepared per federal and state requirements to assist in the preparation of an Environmental Impact Statement (EIS) and to understand the impact of the project on effective floodplain and floodways. This document meets standards contained in the NCDOT Guideline for Drainage Studies and Hydraulic Design and CSX Transportation Drainage Criteria. Any work within a Federal Emergency Management Agency (FEMA) designated Flood Hazard Area must be in compliance with the National Flood Insurance Program (NFIP). The analyses have been conducted in accordance with the following NFIP key regulations and orders: Title 44 CFR parts 59, 60, 65 and 70, Federal Executive Order 11988, and NC Executive Order 123. The State of North Carolina is designated as a Cooperating Technical State (CTS) meaning that the State, as managed by NC Floodplain Mapping Program (NCFMP), assumes primary ownership and responsibility of the NFIP. Therefore, proposed improvements (including adding, changing, replacing, or removing any structure) on a FEMA regulated stream must be documented and receive approval from NCFMP. Therefore, the hydraulic model and this report will be submitted to NCFMP for approval. Table 1. Drainage Area, Flow and Structure Size and Type for Streams Crossing CCX Intermodal Crossings DA Flow, Q (CFS) Upstream Existing Proposed (acres) for 100 yr Structure Type & Structures Type Storm Event Size & Size Tar River NA (Back- 293002 9' Span Bridge 9' Span Bridge water) 12'x 9' Pipe Arch Hornbeam 3878.4' 20802 12'x 9' Pipe Arch Branch Compass 4697.6' 27302 32' Span Bridge 32' Span Bridge Creek Box Culvert Beech12'x4.7' 35008' 12702 & Four- 9' x 8' Box Branch . Culverts 11.5' CMP Note: 1. Drainage area calculated using Streamstat. 2. The flow values are from FIS Study 37127CV000D, Revised July 7, 2014 Carolina Connector Intermodal Rail Terminal Flood Study JACOB 1.1 Tar River Tar River crosses t he existing CSX Railroad rail lines on the northeast side of the City of Rocky Mount, North Carolina. The proposed crossing alignment at Rail Station 6172 is parallel to the existing tracks and not on Tar River. The impacted area is located just south of Airport Road between the City of Rocky Mount, Nash County to the west and Edgecombe County to the east (see Figure 1A(1)). A more detailed map of the vicinity is located in Appendix 1A. An aerial map showing the crossing is also located in Appendix 1A. FIRM Map Numbers 3720386100K, 3720385100K, 3720386000K, and 3720385000K, dated June 18, 2013 contain the immediate upstream vicinity, the crossing, and downstream portions of Tar River. The proposed crossing is shown on this panel to be in Zone AE. A copy of the FIRM panels used is included in Appendix 1A, Effective FIRM. JACOBS CCX Intermodal Project Limit Fe 0 1,525 3.250 6.5W 3,750 13,030 Figure 1A(1). Location Reference Map 2 VA Hornbeam -t Branch` _ Compass _.. Beech Branch Tar River beef LM y, Lund —$W1R LN - Swion Em. H€RE aemeMPcoy_ GE9� 5.t1. kvn Rip �'� lk+n0�, mM4� MPrlhEm. i Cen'>rc ?um.. Es.. HL0.F. Dr:amr JACOBS CCX Intermodal Project Limit Fe 0 1,525 3.250 6.5W 3,750 13,030 Figure 1A(1). Location Reference Map 2 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 1.2 Hornbeam Branch Hornbeam Branch crosses two existing CSX Railroad rail lines on the northeast side of the City of Rocky Mount, North Carolina. The proposed crossing alignment is parallel to the existing tracks. This crossing of Hornbeam Branch is unique in that three jurisdictions contain a portion of the crossing. The City of Rocky Mount and Nash County lie to the west side, upstream of the crossing, while Edgecombe County is on the east, downstream side of the crossing. Downstream of this crossing Hornbeam Branch flows into Compass Creek which empties into the Tar River. A general reference map for this location is provided below in Figure 1 13(1)). A more detailed map of the vicinity is located in Appendix 1 B. An aerial map showing the crossing is located in Appendix 113. FIRM Numbers 3720386100K, 3720385100K, 3720386000K, and 3720385000K, dated June 18, 2013 contain the immediate upstream vicinity, the crossing, and downstream portions of Tar River. The proposed crossing is shown on this panel to be in Zone AE. A copy of the FIRM panels used is included in Appendix 113, Effective FIRM. 4 Hornbeam Branchis Beech Branch Compass Creek Droy—LIM w Tar River e� Legend 5 WTR LN 4aruf [�ui.MERE men—_—ewsN'N Cup.. Cd'x _ yy fI�V �9t +Msdapo sfy...rm� ": f M.onMna.. bardFrMAy wxnwcn. Fsa HEaC W.mr JACOBS CCx Intermodal Project LimitFeel 9 1,625 3.250 6,500 9750 13.000 Figure 113(1). Location Reference Map 3 Carolina Connector Intermodal Rail Terminal Flood Study 1.3 Compass Creek JACOBSL Compass Creek is located in the Coastal Plain region of Tar -Pamlico River basin (8 -digiti HUC 03020101) and surrounded by Nash County to the west and Edgecombe County to the east (Appendix A). It crosses the existing railroad via a bridge, constructed in the early 1900's. Flow is from west to east and ultimately flows to Tar River. A general reference map for this location is provided below in Figure 1C(1)). This crossing is within the City of Rocky Mount. The proposed crossing as shown on FIRM Number 3720386100J is in a FEMA designated SFHA Zone AE. A copy of the FIRM panels used is shown in Appendix 1C, the Effective FIRM. Hornbeam ranch_ Beech Branch Compass �.. .� _ — 'Creek i5o�l Lirtxl Tar River LeWd -5 WTR LN c.mM r. can ur am.[ tot m.a� JACOBS CCx Intermodal Project Limit Figure 2C(1). Location Reference Map I Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 1.4 Beech Branch Beech Branch is located in the Coastal Plain region of Tar -Pamlico River basin (8 -digiti HUC 03020101) and surrounded by Nash County to the west and Edgecombe County to the east (Appendix A). It crosses the existing railroad via two structures, a 12'x4.7' Box Culvert and an 11.5' CMP. Flow is from west to east and ultimately flows to Tar River. A general reference map for this location is provided below in Figure 1A(1)). This crossing is within the City of Rocky Mount. The proposed crossing as shown on FIRM Map Number 3720386300J is in a FEMA designated SFHA Zone AE. A copy of the FIRM panels used is shown in Appendix 11)(1), the Effective FIRM Map. JACOBS CCX Intermodal Project Limit Fee 0 1,625 3,250 65W 9.750 13.0W Figure 11)(1). Location Reference Map 5 F{63 - .. _da .. Hornbea Branch Beech a i Branch Grc)w umrr Compass Creek Tar River ' � 5 IMfR LN Paree. E�.HCaE �aNa(:ap..GE6r ye+d.uE'n [Yn:iry SVS c -r .fin ..faaau W.*ewr rnrm�nw.'b mn�nevun. [ +.HE;tE. dram -nm. JACOBS CCX Intermodal Project Limit Fee 0 1,625 3,250 65W 9.750 13.0W Figure 11)(1). Location Reference Map 5 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS' 2. Hydrologic Analysis A hydrologic analysis was not performed as part of this flood study. Flows from the published effective Flood Insurance Study (FIS) (Study No. 37127CV000D revised July 7, 2014) were compared to the flows in models obtained from the North Carolina Floodplain Mapping Program. The flows in the FIS and effective models were identical for the 100 -year event. Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 3. Hydraulic Analysis - Tar River 3.1 Effective and Duplicate Effective Models The effective models were downloaded from North Carolina Floodplain Mapping Program (NCFMP) website (www.ncfloodmaps. com). The downloaded effective model was run using HEC -RAS (version 5.0.3) to duplicate the output from the effective FIS report. The models use 29,300 cfs for the 100 -year flow. According to the FIS, during the 100 -year event, backwater from the Tar River impacts the downstream face of the existing railroad crossing. 3.2 Corrected Effective/Existing Conditions Model The cross section Stations 445378 and 444102 in the vicinity of CSX rail road crossing in the existing conditions model matches to the effective model. For this study the limits of model are from cross section Station 447983 on upstream end to Station 441773 on downstream. The boundary condition is a known water surface elevation which is the same as in the effective models. The existing conditions model and all models developed from the existing conditions model contain the same flow data used in the effective models. The existing conditions model was checked to ensure it accurately represented the existing conditions based on the data currently available. No updates or corrections to the duplicate effective model were necessary. Table 3.2.1. Summary of Effective vs. Existing Conditions Water Surface Elevations Q Total Water Surface Elevation Velocity Channel (ft) (ft/s) River Sta (cfs) Effective (EF) Duplicate Effective (DEF) Existing (EX) Delta (EX -EF) Effective (EF) Duplicate Effective (DEF) Existing (EX) Delta (EX -EF) 447983 29300 80.4 80.4 80.4 0.00 4.05 4.05 4.05 0.00 446626 29300 78.74 78.74 78.74 1 0.00 1 7.62 7.62 7.62 0.00 446531 Highway 64 Bypass (Rocky Mount) 446436 29300 78.36 78.37 78.37 0.00 7.7 7.69 7.69 0.00 445378 29300 78.28 78.28 78.28 0.00 5.35 5.35 5.35 0.00 444102 29300 78.14 78.14 78.14 0.00 4.56 4.56 4.56 0.00 441773 29300 77.95 77.95 77.95 0.00 3.53 3.53 3.53 0.00 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 3.3 Proposed Conditions A proposed conditions hydraulic model was prepared using the existing conditions model as a base. The rail road bridge crossing at Station 6172 is not included in the effective Tar River model. Also this crossing is influence by backwater through Tar River flooding. There are BFE cross sections River Stations 445378 and 444102 in the vicinity of this bridge crossing. Hence for this analysis the proposed conditions model was prepared to represent additional fill due to proposed embankment in the floodplain. Figure 3.3.1 below shows fill placed at typical cross section at Station 6173 to accommodate the intermodal facility lead tracks. Cross section geometry for HEC -RAS Stations 445378 and 444102 was modified to the additional fill. All other inputs (i.e. other cross sections geometry, flow, boundary conditions, Manning's "n", etc.) are identical to those used in the existing conditions model. N h;i 43 t Lr d t a LU � S[16CRA0 f TOP 2D to 0 -10 -2D -30 -40 -50 -60 -70 5173+00 Figure 3.3.1 Station 6173 Rail Cross Section 8 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= -.W- .,CUs. T ,; � x, a� ZFF Figure 3.3.2 Proposed Cross Section 445378 Representing Fill There is no rise in water surface elevations when compared to existing conditions model. Table 3.3.1 Proposed 100 -year Water Surface Elevation and Velocity Summary Q Total Water Surface Elevation Velocity Channel River Sta (cfs) (ft) NO Existing (EX) Proposed (PR) Delta (PR -EX) Existing (EX) Proposed (PR) Delta (PR -EX) 447983 29300 80.4 80.4 0.00 4.05 4.05 0.00 446626 29300 78.74 78.74 0.00 7.62 7.62 0.00 446531 CSX Railroad Bridge 446436 Figure 3.3.2 Proposed Cross Section 445378 Representing Fill There is no rise in water surface elevations when compared to existing conditions model. Table 3.3.1 Proposed 100 -year Water Surface Elevation and Velocity Summary Q Total Water Surface Elevation Velocity Channel River Sta (cfs) (ft) NO Existing (EX) Proposed (PR) Delta (PR -EX) Existing (EX) Proposed (PR) Delta (PR -EX) 447983 29300 80.4 80.4 0.00 4.05 4.05 0.00 446626 29300 78.74 78.74 0.00 7.62 7.62 0.00 446531 CSX Railroad Bridge 446436 29300 78.37 78.37 0.00 7.69 7.69 0.00 445378 29300 78.28 78.28 0.00 5.35 5.35 0.00 444102 29300 78.14 78.14 0.00 4.56 4.56 0.00 441773 29300 77.95 77.95 0.00 3.53 3.53 0.00 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 3.4 Floodway The floodway encroachments from the effective floodway model were incorporated into the proposed model; see Table 3.4.1 below for the results. The proposed fill does not increase floodway water surface elevations or floodway top widths when compared to existing conditions. Table 3.4.1 Effective vs. Existing vs. Proposed Floodway Water Surface Elevations and Top Widths Q Total Water Surface Elevation Top Width River Sta (cfs) (ft) (ft) Existing (EX) Proposed (PR) Delta (PR -EX) Effective (EF) Existing (EX) Proposed (PR) Delta (PR -EX) 447983 29300 81.12 81.12 0.00 515 515 515 0.00 446626 29300 79.65 79.65 0.00 296 296 296 0.00 446531 US -64 Bypass Bridge 446436 29300 79.32 79.32 0.00 295 295 295 0.00 445378 29300 79.27 79.27 0.00 1063 1063 1063 0.00 444102 29300 79.08 79.08 0.00 650 650 650 0.00 441773 29300 78.86 78.86 0.00 650 650 650 0.00 Carolina Connector Intermodal Rail Terminal Flood Study 4. Hydraulic Analysis — Hornbeam Branch 4.1 Effective and Duplicate Effective Models JACOBSL The effective models were downloaded from North Carolina Floodplain Mapping Program (NCFMP) website (www.ncfloodmaps. com). The downloaded effective model was run using HEC -RAS (version 5.0.3) to duplicate the output from the effective FIS report. The models use 2,080 cfs for the 100 -year flow. According to the FIS, during the 100 -year event, backwater effects from the Tar River are felt up to the downstream face of the existing railroad crossing of Hornbeam Branch. During this event the water surface elevation rises to 78 feet. 4.2 Corrected Effective/Existing Conditions Model The duplicate effective model was checked against available geometry information. Adjustments were made to the geometry of the railroad bridge culvert opening at HEC -RAS Station 6914 based on information provided by the Atlantic Coast Line Railroad Company for the existing masonry arch culvert at this location (See Appendix 1 B(4)). A culvert geometry with an equivalent area (approximately 93 square feet) and approximate shape was selected for the existing condition HEC -RAS model. Also, changes were made to the deck elevations based on the detailed 1 -foot topographic data acquired for the project. Ineffective flow elevations were adjusted in order to allow the right overbank weir flow indicated by the existing topography. The effective and existing models indicate weir overtopping during the 100 -year event. The topography suggests that this overtopping impacts hundreds of feet of existing track. The existing model water surface elevations are at or below the effective model upstream of the existing railroad crossing. Table 4.2.3. Summary of Effective vs. Existing Conditions Water Surface Elevations Q Total Water Surface Elevation Velocity Channel River Sta (cfs) (ft) NO Effective (EF) Existing (EX) Delta (EX -EF) Effective (EF) Existing (EX) Delta (EX -EF) 6939.5 2080 85.42 84.67 -0.75 0.56 0.64 0.08 6907 Existing Arch Culvert 6874.5 2080 75.53 75.56 0.03 9.01 7.33 -1.68 6447 890 74.71 74.71 0.00 3.03 2.97 -0.06 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 4.3 Proposed Conditions A proposed conditions hydraulic model was prepared using the existing conditions model as a base. The proposed rail alignments for the intermodal facility lead tracks and a proposed extension of the existing culvert were inserted into the model for evaluation. The proposed condition floodplain model uses the same flows and downstream boundary conditions that are used in the existing conditions model. In the proposed condition, the existing culvert is extended downstream approximately 45 feet to a point beyond the proposed track improvements. In order to model the culvert extension, HEC -RAS Station 6874.5 in the existing condition model had to be removed and a replacement section added downstream of the proposed condition model, Station 6825. . The proposed culvert extension results in no increase in water surface elevations over the effective water surface elevations upstream and downstream of the improvements. Please see Table 4.3.2 below for a comparison of the results. Table 4.3.2. Proposed 100 -year Water Surface Elevation and Velocity Summary River Q Total Water Surface Elevation Velocity Channel Sta (cfs) (ft) (ft/s) Existing (EX) Proposed (PR) Delta (PR -EX) Existing (EX) Proposed (PR) Delta (PR -EX) 6939.5 2080 84.67 84.67 0.00 0.64 0.64 0.00 6907 Existing Arch Culvert 6874.5 2080 75.56 - - 7.33 - - 6825 2080 - 75.46 - - 7.55 - 6447 890 74.71 74.71 0.00 2.97 2.97 0.00 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 4.4 Floodway The floodway encroachments from the effective floodway model were incorporated into the proposed model; see Table 4.4.1 for the proposed condition results. Table 4.4.1. Existing vs. Proposed Extended Floodway Water Surface Elevations QTotal Water Surface Elevation Top Width (ft) (ft) River Sta (cfs) Existing Floodway (EX) Proposed Floodway (PR) Floodway Delta (PR -EX) Existing Top Width (EX) Proposed Top Width (PR) Delta (PR -EX) 6939.5 2080 85.35 85.34 -0.01 299.00 299.00 0.00 6907 Arch Culvert 6874.5 2080 76.38 - - 299.00 - - 6825 2080 - 76.24 - - 299.00 - 6447 890 75.69 75.69 0.00 164.00 164.00 0.00 Carolina Connector Intermodal Rail Terminal Flood Study 5. Hydraulic Analysis - Compass Creek 5.1 Effective and Duplicate Effective Models JACOBSL The Effective Model for Compass Creek is a detailed study starting from its confluence with Tar River in Edgecombe County to approximately 370 feet upstream of Red Oak Battleboro Road in Nash County. The flood Insurance Rate Map with effective date of June 18, 2013 for the crossing is presented in Appendix 1C(2). The models use 2,730 and 2,780 cfs for the 100 -year flow. The Duplicate Effective Model for Compass Creek was created using cross-sections from the Effective Model approximately 1,500 feet upstream and 800 feet downstream of the proposed work. The model starts at River Station 12820 and ends at Station 15207.5. 5.2 Corrected Effective/Existing Conditions Model To create the existing conditions model, cross sections were added downstream of proposed work. Those cross- sections were generated based on 1 -foot contours. The model results (Table 5.2.1) were used to compare the proposed 100 -year and floodway water surface elevations with the existing condition. Table 5.2.1. Summary of Effective vs. Existing Conditions Water Surface Elevations Q Total Water Surface Elevation Velocity Channel River (ft) (ft/s) Sta (cfs) Effective (EF) Duplicate Effective (DEF) Existing (EX) Delta (DEF -EF) Delta (EX -DEF) Effective (EF) Duplicate (DEF) Effective Existing (EX) Delta (DEF -EF) Delta (EX -DEF) 15207.5 2730 86.34 88.34 88.30 2.00 -0.04 3.28 2.68 2.71 -0.60 0.03 15117.5 Culvert 15027.5 2730 85.77 86.34 86.14 0.57 -0.20 5.24 4.14 4.34 -1.10 0.20 14936.0 2730 85.67 86.33 86.13 0.66 -0.20 3.42 3.28 3.47 -0.14 0.19 14476.0 2730 84.47 85.77 85.46 1.30 -0.31 6.16 5.24 5.64 -0.90 0.40 14172.0 2730 85.67 85.67 85.33 0.00 -0.34 3.42 3.42 3.69 0.00 0.27 13665.4 2730 84.47 84.47 83.96 0.00 -0.51 6.16 6.16 6.47 0.00 0.31 13641.8 Bridge 13618.2 2730 82.24 82.24 81.79 0.00 -0.45 7.63 7.63 8.05 0.00 0.42 13454.4 2730 - - 81.97 - - - - 3.33 - - 13089 2730 - - 81.53 - - - - 4.33 - - 12820.0 2780 81.28 81.28 81.28 0.00 0.00 3.37 3.37 3.37 0.00 0.00 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 5.3 Proposed Condition Model A new bridge to carry the north -south rail is proposed parallel to the existing tracks, along the east side of the existing bridge across Compass Creek. Because of the proximity of the existing and proposed bridges, they have been modeled as a single bridge as recommended in the U.S. Army Corps of Engineers HEC -RAS Hydraulic Reference Manual Version 5.0 (February 2016) See Table 5.3.1/Appendix 1C(3) for model results. The proposed bridge is the same span as the existing bridge, with 11 feet between the two (modeled together as a single 65 -foot width). Table 5.3.1. Proposed 100 -year Water Surface Elevation and Velocity Summary River Sta Q Total Water Surface Elevation Velocity Channel (cfs) (ft) NO Existing (EX) Proposed (PR) Delta (PR -EX) Existing (EX) Proposed (PR) Delta (PR -EX) 15207.5 2730.00 88.30 88.29 -0.01 2.71 2.71 0.00 15117.5 Culvert 15027.5 2730.00 86.14 86.13 -0.01 4.34 4.36 0.02 14936.0 2730.00 86.13 86.12 -0.01 3.47 3.48 0.01 14476.0 2730.00 85.46 85.44 -0.02 5.64 5.67 0.03 14172.0 2730.00 85.33 85.31 -0.02 3.69 3.71 0.02 13665.4 2730.00 83.96 83.93 -0.03 6.47 6.50 0.03 13641.8 Bridge 13580.4 2730.00 81.79 81.76 -0.03 8.05 7.97 -0.08 13454.4 2730.00 81.97 81.97 0.00 3.33 3.33 0.00 13089 2730.00 81.53 81.53 0.00 4.33 4.33 0.00 12820 2780.00 81.26 81.28 0.02 3.37 3.37 0.00 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 5.4 Floodway The floodway encroachments from the effective floodway model were incorporated into the proposed model. The proposed structure and fill does not increase the floodway water surface elevations or floodway top widths when compared to existing conditions. See Table 5.4.1/Appendix 1C(3) for model results. Table 5.4.1 Effective vs. Existing vs. Proposed Floodway Water Surface Elevations and Top Widths Q Water Surface Elevation Top Width Total ft ft M m M River m m C m -V m m p m Sta _ ' p -M m x o Acv n c n r a x X -0-°a M m X o� cfs M n �� x -3'0 ON M Om CD T. C. (D v Oq ^� m X N f D 3 v Go .. L4 M I y m w X ro m m a n m T p �* m Q v M m 15207.5 2730 1 87.16 1 88.53 88.45 88.44 1.37 1 -0.08 1 -0.01 540.0 400.00 400.00 400.0 -140.0 0.00 0.00 15117.5 Culvert 15027.5 2730 86.71 87.16 86.77 86.75 0.45 -0.39 -0.02 311.00 337.81 337.81 337.8 26.81 0.00 0.00 14936.0 2730 86.64 87.16 86.77 86.75 0.52 -0.39 -0.02 280.00 540.00 540.00 540.0 260.0 0.00 0.00 14476.0 2730 85.39 86.72 86.22 86.20 1.33 -0.50 -0.02 36.60 311.00 311.0 311.0 274.4 0.00 0.00 14172.0 2730 86.64 86.14 86.11 -0.50 -0.03 280.00 280.0 280.0 0.00 0.00 13665.4 2730 85.39 84.69 84.64 -0.70 -0.03 36.60 36.60 36.60 0.00 0.00 13641.8 Bridge 13618.2 2730 83.22 83.22 82.59 - 0.00 -0.63 36.60 36.60 36.60 - 0.00 0.00 - 13580.4 2730 - - - 82.55 - - - - - 36.60 - - - 13454.4 2730 - 82.72 82.72 0.00 - 585.00 585.00 0.00 13089 2730 - 82.17 82.17 0.00 - 302.00 302.00 0.00 12820 2780 81.86 81.86 81.86 81.86 0.00 0.00 0.00 350.0 350.00 350.00 350.00 0.00 0.00 0.00 Carolina Connector Intermodal Rail Terminal Flood Study 6. Hydraulic Analysis - Beech Branch 6.1 Effective and Duplicate Effective Models JACOBS' The effective model for Beech Branch is a detailed study starting from its confluence with Tar River in Edgecombe County to approximately 250 feet downstream of Red Oak/ Battleboro Road in Nash County. The Flood Insurance Rate Map with effective date of June 18, 2013 for the crossing is presented in Appendix 1 D(2). A duplicate effective model for Beech Branch was created starting at River Station 45783 and ending at Station 47266 for Beech Branch. The models use 1,270 cfs for the 100 -year flow. 6.2 Corrected Effective/Existing Conditions Model To create the existing conditions model, a cross section was added downstream of proposed work. This cross section was generated based on 1 -foot contours. Also, invert elevations for the existing stream at Section 46730 was adjusted slightly to match survey information gathered for the project. The model results were used to compare the proposed 100 -year and floodway water surface elevations with the existing condition. Table 6.2.1. Summary of Effective vs. Existing Conditions Water Surface Elevations Q Water Surface Elevation Velocity Channel Total River (ft) (ft/s) Sta Duplicate Delta Duplicate Existing Delta (cfs) Effective Existing Delta Effective Delta Effective (EX- Effective (EX) (EX - (EF) (EX) (DEF EF) (EF) (DEF- EF) (DEF) DEF) (DEF) DEF) 47266 1270 98.93 98.93 98.93 0.00 0.0 0.98 0.98 0.98 0.00 0.00 46890 1270 98.86 98.86 98.86 0.00 0.00 1.83 1.83 1.83 0.00 0.00 46810 Culvert 46730 1270 91.99 91.98 93.36 -0.01 1.48 5.95 5.97 4.38 0.02 -1.59 46080 1270 - - 91.38 - - - - 5.82 - - 45783 1270 91.09 91.09 91.09 0.00 0.00 2.28 2.28 2.28 0.00 0.00 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 6.3 Proposed Condition Model Four 9 -foot wide by 8 -foot high box culverts were used for the Beech Branch proposed condition model. The inverts for the proposed culverts were set to match the existing stream flowline. The bottom of one of the barrels has been modeled as native soil, with n= 0.03. This culvert will serve as a low -flow channel and will be installed as a 9 -foot wide by 9 -foot high box culvert including a 1 -foot layer of substrate fill for environmental purposes. Cross Sections 46660, and 4080 have been modified to show the proposed grading upstream and downstream of the proposed box culverts.. See Table 6.3.1 for model results. Table 6.3.1 Proposed 100 -year Water Surface Elevation and Velocity Summary Q Total Water Surface Elevation Velocity Channel River Sta (cfs) (ft) (ft/s) Existing (EX) Proposed (PR) Delta (PR -EX) Existing (EX) Proposed (PR) Delta (PR -EX) 47266 1270 98.93 98.93 0.00 0.98 0.98 0.00 46890 1270 98.86 98.86 0.00 1.83 1.83 0.00 46810 Culvert 46730 1270 93.36 92.61 -0.75 4.38 5.26 0.88 46660 1270 - 92.46 - - 5.07 - 46474 Culvert 46080 1270 91.38 91.23 -0.15 5.82 4.76 -1.06 45783 1270 91.09 91.09 0.00 1 2.28 2.28 0.00 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 6.4 Floodway The floodway encroachments from the effective floodway model were incorporated into the proposed model. The existing condition model exhibits a slight negative surcharge (approximately -0.0047 feet) at Section 46890 that is manifest to a lesser degree in both the duplicate and proposed models. Unsuccessful attempts were made to eliminate or mitigate this discrepancy. This results in a reported 0.01 increase in the proposed conditions model floodway elevations over the existing conditions model floodway elevations despite the 0.00 surcharge in the proposed conditions model. However, the proposed conditions model result at this location does not exceed the effective model calculation. It is therefore reasonable to conclude that the difference does not represent an actual adverse impact in the proposed condition. At all other cross sections, the proposed structure and fill does not increase the reported floodway water surface elevations or floodway top widths when compared to existing conditions. See Appendix 1 D(3) for model results Table 6.4.1 Effective vs. Existing vs. Prop Floodway W. S. Elev. & Top Widths *Note: Increase is due to a negative surcharge in the existing condition. Q Water Surface Elevation Top Width Total (ft) (ft) River My My My My p Sta M C X c °' °' M d ° C * c X c m �' R; 9 O m "� �' a m v+ C m ` ` 71 m m d0 a m m m X m v O m m a0 a m m m X T -M v v 47266 1270 98.93 98.93 98.93 98.93 0.00 0.00 0.00 350 350 350 350 0 0 0 46890 1270 98.86 98.86 98.85 98.86 0.00 -0.01 0.01* 83.00 83.10 83.10 83.10 0.10 0 0 46810 Culvert 46730 1270 92.93 92.93 94.02 93.16 0.00 1.09 -0.86 63 62.8 63.1 62.97 -0.20 0.3 --0.13 46660 1270 - - - 93.06 - - - - - - 52.00 - - - 46474 Culvert 46080 1270 - - 92.29 92.23 - - 0.94 - - 180.68 180.27 - - -0.41 45783 1270 92.07 92.07 92.07 92.07 0.00 0.00 0.00 117 116.92 116.92 116.92 -0.08 0 0 *Note: Increase is due to a negative surcharge in the existing condition. Carolina Connector Intermodal Rail Terminal Flood Study JACOBS= 7. Conclusion Tar River The addition of fill to construct the lead tracks for the intermodal facility will not increase 100 -year floodplain or floodway water surface elevations or floodway top widths for the Tar River. Recommendation: Widen existing bridge matching existing span and low chord. Hornbeam Branch The proposed culvert extension results in no increase to floodplain or floodway water surface elevations or floodway top widths. Recommendation: Extend the existing culvert downstream under the proposed improvements matching geometry. Provide riprap channel protection downstream of the culvert outlet. Compass Creek The addition of fill and widening of the existing bridge at Compass Creek will not increase the 100 -year floodplain or floodway water surface elevations for the Compass Creek floodplain or floodway during the 100 - year event. Changes in cross section geometry can be seen in the HEC -RAS cross section comparisons available in Appendix 1C(3). Recommendation: 32 -foot Span Bridge with low chord at 80.84 feet elevation to match existing. Beech Branch The addition of fill and of four 9 -foot wide by 8 -foot high box culverts will not cause an increase in the Beech Branch floodplain or floodway water surface elevations or floodway top widths during the modeled 100 -year event. Changes in cross section geometry can be seen in the HEC -RAS cross section comparisons available in Appendix 1 D(3). Recommendation: Four 9 -foot wide by 8 -foot high box culverts. The channel bottom upstream and downstream of the culvert will need to be widened and riprap outlet protection will be required. Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Appendix 1 — Intermodal Project Exhibits J CCX Intermodal Project Limit Fe( 0 1,625 3,250 6,500 9,750 13,000 Niblick Dr _. •c � a " e�a0 r ca v •.J cru o d 6 yj, OL CL17 caa _ ro 6 l ro %' ,a `Y. Q� a o Hornbeam Branch o �ro�,� Tar River '�- � � ��r µ � Beech Branch t10�(9c Backwater H— °gle`yBlvd��� H�w+a,e�an=�tivd ,,; i; ►� — — — z. A?3rriott St �o Centura HWY V'C ICA Compass Creek a Old BattleboroIRA © i �'s• Tar River _ `` Ave: - 5 , �o Q , Project Limit - _ Old i9attleboro Rd •-f �. SCP r �eyi �, a1 aNI " ,V.,- Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, Geo Base, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri ChinaHong Kong), swisstopo, Mapmylndia, © OpenStreetMap contributors, and the GIS User Community, Esri, HERE, DeLorme, Ma m India, @ Open4treetMap contributors J CCX Intermodal Project Limit Fe( 0 1,625 3,250 6,500 9,750 13,000 c Ave Iry ilk At I A NkVVas aln, a s gn. 7 adgeco, 0 - lie -d k 0 0 a : 0 NkVVas aln, a s gn. 7 adgeco, 0 - lie -d k 0 0 a 2360000 FEET 2370000 FEET 820000 FEET 77°46'30"W 77°46'0"W 77°45'30"W 77°45'0"W 820000 FEET School Rd r in- f - ' f . A C wl ,moi► �y'4 ' � I41Y nA Fou,tain;School Rd 'moi � � ` ! �� � �♦ r �,rD� ., I ' '•' �'- CI Y OO F ROICKY .11011NT F;TJ Conip iss Creek ZONE"'AE 370092 35°59'30"N CITY OI F °`� 35'59'30"N = OCO CO M ^° j�� ���� )��_ ICompass earrett\Rd �• ee6;� :- - seer Hunt CITY OF Vik ROCKY MOUN��c0ineVe 4h4 p ZZ, 6 ti'0 *' - w ,• q r p ,� 00 p C 115 • � ZONE AE � ,_ CITY OI F ROCKY MOO T ETJ w a` r LL 092 EY1376 3701 f EY1376,V'� wr �•" 1 0 / ­XZZ663`1. i ' a �' �Af: s s 35°59'0"N 35°59'0"N - :�„, .~r - , i Gelo Rtl . + - - � I� CITY OF ROCKY �.: � � s - - :7 a 7E MOUNT ETT Q 1 370092 CITY OF Compass Creek ROCKY MOUNT " CITY OF 370092 Boddie Ct-L� o o ` ROCKY MOUNT 370092 H" ornbeam - ass 78.0 O Branch ,y ''' 0 oss n �.• E=Y11�37 78:0 os� 78.0, I , � Z�Z6'048. 171 -+`_'',..f1 •...„ f 049 ',8:0 =oaa EY1138� r. i EY1139 - «, N ZZ6047�, _- - EY1140n EY1140 ZONE AE Tar _ - 35°58'30°N 35°58'30"N } A� EY 1139 otic — River .