Loading...
HomeMy WebLinkAbout20170864 Ver 1_Copy of R5752Wetland ImpactSummarySheet_20170802WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPA T URFA E WATER IMPA T Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 33+66 - 37+15 L ROADWAY FILL 0.040 0.130 0.110 17.000 10.000 2 38+64 - 45+49-L-LT RAMP B NEW LOC. 30" RCP 110.000 50.000 RELOCATED DITCH 351.000 3 52+88 56+45-L-LT ROADWAY FILL - PIPE 145.000 70.000 4 61+78 - 68+76-L-LT RAMP A NEW LOCATION FILL 0.320 0.140 78.000 44.000 5 63+70 - 83+84 -L-RT RAMP D&-L- ROADWAY FILL 0.840 0.470 TOTALS*: 1.210 0.130 0.710 701.000 174.000 0.000 *Rounded totals are sum of actual impacts NOTES: Revised 2016 09 09 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLANDIMPACTS SURFACE WATERIMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (tt) (tt) (tt) 1 33+66 - 37+15 L ROADWAY FILL 0.040 0.130 0.110 17.000 10.000 2 38+64 - 45+49-L-LT RAMP B NEW LOC. 30" RCP 110.000 50.000 RELOCATED DITCH 351.000 3 52+88 56+45-L-LT ROADWAY FILL - PIPE 145.000 70.000 4 61+7g - 68+76-L-LT RAMP A NEW LOCATION FILL 0.320 0.140 78.000 44.000 5 63+70 - 83+84 -L-RT RAMP D&-L- ROADWAY FILL 0.840 0.470 TOTALS": 1.210 0.130 0.710 701.000 174.000 0.000 `Rounded totals are sum of actual impacts NOTES: �