` \H"ornbeam 1141 � CITY OF ROO C'KY 6W 0- FY1®ZZ6046 8 97 - EY1136: E-1Y01r1�42�'EY1._142 MOUNT EZ�J ZONE AE ; i. EY0910 b'. I ' 4.97 Compass EY0910 f f o Creek . . } wo• •�" - _ , - is 4312 a 41 ro u 810000 FEET '`� u�, 810000 FEET 77°47'0"W 77°46'30"W 77°46'0"W 77°45'30"W 77°45'0"W 2360000 FEET 2370000 FEET FEMA'3 COIDPEAA I[IG 1W TECHr,ICALPAFffl4U1 This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach to floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's commitment to map flood hazard areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEE FIS REPORT FOR ZONE DESCRIPTIONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT HTTP://FRIS.NC.GOV/FRIS For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmap or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 [I�.Ti�l=i�1I1] 0 75 150 PANEL LOCATOR ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood ,t\\ra insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note Without Base Flood Elevation (BFE) appears on this panel, check with your local community to obtain more information, such as the estimated level of Zone A,V, A99 protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the With BFE or Depth zone AE, AO, AH, VE, AR SPECIAL FLOOD 0 t. Regulatory Floodway HAZARD AREAS NASH COUNTY If the community or owner does not provide the necessary data and documentation or if the data and documentation 0.2% Annual Chance Flood Hazard, Areas provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood of 1% Annual Chance Flood with Average hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in Depth Less Than One Foot or With Drainage residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing Areas of Less Than One Square Mile zone x or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Future Conditions 1% Annual Website at http://www.fema.gov/business/nfip/index.shtm. Chance Flood Hazard zone x OTHER AREAS OF Area with Reduced Flood Risk due to Levee FLOOD HAZARD See Notes zone x OTHER Areas Determined to be Outside the AREAS 0.2% Annual Chance Floodplain zone x severe than those in the VE Zone. ------------- Channel, Culvert, or Storm Sewer Limit of Moderate Wave Action (LiMWA) Accredited or Provisionally Accredited GENERAL Levee, Dike, or Floodwall STRUCTURES I I I I I I I I I I I I I Non -accredited Levee, Dike, or Floodwall I BM5510 X North Carolina Geodetic Survey bench mark BM5510® National Geodetic Survey bench mark BM5510� Contractor Est. NCFMP Survey bench mark 0�2 1s-2— Cross Sections with 1% Annual Chance Water Surface Elevation (BFE) s - - - - - - Coastal Transect — - - - - - Coastal Transect Baseline Profile Baseline Hydrographic Feature OTHER Limit of Study FEATURES Jurisdiction Boundary For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmap or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 [I�.Ti�l=i�1I1] 0 75 150 PANEL LOCATOR ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood ,t\\ra insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note 3873 appears on this panel, check with your local community to obtain more information, such as the estimated level of 3893 protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the 4813 levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is 463 required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. NASH COUNTY If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA 4862 ; Website at http://www.fema.gov/business/nfip/index.shtm. 3851 LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone 3850 category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5 -foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA 37159 (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less , severe than those in the VE Zone. 3758 Limit of Moderate Wave Action (LiMWA) 3747 3757 4822 4832 COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1 -800 -344 -WILD. CBRS Area Otherwise Protected Area VA1101►«11111, 1,000 Feet Meters 300 18197 c3897 3886 3896 4806 4816 HALIFAX COUNTY 3885 3895 r 4804 4824,, 3884 3894 �� r 3863 3873 3883 3893 4803 4813 4823 463 - --, 4842 4862 ; 3862 3872 3882 3892 4802 4812 4822 4832 I C MARTIN COUNTY Fr r� cc rrW 0 cc loom Cn a 0 0 U. cc a 0 cc Z NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM FLOOD INSURANCE RATE MAS`' NORTH CAROLINAS � PANEL 3861 0 Ivo s�G�a FE I` 422 Panel Contains: COMMUNITY CID PANEL SUFFIX ROCKY MOUNT, CITY OF 370092 3861 1 MAP NUMBER 3720386100J MAP REVISED 6/18/2013 2360000 FEET 840000 FEET 77°46'30"W 77°46'0"W 77°45'30"W 36°3'0"N 36°2'30"N iI:3%ral�➢I►1 36°1'30"N k�� x:,71 ,� ,C,+'° ,-, y ► `��.. I �^' a /' f r J C'If OF ROCKY M®UNT ETJ` A. � r - 370092 . :Lwr Amu. At& - �o 0 °rdsG+ Fords Colcny Dr r 1502 1 � z _ `so7 , ZONE E �" i r i' r 1r, 7 i 52- + �f •549 535 { 552 - - 543 Bcech -- _ r Branch i ZONE AE ; e�(t, I � a C7 C va = �1 r -. C'IMTY O?F ';ROCKY MOT ' ,, 370092. yea �` •'�r�-w ,'mar � 1 � r'L . FX2�165 5eeen 1 3Y'�nCl7 1478 `483 *7 W : Red Ir On ~+ Rd �a 2370000 FEET 77°45'0"W 840000 FEET r +'F.17r r dl o w&I F 1 t r ries '� r- FX1362 m° " FX1361_, _ FX2172^ FX2170 FX2169 F �FX2171 Pfjri x FX2173 :ti' y ,yea yd^ ALI 84o It44 s WWZJ 1N' IE AE 1453 `447 Beech Branch { ' `aaz ° l 0 429 CD a O 473 - - - 0 /�� M - `aza CITY OF ROCKY MOUNT ETJ r . • 36°3'0"N 36°2'30"N 36°2'0"N 36°1'30"N 830000 FEET 830000 FEET 77°46'30"W 77°46'0"W 77°45'30"W 77°45'0"W 2360000 FEET 2370000 FEET #1111SOPERATINGTECHNICAL PARTNER This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach to floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's commitment to map flood hazard areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. FLOOD HAZARD INFORMATION SEE FIS REPORT FOR ZONE DESCRIPTIONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT HTTP://FRIS.NC.GOV/FRIS Without Base Flood Elevation (BFE) 2886 Zone A, V, A99 2884 With BFE or Depth Zone AE, AO, AH, VE, AR SPECIAL FLOOD Regulatory Floodway HAZARD AREAS 3802 0.2% Annual Chance Flood Hazard, Areas 2880 of 1% Annual Chance Flood with Average 3811 Depth Less Than One Foot or With Drainage 3810 Areas of Less Than One Square Mile Zone x Nash Future Conditions 1% Annual 3719 Chance Flood Hazard Zone x OTHER AREAS OF Area with Reduced Flood Risk due to Levee FLOOD HAZARD See Notes Zone x OTHER Areas Determined to be Outside the AREAS 0.2% Annual Chance Floodplain Zone x 2785 ------------- Channel, Culvert, or Storm Sewer 3705 r Accredited or Provisionally Accredited GENERAL Levee, Dike, or Floodwall STRUCTURES I I I I I I I I I Non -accredited Levee, Dike, or Floodwall BM5510 D North Carolina Geodetic Survey bench mark BM5510 ? National Geodetic Survey bench mark BM551OZ Contractor Est. NCFMP Survey bench mark -(H2 —1,8-2— Cross Sections with 1% Annual Chance Water Surface Elevation (BFE) {s - - - - - - Coastal Transect \\-- - -- - Coastal Transect Baseline Profile Baseline Hydrographic Feature OTHER Limit of Study FEATURES Jurisdiction Boundary NOTES TO USERS For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmaps.com or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note appears on this panel, check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5 -foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less severe than those in the VE Zone. Limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1 -800 -344 -WILD. CBRS Area Otherwise Protected Area SCALE Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 0 250 500 1,000 Feet Meters 0 75 150 300 PANEL LO CATO R 1:6,000 Halifax 3828 3827 3837 84 37 385_7 3867 3877, 3887 3826 3836 3846 3856 3866 3876 3886 I 3825 3835 3845 3855 3865 3875 3885 3824 3834 3844 3854 3864 3874 3823 3833 3843 3853 3863 3873 3822 3832 3842 3852 3862 1 3821 3831 3841 3851 13861 3820 3830 3840 38501 38603870 3729 3739 3749 3759 3769 3728 3738 3748 x3758 3768 3778 3727 3737 374713757 Edgecombe Wilson NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM cc FLOOD INSURANCE RATE MA! NORTH CAROLINA R CL � PANEL 3061 5 v � oND StiGJ� CD FEMA a °, AfC, cc Panel Contains: .. COMMUNITY CID PANEL SUFFIX ` rr EDGECOMBE COUNTY 370087 3863 J NASH COUNTY 370278 3863 J ROCKY MOUNT, CITY OF 370092 3863 J 0 0 cc a 0 CZ MAP NUMBER 3720386300J EFFECTIVE DATE 11/3/2004 2888 L,r 13 J 2886 3806 2884 3804 2882 3803 3813 3802 3812 2880 3801 3811 3800 3810 Nash 3709 3719 3708 3718 2788 3707 3717 2786 3706 3716 2785 2795 3705 r 3715 1:6,000 Halifax 3828 3827 3837 84 37 385_7 3867 3877, 3887 3826 3836 3846 3856 3866 3876 3886 I 3825 3835 3845 3855 3865 3875 3885 3824 3834 3844 3854 3864 3874 3823 3833 3843 3853 3863 3873 3822 3832 3842 3852 3862 1 3821 3831 3841 3851 13861 3820 3830 3840 38501 38603870 3729 3739 3749 3759 3769 3728 3738 3748 x3758 3768 3778 3727 3737 374713757 Edgecombe Wilson NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM cc FLOOD INSURANCE RATE MA! NORTH CAROLINA R CL � PANEL 3061 5 v � oND StiGJ� CD FEMA a °, AfC, cc Panel Contains: .. COMMUNITY CID PANEL SUFFIX ` rr EDGECOMBE COUNTY 370087 3863 J NASH COUNTY 370278 3863 J ROCKY MOUNT, CITY OF 370092 3863 J 0 0 cc a 0 CZ MAP NUMBER 3720386300J EFFECTIVE DATE 11/3/2004 Carolina Connector Intermodal Rail Terminal Flood Study JACOIBS Appendix 1A - Tar River • 1A(1) Exhibits • 1A(2) Hydrologic Data • 1A(3) Hydraulic Model/Output • 1A(4) Supplemental/Additional Data Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1A(1) Exhibits C-) 0 D b j C f �d Thomas A Bells pkwy ��— N a" 4,4' S U) d �3 r nes�yP 7 Gr"°n Rd CD � Q1? CD n �b Rf. +� Fottnt4in School Rd CunKINIIIO�C' q7 oc� 1V-r&green tir 0 Golf Club !I" ` Z � BEAVER POND Freer DrE Cliff Ln - P P + ry4P � II .c a 4b aPer Dr + Benvenue Country Club 'B i EV Llbb Rd �• o¢ a ax, rA Golden East " , 7-16 Crossing Byp I R $ � .qyC % sa' �3 a � a� 468A _ Qb R x*y Mount U Je SP"ts ALBA- - �y9S^ Complex. 468B Gaal a Park21� ., 4g 43 � -` HISTORIC MILL VI`LLLAyGE + ''I C h¢ syer �� r 64 R HILLSDALE Chi St 54 FALLS ROAD v P� E•i NATIONAL rh r p HISTORIC 1. _ X L DISTRICT f vogInia St W Northemtern w Ce-ewy r "r it Rocky Mount ° 9a" unity WEEKS ARMSTRONG Cemetery !rands O HAPPY HILL BrMdt i" 3 + 43 1 L nHOLLY STREET WEST HAVEN f CENTRAL CITY l0 NATIONAL �! NATIONAL HISTORIC aye•Wand! D) DISTRICT r'ca VILLA PLACE HISTORIC DISTRICT tai N `9y NATIONAL--% wawa ' W LPy9e� Rd � =3 W Shore St D 43 `9 � HIStORIC R { DISTRICT + x Rineuiew �e0'n cn Rd CEDARBROC11( f Cernetery o J w r4 tuSi. EDGEMONIT - Fo• NATIONAL LITTLE ' ,1 HISTORIC o C7 Y� 'lt- I'll, RALEIGH DISTRICT MEADOWBROOK ht �• �OWLfF x� W+gh �M Rosewood AVe _ Z � r, St o Legend sr Project Boundary Rocky Mount Cn Vicinity Map N P JACOBS Station 6172 Crossing -CSX Intermodal 0 2,000 4,000 Jacobs Engineering Group, Inc. City of Rocky Mount, Edgecombe/Nash Counties, North Carolina REG No. 2966 Feet xo Project No: JLXCX102 Alf%- �e� L n C- 0 vo C— r X C) X 0 N i� 0 X O O 0 n_ r_ Z m rn 0 rn O rn 0 rn X 0 Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Appendix 1A(2) Hydrologic Data Section 5.0 - Engineering Methods Table 9 -Summary of Discharges Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Revised: July 7, 2014 Page 35 Drainage Discharges (cts) Flooding Source Area Location miles) Approximately 1.6 0% Chance Chance Chance Chance miles downstream of the 211.53 8,410 14,540 17,612 26,195 Nash/Edgecombe County boundary Approximately 100 feet upstream of the 211.0 5,860 9,832 11,777 16,650 Nash/Edgecombe County boundary Approximately 750 feet downstream of 203.7 5,671 9,633 11,590 16,559 U.S. Highway 301 Approximately 2.4 miles downstream 196.9 5,498 9,452 11,419 16,474 of NC Highway 48 Approximately 500 feet downstream of 194.8 5,444 9,396 11,365 16,447 NC Highway 48 Swift Creek Approximately 1.1 miles downstream 183.1 5,156 9,094 11,078 16,299 of Red Oak Road (SR 1003) Approximately 0.9 mile downstream of 182.3 5,138 9,074 11,059 16,289 Red Oak Road (SR 1003 Approximately 1.9 miles downstream 167.74 * * 12,4002 of Hillardston Road SR 1310 Approximately 75 feet upstream of 165.38 * * 12,300 Hillardston Road SR 1310 Approximately 1,300 feet 164.64 * * 12,300 downstream of NC Highway 43 N.C. 97 at Rocky 932.0 16,700 24,400 27,700 40,000 Mount Tar River Confluence of Goose Branch 927.0 16,620 24,310 27,620 40,000 Confluence of Stony 809.0 14,820 22,270 25,770 38,700 Creek Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Revised: July 7, 2014 Page 35 Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Appendix 1A(3) Hydraulic Model Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Tar River Backwater Duplicate Effective HEC -RAS Plan: FWAY DUP EFF River: Main Stem Reach: Reach - 1 Reach River Ste Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach - 1 447983.0 100 -YEAR 29300.00 52.39 80.40 80.57 0.000898 4.05 21853.07 1848.63 0.15 Reach - 1 447983.0 100 -YEAR FW 29300.00 52.39 81.12 81.40 0.001196 4.56 7876.73 515.00 0.17 Reach - 1 446626.0 100 -YEAR 29300.00 51.85 78.74 65.56 79.61 0.000377 7.62 5066.63 2208.70 0.28 Reach - 1 446626.0 100 -YEAR FW 29300.00 51.85 79.65 65.56 80.46 0.000333 7.34 5198.82 296.00 0.27 Reach - 1 446531.0 Bridge Reach - 1 446436.0 100 -YEAR 29300.00 51.69 78.37 65.40 79.26 0.000390 7.69 4998.66 2145.56 0.28 Reach - 1 446436.0 100 -YEAR FW 29300.00 51.69 79.32 65.40 80.14 0.000341 7.40 5145.79 295.00 0.27 Reach - 1 445378.0 100 -YEAR 29300.00 51.08 78.28 78.65 0.000278 5.35 15723.16 3590.70 0.23 Reach - 1 445378.0 100 -YEAR FW 29300.00 51.08 79.27 79.60 0.000228 5.03 9393.27 1063.00 0.21 Reach - 1 444102.0 100 -YEAR 29300.00 50.34 78.14 78.38 0.000124 4.56 33808.48 5420.91 0.16 Reach - 1 444102.0 100 -YEAR FW 29300.00 50.34 79.08 79.38 0.000130 4.77 10084.61 650.00 0.17 Reach - 1 441773.0 100 -YEAR 29300.00 48.99 77.95 60.90 78.10 0.000095 3.53 31186.44 4693.90 0.14 Reach - 1 441773.0 100 -YEAR FW 29300.00 48.99 78.86 60.90 79.08 0.000109 3.90 9809.66 650.00 0.15 Tar River - AUGUST 20,2010 4650 Plan: FWAY—Duplicate_Effective 3/20/2017 Main Stem Reach - 1 90- Legend ------------- ------------- ------------- - EG 100 -YEAR FW WS 100 -YEAR FW - ------------- ------------- ------------ ------------- ------------- -- ---------------------------------------- EG 100 -YEAR - ------------- ------------- ------------- ------------- ------------- ------------ WS 100 -YEAR -- ------------- ------------- ------------- ------------- ------------ .......................... 1 .......................... Crit 100 -YEAR -------------- - ------- ------------ ------ ------- Crit 100........... A .................. .. -YEAR FW 80- ----------- - ----------- --- ------- A -- -- ------------- -- -- ------- -- -- -- --------- ---------- --- -----------------_- ------ ----------- -------- - -- ---------- ------------------ ------------- -------- - ----- - ------ - ---- --------- ----------- ---- ----------- ------------ - ---- --------------------------- -- ---- ----- ----------- ----- ------ ------ ------------------- ----- ------ ----- ----- -------------- ---- --------- ----------- ------------ - -------------- ------ - ------------------------------------------ Ground 70- . ........ .. Lu 60 50- 40 0 1000 2000 3000 4000 5000 6000 7000 Main Channel Distance (ft) 0 I c 0 m Lu 50 3000 3500 4000 4500 5000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Duplicate_Effective 3/20/2017 Upstream Section of Bridge/Culvert/Weir .................A................ EG 100 -YEAR FW • WS 100 -YEAR FW 5500 Ground • Bank Sta Encroachment Legend ................................... EG 100 -YEAR FW WS 100 -YEAR FW 50 1 1- 3500 4000 4500 5000 5500 6000 6500 7000 7500 Station (ft) Crit 100 -YEAR ............................................. Crit 100 -YEAR FW Ground Ineff • Bank Sta Encroachment EG 100 -YEAR FW ------------------------------------ .............................................. Crit 100 -YEAR FW Ground Ineff • Bank St, Encroachment 3500 4000 4500 5000 5500 6000 6500 7000 7500 1 c 0 m LU 50 3500 4500 5000 5500 6000 6500 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Duplicate_Effective 3/20/2017 Cross Section Tar River 69.5 M1181n Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ....................... A...................... Crit 100 -YEAR FW Crit 100 -YEAR Ground Ineff • Bank Sta Encroachment W111: 50 1000 2000 3000 4000 5000 Station (ft) Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR Ground • Bank Sta Encroachment 6000 M I 1 0 m w Tar River - AUGUST 20,2010 4650 Plan: FWAY_Duplicate_Effective 3/20/2017 Cross Section Tar River 69.0 1. .13 70 60 50 -1000 0 1000 2000 3000 4000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Duplicate_Effective 3/20/2017 Cross Section Tar River 68.0 XS98 08 --f .03 +08 +11 �� 1. --� 61/10111 Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ■ Ground • Bank Sta Encroachment 6000 Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR ....................... 4....................... Crit 100 -YEAR ...................... A .................... .. Crit 100 -YEAR FW Ground • Bank Sta Encroachment 40 1000 2000 3000 4000 5000 6000 7000 Station (ft) Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Tar River Backwater Existing HEC -RAS Plan: FWAY EX River: Main Stem Reach: Reach - 1 Reach River Ste Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach - 1 447983.0 100 -YEAR 29300.00 52.39 80.40 80.57 0.000898 4.05 21853.07 1848.63 0.15 Reach - 1 447983.0 100 -YEAR FW 29300.00 52.39 81.12 81.40 0.001196 4.56 7876.73 515.00 0.17 Reach - 1 446626.0 100 -YEAR 29300.00 51.85 78.74 65.56 79.61 0.000377 7.62 5066.63 2208.70 0.28 Reach - 1 446626.0 100 -YEAR FW 29300.00 51.85 79.65 65.56 80.46 0.000333 7.34 5198.82 296.00 0.27 Reach - 1 446531.0 Bridge Reach - 1 446436.0 100 -YEAR 29300.00 51.69 78.37 65.40 79.26 0.000390 7.69 4998.66 2145.56 0.28 Reach - 1 446436.0 100 -YEAR FW 29300.00 51.69 79.32 65.40 80.14 0.000341 7.40 5145.79 295.00 0.27 Reach - 1 445378.0 100 -YEAR 29300.00 51.08 78.28 78.65 0.000278 5.35 15723.16 3590.70 0.23 Reach - 1 445378.0 100 -YEAR FW 29300.00 51.08 79.27 79.60 0.000228 5.03 9393.27 1063.00 0.21 Reach - 1 444102.0 100 -YEAR 29300.00 50.34 78.14 78.38 0.000124 4.56 33808.48 5420.91 0.16 Reach - 1 444102.0 100 -YEAR FW 29300.00 50.34 79.08 79.38 0.000130 4.77 10084.61 650.00 0.17 Reach - 1 441773.0 100 -YEAR 29300.00 48.99 77.95 60.90 78.10 0.000095 3.53 31186.44 4693.90 0.14 Reach - 1 441773.0 100 -YEAR FW 29300.00 48.99 78.86 60.90 79.08 0.000109 3.90 9809.66 650.00 0.15 Tar River - AUGUST 20,2010 4650 Plan: FWAY—Existing_Conditions 3/20/2017 <-- Main Stem Reach - 1 90- Legend ------------- ------------- ------------- - EG 100 -YEAR FW WS 100 -YEAR FW - ------------- ------------- ------------ ------------- ------------- -- ---------------------------------------- EG 100 -YEAR - ------------- ------------- ------------- ------------- ------------- ------------- ........... WS 100 -YEAR -- ------------- ------------- ------------- ------------- ------------ .......................... 1 .......................... Crit 100 -YEAR -------------- ------- ------------- -------------- - - --- ----- ........... A .................. .. Crit 100 -YEAR FW 80- - ----------- - ----------- --- ------ -- -- ------------- -- -- ------- -- ------------------- --- ----------------------------------------- -------------------------------- ---------- ------------------ ------------- -------- ----- - ------ - ---- ------- ......... ............... . ---- ----------- ------------ - ---- --------------------------- -- ---- ----- ----------- ----- ------ ------ ------------------- ----- ------ ----- ----- ------------ - -------- ----------- ------------ - ---------------------------- --------------- - ------------------ - - -------------- Ground 70- . ........ .. Lu 60 50- 40 0 1000 2000 3000 4000 5000 6000 7000 Main Channel Distance (ft) ff I 70 50 3500 ................. A ................ EG 100 -YEAR FW • ws 100 -YEAR FW Ground 0 Bank Sta Encroachment 5500 Legend .................. L ................. EG 100 -YEAR FW WS 100 -YEAR FW 4000 4500 5000 5500 6000 6500 7000 7500 Station (ft) Crit 100 -YEAR ......................1...................... Crit 100 -YEAR FW Ground Iteff Bank Sta Encroachment EG 100 -YEAR FW ------------------------------------ .............................................. Crit 100 -YEAR FW Ground Ineff • Bank St, Encroachment 3500 4000 4500 5000 5500 6000 6500 7000 7500 1 c 0 m LU 50 3500 4500 5000 5500 6000 6500 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Existing_Conditions 3/20/2017 Cross Section Tar River 69.5 M1181n Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ....................... A...................... Crit 100 -YEAR FW Crit 100 -YEAR Ground Ineff • Bank Sta Encroachment W111: 50 1000 2000 3000 4000 5000 Station (ft) Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR Ground • Bank Sta Encroachment 6000 M I 1 0 m w Tar River - AUGUST 20,2010 4650 Plan: FWAY_Existing_Conditions 3/20/2017 Cross Section Tar River 69.0 1. .13 70 60 50 -1000 0 1000 2000 3000 4000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Existing_Conditions 3/20/2017 Cross Section Tar River 68.0 XS98 08 —�. .03 +08 +11 �� 1. --� 61/10111 Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ■ Ground • Bank Sta Encroachment 6000 Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR ....................... 4....................... Crit 100 -YEAR ...................... A .................... .. Crit 100 -YEAR FW Ground • Bank Sta Encroachment 40 1000 2000 3000 4000 5000 6000 7000 Station (ft) Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Tar River Backwater Proposed HEC -RAS Plan: FWAY PROP River: Main Stem Reach: Reach - 1 Reach River Ste Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach - 1 447983.0 100 -YEAR 29300.00 52.39 80.40 80.58 0.000898 4.05 21854.45 1848.65 0.15 Reach - 1 447983.0 100 -YEAR FW 29300.00 52.39 81.12 81.40 0.001196 4.56 7876.73 515.00 0.17 Reach - 1 446626.0 100 -YEAR 29300.00 51.85 78.74 65.56 79.61 0.000377 7.62 5066.93 2208.92 0.28 Reach - 1 446626.0 100 -YEAR FW 29300.00 51.85 79.65 65.56 80.46 0.000333 7.34 5198.82 296.00 0.27 Reach - 1 446531.0 Bridge Reach - 1 446436.0 100 -YEAR 29300.00 51.69 78.37 65.40 79.26 0.000390 7.69 4998.97 2145.87 0.28 Reach - 1 446436.0 100 -YEAR FW 29300.00 51.69 79.32 65.40 80.14 0.000341 7.40 5145.79 295.00 0.27 Reach - 1 445378.0 100 -YEAR 29300.00 51.08 78.28 78.65 0.000278 5.35 15539.02 3499.67 0.23 Reach - 1 445378.0 100 -YEAR FW 29300.00 51.08 79.27 79.60 0.000228 5.03 9393.27 1063.00 0.21 Reach - 1 444102.0 100 -YEAR 29300.00 50.34 78.14 78.38 0.000125 4.56 33147.14 5393.63 0.16 Reach - 1 444102.0 100 -YEAR FW 29300.00 50.34 79.08 79.38 0.000130 4.77 10084.61 650.00 0.17 Reach - 1 441773.0 100 -YEAR 29300.00 48.99 77.95 60.90 78.10 0.000095 3.53 31186.44 4693.90 0.14 Reach - 1 441773.0 100 -YEAR FW 29300.00 48.99 78.86 60.90 79.08 0.000109 3.90 9809.66 650.00 0.15 Tar River - AUGUST 20,2010 4650 Plan: FWAY—Proposed 3/20/2017 Main Stem Reach - 1 90- Legend ------------- ------------- ------------- - EG 100 -YEAR FW WS 100 -YEAR FW - ------------- ------------- ------------ ------------- ------------- -- ---------------------------------------- EG 100 -YEAR - ------------- ------------- ------------- ------------- ------------- ------------ WS 100 -YEAR -- ------------- ------------- ------------- ------------- ------------ .......................... 1 .......................... Crit 100 -YEAR -------------- - ------- ------------ ------ ------- Crit 100........... A .................. .. -YEAR FW 80- ----------- - ----------- --- ------ A -- -- ------------- -- -- ------- -- -- -- --------- ---------- --- -----------------­- ------------------ -------- - -- ---------- ------------------ ------------- -------- - ----- - ------ - ---- ------- --------- ---- ---- - ---- ----------- ------------ - ---- --------------------------- -- ---- ----- ----------- ----- ------ ------ ------------------- ----- ------ ----- ----- ---- ------- - --------- ----------- ------------ - ------------- ------ - ------------------------------------------ Ground 70- . ........ .. Lu 60 50- 40 0 1000 2000 3000 4000 5000 6000 7000 Main Channel Distance (ft) 0 I c 0 m Lu 50 3000 3500 4000 4500 5000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Proposed 3/20/2017 Upstream Section of Bridge/Culvert/Weir .................A................ EG 100 -YEAR FW • WS 100 -YEAR FW 5500 Ground • Bank Sta Encroachment Legend ................................... EG 100 -YEAR FW WS 100 -YEAR FW 50 1 11- 3500 4000 4500 5000 5500 6000 6500 7000 7500 Station (ft) Crit 100 -YEAR ............................................. Crit 100 -YEAR FW Ground Ineff • Bank Sta Encroachment BG1O0��ARRN ------------------------------------ Crit 1nn-YeARRm Ground � LU -------------------------- .............................. ------ ...... ---- ------------------------ - ----------------------------- ........................................................ Bank Sta 70 Encroachment 60 3500 4000 4500 5000 5�00 60100 6500 7000 7500 M 0 m w 4000 4500 5000 5500 6000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Proposed 3/20/2017 Cross Section Tar River 69.5 6500 M1181n Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ....................... A...................... Crit 100 -YEAR FW Crit 100 -YEAR Ground Ineff • Bank Sta Encroachment W-111: Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR Ground • Bank Sta Encroachment 50 1000 2000 3000 4000 5000 6000 Station (ft) M I 1 0 m w Tar River - AUGUST 20,2010 4650 Plan: FWAY_Proposed 3/20/2017 Cross Section Tar River 69.0 1. .13 70 60 50 -1000 0 1000 2000 3000 4000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Proposed 3/20/2017 Cross Section Tar River 68.0 XS98 08 —�. .03 +08 +11 �� 1. --� 61/10111 Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ■ Ground • Bank Sta Encroachment 6000 Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR ....................... 4....................... Crit 100 -YEAR ...................... A .................... .. Crit 100 -YEAR FW Ground • Bank Sta Encroachment 40 1000 2000 3000 4000 5000 6000 7000 Station (ft) Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Appendix 1A(4) Supplemental/Additional Data 100 - - - - AREA FILL: 85.8 SF AREA CUT: 42.4 SF - - - _ 95 85 -- - 80 - 90 85 75 70 65 60 120 — — - - - CONTRACT 90 - EXISTING SEE_ INT' 80 A YARD LEADS 110 - rm - 80 75 70 65 60120 w_ z _ _ EXISTING GRIND _ i - 100 110 r - 95 90 80 70 60 50 40 30 100 95 90 _ AREA FILL: AREA CUT -- - 136.1 SF 1.4 SF _ 85 -- - 80 75 70 65 60 120 — — - - - CONTRACT 90 - EXISTING SEE_ INT' 80 — — -NOT IN 100 YARD LEADS 110 Y Q � 20 10 0 100 95 90 85 80 75 70 6v 60 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 _mU -14U -1DU -IOU _I/U -lao 618100 N N 70 60 50 40 30 20 10 0 100 95 90 85 80 75 70 65 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -1ZU -1Su -14U -13u -IOU -I/V ,II 6180.1.00 N N 100 AREA FILL' 69.9 SF 100 95 AREA CUT: 15.2 SF w_ z _ _ x ; , i r 95 90 90 w W� W W cd *L I 85 85 - I - - - - f I 80 60 - f - I - TOP 0 SUBGRAO 1 `- - i - - 75 _- - 75 70 70 E%ISTING GROUND-� 65 - 65 YARD LEADS NOT IN CONTRACT !- SEE INT:RMODAL PIAN FOR DETAIL_ 60120 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1800 6179+00 10, 0 10, 20' WHERE R/W LIMITS NOT SHOWN SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS GRAPHIC SCALE: 1" - 10' DESIGNED BY ENGINEERING DEPARTMENT VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK -- In�"l-" `m1 g, I • it ..me. 1-1 g, e.ec- anO/Of"rm- D.MONTAGUE CSATAil111SP0ITAi'z0111 INC. DESIGN &CONSTRUCTION ' CROSS SECTIONS DRAWN 87 DRAWING NO. �1oat1on•• tim r.r"imetl nre.itn • nai re�mi. the .r..ertr D MONTAGUE JACKSONVILLE FLORIDA Rx -07 EMT1 6181+00 TO EMT1 6179+00 ionatMa�INDerMltl emir CHECKED BY N, ORTEGA REVISION SHEET NO,. /ltlentw, mtl ow ".t.. �,.tl fm f y ..r.... ".r I';,,�M'bs„„�a�,�,eY1p, APPROVED BY V00090 59 OF 188 SUB NORTH END DIVA FLORENCE I NOT FOR 1) NMUC 11014 1DATE M.GANAS SCALE AS SHOWN ROCKY MOUNT, EDGECOMBE COUNTY, NC DATE DESCRIPTION �'�%g APP JANUARY 19, 2017 ■ ^' C O� x N LEI N N Q' C .3 0 0 u 0 F— c U U a 0 / _T U CL 0 U O N LQ Q N N O W 100 95 AREA FILL' ;165.3 SF AREA CUTS 0.3 SF SF ,n,a�,dndmrid•mi° n •ion•. ardwinaew•°- wrion rurni m•d n•r•wim "atlI =I � imQ- noon r•n°inm••ro°•r�r r m• c1, rrm.°arrmion and •toil e• e•m cm- Fd•nfm dna .n° n°"" •s.d M. a,r w+rdnu nor dw ,a in nw.en.n+. M. cs• rron•°nrr°ri.n D.MONTAGUE ENGINEERING DEPARTMENT CSX TRANSPORTATION INC. DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS + + EMT1 6178 00 TO EM T1 6176 00 SUB: NORTH END DIV: FLORENCE ROCKY MOUNT, EDGECOMBE COUNTY, NC 90 DRAWN 9Y D. MONTACUE w 95 AREA CUT_12 SF 85 CHECKED BY N. ORTECA REVISION — 80 NOT ��--Pf'k+*n j'� IDDE,ISj,CJRIPTION APPROVED BY M. CANAS DATE JANUARY 19, 2017 SCALE AS SHOWN REV DATE -P } �� — 75 a r x 1U 70 TING GRO 65 - - EXI N(� 60YARD LEAQS NOT IN (CONTRACT - SEE INTERMODAL P AN FOR D TAIL - 120 110 100 90 80 70 60 50 40 30 100 AREA — FILL: ,1139.9 SF ,n,a�,dndmrid•mi° n •ion•. ardwinaew•°- wrion rurni m•d n•r•wim "atlI =I � imQ- noon r•n°inm••ro°•r�r r m• c1, rrm.°arrmion and •toil e• e•m cm- Fd•nfm dna .n° n°"" •s.d M. a,r w+rdnu nor dw ,a in nw.en.n+. M. cs• rron•°nrr°ri.n D.MONTAGUE ENGINEERING DEPARTMENT CSX TRANSPORTATION INC. DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS + + EMT1 6178 00 TO EM T1 6176 00 SUB: NORTH END DIV: FLORENCE ROCKY MOUNT, EDGECOMBE COUNTY, NC - DRAWN 9Y D. MONTACUE w 95 AREA CUT_12 SF _ CHECKED BY N. ORTECA REVISION SHEET N0. 60 OF 188 - . NOT ��--Pf'k+*n j'� IDDE,ISj,CJRIPTION APPROVED BY M. CANAS DATE JANUARY 19, 2017 SCALE AS SHOWN REV DATE -P 90 85y 80 - - 75-- L 70 EXI TING CR JND J 65 - — - !TAIL - YARD LEAl S NOT IN (CONTRACT(- SEE INT�:RMODAL P_AN FOR 120 110 100 90 80 70 60 50 40 30 100 95 90 85 80 75 70 65 60 120 110 100 90 80 70 60 50 40 30 WHERE R/W LIMITS NOT SHOWN SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS DE 1 ^ N N 20 10 0 100 95 90 85 80 75 70 65 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -''W 6178+00 N N 20 10 0 100 95 90 85 80 75 70 65 CA -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -180 6177+00 N N 20 10 0 100 95 90 85 80 75 70 E� -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1840 6176+00 10' 0 1a' 20' GRAPHIC SCALE- 1" = l0' ,n,a�,dndmrid•mi° n •ion•. ardwinaew•°- wrion rurni m•d n•r•wim "atlI =I � imQ- noon r•n°inm••ro°•r�r r m• c1, rrm.°arrmion and •toil e• e•m cm- Fd•nfm dna .n° n°"" •s.d M. a,r w+rdnu nor dw ,a in nw.en.n+. M. cs• rron•°nrr°ri.n D.MONTAGUE ENGINEERING DEPARTMENT CSX TRANSPORTATION INC. DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS + + EMT1 6178 00 TO EM T1 6176 00 SUB: NORTH END DIV: FLORENCE ROCKY MOUNT, EDGECOMBE COUNTY, NC - DRAWN 9Y D. MONTACUE w V00090 DRAWING N0, RX -08 _ CHECKED BY N. ORTECA REVISION SHEET N0. 60 OF 188 - . NOT ��--Pf'k+*n j'� IDDE,ISj,CJRIPTION APPROVED BY M. CANAS DATE JANUARY 19, 2017 SCALE AS SHOWN REV DATE -P 100 95 90 85 BO 75 70 65 r 100 95 90 85 80 75 70 65 6020 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1�p 6175+00 -. _� 100 100 'AREA FILL' i0.0 SIF o AREA CUT: 7.0 SF l �_ z_ z 95 95 N � tri - v -� w; m x m 90 W w •E� w W '�I I> 4 85 85to o — — _ 80 .�. __ _ - '---- Bo TOP SUBCRAD1i - _I` _�-- P - — 75 75 — s RA TO ALL 0 ACCESS �1 TURNOU PAD _ - 70 70 EXIST[.JG GROUND -J PROPOSE 36" CMP - 65 65 60ivARQ LEADS NOT IN ICONTRACT - SEE 1NT.RMODAL P AN FOR TAIL _ 120 110 100 90 BO 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 170 -6D 6174+00 w, ti N N - -- z Y AREA FILL: 167.1 SF AREA CUT: 1.3 SF — _fl '21 z o 100 lY IS s -- iC3 wQ m� 22 Ww. UBGRAO W cd AREA FILL AREA CUT 142.7 SF 4,1 SF T — e J I� w _+' ,r - 95 `° 95 SI•NAL PAD T EXIST NG GROUNQ YARD LEADS NOT IN PLAN FOR DETAIL ,CONTRACT r- SEE INTERMODAL 100 95 90 85 80 75 70 65 6020 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1�p 6175+00 -. _� 100 100 'AREA FILL' i0.0 SIF o AREA CUT: 7.0 SF l �_ z_ z 95 95 N � tri - v -� w; m x m 90 W w •E� w W '�I I> 4 85 85to o — — _ 80 .�. __ _ - '---- Bo TOP SUBCRAD1i - _I` _�-- P - — 75 75 — s RA TO ALL 0 ACCESS �1 TURNOU PAD _ - 70 70 EXIST[.JG GROUND -J PROPOSE 36" CMP - 65 65 60ivARQ LEADS NOT IN ICONTRACT - SEE 1NT.RMODAL P AN FOR TAIL _ 120 110 100 90 BO 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 170 -6D 6174+00 w, ti N N - -- 100 i; 100 lY IS s -- iC3 UBGRAO � AREA FILL AREA CUT 142.7 SF 4,1 SF T — e J w _+' - 95 `° 95 100 95 90 85 80 75 70 65 6020 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1�p 6175+00 -. _� 100 100 'AREA FILL' i0.0 SIF o AREA CUT: 7.0 SF l �_ z_ z 95 95 N � tri - v -� w; m x m 90 W w •E� w W '�I I> 4 85 85to o — — _ 80 .�. __ _ - '---- Bo TOP SUBCRAD1i - _I` _�-- P - — 75 75 — s RA TO ALL 0 ACCESS �1 TURNOU PAD _ - 70 70 EXIST[.JG GROUND -J PROPOSE 36" CMP - 65 65 60ivARQ LEADS NOT IN ICONTRACT - SEE 1NT.RMODAL P AN FOR TAIL _ 120 110 100 90 BO 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 170 -6D 6174+00 w, ti N N - -- 100 i; 100 — s E AREA FILL AREA CUT 142.7 SF 4,1 SF w _+' - 95 `° 95 90 90 W tIJ iJ Ir 1 W. 1 r x ,� 85 85 � � �a.^ 80— o BO o v / TOP SUBGRA \ N s — — — — — 75 75 — - — 70 70 X - NG - - — -- 65 - - - - 65 YARD LEAS NOT IN CONTRACT -SEE INTERMODAL PLAN FOR DETAIL F 60 120 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -180p aw 617,3+00 10° 0 10' zo' � 1 WHERE R/W LIMITS NOT SHOWN GRAPHIC SCALE: ill- 10' SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS DESIGNED By ENGINEERING DEPARTMENT VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK uim,rtns. wyry tMa'- D MONTAcuE CSX TRANSPORTATION INC. DESIGN & CONSTRUCTION CROSS SECTIONS PRAWN BY r}Raw1Nc Na. g °°I°'�^�°�°^ D. MONTAGUE JACKSONVILLE FLORIDA RX -09 EMT16175+00 TO EMT16173+00 anti .rain ,Nr waw+w Iinasoi5`w+rlu�9'w,•°p CHECREO BY N.ORTEGA REVISION SHEET NO. Feet- M Yell rot M wa,�«Y�.w.,ro, APPR04£U D r V00090 61 OF 1B8 SUBS NORTH END DIVA FLORENCE � NOT FOR CONTmucnoDATE °IMIMCSM T�eM CAMAS � � SCALE AS SHOWN ROCKY MOUNT, EDGECOMBE COUNTY, NC a a - - REV DATE DESCit�PTigN APP JANUARY 19.2017 C100 ti 100 x T? — _ _ , .� _ AREA FILL 0.0 SF AREA CUT 24.2 SF N 95 95 i 90 - ep x rn-' T. Q 85 d Z w W o, 90 85 80 80 TOP OF SUBGRAD , ~ 75 _ _ — - .5 75 70 x 70 EXIS'ING GROU D� � 65 , - - — - 65 0 60 YARD LEAS NOT IN ICONTRACT - SEE INT:RMODAL P AN FOR D TAIL 120 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 T -30 -40 -50 -60 -70 80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -T80 a 6172-1-00 0 U O Q R N Q LO O 100 0 95 v 90 0 U X BS U) U c3 rn 80 w 75 C c Li 70 u, v 65 E 0 60 100 95 90 85 80 75 70 65 60 c 14 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -180 H Z � ? AREA FILL' 129.9 SF4TOP01- 6171-00 0 J Q AREA CUT: 14.1 SF o 0 100 AREA FILL V24.9 SF - - — - 1 — - c�11/'�BGRAD - 100 E AREA CUT: 'i.3 SF�a i °u 95' -- — - -- - 95 0 90 �_ 90 a3 �'- o B5 Q - 85 j �a� 80 !� 80 TOP OF SUBGRADE pl) rn 75 75 ° - — — 70 EXIS INC GROLI) 70 65 YARD LEA SNOT IN CONTRACT F- SEE PLAN FOR DETAIL 60120 110 100 90 _INT 80 70 60 50 40 30 20 _ 0 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140-150 -160 -170 fi0 -180 6170.00 WHERE R/W LIMITS NOT SHOWN 10 0 10' 20 aw O SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS GRAPHIC SCALE: V = 10' ww J nro m'rim our o-nri'i npe, ww- �� n� DESTGREO BY D. MONTACUE ENGINEERING DEPARTMENT CSx TRANSPORTATION, INC. DESIGN & CONSTRUCTION VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS - DRAWN 9Y D. MONTAGUE DRAWING W y~i W imri rurni-nw rw-vi to .Mi rmx,m rM or'wny o/ iM CSN frmwwrarlon JACKSONVILLE, FLORIDA No. RX -10 EMT1 6172+00 TO EMT1 6170+00 - CHECKED 9Y C w W 0.11 w Mia cm- lfm 1eiioM.Miinoree —1' 4eny'er'w-nor irn rM csx rronwo<renm "III r...*,H N,ORT �/OOOQO SUB: NORTH END DIV: FLORENCE 1 REVISION SNEE7 NO, 62 OF �s8 " w - APPROVED Y M. CANAS a J EXISTNG GROUT D ROCKY MOUNT, EDGECOMBE COUNTY, NC DAZE JANUARY 19.2017 SCALE AS SHOWN REV DATE I DESCRIPTION B. APP YARD LEA -S NOT IN CONTRACT SEE INT RMODAL q,AN FORD TAIL 100 95 90 85 80 75 70 65 60 c 14 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -180 6171-00 0 J Q o 0 100 AREA FILL V24.9 SF - - — - 1 — - - 100 E AREA CUT: 'i.3 SF�a i °u 95' -- — - -- - 95 0 90 �_ 90 a3 �'- o B5 Q - 85 j �a� 80 !� 80 TOP OF SUBGRADE pl) rn 75 75 ° - — — 70 EXIS INC GROLI) 70 65 YARD LEA SNOT IN CONTRACT F- SEE PLAN FOR DETAIL 60120 110 100 90 _INT 80 70 60 50 40 30 20 _ 0 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140-150 -160 -170 fi0 -180 6170.00 WHERE R/W LIMITS NOT SHOWN 10 0 10' 20 aw O SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS GRAPHIC SCALE: V = 10' ww J nro m'rim our o-nri'i npe, ww- �� n� DESTGREO BY D. MONTACUE ENGINEERING DEPARTMENT CSx TRANSPORTATION, INC. DESIGN & CONSTRUCTION VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS - DRAWN 9Y D. MONTAGUE DRAWING W y~i W imri rurni-nw rw-vi to .Mi rmx,m rM or'wny o/ iM CSN frmwwrarlon JACKSONVILLE, FLORIDA No. RX -10 EMT1 6172+00 TO EMT1 6170+00 - CHECKED 9Y C w W 0.11 w Mia cm- lfm 1eiioM.Miinoree —1' 4eny'er'w-nor irn rM csx rronwo<renm "III r...*,H N,ORT �/OOOQO SUB: NORTH END DIV: FLORENCE 1 REVISION SNEE7 NO, 62 OF �s8 " w - APPROVED Y M. CANAS a J ROCKY MOUNT, EDGECOMBE COUNTY, NC DAZE JANUARY 19.2017 SCALE AS SHOWN REV DATE I DESCRIPTION B. APP Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1 B - Hornbeam Branch • 1 B(1) Exhibits • 1 B(2) Hydrologic Data • 1 B(3) Hydraulic Model/Output • 1 B(4) Supplemental/Additional Data Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1B(l) Exhibits 0IIIIIIIIIIIII 0 c B r� 48 a ' forth fo Carolina Wesleyan College to C Ar tL � I BEAVER POND Brernrit a Zr r -Z a w r m i 97 Brench 43 `r t,t1 U (FALLS 64 Toe HISTCWdC fain Rive/ V1l LAGEc>,`' �' S BYP Reservoir 't of ML.ISDALE 64 I. s -P o' Roc s k7+' Mount43fa WEF9CSAWASn��taG x Gi DOWN EAST CEDARMOOK i Pineview Cemetery EUGEM 'ONT NATIONAL HISTORIC DISTRICT r Seven Vidge5 Ad x U RC/ g''` Byps'i#LLJLC)KC7 44 i. �ti` Rocky Mount 301 AROUND THE WEbing Legend - + O Project Area Vicinity Map N J/�Cpg� Hornbeam Branch Crossing - CSX Intermodal 0 2,000 4,000 Jacobs Engineering Group, Inc.City of Rocky Mount, Edgecombe/Nash Counties, North Carolina REG No. 2966 Project No: JLXCX102 Feet al4 f` sir, of Rb,ih- rt I i Jf'jr` r _ �I 1 �j 7 .1�079d �q hr X pNL'X ZONE - LO Q T.,. - l �Q 301 N1 OSLEY DR y '• 1 i. tin COLON CR- I osa ..> MOLL A z � � I n 53 OZONE X .. d r'• r 7 • Exhibit Mck� lin . • . , .�<. ^�'� �` • ' . Effective FIRM ;r 4 fi 1" Hornbeam Crossing - CSX Intermodal ,, • ' , • • + . City of Rocky Mount . Edgecombe/Nash Counties, North Carolina $"1 4,11 �'' �'f?. ��,�^_,�� ' , ��• ' GRID NORTH IIQ# h'' }: i • . MAP SCALE 1" = 500'(1 : 6,000) '►. x asv o awSro 760 1.000 q `-r s . . FEEi — — METERS - f' '.? aa! e • f5a 0 760 500 FJ • •�. • � , PANEL 3851K ..•• 'ZONE X, FIRM rZ{)NE X . ' . , • • . " ... , • ° FLOOD INSURANCE RATE MAP . • ... • " • • er�'� r©^��ri.' NORTH CAROLINA .'....+.'. ` a PANEL 3851 (SEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM PANEL . • ' • • LAYOUT) COAJTAINs; COQ CIO No. PANEL SUFFIX • • • • " III ,� FDGFCOMBE COUNTY 370W7 36$1 K HASH COUNTY 370276 36$1 K ROCKY MOL NT, CITY Oaf' 37W92 3651 K s I -:J No9ee to User The Map Humber shown below sMuM be used • • , • When placing map -d--:on dre Communrry Numbar shown eb-w sh-Id be —d nsur h- appaearlons fox the wbj-d -a nft • MAP REVISED MAP NUMBER JUNE 18, 2013 3720385100K sem F"`H'v f\ �✓� - rhe .i t EY 1138 - sr Q r _ •� � •.« �a0 sem' State ©f North Carolina Fcdcral Emergency Management Agency Source: Federal Emergency Management Agency(FEMA) Panel No. 3720386100K Panel No. 3720385100K F //x, 11111111ACOBS EW xx Reg No. 2966 W n C- 0 vo C— r X C7 X O N Z O 1 n O C7 C/) X O O Cl) C7 r_ Z m rn O rn O rn O rn X Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Appendix 1 B(2) Hydrologic Data Section 5.0 - Engineering Methods Table 9—Summary of Discharges Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Page 26 Revised: July 7, 2014 Drainage Discharges (cts) Flooding Source Area Location miles) Approximately 0.44 0% Chance Chance Chance Chance mile downstream of 3.1 915 1,560 1,770 2,380 Highway 301 By - ass Approximately 0.21 mile upstream of 2.6 826 1,420 1,620 2,180 Highway 301 By - Goose pass Branch Approximately 0.56 mile upstream of 2.4 778 1,340 1,530 2,070 Highway 301 By - ass Approximately 0.88 mile upstream of 2.0 690 1,200 1,370 1,860 Highway 301 By - ass Approximately 100 feet upstream of 3.8 394 685 836 1,191 the confluence with Tar River Approximately 1,500 feet 3.5 374 652 796 1,135 upstream of West Mount Drive Approximately 1,978 feet 2.40 * * 768 Grape downstream of South Halifax Road Branch Approximately 500 feet upstream of 2.01 * * 965 South Halifax Road Approximately 1,735 feet 1.75 * * 643 downstream of Redman Road Approximately 2,441 feet 1.49 * * 587 upstream of Redman Road Nash/Edgecombe 6.7 1,000 1,780 2,080 2,990 County Boundary Hornbeam Approximately 0.23 Branch mile upstream of 6.0 1,000 1,780 2,080 2,990 Nash/Edgecombe County Boundary Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Page 26 Revised: July 7, 2014 Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Appendix 1 B(3) Hydraulic Model Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Hornbeam Branch Duplicate Effective HEC -RAS Plan: EFF FWAY River: Main Stem Reach: Reach - 1 Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach - 1 6939.5 100 -YEAR 2080.00 67.68 85.42 74.05 85.42 0.000009 0.56 16772.82 2593.26 0.02 Reach - 1 6939.5 FWAY 2080.00 67.68 86.36 74.05 86.37 0.000068 1.31 3856.54 299.00 0.05 Reach - 1 6907.0 Culvert Reach - 1 6874.5 100 -YEAR 2080.00 67.78 75.53 74.15 76.57 0.006793 9.01 676.62 830.97 0.59 Reach - 1 6874.5 FWAY 2080.00 67.78 76.37 74.15 76.89 0.003448 6.90 832.04 299.00 0.43 Reach - 1 6447.0 100 -YEAR 890.00 67.32 74.71 72.89 74.78 0.000971 2.97 970.74 386.56 0.23 Reach - 1 6447.0 FWAY 890.00 67.32 75.69 72.80 75.78 0.000907 3.03 678.46 164.00 0.21 Hornbeam Branch Plan: Effective _Floodway 7/25/2017 Upstream Section of Bridge/Culvert/Weir 15 .15 1 4 VA 5 ----- ..------------- - _..... _.. - EG FWAY 85 c 0 m LU 4500 15 65 4000 4500 5000 5500 6000 Station (ft) Hornbeam Branch Plan: Effective_Floodway 7/25/2017 Railroad �0�.15 T .1 4 - 5 —ONE 5000 i 5500 Station (ft) 6500 .2 7000 Legend ............. A............. EG FWAY WS FWAY ---------------------------- EG 100 -YEAR WS 100 -YEAR ................. A ................. Crit FWAY ................................... Crit 100 -YEAR Ground • Ineff • Bank Sta Encroachment 6000 6500 7000 90 85 80 0 0 LU 0 m w 65 4000 4000 Hornbeam Branch Plan: Effective_Floodway 7/25/2017 Railroad 15 P O .15 1 .2 Legend EG FWAY WS FWAY Crit FWAY Crit 100 -YEAR Ground • Ineff Bank Sta Encroachment VIIIIII1 Legend EG FWAY ............................ EG 100 -YEAR WS FWAY WS 100 -YEAR ................. ,................. Crit FWAY ................ Crit 100 -YEAR Ground Ineff • Bank Sta Encroachment 7000 F 85 80 0 0 w 75 70- 65 4400 4600 Hornbeam Branch Plan: Effective_Floodway 7/25/2017 Cross Section Hornbeam Branch 13.0 .15 .04 .15- 4800 .15 4800 5000 Station (ft) 1 .2 Legend EG FWAY WS FWAY .................. I ............... I.. Crit 100 -YEAR Crit FWAY Groundp • Bank Sta Encroachment Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Hornbeam Branch Existing HEC -RAS Plan: EX FWAY River: Main Stem Reach: Reach - 1 Reach River Ste Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach - 1 6939.5 100 -YEAR 2080.00 67.68 84.67 74.05 84.67 0.000012 0.64 14829.48 2563.04 0.03 Reach - 1 6939.5 FWAY 2080.00 67.68 85.35 74.05 85.36 0.000086 1.44 3555.62 299.00 0.06 Reach - 1 6907.0 Culvert Reach - 1 6874.5 100 -YEAR 2080.00 67.78 75.56 74.22 76.15 0.004910 7.33 715.72 833.71 0.49 Reach - 1 6874.5 FWAY 2080.00 67.78 76.38 74.15 77.73 0.007592 9.38 232.24 299.00 0.59 Reach - 1 6447.0 100 -YEAR 890.00 67.32 74.71 72.89 74.78 0.000971 2.97 970.74 386.56 0.23 Reach - 1 6447.0 FWAY 890.00 67.32 75.69 72.80 75.78 0.000907 3.03 678.46 164.00 0.21 Hornbeam—Branch Plan: Existing_Floodway 7/25/2017 Main Stem Reach - 1 90 Legend __ _ ... EG FWAY WS FWAY -------------------------------- EG 100-YEAR ---------------------------------------------------------------------------- .................................................................. ................... .......... - ;.. _,.. _,. --- . .......... _ .............. WS 100 YEAR ---------------------------• ---------------------------------------------------------------------------------------------- _ ......................................... Crit 100 -YEAR Crit FWAY 85 -------------------------------------- Ground 80 o ------------------------------------------------------------------------- I-------------------- ---------------------------------------_. ..... ------------- -------------- -------------- - 1 LU ----- ------- ----- ..--------------- .--------- ------ - .. ... -------- 75 ..-... - --------- -- -- ----- --- -- -- 70 65 0 100 200 300 400 500 Main Channel Distance (ft) IN Hornbeam—Branch Plan: Existing_Floodway 7/25/2017 Upstream Section of Bridge/Culvert/Weir .15 J, .1 J, .0 Legend 4 ----------------------- 5 --------------- ...... ...... --------------- ---------------- ---------------- ---------------- -------- ---------- ---------- ---------------- ---------------- ---------------- --------------- ---------------- ---------- --------- ------------ I ------------- -EG AY 65 4000 4500 -0 Lij 75 -------------------------------------------- ................. ............... i . * .......... 65 i I 4000 4500 15 WS FWAY 5000 5500 6000 6500 7000 Station (ft) Hornbeam—Branch Plan: Existing_Floodway 7/25/2017 Railroad .15 311, .1 ;J, d 1� I - � 1 .2til - 5000 5500 Station (ft) 6000 6500 Legend A EG FWAY WS FWAY ............................ EG 100 -YEAR WS 100 -YEAR .................. A ................. Crit FWAY ---- ................ Crit 100 -YEAR Ground ineff • Bank Sta Encroachment 7000 15 c 0 m LU 70- 65 4000 4500 4 -------- 5 ----------' ---------------------------------C-------------- -- 5000 Hornbeam—Branch Plan: Existing_Floodway 7/25/2017 -------------------------- 85 . --------------------- .. T ---------------------------------------------- --------------- ------------------------------------------------- 80 .2 ............. ................. .................. ................ ................ ................ ................ ................. ................ ................ ................ ................. ................ ........... ........... ........... ........... ........ Legend -------------i--------------- ------------------------------ --- ----------------------------------------------=------ ---- ---------------- ----------------:-----........_i..............................................: ------------------------------ '---------------- ;---------------- . ........... ........... ........... EG F AY :.................................................. ..... ........................................ LU EG 100 -YEAR 75 -------------- WS 100 -YEAR .......... c 0 m LU 70- 65 4000 4500 4 -------- 5 ----------' ---------------------------------C-------------- -- 5000 Hornbeam—Branch Plan: Existing_Floodway 7/25/2017 Railroad .15�.1 LE .2 ............. ................. .................. ................ ................ ................ ................ ................. ................ ................ ................ ................. ................ ........... ........... ........... ........... ........ Legend -------------i--------------- ------------------------------ --- ----------------------------------------------=------ ---- ---------------- ----------------:-----........_i..............................................: .... .................... ........... ........... ........... EG F AY a WS FWAY —_—_ —_ -------- ------- EG 100 -YEAR -------------- WS 100 -YEAR _........:.............. -------'---------------- .................................... Crit FWAY ................ :............... .:............... .:.............. Crit 100 -YEAR - - -.. .... .. .... ................ ................ '................ ;................ .. _ Ground ................ ................ .................. ................ ................ ................ ........... Ineff Bank Sta -- ---- Encroachment .... .... ...... .... .... ........... ........... ........... ....... 5500 6000 6500 ........... 7000 Station (ft) Hornbeam—Branch Plan: Existing_Floodway 7/25/2017 Downstream Section of Bridge/Culvert/Weir Legend EG FWAY WS FWAY ---------------------------- EG 100 -YEAR WS 100 -YEAR ................................... Crit 100 -YEAR .................................... Crit FWAY 0 Ground • Ineff • Bank Sta Encroachment 4000 4500 5000 5500 6000 6500 7000 Station (ft) F 85 80 0 0 w 75 70- 65 4400 4600 Hornbeam—Branch Plan: Existing_Floodway 7/25/2017 Cross Section Hornbeam Branch 13.0 .15 .04 .15- 4800 .15 4800 5000 Station (ft) 1 .2 Legend EG FWAY WS FWAY .................. I ............... I.. Crit 100 -YEAR Crit FWAY Groundp • Bank Sta Encroachment Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Hornbeam Branch Proposed HEC -RAS Plan: PROP FWAY River: Main Stem Reach: Reach - 1 Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach - 1 6939.5 100 -YEAR 2080.00 67.68 84.67 74.05 84.67 0.000012 0.64 14829.48 2563.04 0.03 Reach - 1 6939.5 FWAY 2080.00 67.68 85.34 74.05 85.35 0.000086 1.44 3553.36 299.00 0.06 Reach - 1 6907.0 Culvert Reach - 1 6825 100 -YEAR 2080.00 67.78 75.46 74.16 76.09 0.005305 7.55 683.94 804.25 0.51 Reach - 1 6825 FWAY 2080.00 67.78 76.24 74.16 77.64 0.008036 9.56 227.71 299.00 0.61 Reach - 1 6447.0 100 -YEAR 890.00 67.32 74.71 72.89 74.78 0.000971 2.97 970.74 386.56 0.23 Reach - 1 6447.0 FWAY 890.00 67.32 75.69 72.80 75.78 0.000907 3.03 678.46 164.00 0.21 Hornbeam—Branch Plan: Proposed_Floodway 7/25/2017 Main Stem Reach - 1 90 Legend - ------------------- ------------------- ------------------- ------------------- --------------------------------- ----------------- ------------------- ------ .. ..................................... ------------------- ................... - ............... A............... EG FWAY • WS FWAY --------------------- ------------------- ------------------- ------------------- ------------------ -------------- ------------------ ------------------- ------------------- ------------------- ------------------- ------------------- ------------------- ------------------- ------------------- ------------------- ------------------- ------------------- ------------------- ------------------- -------------------------------- EG 100 YEAR - ------------------- -----------------I----------------- ----------------------------------- ------------------------------------------------------------------ ---------------------------- --------------I............. --. -- WS 100 - ------------------- ------------------- ----------- -------- ---------------------------------------------------------------------------------------------------- -------------------- ------------------ ------- ------------------- ------------------- ------------------- ------------------- ------------------- .................... . .................... Crit 100 -YEAR Crit FWAY 85 - - -------- ----------- ---- - ------------------ ------------------- ------------------- ---------------- - ---- ---------- ------------------- L ------------------ -------------------- -------------------- I --------------- --------- ------------------- i -------------------- ------------------- ------------------- ------------------- ------------------- ------------------- ------ Ground ------------------- ------------------- ------------------- ------------------- ---------------------------------------- ------------------- ---------------------------------- I -------------------- I ------------------- --------------------- - 80- -------------------- I -------------------- --------------------------------------- ------------------- I -------------------- I ------------------ -------------------- I ----------------- ------------------- -------------------- -------------------------------------------------------- -------------------- ------------------- ------------------- ------------------ ------------------- ------------------- ------------------- ....... - ------------------- ------------------- ------------------- I ------------------- ------------------ I I ------------------- -------------------- ------------------- I -------------------- I -------------------- ------------------ I -------------------- ------------------- ------------------- ------------------- ------------------- ------------------- ------------------- - ------------------- ------------------- -------------------- -------------------- ------------------- --------------------------------------- -------------------- ----------------------------------------- --------------------------------------- -------------------- ------------------- ------------------- ------ -------------- - -------- L ,Z6 ----------- --- - ......... ........... -------------------......... ----------------- - ------------------- ------------------- ------------------- ------------------- ------------------ ------------------- ------------------- -------------------- I -------------------- ................. ------------------- ------------------- LU...... ----------- -------- --------------- ----------------- ------------ ---------- ---------------- ----------------------------- ........ ----------- ....... ------------------- . ............ ........... ........................................... ....... ................. . 75 ---- — - __ ------------------------- ........... ---------------- ............................. ........... ...... ..... .................... ................. .................. ........... ................. . , 70 .OIL . ................... ................... ........................................ . ................... ........................................................... 65 ............................................................................... ...................................... ....................................... ................... ............. ......... .. ............................................................. ................... ................... .................. .............. ................... ......................... ...... . 0 100 200 300 400 500 Main Channel Distance (ft) rd6i 70 !9 LU 75 15 Ground A___ |noff oanxntu —l�~~~~~~~~~~~�| 4500 5000 5500 6000 6500 7000 Station (ft) Hornbeam—Branch P|an:Propooed_F|oodway 7/25/2017 Upstream Section orermooxCuxmmvvor .z 4 Legend EG FWAY --------------- EG 100 -YEAR Crit 100 -YEAR Ground Bank Sta Encroachment nsno snun Vnoo 7000 0000 Station (ft) Hornbeam—Branch P|un:Propooad_F|oodway 7/25/2017 Ranmuu 1 �1s .1 .2 4 Legend EG FWAY WS FWAY ---------------------------- EG 1 00 -YEAR WS 100 -YEAR Crit 100 -YEAR Ground A___ |noff oanxntu —l�~~~~~~~~~~~�| 4500 5000 5500 6000 6500 7000 Station (ft) �7 c 0 m LU 70- 65 4000 4500 0 4 5 5000 Hornbeam—Branch Plan: Proposed_Floodway 7/25/2017 Railroad 15 t .1 i} VA Legend EG FWAY WS FWAY ---------------------------- EG 100 -YEAR WS 100 -YEAR ................................... Crit 100 -YEAR .................................... Crit FWAY 0 Ground • Ineff • Bank Sta Encroachment 4000 4500 5000 5500 6000 6500 7000 Station (ft) ----------- ----------------- 85 T -------------------------------------------- ------------------------------------------------ 80 --------------------------------------------- ------------------------------ '----------------;---------------' u 75 c 0 m LU 70- 65 4000 4500 0 4 5 5000 Hornbeam—Branch Plan: Proposed_Floodway 7/25/2017 Railroad 15 t .1 i} VA Legend EG FWAY WS FWAY ---------------------------- EG 100 -YEAR WS 100 -YEAR ................................... Crit 100 -YEAR .................................... Crit FWAY 0 Ground • Ineff • Bank Sta Encroachment 4000 4500 5000 5500 6000 6500 7000 Station (ft) F 85 80 0 0 w 75 70- 65 4400 4600 Hornbeam—Branch Plan: Proposed_Floodway 7/25/2017 Cross Section Hornbeam Branch 13.0 .15 "�'.045�� .15 4800 5000 Station (ft) 1 .2 Legend EG FWAY WS FWAY .................. I ............... I.. Crit 100 -YEAR Crit FWAY Groundp • Bank Sta Encroachment Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Appendix 1 B(4) Supplemental/Additional Data ���purHGRay� - ` `0Asr �N° r� "IC, (oAsrLnE PAILRoAn COMA: <y E a - — -- 1$ lelwec _bcc,"ols vno�o�ry I masor)� I A�en OS oper7,r-)(3 � — I \e4\-4 )77 'n eo r 13o ccr NC MY 35 \,,t �%w SzQ wA�r) �roPosed 12 Arc] 7-�5-21 A��GG-I cfl re-�1C1� 8�%�t I Ola #5vy 5 �5 Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Appendix 1C - Compass Creek • 1C(l) Exhibits • 1C(2) Hydrologic Data • 1C(3) Hydraulic Model/Output • 1C(4) Supplemental/Additional Data Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1C(1) Exhibits 2360000 FEET 2370000 FEET 820000 FEET 77°46'30"W 77°46'0"W 77°45'30"W 77°45'0"W 820000 FEET School Rd r in- f - ' f . A C wl ,moi► �y'4 ' � I41Y nA Fou,tain;School Rd 'moi � � ` ! �� � �♦ r �,rD� ., I ' '•' �'- CI Y OO F ROICKY .11011NT F;TJ Conip iss Creek ZONE"'AE 370092 35°59'30"N CITY OI F °`� 35'59'30"N = OCO CO M ^° j�� ���� )��_ ICompass earrett\Rd �• ee6;� :- - seer Hunt CITY OF Vik ROCKY MOUN��c0ineVe 4h4 p ZZ, 6 ti'0 *' - w ,• q r p ,� 00 p C 115 • � ZONE AE � ,_ CITY OI F ROCKY MOO T ETJ w a` r LL 092 EY1376 3701 f EY1376,V'� wr �•" 1 0 / ­XZZ663`1. i ' a �' �Af: s s 35°59'0"N 35°59'0"N - :�„, .~r - , i Gelo Rtl . + - - � I� CITY OF ROCKY �.: � � s - - :7 a 7E MOUNT ETT Q 1 370092 CITY OF Compass Creek ROCKY MOUNT " CITY OF 370092 Boddie Ct-L� o o ` ROCKY MOUNT 370092 H" ornbeam - ass 78.0 O Branch ,y ''' 0 oss n �.• E=Y11�37 78:0 os� 78.0, I , � Z�Z6'048. 171 -+`_'',..f1 •...„ f 049 ',8:0 =oaa EY1138� r. i EY1139 - «, N ZZ6047�, _- - EY1140n EY1140 ZONE AE Tar _ - 35°58'30°N 35°58'30"N } A� EY 1139 otic — River .` \H"ornbeam 1141 � CITY OF ROO C'KY 6W 0- FY1®ZZ6046 8 97 - EY1136: E-1Y01r1�42�'EY1._142 MOUNT EZ�J ZONE AE ; i. EY0910 b'. I ' 4.97 Compass EY0910 f f o Creek . . } wo• •�" - _ , - is 4312 a 41 ro u 810000 FEET '`� u�, 810000 FEET 77°47'0"W 77°46'30"W 77°46'0"W 77°45'30"W 77°45'0"W 2360000 FEET 2370000 FEET FEMA'3 COIDPEAA I[IG 1W TECHr,ICALPAFffl4U1 This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach to floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's commitment to map flood hazard areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEE FIS REPORT FOR ZONE DESCRIPTIONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT HTTP://FRIS.NC.GOV/FRIS For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmap or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 [I�.Ti�l=i�1I1] 0 75 150 PANEL LOCATOR ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood ,t\\ra insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note Without Base Flood Elevation (BFE) appears on this panel, check with your local community to obtain more information, such as the estimated level of Zone A,V, A99 protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the With BFE or Depth zone AE, AO, AH, VE, AR SPECIAL FLOOD 0 t. Regulatory Floodway HAZARD AREAS NASH COUNTY If the community or owner does not provide the necessary data and documentation or if the data and documentation 0.2% Annual Chance Flood Hazard, Areas provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood of 1% Annual Chance Flood with Average hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in Depth Less Than One Foot or With Drainage residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing Areas of Less Than One Square Mile zone x or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Future Conditions 1% Annual Website at http://www.fema.gov/business/nfip/index.shtm. Chance Flood Hazard zone x OTHER AREAS OF Area with Reduced Flood Risk due to Levee FLOOD HAZARD See Notes zone x OTHER Areas Determined to be Outside the AREAS 0.2% Annual Chance Floodplain zone x severe than those in the VE Zone. ------------- Channel, Culvert, or Storm Sewer Limit of Moderate Wave Action (LiMWA) Accredited or Provisionally Accredited GENERAL Levee, Dike, or Floodwall STRUCTURES I I I I I I I I I I I I I Non -accredited Levee, Dike, or Floodwall I BM5510 X North Carolina Geodetic Survey bench mark BM5510® National Geodetic Survey bench mark BM5510� Contractor Est. NCFMP Survey bench mark 0�2 1s-2— Cross Sections with 1% Annual Chance Water Surface Elevation (BFE) s - - - - - - Coastal Transect — - - - - - Coastal Transect Baseline Profile Baseline Hydrographic Feature OTHER Limit of Study FEATURES Jurisdiction Boundary For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmap or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 [I�.Ti�l=i�1I1] 0 75 150 PANEL LOCATOR ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood ,t\\ra insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note 3873 appears on this panel, check with your local community to obtain more information, such as the estimated level of 3893 protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the 4813 levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is 463 required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. NASH COUNTY If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA 4862 ; Website at http://www.fema.gov/business/nfip/index.shtm. 3851 LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone 3850 category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5 -foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA 37159 (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less , severe than those in the VE Zone. 3758 Limit of Moderate Wave Action (LiMWA) 3747 3757 4822 4832 COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1 -800 -344 -WILD. CBRS Area Otherwise Protected Area VA1101►«11111, 1,000 Feet Meters 300 18197 c3897 3886 3896 4806 4816 HALIFAX COUNTY 3885 3895 r 4804 4824,, 3884 3894 �� r 3863 3873 3883 3893 4803 4813 4823 463 - --, 4842 4862 ; 3862 3872 3882 3892 4802 4812 4822 4832 I C MARTIN COUNTY Fr r� cc rrW 0 cc loom Cn a 0 0 U. cc a 0 cc Z NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM FLOOD INSURANCE RATE MAS`' NORTH CAROLINAS � PANEL 3861 0 Ivo s�G�a FE I` 422 Panel Contains: COMMUNITY CID PANEL SUFFIX ROCKY MOUNT, CITY OF 370092 3861 1 MAP NUMBER 3720386100J MAP REVISED 6/18/2013 jACOBS- Compass Creek Proposed Floodplain & Floodway Feet 0 125 250 500 750 1,000 CSX Intermodal, Rocky Mount, NC Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Appendix 1C(2) Hydrologic Data Section 5.0 - Engineering Methods Table 9 -Summary of Discharges Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Page 24 Revised: July 7, 2014 Drainage Discharges (cts) Flooding Source Area Location miles) Approximately 0.16 0% Chance Chance Chance Chance Big Peachtree mile upstream of 9.65 * * 3,070 Creek Nash/Franklin County boundary Approximately 0.7 mile downstream of 4.4 467 864 1,080 1,715 Bulluck School Road Cokey SR 1006 Swamp Approximately 0.7 mile upstream of 3.1 377 707 888 1,422 Old Wilson Road (SR 1002) Nash/Edgecombe 8.8 1,390 2,350 2,730 3,820 County Boundary Approximately 1.0 mile upstream of 6.3 1,120 1,950 2,260 3,200 Highway 301 Approximately 0.17 mile downstream of 4.8 941 1,660 1,940 2,770 Highway 48 Approximately 1.0 Compass mile upstream of 3.5 774 1,400 1,630 2,350 Creek Highway 48 Approximately 0.87 mile downstream of 2.6 651 1,200 1,400 2,030 Interstate 95 Approximately 0.33 mile downstream of 1.0 358 702 833 1,230 Interstate 95 Approximately 445 feet upstream of 0.6 264 534 637 955 Interstate 95 At mouth 4.9 1,335 2,173 2,476 3,342 At the confluence of 2.7 662 1,212 1,424 2,066 Cowlick Parkers Canal Creek Approximately 129 feet upstream of 1.5 354 715 862 1,325 North Raleigh Street Cypress At the confluence 31.5 * * 6,436 Creek with Tar River Fishing At the Creek Nash/Edgecombe 530.2 12,041 18,143 20,832 30,326 County boundary Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Page 24 Revised: July 7, 2014 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1C(3) Hydraulic Model Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Compass Creek Duplicate Effective HEC -RAS Plan: DupEFF River: Compass Creek Reach: Main Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (fuft) (ft/s) (sq ft) (ft) Main 15207.5 100 -YEAR 2730.00 72.51 88.34 78.89 88.40 0.000272 2.68 2930.96 827.70 0.12 Main 15207.5 FWAY 2730.00 72.51 88.53 78.89 88.59 0.000285 2.77 2346.60 400.00 0.12 Main 15117.5 Culvert Main 15027.5 100 -YEAR 2730.00 72.37 86.34 78.75 86.52 0.000765 4.14 1662.09 566.14 0.20 Main 15027.5 FWAY 2730.00 72.37 87.16 78.75 87.29 0.000545 3.63 1685.82 337.81 0.17 Main 14936.0 100 -YEAR 2730.00 72.32 86.33 86.42 0.000419 3.28 2588.55 837.37 0.16 Main 14936.0 FWAY 2730.00 72.32 87.16 87.22 0.000296 2.87 2607.22 540.00 0.14 Main 14476.0 100 -YEAR 2730.00 72.10 85.77 86.10 0.001108 5.24 1359.38 719.27 0.26 Main 14476.0 FWAY 2730.00 72.10 86.72 86.98 0.000832 4.76 1253.46 311.00 0.23 Main 14172.0 100 -YEAR 2730.00 71.98 85.67 85.76 0.000718 3.42 2504.46 695.39 0.18 Main 14172.0 FWAY 2730.00 71.98 86.64 86.73 0.000548 3.16 2105.17 280.00 0.16 Main 13665.4 100 -YEAR 2730.00 71.89 84.47 78.93 85.01 0.002494 6.16 535.85 1109.00 0.33 Main 13665.4 FWAY 2730.00 71.89 85.39 78.96 85.99 0.003719 6.21 439.40 36.60 0.32 Main 13641.8 Bridge Main 13618.2 100 -YEAR 2730.00 71.68 82.24 78.72 83.08 0.004994 7.63 428.83 918.49 0.45 Main 13618.2 FWAY 2730.00 71.68 83.22 78.75 84.08 0.006149 7.43 367.51 36.60 0.41 Main 12820.0 100 -YEAR 2780.00 71.27 81.28 77.88 81.34 0.000851 3.37 3075.42 685.34 0.19 Main 12820.0 FWAY 2780.00 71.27 81.86 78.13 81.96 0.001113 4.01 2108.07 350.00 0.22 CSX—COMPASS—CREEK Plan: CC—DupEFF 7/25/2017 Compass Creek Main 90- Legend . ................... ....................................... .................... ............................................................ -------------------- ---------------------------------------- ---------------------------------------- ------------------- ------------------- ............... A ............... EG FWAY I --------------- -------------- WS FWAY -------------------------------- EG 100 -YEAR 88- WS 100 -YEAR ................. ................... ....... ......................... ......................... ................ .............. ............... ................... ................... ................... .......... ............ -------------- — ---- -------- ------- ............ .................... A .................... Crit FWAY -------------- -------------- ------ ------------------ ------ -------------------- .................... . .................... Crit 100 -YEAR I -------------------- I --------------------------------------- ------------ .............. ...... ----------- A -A --------------------- -------- .... ------------- ............. - - --------........ -------- ------ ------------- - -------- ... Groun 86- ------------------- ---------------------------------------- 84 ---- -------------------- I ---------------------------------------- ......... ...... ------------- 82� ---- ::,i - -- ......... ... 80 - LU 78 ............ 76 74- 72 70 0 5 0 1000 1500 2000 2500 Main Channel Distance (ft) 95 CSX_COMPASS_CREEK Plan: CC_DupEFF 7/25/2017 WESLEYAN BLVD .2 .09 O 5 c 0 m LU 3500 4000 E .09 EG FWAY ---------------------------- EG 100 -YEAR ------------------- WS 100-YEAR ..................................................................................................................... ..................... ..................... ............... ......................._i................... i................... Crit 100 -YEAR ...........!................... Crit FWAY 4500 5000 5500 6000 Station (ft) CSX—COMPASS—CREEK Plan: CC_DupEFF 7/25/2017 Legend EG FWAY WS FWAY ---------------------------- EG 100 -YEAR WS 100 -YEAR ................................... Crit 100 -YEAR .................................... Crit FWAY 0 Ground • Ineff • Bank Sta Encroachment 3500 4000 4500 5000 5500 6000 Station (ft) CSX—COMPASS—CREEK P|an:CC_DupEFF 7/25/2017 Cross Section Compass Creek 23.0 3500 4000 4500 5000 5500 6000 Station (ft) CSX—COMPASS—CREEK Plan: CC—DupEFF 7/25/2017 Cross Section Compass Creek 22.0 7 105 EG FWAY 100 95- WS 100 -YEAR Ground 90- Bank Sta ... Encroachment FU 85- 75 70 3500 4000 4500 5000 5500 6�00 Station (ft) 95 90 0 m w 75- 70 4200 22� .224 Legend EG FWAY EG FWAY WS FWAY - WS FWAY ......... WS 100 -YEAR EG 100 -YEAR -------- .....:........................... WS 100 -YEAR .................. Ground M Ground Ineff • Bank Sta Bank Sta Encroachment Encroachment 5800 .224 Legend EG FWAY WS FWAY ///. EG 100 -YEAR ......... WS 100 -YEAR ........................... ........................... .................,................. Crit FWAY .....:........................... ................ Crit 100 -YEAR Ground Ineff • Bank Sta ............................... Encroachment 4000 4200 4400 4600 4800 5000 Station (ft) .... 5800 CSX—COMPASS—CREEK Plan: CC_DupEFF 7/25/2017 Railroad c 0 m LU 4000 4200 4400 4600 4800 5000 5200 5400 Station (ft) CSX—COMPASS—CREEK Plan: CC_DupEFF 7/25/2017 Railroad 5600 Legend ............. A............. EG FWAY ---------------------------- Gr, lnn_vGoo b'1;:III1] ......................... Crit FWAY Ground i Ineff • Bank Sta Encroachment Legend ........................... EG FWAY ---------------------------- EG 100 -YEAR WS FWAY WS 100 -YEAR ................................... Crit 100 -YEAR .................................... Crit FWAY 0 Ground • Ineff • Bank Sta Encroachment 70 1 1 1 1 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 Station (ft) CSX—COMPASS—CREEK Plan: CC_DupEFF 7/25/2017 Downstream Section of Bridge/Culvert/Weir 224 3�k .168 ":056 .168 .224 Legend EG FWAY 4200 4400 4600 4800 5000 5200 5400 Station (ft) CSX—COMPASS—CREEK Plan: CC_DupEFF 7/25/2017 Cross Section Compass Creek 26.0 .168 "� .0 .168 Crit 100 -YEAR 61.10101 Ground • Ineff • Bank Sta Encroachment Legend EG FWAY WS FWAY .......................... EG 100 -YEAR WS 100 -YEAR ................. ,................. Crit FWAY ................ Crit 100 -YEAR Ground • Bank Sta Encroachment 4200 4400 4600 4800 5000 5200 5400 5600 Station (ft) Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Compass Creek Existing HEC -RAS Plan: CC EX Cond River: Compass Creek Reach: Main Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (fuft) (ft/s) (sq ft) (ft) Main 15207.5 100 -YEAR 2730.00 72.51 88.30 78.89 88.35 0.000278 2.71 2893.35 820.10 0.12 Main 15207.5 FWAY 2730.00 72.51 88.45 78.89 88.52 0.000295 2.81 2314.98 400.00 0.12 Main 15117.5 Culvert Main 15027.5 100 -YEAR 2730.00 72.37 86.14 78.75 86.34 0.000858 4.34 1551.02 546.96 0.21 Main 15027.5 FWAY 2730.00 72.37 86.77 78.75 86.93 0.000653 3.90 1555.01 337.81 0.18 Main 14936.0 100 -YEAR 2730.00 72.32 86.13 86.23 0.000479 3.47 2422.16 817.68 0.17 Main 14936.0 FWAY 2730.00 72.32 86.77 86.84 0.000365 3.13 2396.87 540.00 0.15 Main 14476.0 100 -YEAR 2730.00 72.10 85.46 85.86 0.001328 5.64 1143.37 620.32 0.28 Main 14476.0 FWAY 2730.00 72.10 86.22 86.55 0.001036 5.19 1099.66 311.00 0.25 Main 14172.0 100 -YEAR 2730.00 71.98 85.33 85.45 0.000872 3.69 2277.15 671.15 0.20 Main 14172.0 FWAY 2730.00 71.98 86.14 86.24 0.000666 3.38 1963.46 280.00 0.17 Main 13665.4 100 -YEAR 2730.00 71.89 83.96 78.93 84.57 0.002928 6.47 509.16 1077.76 0.35 Main 13665.4 FWAY 2730.00 71.89 84.69 78.96 85.36 0.004408 6.60 413.50 36.60 0.35 Main 13641.8 Bridge Main 13618.2 100 -YEAR 2730.00 71.68 81.79 78.72 82.73 0.005947 8.05 405.19 860.53 0.48 Main 13618.2 FWAY 2730.00 71.68 82.59 78.75 83.56 0.007397 7.93 344.45 36.60 0.46 Main 13454.4 100 -YEAR 2730.00 71.60 81.97 82.01 0.000769 3.33 3815.21 957.52 0.19 Main 13454.4 FWAY 2730.00 71.60 82.72 82.78 0.000922 3.82 2925.82 585.00 0.21 Main 13089 100 -YEAR 2730.00 71.50 81.53 81.64 0.001354 4.33 2380.43 544.63 0.25 Main 13089 FWAY 2730.00 71.50 82.17 82.33 0.001581 4.89 1760.17 302.00 0.27 Main 12820.0 100 -YEAR 2780.00 71.27 81.28 77.88 81.34 0.000851 3.37 3075.42 685.34 0.19 Main 12820.0 FWAY 2780.00 71.27 81.86 78.13 81.96 0.001113 4.01 2108.07 350.00 0.22 CSX—COMPASS—CREEK Plan: CC—EX—Cond 7/25/2017 Compass Creek Main 90 - Legend . ................... ....................................... ................... .............................................. ............................... ............... A ............... EG FWAY . A------------------------- WS FWAY ------------------------------ EG 100 -YEAR 88 - WS 100 -YEAR - ------------------- ------------------- ------------------- --------------------------------------- ------------- ------------------------- --------------------------------------- ------------ ------------------------------------------------------- ------- ------------------- ---- ---- ------------------- ----- - --------------- -------------- - ------ .. .... ---- ---- ............ ..................... & .................... Crit FWAY ---------------------- ------------------------ ---- .... --- -------------- .................... . .................... Crit 100 -YEAR 86- - ------------------- -------------------- -------------------- I --------------- ........ - - ----- --- - ----------- ........ ---- ---- ----------------------------- - --- ------ -------------- ------ Ground 84 82 ------------------- ------------------- --------- ---------- ------- ------------- ------- - ----------------- -------------- ...... ----- ------- ----------------------- ...... 80 LU 78 76 74- 72 70 0 500 1000 1500 2000 2500 Main Channel Distance (ft) CSX—COMPASS—CREEK Plan: CC—EX—Cond 7/25/2017 Upstream Section of Bridge/Culvert/Weir —.2 .09 .1 JK �K 95 0 .1 —.09 - - - - - ---------------- -- -------- ------5 ............... ............... ------ .................................................... Leend ------------------- ------------------- ------ ---- ------------- ------------------- ------------------- ------------------- ----------- ............ .... EG FWAY ....................... .................. IN ------------------- i ------------ WSFWAY ............................ EG 100-YEAR ------------------- ------------------- - ------------------ ----------------- ------------------- ------------------- WS 100-YEAR ................... .. .................. .................. ............................. .................... .................... ................... ................... ................... Crit 100-YEAR Crit FWAY ............ ................... ....................................... ................... ................... .......... ................... ........................................ .................. Ground .......... .......................... ........................................ ................... ................... Ineff ........... ................... ................... ................... ........................................ ............................................................. ------------------- • Bank Sta ................... ................... ......................................................................................................... ------------------- ------------------- ------------------- ------------------- -------------------------------------------------------------- Encroachment 0610111 .2 HIM 3500 4000 4500 Station (ft) 5000 5500 6000 95 CSX_COMPASS_CREEK Plan: CC_EX_Cond 7/25/2017 WESLEYAN BLVD .2 .09 O 5 c 0 m LU 3500 4000 E .09 EG FWAY ---------------------------- EG 100 -YEAR _.......... ...............................------------------------------- - - - - -- WS 100 -YEAR .. 7:T7.7................... ..................... ......................................_i................... i................... Crit 100 -YEAR ......:.......................................!..........................................................!................... Crit FWAY 4500 5000 5500 6000 Station (ft) CSX—COMPASS—CREEK Plan: CC EX Cond 7/25/2017 Legend EG FWAY WS FWAY ---------------------------- EG 100 -YEAR WS 100 -YEAR ................................... Crit 100 -YEAR .................................... Crit FWAY 0 Ground • Ineff • Bank Sta Encroachment 3500 4000 4500 5000 5500 6000 Station (ft) CSX—COMPASS—CREEK P|an:CC_EX_Cond 7/25/2017 Cross Section Compass Creek 23.0 L � on 1e �o 3500 4000 4500 5000 5500 6000 Station (ft) CSX—COMPASS—CREEK Plan: CC—EX—Cond 7/25/2017 Cross Section Compass Creek 22.0 105j T : 100 WS FWAY 95- WS 100 -YEAR Ground go - Bank Sta FU 85- 75 70 3500 4000 4500 5000 5500 6�00 Station (ft) 95 90 0 m w 75- 70 4200 95 4000 CSX—COMPASS—CREEK Plan: CC_EX_Cond 7/25/2017 Railroad c 0 m LU 4000 4200 4400 4600 4800 5000 5200 5400 Station (ft) CSX—COMPASS—CREEK Plan: CC_EX_Cond 7/25/2017 Railroad 61:31I11 Legend ............. A............. EG FWAY ---------------------------- Gr, lnn_vGoo b'1;:III11 ......................... Crit FWAY Ground i Ineff • Bank Sta Encroachment Legend ........................... EG FWAY ---------------------------- EG 100 -YEAR WS FWAY WS 100 -YEAR ................................... Crit 100 -YEAR .................................... Crit FWAY 0 Ground • Ineff • Bank Sta Encroachment 70 1 1 1 1 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 Station (ft) CSX—COMPASS—CREEK Plan: CC_EX_Cond 7/25/2017 Downstream Section of Bridge/Culvert/Weir 224 3�k .168 ":056 .168 JL .224 Legend EG FWAY 4000 4200 4400 4600 4800 5000 5200 Station (ft) CSX—COMPASS—CREEK Plan: CC_EX_Cond 7/25/2017 CC XS 2 New" —.168 "� 0 5 6 5400 –.168 611-10111 Crit 100 -YEAR 61.10101 4200 4400 4600 4800 5000 5200 5400 Station (ft) Ground • Ineff • Bank Sta Encroachment Legend EG FWAY WS FWAY ......................... EG 100 -YEAR WS 100 -YEAR ■ Ground T� 5600 • Bank Sta Encroachment 86 84- 82 80 0 � 78 w 76 74 72 70 4200 0 m w .224 CSX—COMPASS—CREEK Plan: CC_EX_Cond 7/25/2017 CC XS 1 New' .224 .168 — — — 0 5 6 4400 4600 4800 5000 Station (ft) CSX—COMPASS—CREEK Plan: CC_EX_Cond 7/25/2017 Cross Section Compass Creek 26.0 .168 5200 MCI-] 168 Legend EG FWAY WS FWAY ............................ EG 100 -YEAR WS 100 -YEAR ■ Ground • Bank Sta Encroachment 5600 Legend EG FWAY WS FWAY .......................... EG 100 -YEAR WS 100 -YEAR ................. ,................. Crit FWAY ................ Crit 100 -YEAR Ground • Bank Sta Encroachment 70 4200 4400 4600 4800 5000 5200 5400 5600 Station (ft) Carolina Connector Intermodal Rail Terminal Flood Study J,, COBS Compass Creek Proposed HEC -RAS Plan: CC Prop River: Compass Creek Reach: Main Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (fuft) (ft/s) (sq ft) (ft) Main 15207.5 100 -YEAR 2730.00 72.51 88.29 78.89 88.35 0.000279 2.71 2890.18 819.46 0.12 Main 15207.5 FWAY 2730.00 72.51 88.44 78.89 88.51 0.000296 2.81 2312.60 400.00 0.12 Main 15117.5 Culvert Main 15027.5 100 -YEAR 2730.00 72.37 86.13 78.75 86.33 0.000865 4.36 1543.91 545.71 0.21 Main 15027.5 FWAY 2730.00 72.37 86.75 78.75 86.91 0.000659 3.92 1548.06 337.81 0.18 Main 14936.0 100 -YEAR 2730.00 72.32 86.12 86.22 0.000483 3.48 2411.44 816.39 0.17 Main 14936.0 FWAY 2730.00 72.32 86.75 86.83 0.000369 3.14 2385.67 540.00 0.15 Main 14476.0 100 -YEAR 2730.00 72.10 85.44 85.84 0.001345 5.67 1130.00 614.00 0.28 Main 14476.0 FWAY 2730.00 72.10 86.20 86.53 0.001049 5.21 1091.20 311.00 0.25 Main 14172.0 100 -YEAR 2730.00 71.98 85.31 85.43 0.000884 3.71 2261.51 669.45 0.20 Main 14172.0 FWAY 2730.00 71.98 86.11 86.21 0.000674 3.40 1955.63 280.00 0.18 Main 13665.4 100 -YEAR 2730.00 71.89 83.93 78.93 84.53 0.002963 6.50 507.23 1075.50 0.35 Main 13665.4 FWAY 2730.00 71.89 84.64 78.96 85.33 0.004453 6.63 411.99 36.60 0.35 Main 13641.8 Bridge Main 13580.4 100 -YEAR 2730.00 71.68 81.76 78.72 82.67 0.008293 7.97 403.50 859.49 0.48 Main 13580.4 FWAY 2730.00 71.68 82.55 78.74 83.54 0.014773 7.96 343.13 36.60 0.46 Main 13454.4 100 -YEAR 2730.00 71.60 81.97 82.01 0.000769 3.33 3815.21 957.52 0.19 Main 13454.4 FWAY 2730.00 71.60 82.72 82.78 0.000922 3.82 2925.82 585.00 0.21 Main 13089 100 -YEAR 2730.00 71.50 81.53 81.64 0.001354 4.33 2380.42 544.63 0.25 Main 13089 FWAY 2730.00 71.50 82.17 82.33 0.001581 4.89 1760.17 302.00 0.27 Main 12820.0 100 -YEAR 2780.00 71.27 81.28 77.88 81.34 0.000851 3.37 3075.42 685.34 0.19 Main 12820.0 FWAY 2780.00 71.27 81.86 78.13 81.96 0.001113 4.01 2108.07 350.00 0.22 CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 Compass Creek Main 90 f............... Legend ......................................................... .............................................................................. ------- ------- - A ............... EG FWAY . --------------- WS FWAY 88 EG 100-YEAR E WS 100 -YEAR ------------------------------------ ----------------------------------------------------------- -------------------------------- ----- .................... ',. .............. ;.. ;... ;. ................ ................ Crit FWAY .......-------------------- ----------------- ---- .....Crit -_-------------- ---- . .................... 100 -YEAR 86 ................ f A-------------------------- ........ ---...... --- Ground 84 82 '....._.-------- -.... + - - -------- c 80 LU ......... . 78 76 74- 4-72 72 70 — 0 500 1000 1500 2000 2500 Main Channel Distance (ft) 95.2� ------------------- ---------------- ------------------- ------------------- ------------------- CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 WESLEYAN BLVD .09 5 0 LU 3500 4000 I .09 .............. L ............. EG FWAY - -------------------------- EG 100 -YEAR --------------------- ------------- -------- -------------------- I ------------------- ------------------- . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - - - - - - - - - - - - - - - - - - ------------------- ------------------- WS 100 -YEAR ........................................ ................... ................... ....... .. ................. . ................. .......... ................... ........... ................... Crit 100 -YEAR A................. Crit FWAY ................... ................... ............ 4500 5000 5500 6000 Station (ft) CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 Legend ....... ..... A ............. EG FWAY WS FWAY ---------------------------- EG 100 -YEAR WS 100 -YEAR ................................... Crit 100 -YEAR .................................... Crit FWAY 0 Ground • Ir7eff 0 Bank Sta Encroachment 3500 4000 4500 5000 5500 6000 Station (ft) CSX—COMPASS—CREEK Phan:CC_pmp 7/25/2017 ------------ �85. iiiiiiii�; --*- :7: : :. ................... ......... ............... ................... ............................... .............. ................... ................... ................... ................ ........ .................... ..................E7- ------------------- ------------------- ------------------- ---------------------------------------- ----------------------------------------- ------------------- ------------------- ------------ ------ ------------------- ------------------------------------------------------------- ----- ................ .......................................................... ................... ................... ...................--------------- ------------------- ------------------- --------------------- 807570 95 90 0 m w 75- 70 4200 9 -1:11Il7 224 .224 Legend EG FWAY EG FWAY WS FWAY - WS FWAY ......... WS 100 -YEAR EG 100 -YEAR -------- WS 100 -YEAR .................. M Ground Ineff • • Bank Sta ............................... Encroachment Encroachment 5800 .224 Legend EG FWAY . WS FWAY EG 100 -YEAR ......... WS 100 -YEAR ........................... ........................... .................,................. Crit FWAY ................ Crit 100 -YEAR .....:........................... Ground Ineff • Bank Sta ............................... Encroachment ........................... ........................... ................ ...........{........................... :.................... .......{...........................:...........................� 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 Station (ft) CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 Railroad 224 3�k .168 ":056 .168 JL .224 Legend EG FWAY 70 4000 4200 4400 4600 4800 5000 5200 Station (ft) CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 Railroad .224 168 1<05+-- 4000 :056 4000 4200 4400 4600 4800 5000 Station (ft) 5400 168 1.141I11 Crit FWAY Ground • Ineff • Bank Sta Encroachment 5800 .224 Legend EG FWAY %------------- EG .......... EG 100 -YEAR WS FWAY WS 100 -YEAR ..................:.................. Crit 100-YEAR ..................A.......... ...... Crit FWAY Ground Ineff • Bank Sta ............................... Encroachment T 5600 1 800 70 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 Station (ft) CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 CC XS 2 New" 86 .168 0 .168 ............................................................... ........ ......... ......... ........ ......... ..... .... ......... ......... Legend .\...........:.............:. ;... 5 84 4800 CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 Downstream Section of Bridge/Culvert/Weir 224.168 .05 .168 .224 95 'I Legend ......................:..................................................... .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ............................ .................. ... ....... ......•............. EG FWAY -------------------------->--------------------------- -------------------------------------------------------- ------------------------- ---------------------------------------------------- --------------------------- ------------------------------------------------------ ..........................................................!.......................................................................................................................... _... YEAR 100 YEAR 100 - 90 WS FWAY ----------------------------------------------------------------------- --------------------------- ---------------------------------------------------------------------------------- -------------------------- ...................................................... i......................... ...................... ...................... ------ 100 YEAR 00 - YEAR ........................... ................................................... ................................................................................................ _................................................ .................................................................................................................................................:....................................................:.......................................................:......................................................:..................... ............................ ....................... Crit FWAY .............................. Crit 100 -YEAR 85 ......................... ...................................................................................................................................... .......................... .............................. ........................................ . o.............................................................................................................. ........................... ........ ;........................... ........................... ............................ Ground --------------------------- .....................................................;............................ _.............. A Ineff LU — Bank Sta 80 - - -- -- ------------------------------------------------------- *-.., .. ......................... ........................... Encroachment .............. .................................................................... ................................................... .........................................................:.............................. ----------------------- ------------------------ ----- .................... ................................................................................... ......................... ..;...................................................... _ _- L ,........................... 75 -------------- ------- ---- -- 70 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 Station (ft) CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 CC XS 2 New" 86 .168 0 .168 ............................................................... ........ ......... ......... ........ ......... ..... .... ......... ......... Legend .\...........:.............:. ;... 5 84 4800 CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 CC XS 1 New' .224 .168 — — — 86 �� 0 5 6 84 - -.................................... 82 80 0 � 78 w 76 74 72 70 4200 4400 4600 4800 5000 Station (ft) CSX—COMPASS—CREEK Plan: CC_prop 7/25/2017 Cross Section Compass Creek 26.0 .224 .168 5200 168 168 991108] Legend EG FWAY WS FWAY ............................ EG 100 -YEAR WS 100 -YEAR ■ Ground • Bank Sta Encroachment 5600 Legend EG FWAY WS FWAY .......................... EG 100 -YEAR WS 100 -YEAR ................. ,................. Crit FWAY ................ Crit 100 -YEAR Ground • Bank Sta Encroachment 4200 4400 4600 4800 5000 5200 5400 5600 Station (ft) Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1 C(4) Supplemental/Additional Data No Supplemental/Additional Data Provided Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1 D - Beech Branch • 1C(l) Exhibits • 1C(2) Hydrologic Data • 1C(3) Hydraulic Model/Output • 1C(4) Supplemental/Additional Data Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1D(1) Exhibits 2360000 FEET 2370000 FEET 840000 FEET 77°46'30"W 77°46'0"W 77°45'30"W 77°45'0"W 840000 FEET 6 1 z, Soco�j tr "' q +' o P , .ped' r + rYe�ra9Ps - �e'� '��`-•'y:�a .r ;` �.• �i kr ''� - Ire i 1 _ ,���ti � '� =b FFFF r`y 1. S_wse ' Bra w , d attfP c Al' . v f FX�2167 , � ay .. - r, a �I ` i• 51• _ x�-]jJ;`, r �.Yit,.. �f • r' s f"''q` .',t IJ. ` Ir ' •'� � � �', '` - - -_ '-. ._ .,c. _ice *- .-� _ P _ i, 1 J� I`a _ _ ,• 01111b; 36°3'0"N 36°3'0"N .�F-X1361 f a /'44 "� FX2172 me H-1 1�TAS+H COO UNTY � ,J" � ' • 4 ` • ,a, - h�iy "* '` Y. UN.INCO'RPOO RATEtD AREAS r F , `io+' y a 370278 5� d' m L47 y air ! "• a d,� �m r r"► , CITY OF ROCKY F •r s NN M®UNT ETJ •"� • .z 94 r• p. ',aQe r <4T <_ ,4 r, FXr2174 10 C1 �o6ry - � I I - SII 4 36°2'30"N A . 36°2'30"N r=� FX�2�166 . - 7< f C. , Y ° ,. r -q Q iaa7 Becch C'ITk OF - w B��,nca, y : .;"ROCKY MOUNT ' - _ • y y — �Fcrdscoo 370092. r _ . AE " Fords Colcn Dr ZONE. MAI CiZ 1453 � 2 N k - • `sot r 90,E a5a y'k 3 36°2'0"N do I AV AV yy o t ° 4 � `So7 .. FX2�165 ,' 442 c ZONE E ,} f C --- 3--' �_ 1429 CD i a Beech C k' a 1 m Branch 1 8 483 / 1473 ' 1424 7 A r, i�f, z - CITY OF ROCKY r MOUNT TJ - ; - 370092 - , MR • 52• 549 • 535 v + 1552 1543 BPech r �Ir Bi ACIZ 7� &'. . I I Redlro �t ' rA Aja ZONAE AE'}dal m• a -- x'49 36°1'30"N 36°1'30"N . i 830000 FEET 830000 FEET J' 77°46'30"W 77°46'0"W 77°45'30"W 77°45'0"W AWL 2360000 FEET 2370000 FEET #1111SOPERATING TECHNICAL PARTNER This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach to floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's commitment to map flood hazard areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEE FIS REPORT FOR ZONE DESCRIPTIONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT HTTP://FRIS.NC.GOV/FRIS For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmaps.com or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note appears on this panel, check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5 -foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less severe than those in the VE Zone. Limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1 -800 -344 -WILD. CBRS Area Otherwise Protected Area Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 0 250 500 1,000 Feet Meters 0 75 150 300 PANEL LO CATO R Without Base Flood Elevation (BFE) SUFFIX Zone A, V, A99 2888 L,r With BFE or Depth Zone AE, AO, AH, VE, AR SPECIAL FLOOD Regulatory Floodway HAZARD AREAS / 2886 0.2% Annual Chance Flood Hazard, Areas 2884 of 1% Annual Chance Flood with Average 2882 Depth Less Than One Foot or With Drainage 3813 Areas of Less Than One Square Mile Zone x 3812 Future Conditions 1% Annual 2880 Chance Flood Hazard Zone x OTHER AREAS OF N Area with Reduced Flood Risk due to Levee FLOOD HAZARD See Notes Zone x OTHER Areas Determined to be Outside the AREAS 0.2% Annual Chance Floodplain Zone x 3718 ------------- Channel, Culvert, or Storm Sewer Accredited or Provisionally Accredited GENERAL Levee, Dike, or Floodwall STRUCTURES I I I I I I I I I I I I I Non -accredited Levee, Dike, or Floodwall 2785 BM5510 D North Carolina Geodetic Survey bench mark 3705 i BM5510 ? National Geodetic Survey bench mark BM551OZ Contractor Est. NCFMP Survey bench mark -(H2 —1,8-2— Cross Sections with 1% Annual Chance Water Surface Elevation (BFE) {s - - - - - - Coastal Transect \\-- - -- - Coastal Transect Baseline Profile Baseline Hydrographic Feature OTHER Limit of Study FEATURES Jurisdiction Boundary For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmaps.com or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note appears on this panel, check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5 -foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less severe than those in the VE Zone. Limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1 -800 -344 -WILD. CBRS Area Otherwise Protected Area Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 0 250 500 1,000 Feet Meters 0 75 150 300 PANEL LO CATO R Halifax 3828 3826 13836 13846 13856 13866 13876 3825 13835 13845 13855 13865 13875 13885 3824 13834 13844 13854 13864 11874 3823 13833 13843 13853 081631 3873 3822 3832 3842 3852 3862 1 3821 3831 3841 3851 13861 3820 3830 3840 3850 38603870 3729 3739 3749 3759 3769 3728 3738 3748 13758 3768 3778 3727 3737 3747/3757 Edgecombe 3726 -3736 3,746 Wilson NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM FLOOD INSURANCE RATE MAP NORTH CAROLINA A. AR � PANEL 3863 h ��igND StiGJ�' FEMA Panel Contains: COMMUNITY EDGECOMBE COUNTY NASH COUNTY ROCKY MOUNT, CITY OF CID PANEL SUFFIX 370087 2888 L,r 1-3 370278 3863 J / 2886 3806 2884 3804 2882 3803 3813 3802 3812 2880 3801 3811 3800 3810 Nash 3709 3719 3708 3718 2788 3707 3717 2786 3706 3716 2785 2795 3705 i 3715 Halifax 3828 3826 13836 13846 13856 13866 13876 3825 13835 13845 13855 13865 13875 13885 3824 13834 13844 13854 13864 11874 3823 13833 13843 13853 081631 3873 3822 3832 3842 3852 3862 1 3821 3831 3841 3851 13861 3820 3830 3840 3850 38603870 3729 3739 3749 3759 3769 3728 3738 3748 13758 3768 3778 3727 3737 3747/3757 Edgecombe 3726 -3736 3,746 Wilson NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM FLOOD INSURANCE RATE MAP NORTH CAROLINA A. AR � PANEL 3863 h ��igND StiGJ�' FEMA Panel Contains: COMMUNITY EDGECOMBE COUNTY NASH COUNTY ROCKY MOUNT, CITY OF CID PANEL SUFFIX 370087 3863 J 370278 3863 J 370092 3863 J MAP NUMBER 3720386300J EFFECTIVE DATE 11/3/2004 F` L m..j iz -------sem --- ---------------------- ------ ----- ------ --_� -------------- .�--- T- Beech Branch Proposed Floodplain & Floodway Z _ Carolina Connector Intermodal Rail Terminal (CCX) t CSX Intermodal Terminals, Inc. (CSXIT) City of Rocky Mount, NC [ X ] JACOBS ry I Legend {`� w — ���, New Cross Sections z Q 100 200 400 Cross—Section �- Feet Stream Centerline 100yr ♦ �a 1- - Floodway w � 1 _ 1 1 r I — ! •I - -- ---- -- - -- —SOG _ 115 �°•kF :... '� =� .y �i�e yg,471a6 .fit �P 9. .9 i,. .I '. .po. nt S - �. �..' �� •�4 t~ t. Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1 D(2) Hydrologic Data Section 5.0 - Engineering Methods Table 9—Summary of Discharges Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Revised: July 7, 2014 Page 23 Drainage Discharges (cts) Flooding Source Location Area miles) 5.8 0% Chance Chance Chance Chance 555 1,020 1,270 2,000 Nash/Edgecombe County Boundary Approximately 0.15 mile upstream of 5.0 507 934 1,170 1,840 Highway 301 Approximately 0.37 mile upstream of 3.9 435 809 1,010 1,610 Highway 301 Beech Branch Approximately 1.0 mile upstream of 3.5 406 758 951 1,520 Highway 301 Approximately 0.65 mile downstream of 2.4 322 610 769 1,240 Red Oak-Battleboro Road Red Oak-Battleboro 1.6 254 487 617 1,010 Road Approximately 1.5 miles upstream of 32.31 * * 6,540 Boddie Mill Pond Road Approximately 1.16 miles downstream 20.92 * * 4,980 of Edwards Road Approximately 1,368 feet 19.63 * * 4,790 downstream of Edwards Road Big Peachtree Approximately Creek 2,530 feet 16.80 * * 4,340 upstream of Edwards Road Approximately 2,426 feet downstream of 15.25 * * 4,090 Lancaster Store Road Approximately 500 feet upstream of 11.19 * * 3,370 Lancaster Store Road Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Revised: July 7, 2014 Page 23 Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1 D(3) Hydraulic Model Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Beech Branch Duplicate Effective HEC -RAS Plan: DupEff River: BEECH BRANCH Reach: MAIN Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) MAIN 47266.0 100 -YEAR 1270.00 85.68 98.93 98.94 0.000025 0.98 4137.17 608.88 0.05 MAIN 47266.0 FLOODWAY 1270.00 85.68 98.93 98.94 0.000027 1.01 3312.21 350.00 0.05 MAIN 46890.0 100 -YEAR 1270.00 85.61 98.86 90.69 98.91 0.000123 1.83 809.45 533.15 0.10 MAIN 46890.0 FLOODWAY 1270.00 85.61 98.86 90.69 98.91 0.000127 1.86 809.25 83.10 0.10 MAIN 46810.0 Culvert MAIN 46730.0 100 -YEAR 1270.00 85.85 91.98 90.93 92.52 0.005843 5.97 225.04 168.28 0.57 MAIN 46730.0 FLOODWAY 1270.00 85.85 92.93 90.95 93.28 0.002866 4.73 268.57 62.80 0.40 MAIN 45783.0 100 -YEAR 1270.00 85.16 91.09 88.31 91.15 0.000499 2.28 1241.88 379.18 0.19 MAIN 45783.0 FLOODWAY 1270.00 85.16 92.07 88.45 92.17 0.000531 2.57 590.09 116.92 0.19 CSX—BEECH—BRANCH Plan: BB_DupEFF 7/25/2017 BEECH—BRANCH MAIN 115 Legend - ------------------------------ ------------------------------------------------------------ - ----------------------------- ------------------------------------------------------------- ------------- I --------------------------------------------------------------------------------------------- .................. L ................. EG FLOODWAY - ------------------------------ ------------------------------------------------------------- ----------------------------- ----------------------------- ------------------------------ ----------- ------------------------------ --------- ------------ ------------------------------ ------------------------------------------------- ------------- WS FLOODWAY . .............................. .............................. ............................. ............................. ............................................................ ............................. .............................. .............................. .............................. .............................. .............................. ............................................................................................ .............................. .................................... EG 100 -YEAR -------------------------------- ------------------------------------------------------------- ------------------------------------ ------------------ .......... ------- ............... -------------------------------------- ---------------------------- - WS 1 00 -YEAR ....................... A ...................... Crit FLOODWAY ....................... . ...................... Crit 100 -YEAR 110 - . - ------------------------------------------------------------- .............................. .............................. ----------------------------- ------------------------------ ------------------------------ .............................. ----------------------------- ----------------------------- ............................. - ----------------------------- -------------------------------------------------------------- ............................................................. -------------------------------------------------------------- ----------------------------- ------------------------------ ............................. .............................. ------------------------------ .............................. ...... --------------- .............................................................. ------- ------------------------------ ----------------------------- ............................... :1 ............................. ------------------------------- : ------------------------------ Ground -------------------------------- ------------------------------ ----------------------------- - ------------------------------------------------------------ ------------------------------ ....................... .............................. ------------------------------ ----- ...... ....................... ............................. .............................. ----- ..... .............................. --------------------------------------- ------------------------------- I ------------------------------ 105 . - .............................. .................................................................................................... ------------------------------ --------------------------------------------------------------------------------------------------------------------------- ----------------------------- ----------------------------- -------------------------------- ------------------------------------------------------------ ------------------------------------------------------------- ----------------------------- ------------------------------------ - ----------------------------------------------------------- ------------------------ I ------------------------------- ---- ............................. ...................... .............................. --- ---- ------ ------------------------------------------------------- ------------------------------- I ------------------------------ ------------------------------------------------------------ 100- LU . .............................. ............................................................ ............................................................................................ ............................... -------------------------------- ------------------------------------------------------------- ------------------------------------------------------------ I ------------------------------- ----------------------------- ------------------------------ ------------------------------ A, A, A- ------------------------------ -------------------------------- ------------------------------------------------------------- ............................................................ .............................. ....... ..................... .............................. ... ... .... ------------------------------ ------------------------------ ------------------------------------------------------------ ------------------------------------------------------------ ------------------------------ ------------------------------ -------------------- 5- - ------------------------------ ------------------------------------------------------------- ------------------------------ ----------- --------------- --------- --------- ---------- ----- --------- ---------------------- ------------ ----------------------- ----------------- --------------- ------------------------------ ----------------------------- .............................. .............................. .............................. .......................... ------------------------------ ---- ..... ----------- -- ----------- ........ -------- ---------------------------------------- ........ ------------- -------- ------------ ......... ------------ ------- --------- ------- ------------ ----..... ........ ---- -------------------- ----- ... ------------- 9067 ............ 85 0 260 400 600 800 1000 1200 14'00 1600 Main Channel Distance (ft) 11 IM 10 0 0 w 9 9 CSX—BEECH—BRANCH Plan: BB_DupEFF 7/25/2017 Cross Section Beech Branch 66.0 4400 5400 Legend ............... A ............... EG FLOODWAY -------------------------------- EG 100 -YEAR WS FLOODWAY WS 100 -YEAR ■ Ground Bank Sta Encroachment 5600 ............................. :...................:. EG FLOODWAY .....:...................:......... ----------------------------- EG 100 -YEAR WS 100 -YEAR WS FLOODWAY ....................................... Crit 100 -YEAR ................... A ................... Crit FLOODWAY 4000 4500 5000 5500 6000 6500 Station (ft) Ground Ineff • Bank Sta Encroachment CSX—BEECH—BRANCH Plan: BB_DupEFF 7/25/2017 Railroad .15 "x'.04+ .15}' .2 90 , 85 4000 4500 ..........:........................................ I1 1 5000 5500 Station (ft) CSX—BEECH—BRANCH Plan: BB_DupEFF 7/25/2017 Railroad 2 .15 .04� .15 .2 120 ....................................... ............... ...................:......................................................................................... ...................................... 115 \ -- .................................... ................ 110 ----------------------------------------------- 105-.............. .............. c ............ :.......... ......... ................... :...................:................... :................... :................... ................... :................... :................... :................... :................... ------ ------ -- - - w 100 -------------- 95 - ....... ........................ _ -.... ...........:................... 6000 6500 90 85 4000 4500 5000 Station (ft) 5500 6000 Legend ............ EG FLOODWAY ....... + .............. Crit 100 -YEAR ..................... ............... Crit FLOODWAY WS FLOODWAY 6500 Ground Ineff • Bank Sta Encroachment 120 115 110 _ 105 0 w 100- 95 90- 85 4000 1101 105 100 0 m w CSX—BEECH—BRANCH Plan: BB_DupEFF 7/25/2017 Downstream Section of Bridge/Culvert/Weir 2.15 "1' .04 1 .15 � .2 4500 5000 5500 Station (ft) CSX—BEECH—BRANCH Plan: BB_DupEFF 7/25/2017 Cross Section Beech Branch 73.0 15 .04 15 1:11I1111 6500 4700 4800 4900 5000 5100 5200 5300 5400 5500 Station (ft) Legend EG FLOODWAY Crit 100 -YEAR Ground A Ineff • Bank Sta Encroachment Legend EG FLOODWAY I.."..".." ... ,................. Crit 100 -YEAR Ground • Bank Sta Encroachment Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Beech Branch Existing HEC -RAS Plan: BB EX River: BEECH BRANCH Reach: MAIN Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) MAIN 47266.0 100 -YEAR 1270.00 85.68 98.93 98.94 0.000025 0.98 4136.54 608.85 0.05 MAIN 47266.0 FLOODWAY 1270.00 85.68 98.93 98.94 0.000027 1.01 3309.86 350.00 0.05 MAIN 46890.0 100 -YEAR 1270.00 85.61 98.86 90.69 98.91 0.000123 1.83 809.36 533.10 0.10 MAIN 46890.0 FLOODWAY 1270.00 85.61 98.85 90.69 98.90 0.000128 1.86 808.69 83.10 0.10 MAIN 46810.0 Culvert MAIN 46730.0 100 -YEAR 1270.00 86.81 93.36 91.12 93.65 0.002088 4.38 308.91 265.44 0.36 MAIN 46730.0 FLOODWAY 1270.00 86.81 94.02 91.14 94.26 0.001518 3.90 325.85 63.10 0.30 MAIN 46080 100 -YEAR 1270.00 85.27 91.38 91.60 0.005947 5.82 710.22 334.02 0.58 MAIN 46080 FLOODWAY 1270.00 85.27 92.29 92.66 0.005180 6.43 520.15 180.68 0.56 MAIN 45783.0 100 -YEAR 1270.00 85.16 91.09 88.31 91.15 0.000499 2.28 1241.88 379.18 0.19 MAIN 45783.0 FLOODWAY 1270.00 85.16 92.07 88.45 92.17 0.000531 2.57 590.09 116.92 0.19 CSX—BEECH—BRANCH Plan: BB—EX 7/25/2017 BEECH—BRANCH MAIN J 115 Legend - ------------------------------ ------------------------------------------------------------ - ----------------------------- ------------------------------------------------------ -------------- -------------------------------------------------------------------------------------------- ................. A ................. EG FLOODWAY - ------------------------------ ------------------------------------------------------------------------------------------- ------------------------------------------------------------ ------------ ------------------------------ - ------------------------------------------------------------ WS FLOODWAY .................................... EG 1 00 -YEAR -------------------------------- ------------------------------------------------------------- ------------------------------------ ------------------ ------- ....................... -------------------------------------- -------------------------- WS 100 -YEAR .. ........... A ...................... Crit FLOODWAY ....................... . ...................... Crit 100 -YEAR 110 - . - ------------------------------ I ------------------------------ .............................. .............................. ----------------------------- ------------------------------ ------------------------------ ----------------------------- .............................. ............................................................ ----------------------------- - ----------------------------- ------------------------------ -------------------------------------------------------------- I ------------------------------- I .............................. ----------------------------- ------------------------------ ............................. .............................. ------------------------------ .............................. ...... --------------- .............................................................. --------------------------------------------------------------------- ------------------------------ --------------------------- ............................... :1 ............................. Ground -------------------------------- ------------------------------ ----------------------------- - ----------------------------- ----------------------------- ------------------------------ .............................. ------------------------------ ----- ............................. .............................. ----- ..... .............................. --------------------------------------- ------------------------------- I ------------------------------ 105 . - .............................. ................................... ------------------------------ --------------------------------------------------------------------------------------------------------------------------- ................................................................. ....................... .............................. ----------------------------- -------------------------------- -------------------------------- ------------------------------ ------------------------------------------------------------ ----------------------------- ------------------------------------------------------------ - ----------------------------------------------------------- ------------------------------ ---- .............................. ...................... .............................. --- ---- ------ -------------------------------------------------------------------------------------------- -------------------------------------------------------------- ------------------------------ 100--, LU. .............................. ............................................................ ............................................................................................ .............................. - ------------------------------ ------------------------------------------------------------- ----------------------------- ------------------------------ I ------------------------------- ----------------------------- ------------------------------ ------------------------------ ------------------------------ - - ------------------------------ ------------------------------------------------------------- ------------------------------ ------------------------------ ............................................................ ---------------------- --- -------- -------- .............................. ------------------------------ ------- --------------------- ------------------------------ ------------------ --- ... .... .... ------------------------------ .............................. ...... ------ ------ .............................. .......... --------------------- ................ ---------- --------- .............. ---------------- . ................. -------------------------- ----------------------------------- . ..... 5- - ------------------------------ ------------------------------------------------------------- ------------------------------ ------------------------------ ............................................................. ------------------------------ ---------- --------- ------- ----------- ------ -------- 90 --------------- ------- ---- -- -------------------- .............. ................... ------ ........... ------ ...... -------- 85 T i 0 200 400 600 800 1000 1200 1400 1600 Main Channel Distance (ft) 105 100 0 o - LU 95 90- 85 4400 120 115 110 105 c 0 m LU 100 4600 4800 5000 5200 5400 5600 Legend EG 100 -YEAR T WS FLOODWAY ......................................... Crit 100 -YEAR .................... y .................... Crit FLOODWAY t Ground Ineff • Bank Sta ------------------ Encroachment 85 4000 4500 5000 Station (ft) 5500 6000 6500 90� .............. ................... .................... I ................... ................... ..................... I ................... ....................................... .................... ......... 85 4000 4500 120 115 110 105 LU 100 90 85 4000 4500 1i 5000 5500 Station (ft) CSX—BEECH—BRANCH Plan: BB—EX 7/25/2017 Railroad M 31( .15 I 5000 Station (ft) 1 5500 6000 .2 )1 6000 ---i 6500 Legend ................................ EG 100 -YEAR ---------------•--------------- EG --------------A--------------- EG FLOODWAY ......................................... Crit 100 -YEAR VVb t-LUUUVVAY Ground A Ineff 0 Bank Sta Encroachment 6500 120 115 110 105 0 E -j 100- 95- 90- 85 4000 94 0 . - 90- .............. ------------------- > W . - ................... ------------------- - 88- - . ------------------- --------------------- ................... - . 86 ------------------- ................... ............. 84 4900 CSX—BEECH—BRANCH Plan: BB—EX 7/25/2017 Downstream Section of Bridge/Culvert/Weir .2J- .15 >�<.04 Jk .15- -1- 4500 1, .15 Jlk--.04 5000 5500 Station (ft) CSX—BEECH—BRANCH Plan: BBEX7/25/2017 .15 M 1:1111111 5000 5100 5200 5300 Station (ft) Legend A EG FLOODWAY WS FLOODWAY uni r-LUUUVVAY Crit 100 -YEAR Ground A Ineff • Bank Sta Encroachment 6500 Legend A EG FLOODWAY WS FLOODWAY -------------------------------- EG 100 -YEAR WS 100 -YEAR ■ Ground • Bank Sta Encroachment 5400 CSX—BEECH—BRANCH Plan: BB—EX 7/25/2017 Cross Section Beech Branch 73.0 .15 .04 .15 110- Legend - - ------------------------------ ------------------------------ ------------------------------ ------------------------------ ------------------------------ ------------------------------- -------------------------------------------------------------- : ------------------------------ ------------------------------ ------------------------------ ------------------------------ -------------------------------------------------------------- ------------------------------ ------------------------------ -------------------------------------------------------- ------------------------------ ------------------------------ ------------------------------ ------------------------------------ EG FLOODWAY - -------------------------- ------------------------------ ---------------------------------------------------------------------------------------------- --------------------------------------------------------------- ------------------------------ ------------------------------ ------------------------------------------------------------ ---------------------------------- ------------------------------ ------------------------------ -------------------------------------------------------------- ---WS FLOODWAY -------------------------------- EG 100-YEAR 105 ------------------------------ ------------------------------ --------------------------------------------------------------------------------------------- ------------------------------ ------------------------------ ------------------------------ -------------------------------------------------------- ------------------------------ ------------------------------ ------------------------------ --------------------------------------------------------------- ------------------------------ ------------------------------ ---------------------------------------------------------------------------------------------------------------------------- ------------------------------ ------------------------------- I --------------------------------------------- --------------- WS 100 YEAR ---------------------------- ------------------------- ------------------------------ ------------------------------ -------------------------------------------------------------- ------------------------------- ------------------------------ ------------------------------ ------------------------------ ------------------------------ ------------------------------------------------------------ --------------------------------------------------------- ------ .............................. ------------------------------ ------------------------------ .................... -------------------------------- : -------------------------------- ............ .... ----------------------------- ---- .................... . .................... Crit FLOODWAY 100 Crit 100-YEAR ------------------------- ----------------------- : --------------------------------------------------------------- I ------------------------------ ------------------------------ ------------------------------ ------------------------------- ----------------------- ------ ----------------------------- ----------------------------- ------------------------------ I ------------------- ------------------------------------------- I ----------------------------------------------------------------- ------------------------------ ------------------------------ ------------------------------ -------------------------------- .............................. .............................. .............................. .............................. ........... ................................................. ............................ Ground -------------------------------------------------------------- ------------------------------ ------------------------------ ------------------------------------------------------------ --- I ------------------------------ .............................. .............................. ....................... .............................................................. •---------------- ....... .............................. .............................. ...................... ...................... .............................. Bank Sta 95 . ......................... ........................ - ----------------------------- ------------------------- --- ---- ---- ............................... ------------------------------- Encroachment .............................. ------------------------------ - - 90- ------------------------------ ------------------------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - ...... ....... . . . . . . . . . . . . . . . . . . . .............................. .............................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ------------------------------ -------------------------- .............................. .............................. --------------------------- .............................................................. ---f...............................---- ... ......................................... ......................................... ....... ................................................................................................................................ ........................ --------- --------- .............................. ..................... --------- - 85 1 11 4700 4800 4900 5000 5100 5200 5300 5400 5500 Station (ft) Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Beech Branch Proposed HEC -RAS Plan: BB Prop River: BEECH BRANCH Reach: MAIN Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) MAIN 47266.0 100 -YEAR 1270.00 85.68 98.93 98.94 0.000025 0.98 4137.17 608.88 0.05 MAIN 47266.0 FLOODWAY 1270.00 85.68 98.93 98.94 0.000027 1.01 3311.83 350.00 0.05 MAIN 46890.0 100 -YEAR 1270.00 85.61 98.86 90.69 98.91 0.000123 1.83 809.45 533.15 0.10 MAIN 46890.0 FLOODWAY 1270.00 85.61 98.86 90.69 98.91 0.000128 1.86 809.16 83.10 0.10 MAIN 46810.0 Culvert MAIN 46730.0 100 -YEAR 1270.00 86.81 92.61 91.12 93.03 0.003783 5.26 256.66 211.35 0.48 MAIN 46730.0 FLOODWAY 1270.00 86.81 93.16 91.13 93.50 0.002708 4.68 271.41 62.97 0.40 MAIN 46660 100 -YEAR 1270.00 86.63 92.46 89.71 92.85 0.002024 5.07 270.50 301.95 0.37 MAIN 46660 FLOODWAY 1270.00 86.63 93.06 89.71 93.38 0.001453 4.58 300.83 52.00 0.32 MAIN 46474 Culvert MAIN 46080 100 -YEAR 1270.00 85.74 91.23 88.61 91.58 0.001804 4.76 266.74 329.84 0.36 MAIN 46080 FLOODWAY 1270.00 85.74 92.23 88.61 92.48 0.001015 4.01 316.96 180.27 0.28 MAIN 45783.0 100 -YEAR 1270.00 85.16 91.09 88.31 91.15 0.000499 2.28 1241.88 379.18 0.19 MAIN 45783.0 FLOODWAY 1270.00 85.16 92.07 88.45 92.17 0.000531 2.57 590.09 116.92 0.19 CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 BEECH—BRANCH MAIN 120 Legend .................. ................. EG FLOODWAY WS FLOODWAY EG 100 -YEAR 115 WS 100-YEAR .......................4...................... Crit FLOODWAY ----------------------- --------------------- ... ..................... .......................... 4........................... ........................- .............................................. Crit 100 -YEAR Ground 110 ......................................................................................._.._ _....-............................... ............................. .............. ........................""""""""""' 105 F1 - ------------------------------ ------------------------------------------------------------- -------------------------------------- ------------------------------ ---------------------- ------------------------------ 100 LU ---------------------------- ------------------------------ ----------- _ _ .---- 95 ---'---'-�-'-----�--'------ 90 -...--------------- ........................................ - 85 80 0 200 400 600 800 1000 1200 1400 1600 Main Channel Distance (ft) CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 Cross Section Beech Branch 66.0 90 85 4000 4800 5000 5200 Station (ft) CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 Upstream Section of Bridge/Culvert/Weir .04 � .15 ...... .. . . .... - ---- 5400 --1 5600 Legend ................................ WS FLOODWAY ......................................... Crit 100 -YEAR .................... A .................... Crit FLOODWAY Ground Ir7eff • Bank Sta .................. — ------------------ Encroachment .......... ................... ................... ................... t ................... ................... ---------- ----------------------------------------- -------------------- ------------- 4500 5000 5500 6000 6500 Station (ft) CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 Railroad .15 J- .04 1, .15 :J, T 3� 1 - .2 1207 .1------------------- i ------------------- f ................... Legend .................. .............................. . ................................ ....... ----- ----- .................------------------- -------------------------------- ------------------------------------- ............................. ----- ------ EG 100 -YEAR 115 -- - WS WS .. 100 -YEAR ---------------A--------------- r------------ ------------------- ------------------- ------------------- -------------------- ------------------- ................................... ......... EG FLOODWAY ............... ................... pr 110 -------------- ------------------- ---------------- .............. ................... ............... -------------- -------------------- I -------------------- I -------------- -------------------------------------------- 105 --------------- ------------------- ------------------- : ------- 0 ................... ................... ............................. ---------------- ------------------- ------------------- ------------- > -------------- --------------------------------------- ----------------- LU 100 ---------------- ------------------- ------------------- ................... ................... ........................... ................. ................... ....... ................... ................... : ........ ................... .......... ....................................... : ......... - ------------------- ------------------- - -------------------------------------------------------------------------------- ---------------- 951 -------------- ------------------- --------------------------------------- I ---------------------------------------- I -------------------- ---------------- : ------------------- ------------------- ------------------- --------------------------------------- ------------------------ 90J .............. ................... .................... .............. I ................... ......................... .............. .......... ................... .................... .................... .............. ................... .................... ................... ........................................ I ...... .......................... I ................... ....................................... 85 4000 4500 120 115 110 105 LU 100 90 85 4000 4500 ................... : ................... 4 : ................. ................... ................... 5000 5500 Station (ft) CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 Railroad .04 � .15 1 5000 Station (ft) 1 5500 6000 .2 )1 6000 ---i 6500 Legend ............... r............... EG FLOODWAY ......................................... Crit 100 -YEAR ......................................... Crit FLOODWAY WS FLOODWAY 6500 Ground A Ineff 0 Bank Sta Encroachment 120 115 110 105 c 0 w 100 5000 5500 Station (ft) CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 Upstream of the proposed culverts (New`) .2 6000 ......'....................:................... Legend ............. ......:................... EG FLOODWAY • WS FLOODWAY urn r-LVVUVVAY ................ _..................... Crit 100 -YEAR 6500 85 — 4600 4700 4800 4900 5000 Station (ft) 5100 5200 5300 Ground • Ineff • Bank Sta Encroachment Legend ...............•............... EG FLOODWAY WS FLOODWAY Cant "IUU-YLAK ................... • ................... Crit FLOODWAY 5400 Ground Ineff • Bank Sta Encroachment CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 Proposed Culvert .15 .04 .015 ............................. ............................... !............................ ........................... i............... _.' ............................... Legend ......................!............................... ...............•............... EG FLOODWAY • WS FLOODWAY EDIIIU7 90 85 80 4900 4700 �.15 urn r-LVVUVVAY ................ _.................... . Crit 100 -YEAR Ground • Ineff • Bank Sta Encroachment 4800 4900 5000 51100 5200 5300 5400 Station (ft) CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 Proposed Culvert .04 15 Legend L...... t.. :....... !....... t... ...............•............... EG FLOODWAY WS FLOODWAY 5000 5100 5200 5300 Station (ft) Unt rwvuvVHY Crit 100 -YEAR t Ground Ineff Bank Sta Encroachment 5400 15 CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 IDS of Proposed Culvert (New*) .15 Legend ---------------------------------------------- -------------------- ----------------------------------------------------------- ............... .......... ........... ................... ................... ................... ................... ....................................... ................. ................... ................... ................... EG FLOODWAY .......................... ................... ................... ................... ................... ................... ................... ................... ................... ................... ................... ................... ------------------- ------------------- WS FLOODWAY .......................... ......... ...... ................... ................... ................... ................... ................... ................... ..... ................... ................... .......... ........ ................... ................... ................... ................... ................... EG 100 -YEAR ---------------------------------------------------------- ...... -------------------------------- -------------------------- WS 100 -YEAR .............................................................. ............... ................. ................................................... ................... ................... ................... ................... ..................... ..................... Crit 100 -YEAR .... .......... ................... ................... ................... ................... ................... ................... ................... ................... Crit FLOODWAY ............ ................... .......... Ground ------------------- ------------------- ------------------- ------------------- ------------------- • Ineff ............. ................... F ................... ................... ................... ................... .......... ......... ------------------- ------------------- ---- ------ ----- ......... ................... ------------------- ------------------- ------------------- ------------------ --------- ----------------------------- - ................... ................... ................... Bank Sta Encroachment 4900 5000 5100 5200 5300 Station (ft) CSX—BEECH—BRANCH Plan: BB—Prop 7/25/2017 Cross Section Beech Branch 73.0 5400 Legend A EG FLOODWAY XAIC CI nnMAAIAV 4700 4800 4900 5000 5100 5200 5300 5400 5500 Station (ft) ... . ................ Crit 100 -YEAR Ground 0 Bank Sta Encroachment Carolina Connector Intermodal Rail Terminal Flood Study JACOBS Appendix 1 D(4) Supplemental/Additional Data No Supplemental/Additional Data Provided CSX CSX Transportation CSX Battleboro to Bricks 2"d Main Track Flood Study July 25, 2017 �IA-CARO FESS/0N i ' 040473 - �yT `"/VGINEE�, tiN-- 9 [ CSX1 HOW tomorrow moves ..rtie JACOBS CSX CSX Transportation CSX Battleboro to Bricks 2"d Main Track Flood Study July 25, 2017 cial Naw tomorrow moves NO -RISE CERTIFICATION This document is to certify that I am duly qualified engineer licensed to practice in the State of North Carolina. It is to further certify that the attached technical data supports the fact that the proposed Carolina Connect Intermodal Rail Terminal Project will not increase the base flood elevations or floodway elevations, or impact the floodway widths, on Tar River Backwater at published cross-sections in the Flood Insurance Study for Edgecombe/Nash Counties, North Carolina, FEMA Map Numbers 3720386100K, 3720385100K, 3720386000K, and 3720385000K dated June 18, 2013 and will not increase the base flood elevations or floodway elevations, or impact the floodway widths at unpublished cross-sections in the area of the proposed development. ���►ti�rr�iii -CARoZ/f� J 40473 — i �FjV 'IN�CEQ`� Seal and Signature Nathan Ortega Name Project Manager Title 725 West Town and Country Road, Suite 300 Orange, CA, 92868 Address 7/17/2017 Date FOR COMMUNITY USE ONLY ❑ Approved ❑ Disapproved Name and Title Signature Date NO -RISE CERTIFICATION This document is to certify that I am duly qualified engineer licensed to practice in the State of North Carolina. It is to further certify that the attached technical data supports the fact that the proposed Carolina Connect Intermodal Rail Terminal Project will not increase the base flood elevations or floodway elevations, or impact the floodway widths, on Swift Creek at published cross-sections in the Flood Insurance Study for Edgecombe/Nash Counties, North Carolina, FEMA Map Numbers 3720387500K and 3720387400K dated June 18, 2013 and will not increase the base flood elevations or floodway elevations, or impact the floodway widths at unpublished cross-sections in the area of the proposed development. tpRJH-CAR0(�*',, X ES5/Of AL 040473 rf y�N J. W Seal and Signature Nathan Orteqa Name Project Manager Title 725 West Town and Country Road, Suite 300 Orange, CA, 92868 Address 7/17/2017 Date FOR COMMUNITY USE ONLY ❑ Approved ❑ Disapproved Name and Title Signature Date Document history and status Distribution of copies CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS CSX Project No: JLX26141 Document Title: CSX Battleboro to Bricks 2nd Main Track Flood Study Document No.: 1 Date: July 25, 2017 Client Name: CSX Transportation Project Manager: Nathan Ortega, PE Author: Hrushikesh Sandhe, PE LEED AP File Name: pw:\\DC1CLUS01.jacobs.com:Jacobs_JLPatterson\Documents\ Engineering\CSX\Contract 02_2015_2018\Intermodal\JLXCX102_CCX_Terminal\ 700_Working_Docs\720_Models\720.02_Civil\H&H\PDF\Battleboro to Bricks 2nd Main Track Report 20170717.pdf Jacobs Engineering Group Inc. © Copyright 2017 Jacobs Engineering Group Inc. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This report has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this report by any third party. CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS Contents 1. Introduction..................................................................................................................................................... 1 1.1 Swift Creek................................................................................................................................................. 1 1.2 Tar River.................................................................................................................................................... 2 2. Hydrologic Analysis....................................................................................................................................... 3 3. Hydraulic Analysis......................................................................................................................................... 4 3.1 Swift Creek................................................................................................................................................. 4 3.1.1 Effective and Duplicate Effective Models......................................................................................... 4 3.1.2 Existing Conditions........................................................................................................................... 4 3.1.3 Proposed Conditions........................................................................................................................ 6 3.1.4 Floodways........................................................................................................................................ 9 3.2 Tar River.................................................................................................................................................. 11 3.2.1 Effective and Duplicate Effective Models....................................................................................... 11 3.2.2 Existing Conditions Model.............................................................................................................. 11 3.2.3 Proposed Conditions...................................................................................................................... 12 3.2.4 Floodway........................................................................................................................................ 14 4. Conclusion.................................................................................................................................................... 15 4.1 Swift Creek............................................................................................................................................... 15 4.2 Tar River.................................................................................................................................................. 15 Appendix A. Swift Creek Exhibits Appendix B. Swift Creek Hydrologic Data Appendix C. Swift Creek Hydraulic Model Appendix D. Swift Creek Additional Data Appendix E. Tar River Exhibits Appendix F. Tar River Hydrologic Model Appendix G. Tar River Hydraulic Model Appendix H. Tar River Additional Data CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS 1. Introduction 1.1 Swift Creek Swift Creek crosses an existing CSX Railroad rail line between the communities of Battleboro and Whitakers, North Carolina parallel to US Highway 301. The proposed changes to the crossing include the widening and strengthening of bridge piers to accommodate a new walkway. This crossing of Swift Creek is unique in that two jurisdictions contain a portion of the crossing. Nash County lies to the west side, upstream of the crossing, while Edgecombe County is on the east, downstream side of the crossing. Downstream of this crossing Swift Creek flows into the Tar River near the community of Tarboro. A general reference map for this location is provided below in Figure 1. A more detailed map of the vicinity is located on Exhibit 1, Appendix A. An aerial map showing the crossing is located on Exhibit 2, Appendix A. The Nash County Flood Insurance Rate Map (FIRM), Map No. 3720387400K, Panel No. 3874, dated June 18, 2013 contains the portions of the watershed on the southern portion of the crossing, containing area in both Nash County and Edgecombe County. Panel 3874 shows the immediate upstream area of the crossing to be located in Zone AE. FIRM Map No. 3720387500K, Panel No. 3875, dated June 18, 2013 contains the immediate upstream vicinity, the crossing, and downstream portions of Swift Creek. The proposed crossing is shown on this panel to be in Zone AE. A copy of the FIRM panels used is shown in Exhibit 3, Appendix A, the Effective FIRM Map. St Tcftlk Figure 1. Location Reference Map CSX Battleboro to Bricks 2nd Main Track Flood Study JACOjBS 1.2 Tar River Tar River crosses existing CSX Railroad rail lines on the northeast side of the City of Rocky Mount, North Carolina. The proposed crossing alignment at Rail Station 6172 is parallel to the existing tracks and not on Tar River. The impacted area is located just south of Airport Road between the City of Rocky mount, Nash County to the west and Edgecombe County to the east (see Figure 2). A more detailed map of the vicinity is located in Appendix E. An aerial map showing the crossing is also located in Appendix E. FIRM Numbers 3720386100K, 3720385100K, 3720386000K, and 3720385000K, dated June 18, 2013 contain the immediate upstream vicinity, the crossing, and downstream portions of Tar River. The proposed crossing is shown on this panel to be in Zone AE. A copy of the FIRM panels used is included in Appendix E, Effective FIRM Map. Figure 2. Location Reference Map z Y_s� r F..�,,.t.r P��enr—a . Legend i S WIR_LH - JA .N.Ffl. tv . taYnitl. McYiYtRPCaA. CfBf JY!YI, l.EfI,FYI 0Ml19.{fadmYK' ,Yf YyrgY.Y i � 1!R m� 6 9nVi GnAb An JACOBS CCX Intermodal Project Limit LL'I F.625 3,250 6.500 9,750 13,000 Figure 2. Location Reference Map z CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS 2. Hydrologic Analysis A hydrologic analysis was not performed as part of this flood study. Flows from the published effective Flood Insurance Study (FIS) (Study No. 37127CV000D revised July 7, 2014) were compared to the flows in models obtained from the North Carolina Floodplain Mapping Program. The flows in the FIS and effective models were identical for the 100 -year event. CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS 3. Hydraulic Analysis 3.1 Swift Creek 3.1.1 Effective and Duplicate Effective Models The effective models were downloaded from North Carolina flood map website (www.ncfloodmaps.com). The downloaded effective model was run using HEC RAS (version 5.0.3) to duplicate the output from flood insurance study (FIS) report. The boundary conditions for the effective and duplicate effective floodplain and floodway models are known water surface elevation. A known water surface elevation of 88.74 feet is used for the floodplain models while 89.72 feet is used for the floodway models. 3.1.2 Existing Conditions The duplicate effective model was used as a base to prepare existing conditions model. This model contained bridges labeled as MP 109.1, MP 109.6, MP 109.7, MP 109.8, and MP 109.9 modeled as a single bridge with multiple openings. Comparing with the plans provided by CSX Engineering Department, the number and location of piers for the bridge in the model may not be accurately representative of existing conditions. An existing condition model was developed from the effective geometry with changes made to the number, location, and size of bridge piers on all five bridges. In the existing conditions model the five bridges have a width of 25 feet with opening centerline stations at Station 1895 for bridge MP 109.1, Station 5002.5 for bridge MP 109.6, Station 5577.5 for bridge MP 109.7, Station 5775 for bridge MP 109.8, and station 7305 for bridge MP 109.9. The modified bridge piers in the existing conditions model were sized to represent the area blocked by bridge piers on the plans. As per the design drawing provided by CSX Engineering Department, the existing upstream bridge piers are rectangular in shape approximately 6 feet wide and 9.5 feet tall. The downstream bridge piers are trapezoidal in shape approximately 3 feet wide at the top, 5 feet 6 inches wide at the base and 9.5 feet tall. Piers in the model were set to have an equal area of blockage with the pier face being 4.25 feet wide and 9.5 feet tall for the downstream piers and 6 feet wide and 9.5 feet tall for the upstream piers. The flow and boundary conditions is same as the effective hydraulic model. The Table 1 below has water surface elevations comparison. CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS Table 1. Summary of Effective vs. Existing Conditions Water Surface Elevations Q Total Water Surface Elevation River Sta (cfs) (ft) Effective (EF) Duplicate Effective (DEF) Existing (EX) Delta (DEF -EF) Delta (EX -DEF) 144217 11777 94.82 94.82 94.83 0.00 0.01 142845 11777 94.59 94.59 94.59 0.00 0.00 142805 US -301 Bridge 142768 11777 93.02 93.02 93.04 0.00 0.02 139290 11777 91.97 91.97 92.01 0.00 0.04 134189 11777 91.58 91.58 91.64 0.00 0.06 130590 17612 91.08 91.08 91.15 0.00 0.07 130521 CSX Railway Bridge 130385 17612 90.87 90.86 90.86-0.01 0.00 126426 17612 88.74 88.74 88.74 0.00 0.00 CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS 3.1.3 Proposed Conditions The proposed condition for the Swift Creek crossing is the widening of the existing bridge piers. A proposed conditions hydraulic model was prepared using the existing conditions model as a base. The proposed changes based on plans provided by CSX Engineering Department (Drawing No A109.1-04) are an extension in the width of the bridge deck and addition of 1 -foot diameter round columns downstream of the existing piers at River Station 130521. The added columns were conservatively modeled as a 2 -foot extension of the bridge width, which is the distance between the downstream end of the existing piers and the downstream end of the proposed columns. A 0.01 -foot rise is reported in the HEC -RAS summary tables at Section 17612; however examination of the model results reveals the calculated difference to be 0.0041 feet which equates to a 0.00 foot rise within the precision required. The floodplain is mapped with cross sections on Exhibit 4, Appendix A. The water surface elevations were evaluated for the 100 -year event. Additional summary data and the HEC -RAS output can be found in Appendix C. The results show that there is a 0.00 foot rise in water surface elevation for the 100 -year event. The channel velocity decreases or does not change within the limits of this study, therefore not increasing any existing erosion potential. The freeboard for the bridge is 1.1 feet. Table 2 below summarizes the results of the analysis for this condition CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS LT -H PLAN BRIDGE AT MP A109.9 Figure 3. Proposed Bridge Widening, Plan View Figure 4. Proposed Bridge Widening, Section View MR M) CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS Table 2. Existing vs. Proposed (Bridge Widening) Water Surface Elevations *The 0.01 -foot increase is due to a rounding anomaly. Examination of the HEC -RAS model indicates a calculated difference of approximately 0.0041 feet or 0.00 feet. Q Total Water Surface Elevation Velocity Channel River Sta (cfs) (ft) NO Existing Proposed (EX) (PR) Delta (PR -EX) Existing Proposed (EX) (PR) Delta (PR -EX) 144217 11777 94.83 94.83 0.00 1.59 1.59 0.00 142845 11777 94.59 94.59 0.00 1.44 1.44 0.00 142805 Bridge 142768 11777 93.04 93.04 0.00 2.45 2.45 0.00 139290 11777 92.01 92.01 0.00 1.60 1.60 0.00 134189 11777 91.64 91.64 0.00 0.95 0.95 0.00 130590 17612 91.15 91.16 0.01* 3.47 3.46 -0.01 130521 CSX Railroad Bridge 130385 17612 90.86 90.86 0.00 3.61 3.61 0 126426 17612 88.74 88.74 0.00 2.25 2.25 0 *The 0.01 -foot increase is due to a rounding anomaly. Examination of the HEC -RAS model indicates a calculated difference of approximately 0.0041 feet or 0.00 feet. CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS 3.1.4 Floodways The floodway encroachment stations from effective model were incorporated for the proposed bridge widening scenario. Results for these simulations can be found in Table 3. There was surcharge in the effective floodway of less than or equal to one foot for proposed bridge widening scenario. CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS' Table 3. Existing vs. Proposed (Bridge Widening) Floodway Water Surface Elevation *The 0.01 -foot increase is due to a rounding anomaly. Examination of the HEC -RAS model indicates a calculated difference of approximately 0.0037 feet or 0.00 feet. Q Total Water Surface Elevation Velocity Channel Top Width (ft) (ft/s) (ft) River Sta (cfs) Existing Floodway (EX) Proposed Floodway (PR) Delta (PR -EX) Existing (EX) Proposed (PR) Delta (PR -EX) Existing (EX) Proposed (PR) Delta (PR -EX) 144217 11777 95.26 95.26 0.00 2.09 2.09 0.00 2750 2750 0 142845 11777 94.86 94.86 0.00 1.91 1.91 0.00 2880 2880 0 142805 US -301 Bridge 142768 11777 94.03 94.03 0.00 2.72 2.72 0.00 2865 2865 0 139290 11777 92.86 92.86 0.00 1.93 1.93 0.00 3722 3722 0 134189 11777 92.33 92.33 0.00 1.23 1.23 0.00 4397 4397 0 130590 17612 91.74 91.75 0.01* 3.35 3.35 0.00 6000 6000 0 130521 CSX Railway Bridge 130385 17612 91.50 1 91.50 1 0.00 1 3.44 3.44 0.00 1 6000 6000 0 126426 17612 89.72 1 89.72 0.00 2.26 2.26 0.00 3400 3400 0 *The 0.01 -foot increase is due to a rounding anomaly. Examination of the HEC -RAS model indicates a calculated difference of approximately 0.0037 feet or 0.00 feet. CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS 3.2 Tar River 3.2.1 Effective and Duplicate Effective Models The effective models were downloaded from North Carolina Floodplain Mapping Program (NCFMP) website (www.ncfloodmaps. com). The downloaded effective model was run using HEC -RAS (version 5.0.3) to duplicate the output from the effective FIS report. The models use 29,300 cfs for the 100 -year flow. According to the FIS, during the 100 -year event, backwater from the Tar River impacts the downstream face of the existing railroad crossing. 3.2.2 Existing Conditions Model The cross section Stations 445378 and 444102 in the vicinity of CSX rail road crossing in the existing conditions model matches to the effective model. For this study the limits of model are from cross section Station 447983 on upstream end to Station 441773 on downstream. The boundary condition is a known water surface elevation which is the same as in the effective models. The existing conditions model and all models developed from the existing conditions model contain the same flow data used in the effective models. The existing conditions model was checked to ensure it accurately represented the existing conditions based on the data currently available. Table 4. Summary of Effective vs. Existing Conditions Water Surface Elevations Q Water Surface Elevation Velocity Channel Total (ft) (ft/s) River Sta (cfs) Effective Duplicate Existing Delta Effective Duplicate Existing Delta Effective Effective (EF) (EX) (EX -EF) (EF) (EX) (EX -EF) (DEF) (DEF) 447983 29300 80.40 80.40 80.40 0.00 4.05 4.05 4.05 0.00 446626 29300 78.74 78.74 78.74 0.00 7.62 7.62 7.62 0.00 446531 US -64 Bypass Bridge (Rocky Mount) 446436 29300 78.36 78.37 78.37 0.01 7.70 7.69 7.69 -0.01 445378 29300 78.28 78.28 78.28 0.00 5.35 5.35 5.35 0.00 444102 29300 78.14 78.14 78.14 0.00 4.56 4.56 4.56 0.00 441773 29300 77.95 77.95 77.95 0.00 3.53 3.53 3.53 0.00 CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS 3.2.3 Proposed Conditions A proposed conditions hydraulic model was prepared using the existing conditions model as a base. The rail road bridge crossing at Station 6172 is not included in the effective Tar River model. Also this crossing is influence by backwater through Tar River flooding. There are BFE cross sections River Stations 445378 and 444102 in the vicinity of this bridge crossing. Hence for this analysis the proposed conditions model was prepared to represent additional fill due to proposed embankment in the floodplain. Figure 5 below shows fill placed at typical cross section at Station 6173 to accommodate the intermodal facility lead tracks. Cross section geometry for HEC -RAS Stations 445378 and 444102 was modified to reflect the additional fill. All other inputs (i.e. other cross sections geometry, flow, boundary conditions, Manning's "n", etc.) are identical to those used in the existing conditions model. V U U 4] s� LD rr Oti h { �t �+l ❑ Ln Ln 'r, Vi t Q LL1 - - 4.1 rag ; SUBGRADE _"' 1 20 t0 0 -10 -20 -30 -40 -50 6173+00 Figure 5. Station 6173 Rail Cross Section CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS Tal River - AUGUST 24,2010 5856PROP 2) DUP_ur lErwa = 1.1wn. lnin Ftsxn = kaaen - s a5= oni32 0 [reaa s.�lien rr nnwr en 5 Figure 6. Proposed Cross Section 445378 Representing Fill There is no rise in water surface elevations when compared to existing conditions model. Table 5. Proposed 100 -Year Water Surface Elevation and Velocity Summary I wPnn� WI imvrIk.GT.[w l51PPw4 -PIFmn -Du9 E" GnwE - Wi' EK: axx A'a'plR SCI P0.f]P [:mei Hwk .4� . rnern 13 Q Total Water Surface Elevation Velocity Channel River Sta (cfs) (ft) (ft/s) Existing (EX) Proposed (PR) Delta (PR -EX) Existing (EX) Proposed (PR) Delta (PR -EX) 447983 29300 80.40 80.40 0.00 4.05 4.05 0.00 446626 29300 78.74 78.74 0.00 7.62 7.62 0.00 446531 US -64 Bypass Bridge (Rocky Mount) 446436 29300 78.37 78.37 0.00 7.69 7.69 0.00 445378 29300 78.28 78.28 0.00 5.35 5.35 0.00 444102 29300 78.14 78.14 0.00 4.56 4.56 0.00 441773 29300 77.95 77.95 0.00 3.53 3.53 0.00 13 CSX Battleboro to Bricks 2nd Main Track Flood Study JACOIBS 3.2.4 Floodway The floodway encroachments from the effective floodway model were incorporated into the proposed model; see Table 6 below for the results. The proposed fill does not increase floodway water surface elevations or floodway widths when compared to existing conditions. Table 6. Effective vs. Existing vs. Proposed Floodway Water Surface Elevations and Top Widths 14 Total Water Surface Elevation Top Width River Sta (cfs) (ft) (ft) Existing Proposed Delta (EX) (PR) (PR -EX) Effective Existing (EF) (EX) Proposed (PR) Delta (PR -EX) 447983 29300 81.12 81.12 0.00 515 515 515 0.00 446626 29300 79.65 79.65 0.00 296 296 296 0.00 446531 US -64 Bypass Bridge (Rocky Mount) 446436 29300 79.32 79.32 0.00 295 295 295 0.00 445378 29300 79.27 79.27 0.00 1063 1063 1063 0.00 444102 29300 79.08 79.08 0.00 650 650 650 0.00 441773 29300 78.86 78.86 0.00 650 650 650 0.00 14 CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS 4. Conclusion 4.1 Swift Creek The proposed widening of the railroad bridge on Swift Creek will not increase floodplain or floodway water surface elevations or floodway top widths within the limits of the study. Changes in cross section geometry in the bridge Section 130521 can be seen in the HEC -RAS cross section comparisons available in Appendix C. Recommendation: Widen existing bridge matching existing span and low chord. 4.2 Tar River The addition of fill to construct the tracks will not increase 100 -year floodplain or floodway water surface elevations or the floodway top widths for the Tar River. Changes in cross section geometry can be seen in the HEC -RAS cross section comparison available in Appendix G. Recommendation: Widen existing bridge matching existing span and low chord. Appendix A. Swift Creek Exhibits QI m Johnston Rd I4 4adley-Cutr� Ln 301, 59 Battleboro <p c� �cY r r Whitakers 33 M Welds Rd Battleboro Rd qb 97 ¢v Legend Op b I n g Project Area JACOBVicinity Map N IS Swift Creek Crossing -CSX Battleboro to Bricks 2nd Main Track Flood Study 0 2,000 4,000 Jacobs Engineering Group, Inc. Edgecombe/Nash Counties, North Carolina REG No. 2966 Project No. JLX26141 Feet - "-``�,'! _ �I •'�I ' � I ' �' 'E3. �" �:l�Yi+.4i{,1$.L�111,Y�r`�•!?T31`5 t' IF `M rMs-, r)", r j.,/r f'f"/f �� ,! •', f.:r. � rf.,r.�F y":� ,"' `/j/'jr/r/. `'"�,:.ii •-� i/�r j,'-f./r.- ♦/; f,?-�,,/ %�/''i/rr r,',•p.�py!/ !J,//'/rt/'//,�jr r`J 'r�/r /r: y!� Is f i J/ ". / � ✓'t r r'" - ✓ / r f / � f r/ f/'F.'! `{ / r"� ` `% �' r/,;'�. � ,, /,r� <jr rrr`r/ jr �. r '`r/i,.�'/. �,t'!� '�/f � !rif /r' i!f�// r''•..r / � r; �'x`' itr'j% '/t' / f ✓ i/ ,r, , r jj � ' f,l�,.// • / , � r fr . i . f, ' , ,' {' r,; r �; // ' ,%'. ' r t � / j t f ff�lr.l✓/r% ,. ,' � ' jl j r � � / j j�% �,�/% � ' TS,:73 i3 f swim k y 44. ,ate p r ri ri !lm x n C- 0 vo C— r X C) X 0 N II n X O O 0 n_ r_ Z m rn 0 rn G� rn 0 rn X Appendix B. Swift Creek Hydrologic Data Section 5.0 - Engineering Methods Table 9 -Summary of Discharges Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Revised: July 7, 2014 Page 35 Drainage Discharges (cts) Flooding Source Area Location miles) Approximately 1.6 0% Chance Chance Chance Chance miles downstream of the 211.53 8,410 14,540 17,612 26,195 Nash/Edgecombe County boundary Approximately 100 feet upstream of the 211.0 5,860 9,832 11,777 16,650 Nash/Edgecombe County boundary Approximately 750 feet downstream of 203.7 5,671 9,633 11,590 16,559 U.S. Highway 301 Approximately 2.4 miles downstream 196.9 5,498 9,452 11,419 16,474 of NC Highway 48 Approximately 500 feet downstream of 194.8 5,444 9,396 11,365 16,447 NC Highway 48 Swift Creek Approximately 1.1 miles downstream 183.1 5,156 9,094 11,078 16,299 of Red Oak Road (SR 1003) Approximately 0.9 mile downstream of 182.3 5,138 9,074 11,059 16,289 Red Oak Road (SR 1003 Approximately 1.9 miles downstream 167.74 * * 12,4002 of Hillardston Road SR 1310 Approximately 75 feet upstream of 165.38 * * 12,300 Hillardston Road SR 1310 Approximately 1,300 feet 164.64 * * 12,300 downstream of NC Highway 43 N.C. 97 at Rocky 932.0 16,700 24,400 27,700 40,000 Mount Tar River Confluence of Goose Branch 927.0 16,620 24,310 27,620 40,000 Confluence of Stony 809.0 14,820 22,270 25,770 38,700 Creek Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Revised: July 7, 2014 Page 35 Appendix C. Swift Creek Hydraulic Model CSX Swift Creek/Tar River Backwater Flood Study JACOBS Swift Creek Duplicate Effective HEC -RAS Plan: FWAY DUP EFF River: Swift Creek Reach: Reach -1 Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (fuft) (fus) (sq ft) (ft) Reach -1 144217 100 -year 11777.00 83.86 94.82 90.36 94.83 0.000259 1.59 22466.26 4028.10 0.10 Reach -1 144217 100 -FW 11777.00 83.86 95.25 90.77 95.27 0.000418 2.09 16565.68 2750.00 0.13 Reach -1 142845 100 -year 11777.00 83.83 94.59 93.47 94.60 0.000282 1.44 22002.71 4327.61 0.10 Reach -1 142845 100 -FW 11777.00 83.83 94.86 93.47 94.87 0.000471 1.91 16033.98 2880.00 0.13 Reach -1 142805 Bridge Reach -1 142768 100 -year 11777.00 86.19 93.02 90.73 93.04 0.001084 2.47 14693.16 4311.21 0.19 Reach -1 142768 100 -FW 11777.00 86.19 94.01 90.73 94.04 0.001059 2.73 12649.90 2865.00 0.19 Reach -1 139290 100 -year 11777.00 83.68 91.97 88.70 91.97 0.000491 1.62 21145.20 6019.62 0.12 Reach -1 139290 100 -FW 11777.00 83.68 92.82 89.11 92.83 0.000585 1.95 17153.51 3722.00 0.13 Reach -1 134189 100 -year 11777.00 82.12 91.58 86.69 91.59 0.000102 0.96 36642.23 7503.82 0.06 Reach -1 134189 100 -FW 11777.00 82.12 92.27 87.07 92.28 0.000154 1.25 27502.57 4397.00 0.08 Reach -1 130590 100 -year 17612.00 81.63 91.08 86.71 91.14 0.001129 3.51 13496.82 8152.87 0.21 Reach -1 130590 100 -FW 17612.00 81.63 91.67 86.89 91.72 0.000967 3.39 13846.65 6000.00 0.20 Reach -1 130521 Mult Open Reach -1 130385 100 -year 17612.00 81.35 90.86 86.81 90.92 0.001181 3.61 13386.75 7904.04 0.21 Reach -1 130385 100 -FW 17612.00 81.35 91.50 86.93 91.55 0.000980 3.44 13857.60 6000.00 0.20 Reach -1 126426 100 -year 17612.00 79.39 88.74 84.67 88.75 0.000594 2.25 23903.21 4694.68 0.15 Reach -1 126426 100 -FW 17612.00 79.39 89.72 84.72 89.73 0.000510 2.26 22012.33 3400.00 0.14 115 �•05 .15 .0 6 110- 105- 100- 0 101051000 m w 95- E, [0 5 1 1 1 0 m LU E,[0 ] �—.05-� . 1 5 80 4000 ................................................................... Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 Swift Creek DET 13.0 .15 6000 8000 Station (ft) Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 HWY 301 (SWC) us .15 iIIIIIII1 M �...... - -------- ....................................................................................................................... -------- --------- ---- ----------------------- ......................... .............................. :............................... ----------........................................................................................................................I .............................. : ............................................................................................................... ...........................................................................................,..............................................................;............... 5000 6000 7000 8000 9000 10000 11000 Station (ft) Legend EG 100 -FW Crit 100 -year Ground Ineff • Bank Sta Encroachment M1111I1, Legend EG 100 -FW WS 100 -FW --------------------------- EG 100 -year WS 100 -year .................................... Crit 100 -year .................................. Crit 100 -FW Ground l Ineff • Bank Sta Encroachment 12000 Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 HWY 301 (SWC) TORStructure ID: N_SWC_02Detailed Survey Structu 110 �—.05 .15 — ..................5.. .......................... ........................ .......................... .......................... ...................... .- ---- ------------------------------------ ----------------------------------------------------------- ---- ..........■ 4000 5000 .. ............&................ Crit 100 -FW ------------- A 100 -FW • WS 100 -FW ................. . ................ Crit 100 -year --------------------------- EG 100 -year WS 100 -year a Ground Ineff • Bank Sta Encroachment 12000 • Ineff • Bank Sta Encroachment 4000 5000 6000 7000 8000 9000 10000 11000 12000 Station (ft) 110 105 Swift Creek Plan: F|oodway_Dup| 4/20/2017 HWY 301 (SWC) ds 90 _____ EG1OOfW ----�-----�| WS 100 -FW Crit 100 -year __-�---' Crit 100 -FW Ground A___ mon eanxSto Encroachment ao. -----------� 4000 s000 snoo rono 0000 y000 10000 11000 12OoO Station (ft) Swift Creek P|an:F|oodwuy_Dup|ioote_Effective 4/20/2017 Swift Creek DET u.0 I WS 100 -FW Crit 1 00 -FW Crit 1 00 -year Ground I Encroachment 0 KII1II] 4000 6000 8000 Station (ft) Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 Railroad SWC us ^ .15 = .05 Crit 100 -FW ............. Crit 100 -year Ground Ineff • Bank Sta Encroachment i[IAIIN Legend ............ .............. EG 100 -FW WS 100 -FW ........................... EG 100 -year WS 100 -year ................. A ................ Crit 100 -FW .......................... Crit 100 -year i Ground • Ineff • Bank Sta Encroachment 4000 6000 8000 10000 12000 Station (ft) Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 Railroad SWC TORStructure ID: RRApproximate Survey Structure 15 .15 =' 05 0 6 KIIIIIII UIIIIII 6000 T 8000 Station (ft) Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 Railroad SWC TORStructure ID: RRApproximate Survey Structure 10000 EG 100 -FW • WS 100 -FW Grit 1UU-year ............................... Crit 100 -FW Ground Ineff • Bank Sta Encroachment 12000 Legend EG 100 -FW WS 100 -FW ........................... EG 100 -year WS 100 -year ................. A ................ Crit 100 -FW .......................... Crit 100 -year i Ground l Ineff • Bank Sta Encroachment 80 0 2000 4000 6000 8000 10000 Station (ft) .05 1 1'20 ............................... 115- — — 110 -------------------------------- 105 100 w Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 Railroad SWC TORStructure ID: RRApproximate Survey Structure 15 .15 =' 05 0 6 KIIIIIII UIIIIII 6000 T 8000 Station (ft) Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 Railroad SWC TORStructure ID: RRApproximate Survey Structure 10000 EG 100 -FW • WS 100 -FW Grit 1UU-year ............................... Crit 100 -FW Ground Ineff • Bank Sta Encroachment 12000 Legend EG 100 -FW WS 100 -FW ........................... EG 100 -year WS 100 -year ................. A ................ Crit 100 -FW .......................... Crit 100 -year i Ground l Ineff • Bank Sta Encroachment 80 0 2000 4000 6000 8000 10000 Station (ft) Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 Railroad SWC ds .05 .15 Id 1, .15 .05 120 161- : 6 Legend .... ............. A ............ EG 100 -FW 115� I I WS 100 -FW ------------------- ------------------- ------------------- ------------------------------------------------------------ ------------------- ------------------- ------------------- ------------------- ------------------- ------------------------------------------------------------ ------- ---------------------------------------- ------------------- -------------------- -------------------- ------------------- ------------------- -------------------- -------------------- ....... --------------------------- EG 100 -year 110 ------------------- ------------------- ................... ------------------- I ------------------------------------------------------------- ................... ........... ................... .................... .................... .................... .............. ------------------- WS 100 -year ................. A ................ Crit 100 -FW 105 . ............... -------------------- ---------- I --------------------- Crit 1 00 -year Ground loo - A -------------- ------------------- --------- ------------ ---- -------------- ------------------- Inelf LLI AL L A Bank Sta 95 - Encroachment 90- 85- ................... 80 0 2000 4000 6000 8000 10000 Station (ft) Swift Creek Plan: Floodway_Duplicate_Effective 4/20/2017 Swift Creek DET 1.0 .15 .05 05:�� .15 120 ------------------------------ : ---------------------------- ............. ............................... .............................. ................ 40 ....... Legend ------------------------------ .............................. ------------------------------- ------------------------------ ------------------------------- ------------------------------ ------------------------------ ----------------------------- ------------------------------- ------------------------------ ............................... .............................. ............................... .............................. .............. ...... EG 100 -FW ......................... ............................... .............................. ............................... .............................. .............................. ............................. ............................... .............................. ............................... .............................. ............................... .............................. ......... ..................... .............................. ............................... WS 100 -FW ............................... ........................... EG 100 -year 110 . .............................. .......................................................... ...... ............................... ...................... .......... ............................... .................. ............... ............. .............................................................. . .............................. .............................................................. .............................................................. ............................... .............................. .............................................................. .............................. .............................. .............................. ............ ................ .............................. .............................. .............................. WS 100 -year - ------------------------------ . .............................. ------------------------------- .............................................................. ------------------------------ ------------------------------- .............................................................. ------------------------------ ------------------------------- ............................... ------------------------------ .............................. ------------------------------- .............................................................. ------------------------------ ............................................... .............................................................. ............................... .................... ...................................................... ... ......................... ................................................. Crit 1 00 -FW 100-- . ................ Crit 1 00 -year ................... ............................... .. ......................... ............................... .............................. .............................................................. ............................... ....... 4 ............... .................... 4 ...................... ............................... ......... ..................... s ........... ............................... ... ......................... ............................... .............................. .............................................................. ............................... .............................. ............................... .............................. ...................... ........ .............................. ............................... .............................. ......................... Ground ------------------- ------------------------------- L ------------------------------ -------------------------------------------------------------- ------------------------------- ------------------------------ ............................... .............................. --------------------- --------- ------------------------------ ------------------------------- .............................. ------------------------------ .............................. ------------------------ ....................... A Ineff W 90 -.— p Bank Sta -------------------------------- ------------------------------- --- - IV .... ........................................... .............................. 4 ............................... .............................................................. .............................. 4 ............................... ............................... Encroachment -------------------------------- 80- - ------------------------------ . .............................. ------------------------------- ------------------------------- ............................... ----------------- ------------------------------ ------------------------------- .............................. ............ ! ..... ... .................. ... ............... ------------------------------ i -------------------------------- ............ .... . . ...... ------------------------------ ............. . i --------------------------------- ..................... ------------------------------ -------------------------------- -------------------------------- .... ..... ---------------------- -------- J ---- - -- ------------------- ------------------------------ ------------------------------- .... .... ------------------------------ ------------------------------ ------------------------------ ------------------------------ .... ------------------------------ ------------------------------ ------------------------------- ------------------------------- 4 ............................... —------------------------------- -------------------------------------------------------------- ------------------ 70 --- .... .... .... .... .... .... .... .... ... ------------------------------- . ...................... 2000 3000 4000 5000 6000 7000 8000 9000 10000 Station (ft) CSX Swift Creek/Tar River Backwater Flood Study JACOBS Swift Creek Existing HEC -RAS Plan: Floodwav Existinq Conditions River: Swift Creek Reach: Reach -1 Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (fuft) (fus) (sq ft) (ft) Reach -1 144217 100 -year 11777.00 83.86 94.83 90.36 94.83 0.000259 1.59 22472.10 4028.15 0.10 Reach -1 144217 100 -FW 11777.00 83.86 95.26 90.77 95.27 0.000418 2.09 16568.49 2750.00 0.13 Reach -1 142845 100 -year 11777.00 83.83 94.59 93.47 94.60 0.000282 1.44 22009.74 4327.61 0.10 Reach -1 142845 100 -FW 11777.00 83.83 94.86 93.47 94.87 0.000470 1.91 16037.65 2880.00 0.13 Reach -1 142805 Bridge Reach -1 142768 100 -year 11777.00 86.19 93.04 90.73 93.06 0.001070 2.45 14754.28 4311.86 0.19 Reach -1 142768 100 -FW 11777.00 86.19 94.03 90.73 94.05 0.001048 2.72 12693.67 2865.00 0.19 Reach -1 139290 100 -year 11777.00 83.68 92.01 88.70 92.02 0.000474 1.60 21380.24 6035.88 0.12 Reach -1 139290 100 -FW 11777.00 83.68 92.86 89.11 92.87 0.000568 1.93 17304.30 3722.00 0.13 Reach -1 134189 100 -year 11777.00 82.12 91.64 86.69 91.64 0.000099 0.95 37009.64 7505.17 0.06 Reach -1 134189 100 -FW 11777.00 82.12 92.33 87.07 92.33 0.000149 1.23 27751.39 4397.00 0.08 Reach -1 130590 100 -year 17612.00 81.63 91.15 86.71 91.21 0.001089 3.47 13653.03 8156.45 0.21 Reach -1 130590 100 -FW 17612.00 81.63 91.74 86.89 91.79 0.000934 3.35 14000.10 6000.00 0.19 Reach -1 130521 Mult Open Reach -1 130385 100 -year 17612.00 81.35 90.86 86.81 90.92 0.001181 3.61 13386.75 7904.04 0.21 Reach -1 130385 100 -FW 17612.00 81.35 91.50 86.93 91.55 0.000980 3.44 13857.60 6000.00 0.20 Reach -1 126426 100 -year 17612.00 79.39 88.74 84.67 88.75 0.000594 2.25 23903.21 4694.68 0.15 Reach -1 126426 100 -FW 17612.00 79.39 89.72 84.72 89.73 0.000510 2.26 22012.33 3400.00 0.14 115 �•05 .15 .0 6 110- 105- 100- 0 101051000 m w 95- E, Lillie] 5 1 1 1 0 m LU CLiIII1] �—.05-� . 1 5 80 4000 ................................................................... Swift Creek Plan: Floodway_Existing Conditions 7/25/2017 Swift Creek DET 13.0 .15 6000 8000 Station (ft) Swift Creek Plan: Floodway_Existing Conditions 7/25/2017 HWY 301 (SWC) us .15 itsiollI1 M I I i I i I i 1 1 5000 6000 7000 8000 9000 10000 11000 Station (ft) Legend EG 100 -FW Crit 100 -year Ground Ineff • Bank Sta Encroachment iv�l/IsIC Legend EG 100 -FW WS 100 -FW --------------------------- EG 100 -year WS 100 -year .................................... Crit 100 -year .................................. Crit 100 -FW Ground l Ineff • Bank Sta Encroachment 12000 V ----------------------------------------------------- I' I I i I i I i 1 1 5000 6000 7000 8000 9000 10000 11000 Station (ft) Legend EG 100 -FW Crit 100 -year Ground Ineff • Bank Sta Encroachment iv�l/IsIC Legend EG 100 -FW WS 100 -FW --------------------------- EG 100 -year WS 100 -year .................................... Crit 100 -year .................................. Crit 100 -FW Ground l Ineff • Bank Sta Encroachment 12000 Swift Creek Plan: Floodway_Existing Conditions 7/25/2017 HWY 301 (SWC) TORStructure ID: N_SWC_02Detailed Survey Structu 110 �—.05 > <0& .15 — 5 ------------------------------ ----- - ----------------- --- rion k k k -k Legend Crit 100 -FW ------------- A 100 -FW • WS 100 -FW ................. . ................ Crit 100 -year --------------------------- EG 100 -year WS 100 -year a Ground Ineff .................. • -------- Bank Sta Encroachment 4000 5000 12000 • Ineff • Bank Sta Encroachment 4000 5000 6000 7000 8000 9000 10000 11000 12000 Station (ft) 0 KII1II] EG 100-FW • WS 100-FW Crit 100 -FW . ............... Crit 100 -year Ground Ineff • Bank St, Encroachment i[iAIlIC Legend ............ .............. EG 100 -FW WS 100 -FW ........................... EG 100 -year WS 100 -year ................. A ................ Crit 100 -FW .......................... Crit 100 -year i Ground • Ineff • Bank Sta Encroachment 4000 6000 8000 10000 12000 Station (ft) 1'20 .05 j .15.06 115- 110- 105- 100- LU 15110105100w 0 0 Swift Creek Plan: Floodway_Existing Conditions 7/25/2017 Railroad SWC TORStructure ID: RRApproximate Survey Structure 15 ":06.1501 0.15 J, .06 T 15 .05 —� Legend EG 100 -FW ws � nn_F�ni -, 1 2000 05 .15 =� -," - .06 4000 6000 8000 Station (ft) Swift Creek Plan: Floodway_Existing Conditions 7/25/2017 Railroad SWC TORStructure ID: RRApproximate Survey Structure 15 "x'06 .15– 0 1 0 .15 ",.06 G C G MIIIIII 15 05 ..............4............. Crit 100 -FW Ground Ineff • Bank Sta Encroachment W1111II Legend EG 100 -FW WS 100 -FW --------------------------- EG 100 -year WS 100 -year ................................... Crit 100-year ................4................ Crit 100 -FW Ground • Ineff • Bank Sta Encroachment 2000 4000 6000 8000 10000 Station (ft) Swift Creek Plan: Floodway_Existing Conditions 7/25/2017 Railroad SWC ds .05 .15 Id 1, .15 .05 120 161- : 6 Legend .. ............. A ............ EG 100 -FW 115� I I WS 100 -FW ------------------- ------------------- ------------------- ------------------------------------------------------------ ------------------- ------------------- ------------------- ------------------- ------------------- ------------------------------------------------------------ ------- ---------------------------------------- ------------------- -------------------- -------------------- ------------------- ------------------- -------------------- -------------------- ....... --------------------------- EG 100 -year 110 ------------------- ------------------- ................... ------------------- I ------------------------------------------------------------- ................... ........... ................... .................... .................... .................... .............. ------------------- WS 100 -year ................. A ................ Crit 100 -FW 105 . ............... -------------------- ---------- I --------------------- Crit 1 00 -year Ground loo - A -------------- ------------ ------------------- --------- ---- -------------- ------------------- Inelf LLI AL L A Bank Sta 95 - Encroachment 90- 85- ................... 80 0 2000 4000 6000 8000 10000 Station (ft) Swift Creek Plan: Floodway_Existing Conditions 7/25/2017 Swift Creek DET 1.0 dJ .15 .05 E 05:�� .15 120 ------------------------------ : ---------------------------- ............. ............................... .............................. ................ 40 ....... Legend ------------------------------ .............................. ------------------------------- ------------------------------ ------------------------------- ------------------------------ ------------------------------ ----------------------------- ------------------------------- ------------------------------ ............................... .............................. ............................... .............................. .............. ...... 1 EG 100 -FW ......................... ............................... .............................. ............................... .............................. .............................. ............................. ............................... .............................. ............................... .............................. ............................... .............................. ......... ..................... .............................. ............................... WS 100 -FW ............................... ........................... EG 100 -year 110 . .............................. .......................................................... .......... ............................... .................. ............... ............. .............................................................. . .............................. .............................................................. .............................................................. ............................... .............................. .............................................................. .............................. .............................. .............................. ............ ................ .............................. .............................. .............................. WS 100 -year - ------------------------------ . .............................. ------------------------------- .............................................................. ------------------------------ ------------------------------- .............................................................. ------------------------------ ------------------------------- ............................... ------------------------------ .............................. ------------------------------- .............................................................. ------------------------------ ............................................... .............................................................. ............................... .................... ...................................................... ... ......................... ................................................. Crit 1 00 -FW 100-- . ................ Crit 1 00 -year ................... ............................... .. ......................... ............................... .............................. .............................................................. ............................... ....... 4 ............... .................... 4 ...................... ............................... ......... ..................... ........... ............................... ... ......................... ............................... .............................. .............................................................. ............................... .............................. ............................... .............................. ...................... ........ .............................. ............................... .............................. ......................... Ground ------------------- ------------------------------- L ------------------------------ -------------------------------------------------------------- ------------------------------- ------------------------------ ............................... .............................. --------------------- --------- ------------------------------ ------------------------------- .............................. ------------------------------ .............................. ------------------------ ....................... A Ineff W 90 -.— p Bank Sta -------------------------------- ------------------------------- --- - IV .... ........................................... .............................. 4 ............................... .............................................................. .............................. 4 ............................... ............................... Encroachment -------------------------------- 80- - ------------------------------ . .............................. ------------------------------- ------------------------------- ............................... ----------------- ------------------------------ ------------------------------- .............................. ............ ! ..... ... .................. ... ............... ------------------------------ i -------------------------------- ............ .... . . ...... ------------------------------ ............. . i --------------------------------- ..................... -------------------------------- ------------------------------ -------------------------------- .... ..... ---------------------- -------- ---- - -- ------------------- ------------------------------ ------------------------------- .... .... ------------------------------ ------------------------------ ------------------------------ ------------------------------ .... ------------------------------ ------------------------------ ------------------------------- ------------------------------- 4 ............................... -------------------------------- -------------------------------------------------------------- ------------------ 70 --- .... .... .... .... .... .... .... .... ... ------------------------------- . ...................... 2000 3000 4000 5000 6000 7000 8000 9000 10000 Station (ft) CSX Swift Creek/Tar River Backwater Flood Study JACOBS Swift Creek Proposed HEC -RAS Plan: Floodwav PROP River: Swift Creek Reach: Reach -1 Reach River Ste Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) (ft) (ft) (ft) (ft) (fuft) (fus) (sq ft) (ft) Reach -1 144217 100 -year 11777.00 83.86 94.83 90.36 94.83 0.000258 1.59 22475.10 4028.17 0.10 Reach -1 144217 100 -FW 11777.00 83.86 95.26 90.77 95.27 0.000418 2.09 16566.90 2750.00 0.13 Reach -1 142845 100 -year 11777.00 83.83 94.59 93.47 94.60 0.000282 1.44 22013.38 4327.62 0.10 Reach -1 142845 100 -FW 11777.00 83.83 94.86 93.47 94.87 0.000471 1.91 16035.58 2880.00 0.13 Reach -1 142805 Bridge Reach -1 142768 100 -year 11777.00 86.19 93.04 90.73 93.06 0.001069 2.45 14757.88 4311.89 0.19 Reach -1 142768 100 -FW 11777.00 86.19 94.03 90.73 94.05 0.001047 2.72 12695.90 2865.00 0.19 Reach -1 139290 100 -year 11777.00 83.68 92.01 88.70 92.02 0.000473 1.60 21393.74 6036.82 0.12 Reach -1 139290 100 -FW 11777.00 83.68 92.86 89.11 92.87 0.000567 1.93 17311.80 3722.00 0.13 Reach -1 134189 100 -year 11777.00 82.12 91.64 86.69 91.64 0.000099 0.95 37030.53 7505.25 0.06 Reach -1 134189 100 -FW 11777.00 82.12 92.33 87.07 92.34 0.000149 1.23 27763.70 4397.00 0.08 Reach -1 130590 100 -year 17612.00 81.63 91.16 86.71 91.21 0.001087 3.46 13661.89 8156.65 0.21 Reach -1 130590 100 -FW 17612.00 81.63 91.75 86.89 91.80 0.000932 3.35 14007.62 6000.00 0.19 Reach -1 130521 Mult Open Reach -1 130385 100 -year 17612.00 81.35 90.86 86.81 90.92 0.001181 3.61 13386.75 7904.04 0.21 Reach -1 130385 100 -FW 17612.00 81.35 91.50 86.93 91.55 0.000980 3.44 13857.60 6000.00 0.20 Reach -1 126426 100 -year 17612.00 79.39 88.74 84.67 88.75 0.000594 2.25 23903.21 4694.68 0.15 Reach -1 126426 100 -FW 17612.00 79.39 89.72 84.72 89.73 0.000510 2.26 22012.33 3400.00 0.14 Swift Creek P|an:F|oodvvay_Prupoaed 7/25/2017 Swift Creek DET 1o.O .15 6000 8000 Station (ft) Swift Creek P|an:F|oodvvay_Propoeed 7/25/2017 Hvvv3o1 (SWC) us .15 M 5000 6000 7000 8000 9000 10000 11000 Station (ft) Legend EG 100 -FW ___^--- Crit 1 00 -year Gmund |non eanxSta snomaommont�/ ----------------------------------------------------- 5000 6000 7000 8000 9000 10000 11000 Station (ft) Legend EG 100 -FW ___^--- Crit 1 00 -year Gmund |non eanxSta snomaommont�/ 4000 5000 ....... ......... ................ Crit 1OO-FVY __- A ------------- EG 100-FW __sG100-Fw WS 100'FVV ...... .......... ~................ Crit 100 -year --------------------------- EG 100 -year wS1oo'yoo, Ground A___ moff w eanxSto Encroachment 12000 |non Banksm Encroachment�/ 4000 nnoo 6000 rnoo onuo 0000 10000 11000 1e000 Station (ft) ------------------------ ---------------------------- ........................... .................. ............ ------------------------------ ------------------------------- .............................. .... ------------------------------ ------------------------------- .............................. .... ------------------------------ ------------------------------- ............................. ..... ------------------------------ ------------------------------- ............................ ..... ----- ----- ..... ....................... ............................... ....................... ............ .......................... 100 - ------------------------------ ------------------- .......................... ............................... ..............................� � LLJ 4000 5000 ....... ......... ................ Crit 1OO-FVY __- A ------------- EG 100-FW __sG100-Fw WS 100'FVV ...... .......... ~................ Crit 100 -year --------------------------- EG 100 -year wS1oo'yoo, Ground A___ moff w eanxSto Encroachment 12000 |non Banksm Encroachment�/ 4000 nnoo 6000 rnoo onuo 0000 10000 11000 1e000 Station (ft) � I j 0 2000 4000 6000 Station (ft) Swift Creek Plan: Floodway_Proposed 7/25/2017 Railroad SWC us 8000 10000 Legend ............ .............. EG 100 -FW • WS 100 -FW ........................... EG 100 -year WS 100 -year ................. A ................ Crit 100 -FW .......................... Crit 100 -year i Ground l Ineff • Bank Sta Encroachment 80 0 2000 4000 6000 8000 10000 12000 Station (ft) 05 j 1200 .15 .06 115- 110- 105- 100- LU 15110105100w 0 0 Swift Creek Plan: Floodway_Proposed 7/25/2017 Railroad SWC TORStructure ID: RRApproximate Survey Structure 15 ":06.1501 0.15 J, .06 T 15 .05 —� Legend EG 100 -FW ws � nn_F�ni ►41I1P7 E, 1111111 05�.15.06-1, .15 6000 8000 Station (ft) Swift Creek Plan: Floodway_Proposed 7/25/2017 Railroad SWC TORStructure ID: RRApproximate Survey Structure P'06.15 0 1 0.15 ", .06 G C G MINOIC 15 ............................ Crit 100 -FW Ground Ineff • Bank Sta Encroachment W11I1I1, .05 Legend EG 100 -FW WS 100 -FW --------------------------- EG 100 -year WS 100 -year .................................... Crit 100 -year .................................. Crit 100 -FW Ground • Ineff • Bank Sta Encroachment 2000 4000 6000 8000 10000 Station (ft) Swift Creek Plan: Floodway_Proposed 7/25/2017 Railroad SWC ds .05 .15 > .15 t�--.05 120 -6JE 6 Legend .. ............. A ............ EG 100 -FW 115� I I WS 100 -FW ------------------- ------------------- ------------------- ------------------------------------------------------------ ------------------- ------------------- ------------------- ------------------- ------------------- ------------------------------------------------------------ ------- ---------------------------------------- ------------------- -------------------- -------------------- ------------------- ------------------- -------------------- -------------------- ....... --------------------------- EG 100 -year 110 ------------------- ------------------- ................... ------------------- I ------------------------------------------------------------- ................... ........... ................... .................... .................... .................... .............. ------------------- WS 100 -year ................. A ................ Crit 100 -FW 105 . ............... ................... ................... ................... ................... .................... .................... ......... -------------------- ---------- ................... ................... ..... ----- I --------------------- Crit 1 00 -year Ground loo - A ------------------- --------- -------------- ------------ ---- -------------- ------------------- Inelf LLI AL L A Bank Sta 95 - Encroachment 90- 85- ................... 80 0 2000 4000 6000 8000 10000 Station (ft) Swift Creek Plan: Floodway_Proposed 7/25/2017 Swift Creek DET 1.0 dJ .15 .05 E 05:�� .15 120 ------------------------------ : ---------------------------- ............. ............................... .............................. ................ 40 ....... Legend ------------------------------ .............................. ------------------------------- ------------------------------ ------------------------------- ------------------------------ ------------------------------ ----------------------------- ------------------------------- ------------------------------ ............................... .............................. ............................... .............................. .............. ...... 1 EG 100 -FW ......................... ............................... .............................. ............................... .............................. .............................. ............................. ............................... .............................. ............................... .............................. ............................... .............................. ......... ..................... .............................. ............................... WS 100 -FW ........................... EG 100 -year 110 . .............................. .......................................................... ........... ............................... ................. . ............. ............................................................ . .............................. .............................................................. .............................................................. ............................... .............................. .............................................................. .............................. .............................. .............................. ............ ................ .............................. .............................. .............................. WS 100 -year - ------------------------------ . .............................. ------------------------------- .............................................................. ------------------------------ ------------------------------- .............................................................. ------------------------------ ------------------------------- ............................... ------------------------------ ------------------------------- .............................. .............................................................. ------------------------------ ............................................... .............................................................. ............................... .................... ...................................................... ... ......................... ................................................. Crit 1 00 -FW 100-- . ................ Crit 1 00 -year ................... ............................... .. ......................... ............................... .............................. .............................................................. ............................... ....... 4 ............... .................... 4 ...................... ............................... ......... ..................... s ........... ............................... ... ......................... ............................... .............................. .............................................................. ............................... .............................. ............................... .............................. ...................... ........ .............................. ............................... .............................. ......................... Ground ------------------- ------------------------------- L ------------------------------ -------------------------------------------------------------- ------------------------------- ------------------------------ ............................... .............................. --------------------- --------- ------------------------------ ------------------------------- .............................. ------------------------------ .............................. ------------------------ ....................... A Ineff W 90 -.— Bank Sta -------------------------------- ------------------------------- --- - IV .... ........................................... .............................. 4 ............................... .............................................................. .............................. 4 ............................... ............................... Encroachment -------------------------------- 80- - ------------------------------ . .............................. ------------------------------- ------------------------------- ............................... ----------------- ------------------------------ ------------------------------- .............................. ............ ! ..... ... .................. ... ............... ------------------------------ i -------------------------------- ............ .... . . ...... ............. . ------------------------------ i --------------------------------- ..................... -------------------------------- ------------------------------ -------------------------------- .... ..... ---------------------- -------- ---- - -- ------------------- ------------------------------ ------------------------------- .... .... ------------------------------ ------------------------------ ------------------------------ ------------------------------ .... ------------------------------ ------------------------------ ------------------------------- ------------------------------- 4 ............................... —------------------------------- -------------------------------------------------------------- ------------------ 70 --- .... .... .... .... .... .... .... .... ... ------------------------------- . ...................... 2000 3000 4000 5000 6000 7000 8000 9000 10000 Station (ft) Appendix D. Swift Creek Additional Data 54'1ZX 13 '"boVAll ACAT.Islllz o9.i A/09.1-10 ISO/B' 9••� 273-9" /8'-qf" I+6 Ah "'D Base er RN/ 'I I� •I U U ij u y L U " 'I II �I �� ' �I II Ali L �� II �� I' IIT 1�� U L jl II U .0 la u U jj U U U li (� U U U u Uu UIU W' u 9 -3• /6 ®/B =3" • 292 •-O' 9 =3'• L. A«c EEL VATION Bos• \ ,r 7,14-7DM DWI•/4 -9•'O" LIST OF MATERIALS-Wa. ea N 193 \n� W2 •�/Z+/1'S-0" /2 x/ =/ •-O•• /2,1/2 5:0 /1°x!2'=5-0' /I s12 H=0" FALSEWORN 104 R/es- 3S -0' 2 /r•/2 -/O.O" /01 /2'+/Z -S -O -B/oc/nilg ^+ BP 32 9", 14" - /r 42t 4Z /i 2 .� 1 1 -3' 2-6" /'3/1 1'6 2'3 3'0" 2 3" 1'6"/ /13 2=6' 1'3 /1 7',/f'- 9•-O" • 34 9+B -/6:-O" - Sfi Viers. -Bracing.a. ECTI ON A -A ECTIS ON B -B Sca/ �•/=0" Srn/ems/-O" . PI 384 �.d -//'O'/on9 -B.' W, 1 p/.r. 9x�- 9} /ang -PI. WBea/robe we/ded e.. torte f%/lett 9hxek. inegn arfso. NotSPeor•/eesePn/}a s //so ebw=or✓k. beM/aasidon}P /92 60-19',r • 4B 13 -0 // -Away R¢% " s b 1pP/}b lurnig fi% o! rf/ya�¢n }e/sa *esdtr }Teisa aJnnd /sa worth be }s. / 2 I NMe 4� /ong. q/o cu. yas-eonoroie. DETAILS OF ROLLERS 5 Ti¢cF •Pais eY MB h Bose or Ro,/-//B Troch w'SL¢/e HO" 12 AS SWANTED AS SHOWN D 3's (- •N "/�0'/�O'/�O" •N 3=0" 3 � 9• 4®/=6=6=0" /=0" 4®/=6=6=0" �IE JI ', C' K� � �}-IT n � F J m 3 NEW SECTION p4 OLD SECTION b I _ _ b �� .% IL i_ 'li i YII ti JI • I II g � 0, � - I a ill' dl of P IS -6" /4=0•• /�3'/=fi /�6 /3 /3-0" Il.i y •/6 0-�II E /f END VIEW OF PIERS SECTION C -C ' L ' SECTION E -E SECTION D -D /=3' /=6 /3 3 /C /77 1/&- /// LIST OF MATERIALS W.W. 190 LIST OF MATERIALS W.'N. 191LIST OF MATERIALS WN, 199 60P/es 9S- /20 P%es-3.t=e'roxrg. A. C. L. R. R. /Ix/1'-/4-O" -Caps. 2/i•/z'-/o'-o" ••-B.�c•n�y. DETAILS OF RECONSTRUCTION OF PIERS DETAILS OF •B• BARS 30 /z'•/2' - S-1- - - 3p/1+/2" - 5- d /z 7 r/4' -/0'-0" - /z 7x/4' 60 2 +';/2 22 >•/4' -/p' -o' - •- WATERWAY 193 Sca/e=/=o B 6//4'-/0'-0' - B -/0•-0" sx/•r - s' -0' -sl; ger:. /B 6+/4 -/O•-O" - •' /z > /! s' -o' - sr BATTLEBORO, N. C. /o s'•e"-J6=o"-Braeing/p sx B'•/6'-0' •• -Brae g. 11 � /1 .71 B" - B' -o' - 96 Wo 96 •'/.' 96 i'a"e.//=0'/¢�-Barr q" B+ 'xo� �R¢//B -O' /—C R 20 3, B' 0'- a' -• n (USE THIS 2/6 %9,/-//-o"/ g -Ba rs �.' B 1 G(a SCALE 2=8 0es9�C DRAWING FOR WWS. 190, 191,9 192) AS SHOWN DECEMBER 1946 b enLg,¢,Pe/® TT cu y j2 j net i ./ cv y octet . `� OFFICE OF CHIEF ENGINEER6, . WTLMINGTON, N. C. S. 54'1ZX 13 '"boVAll ACAT.Islllz o9.i A/09.1-10 8' IDS I,6Ls'vis - �i s3iYn Lf'ON 1Nn ONNStM3 I amut trzk.06tS"Y is fif'ON LN39 3MISIX3 WON 1N3B ONFSS 31j ¢ 0 ti eye y.. W 1 LI'60.S6LS'YtS _. + � c SCION 11438 OMISlx3 • urt 9fi'ON 11438 ONt151x3 R; W I Ww LS'SI•.S6LS'V15 � �i I a -M t.N38 OMIISI f3 LBT9.96Lx'Y15 - ih_ ..- 8f`ON 11438 ONI151%3 7y uv..r L6LS'Y1S _ pppx 69-ONM393e OM�%isa%3 N O O i 6PODM6i5�'V 15 _ 01 WON 1N38 OMISI%3 it a 94 n _ f L'81a46a9'Y 1 S 12. Ib'ON 11436 ONtLSIX3 ?, VVVVV w � z gT dY'ON 4t138 ONt1Sl%3 4 r E d •- - I SCSx•9615'Y15 fr`ON IN38 0M1.SI%37 :C SY'i(•96LS'Y'1 N cz�00 ^' � S WON 11438 ONIISIX3 91i6-96iS'Y15 c, So -ON 1N38 OtN151%3 f - ,,r w Z x6.6v.L6Ls-YLs � °' go -ON INN ONILSIx3it a s �'ry Pc I I S LYON 4N36 OMPStx3 rt 0 O fi5'910•i6tS'Y15 J WON LN38 OINIISIX3 # as SS«16LS'Vls - 3NIl H71aP WON INA WISIx3 3 m • a � � � i4 � � � - }[ � Ln" LN3S OMiSix3 'i d � 6 !q 64y4y O + BrON 1N3B 9w1SIx3 j V) j d M >t 60'il.Z61TV1S y6 61 -ON 1N38 OMisIx3 Z1 P ,,pp irg-ZBi"is N' WON IPM !Nwlsix3 3 F N _ K STES-UtTVls - Ito li"ON LN30 Nusin SL'IL*26451VLS _ ZZ'ON 1N38 SMISIx3 j - - - Iy SZ'ON INA sals1x3 j. - ... 4 O L+ WON 1N39 SWSIx3 1 d i 6i'9z.E6LS'Vls WON INN 9M1SB13 j G „ SZ'ON 1NN SMISIx3 j. a� iZ'C9�C64S'V 15. _ LZ -ON INA 741slx3 - .. v✓ 4 WON iN39 OMLSU3 o `t' 6s•66«�fils•vd5 s WON INA "ASU3 A r - - Y' Y7 tt _ .14 Y sB'1I•Ybls'VlS- 0£'ON dM33B 7N11SW3 j �b'BSrb6LS'VAs � +� ICON IN38 WISIx3 j © - - OSw61S'ad5 3N11 117dV14 s1'f5.06A5'YYS WON IN39 ONIaSI%3 � Sf71.OfilS'7:S u, 11.04 INN 5MMX3 3j .O- -Y x -.i 1r`fi9•acls`Txs s ZrON INN ONNlstx3 3 . 0 a s _ Z WON AN30 OWSIX3 } ...... -.... 60`92•16ds'Tx5 --- _ - , .._ Vi -ON 1N-OMISI%3 j w �1 tl'7R+WLS'T LS - - O. 57'04 1N39 OM1SIXI 3 . V7 _J 99+0515'Tls 3M, N71TN IN'09 •b9i5'u 15 m 9'ON LN30 OM1SI%3 a cl cl a' �e 'r Q 1. ON IN39 ON1ISINN3 1 ti a n e1roL.991s`Tls ; U _ "0N 1N39 ?r1115F17. fY 1 IY'91+o61s'Ti5 a -. _. 9'0N LN39 OMISUN3 j m 99.90+991i'IN1S _ _ < k 3'OND IN39 5MASM3 0 fi9'4C•0615Y L5 4 6 -ON IN39 7NUSf%3 3 m + mT 3• i tl, In 19'90*6915'1r1S u✓v`+ roN 1N3B 9NN1stm % .. a+ m N CFIz � u �� =J to VON IWA 7M1SIX3 I lYfy+6815"715 Y -ON 1N39 OW1S7%3{ W so W = L9`19+69x5'715 - VON 1439 OMISIIN3 i s1'f5.06A5'YYS WON IN39 ONIaSI%3 � Sf71.OfilS'7:S u, 11.04 INN 5MMX3 3j .O- -Y x -.i 1r`fi9•acls`Txs s ZrON INN ONNlstx3 3 . 0 a s _ Z WON AN30 OWSIX3 } ...... -.... 60`92•16ds'Tx5 --- _ - , .._ Vi -ON 1N-OMISI%3 j w �1 tl'7R+WLS'T LS - - O. 57'04 1N39 OM1SIXI 3 . V7 _J 99+0515'Tls 3M, N71TN IN'09 •b9i5'u 15 9'ON LN30 OM1SI%3 a ofil'96•b9l5'Tis a' �e 'r — 1. ON IN39 ON1ISINN3 1 ti a n f 1 IY'91+o61s'Ti5 a -. _. 9'0N LN39 OMISUN3 j m k fi9'4C•0615Y L5 6 -ON IN39 7NUSf%3 3 m s1'f5.06A5'YYS WON IN39 ONIaSI%3 � Sf71.OfilS'7:S u, 11.04 INN 5MMX3 3j .O- -Y x -.i 1r`fi9•acls`Txs s ZrON INN ONNlstx3 3 . 0 a s _ Z WON AN30 OWSIX3 } ...... -.... 60`92•16ds'Tx5 --- _ - , .._ Vi -ON 1N-OMISI%3 j w �1 tl'7R+WLS'T LS - - O. 57'04 1N39 OM1SIXI 3 . V7 _J 99+0515'Tls 3M, N71TN 2 a 9 2 2 O r a' �e 'r 9' of a. i w0 m mT 3• i u✓v`+ CFIz � u �� I a: 2 a 9 2 2 O r k wti q a � GG``ee z 7777 m N W - Lr CS SL! `Y1511 _ 8 1 .� ="H lr 3b N651x^ C. a r'!S•5cl S'Y1S Z MN 1N38 Wu1SM3 3j f} ;9*K+SLLS'YL5 LN39 N38N11L XX 9 i 3 � m� S.1 4 y +A S cr sr9t•!L!5•Yls �. � S zZ'5R+5LRL'Y1S VON LN36 WLSrX3 iJ wti q a � GG``ee z 7777 m N W - Lr CS SL! `Y1511 _ 8 1 VAA x C. a d 1N38 !13801 i a cs + a ;9*K+SLLS'YL5 LN39 N38N11L XX 9 i 4 � m� r '� 4 y +A S sr9t•!L!5•Yls �. � S q j r`ON LN38 WdLSIX3 9!'L 5'e1S r'ON LN38 Mi gX3 ��►_ S2'S9.1lt5'YLS i13WN1 _ a Lfl � r \ w J P _ r3 W z •m � 1.1139 LLLS'Y1S wr I Ir'oc•SRCS`YLS �'� j111 ---_ � � _ � J ` Rl �'Ixt g'ni Nvy r5°O9.5RL5'YLS # "' In r1•LB+StL5'YLS � �. "�'�+. o _-' .�. i 1 N39 M39MIL j 4 � w - _ - i 0 or96«sLivvls �} VON A39 SMISIX3 3, _ 8 1 95'OS•LLLS'YLS x C. VON LN38 Wls*3 �. a d s a a cs + a ;9*K+SLLS'YL5 LN39 N38N11L XX 9 i 4 � m� r '� v sr9t•!L!5•Yls �. � 9911.9LL5'Y1S _ ._ r`ON LN38 WdLSIX3 _J r'ON LN38 Mi gX3 ��►_ S2'S9.1lt5'YLS i13WN1 _ a Lfl � r \ w J P _ r3 W z •m � 1.1139 LLLS'Y1S wr I d p ►1'62-9Ll5'M 15 -'- - z m � �. a� S'ON AM WIIL SIX3 ` Rl �'Ixt g'ni Nvy -96"CS-ILLS'Y:S ,.ON LN38 WISIX3 i orzt.RlLS'Yis ZION IN39 9NILS4 i - Ym "fiPliLLS'Y LS A 1N38 lL39Y111 j � - �M1 oeS'■15 $ 94 1N38 839N11 j I 95'OS•LLLS'YLS fo C. VON LN38 Wls*3 �. d s a a cs XX 9 i 4 � m� r '� v sr9t•!L!5•Yls �. � eL"9o•eLLSrts _ ._ r`ON LN38 WdLSIX3 _J � N ��►_ S2'S9.1lt5'YLS i13WN1 Lfl � r \ w J P 6'OH RN3B WML51X3 �_.__. . W AM last, 1.1139 LLLS'Y1S wr I '�` -may wl 3 LN38 emlsl z-co-OLLRLS ` Rl �'Ixt - Ym "fiPliLLS'Y LS A 1N38 lL39Y111 j � - �M1 oeS'■15 $ 94 1N38 839N11 j I 95'OS•LLLS'YLS fo C. VON LN38 Wls*3 �. d s 1�� e co — z r '� 3a sr9t•!L!5•Yls �. � eL"9o•eLLSrts _ ._ r`ON LN38 WdLSIX3 _J ��►_ S2'S9.1lt5'YLS i13WN1 9t"91.9LLS'YlS 6'OH RN3B WML51X3 �_.__. . AM last, - Ym "fiPliLLS'Y LS A 1N38 lL39Y111 j � - �M1 oeS'■15 $ 94 1N38 839N11 j I Wzn�w fo � lz LN38 N380Q1 s 1�� e 3a sr9t•!L!5•Yls �. � _ ._ .INN ��►_ S2'S9.1lt5'YLS i13WN1 1.1139 LLLS'Y1S wr I '�` -may wl 3 LN38 emlsl z-co-OLLRLS ` Rl .... 1N38 N38A11 .. g'ni Nvy �w Wzn�w m � lz s 1�� e a� rs u a w– L4'9i •6915'7 ; 1 _ ON 11436 9M.LSM3: 1, pp K 2 W 1Y'YS p'ON 11439 7N1_Sdx. 9Y21.6915`als -" �-ON IN39 0N1151X3 ti,.j� w O iON LN39 9NI'1SIX3 11436 lagiUl *,ON 11439 OMISIX; '-4.ul O a mw� w 5'014 11438 '.1NI1SVX3 i£'ir-01157x5 - _ _ TON 1N39 OMLSIX3 a m :.1436 SMnll j u. L'ON 11436 OM159X3 j a6'69.a1Ly 715 "—�- � Z Nae 14391111 +t WON LN39 91449% vspo Co .+138 e3ml 8'014 �IN38 9M1SIX3 ',- ++ R f �. 91'90.1146'71s 1N3e e3e1111 Z OI'ON 1N36 ONUSiX3 L p i a �4w s OCW �S d V tn Iw1E ;LL VON A39 ONIYSMN j £5'bf+8£1S'tr 15 ►ION I" ')NUSIX3 � S82S«BiLS'tr LS_- _ TON 1N3B WISIX3 3 i a'oN 1439 �r11151x3 � 3 Oi`-WLS`YLS CON 1438 9NIlAX3 0 0 cn b9'L0+4i1S'r15 B'ON 1N30 omisrf3 j 06'SZ+4CiS'vi5. ..: WON LN39 ONIMY3 3 Sb'bb+4C15'ViS I — VON 1N38 9NI1AX3 3 j i F 1919 OMI YI _ II'ON 1439 `.iebE Slx3 L I BO'�+fi£15'v15 ZYOM 1438 %ftsf t3 3 0 0 + Z6'86.6C1s'vls O — VON AN39 OMISIX3 , - a li'LI+OlrLVTL5 WGM 1N30 'MiSIX3 j �a 0* 1N3B ONIISIX3 �c 22'5£+OelS'trls s VON 0438 WiAX3 i Z C7 'gg .. lot;wF ri'ae«L1Ls`vL5 3K "ON 1N38 UMSIX3 i 5� 04 INS. 7411 Si>' ? -• z z LrON 1N38 WISIX3 j O :r Co 4 }_..- ® OD — Z`ON LN39 OM1SIX3 LO-- VON A39 ONIYSMN j £5'bf+8£1S'tr 15 ►ION I" ')NUSIX3 � S82S«BiLS'tr LS_- _ TON 1N3B WISIX3 3 i a'oN 1439 �r11151x3 � 3 Oi`-WLS`YLS CON 1438 9NIlAX3 0 0 cn b9'L0+4i1S'r15 B'ON 1N30 omisrf3 j 06'SZ+4CiS'vi5. ..: WON LN39 ONIMY3 3 Sb'bb+4C15'ViS I — VON 1N38 9NI1AX3 3 j i F 1919 OMI YI _ II'ON 1439 `.iebE Slx3 L I BO'�+fi£15'v15 ZYOM 1438 %ftsf t3 3 0 0 + Z6'86.6C1s'vls O — VON AN39 OMISIX3 , - a 1:00 a� EN39 939NIL LlTO+BCLS`VYS :439 83RAIl SZ'II*B£LS'trls t N30 UN M1 3 �692+Bi15'vY5 " IN39 43"1 } Sr til'oi•BCLS"rY5 'y'M LN38 H39411 } I ..I vN z® �M w { i4 cs r uk �' j} N 'M M B a o �Fl b PV J �P 14'BC 1N38 M3®qli aj '� 1N39 H3ml j 1439 timm1 br9B«6i4S'v4s INN Ai"i 3 i I li'LI+OlrLVTL5 WGM 1N30 'MiSIX3 j �a �c 22'5£+OelS'trls s VON 0438 WiAX3 Z C7 'gg .. lot;wF iii K"p 3K 5� 04 INS. 7411 Si>' ? -• CL'IL+OeLS'vYi LrON 1N38 WISIX3 j 1:00 a� EN39 939NIL LlTO+BCLS`VYS :439 83RAIl SZ'II*B£LS'trls t N30 UN M1 3 �692+Bi15'vY5 " IN39 43"1 } Sr til'oi•BCLS"rY5 'y'M LN38 H39411 } I ..I vN z® �M w { i4 cs r uk �' j} N 'M M B a o �Fl b PV J �P 14'BC 1N38 M3®qli aj '� 1N39 H3ml j 1439 timm1 br9B«6i4S'v4s INN Ai"i 3 i I 1 q 4 �a s 'gg .. lot;wF iii K"p 4 z z IL ?/ LLJ �a ---- rdAYs t F ry � • W I � LL + LL w a J � J .o ry IIICCC--- d S � � g W .• JJ yl. K 1N3B 1y411�� W V T- 4 iyll{ �o a- I_a cn o 'Vpf.aQ�� © a ID' ZZI J.0 LU �' 3 ❑'CC w m � (.n C7 � � � C i -yd'-` •-da�in z crP LL z [ r z z IL ?/ LLJ �a ---- rdAYs t F ry • W I � LL + LL w J J � J .o ry IIICCC--- d S � � g W .• JJ yl. K 1N3B 1y411�� W V T- 4 iyll{ �o a- _W o All z z IL ?/ a -"ji �`duo.t r ---- rdAYs t F ry • W I � LL + LL w J J � J .o d S � � g W .• JJ yl. K 1N3B ¢6RIK MHV38 j 2 q 3NfkV 3R j T- 4 W �o a- o All m� �I rc m `k' a R I 1N36 d a .4-.9 w J d S � � g W .• JJ yl. K I 1N36 d .4-.9 3 J d S � � g W .• JJ yl. K ¢6RIK = W o Appendix E. Tar River Exhibits C-) 0 D b j C f �d Thomas A Bells pkwy ��— N a" 4,4' S U) d �3 r nes�yP 7 Gr"°n Rd CD � Q1? CD n �b Rf. +� Fottnt4in School Rd CunKINIItO�C' q7 5� oc� 1Vor&g—n ti119. 0 Golf Club !I" ` Z � BEAVER POND Freor DrE Cliff Ln - P 3117 � P + ry4P � II .c a $ I+ 4b aPer Dr �' + Benvenue Country Club 'B i EV Llbb Rd �• o¢ a ax, J Golden East " 5716 Crossing '�I R $ .�,C .Id' �- rer�y� ` a �lr�rl,tRti a � a� 468A _ Qb R x*y Mount U Je SP"ts 4GRA- - �y9S^ Complex. 468B Gaal a Park21� ., 4g 43 � -` HISTORIC MILL VI`LLLAyGE + ''I C h¢ Syer �� r 64 R HILLSDALE Chi St 54 FALLS ROAD v P� E•i NATIONAL rn r p HISTORIC 1. _ X L DISTRICT f vog9nla St W Northemtern r Cemetery "r it Rocky Mount ° 9a" unity WEEKS ARMSTRONG Cemetery !rands O HAPPY HILL r arwmh i" 3 + 43 1 L nHOLLY STREET WEST HAVEN f CENTRAL CItY l0 NATIONAL �! NATIONAL HISTORIC aye•Wand! D) DISTRICT r'ca VILLA ATIPLACE HISTORIC DISTRICT tai N `9y NATIONAL --% wawa ' W LPy9e� Rd � =3 W Shore St D 43 `9 � HIStOR1C R { DISTRICT + x Rineuiew �e0'n cn Rd CEDARBROC11( / Cernetery o J w r4 tuSi. EDGEMONIT - Fo• NATIONAL LITTLE ' ,1 HISTORIC o C7 Y� 'lt- I'll, RALEIGH DISTRICT MEADOWSROOK ht �• �OWLfF x� W,gh �M r, Rosewood AVe _ Z � St o Legend Sr Project Boundary Rocky Mount ....-- Cn o JACOB Vicinity Map N rn Station 6172 Crossing -CSX Battleboro to Bricks 2nd Main Track Flood Study Q 2,000 4,000 IS Jacobs Engineering croup, Inc. City of Rocky Mount, Edgecombe/Nash Counties, North Carolina X REG No. 2966 Project No: JLX26141 Feet 0 L n C- 0 vo C— r X C) X 0 N i� 0 X O O 0 n_ r_ Z m rn 0 rn O rn 0 rn X 0 Appendix F. Tar River Hydrologic Model Section 5.0 - Engineering Methods Table 9 -Summary of Discharges Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Revised: July 7, 2014 Page 35 Drainage Discharges (cts) Flooding Source Area Location miles) Approximately 1.6 0% Chance Chance Chance Chance miles downstream of the 211.53 8,410 14,540 17,612 26,195 Nash/Edgecombe County boundary Approximately 100 feet upstream of the 211.0 5,860 9,832 11,777 16,650 Nash/Edgecombe County boundary Approximately 750 feet downstream of 203.7 5,671 9,633 11,590 16,559 U.S. Highway 301 Approximately 2.4 miles downstream 196.9 5,498 9,452 11,419 16,474 of NC Highway 48 Approximately 500 feet downstream of 194.8 5,444 9,396 11,365 16,447 NC Highway 48 Swift Creek Approximately 1.1 miles downstream 183.1 5,156 9,094 11,078 16,299 of Red Oak Road (SR 1003) Approximately 0.9 mile downstream of 182.3 5,138 9,074 11,059 16,289 Red Oak Road (SR 1003 Approximately 1.9 miles downstream 167.74 * * 12,4002 of Hillardston Road SR 1310 Approximately 75 feet upstream of 165.38 * * 12,300 Hillardston Road SR 1310 Approximately 1,300 feet 164.64 * * 12,300 downstream of NC Highway 43 N.C. 97 at Rocky 932.0 16,700 24,400 27,700 40,000 Mount Tar River Confluence of Goose Branch 927.0 16,620 24,310 27,620 40,000 Confluence of Stony 809.0 14,820 22,270 25,770 38,700 Creek Flood Insurance Study Report: Nash County, North Carolina and Incorporated Areas Revised: July 7, 2014 Page 35 Appendix G. Tar River Hydraulic Model CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS Tar River Duplicate Effective HEC -RAS Plan: FWAY DUP EFF River: Main Stem Reach: Reach - 1 Reach River Sta Profile Q Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach - 1 447983.0 100 -YEAR 29300.00 52.39 80.40 80.57 0.000898 4.05 21853.07 1848.63 0.15 Reach - 1 447983.0 100 -YEAR FW 29300.00 52.39 81.12 81.40 0.001196 4.56 7876.73 515.00 0.17 Reach - 1 446626.0 100 -YEAR 29300.00 51.85 78.74 65.56 79.61 0.000377 7.62 5066.63 2208.70 0.28 Reach - 1 446626.0 100 -YEAR FW 29300.00 51.85 79.65 65.56 80.46 0.000333 7.34 5198.82 296.00 0.27 Reach - 1 446531.0 Bridge Reach - 1 446436.0 100 -YEAR 29300.00 51.69 78.37 65.40 79.26 0.000390 7.69 4998.66 2145.56 0.28 Reach - 1 446436.0 100 -YEAR FW 29300.00 51.69 79.32 65.40 80.14 0.000341 7.40 5145.79 295.00 0.27 Reach - 1 445378.0 100 -YEAR 29300.00 51.08 78.28 78.65 0.000278 5.35 15723.16 3590.70 0.23 Reach - 1 445378.0 100 -YEAR FW 29300.00 51.08 79.27 79.60 0.000228 5.03 9393.27 1063.00 0.21 Reach - 1 444102.0 100 -YEAR 29300.00 50.34 78.14 78.38 0.000124 4.56 33808.48 5420.91 0.16 Reach - 1 444102.0 100 -YEAR FW 29300.00 50.34 79.08 79.38 0.000130 4.77 10084.61 650.00 0.17 Reach - 1 441773.0 100 -YEAR 29300.00 48.99 77.95 60.90 78.10 0.000095 3.53 31186.44 4693.90 0.14 Reach - 1 441773.0 100 -YEAR FW 29300.00 48.99 78.86 60.90 79.08 0.000109 3.90 9809.66 650.00 0.15 Tar River - AUGUST 20,2010 4650 Plan: FWAY—Duplicate_Effective 3/20/2017 <__ Main Stem Reach - 1 90- Legend ------------- ------------- ------------- - EG 100 -YEAR FW WS 100 -YEAR FW - ------------- ------------- ------------ ------------- ------------- -- ---------------------------------------- EG 100 -YEAR - ------------- ------------- ------------- ------------- ------------- ------------ WS 1 00 -YEAR - ------------- --------------------------- ------------- ------------- -------------------------- .......................... 1 .......................... Crit 100 -YEAR -------------- - ------- ------------ ------------- ........... A .................. .. Crit 100 -YEAR FW 80- -------- -------- --------- ......... --------------------------------------------- ------- A -- -- ------------- -- -- ------- -- -- -- --------- ---------- --- ------------------_--------- _ -------- ­ -------------------------------- ---------- ------------------ ------------- -------- ----- - ------ -- ---- ------- -- ------------- --- - ......... ............... ------------------------------------ ------------ --------------------------------- ------ ----- ----- ------ ----- ------ ------ ------------------- ----- ------ ----- ----- ------------ ----------- ------------ - -------------- ------ - ------------------------------------------ Ground 70- Lu 60 50- 40 0 1000 2000 3000 4000 5�00 6000 7000 Main Channel Distance (ft) .................A................ EG 100 -YEAR FW • WS 100 -YEAR FW 5500 0 I c 0 m LU Ground • Bank Sta Encroachment Legend ................................... EG 100 -YEAR FW WS 100 -YEAR FW 50 1 1- 3500 4000 4500 5000 5500 6000 6500 7000 7500 Station (ft) Crit 100-YEAR ......................1...................... Crit 100 -YEAR FW Ground Ineff • Bank Sta Encroachment EG 100 -YEAR FW ------------------------------------ .............................................. Crit 100 -YEAR FW Ground Ineff • Bank St, Encroachment 3500 4000 4500 5000 5500 6000 6500 7000 7500 1 c 0 m LU 50 3500 4500 5000 5500 6000 6500 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Duplicate_Effective 3/20/2017 Cross Section Tar River 69.5 M1181n Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ....................... A...................... Crit 100 -YEAR FW Crit 100 -YEAR Ground Ineff • Bank Sta Encroachment W111: 50 1000 2000 3000 4000 5000 Station (ft) Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR Ground • Bank Sta Encroachment 6000 M I 1 0 m w Tar River - AUGUST 20,2010 4650 Plan: FWAY_Duplicate_Effective 3/20/2017 Cross Section Tar River 69.0 1. .13 70 60 50 -1000 0 1000 2000 3000 4000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Duplicate_Effective 3/20/2017 Cross Section Tar River 68.0 XS98 08 --f .03 +08 +11 �� 1. --� 61/10111 Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ■ Ground • Bank Sta Encroachment 6000 Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR ....................... 4....................... Crit 100 -YEAR ...................... A .................... .. Crit 100 -YEAR FW Ground • Bank Sta Encroachment 40 1000 2000 3000 4000 5000 6000 7000 Station (ft) CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS Tar River Existing HEC -RAS Plan: FWAY EX River: Main Stem Reach: Reach - 1 Reach River Sta Profile 4 Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach - 1 447983.0 100 -YEAR 29300.00 52.39 80.40 80.57 0.000898 4.05 21853.07 1848.63 0.15 Reach - 1 447983.0 100 -YEAR FW 29300.00 52.39 81.12 81.40 0.001196 4.56 7876.73 515.00 0.17 Reach - 1 446626.0 100 -YEAR 29300.00 51.85 78.74 65.56 79.61 0.000377 7.62 5066.63 2208.70 0.28 Reach - 1 446626.0 100 -YEAR FW 29300.00 51.85 79.65 65.56 80.46 0.000333 7.34 5198.82 296.00 0.27 Reach - 1 446531.0 Bridge Reach - 1 446436.0 100 -YEAR 29300.00 51.69 78.37 65.40 79.26 0.000390 7.69 4998.66 2145.56 0.28 Reach - 1 446436.0 100 -YEAR FW 29300.00 51.69 79.32 65.40 80.14 0.000341 7.40 5145.79 295.00 0.27 Reach - 1 445378.0 100 -YEAR 29300.00 51.08 78.28 78.65 0.000278 5.35 15723.16 3590.70 0.23 Reach - 1 445378.0 100 -YEAR FW 29300.00 51.08 79.27 79.60 0.000228 5.03 9393.27 1063.00 0.21 Reach - 1 444102.0 100 -YEAR 29300.00 50.34 78.14 78.38 0.000124 4.56 33808.48 5420.91 0.16 Reach - 1 444102.0 100 -YEAR FW 29300.00 50.34 79.08 79.38 0.000130 4.77 10084.61 650.00 0.17 Reach - 1 441773.0 100 -YEAR 29300.00 48.99 77.95 60.90 78.10 0.000095 3.53 31186.44 4693.90 0.14 Reach - 1 441773.0 100 -YEAR FW 29300.00 48.99 78.86 60.90 79.08 0.000109 3.90 9809.66 650.00 0.15 Tar River - AUGUST 20,2010 4650 Plan: FWAY—Existing_Conditions 3/20/2017 <-- Main Stem Reach - 1 90- Legend ------------- ------------- ------------- - EG 100 -YEAR FW WS 100 -YEAR FW - ------------- ------------- ------------ ------------- ------------- -- ---------------------------------------- EG 100 -YEAR - ------------- ------------- ------------- ------------- ------------- ------------- ........... WS 1 00 -YEAR - ------------- ------------- ------------- ------------- ------------- ------------- ------------ .......................... 1 .......................... Crit 100 -YEAR -------------- ------- ------------- -------------- - - --- ----- ........... A .................. .. Crit 1 00 -YEAR FW 80- -------- -------- --------- ......... --------------------------------------------- ------ -- -- ------------- -- -- ---------- -- -- ----------- --- ------------------------------ — -------- — -------------------------------- ---------- ------------------ ------------- -------- ----- - ------ -- ---- ------- ......... ............ ------------------------------------ ------------ ----- --------------------------- -- ---- ----- ----- ------ ----- ------ ------ ------------------- ----- ------ ----- ----- ------------ ---------- ----------- ------------ - --------------- - - ------------ --------------- ---------- Ground 70- Lu 60 50- 40 0 1000 2000 3000 4000 5�00 6000 7000 Main Channel Distance (ft) 11 ic 0 80 LU 70 50 3500 ................. A ................ EG 100 -YEAR FW • ws 100 -YEAR FW Uround 0 Bank Sta Encroachment 5500 Legend .................. L ................. EG 100 -YEAR FW WS 100 -YEAR FW 4000 4500 5000 5500 6000 6500 7000 7500 Station (ft) Crit 100 -YEAR ....................... k ...................... Crit 100 -YEAR FW Ground Iteff Bank Sta Encroachment EG 100 -YEAR FW ------------------------------------ .............................................. Crit 100 -YEAR FW Ground Ineff • Bank St, Encroachment 3500 4000 4500 5000 5500 6000 6500 7000 7500 1 c 0 m LU 50 3500 4500 5000 5500 6000 6500 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Existing_Conditions 3/20/2017 Cross Section Tar River 69.5 M1181n Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ....................... A...................... Crit 100 -YEAR FW Crit 100 -YEAR Ground Ineff • Bank Sta Encroachment W111: 50 1000 2000 3000 4000 5000 Station (ft) Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR Ground • Bank Sta Encroachment 6000 M I 1 0 m w Tar River - AUGUST 20,2010 4650 Plan: FWAY_Existing_Conditions 3/20/2017 Cross Section Tar River 69.0 1. .13 70 60 50 -1000 0 1000 2000 3000 4000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Existing_Conditions 3/20/2017 Cross Section Tar River 68.0 XS98 08 —�. .03 +08 +11 �� 1. --� 61/10111 Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ■ Ground • Bank Sta Encroachment 6000 Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR ....................... 4....................... Crit 100 -YEAR ...................... A .................... .. Crit 100 -YEAR FW Ground • Bank Sta Encroachment 40 1000 2000 3000 4000 5000 6000 7000 Station (ft) CSX Battleboro to Bricks 2nd Main Track Flood Study JACOBS Tar River Proposed HEC -RAS Plan: FWAY PROP River: Main Stem Reach: Reach - 1 Reach River Sta Profile 4 Total Min Ch EI W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach - 1 447983.0 100 -YEAR 29300.00 52.39 80.40 80.58 0.000898 4.05 21854.45 1848.65 0.15 Reach - 1 447983.0 100 -YEAR FW 29300.00 52.39 81.12 81.40 0.001196 4.56 7876.73 515.00 0.17 Reach - 1 446626.0 100 -YEAR 29300.00 51.85 78.74 65.56 79.61 0.000377 7.62 5066.93 2208.92 0.28 Reach - 1 446626.0 100 -YEAR FW 29300.00 51.85 79.65 65.56 80.46 0.000333 7.34 5198.82 296.00 0.27 Reach - 1 446531.0 Bridge Reach - 1 446436.0 100 -YEAR 29300.00 51.69 78.37 65.40 79.26 0.000390 7.69 4998.97 2145.87 0.28 Reach - 1 446436.0 100 -YEAR FW 29300.00 51.69 79.32 65.40 80.14 0.000341 7.40 5145.79 295.00 0.27 Reach - 1 445378.0 100 -YEAR 29300.00 51.08 78.28 78.65 0.000278 5.35 15539.02 3499.67 0.23 Reach - 1 445378.0 100 -YEAR FW 29300.00 51.08 79.27 79.60 0.000228 5.03 9393.27 1063.00 0.21 Reach - 1 444102.0 100 -YEAR 29300.00 50.34 78.14 78.38 0.000125 4.56 33147.14 5393.63 0.16 Reach - 1 444102.0 100 -YEAR FW 29300.00 50.34 79.08 79.38 0.000130 4.77 10084.61 650.00 0.17 Reach - 1 441773.0 100 -YEAR 29300.00 48.99 77.95 60.90 78.10 0.000095 3.53 31186.44 4693.90 0.14 Reach - 1 441773.0 100 -YEAR FW 29300.00 48.99 78.86 60.90 79.08 0.000109 3.90 9809.66 650.00 0.15 Tar River - AUGUST 20,2010 4650 Plan: FWAY—Proposed 3/20/2017 Main Stem Reach - 1 90- Legend ------------- ------------- ------------- - EG 100 -YEAR FW WS 100 -YEAR FW - ------------- ------------- ------------ ------------- ------------- -- ---------------------------------------- EG 100 -YEAR - ------------- ------------- ------------- ------------- ------------- ------------ WS 100 -YEAR - ------------- --------------------------- ------------- ------------- -------------------------- .......................... 1 .......................... Crit 100 -YEAR -----------.-.-.- - ------- ------------ ------ ------- ........... A .................. .. Crit 100 -YEAR FW 80 -------- -------- --------- ......... ----------- -------­--------­---------------------------------------------------------- ------------- -------- ----- ------ - --- ------- A ..... ------------------_-------------- ---------------------------------- ------------------------------------ ------------ --------------------------------- ------ ----- ----------- ----- ------ --------------- ----- .................. ----70Lu --------- --------- - - .. -------------------- Ground 70 0 w 60 50- 40 0 1000 2000 3000 4000 5000 6000 7000 Main Channel Distance (ft) .................A................ EG 100 -YEAR FW • WS 100 -YEAR FW 5500 0 I c 0 m LU Ground • Bank Sta Encroachment Legend ................................... EG 100 -YEAR FW WS 100 -YEAR FW 50 1 1- 3500 4000 4500 5000 5500 6000 6500 7000 7500 Station (ft) Crit 100-YEAR ......................1...................... Crit 100 -YEAR FW Ground Ineff • Bank Sta Encroachment EG 100 -YEAR FW ------------------------------------ .............................................. Crit 100 -YEAR FW Ground c 0 m LU 50 3500 4500 5000 5500 6000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Proposed 3/20/2017 Cross Section Tar River 69.5 6500 M1181n Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ....................... A...................... Crit 100 -YEAR FW Crit 100 -YEAR Ground Ineff • Bank Sta Encroachment W111: Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR Ground • Bank Sta Encroachment 50 1000 2000 3000 4000 5000 6000 Station (ft) M I 1 0 m w Tar River - AUGUST 20,2010 4650 Plan: FWAY_Proposed 3/20/2017 Cross Section Tar River 69.0 1. .13 70 60 50 -1000 0 1000 2000 3000 4000 Station (ft) Tar River - AUGUST 20,2010 4650 Plan: FWAY_Proposed 3/20/2017 Cross Section Tar River 68.0 XS98 08 —�. .03 +08 +11 �� 1. --� 6/1/0111 Legend EG 100 -YEAR FW WS 100 -YEAR FW ------------------------------------ EG 100 -YEAR WS 100 -YEAR ■ Ground • Bank Sta Encroachment 6000 Legend EG 100 -YEAR FW WS 100 -YEAR FW ----------------------------------- EG 100 -YEAR WS 100 -YEAR ....................... 4....................... Crit 100 -YEAR ...................... A .................... .. Crit 100 -YEAR FW Ground • Bank Sta Encroachment 40 1000 2000 3000 4000 5000 6000 7000 Station (ft) Appendix H. Tar River Additional Data 100 - - - - AREA FILL: 85.8 SF AREA CUT: 42.4 SF - - - _ 95 85 -- - 80 - 90 85 75 70 65 60 120 — — - - - CONTRACT 90 - EXISTING SEE_ INT' 80 A YARD LEADS 110 - rm - 80 75 70 65 60120 w_ z _ _ EXISTING GRIND _ i - 100 110 r - 95 90 80 70 60 50 40 30 100 95 90 _ AREA FILL: AREA CUT -- - 136.1 SF 1.4 SF _ 85 -- - 80 75 70 65 60 120 — — - - - CONTRACT 90 - EXISTING SEE_ INT' 80 — — -NOT IN 100 YARD LEADS 110 Y Q � 20 10 0 100 95 90 85 80 75 70 6v 60 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 _mU -14U -1DU -IOU _I/U -lao 618100 N N 70 60 50 40 30 20 10 0 100 95 90 85 80 75 70 65 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -1ZU -1Su -14U -13u -IOU -I/V ,II 6180.1.00 N N 100 AREA FILL' 69.9 SF 100 95 AREA CUT: 15.2 SF w_ z _ _ x ; , i r 95 90 90 w W� W W cd *L I 85 85 - I - - - - f I 80 60 - f - I - TOP 0 SUBGRAO 1 `- - i - - 75 _- - 75 70 70 E%ISTING GROUND-� 65 - 65 YARD LEADS NOT IN CONTRACT !- SEE INT:RMODAL PIAN FOR DETAIL_ 60120 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1800 6179+00 10, 0 10, 20' WHERE R/W LIMITS NOT SHOWN SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS GRAPHIC SCALE: 1" - 10' DESIGNED BY ENGINEERING DEPARTMENT VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK -- In�"l-" `m1 g, I • it ..me. 1-1 g, e.ec- anO/Of"rm- D.MONTAGUE CSATAil111SP0ITAi'z0111 INC. DESIGN &CONSTRUCTION ' CROSS SECTIONS DRAWN 87 DRAWING NO. �1oat1on•• tim r.r"imetl nre.itn • nai re�mi. the .r..ertr D MONTAGUE JACKSONVILLE FLORIDA Rx -07 EMT1 6181+00 TO EMT1 6179+00 ionatMa�INDerMltl emir CHECKED BY N, ORTEGA REVISION SHEET NO,. /ltlentw, mtl ow ".t.. �,.tl fm f y ..r.... ".r I';,,�M'bs„„�a�,�,eY1p, APPROVED BY V00090 59 OF 188 SUB NORTH END DIVA FLORENCE I NOT FOR 1) NMUC 11014 1DATE M.GANAS SCALE AS SHOWN ROCKY MOUNT, EDGECOMBE COUNTY, NC DATE DESCRIPTION �'�%g APP JANUARY 19, 2017 ■ ^' C O� x N LEI N N Q' C .3 0 0 u 0 F— c U U a 0 / _T U CL 0 U O N LQ Q N N O W 100 95 AREA FILL' ;165.3 SF AREA CUTS 0.3 SF SF ,n,a�,dndmrid•mi° n •ion•. ardwinaew•°- wrion rurni m•d n•r•wim "atlI =I � imQ- noon r•n°inm••ro°•r�r r m• c1, rrm.°arrmion and •toil e• e•m cm- Fd•nfm dna .n° n°"" •s.d M. a,r w+rdnu nor dw ,a in nw.en.n+. M. cs• rron•°nrr°ri.n D.MONTAGUE ENGINEERING DEPARTMENT CSX TRANSPORTATION INC. DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS + + EMT1 6178 00 TO EM T1 6176 00 SUB: NORTH END DIV: FLORENCE ROCKY MOUNT, EDGECOMBE COUNTY, NC 90 DRAWN 9Y D. MONTACUE w 95 AREA CUT_12 SF 85 CHECKED BY N. ORTECA REVISION — 80 NOT ��--Pf'k+*n j'� IDDE,ISj,CJRIPTION APPROVED BY M. CANAS DATE JANUARY 19, 2017 SCALE AS SHOWN REV DATE -P } �� — 75 a r x 1U 70 TING GRO 65 - - EXI N(� 60YARD LEAQS NOT IN (CONTRACT - SEE INTERMODAL P AN FOR D TAIL - 120 110 100 90 80 70 60 50 40 30 100 AREA — FILL: ,1139.9 SF ,n,a�,dndmrid•mi° n •ion•. ardwinaew•°- wrion rurni m•d n•r•wim "atlI =I � imQ- noon r•n°inm••ro°•r�r r m• c1, rrm.°arrmion and •toil e• e•m cm- Fd•nfm dna .n° n°"" •s.d M. a,r w+rdnu nor dw ,a in nw.en.n+. M. cs• rron•°nrr°ri.n D.MONTAGUE ENGINEERING DEPARTMENT CSX TRANSPORTATION INC. DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS + + EMT1 6178 00 TO EM T1 6176 00 SUB: NORTH END DIV: FLORENCE ROCKY MOUNT, EDGECOMBE COUNTY, NC - DRAWN 9Y D. MONTACUE w 95 AREA CUT_12 SF _ CHECKED BY N. ORTECA REVISION SHEET N0. 60 OF 188 - . NOT ��--Pf'k+*n j'� IDDE,ISj,CJRIPTION APPROVED BY M. CANAS DATE JANUARY 19, 2017 SCALE AS SHOWN REV DATE -P 90 85y 80 - - 75-- L 70 EXI TING CR JND J 65 - — - !TAIL - YARD LEAl S NOT IN (CONTRACT(- SEE INT�:RMODAL P_AN FOR 120 110 100 90 80 70 60 50 40 30 100 95 90 85 80 75 70 65 60 120 110 100 90 80 70 60 50 40 30 WHERE R/W LIMITS NOT SHOWN SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS DE 1 ^ N N 20 10 0 100 95 90 85 80 75 70 65 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -''W 6178+00 N N 20 10 0 100 95 90 85 80 75 70 65 CA -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -180 6177+00 N N 20 10 0 100 95 90 85 80 75 70 E� -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1840 6176+00 10' 0 1a' 20' GRAPHIC SCALE- 1" = l0' ,n,a�,dndmrid•mi° n •ion•. ardwinaew•°- wrion rurni m•d n•r•wim "atlI =I � imQ- noon r•n°inm••ro°•r�r r m• c1, rrm.°arrmion and •toil e• e•m cm- Fd•nfm dna .n° n°"" •s.d M. a,r w+rdnu nor dw ,a in nw.en.n+. M. cs• rron•°nrr°ri.n D.MONTAGUE ENGINEERING DEPARTMENT CSX TRANSPORTATION INC. DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS + + EMT1 6178 00 TO EM T1 6176 00 SUB: NORTH END DIV: FLORENCE ROCKY MOUNT, EDGECOMBE COUNTY, NC - DRAWN 9Y D. MONTACUE w V00090 DRAWING N0, RX -08 _ CHECKED BY N. ORTECA REVISION SHEET N0. 60 OF 188 - . NOT ��--Pf'k+*n j'� IDDE,ISj,CJRIPTION APPROVED BY M. CANAS DATE JANUARY 19, 2017 SCALE AS SHOWN REV DATE -P 100 95 90 85 BO 75 70 65 r 100 95 90 85 80 75 70 65 6020 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1�p 6175+00 -. _� 100 100 'AREA FILL' i0.0 SIF o AREA CUT: 7.0 SF l �_ z_ z 95 95 N � tri - v -� w; m x m 90 W w •E� w W '�I I> 4 85 85to o — — _ 80 .�. __ _ - '---- Bo TOP SUBCRAD1i - _I` _�-- P - — 75 75 — s RA TO ALL 0 ACCESS �1 TURNOU PAD _ - 70 70 EXIST[.JG GROUND -J PROPOSE 36" CMP - 65 65 60ivARQ LEADS NOT IN ICONTRACT - SEE 1NT.RMODAL P AN FOR TAIL _ 120 110 100 90 BO 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 170 -6D 6174+00 w, ti N N - -- z Y AREA FILL: 167.1 SF AREA CUT: 1.3 SF — _fl '21 z o 100 lY IS s -- iC3 wQ m� 22 Ww. UBGRAO W cd AREA FILL AREA CUT 142.7 SF 4,1 SF T — e J I� w _+' ,r - 95 `° 95 SI•NAL PAD T EXIST NG GROUNQ YARD LEADS NOT IN PLAN FOR DETAIL ,CONTRACT r- SEE INTERMODAL 100 95 90 85 80 75 70 65 6020 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1�p 6175+00 -. _� 100 100 'AREA FILL' i0.0 SIF o AREA CUT: 7.0 SF l �_ z_ z 95 95 N � tri - v -� w; m x m 90 W w •E� w W '�I I> 4 85 85to o — — _ 80 .�. __ _ - '---- Bo TOP SUBCRAD1i - _I` _�-- P - — 75 75 — s RA TO ALL 0 ACCESS �1 TURNOU PAD _ - 70 70 EXIST[.JG GROUND -J PROPOSE 36" CMP - 65 65 60ivARQ LEADS NOT IN ICONTRACT - SEE 1NT.RMODAL P AN FOR TAIL _ 120 110 100 90 BO 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 170 -6D 6174+00 w, ti N N - -- 100 i; 100 lY IS s -- iC3 UBGRAO � AREA FILL AREA CUT 142.7 SF 4,1 SF T — e J w _+' - 95 `° 95 100 95 90 85 80 75 70 65 6020 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -1�p 6175+00 -. _� 100 100 'AREA FILL' i0.0 SIF o AREA CUT: 7.0 SF l �_ z_ z 95 95 N � tri - v -� w; m x m 90 W w •E� w W '�I I> 4 85 85to o — — _ 80 .�. __ _ - '---- Bo TOP SUBCRAD1i - _I` _�-- P - — 75 75 — s RA TO ALL 0 ACCESS �1 TURNOU PAD _ - 70 70 EXIST[.JG GROUND -J PROPOSE 36" CMP - 65 65 60ivARQ LEADS NOT IN ICONTRACT - SEE 1NT.RMODAL P AN FOR TAIL _ 120 110 100 90 BO 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 170 -6D 6174+00 w, ti N N - -- 100 i; 100 — s E AREA FILL AREA CUT 142.7 SF 4,1 SF w _+' - 95 `° 95 90 90 W tIJ iJ Ir 1 W. 1 r x ,� 85 85 � � �a.^ 80— o BO o v / TOP SUBGRA \ N s — — — — — 75 75 — - — 70 70 X - NG - - — -- 65 - - - - 65 YARD LEAS NOT IN CONTRACT -SEE INTERMODAL PLAN FOR DETAIL F 60 120 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -180p aw 617,3+00 10° 0 10' zo' � 1 WHERE R/W LIMITS NOT SHOWN GRAPHIC SCALE: ill- 10' SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS DESIGNED By ENGINEERING DEPARTMENT VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK uim,rtns. wyry tMa'- D MONTAcuE CSX TRANSPORTATION INC. DESIGN & CONSTRUCTION CROSS SECTIONS PRAWN BY r}Raw1Nc Na. g °°I°'�^�°�°^ D. MONTAGUE JACKSONVILLE FLORIDA RX -09 EMT16175+00 TO EMT16173+00 anti .rain ,Nr waw+w Iinasoi5`w+rlu�9'w,•°p CHECREO BY N.ORTEGA REVISION SHEET NO. Feet- M Yell rot M wa,�«Y�.w.,ro, APPR04£U D r V00090 61 OF 1B8 SUBS NORTH END DIVA FLORENCE � NOT FOR CONTmucnoDATE °IMIMCSM T�eM CAMAS � � SCALE AS SHOWN ROCKY MOUNT, EDGECOMBE COUNTY, NC a a - - REV DATE DESCit�PTigN APP JANUARY 19.2017 C100 ti 100 x T? — _ _ , .� _ AREA FILL 0.0 SF AREA CUT 24.2 SF N 95 95 i 90 - ep x rn-' T. Q 85 d Z w W o, 90 85 80 80 TOP OF SUBGRAD , ~ 75 _ _ — - .5 75 70 x 70 EXIS'ING GROU D� � 65 , - - — - 65 0 60 YARD LEAS NOT IN ICONTRACT - SEE INT:RMODAL P AN FOR D TAIL 120 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 T -30 -40 -50 -60 -70 80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -T80 a 6172-1-00 0 U O Q R N Q LO O 100 0 95 v 90 0 U X BS U) U c3 rn 80 w 75 C c Li 70 u, v 65 E 0 60 100 95 90 85 80 75 70 65 60 c 14 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -180 H Z � ? AREA FILL' 129.9 SF4TOP01- 6171-00 0 J Q AREA CUT: 14.1 SF o 0 100 AREA FILL V24.9 SF - - — - 1 — - c�11/'�BGRAD - 100 E AREA CUT: 'i.3 SF�a i °u 95' -- — - -- - 95 0 90 �_ 90 a3 �'- o B5 Q - 85 j �a� 80 !� 80 TOP OF SUBGRADE pl) rn 75 75 ° - — — 70 EXIS INC GROLI) 70 65 YARD LEA SNOT IN CONTRACT F- SEE PLAN FOR DETAIL 60120 110 100 90 _INT 80 70 60 50 40 30 20 _ 0 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140-150 -160 -170 fi0 -180 6170.00 WHERE R/W LIMITS NOT SHOWN 10 0 10' 20 aw O SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS GRAPHIC SCALE: V = 10' ww J nro m'rim our o-nri'i npe, ww- �� n� DESTGREO BY D. MONTACUE ENGINEERING DEPARTMENT CSx TRANSPORTATION, INC. DESIGN & CONSTRUCTION VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS - DRAWN 9Y D. MONTAGUE DRAWING W y~i W imri rurni-nw rw-vi to .Mi rmx,m rM or'wny o/ iM CSN frmwwrarlon JACKSONVILLE, FLORIDA No. RX -10 EMT1 6172+00 TO EMT1 6170+00 - CHECKED 9Y C w W 0.11 w Mia cm- lfm 1eiioM.Miinoree —1' 4eny'er'w-nor irn rM csx rronwo<renm "III r...*,H N,ORT �/OOOQO SUB: NORTH END DIV: FLORENCE 1 REVISION SNEE7 NO, 62 OF �s8 " w - APPROVED Y M. CANAS a J EXISTNG GROUT D ROCKY MOUNT, EDGECOMBE COUNTY, NC DAZE JANUARY 19.2017 SCALE AS SHOWN REV DATE I DESCRIPTION B. APP YARD LEA -S NOT IN CONTRACT SEE INT RMODAL q,AN FORD TAIL 100 95 90 85 80 75 70 65 60 c 14 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 -160 -170 -180 6171-00 0 J Q o 0 100 AREA FILL V24.9 SF - - — - 1 — - - 100 E AREA CUT: 'i.3 SF�a i °u 95' -- — - -- - 95 0 90 �_ 90 a3 �'- o B5 Q - 85 j �a� 80 !� 80 TOP OF SUBGRADE pl) rn 75 75 ° - — — 70 EXIS INC GROLI) 70 65 YARD LEA SNOT IN CONTRACT F- SEE PLAN FOR DETAIL 60120 110 100 90 _INT 80 70 60 50 40 30 20 _ 0 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140-150 -160 -170 fi0 -180 6170.00 WHERE R/W LIMITS NOT SHOWN 10 0 10' 20 aw O SEE PLAN AND PROFILE SHEETS FOR R/W LIMITS GRAPHIC SCALE: V = 10' ww J nro m'rim our o-nri'i npe, ww- �� n� DESTGREO BY D. MONTACUE ENGINEERING DEPARTMENT CSx TRANSPORTATION, INC. DESIGN & CONSTRUCTION VAL. SEC. CONTRACT NO. CCX TERMINAL ROCKY MOUNT MAIN TRACK CROSS SECTIONS - DRAWN 9Y D. MONTAGUE DRAWING W y~i W imri rurni-nw rw-vi to .Mi rmx,m rM or'wny o/ iM CSN frmwwrarlon JACKSONVILLE, FLORIDA No. RX -10 EMT1 6172+00 TO EMT1 6170+00 - CHECKED 9Y C w W 0.11 w Mia cm- lfm 1eiioM.Miinoree —1' 4eny'er'w-nor irn rM csx rronwo<renm "III r...*,H N,ORT �/OOOQO SUB: NORTH END DIV: FLORENCE 1 REVISION SNEE7 NO, 62 OF �s8 " w - APPROVED Y M. CANAS a J ROCKY MOUNT, EDGECOMBE COUNTY, NC DAZE JANUARY 19.2017 SCALE AS SHOWN REV DATE I DESCRIPTION B. APP